Login
[x]
Log in using an account from:
Fedora Account System
Red Hat Associate
Red Hat Customer
Or login using a Red Hat Bugzilla account
Forgot Password
Login:
Hide Forgot
Create an Account
Red Hat Bugzilla – Attachment 1441688 Details for
Bug 1531158
mkisofs crashed at the end when burning a Blue-Ray
[?]
New
Simple Search
Advanced Search
My Links
Browse
Requests
Reports
Current State
Search
Tabular reports
Graphical reports
Duplicates
Other Reports
User Changes
Plotly Reports
Bug Status
Bug Severity
Non-Defaults
|
Product Dashboard
Help
Page Help!
Bug Writing Guidelines
What's new
Browser Support Policy
5.0.4.rh83 Release notes
FAQ
Guides index
User guide
Web Services
Contact
Legal
This site requires JavaScript to be enabled to function correctly, please enable it.
New logfile
log2.log (text/plain), 1.28 MB, created by
Peter
on 2018-05-25 18:40:58 UTC
(
hide
)
Description:
New logfile
Filename:
MIME Type:
Creator:
Peter
Created:
2018-05-25 18:40:58 UTC
Size:
1.28 MB
patch
obsolete
>Burned media >----------------------- >BD-R sequenziell (SRM) > >Devices >----------------------- >BUFFALO Optical Drive 1.00 (/dev/sr0, CD-R, CD-RW, CD-ROM, DVD-ROM, DVD-R, DVD-RW, DVD-R doppelschichtig, BD-CD-ROM, BD-CD-R, BD-CD-R, DVD+R, DVD+RW, DVD+R doppelschichtig) [DVD-ROM, DVD-R sequenziell, Zweischichtige DVD-R sequenziell, Zweischicht-DVD-R-Sprung, DVD-RAM, DVD-RW Eingeschränktes Ãberbrennen, DVD-RW sequenziell, DVD+RW, DVD+R, Zweischichtige DVD+R, CD-ROM, CD-R, CD-RW, BD-CD-ROM, BD-R sequenziell (SRM), BD-R Zufällig (RRM), BD-CD-R] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R16, RAW/R96P, RAW/R96R, Eingeschränktes Ãberbrennen, Sprung zwischen DVD-Schichten, Zufällige Aufnahme, Sequenzielle Aufnahme, Sequenzielle Aufnahme + POW] [%7] > >K3b::IsoImager >----------------------- >mkisofs print size result: 12207613 (25001191424 bytes) > >System >----------------------- >K3b Version: 17.12.3 >KDE Version: 5.44.0 >Qt Version: 5.10.1 >Kernel: 4.16.10-300.fc28.x86_64 > >Used versions >----------------------- >mkisofs: 1.1.11 >growisofs: 7.1 > >growisofs >----------------------- >Executing 'builtin_dd if=/dev/fd/0 of=/dev/sr0 obs=32k seek=0' >/dev/sr0: pre-formatting blank BD-R for 24.8GB... >/dev/sr0: "Current Write Speed" is 4.1x4390KBps. > 20348928/25001191424 ( 0.1%) @0.8x, remaining 143:13 RBU 100.0% UBU 3.1% > 32374784/25001191424 ( 0.1%) @0.8x, remaining 128:32 RBU 100.0% UBU 96.9% > 44793856/25001191424 ( 0.2%) @0.8x, remaining 120:42 RBU 100.0% UBU 96.9% > 57212928/25001191424 ( 0.2%) @0.8x, remaining 123:31 RBU 100.0% UBU 96.9% > 69992448/25001191424 ( 0.3%) @0.9x, remaining 118:43 RBU 100.0% UBU 96.9% > 82771968/25001191424 ( 0.3%) @0.9x, remaining 115:24 RBU 99.0% UBU 96.9% > 95551488/25001191424 ( 0.4%) @0.9x, remaining 117:17 RBU 100.0% UBU 96.9% > 107282432/25001191424 ( 0.4%) @0.8x, remaining 116:01 RBU 100.0% UBU 96.9% > 120127488/25001191424 ( 0.5%) @0.9x, remaining 113:55 RBU 100.0% UBU 96.9% > 132972544/25001191424 ( 0.5%) @0.9x, remaining 115:19 RBU 100.0% UBU 96.9% > 144900096/25001191424 ( 0.6%) @0.8x, remaining 114:21 RBU 100.0% UBU 96.9% > 157745152/25001191424 ( 0.6%) @0.9x, remaining 112:52 RBU 100.0% UBU 96.9% > 170590208/25001191424 ( 0.7%) @0.9x, remaining 114:01 RBU 100.0% UBU 96.9% > 182943744/25001191424 ( 0.7%) @0.8x, remaining 113:03 RBU 100.0% UBU 96.9% > 196280320/25001191424 ( 0.8%) @0.9x, remaining 111:37 RBU 100.0% UBU 96.9% > 209125376/25001191424 ( 0.8%) @0.9x, remaining 112:37 RBU 100.0% UBU 96.9% > 221413376/25001191424 ( 0.9%) @0.8x, remaining 111:54 RBU 100.0% UBU 96.9% > 234815488/25001191424 ( 0.9%) @0.9x, remaining 110:44 RBU 100.0% UBU 96.9% > 247660544/25001191424 ( 1.0%) @0.9x, remaining 111:36 RBU 100.0% UBU 96.9% > 259588096/25001191424 ( 1.0%) @0.8x, remaining 111:11 RBU 100.0% UBU 96.9% > 272891904/25001191424 ( 1.1%) @0.9x, remaining 110:14 RBU 100.0% UBU 96.9% > 286195712/25001191424 ( 1.1%) @0.9x, remaining 110:49 RBU 100.0% UBU 96.9% > 299040768/25001191424 ( 1.2%) @0.9x, remaining 110:08 RBU 100.0% UBU 96.9% > 311885824/25001191424 ( 1.2%) @0.9x, remaining 109:30 RBU 100.0% UBU 96.9% > 324730880/25001191424 ( 1.3%) @0.9x, remaining 110:11 RBU 100.0% UBU 96.9% > 337379328/25001191424 ( 1.3%) @0.8x, remaining 109:39 RBU 100.0% UBU 96.9% > 350420992/25001191424 ( 1.4%) @0.9x, remaining 109:02 RBU 100.0% UBU 96.9% > 363266048/25001191424 ( 1.5%) @0.9x, remaining 109:38 RBU 100.0% UBU 96.9% > 375193600/25001191424 ( 1.5%) @0.8x, remaining 109:23 RBU 100.0% UBU 96.9% > 388366336/25001191424 ( 1.6%) @0.9x, remaining 109:51 RBU 100.0% UBU 96.9% > 401539072/25001191424 ( 1.6%) @0.9x, remaining 109:15 RBU 100.0% UBU 96.9% > 414646272/25001191424 ( 1.7%) @0.9x, remaining 108:42 RBU 100.0% UBU 96.9% > 427491328/25001191424 ( 1.7%) @0.9x, remaining 109:13 RBU 100.0% UBU 96.9% > 440336384/25001191424 ( 1.8%) @0.9x, remaining 108:45 RBU 100.0% UBU 96.9% > 452263936/25001191424 ( 1.8%) @0.8x, remaining 108:33 RBU 100.0% UBU 96.9% > 465174528/25001191424 ( 1.9%) @0.9x, remaining 109:00 RBU 100.0% UBU 96.9% > 478150656/25001191424 ( 1.9%) @0.9x, remaining 108:33 RBU 100.0% UBU 96.9% > 490733568/25001191424 ( 2.0%) @0.8x, remaining 108:13 RBU 100.0% UBU 96.9% > 503644160/25001191424 ( 2.0%) @0.9x, remaining 108:37 RBU 100.0% UBU 96.9% > 516489216/25001191424 ( 2.1%) @0.9x, remaining 108:14 RBU 100.0% UBU 96.9% > 529334272/25001191424 ( 2.1%) @0.9x, remaining 107:52 RBU 100.0% UBU 96.9% > 542179328/25001191424 ( 2.2%) @0.9x, remaining 108:16 RBU 100.0% UBU 96.9% > 555024384/25001191424 ( 2.2%) @0.9x, remaining 107:54 RBU 100.0% UBU 96.9% > 566951936/25001191424 ( 2.3%) @0.8x, remaining 107:44 RBU 100.0% UBU 96.9% > 579796992/25001191424 ( 2.3%) @0.9x, remaining 108:06 RBU 100.0% UBU 96.9% > 592642048/25001191424 ( 2.4%) @0.9x, remaining 107:46 RBU 100.0% UBU 96.9% > 604602368/25001191424 ( 2.4%) @0.8x, remaining 107:36 RBU 100.0% UBU 96.9% > 617414656/25001191424 ( 2.5%) @0.9x, remaining 107:56 RBU 100.0% UBU 96.9% > 630259712/25001191424 ( 2.5%) @0.9x, remaining 107:37 RBU 100.0% UBU 96.9% > 642187264/25001191424 ( 2.6%) @0.8x, remaining 107:28 RBU 100.0% UBU 96.9% > 655032320/25001191424 ( 2.6%) @0.9x, remaining 107:47 RBU 100.0% UBU 96.9% > 667877376/25001191424 ( 2.7%) @0.9x, remaining 107:28 RBU 100.0% UBU 96.9% > 679804928/25001191424 ( 2.7%) @0.8x, remaining 107:19 RBU 100.0% UBU 96.9% > 692322304/25001191424 ( 2.8%) @0.8x, remaining 107:40 RBU 100.0% UBU 96.9% > 704708608/25001191424 ( 2.8%) @0.8x, remaining 107:27 RBU 100.0% UBU 96.9% > 716505088/25001191424 ( 2.9%) @0.8x, remaining 107:19 RBU 100.0% UBU 96.9% > 729088000/25001191424 ( 2.9%) @0.8x, remaining 107:38 RBU 100.0% UBU 96.9% > 741703680/25001191424 ( 3.0%) @0.8x, remaining 107:23 RBU 100.0% UBU 96.9% > 754122752/25001191424 ( 3.0%) @0.8x, remaining 107:10 RBU 100.0% UBU 96.9% > 766050304/25001191424 ( 3.1%) @0.8x, remaining 107:33 RBU 100.0% UBU 96.9% > 778895360/25001191424 ( 3.1%) @0.9x, remaining 107:17 RBU 100.0% UBU 96.9% > 790822912/25001191424 ( 3.2%) @0.8x, remaining 107:08 RBU 100.0% UBU 96.9% > 803667968/25001191424 ( 3.2%) @0.9x, remaining 107:23 RBU 100.0% UBU 96.9% > 816513024/25001191424 ( 3.3%) @0.9x, remaining 107:07 RBU 100.0% UBU 96.9% > 828440576/25001191424 ( 3.3%) @0.8x, remaining 106:59 RBU 100.0% UBU 96.9% > 841285632/25001191424 ( 3.4%) @0.9x, remaining 107:12 RBU 100.0% UBU 96.9% > 854130688/25001191424 ( 3.4%) @0.9x, remaining 106:57 RBU 100.0% UBU 96.9% > 866648064/25001191424 ( 3.5%) @0.8x, remaining 106:45 RBU 100.0% UBU 96.9% > 879034368/25001191424 ( 3.5%) @0.8x, remaining 107:01 RBU 100.0% UBU 96.9% > 891748352/25001191424 ( 3.6%) @0.8x, remaining 106:47 RBU 100.0% UBU 96.9% > 904593408/25001191424 ( 3.6%) @0.9x, remaining 106:33 RBU 100.0% UBU 96.9% > 917372928/25001191424 ( 3.7%) @0.9x, remaining 106:45 RBU 100.0% UBU 96.9% > 930611200/25001191424 ( 3.7%) @0.9x, remaining 106:28 RBU 100.0% UBU 96.9% > 942309376/25001191424 ( 3.8%) @0.8x, remaining 106:22 RBU 100.0% UBU 96.9% > 955318272/25001191424 ( 3.8%) @0.9x, remaining 106:33 RBU 100.0% UBU 96.9% > 968097792/25001191424 ( 3.9%) @0.9x, remaining 106:20 RBU 100.0% UBU 96.9% > 980877312/25001191424 ( 3.9%) @0.9x, remaining 106:07 RBU 100.0% UBU 96.9% > 993820672/25001191424 ( 4.0%) @0.9x, remaining 106:17 RBU 100.0% UBU 96.9% > 1006960640/25001191424 ( 4.0%) @0.9x, remaining 106:02 RBU 100.0% UBU 96.9% > 1020067840/25001191424 ( 4.1%) @0.9x, remaining 105:47 RBU 100.0% UBU 96.9% > 1032847360/25001191424 ( 4.1%) @0.9x, remaining 105:58 RBU 100.0% UBU 96.9% > 1045626880/25001191424 ( 4.2%) @0.9x, remaining 105:46 RBU 100.0% UBU 96.9% > 1058406400/25001191424 ( 4.2%) @0.9x, remaining 105:34 RBU 100.0% UBU 96.9% > 1071185920/25001191424 ( 4.3%) @0.9x, remaining 105:44 RBU 100.0% UBU 96.9% > 1084162048/25001191424 ( 4.3%) @0.9x, remaining 105:31 RBU 100.0% UBU 96.9% > 1097170944/25001191424 ( 4.4%) @0.9x, remaining 105:18 RBU 99.9% UBU 96.9% > 1109065728/25001191424 ( 4.4%) @0.8x, remaining 105:33 RBU 94.7% UBU 96.9% > 1122041856/25001191424 ( 4.5%) @0.9x, remaining 105:20 RBU 100.0% UBU 96.9% > 1135017984/25001191424 ( 4.5%) @0.9x, remaining 105:08 RBU 100.0% UBU 96.9% > 1147863040/25001191424 ( 4.6%) @0.9x, remaining 105:17 RBU 100.0% UBU 96.9% > 1160642560/25001191424 ( 4.6%) @0.9x, remaining 105:06 RBU 100.0% UBU 96.9% > 1173422080/25001191424 ( 4.7%) @0.9x, remaining 104:54 RBU 100.0% UBU 96.9% > 1186201600/25001191424 ( 4.7%) @0.9x, remaining 105:04 RBU 100.0% UBU 96.9% > 1198981120/25001191424 ( 4.8%) @0.9x, remaining 104:53 RBU 100.0% UBU 96.9% > 1211760640/25001191424 ( 4.8%) @0.9x, remaining 104:42 RBU 100.0% UBU 96.9% > 1224540160/25001191424 ( 4.9%) @0.9x, remaining 104:51 RBU 100.0% UBU 96.9% > 1237319680/25001191424 ( 4.9%) @0.9x, remaining 104:40 RBU 100.0% UBU 96.9% > 1250099200/25001191424 ( 5.0%) @0.9x, remaining 104:29 RBU 100.0% UBU 96.9% > 1262878720/25001191424 ( 5.1%) @0.9x, remaining 104:38 RBU 100.0% UBU 96.9% > 1275658240/25001191424 ( 5.1%) @0.9x, remaining 104:27 RBU 100.0% UBU 96.9% > 1288437760/25001191424 ( 5.2%) @0.9x, remaining 104:17 RBU 100.0% UBU 96.9% > 1301217280/25001191424 ( 5.2%) @0.9x, remaining 104:25 RBU 100.0% UBU 96.9% > 1313996800/25001191424 ( 5.3%) @0.9x, remaining 104:15 RBU 100.0% UBU 96.9% > 1326776320/25001191424 ( 5.3%) @0.9x, remaining 104:05 RBU 100.0% UBU 96.9% > 1339555840/25001191424 ( 5.4%) @0.9x, remaining 104:12 RBU 100.0% UBU 96.9% > 1352335360/25001191424 ( 5.4%) @0.9x, remaining 104:03 RBU 100.0% UBU 96.9% > 1365114880/25001191424 ( 5.5%) @0.9x, remaining 103:53 RBU 100.0% UBU 96.9% > 1377763328/25001191424 ( 5.5%) @0.8x, remaining 104:01 RBU 100.0% UBU 96.9% > 1390346240/25001191424 ( 5.6%) @0.8x, remaining 103:52 RBU 100.0% UBU 96.9% > 1402929152/25001191424 ( 5.6%) @0.8x, remaining 103:43 RBU 100.0% UBU 96.9% > 1415512064/25001191424 ( 5.7%) @0.8x, remaining 103:51 RBU 99.9% UBU 96.9% > 1428160512/25001191424 ( 5.7%) @0.8x, remaining 103:42 RBU 100.0% UBU 96.9% > 1440940032/25001191424 ( 5.8%) @0.9x, remaining 103:33 RBU 100.0% UBU 96.9% > 1453719552/25001191424 ( 5.8%) @0.9x, remaining 103:40 RBU 100.0% UBU 96.9% > 1466499072/25001191424 ( 5.9%) @0.9x, remaining 103:30 RBU 100.0% UBU 96.9% > 1479278592/25001191424 ( 5.9%) @0.9x, remaining 103:21 RBU 100.0% UBU 96.9% > 1491795968/25001191424 ( 6.0%) @0.8x, remaining 103:29 RBU 100.0% UBU 96.9% > 1504247808/25001191424 ( 6.0%) @0.8x, remaining 103:21 RBU 100.0% UBU 96.9% > 1516765184/25001191424 ( 6.1%) @0.8x, remaining 103:13 RBU 100.0% UBU 96.9% > 1529544704/25001191424 ( 6.1%) @0.9x, remaining 103:19 RBU 100.0% UBU 96.9% > 1542094848/25001191424 ( 6.2%) @0.8x, remaining 103:11 RBU 100.0% UBU 96.9% > 1554448384/25001191424 ( 6.2%) @0.8x, remaining 103:04 RBU 100.0% UBU 96.9% > 1567424512/25001191424 ( 6.3%) @0.9x, remaining 103:09 RBU 100.0% UBU 96.9% > 1580466176/25001191424 ( 6.3%) @0.9x, remaining 102:59 RBU 100.0% UBU 96.9% > 1593114624/25001191424 ( 6.4%) @0.8x, remaining 102:51 RBU 100.0% UBU 96.9% > 1604911104/25001191424 ( 6.4%) @0.8x, remaining 103:01 RBU 100.0% UBU 96.9% > 1617887232/25001191424 ( 6.5%) @0.9x, remaining 102:51 RBU 100.0% UBU 96.9% > 1630732288/25001191424 ( 6.5%) @0.9x, remaining 102:42 RBU 100.0% UBU 96.9% > 1643577344/25001191424 ( 6.6%) @0.9x, remaining 102:47 RBU 100.0% UBU 96.9% > 1656881152/25001191424 ( 6.6%) @0.9x, remaining 102:37 RBU 100.0% UBU 96.9% > 1670184960/25001191424 ( 6.7%) @0.9x, remaining 102:26 RBU 100.0% UBU 96.9% > 1683030016/25001191424 ( 6.7%) @0.9x, remaining 102:31 RBU 100.0% UBU 96.9% > 1696071680/25001191424 ( 6.8%) @0.9x, remaining 102:22 RBU 100.0% UBU 96.9% > 1709539328/25001191424 ( 6.8%) @0.9x, remaining 102:11 RBU 100.0% UBU 96.9% > 1722482688/25001191424 ( 6.9%) @0.9x, remaining 102:15 RBU 100.0% UBU 96.9% > 1735327744/25001191424 ( 6.9%) @0.9x, remaining 102:07 RBU 100.0% UBU 96.9% > 1748533248/25001191424 ( 7.0%) @0.9x, remaining 101:57 RBU 100.0% UBU 96.9% > 1761935360/25001191424 ( 7.0%) @0.9x, remaining 101:59 RBU 100.0% UBU 96.9% > 1774780416/25001191424 ( 7.1%) @0.9x, remaining 101:51 RBU 100.0% UBU 96.9% > 1787625472/25001191424 ( 7.2%) @0.9x, remaining 101:56 RBU 100.0% UBU 96.9% > 1800732672/25001191424 ( 7.2%) @0.9x, remaining 101:46 RBU 100.0% UBU 96.9% > 1814036480/25001191424 ( 7.3%) @0.9x, remaining 101:37 RBU 100.0% UBU 96.9% > 1827078144/25001191424 ( 7.3%) @0.9x, remaining 101:40 RBU 100.0% UBU 96.9% > 1839923200/25001191424 ( 7.4%) @0.9x, remaining 101:32 RBU 100.0% UBU 96.9% > 1852768256/25001191424 ( 7.4%) @0.9x, remaining 101:24 RBU 100.0% UBU 96.9% > 1865875456/25001191424 ( 7.5%) @0.9x, remaining 101:27 RBU 100.0% UBU 96.9% > 1879113728/25001191424 ( 7.5%) @0.9x, remaining 101:18 RBU 100.0% UBU 96.9% > 1892220928/25001191424 ( 7.6%) @0.9x, remaining 101:09 RBU 100.0% UBU 96.9% > 1905065984/25001191424 ( 7.6%) @0.9x, remaining 101:13 RBU 100.0% UBU 96.9% > 1917911040/25001191424 ( 7.7%) @0.9x, remaining 101:05 RBU 100.0% UBU 96.9% > 1930756096/25001191424 ( 7.7%) @0.9x, remaining 100:58 RBU 100.0% UBU 96.9% > 1943797760/25001191424 ( 7.8%) @0.9x, remaining 101:01 RBU 100.0% UBU 96.9% > 1956937728/25001191424 ( 7.8%) @0.9x, remaining 100:52 RBU 100.0% UBU 96.9% > 1970077696/25001191424 ( 7.9%) @0.9x, remaining 100:43 RBU 100.0% UBU 96.9% > 1983053824/25001191424 ( 7.9%) @0.9x, remaining 100:47 RBU 100.0% UBU 96.9% > 1995898880/25001191424 ( 8.0%) @0.9x, remaining 100:39 RBU 100.0% UBU 96.9% > 2008743936/25001191424 ( 8.0%) @0.9x, remaining 100:32 RBU 100.0% UBU 96.9% > 2021588992/25001191424 ( 8.1%) @0.9x, remaining 100:35 RBU 100.0% UBU 96.9% > 2034434048/25001191424 ( 8.1%) @0.9x, remaining 100:28 RBU 100.0% UBU 96.9% > 2047279104/25001191424 ( 8.2%) @0.9x, remaining 100:20 RBU 100.0% UBU 96.9% > 2060255232/25001191424 ( 8.2%) @0.9x, remaining 100:24 RBU 100.0% UBU 96.9% > 2073296896/25001191424 ( 8.3%) @0.9x, remaining 100:15 RBU 100.0% UBU 96.9% > 2086273024/25001191424 ( 8.3%) @0.9x, remaining 100:08 RBU 100.0% UBU 96.9% > 2099249152/25001191424 ( 8.4%) @0.9x, remaining 100:11 RBU 100.0% UBU 96.9% > 2112225280/25001191424 ( 8.4%) @0.9x, remaining 100:03 RBU 99.9% UBU 96.9% > 2124152832/25001191424 ( 8.5%) @0.8x, remaining 99:58 RBU 99.9% UBU 96.9% > 2137063424/25001191424 ( 8.5%) @0.9x, remaining 100:02 RBU 100.0% UBU 96.9% > 2149974016/25001191424 ( 8.6%) @0.9x, remaining 99:54 RBU 100.0% UBU 96.9% > 2162851840/25001191424 ( 8.7%) @0.9x, remaining 99:47 RBU 100.0% UBU 96.9% > 2175729664/25001191424 ( 8.7%) @0.9x, remaining 99:50 RBU 100.0% UBU 96.9% > 2188574720/25001191424 ( 8.8%) @0.9x, remaining 99:43 RBU 100.0% UBU 96.9% > 2201419776/25001191424 ( 8.8%) @0.9x, remaining 99:35 RBU 100.0% UBU 96.9% > 2213445632/25001191424 ( 8.9%) @0.8x, remaining 99:41 RBU 100.0% UBU 96.9% > 2226257920/25001191424 ( 8.9%) @0.9x, remaining 99:34 RBU 100.0% UBU 96.9% > 2239070208/25001191424 ( 9.0%) @0.9x, remaining 99:27 RBU 100.0% UBU 96.9% > 2251882496/25001191424 ( 9.0%) @0.9x, remaining 99:30 RBU 100.0% UBU 96.9% > 2264727552/25001191424 ( 9.1%) @0.9x, remaining 99:23 RBU 100.0% UBU 96.9% > 2277572608/25001191424 ( 9.1%) @0.9x, remaining 99:16 RBU 100.0% UBU 96.9% > 2289500160/25001191424 ( 9.2%) @0.8x, remaining 99:21 RBU 100.0% UBU 96.9% > 2302345216/25001191424 ( 9.2%) @0.9x, remaining 99:14 RBU 100.0% UBU 96.9% > 2315190272/25001191424 ( 9.3%) @0.9x, remaining 99:07 RBU 100.0% UBU 96.9% > 2328035328/25001191424 ( 9.3%) @0.9x, remaining 99:10 RBU 100.0% UBU 96.9% > 2339045376/25001191424 ( 9.4%) @0.7x, remaining 99:08 RBU 100.0% UBU 96.9% > 2351890432/25001191424 ( 9.4%) @0.9x, remaining 99:01 RBU 100.0% UBU 96.9% > 2364735488/25001191424 ( 9.5%) @0.9x, remaining 99:04 RBU 100.0% UBU 96.9% > 2377580544/25001191424 ( 9.5%) @0.9x, remaining 98:57 RBU 100.0% UBU 96.9% > 2390294528/25001191424 ( 9.6%) @0.8x, remaining 98:51 RBU 100.0% UBU 96.9% > 2402942976/25001191424 ( 9.6%) @0.8x, remaining 98:54 RBU 100.0% UBU 96.9% > 2415525888/25001191424 ( 9.7%) @0.8x, remaining 98:48 RBU 100.0% UBU 96.9% > 2428108800/25001191424 ( 9.7%) @0.8x, remaining 98:41 RBU 99.9% UBU 96.9% > 2440888320/25001191424 ( 9.8%) @0.9x, remaining 98:44 RBU 100.0% UBU 96.9% > 2453733376/25001191424 ( 9.8%) @0.9x, remaining 98:37 RBU 100.0% UBU 96.9% > 2466578432/25001191424 ( 9.9%) @0.9x, remaining 98:30 RBU 100.0% UBU 96.9% > 2479423488/25001191424 ( 9.9%) @0.9x, remaining 98:33 RBU 100.0% UBU 96.9% > 2492071936/25001191424 (10.0%) @0.8x, remaining 98:27 RBU 100.0% UBU 96.9% > 2504589312/25001191424 (10.0%) @0.8x, remaining 98:21 RBU 100.0% UBU 96.9% > 2517041152/25001191424 (10.1%) @0.8x, remaining 98:24 RBU 100.0% UBU 96.9% > 2529886208/25001191424 (10.1%) @0.9x, remaining 98:17 RBU 100.0% UBU 96.9% > 2542731264/25001191424 (10.2%) @0.9x, remaining 98:11 RBU 100.0% UBU 96.9% > 2555576320/25001191424 (10.2%) @0.9x, remaining 98:13 RBU 100.0% UBU 96.9% > 2568126464/25001191424 (10.3%) @0.8x, remaining 98:07 RBU 100.0% UBU 96.9% > 2580512768/25001191424 (10.3%) @0.8x, remaining 98:02 RBU 100.0% UBU 96.9% > 2593193984/25001191424 (10.4%) @0.8x, remaining 98:04 RBU 100.0% UBU 96.9% > 2606039040/25001191424 (10.4%) @0.9x, remaining 97:57 RBU 100.0% UBU 96.9% > 2618884096/25001191424 (10.5%) @0.9x, remaining 97:51 RBU 100.0% UBU 96.9% > 2631270400/25001191424 (10.5%) @0.8x, remaining 97:54 RBU 100.0% UBU 96.9% > 2642739200/25001191424 (10.6%) @0.8x, remaining 97:51 RBU 100.0% UBU 96.9% > 2655584256/25001191424 (10.6%) @0.9x, remaining 97:44 RBU 100.0% UBU 96.9% > 2668429312/25001191424 (10.7%) @0.9x, remaining 97:46 RBU 100.0% UBU 96.9% > 2680815616/25001191424 (10.7%) @0.8x, remaining 97:41 RBU 100.0% UBU 96.9% > 2693201920/25001191424 (10.8%) @0.8x, remaining 97:36 RBU 100.0% UBU 96.9% > 2706046976/25001191424 (10.8%) @0.9x, remaining 97:37 RBU 100.0% UBU 96.9% > 2718892032/25001191424 (10.9%) @0.9x, remaining 97:31 RBU 100.0% UBU 96.9% > 2731147264/25001191424 (10.9%) @0.8x, remaining 97:26 RBU 100.0% UBU 96.9% > 2743664640/25001191424 (11.0%) @0.8x, remaining 97:28 RBU 100.0% UBU 96.9% > 2756509696/25001191424 (11.0%) @0.9x, remaining 97:22 RBU 100.0% UBU 96.9% > 2769158144/25001191424 (11.1%) @0.8x, remaining 97:16 RBU 100.0% UBU 96.9% > 2781937664/25001191424 (11.1%) @0.9x, remaining 97:18 RBU 100.0% UBU 96.9% > 2793865216/25001191424 (11.2%) @0.8x, remaining 97:14 RBU 100.0% UBU 96.9% > 2806644736/25001191424 (11.2%) @0.9x, remaining 97:08 RBU 100.0% UBU 96.9% > 2819555328/25001191424 (11.3%) @0.9x, remaining 97:09 RBU 100.0% UBU 96.9% > 2832859136/25001191424 (11.3%) @0.9x, remaining 97:02 RBU 100.0% UBU 96.9% > 2845835264/25001191424 (11.4%) @0.9x, remaining 96:55 RBU 100.0% UBU 96.9% > 2858614784/25001191424 (11.4%) @0.9x, remaining 96:57 RBU 100.0% UBU 96.9% > 2871492608/25001191424 (11.5%) @0.9x, remaining 96:50 RBU 100.0% UBU 96.9% > 2884763648/25001191424 (11.5%) @0.9x, remaining 96:43 RBU 100.0% UBU 96.9% > 2897805312/25001191424 (11.6%) @0.9x, remaining 96:44 RBU 100.0% UBU 96.9% > 2910584832/25001191424 (11.6%) @0.9x, remaining 96:38 RBU 100.0% UBU 96.9% > 2923364352/25001191424 (11.7%) @0.9x, remaining 96:32 RBU 100.0% UBU 96.9% > 2936406016/25001191424 (11.7%) @0.9x, remaining 96:33 RBU 100.0% UBU 96.9% > 2949611520/25001191424 (11.8%) @0.9x, remaining 96:26 RBU 100.0% UBU 96.9% > 2962554880/25001191424 (11.8%) @0.9x, remaining 96:20 RBU 100.0% UBU 96.9% > 2975334400/25001191424 (11.9%) @0.9x, remaining 96:21 RBU 100.0% UBU 96.9% > 2988113920/25001191424 (12.0%) @0.9x, remaining 96:15 RBU 100.0% UBU 96.9% > 3000991744/25001191424 (12.0%) @0.9x, remaining 96:09 RBU 100.0% UBU 96.9% > 3014131712/25001191424 (12.1%) @0.9x, remaining 96:10 RBU 100.0% UBU 96.9% > 3026485248/25001191424 (12.1%) @0.8x, remaining 96:05 RBU 100.0% UBU 96.9% > 3039559680/25001191424 (12.2%) @0.9x, remaining 95:58 RBU 100.0% UBU 96.9% > 3052666880/25001191424 (12.2%) @0.9x, remaining 95:59 RBU 100.0% UBU 96.9% > 3065643008/25001191424 (12.3%) @0.9x, remaining 95:52 RBU 100.0% UBU 96.9% > 3078422528/25001191424 (12.3%) @0.9x, remaining 95:46 RBU 100.0% UBU 96.9% > 3091202048/25001191424 (12.4%) @0.9x, remaining 95:48 RBU 100.0% UBU 96.9% > 3103752192/25001191424 (12.4%) @0.8x, remaining 95:42 RBU 100.0% UBU 96.9% > 3116761088/25001191424 (12.5%) @0.9x, remaining 95:36 RBU 100.0% UBU 96.9% > 3129540608/25001191424 (12.5%) @0.9x, remaining 95:37 RBU 100.0% UBU 96.9% > 3142320128/25001191424 (12.6%) @0.9x, remaining 95:31 RBU 100.0% UBU 96.9% > 3155099648/25001191424 (12.6%) @0.9x, remaining 95:26 RBU 100.0% UBU 96.9% > 3167879168/25001191424 (12.7%) @0.9x, remaining 95:27 RBU 100.0% UBU 96.9% > 3180658688/25001191424 (12.7%) @0.9x, remaining 95:21 RBU 100.0% UBU 96.9% > 3192586240/25001191424 (12.8%) @0.8x, remaining 95:17 RBU 93.8% UBU 96.9% > 3205365760/25001191424 (12.8%) @0.9x, remaining 95:18 RBU 100.0% UBU 96.9% > 3218145280/25001191424 (12.9%) @0.9x, remaining 95:12 RBU 100.0% UBU 96.9% > 3230924800/25001191424 (12.9%) @0.9x, remaining 95:07 RBU 100.0% UBU 96.9% > 3243704320/25001191424 (13.0%) @0.9x, remaining 95:08 RBU 100.0% UBU 96.9% > 3256483840/25001191424 (13.0%) @0.9x, remaining 95:02 RBU 100.0% UBU 96.9% > 3269263360/25001191424 (13.1%) @0.9x, remaining 95:03 RBU 100.0% UBU 96.9% > 3282075648/25001191424 (13.1%) @0.9x, remaining 94:57 RBU 100.0% UBU 96.9% > 3294887936/25001191424 (13.2%) @0.9x, remaining 94:51 RBU 100.0% UBU 96.9% > 3307732992/25001191424 (13.2%) @0.9x, remaining 94:52 RBU 99.9% UBU 96.9% > 3320512512/25001191424 (13.3%) @0.9x, remaining 94:47 RBU 100.0% UBU 96.9% > 3333292032/25001191424 (13.3%) @0.9x, remaining 94:41 RBU 99.9% UBU 96.9% > 3346006016/25001191424 (13.4%) @0.8x, remaining 94:42 RBU 100.0% UBU 96.9% > 3358785536/25001191424 (13.4%) @0.9x, remaining 94:36 RBU 100.0% UBU 96.9% > 3371499520/25001191424 (13.5%) @0.8x, remaining 94:31 RBU 100.0% UBU 96.9% > 3384279040/25001191424 (13.5%) @0.9x, remaining 94:32 RBU 100.0% UBU 96.9% > 3397058560/25001191424 (13.6%) @0.9x, remaining 94:26 RBU 100.0% UBU 96.9% > 3409838080/25001191424 (13.6%) @0.9x, remaining 94:20 RBU 100.0% UBU 96.9% > 3422617600/25001191424 (13.7%) @0.9x, remaining 94:21 RBU 100.0% UBU 96.9% > 3435397120/25001191424 (13.7%) @0.9x, remaining 94:16 RBU 100.0% UBU 96.9% > 3448176640/25001191424 (13.8%) @0.9x, remaining 94:10 RBU 100.0% UBU 96.9% > 3460956160/25001191424 (13.8%) @0.9x, remaining 94:11 RBU 100.0% UBU 96.9% > 3473735680/25001191424 (13.9%) @0.9x, remaining 94:05 RBU 100.0% UBU 96.9% > 3486515200/25001191424 (13.9%) @0.9x, remaining 94:00 RBU 100.0% UBU 96.9% > 3499294720/25001191424 (14.0%) @0.9x, remaining 94:00 RBU 100.0% UBU 96.9% > 3511943168/25001191424 (14.0%) @0.8x, remaining 93:55 RBU 100.0% UBU 96.9% > 3524526080/25001191424 (14.1%) @0.8x, remaining 93:50 RBU 100.0% UBU 96.9% > 3537043456/25001191424 (14.1%) @0.8x, remaining 93:51 RBU 100.0% UBU 96.9% > 3549593600/25001191424 (14.2%) @0.8x, remaining 93:46 RBU 100.0% UBU 96.9% > 3562340352/25001191424 (14.2%) @0.8x, remaining 93:40 RBU 100.0% UBU 96.9% > 3575119872/25001191424 (14.3%) @0.9x, remaining 93:41 RBU 100.0% UBU 96.9% > 3588423680/25001191424 (14.4%) @0.9x, remaining 93:35 RBU 100.0% UBU 96.9% > 3600908288/25001191424 (14.4%) @0.8x, remaining 93:30 RBU 100.0% UBU 96.9% > 3614310400/25001191424 (14.5%) @0.9x, remaining 93:29 RBU 100.0% UBU 96.9% > 3627155456/25001191424 (14.5%) @0.9x, remaining 93:24 RBU 100.0% UBU 96.9% > 3640000512/25001191424 (14.6%) @0.9x, remaining 93:18 RBU 100.0% UBU 96.9% > 3651928064/25001191424 (14.6%) @0.8x, remaining 93:20 RBU 100.0% UBU 96.9% > 3664773120/25001191424 (14.7%) @0.9x, remaining 93:14 RBU 100.0% UBU 96.9% > 3678470144/25001191424 (14.7%) @0.9x, remaining 93:07 RBU 100.0% UBU 96.9% > 3691380736/25001191424 (14.8%) @0.9x, remaining 93:08 RBU 100.0% UBU 96.9% > 3703308288/25001191424 (14.8%) @0.8x, remaining 93:04 RBU 100.0% UBU 96.9% > 3716153344/25001191424 (14.9%) @0.9x, remaining 92:58 RBU 100.0% UBU 96.9% > 3728998400/25001191424 (14.9%) @0.9x, remaining 92:59 RBU 100.0% UBU 96.9% > 3742334976/25001191424 (15.0%) @0.9x, remaining 92:52 RBU 100.0% UBU 96.9% > 3754688512/25001191424 (15.0%) @0.8x, remaining 92:48 RBU 100.0% UBU 96.9% > 3767533568/25001191424 (15.1%) @0.9x, remaining 92:48 RBU 100.0% UBU 96.9% > 3780378624/25001191424 (15.1%) @0.9x, remaining 92:42 RBU 100.0% UBU 96.9% > 3793420288/25001191424 (15.2%) @0.9x, remaining 92:37 RBU 100.0% UBU 96.9% > 3806986240/25001191424 (15.2%) @0.9x, remaining 92:36 RBU 100.0% UBU 96.9% > 3819831296/25001191424 (15.3%) @0.9x, remaining 92:30 RBU 100.0% UBU 96.9% > 3832020992/25001191424 (15.3%) @0.8x, remaining 92:26 RBU 100.0% UBU 96.9% > 3845521408/25001191424 (15.4%) @0.9x, remaining 92:25 RBU 100.0% UBU 96.9% > 3858366464/25001191424 (15.4%) @0.9x, remaining 92:20 RBU 100.0% UBU 96.9% > 3871277056/25001191424 (15.5%) @0.9x, remaining 92:14 RBU 100.0% UBU 96.9% > 3884777472/25001191424 (15.5%) @0.9x, remaining 92:13 RBU 100.0% UBU 96.9% > 3897819136/25001191424 (15.6%) @0.9x, remaining 92:07 RBU 100.0% UBU 96.9% > 3910664192/25001191424 (15.6%) @0.9x, remaining 92:02 RBU 100.0% UBU 96.9% > 3923836928/25001191424 (15.7%) @0.9x, remaining 92:02 RBU 100.0% UBU 96.9% > 3937271808/25001191424 (15.7%) @0.9x, remaining 91:55 RBU 100.0% UBU 96.9% > 3950116864/25001191424 (15.8%) @0.9x, remaining 91:50 RBU 100.0% UBU 96.9% > 3962961920/25001191424 (15.9%) @0.9x, remaining 91:50 RBU 100.0% UBU 96.9% > 3976200192/25001191424 (15.9%) @0.9x, remaining 91:44 RBU 100.0% UBU 96.9% > 3989569536/25001191424 (16.0%) @0.9x, remaining 91:38 RBU 100.0% UBU 96.9% > 4002414592/25001191424 (16.0%) @0.9x, remaining 91:38 RBU 100.0% UBU 96.9% > 4015259648/25001191424 (16.1%) @0.9x, remaining 91:33 RBU 100.0% UBU 96.9% > 4028366848/25001191424 (16.1%) @0.9x, remaining 91:27 RBU 100.0% UBU 96.9% > 4041736192/25001191424 (16.2%) @0.9x, remaining 91:26 RBU 100.0% UBU 96.9% > 4054712320/25001191424 (16.2%) @0.9x, remaining 91:21 RBU 100.0% UBU 96.9% > 4067557376/25001191424 (16.3%) @0.9x, remaining 91:15 RBU 100.0% UBU 96.9% > 4080402432/25001191424 (16.3%) @0.9x, remaining 91:15 RBU 100.0% UBU 96.9% > 4093640704/25001191424 (16.4%) @0.9x, remaining 91:09 RBU 100.0% UBU 96.9% > 4106911744/25001191424 (16.4%) @0.9x, remaining 91:04 RBU 100.0% UBU 96.9% > 4119789568/25001191424 (16.5%) @0.9x, remaining 91:03 RBU 100.0% UBU 96.9% > 4132700160/25001191424 (16.5%) @0.9x, remaining 90:58 RBU 100.0% UBU 96.9% > 4145545216/25001191424 (16.6%) @0.9x, remaining 90:53 RBU 100.0% UBU 96.9% > 4158390272/25001191424 (16.6%) @0.9x, remaining 90:53 RBU 100.0% UBU 96.9% > 4171399168/25001191424 (16.7%) @0.9x, remaining 90:47 RBU 100.0% UBU 96.9% > 4184604672/25001191424 (16.7%) @0.9x, remaining 90:42 RBU 100.0% UBU 96.9% > 4197777408/25001191424 (16.8%) @0.9x, remaining 90:41 RBU 100.0% UBU 96.9% > 4210688000/25001191424 (16.8%) @0.9x, remaining 90:36 RBU 100.0% UBU 96.9% > 4223533056/25001191424 (16.9%) @0.9x, remaining 90:31 RBU 100.0% UBU 96.9% > 4236378112/25001191424 (16.9%) @0.9x, remaining 90:30 RBU 100.0% UBU 96.9% > 4249223168/25001191424 (17.0%) @0.9x, remaining 90:25 RBU 100.0% UBU 96.9% > 4262232064/25001191424 (17.0%) @0.9x, remaining 90:20 RBU 100.0% UBU 96.9% > 4275372032/25001191424 (17.1%) @0.9x, remaining 90:19 RBU 100.0% UBU 96.9% > 4288446464/25001191424 (17.2%) @0.9x, remaining 90:14 RBU 100.0% UBU 96.9% > 4301520896/25001191424 (17.2%) @0.9x, remaining 90:08 RBU 100.0% UBU 96.9% > 4314365952/25001191424 (17.3%) @0.9x, remaining 90:08 RBU 100.0% UBU 96.9% > 4327211008/25001191424 (17.3%) @0.9x, remaining 90:03 RBU 100.0% UBU 96.9% > 4339138560/25001191424 (17.4%) @0.8x, remaining 89:59 RBU 98.0% UBU 96.9% > 4351983616/25001191424 (17.4%) @0.9x, remaining 89:59 RBU 100.0% UBU 96.9% > 4364828672/25001191424 (17.5%) @0.9x, remaining 89:54 RBU 100.0% UBU 96.9% > 4377673728/25001191424 (17.5%) @0.9x, remaining 89:49 RBU 100.0% UBU 96.9% > 4390518784/25001191424 (17.6%) @0.9x, remaining 89:49 RBU 100.0% UBU 96.9% > 4403363840/25001191424 (17.6%) @0.9x, remaining 89:44 RBU 100.0% UBU 96.9% > 4416208896/25001191424 (17.7%) @0.9x, remaining 89:39 RBU 100.0% UBU 96.9% > 4429119488/25001191424 (17.7%) @0.9x, remaining 89:38 RBU 100.0% UBU 96.9% > 4442030080/25001191424 (17.8%) @0.9x, remaining 89:33 RBU 100.0% UBU 96.9% > 4455006208/25001191424 (17.8%) @0.9x, remaining 89:28 RBU 100.0% UBU 96.9% > 4467916800/25001191424 (17.9%) @0.9x, remaining 89:27 RBU 100.0% UBU 96.9% > 4480860160/25001191424 (17.9%) @0.9x, remaining 89:22 RBU 99.9% UBU 96.9% > 4493737984/25001191424 (18.0%) @0.9x, remaining 89:17 RBU 100.0% UBU 96.9% > 4506648576/25001191424 (18.0%) @0.9x, remaining 89:17 RBU 100.0% UBU 96.9% > 4519559168/25001191424 (18.1%) @0.9x, remaining 89:12 RBU 100.0% UBU 96.9% > 4532404224/25001191424 (18.1%) @0.9x, remaining 89:07 RBU 100.0% UBU 96.9% > 4544921600/25001191424 (18.2%) @0.8x, remaining 89:07 RBU 100.0% UBU 96.9% > 4557504512/25001191424 (18.2%) @0.8x, remaining 89:02 RBU 100.0% UBU 96.9% > 4570546176/25001191424 (18.3%) @0.9x, remaining 88:57 RBU 100.0% UBU 96.9% > 4583456768/25001191424 (18.3%) @0.9x, remaining 88:56 RBU 100.0% UBU 96.9% > 4596039680/25001191424 (18.4%) @0.8x, remaining 88:52 RBU 100.0% UBU 96.9% > 4609015808/25001191424 (18.4%) @0.9x, remaining 88:46 RBU 100.0% UBU 96.9% > 4621991936/25001191424 (18.5%) @0.9x, remaining 88:46 RBU 100.0% UBU 96.9% > 4634574848/25001191424 (18.5%) @0.8x, remaining 88:41 RBU 100.0% UBU 96.9% > 4647288832/25001191424 (18.6%) @0.8x, remaining 88:37 RBU 100.0% UBU 96.9% > 4660428800/25001191424 (18.6%) @0.9x, remaining 88:36 RBU 99.9% UBU 96.9% > 4673110016/25001191424 (18.7%) @0.8x, remaining 88:31 RBU 100.0% UBU 96.9% > 4685692928/25001191424 (18.7%) @0.8x, remaining 88:26 RBU 100.0% UBU 96.9% > 4698603520/25001191424 (18.8%) @0.9x, remaining 88:26 RBU 100.0% UBU 96.9% > 4711645184/25001191424 (18.8%) @0.9x, remaining 88:21 RBU 100.0% UBU 96.9% > 4724228096/25001191424 (18.9%) @0.8x, remaining 88:20 RBU 100.0% UBU 96.9% > 4736811008/25001191424 (18.9%) @0.8x, remaining 88:16 RBU 100.0% UBU 96.9% > 4749393920/25001191424 (19.0%) @0.8x, remaining 88:11 RBU 100.0% UBU 96.9% > 4761976832/25001191424 (19.0%) @0.8x, remaining 88:11 RBU 100.0% UBU 96.9% > 4774854656/25001191424 (19.1%) @0.9x, remaining 88:06 RBU 100.0% UBU 96.9% > 4787863552/25001191424 (19.2%) @0.9x, remaining 88:01 RBU 100.0% UBU 96.9% > 4800512000/25001191424 (19.2%) @0.8x, remaining 88:01 RBU 100.0% UBU 96.9% > 4813094912/25001191424 (19.3%) @0.8x, remaining 87:56 RBU 100.0% UBU 96.9% > 4825677824/25001191424 (19.3%) @0.8x, remaining 87:52 RBU 100.0% UBU 96.9% > 4838686720/25001191424 (19.4%) @0.9x, remaining 87:51 RBU 100.0% UBU 96.9% > 4851630080/25001191424 (19.4%) @0.9x, remaining 87:46 RBU 100.0% UBU 96.9% > 4864212992/25001191424 (19.5%) @0.8x, remaining 87:41 RBU 100.0% UBU 96.9% > 4876795904/25001191424 (19.5%) @0.8x, remaining 87:41 RBU 100.0% UBU 96.9% > 4889378816/25001191424 (19.6%) @0.8x, remaining 87:36 RBU 100.0% UBU 96.9% > 4902223872/25001191424 (19.6%) @0.9x, remaining 87:32 RBU 100.0% UBU 96.9% > 4915134464/25001191424 (19.7%) @0.9x, remaining 87:31 RBU 99.9% UBU 96.9% > 4927913984/25001191424 (19.7%) @0.9x, remaining 87:26 RBU 100.0% UBU 96.9% > 4939710464/25001191424 (19.8%) @0.8x, remaining 87:23 RBU 100.0% UBU 96.9% > 4952162304/25001191424 (19.8%) @0.8x, remaining 87:22 RBU 100.0% UBU 96.9% > 4964876288/25001191424 (19.9%) @0.8x, remaining 87:18 RBU 100.0% UBU 96.9% > 4977459200/25001191424 (19.9%) @0.8x, remaining 87:13 RBU 100.0% UBU 96.9% > 4990042112/25001191424 (20.0%) @0.8x, remaining 87:13 RBU 100.0% UBU 96.9% > 5002625024/25001191424 (20.0%) @0.8x, remaining 87:08 RBU 100.0% UBU 96.9% > 5015207936/25001191424 (20.1%) @0.8x, remaining 87:04 RBU 100.0% UBU 96.9% > 5027987456/25001191424 (20.1%) @0.9x, remaining 87:03 RBU 100.0% UBU 96.9% > 5040766976/25001191424 (20.2%) @0.9x, remaining 86:59 RBU 100.0% UBU 96.9% > 5053546496/25001191424 (20.2%) @0.9x, remaining 86:54 RBU 100.0% UBU 96.9% > 5066326016/25001191424 (20.3%) @0.9x, remaining 86:53 RBU 100.0% UBU 96.9% > 5078908928/25001191424 (20.3%) @0.8x, remaining 86:49 RBU 100.0% UBU 96.9% > 5091491840/25001191424 (20.4%) @0.8x, remaining 86:44 RBU 100.0% UBU 96.9% > 5104074752/25001191424 (20.4%) @0.8x, remaining 86:44 RBU 100.0% UBU 96.9% > 5116657664/25001191424 (20.5%) @0.8x, remaining 86:39 RBU 100.0% UBU 96.9% > 5129240576/25001191424 (20.5%) @0.8x, remaining 86:35 RBU 100.0% UBU 96.9% > 5141823488/25001191424 (20.6%) @0.8x, remaining 86:34 RBU 100.0% UBU 96.9% > 5154406400/25001191424 (20.6%) @0.8x, remaining 86:30 RBU 100.0% UBU 96.9% > 5166989312/25001191424 (20.7%) @0.8x, remaining 86:26 RBU 100.0% UBU 96.9% > 5179572224/25001191424 (20.7%) @0.8x, remaining 86:25 RBU 100.0% UBU 96.9% > 5192220672/25001191424 (20.8%) @0.8x, remaining 86:20 RBU 100.0% UBU 96.9% > 5204901888/25001191424 (20.8%) @0.8x, remaining 86:16 RBU 100.0% UBU 96.9% > 5217517568/25001191424 (20.9%) @0.8x, remaining 86:15 RBU 100.0% UBU 96.9% > 5230166016/25001191424 (20.9%) @0.8x, remaining 86:11 RBU 100.0% UBU 96.9% > 5242748928/25001191424 (21.0%) @0.8x, remaining 86:06 RBU 100.0% UBU 96.9% > 5255397376/25001191424 (21.0%) @0.8x, remaining 86:06 RBU 100.0% UBU 96.9% > 5267980288/25001191424 (21.1%) @0.8x, remaining 86:01 RBU 100.0% UBU 96.9% > 5280563200/25001191424 (21.1%) @0.8x, remaining 85:57 RBU 100.0% UBU 96.9% > 5292818432/25001191424 (21.2%) @0.8x, remaining 85:57 RBU 100.0% UBU 96.9% > 5305401344/25001191424 (21.2%) @0.8x, remaining 85:52 RBU 100.0% UBU 96.9% > 5317984256/25001191424 (21.3%) @0.8x, remaining 85:48 RBU 100.0% UBU 96.9% > 5330567168/25001191424 (21.3%) @0.8x, remaining 85:47 RBU 100.0% UBU 96.9% > 5343150080/25001191424 (21.4%) @0.8x, remaining 85:43 RBU 100.0% UBU 96.9% > 5355732992/25001191424 (21.4%) @0.8x, remaining 85:39 RBU 100.0% UBU 96.9% > 5368315904/25001191424 (21.5%) @0.8x, remaining 85:38 RBU 100.0% UBU 96.9% > 5380898816/25001191424 (21.5%) @0.8x, remaining 85:33 RBU 100.0% UBU 96.9% > 5393481728/25001191424 (21.6%) @0.8x, remaining 85:29 RBU 100.0% UBU 96.9% > 5406064640/25001191424 (21.6%) @0.8x, remaining 85:28 RBU 100.0% UBU 96.9% > 5418582016/25001191424 (21.7%) @0.8x, remaining 85:24 RBU 100.0% UBU 96.9% > 5431033856/25001191424 (21.7%) @0.8x, remaining 85:20 RBU 100.0% UBU 96.9% > 5443452928/25001191424 (21.8%) @0.8x, remaining 85:19 RBU 100.0% UBU 96.9% > 5455872000/25001191424 (21.8%) @0.8x, remaining 85:15 RBU 100.0% UBU 96.9% > 5468291072/25001191424 (21.9%) @0.8x, remaining 85:11 RBU 100.0% UBU 96.9% > 5480775680/25001191424 (21.9%) @0.8x, remaining 85:10 RBU 100.0% UBU 96.9% > 5493489664/25001191424 (22.0%) @0.8x, remaining 85:06 RBU 100.0% UBU 96.9% > 5506662400/25001191424 (22.0%) @0.9x, remaining 85:01 RBU 100.0% UBU 96.9% > 5519048704/25001191424 (22.1%) @0.8x, remaining 85:00 RBU 100.0% UBU 96.9% > 5532549120/25001191424 (22.1%) @0.9x, remaining 84:55 RBU 100.0% UBU 96.9% > 5545328640/25001191424 (22.2%) @0.9x, remaining 84:50 RBU 100.0% UBU 96.9% > 5557288960/25001191424 (22.2%) @0.8x, remaining 84:50 RBU 100.0% UBU 96.9% > 5569183744/25001191424 (22.3%) @0.8x, remaining 84:47 RBU 100.0% UBU 96.9% > 5582159872/25001191424 (22.3%) @0.9x, remaining 84:42 RBU 100.0% UBU 96.9% > 5595594752/25001191424 (22.4%) @0.9x, remaining 84:40 RBU 100.0% UBU 96.9% > 5608374272/25001191424 (22.4%) @0.9x, remaining 84:36 RBU 100.0% UBU 96.9% > 5621448704/25001191424 (22.5%) @0.9x, remaining 84:31 RBU 100.0% UBU 96.9% > 5632884736/25001191424 (22.5%) @0.8x, remaining 84:31 RBU 100.0% UBU 96.9% > 5645008896/25001191424 (22.6%) @0.8x, remaining 84:27 RBU 100.0% UBU 96.9% > 5657788416/25001191424 (22.6%) @0.9x, remaining 84:23 RBU 100.0% UBU 96.9% > 5670895616/25001191424 (22.7%) @0.9x, remaining 84:21 RBU 100.0% UBU 96.9% > 5684199424/25001191424 (22.7%) @0.9x, remaining 84:16 RBU 100.0% UBU 96.9% > 5696978944/25001191424 (22.8%) @0.9x, remaining 84:12 RBU 100.0% UBU 96.9% > 5709135872/25001191424 (22.8%) @0.8x, remaining 84:11 RBU 100.0% UBU 96.9% > 5722537984/25001191424 (22.9%) @0.9x, remaining 84:06 RBU 100.0% UBU 96.9% > 5735317504/25001191424 (22.9%) @0.9x, remaining 84:02 RBU 100.0% UBU 96.9% > 5748097024/25001191424 (23.0%) @0.9x, remaining 84:00 RBU 100.0% UBU 96.9% > 5761499136/25001191424 (23.0%) @0.9x, remaining 83:55 RBU 100.0% UBU 96.9% > 5774508032/25001191424 (23.1%) @0.9x, remaining 83:50 RBU 100.0% UBU 96.9% > 5787287552/25001191424 (23.1%) @0.9x, remaining 83:49 RBU 100.0% UBU 96.9% > 5800329216/25001191424 (23.2%) @0.9x, remaining 83:45 RBU 100.0% UBU 96.9% > 5813698560/25001191424 (23.3%) @0.9x, remaining 83:39 RBU 100.0% UBU 96.9% > 5826478080/25001191424 (23.3%) @0.9x, remaining 83:38 RBU 100.0% UBU 96.9% > 5839257600/25001191424 (23.4%) @0.9x, remaining 83:34 RBU 100.0% UBU 96.9% > 5852364800/25001191424 (23.4%) @0.9x, remaining 83:29 RBU 100.0% UBU 96.9% > 5865668608/25001191424 (23.5%) @0.9x, remaining 83:27 RBU 100.0% UBU 96.9% > 5878448128/25001191424 (23.5%) @0.9x, remaining 83:23 RBU 100.0% UBU 96.9% > 5891227648/25001191424 (23.6%) @0.9x, remaining 83:18 RBU 100.0% UBU 96.9% > 5904269312/25001191424 (23.6%) @0.9x, remaining 83:17 RBU 100.0% UBU 96.9% > 5917507584/25001191424 (23.7%) @0.9x, remaining 83:12 RBU 100.0% UBU 96.9% > 5930418176/25001191424 (23.7%) @0.9x, remaining 83:07 RBU 100.0% UBU 96.9% > 5943197696/25001191424 (23.8%) @0.9x, remaining 83:06 RBU 100.0% UBU 96.9% > 5955977216/25001191424 (23.8%) @0.9x, remaining 83:01 RBU 100.0% UBU 96.9% > 5969215488/25001191424 (23.9%) @0.9x, remaining 82:57 RBU 100.0% UBU 96.9% > 5982388224/25001191424 (23.9%) @0.9x, remaining 82:55 RBU 100.0% UBU 96.9% > 5995167744/25001191424 (24.0%) @0.9x, remaining 82:50 RBU 100.0% UBU 96.9% > 6007947264/25001191424 (24.0%) @0.9x, remaining 82:46 RBU 100.0% UBU 96.9% > 6020726784/25001191424 (24.1%) @0.9x, remaining 82:45 RBU 100.0% UBU 96.9% > 6033833984/25001191424 (24.1%) @0.9x, remaining 82:40 RBU 100.0% UBU 96.9% > 6046285824/25001191424 (24.2%) @0.8x, remaining 82:36 RBU 94.7% UBU 96.9% > 6059065344/25001191424 (24.2%) @0.9x, remaining 82:35 RBU 100.0% UBU 96.9% > 6072041472/25001191424 (24.3%) @0.9x, remaining 82:30 RBU 100.0% UBU 96.9% > 6085148672/25001191424 (24.3%) @0.9x, remaining 82:25 RBU 100.0% UBU 96.9% > 6098255872/25001191424 (24.4%) @0.9x, remaining 82:24 RBU 100.0% UBU 96.9% > 6111035392/25001191424 (24.4%) @0.9x, remaining 82:19 RBU 100.0% UBU 96.9% > 6123814912/25001191424 (24.5%) @0.9x, remaining 82:18 RBU 100.0% UBU 96.9% > 6136594432/25001191424 (24.5%) @0.9x, remaining 82:13 RBU 100.0% UBU 96.9% > 6149373952/25001191424 (24.6%) @0.9x, remaining 82:09 RBU 100.0% UBU 96.9% > 6162415616/25001191424 (24.6%) @0.9x, remaining 82:07 RBU 100.0% UBU 96.9% > 6175457280/25001191424 (24.7%) @0.9x, remaining 82:03 RBU 100.0% UBU 96.9% > 6188498944/25001191424 (24.8%) @0.9x, remaining 81:58 RBU 100.0% UBU 96.9% > 6200066048/25001191424 (24.8%) @0.8x, remaining 81:58 RBU 100.0% UBU 96.9% > 6213074944/25001191424 (24.9%) @0.9x, remaining 81:53 RBU 100.0% UBU 96.9% > 6226051072/25001191424 (24.9%) @0.9x, remaining 81:49 RBU 100.0% UBU 96.9% > 6238830592/25001191424 (25.0%) @0.9x, remaining 81:47 RBU 100.0% UBU 96.9% > 6251610112/25001191424 (25.0%) @0.9x, remaining 81:43 RBU 100.0% UBU 96.9% > 6264389632/25001191424 (25.1%) @0.9x, remaining 81:39 RBU 100.0% UBU 96.9% > 6277169152/25001191424 (25.1%) @0.9x, remaining 81:37 RBU 100.0% UBU 96.9% > 6289948672/25001191424 (25.2%) @0.9x, remaining 81:33 RBU 100.0% UBU 96.9% > 6302728192/25001191424 (25.2%) @0.9x, remaining 81:29 RBU 100.0% UBU 96.9% > 6315540480/25001191424 (25.3%) @0.9x, remaining 81:27 RBU 100.0% UBU 96.9% > 6328483840/25001191424 (25.3%) @0.9x, remaining 81:23 RBU 100.0% UBU 96.9% > 6341394432/25001191424 (25.4%) @0.9x, remaining 81:18 RBU 100.0% UBU 96.9% > 6354305024/25001191424 (25.4%) @0.9x, remaining 81:17 RBU 100.0% UBU 96.9% > 6367182848/25001191424 (25.5%) @0.9x, remaining 81:12 RBU 99.9% UBU 96.9% > 6380060672/25001191424 (25.5%) @0.9x, remaining 81:08 RBU 100.0% UBU 96.9% > 6392905728/25001191424 (25.6%) @0.9x, remaining 81:06 RBU 100.0% UBU 96.9% > 6405783552/25001191424 (25.6%) @0.9x, remaining 81:02 RBU 100.0% UBU 96.9% > 6418595840/25001191424 (25.7%) @0.9x, remaining 80:58 RBU 100.0% UBU 96.9% > 6431375360/25001191424 (25.7%) @0.9x, remaining 80:56 RBU 100.0% UBU 96.9% > 6444154880/25001191424 (25.8%) @0.9x, remaining 80:52 RBU 100.0% UBU 96.9% > 6456934400/25001191424 (25.8%) @0.9x, remaining 80:47 RBU 100.0% UBU 96.9% > 6461194240/25001191424 (25.8%) @0.3x, remaining 80:55 RBU 93.9% UBU 96.9% > 6473973760/25001191424 (25.9%) @0.9x, remaining 80:50 RBU 100.0% UBU 96.9% > 6486753280/25001191424 (25.9%) @0.9x, remaining 80:46 RBU 100.0% UBU 96.9% > 6499532800/25001191424 (26.0%) @0.9x, remaining 80:44 RBU 100.0% UBU 96.9% > 6512312320/25001191424 (26.0%) @0.9x, remaining 80:40 RBU 100.0% UBU 96.9% > 6525091840/25001191424 (26.1%) @0.9x, remaining 80:36 RBU 100.0% UBU 96.9% > 6537871360/25001191424 (26.2%) @0.9x, remaining 80:34 RBU 100.0% UBU 96.9% > 6550650880/25001191424 (26.2%) @0.9x, remaining 80:30 RBU 100.0% UBU 96.9% > 6563430400/25001191424 (26.3%) @0.9x, remaining 80:26 RBU 100.0% UBU 96.9% > 6576209920/25001191424 (26.3%) @0.9x, remaining 80:24 RBU 100.0% UBU 96.9% > 6588989440/25001191424 (26.4%) @0.9x, remaining 80:20 RBU 100.0% UBU 96.9% > 6601768960/25001191424 (26.4%) @0.9x, remaining 80:16 RBU 100.0% UBU 96.9% > 6614548480/25001191424 (26.5%) @0.9x, remaining 80:14 RBU 100.0% UBU 96.9% > 6627328000/25001191424 (26.5%) @0.9x, remaining 80:10 RBU 100.0% UBU 96.9% > 6640041984/25001191424 (26.6%) @0.8x, remaining 80:05 RBU 100.0% UBU 96.9% > 6652723200/25001191424 (26.6%) @0.8x, remaining 80:04 RBU 100.0% UBU 96.9% > 6665338880/25001191424 (26.7%) @0.8x, remaining 80:00 RBU 100.0% UBU 96.9% > 6677987328/25001191424 (26.7%) @0.8x, remaining 79:56 RBU 100.0% UBU 96.9% > 6690635776/25001191424 (26.8%) @0.8x, remaining 79:54 RBU 100.0% UBU 96.9% > 6703284224/25001191424 (26.8%) @0.8x, remaining 79:50 RBU 100.0% UBU 96.9% > 6715932672/25001191424 (26.9%) @0.8x, remaining 79:46 RBU 100.0% UBU 96.9% > 6729629696/25001191424 (26.9%) @0.9x, remaining 79:43 RBU 100.0% UBU 96.9% > 6742474752/25001191424 (27.0%) @0.9x, remaining 79:39 RBU 100.0% UBU 96.9% > 6756106240/25001191424 (27.0%) @0.9x, remaining 79:34 RBU 100.0% UBU 96.9% > 6768951296/25001191424 (27.1%) @0.9x, remaining 79:32 RBU 100.0% UBU 96.9% > 6781796352/25001191424 (27.1%) @0.9x, remaining 79:28 RBU 100.0% UBU 96.9% > 6792806400/25001191424 (27.2%) @0.7x, remaining 79:25 RBU 100.0% UBU 96.9% > 6805651456/25001191424 (27.2%) @0.9x, remaining 79:24 RBU 100.0% UBU 96.9% > 6818562048/25001191424 (27.3%) @0.9x, remaining 79:19 RBU 100.0% UBU 96.9% > 6832259072/25001191424 (27.3%) @0.9x, remaining 79:14 RBU 100.0% UBU 96.9% > 6845104128/25001191424 (27.4%) @0.9x, remaining 79:13 RBU 100.0% UBU 96.9% > 6857031680/25001191424 (27.4%) @0.8x, remaining 79:09 RBU 100.0% UBU 96.9% > 6868041728/25001191424 (27.5%) @0.7x, remaining 79:07 RBU 100.0% UBU 96.9% > 6880886784/25001191424 (27.5%) @0.9x, remaining 79:05 RBU 100.0% UBU 96.9% > 6893797376/25001191424 (27.6%) @0.9x, remaining 79:01 RBU 100.0% UBU 96.9% > 6907494400/25001191424 (27.6%) @0.9x, remaining 78:55 RBU 100.0% UBU 96.9% > 6920339456/25001191424 (27.7%) @0.9x, remaining 78:54 RBU 100.0% UBU 96.9% > 6933741568/25001191424 (27.7%) @0.9x, remaining 78:49 RBU 100.0% UBU 96.9% > 6946160640/25001191424 (27.8%) @0.8x, remaining 78:45 RBU 100.0% UBU 96.9% > 6959792128/25001191424 (27.8%) @0.9x, remaining 78:43 RBU 100.0% UBU 96.9% > 6972637184/25001191424 (27.9%) @0.9x, remaining 78:38 RBU 100.0% UBU 96.9% > 6986006528/25001191424 (27.9%) @0.9x, remaining 78:33 RBU 100.0% UBU 96.9% > 6999244800/25001191424 (28.0%) @0.9x, remaining 78:31 RBU 100.0% UBU 96.9% > 7012089856/25001191424 (28.0%) @0.9x, remaining 78:27 RBU 100.0% UBU 96.9% > 7025721344/25001191424 (28.1%) @0.9x, remaining 78:22 RBU 100.0% UBU 96.9% > 7038697472/25001191424 (28.2%) @0.9x, remaining 78:20 RBU 100.0% UBU 96.9% > 7051739136/25001191424 (28.2%) @0.9x, remaining 78:16 RBU 100.0% UBU 96.9% > 7065305088/25001191424 (28.3%) @0.9x, remaining 78:11 RBU 100.0% UBU 96.9% > 7078150144/25001191424 (28.3%) @0.9x, remaining 78:09 RBU 100.0% UBU 96.9% > 7091322880/25001191424 (28.4%) @0.9x, remaining 78:04 RBU 100.0% UBU 96.9% > 7104757760/25001191424 (28.4%) @0.9x, remaining 78:00 RBU 100.0% UBU 96.9% > 7117602816/25001191424 (28.5%) @0.9x, remaining 77:58 RBU 100.0% UBU 96.9% > 7130841088/25001191424 (28.5%) @0.9x, remaining 77:53 RBU 100.0% UBU 96.9% > 7144210432/25001191424 (28.6%) @0.9x, remaining 77:49 RBU 100.0% UBU 96.9% > 7157055488/25001191424 (28.6%) @0.9x, remaining 77:47 RBU 100.0% UBU 96.9% > 7170228224/25001191424 (28.7%) @0.9x, remaining 77:42 RBU 100.0% UBU 96.9% > 7183663104/25001191424 (28.7%) @0.9x, remaining 77:37 RBU 100.0% UBU 96.9% > 7196508160/25001191424 (28.8%) @0.9x, remaining 77:36 RBU 100.0% UBU 96.9% > 7209582592/25001191424 (28.8%) @0.9x, remaining 77:31 RBU 100.0% UBU 96.9% > 7223115776/25001191424 (28.9%) @0.9x, remaining 77:26 RBU 100.0% UBU 96.9% > 7235960832/25001191424 (28.9%) @0.9x, remaining 77:25 RBU 100.0% UBU 96.9% > 7248805888/25001191424 (29.0%) @0.9x, remaining 77:20 RBU 100.0% UBU 96.9% > 7262306304/25001191424 (29.0%) @0.9x, remaining 77:16 RBU 100.0% UBU 96.9% > 7275413504/25001191424 (29.1%) @0.9x, remaining 77:14 RBU 100.0% UBU 96.9% > 7288258560/25001191424 (29.2%) @0.9x, remaining 77:09 RBU 100.0% UBU 96.9% > 7301431296/25001191424 (29.2%) @0.9x, remaining 77:05 RBU 100.0% UBU 96.9% > 7314866176/25001191424 (29.3%) @0.9x, remaining 77:02 RBU 100.0% UBU 96.9% > 7327711232/25001191424 (29.3%) @0.9x, remaining 76:58 RBU 100.0% UBU 96.9% > 7340556288/25001191424 (29.4%) @0.9x, remaining 76:54 RBU 100.0% UBU 96.9% > 7353892864/25001191424 (29.4%) @0.9x, remaining 76:52 RBU 100.0% UBU 96.9% > 7367163904/25001191424 (29.5%) @0.9x, remaining 76:47 RBU 100.0% UBU 96.9% > 7380008960/25001191424 (29.5%) @0.9x, remaining 76:43 RBU 100.0% UBU 96.9% > 7392854016/25001191424 (29.6%) @0.9x, remaining 76:41 RBU 100.0% UBU 96.9% > 7406223360/25001191424 (29.6%) @0.9x, remaining 76:36 RBU 100.0% UBU 96.9% > 7419461632/25001191424 (29.7%) @0.9x, remaining 76:32 RBU 100.0% UBU 96.9% > 7432306688/25001191424 (29.7%) @0.9x, remaining 76:30 RBU 100.0% UBU 96.9% > 7445151744/25001191424 (29.8%) @0.9x, remaining 76:26 RBU 100.0% UBU 96.9% > 7458390016/25001191424 (29.8%) @0.9x, remaining 76:21 RBU 100.0% UBU 96.9% > 7471726592/25001191424 (29.9%) @0.9x, remaining 76:19 RBU 100.0% UBU 96.9% > 7484604416/25001191424 (29.9%) @0.9x, remaining 76:15 RBU 100.0% UBU 96.9% > 7497449472/25001191424 (30.0%) @0.9x, remaining 76:11 RBU 100.0% UBU 96.9% > 7510425600/25001191424 (30.0%) @0.9x, remaining 76:09 RBU 100.0% UBU 96.9% > 7523729408/25001191424 (30.1%) @0.9x, remaining 76:04 RBU 100.0% UBU 96.9% > 7535493120/25001191424 (30.1%) @0.8x, remaining 76:01 RBU 100.0% UBU 96.9% > 7548764160/25001191424 (30.2%) @0.9x, remaining 75:59 RBU 100.0% UBU 96.9% > 7560953856/25001191424 (30.2%) @0.8x, remaining 75:55 RBU 100.0% UBU 96.9% > 7574257664/25001191424 (30.3%) @0.9x, remaining 75:53 RBU 100.0% UBU 96.9% > 7587364864/25001191424 (30.3%) @0.9x, remaining 75:48 RBU 100.0% UBU 96.9% > 7600209920/25001191424 (30.4%) @0.9x, remaining 75:44 RBU 100.0% UBU 96.9% > 7613054976/25001191424 (30.5%) @0.9x, remaining 75:42 RBU 100.0% UBU 96.9% > 7625932800/25001191424 (30.5%) @0.9x, remaining 75:38 RBU 100.0% UBU 96.9% > 7639171072/25001191424 (30.6%) @0.9x, remaining 75:34 RBU 100.0% UBU 96.9% > 7652376576/25001191424 (30.6%) @0.9x, remaining 75:31 RBU 100.0% UBU 96.9% > 7665352704/25001191424 (30.7%) @0.9x, remaining 75:27 RBU 100.0% UBU 96.9% > 7678197760/25001191424 (30.7%) @0.9x, remaining 75:23 RBU 100.0% UBU 96.9% > 7691042816/25001191424 (30.8%) @0.9x, remaining 75:21 RBU 100.0% UBU 96.9% > 7703887872/25001191424 (30.8%) @0.9x, remaining 75:17 RBU 100.0% UBU 96.9% > 7717027840/25001191424 (30.9%) @0.9x, remaining 75:13 RBU 100.0% UBU 96.9% > 7730167808/25001191424 (30.9%) @0.9x, remaining 75:10 RBU 100.0% UBU 96.9% > 7743340544/25001191424 (31.0%) @0.9x, remaining 75:06 RBU 100.0% UBU 96.9% > 7756185600/25001191424 (31.0%) @0.9x, remaining 75:02 RBU 100.0% UBU 96.9% > 7769030656/25001191424 (31.1%) @0.9x, remaining 75:00 RBU 100.0% UBU 96.9% > 7781875712/25001191424 (31.1%) @0.9x, remaining 74:56 RBU 100.0% UBU 96.9% > 7794720768/25001191424 (31.2%) @0.9x, remaining 74:52 RBU 100.0% UBU 96.9% > 7807664128/25001191424 (31.2%) @0.9x, remaining 74:50 RBU 100.0% UBU 96.9% > 7820771328/25001191424 (31.3%) @0.9x, remaining 74:45 RBU 100.0% UBU 96.9% > 7833845760/25001191424 (31.3%) @0.9x, remaining 74:41 RBU 100.0% UBU 96.9% > 7846952960/25001191424 (31.4%) @0.9x, remaining 74:39 RBU 100.0% UBU 96.9% > 7859863552/25001191424 (31.4%) @0.9x, remaining 74:35 RBU 100.0% UBU 96.9% > 7872708608/25001191424 (31.5%) @0.9x, remaining 74:31 RBU 100.0% UBU 96.9% > 7885553664/25001191424 (31.5%) @0.9x, remaining 74:29 RBU 100.0% UBU 96.9% > 7898398720/25001191424 (31.6%) @0.9x, remaining 74:24 RBU 100.0% UBU 96.9% > 7911243776/25001191424 (31.6%) @0.9x, remaining 74:20 RBU 100.0% UBU 96.9% > 7924088832/25001191424 (31.7%) @0.9x, remaining 74:18 RBU 100.0% UBU 96.9% > 7936933888/25001191424 (31.7%) @0.9x, remaining 74:14 RBU 100.0% UBU 96.9% > 7949942784/25001191424 (31.8%) @0.9x, remaining 74:10 RBU 100.0% UBU 96.9% > 7962951680/25001191424 (31.9%) @0.9x, remaining 74:08 RBU 100.0% UBU 96.9% > 7975927808/25001191424 (31.9%) @0.9x, remaining 74:04 RBU 100.0% UBU 96.9% > 7988903936/25001191424 (32.0%) @0.9x, remaining 73:59 RBU 100.0% UBU 96.9% > 8001880064/25001191424 (32.0%) @0.9x, remaining 73:57 RBU 100.0% UBU 96.9% > 8014856192/25001191424 (32.1%) @0.9x, remaining 73:53 RBU 100.0% UBU 96.9% > 8027766784/25001191424 (32.1%) @0.9x, remaining 73:49 RBU 100.0% UBU 96.9% > 8040611840/25001191424 (32.2%) @0.9x, remaining 73:47 RBU 100.0% UBU 96.9% > 8053456896/25001191424 (32.2%) @0.9x, remaining 73:43 RBU 100.0% UBU 96.9% > 8066301952/25001191424 (32.3%) @0.9x, remaining 73:39 RBU 100.0% UBU 96.9% > 8078426112/25001191424 (32.3%) @0.8x, remaining 73:37 RBU 100.0% UBU 96.9% > 8090681344/25001191424 (32.4%) @0.8x, remaining 73:34 RBU 100.0% UBU 96.9% > 8103002112/25001191424 (32.4%) @0.8x, remaining 73:30 RBU 100.0% UBU 96.9% > 8115847168/25001191424 (32.5%) @0.9x, remaining 73:28 RBU 100.0% UBU 96.9% > 8128692224/25001191424 (32.5%) @0.9x, remaining 73:24 RBU 100.0% UBU 96.9% > 8141537280/25001191424 (32.6%) @0.9x, remaining 73:20 RBU 100.0% UBU 96.9% > 8154382336/25001191424 (32.6%) @0.9x, remaining 73:18 RBU 100.0% UBU 96.9% > 8166309888/25001191424 (32.7%) @0.8x, remaining 73:15 RBU 100.0% UBU 96.9% > 8178565120/25001191424 (32.7%) @0.8x, remaining 73:11 RBU 100.0% UBU 96.9% > 8191410176/25001191424 (32.8%) @0.9x, remaining 73:09 RBU 100.0% UBU 96.9% > 8204255232/25001191424 (32.8%) @0.9x, remaining 73:05 RBU 100.0% UBU 96.9% > 8215855104/25001191424 (32.9%) @0.8x, remaining 73:02 RBU 100.0% UBU 96.9% > 8224374784/25001191424 (32.9%) @0.6x, remaining 73:03 RBU 100.0% UBU 96.9% > 8237154304/25001191424 (32.9%) @0.9x, remaining 72:59 RBU 100.0% UBU 96.9% > 8249802752/25001191424 (33.0%) @0.8x, remaining 72:55 RBU 100.0% UBU 96.9% > 8262647808/25001191424 (33.0%) @0.9x, remaining 72:53 RBU 100.0% UBU 96.9% > 8275492864/25001191424 (33.1%) @0.9x, remaining 72:49 RBU 100.0% UBU 96.9% > 8288337920/25001191424 (33.2%) @0.9x, remaining 72:45 RBU 100.0% UBU 96.9% > 8301182976/25001191424 (33.2%) @0.9x, remaining 72:43 RBU 100.0% UBU 96.9% > 8313143296/25001191424 (33.3%) @0.8x, remaining 72:40 RBU 100.0% UBU 96.9% > 8325955584/25001191424 (33.3%) @0.9x, remaining 72:36 RBU 100.0% UBU 96.9% > 8338800640/25001191424 (33.4%) @0.9x, remaining 72:34 RBU 100.0% UBU 96.9% > 8351645696/25001191424 (33.4%) @0.9x, remaining 72:29 RBU 100.0% UBU 96.9% > 8364490752/25001191424 (33.5%) @0.9x, remaining 72:25 RBU 100.0% UBU 96.9% > 8377335808/25001191424 (33.5%) @0.9x, remaining 72:23 RBU 100.0% UBU 96.9% > 8390180864/25001191424 (33.6%) @0.9x, remaining 72:19 RBU 100.0% UBU 96.9% > 8403025920/25001191424 (33.6%) @0.9x, remaining 72:15 RBU 100.0% UBU 96.9% > 8415870976/25001191424 (33.7%) @0.9x, remaining 72:13 RBU 100.0% UBU 96.9% > 8428716032/25001191424 (33.7%) @0.9x, remaining 72:09 RBU 100.0% UBU 96.9% > 8441561088/25001191424 (33.8%) @0.9x, remaining 72:05 RBU 100.0% UBU 96.9% > 8454242304/25001191424 (33.8%) @0.8x, remaining 72:03 RBU 100.0% UBU 96.9% > 8466923520/25001191424 (33.9%) @0.8x, remaining 71:59 RBU 100.0% UBU 96.9% > 8479571968/25001191424 (33.9%) @0.8x, remaining 71:55 RBU 100.0% UBU 96.9% > 8492187648/25001191424 (34.0%) @0.8x, remaining 71:53 RBU 100.0% UBU 96.9% > 8504868864/25001191424 (34.0%) @0.8x, remaining 71:49 RBU 100.0% UBU 96.9% > 8517713920/25001191424 (34.1%) @0.9x, remaining 71:45 RBU 100.0% UBU 96.9% > 8530558976/25001191424 (34.1%) @0.9x, remaining 71:43 RBU 100.0% UBU 96.9% > 8543404032/25001191424 (34.2%) @0.9x, remaining 71:39 RBU 100.0% UBU 96.9% > 8556249088/25001191424 (34.2%) @0.9x, remaining 71:35 RBU 100.0% UBU 96.9% > 8568963072/25001191424 (34.3%) @0.8x, remaining 71:33 RBU 100.0% UBU 96.9% > 8581545984/25001191424 (34.3%) @0.8x, remaining 71:29 RBU 100.0% UBU 96.9% > 8594128896/25001191424 (34.4%) @0.8x, remaining 71:25 RBU 100.0% UBU 96.9% > 8607105024/25001191424 (34.4%) @0.9x, remaining 71:23 RBU 100.0% UBU 96.9% > 8619884544/25001191424 (34.5%) @0.9x, remaining 71:19 RBU 100.0% UBU 96.9% > 8632205312/25001191424 (34.5%) @0.8x, remaining 71:16 RBU 100.0% UBU 96.9% > 8642494464/25001191424 (34.6%) @0.7x, remaining 71:15 RBU 100.0% UBU 96.9% > 8654290944/25001191424 (34.6%) @0.8x, remaining 71:12 RBU 100.0% UBU 96.9% > 8666873856/25001191424 (34.7%) @0.8x, remaining 71:08 RBU 100.0% UBU 96.9% > 8680243200/25001191424 (34.7%) @0.9x, remaining 71:06 RBU 100.0% UBU 96.9% > 8692826112/25001191424 (34.8%) @0.8x, remaining 71:02 RBU 100.0% UBU 96.9% > 8705933312/25001191424 (34.8%) @0.9x, remaining 70:58 RBU 100.0% UBU 96.9% > 8718778368/25001191424 (34.9%) @0.9x, remaining 70:56 RBU 100.0% UBU 96.9% > 8731361280/25001191424 (34.9%) @0.8x, remaining 70:52 RBU 100.0% UBU 96.9% > 8741584896/25001191424 (35.0%) @0.7x, remaining 70:50 RBU 100.0% UBU 96.9% > 8752594944/25001191424 (35.0%) @0.7x, remaining 70:49 RBU 100.0% UBU 96.9% > 8765964288/25001191424 (35.1%) @0.9x, remaining 70:44 RBU 100.0% UBU 96.9% > 8778547200/25001191424 (35.1%) @0.8x, remaining 70:41 RBU 100.0% UBU 96.9% > 8791523328/25001191424 (35.2%) @0.9x, remaining 70:38 RBU 100.0% UBU 96.9% > 8804499456/25001191424 (35.2%) @0.9x, remaining 70:34 RBU 100.0% UBU 96.9% > 8817082368/25001191424 (35.3%) @0.8x, remaining 70:30 RBU 100.0% UBU 96.9% > 8830386176/25001191424 (35.3%) @0.9x, remaining 70:28 RBU 100.0% UBU 96.9% > 8843034624/25001191424 (35.4%) @0.8x, remaining 70:24 RBU 100.0% UBU 96.9% > 8855879680/25001191424 (35.4%) @0.9x, remaining 70:20 RBU 100.0% UBU 96.9% > 8868986880/25001191424 (35.5%) @0.9x, remaining 70:18 RBU 100.0% UBU 96.9% > 8881569792/25001191424 (35.5%) @0.8x, remaining 70:14 RBU 100.0% UBU 96.9% > 8894611456/25001191424 (35.6%) @0.9x, remaining 70:10 RBU 100.0% UBU 96.9% > 8907522048/25001191424 (35.6%) @0.9x, remaining 70:07 RBU 100.0% UBU 96.9% > 8920104960/25001191424 (35.7%) @0.8x, remaining 70:04 RBU 100.0% UBU 96.9% > 8924823552/25001191424 (35.7%) @0.3x, remaining 70:06 RBU 100.0% UBU 96.9% > 8936620032/25001191424 (35.7%) @0.8x, remaining 70:04 RBU 100.0% UBU 96.9% > 8958640128/25001191424 (35.8%) @1.5x, remaining 69:53 RBU 100.0% UBU 96.9% > 8980267008/25001191424 (35.9%) @1.4x, remaining 69:43 RBU 100.0% UBU 96.9% > 9001861120/25001191424 (36.0%) @1.4x, remaining 69:34 RBU 100.0% UBU 96.9% > 9023782912/25001191424 (36.1%) @1.5x, remaining 69:24 RBU 100.0% UBU 96.9% > 9045803008/25001191424 (36.2%) @1.5x, remaining 69:15 RBU 100.0% UBU 96.9% > 9067823104/25001191424 (36.3%) @1.5x, remaining 69:05 RBU 100.0% UBU 96.9% > 9089515520/25001191424 (36.4%) @1.4x, remaining 68:54 RBU 100.0% UBU 96.9% > 9110945792/25001191424 (36.4%) @1.4x, remaining 68:46 RBU 100.0% UBU 96.9% > 9132965888/25001191424 (36.5%) @1.5x, remaining 68:36 RBU 100.0% UBU 96.9% > 9154985984/25001191424 (36.6%) @1.5x, remaining 68:25 RBU 100.0% UBU 96.9% > 9176743936/25001191424 (36.7%) @1.5x, remaining 68:17 RBU 100.0% UBU 96.9% > 9198108672/25001191424 (36.8%) @1.4x, remaining 68:07 RBU 100.0% UBU 96.9% > 9220128768/25001191424 (36.9%) @1.5x, remaining 67:57 RBU 100.0% UBU 96.9% > 9242148864/25001191424 (37.0%) @1.5x, remaining 67:48 RBU 100.0% UBU 96.9% > 9263480832/25001191424 (37.1%) @1.4x, remaining 67:38 RBU 100.0% UBU 96.9% > 9285271552/25001191424 (37.1%) @1.5x, remaining 67:28 RBU 100.0% UBU 96.9% > 9307291648/25001191424 (37.2%) @1.5x, remaining 67:20 RBU 100.0% UBU 96.9% > 9328656384/25001191424 (37.3%) @1.4x, remaining 67:10 RBU 100.0% UBU 96.9% > 9350414336/25001191424 (37.4%) @1.5x, remaining 67:00 RBU 100.0% UBU 96.9% > 9372434432/25001191424 (37.5%) @1.5x, remaining 66:52 RBU 100.0% UBU 96.9% > 9393602560/25001191424 (37.6%) @1.4x, remaining 66:42 RBU 100.0% UBU 96.9% > 9415557120/25001191424 (37.7%) @1.5x, remaining 66:32 RBU 100.0% UBU 96.9% > 9437282304/25001191424 (37.7%) @1.4x, remaining 66:24 RBU 100.0% UBU 96.9% > 9458974720/25001191424 (37.8%) @1.4x, remaining 66:14 RBU 100.0% UBU 96.9% > 9480437760/25001191424 (37.9%) @1.4x, remaining 66:05 RBU 100.0% UBU 96.9% > 9502261248/25001191424 (38.0%) @1.5x, remaining 65:56 RBU 100.0% UBU 96.9% > 9523691520/25001191424 (38.1%) @1.4x, remaining 65:47 RBU 100.0% UBU 96.9% > 9545416704/25001191424 (38.2%) @1.4x, remaining 65:37 RBU 100.0% UBU 96.9% > 9566945280/25001191424 (38.3%) @1.4x, remaining 65:29 RBU 100.0% UBU 96.9% > 9588506624/25001191424 (38.4%) @1.4x, remaining 65:20 RBU 99.9% UBU 96.9% > 9610199040/25001191424 (38.4%) @1.4x, remaining 65:10 RBU 100.0% UBU 96.9% > 9631432704/25001191424 (38.5%) @1.4x, remaining 65:03 RBU 100.0% UBU 96.9% > 9652666368/25001191424 (38.6%) @1.4x, remaining 64:54 RBU 100.0% UBU 96.9% > 9673113600/25001191424 (38.7%) @1.4x, remaining 64:45 RBU 100.0% UBU 96.9% > 9694347264/25001191424 (38.8%) @1.4x, remaining 64:37 RBU 100.0% UBU 96.9% > 9715580928/25001191424 (38.9%) @1.4x, remaining 64:28 RBU 100.0% UBU 96.9% > 9736814592/25001191424 (38.9%) @1.4x, remaining 64:19 RBU 100.0% UBU 96.9% > 9758474240/25001191424 (39.0%) @1.4x, remaining 64:11 RBU 100.0% UBU 96.9% > 9780068352/25001191424 (39.1%) @1.4x, remaining 64:02 RBU 100.0% UBU 96.9% > 9801302016/25001191424 (39.2%) @1.4x, remaining 63:53 RBU 100.0% UBU 96.9% > 9822928896/25001191424 (39.3%) @1.4x, remaining 63:45 RBU 100.0% UBU 96.9% > 9844555776/25001191424 (39.4%) @1.4x, remaining 63:36 RBU 100.0% UBU 96.9% > 9865789440/25001191424 (39.5%) @1.4x, remaining 63:27 RBU 100.0% UBU 96.9% > 9887088640/25001191424 (39.5%) @1.4x, remaining 63:20 RBU 100.0% UBU 96.9% > 9908912128/25001191424 (39.6%) @1.5x, remaining 63:10 RBU 100.0% UBU 96.9% > 9930276864/25001191424 (39.7%) @1.4x, remaining 63:02 RBU 100.0% UBU 96.9% > 9951510528/25001191424 (39.8%) @1.4x, remaining 62:54 RBU 100.0% UBU 96.9% > 9972776960/25001191424 (39.9%) @1.4x, remaining 62:45 RBU 100.0% UBU 96.9% > 9994502144/25001191424 (40.0%) @1.4x, remaining 62:36 RBU 100.0% UBU 96.9% >10015997952/25001191424 (40.1%) @1.4x, remaining 62:29 RBU 100.0% UBU 96.9% >10037231616/25001191424 (40.1%) @1.4x, remaining 62:20 RBU 100.0% UBU 96.9% >10058465280/25001191424 (40.2%) @1.4x, remaining 62:11 RBU 100.0% UBU 96.9% >10079698944/25001191424 (40.3%) @1.4x, remaining 62:04 RBU 100.0% UBU 96.9% >10101260288/25001191424 (40.4%) @1.4x, remaining 61:55 RBU 100.0% UBU 96.9% >10122788864/25001191424 (40.5%) @1.4x, remaining 61:46 RBU 100.0% UBU 96.9% >10144186368/25001191424 (40.6%) @1.4x, remaining 61:39 RBU 100.0% UBU 96.9% >10165420032/25001191424 (40.7%) @1.4x, remaining 61:30 RBU 100.0% UBU 96.9% >10186653696/25001191424 (40.7%) @1.4x, remaining 61:22 RBU 100.0% UBU 96.9% >10207887360/25001191424 (40.8%) @1.4x, remaining 61:15 RBU 100.0% UBU 96.9% >10229121024/25001191424 (40.9%) @1.4x, remaining 61:06 RBU 100.0% UBU 96.9% >10250354688/25001191424 (41.0%) @1.4x, remaining 60:58 RBU 100.0% UBU 96.9% >10271686656/25001191424 (41.1%) @1.4x, remaining 60:50 RBU 100.0% UBU 96.9% >10293018624/25001191424 (41.2%) @1.4x, remaining 60:42 RBU 100.0% UBU 96.9% >10314317824/25001191424 (41.3%) @1.4x, remaining 60:33 RBU 100.0% UBU 96.9% >10335617024/25001191424 (41.3%) @1.4x, remaining 60:26 RBU 100.0% UBU 96.9% >10356850688/25001191424 (41.4%) @1.4x, remaining 60:18 RBU 100.0% UBU 96.9% >10378117120/25001191424 (41.5%) @1.4x, remaining 60:09 RBU 100.0% UBU 96.9% >10397810688/25001191424 (41.6%) @1.3x, remaining 60:03 RBU 98.6% UBU 96.9% >10419044352/25001191424 (41.7%) @1.4x, remaining 59:55 RBU 100.0% UBU 96.9% >10439655424/25001191424 (41.8%) @1.4x, remaining 59:47 RBU 100.0% UBU 96.9% >10460790784/25001191424 (41.8%) @1.4x, remaining 59:40 RBU 100.0% UBU 96.9% >10481958912/25001191424 (41.9%) @1.4x, remaining 59:32 RBU 100.0% UBU 96.9% >10503192576/25001191424 (42.0%) @1.4x, remaining 59:24 RBU 100.0% UBU 96.9% >10524426240/25001191424 (42.1%) @1.4x, remaining 59:17 RBU 100.0% UBU 96.9% >10545659904/25001191424 (42.2%) @1.4x, remaining 59:08 RBU 100.0% UBU 96.9% >10566893568/25001191424 (42.3%) @1.4x, remaining 59:00 RBU 100.0% UBU 96.9% >10588127232/25001191424 (42.4%) @1.4x, remaining 58:53 RBU 100.0% UBU 96.9% >10609360896/25001191424 (42.4%) @1.4x, remaining 58:45 RBU 100.0% UBU 96.9% >10630365184/25001191424 (42.5%) @1.4x, remaining 58:37 RBU 100.0% UBU 96.9% >10651271168/25001191424 (42.6%) @1.4x, remaining 58:30 RBU 100.0% UBU 96.9% >10672865280/25001191424 (42.7%) @1.4x, remaining 58:22 RBU 100.0% UBU 96.9% >10694885376/25001191424 (42.8%) @1.5x, remaining 58:14 RBU 100.0% UBU 96.9% >10717036544/25001191424 (42.9%) @1.5x, remaining 58:06 RBU 100.0% UBU 96.9% >10739187712/25001191424 (43.0%) @1.5x, remaining 57:58 RBU 100.0% UBU 96.9% >10761338880/25001191424 (43.0%) @1.5x, remaining 57:49 RBU 100.0% UBU 96.9% >10783490048/25001191424 (43.1%) @1.5x, remaining 57:42 RBU 100.0% UBU 96.9% >10805641216/25001191424 (43.2%) @1.5x, remaining 57:33 RBU 100.0% UBU 96.9% >10827792384/25001191424 (43.3%) @1.5x, remaining 57:25 RBU 100.0% UBU 96.9% >10849943552/25001191424 (43.4%) @1.5x, remaining 57:18 RBU 100.0% UBU 96.9% >10872094720/25001191424 (43.5%) @1.5x, remaining 57:09 RBU 100.0% UBU 96.9% >10894245888/25001191424 (43.6%) @1.5x, remaining 57:01 RBU 100.0% UBU 96.9% >10916397056/25001191424 (43.7%) @1.5x, remaining 56:53 RBU 100.0% UBU 96.9% >10938548224/25001191424 (43.8%) @1.5x, remaining 56:45 RBU 100.0% UBU 96.9% >10960699392/25001191424 (43.8%) @1.5x, remaining 56:37 RBU 100.0% UBU 96.9% >10982850560/25001191424 (43.9%) @1.5x, remaining 56:30 RBU 100.0% UBU 96.9% >11005001728/25001191424 (44.0%) @1.5x, remaining 56:21 RBU 100.0% UBU 96.9% >11027152896/25001191424 (44.1%) @1.5x, remaining 56:13 RBU 100.0% UBU 96.9% >11049304064/25001191424 (44.2%) @1.5x, remaining 56:06 RBU 100.0% UBU 96.9% >11071258624/25001191424 (44.3%) @1.5x, remaining 55:58 RBU 100.0% UBU 96.9% >11093114880/25001191424 (44.4%) @1.5x, remaining 55:50 RBU 100.0% UBU 96.9% >11114905600/25001191424 (44.5%) @1.5x, remaining 55:43 RBU 100.0% UBU 96.9% >11137056768/25001191424 (44.5%) @1.5x, remaining 55:34 RBU 100.0% UBU 96.9% >11159207936/25001191424 (44.6%) @1.5x, remaining 55:26 RBU 100.0% UBU 96.9% >11179655168/25001191424 (44.7%) @1.4x, remaining 55:20 RBU 100.0% UBU 96.9% >11201478656/25001191424 (44.8%) @1.5x, remaining 55:12 RBU 100.0% UBU 96.9% >11223171072/25001191424 (44.9%) @1.4x, remaining 55:04 RBU 100.0% UBU 96.9% >11245256704/25001191424 (45.0%) @1.5x, remaining 54:57 RBU 100.0% UBU 96.9% >11267407872/25001191424 (45.1%) @1.5x, remaining 54:49 RBU 100.0% UBU 96.9% >11289559040/25001191424 (45.2%) @1.5x, remaining 54:41 RBU 100.0% UBU 96.9% >11311218688/25001191424 (45.2%) @1.4x, remaining 54:35 RBU 100.0% UBU 96.9% >11333009408/25001191424 (45.3%) @1.5x, remaining 54:27 RBU 100.0% UBU 96.9% >11355160576/25001191424 (45.4%) @1.5x, remaining 54:19 RBU 100.0% UBU 96.9% >11377311744/25001191424 (45.5%) @1.5x, remaining 54:12 RBU 100.0% UBU 96.9% >11398840320/25001191424 (45.6%) @1.4x, remaining 54:04 RBU 100.0% UBU 96.9% >11420762112/25001191424 (45.7%) @1.5x, remaining 53:56 RBU 100.0% UBU 96.9% >11442913280/25001191424 (45.8%) @1.5x, remaining 53:49 RBU 100.0% UBU 96.9% >11464671232/25001191424 (45.9%) @1.5x, remaining 53:42 RBU 100.0% UBU 96.9% >11486363648/25001191424 (45.9%) @1.4x, remaining 53:34 RBU 100.0% UBU 96.9% >11508514816/25001191424 (46.0%) @1.5x, remaining 53:27 RBU 100.0% UBU 96.9% >11530272768/25001191424 (46.1%) @1.5x, remaining 53:19 RBU 100.0% UBU 96.9% >11551965184/25001191424 (46.2%) @1.4x, remaining 53:13 RBU 100.0% UBU 96.9% >11574116352/25001191424 (46.3%) @1.5x, remaining 53:05 RBU 100.0% UBU 96.9% >11595677696/25001191424 (46.4%) @1.4x, remaining 52:58 RBU 100.0% UBU 96.9% >11617566720/25001191424 (46.5%) @1.5x, remaining 52:51 RBU 100.0% UBU 96.9% >11639652352/25001191424 (46.6%) @1.5x, remaining 52:43 RBU 100.0% UBU 96.9% >11661017088/25001191424 (46.6%) @1.4x, remaining 52:36 RBU 100.0% UBU 96.9% >11683168256/25001191424 (46.7%) @1.5x, remaining 52:29 RBU 100.0% UBU 96.9% >11704664064/25001191424 (46.8%) @1.4x, remaining 52:22 RBU 100.0% UBU 96.9% >11726618624/25001191424 (46.9%) @1.5x, remaining 52:14 RBU 100.0% UBU 96.9% >11748376576/25001191424 (47.0%) @1.5x, remaining 52:08 RBU 100.0% UBU 96.9% >11770068992/25001191424 (47.1%) @1.4x, remaining 52:00 RBU 100.0% UBU 96.9% >11792023552/25001191424 (47.2%) @1.5x, remaining 51:52 RBU 100.0% UBU 96.9% >11813519360/25001191424 (47.3%) @1.4x, remaining 51:46 RBU 100.0% UBU 96.9% >11835539456/25001191424 (47.3%) @1.5x, remaining 51:39 RBU 100.0% UBU 96.9% >11856969728/25001191424 (47.4%) @1.4x, remaining 51:31 RBU 100.0% UBU 96.9% >11878957056/25001191424 (47.5%) @1.5x, remaining 51:25 RBU 100.0% UBU 96.9% >11900420096/25001191424 (47.6%) @1.4x, remaining 51:18 RBU 100.0% UBU 96.9% >11922309120/25001191424 (47.7%) @1.5x, remaining 51:10 RBU 100.0% UBU 96.9% >11942166528/25001191424 (47.8%) @1.3x, remaining 51:05 RBU 100.0% UBU 96.9% >11963531264/25001191424 (47.9%) @1.4x, remaining 50:57 RBU 100.0% UBU 96.9% >11985616896/25001191424 (47.9%) @1.5x, remaining 50:50 RBU 100.0% UBU 96.9% >12006916096/25001191424 (48.0%) @1.4x, remaining 50:44 RBU 100.0% UBU 96.9% >12029001728/25001191424 (48.1%) @1.5x, remaining 50:36 RBU 100.0% UBU 96.9% >12050366464/25001191424 (48.2%) @1.4x, remaining 50:29 RBU 100.0% UBU 96.9% >12071960576/25001191424 (48.3%) @1.4x, remaining 50:23 RBU 100.0% UBU 96.9% >12093816832/25001191424 (48.4%) @1.5x, remaining 50:16 RBU 100.0% UBU 96.9% >12115116032/25001191424 (48.5%) @1.4x, remaining 50:09 RBU 100.0% UBU 96.9% >12137070592/25001191424 (48.5%) @1.5x, remaining 50:02 RBU 100.0% UBU 96.9% >12159746048/25001191424 (48.6%) @1.5x, remaining 49:54 RBU 100.0% UBU 96.9% >12182683648/25001191424 (48.7%) @1.5x, remaining 49:47 RBU 100.0% UBU 96.9% >12204998656/25001191424 (48.8%) @1.5x, remaining 49:40 RBU 100.0% UBU 96.9% >12227641344/25001191424 (48.9%) @1.5x, remaining 49:33 RBU 100.0% UBU 96.9% >12250578944/25001191424 (49.0%) @1.5x, remaining 49:25 RBU 100.0% UBU 96.9% >12272664576/25001191424 (49.1%) @1.5x, remaining 49:18 RBU 100.0% UBU 96.9% >12295536640/25001191424 (49.2%) @1.5x, remaining 49:11 RBU 100.0% UBU 96.9% >12318179328/25001191424 (49.3%) @1.5x, remaining 49:03 RBU 100.0% UBU 96.9% >12340494336/25001191424 (49.4%) @1.5x, remaining 48:57 RBU 100.0% UBU 96.9% >12363431936/25001191424 (49.5%) @1.5x, remaining 48:49 RBU 100.0% UBU 96.9% >12385550336/25001191424 (49.5%) @1.5x, remaining 48:42 RBU 99.9% UBU 96.9% >12408389632/25001191424 (49.6%) @1.5x, remaining 48:35 RBU 100.0% UBU 96.9% >12430835712/25001191424 (49.7%) @1.5x, remaining 48:28 RBU 100.0% UBU 96.9% >12453347328/25001191424 (49.8%) @1.5x, remaining 48:20 RBU 100.0% UBU 96.9% >12476022784/25001191424 (49.9%) @1.5x, remaining 48:14 RBU 100.0% UBU 96.9% >12498305024/25001191424 (50.0%) @1.5x, remaining 48:07 RBU 100.0% UBU 96.9% >12521111552/25001191424 (50.1%) @1.5x, remaining 47:59 RBU 100.0% UBU 96.9% >12543262720/25001191424 (50.2%) @1.5x, remaining 47:53 RBU 100.0% UBU 96.9% >12566134784/25001191424 (50.3%) @1.5x, remaining 47:45 RBU 100.0% UBU 96.9% >12588220416/25001191424 (50.4%) @1.5x, remaining 47:38 RBU 100.0% UBU 96.9% >12611059712/25001191424 (50.4%) @1.5x, remaining 47:32 RBU 100.0% UBU 96.9% >12633178112/25001191424 (50.5%) @1.5x, remaining 47:25 RBU 100.0% UBU 96.9% >12655886336/25001191424 (50.6%) @1.5x, remaining 47:17 RBU 99.9% UBU 96.9% >12678135808/25001191424 (50.7%) @1.5x, remaining 47:11 RBU 100.0% UBU 96.9% >12700614656/25001191424 (50.8%) @1.5x, remaining 47:04 RBU 100.0% UBU 96.9% >12722667520/25001191424 (50.9%) @1.5x, remaining 46:57 RBU 100.0% UBU 96.9% >12743278592/25001191424 (51.0%) @1.4x, remaining 46:51 RBU 95.9% UBU 96.9% >12766216192/25001191424 (51.1%) @1.5x, remaining 46:44 RBU 100.0% UBU 96.9% >12788236288/25001191424 (51.2%) @1.5x, remaining 46:37 RBU 100.0% UBU 96.9% >12810715136/25001191424 (51.2%) @1.5x, remaining 46:30 RBU 100.0% UBU 96.9% >12833193984/25001191424 (51.3%) @1.5x, remaining 46:23 RBU 100.0% UBU 96.9% >12855214080/25001191424 (51.4%) @1.5x, remaining 46:16 RBU 100.0% UBU 96.9% >12878086144/25001191424 (51.5%) @1.5x, remaining 46:10 RBU 100.0% UBU 96.9% >12900171776/25001191424 (51.6%) @1.5x, remaining 46:03 RBU 100.0% UBU 96.9% >12922355712/25001191424 (51.7%) @1.5x, remaining 45:56 RBU 100.0% UBU 96.9% >12945129472/25001191424 (51.8%) @1.5x, remaining 45:50 RBU 100.0% UBU 96.9% >12967149568/25001191424 (51.9%) @1.5x, remaining 45:43 RBU 100.0% UBU 96.9% >12989300736/25001191424 (52.0%) @1.5x, remaining 45:36 RBU 100.0% UBU 96.9% >13012107264/25001191424 (52.0%) @1.5x, remaining 45:30 RBU 100.0% UBU 96.9% >13034127360/25001191424 (52.1%) @1.5x, remaining 45:23 RBU 100.0% UBU 96.9% >13056147456/25001191424 (52.2%) @1.5x, remaining 45:16 RBU 100.0% UBU 96.9% >13078822912/25001191424 (52.3%) @1.5x, remaining 45:10 RBU 100.0% UBU 96.9% >13101105152/25001191424 (52.4%) @1.5x, remaining 45:03 RBU 100.0% UBU 96.9% >13123125248/25001191424 (52.5%) @1.5x, remaining 44:56 RBU 100.0% UBU 96.9% >13145341952/25001191424 (52.6%) @1.5x, remaining 44:50 RBU 100.0% UBU 96.9% >13168017408/25001191424 (52.7%) @1.5x, remaining 44:43 RBU 100.0% UBU 96.9% >13190103040/25001191424 (52.8%) @1.5x, remaining 44:36 RBU 100.0% UBU 96.9% >13212123136/25001191424 (52.8%) @1.5x, remaining 44:30 RBU 100.0% UBU 96.9% >13234274304/25001191424 (52.9%) @1.5x, remaining 44:23 RBU 100.0% UBU 96.9% >13256818688/25001191424 (53.0%) @1.5x, remaining 44:16 RBU 100.0% UBU 96.9% >13279100928/25001191424 (53.1%) @1.5x, remaining 44:10 RBU 100.0% UBU 96.9% >13301121024/25001191424 (53.2%) @1.5x, remaining 44:04 RBU 100.0% UBU 96.9% >13323141120/25001191424 (53.3%) @1.5x, remaining 43:57 RBU 100.0% UBU 96.9% >13345226752/25001191424 (53.4%) @1.5x, remaining 43:51 RBU 100.0% UBU 96.9% >13367672832/25001191424 (53.5%) @1.5x, remaining 43:44 RBU 100.0% UBU 96.9% >13390118912/25001191424 (53.6%) @1.5x, remaining 43:37 RBU 100.0% UBU 96.9% >13412139008/25001191424 (53.6%) @1.5x, remaining 43:32 RBU 100.0% UBU 96.9% >13434159104/25001191424 (53.7%) @1.5x, remaining 43:25 RBU 100.0% UBU 96.9% >13456179200/25001191424 (53.8%) @1.5x, remaining 43:18 RBU 100.0% UBU 96.9% >13478199296/25001191424 (53.9%) @1.5x, remaining 43:13 RBU 100.0% UBU 96.9% >13500219392/25001191424 (54.0%) @1.5x, remaining 43:06 RBU 100.0% UBU 96.9% >13522239488/25001191424 (54.1%) @1.5x, remaining 42:59 RBU 100.0% UBU 96.9% >13544259584/25001191424 (54.2%) @1.5x, remaining 42:54 RBU 100.0% UBU 96.9% >13565034496/25001191424 (54.3%) @1.4x, remaining 42:47 RBU 82.0% UBU 96.9% >13587251200/25001191424 (54.3%) @1.5x, remaining 42:41 RBU 100.0% UBU 96.9% >13609402368/25001191424 (54.4%) @1.5x, remaining 42:35 RBU 100.0% UBU 96.9% >13631422464/25001191424 (54.5%) @1.5x, remaining 42:28 RBU 100.0% UBU 96.9% >13653442560/25001191424 (54.6%) @1.5x, remaining 42:22 RBU 100.0% UBU 96.9% >13675462656/25001191424 (54.7%) @1.5x, remaining 42:16 RBU 100.0% UBU 96.9% >13697482752/25001191424 (54.8%) @1.5x, remaining 42:10 RBU 100.0% UBU 96.9% >13719502848/25001191424 (54.9%) @1.5x, remaining 42:03 RBU 100.0% UBU 96.9% >13741522944/25001191424 (55.0%) @1.5x, remaining 41:57 RBU 100.0% UBU 96.9% >13763543040/25001191424 (55.1%) @1.5x, remaining 41:51 RBU 100.0% UBU 96.9% >13785563136/25001191424 (55.1%) @1.5x, remaining 41:45 RBU 100.0% UBU 96.9% >13807583232/25001191424 (55.2%) @1.5x, remaining 41:39 RBU 100.0% UBU 96.9% >13829603328/25001191424 (55.3%) @1.5x, remaining 41:32 RBU 100.0% UBU 96.9% >13851623424/25001191424 (55.4%) @1.5x, remaining 41:26 RBU 100.0% UBU 96.9% >13873643520/25001191424 (55.5%) @1.5x, remaining 41:20 RBU 100.0% UBU 96.9% >13895663616/25001191424 (55.6%) @1.5x, remaining 41:14 RBU 100.0% UBU 96.9% >13917683712/25001191424 (55.7%) @1.5x, remaining 41:07 RBU 100.0% UBU 96.9% >13939703808/25001191424 (55.8%) @1.5x, remaining 41:02 RBU 100.0% UBU 96.9% >13961723904/25001191424 (55.8%) @1.5x, remaining 40:55 RBU 100.0% UBU 96.9% >13983678464/25001191424 (55.9%) @1.5x, remaining 40:49 RBU 100.0% UBU 96.9% >14005501952/25001191424 (56.0%) @1.5x, remaining 40:44 RBU 100.0% UBU 96.9% >14027259904/25001191424 (56.1%) @1.5x, remaining 40:37 RBU 100.0% UBU 96.9% >14049050624/25001191424 (56.2%) @1.5x, remaining 40:32 RBU 100.0% UBU 96.9% >14070906880/25001191424 (56.3%) @1.5x, remaining 40:25 RBU 100.0% UBU 96.9% >14092926976/25001191424 (56.4%) @1.5x, remaining 40:19 RBU 100.0% UBU 96.9% >14114947072/25001191424 (56.5%) @1.5x, remaining 40:14 RBU 100.0% UBU 96.9% >14136967168/25001191424 (56.5%) @1.5x, remaining 40:07 RBU 100.0% UBU 96.9% >14158987264/25001191424 (56.6%) @1.5x, remaining 40:01 RBU 100.0% UBU 96.9% >14180810752/25001191424 (56.7%) @1.5x, remaining 39:55 RBU 100.0% UBU 96.9% >14202437632/25001191424 (56.8%) @1.4x, remaining 39:49 RBU 100.0% UBU 96.9% >14224130048/25001191424 (56.9%) @1.4x, remaining 39:43 RBU 100.0% UBU 96.9% >14246150144/25001191424 (57.0%) @1.5x, remaining 39:38 RBU 100.0% UBU 96.9% >14267711488/25001191424 (57.1%) @1.4x, remaining 39:31 RBU 100.0% UBU 96.9% >14289272832/25001191424 (57.2%) @1.4x, remaining 39:25 RBU 100.0% UBU 96.9% >14311292928/25001191424 (57.2%) @1.5x, remaining 39:20 RBU 100.0% UBU 96.9% >14333313024/25001191424 (57.3%) @1.5x, remaining 39:14 RBU 100.0% UBU 96.9% >14355333120/25001191424 (57.4%) @1.5x, remaining 39:07 RBU 100.0% UBU 96.9% >14376796160/25001191424 (57.5%) @1.4x, remaining 39:02 RBU 100.0% UBU 96.9% >14397407232/25001191424 (57.6%) @1.4x, remaining 38:56 RBU 100.0% UBU 96.9% >14418837504/25001191424 (57.7%) @1.4x, remaining 38:50 RBU 100.0% UBU 96.9% >14440660992/25001191424 (57.8%) @1.5x, remaining 38:45 RBU 100.0% UBU 96.9% >14462681088/25001191424 (57.8%) @1.5x, remaining 38:39 RBU 100.0% UBU 96.9% >14484537344/25001191424 (57.9%) @1.5x, remaining 38:33 RBU 100.0% UBU 96.9% >14505869312/25001191424 (58.0%) @1.4x, remaining 38:28 RBU 100.0% UBU 96.9% >14527823872/25001191424 (58.1%) @1.5x, remaining 38:21 RBU 100.0% UBU 96.9% >14549843968/25001191424 (58.2%) @1.5x, remaining 38:15 RBU 100.0% UBU 96.9% >14571339776/25001191424 (58.3%) @1.4x, remaining 38:10 RBU 100.0% UBU 96.9% >14592966656/25001191424 (58.4%) @1.4x, remaining 38:04 RBU 100.0% UBU 96.9% >14614986752/25001191424 (58.5%) @1.5x, remaining 37:58 RBU 100.0% UBU 96.9% >14636613632/25001191424 (58.5%) @1.4x, remaining 37:53 RBU 100.0% UBU 96.9% >14658109440/25001191424 (58.6%) @1.4x, remaining 37:47 RBU 100.0% UBU 96.9% >14680129536/25001191424 (58.7%) @1.5x, remaining 37:41 RBU 100.0% UBU 96.9% >14701723648/25001191424 (58.8%) @1.4x, remaining 37:35 RBU 100.0% UBU 96.9% >14723252224/25001191424 (58.9%) @1.4x, remaining 37:29 RBU 100.0% UBU 96.9% >14745272320/25001191424 (59.0%) @1.5x, remaining 37:23 RBU 100.0% UBU 96.9% >14766571520/25001191424 (59.1%) @1.4x, remaining 37:18 RBU 100.0% UBU 96.9% >14788395008/25001191424 (59.2%) @1.5x, remaining 37:12 RBU 100.0% UBU 96.9% >14810284032/25001191424 (59.2%) @1.5x, remaining 37:06 RBU 100.0% UBU 96.9% >14831517696/25001191424 (59.3%) @1.4x, remaining 37:01 RBU 100.0% UBU 96.9% >14853537792/25001191424 (59.4%) @1.5x, remaining 36:55 RBU 100.0% UBU 96.9% >14874902528/25001191424 (59.5%) @1.4x, remaining 36:49 RBU 100.0% UBU 96.9% >14896660480/25001191424 (59.6%) @1.5x, remaining 36:44 RBU 100.0% UBU 96.9% >14918385664/25001191424 (59.7%) @1.4x, remaining 36:38 RBU 99.9% UBU 96.9% >14939783168/25001191424 (59.8%) @1.4x, remaining 36:32 RBU 100.0% UBU 96.9% >14961803264/25001191424 (59.8%) @1.5x, remaining 36:27 RBU 98.1% UBU 96.9% >14982905856/25001191424 (59.9%) @1.4x, remaining 36:21 RBU 100.0% UBU 96.9% >15004041216/25001191424 (60.0%) @1.4x, remaining 36:16 RBU 100.0% UBU 96.9% >15026028544/25001191424 (60.1%) @1.5x, remaining 36:10 RBU 100.0% UBU 96.9% >15047327744/25001191424 (60.2%) @1.4x, remaining 36:05 RBU 100.0% UBU 96.9% >15069151232/25001191424 (60.3%) @1.5x, remaining 35:59 RBU 100.0% UBU 96.9% >15090483200/25001191424 (60.4%) @1.4x, remaining 35:54 RBU 99.9% UBU 96.9% >15112273920/25001191424 (60.4%) @1.5x, remaining 35:48 RBU 100.0% UBU 96.9% >15133573120/25001191424 (60.5%) @1.4x, remaining 35:42 RBU 100.0% UBU 96.9% >15155396608/25001191424 (60.6%) @1.5x, remaining 35:37 RBU 100.0% UBU 96.9% >15176597504/25001191424 (60.7%) @1.4x, remaining 35:31 RBU 100.0% UBU 96.9% >15198519296/25001191424 (60.8%) @1.5x, remaining 35:25 RBU 100.0% UBU 96.9% >15219621888/25001191424 (60.9%) @1.4x, remaining 35:20 RBU 100.0% UBU 96.9% >15241641984/25001191424 (61.0%) @1.5x, remaining 35:14 RBU 100.0% UBU 96.9% >15261564928/25001191424 (61.0%) @1.3x, remaining 35:09 RBU 100.0% UBU 96.9% >15282929664/25001191424 (61.1%) @1.4x, remaining 35:04 RBU 100.0% UBU 96.9% >15304359936/25001191424 (61.2%) @1.4x, remaining 34:59 RBU 99.9% UBU 96.9% >15326052352/25001191424 (61.3%) @1.4x, remaining 34:53 RBU 100.0% UBU 96.9% >15347154944/25001191424 (61.4%) @1.4x, remaining 34:48 RBU 100.0% UBU 96.9% >15369175040/25001191424 (61.5%) @1.5x, remaining 34:42 RBU 100.0% UBU 96.9% >15390277632/25001191424 (61.6%) @1.4x, remaining 34:37 RBU 100.0% UBU 96.9% >15411773440/25001191424 (61.6%) @1.4x, remaining 34:31 RBU 100.0% UBU 96.9% >15433400320/25001191424 (61.7%) @1.4x, remaining 34:26 RBU 100.0% UBU 96.9% >15454502912/25001191424 (61.8%) @1.4x, remaining 34:20 RBU 100.0% UBU 96.9% >15476326400/25001191424 (61.9%) @1.5x, remaining 34:15 RBU 100.0% UBU 96.9% >15497625600/25001191424 (62.0%) @1.4x, remaining 34:10 RBU 100.0% UBU 96.9% >15518728192/25001191424 (62.1%) @1.4x, remaining 34:04 RBU 100.0% UBU 96.9% >15540715520/25001191424 (62.2%) @1.5x, remaining 33:59 RBU 100.0% UBU 96.9% >15561850880/25001191424 (62.2%) @1.4x, remaining 33:53 RBU 100.0% UBU 96.9% >15582953472/25001191424 (62.3%) @1.4x, remaining 33:48 RBU 100.0% UBU 96.9% >15604842496/25001191424 (62.4%) @1.5x, remaining 33:43 RBU 100.0% UBU 96.9% >15626076160/25001191424 (62.5%) @1.4x, remaining 33:37 RBU 100.0% UBU 96.9% >15647178752/25001191424 (62.6%) @1.4x, remaining 33:32 RBU 100.0% UBU 96.9% >15668871168/25001191424 (62.7%) @1.4x, remaining 33:27 RBU 100.0% UBU 96.9% >15690301440/25001191424 (62.8%) @1.4x, remaining 33:21 RBU 100.0% UBU 96.9% >15711404032/25001191424 (62.8%) @1.4x, remaining 33:16 RBU 100.0% UBU 96.9% >15733030912/25001191424 (62.9%) @1.4x, remaining 33:11 RBU 100.0% UBU 96.9% >15754461184/25001191424 (63.0%) @1.4x, remaining 33:05 RBU 100.0% UBU 96.9% >15776284672/25001191424 (63.1%) @1.5x, remaining 32:59 RBU 100.0% UBU 96.9% >15798304768/25001191424 (63.2%) @1.5x, remaining 32:54 RBU 100.0% UBU 96.9% >15819538432/25001191424 (63.3%) @1.4x, remaining 32:49 RBU 100.0% UBU 96.9% >15841558528/25001191424 (63.4%) @1.5x, remaining 32:43 RBU 100.0% UBU 96.9% >15863185408/25001191424 (63.4%) @1.4x, remaining 32:38 RBU 100.0% UBU 96.9% >15884812288/25001191424 (63.5%) @1.4x, remaining 32:32 RBU 100.0% UBU 96.9% >15906766848/25001191424 (63.6%) @1.5x, remaining 32:27 RBU 100.0% UBU 96.9% >15928066048/25001191424 (63.7%) @1.4x, remaining 32:22 RBU 100.0% UBU 96.9% >15950086144/25001191424 (63.8%) @1.5x, remaining 32:16 RBU 100.0% UBU 96.9% >15971352576/25001191424 (63.9%) @1.4x, remaining 32:11 RBU 100.0% UBU 96.9% >15993339904/25001191424 (64.0%) @1.5x, remaining 32:06 RBU 100.0% UBU 96.9% >16014802944/25001191424 (64.1%) @1.4x, remaining 32:00 RBU 99.9% UBU 96.9% >16036593664/25001191424 (64.1%) @1.5x, remaining 31:55 RBU 100.0% UBU 96.9% >16058122240/25001191424 (64.2%) @1.4x, remaining 31:50 RBU 100.0% UBU 96.9% >16079847424/25001191424 (64.3%) @1.4x, remaining 31:44 RBU 100.0% UBU 96.9% >16101408768/25001191424 (64.4%) @1.4x, remaining 31:39 RBU 100.0% UBU 96.9% >16121528320/25001191424 (64.5%) @1.3x, remaining 31:34 RBU 88.4% UBU 96.9% >16143187968/25001191424 (64.6%) @1.4x, remaining 31:29 RBU 100.0% UBU 96.9% >16164782080/25001191424 (64.7%) @1.4x, remaining 31:23 RBU 100.0% UBU 96.9% >16186310656/25001191424 (64.7%) @1.4x, remaining 31:18 RBU 100.0% UBU 96.9% >16208035840/25001191424 (64.8%) @1.4x, remaining 31:13 RBU 100.0% UBU 96.9% >16229335040/25001191424 (64.9%) @1.4x, remaining 31:07 RBU 100.0% UBU 96.9% >16251289600/25001191424 (65.0%) @1.5x, remaining 31:02 RBU 100.0% UBU 96.9% >16272523264/25001191424 (65.1%) @1.4x, remaining 30:57 RBU 100.0% UBU 96.9% >16294477824/25001191424 (65.2%) @1.5x, remaining 30:52 RBU 100.0% UBU 96.9% >16315777024/25001191424 (65.3%) @1.4x, remaining 30:47 RBU 100.0% UBU 96.9% >16337305600/25001191424 (65.3%) @1.4x, remaining 30:41 RBU 100.0% UBU 96.9% >16359030784/25001191424 (65.4%) @1.4x, remaining 30:36 RBU 100.0% UBU 96.9% >16380264448/25001191424 (65.5%) @1.4x, remaining 30:31 RBU 100.0% UBU 96.9% >16402153472/25001191424 (65.6%) @1.5x, remaining 30:26 RBU 100.0% UBU 96.9% >16423518208/25001191424 (65.7%) @1.4x, remaining 30:21 RBU 100.0% UBU 96.9% >16444817408/25001191424 (65.8%) @1.4x, remaining 30:15 RBU 100.0% UBU 96.9% >16466771968/25001191424 (65.9%) @1.5x, remaining 30:10 RBU 100.0% UBU 96.9% >16487612416/25001191424 (65.9%) @1.4x, remaining 30:05 RBU 100.0% UBU 96.9% >16509239296/25001191424 (66.0%) @1.4x, remaining 30:00 RBU 100.0% UBU 96.9% >16530472960/25001191424 (66.1%) @1.4x, remaining 29:55 RBU 100.0% UBU 96.9% >16552001536/25001191424 (66.2%) @1.4x, remaining 29:50 RBU 100.0% UBU 96.9% >16573726720/25001191424 (66.3%) @1.4x, remaining 29:44 RBU 100.0% UBU 96.9% >16594960384/25001191424 (66.4%) @1.4x, remaining 29:39 RBU 100.0% UBU 96.9% >16616259584/25001191424 (66.5%) @1.4x, remaining 29:34 RBU 100.0% UBU 96.9% >16638115840/25001191424 (66.5%) @1.5x, remaining 29:29 RBU 100.0% UBU 96.9% >16659447808/25001191424 (66.6%) @1.4x, remaining 29:24 RBU 100.0% UBU 96.9% >16680681472/25001191424 (66.7%) @1.4x, remaining 29:19 RBU 100.0% UBU 96.9% >16702177280/25001191424 (66.8%) @1.4x, remaining 29:13 RBU 100.0% UBU 96.9% >16723935232/25001191424 (66.9%) @1.5x, remaining 29:08 RBU 100.0% UBU 96.9% >16745168896/25001191424 (67.0%) @1.4x, remaining 29:03 RBU 100.0% UBU 96.9% >16766402560/25001191424 (67.1%) @1.4x, remaining 28:58 RBU 100.0% UBU 96.9% >16787767296/25001191424 (67.1%) @1.4x, remaining 28:53 RBU 100.0% UBU 96.9% >16809492480/25001191424 (67.2%) @1.4x, remaining 28:48 RBU 100.0% UBU 96.9% >16830889984/25001191424 (67.3%) @1.4x, remaining 28:43 RBU 100.0% UBU 96.9% >16852123648/25001191424 (67.4%) @1.4x, remaining 28:38 RBU 100.0% UBU 96.9% >16873357312/25001191424 (67.5%) @1.4x, remaining 28:33 RBU 100.0% UBU 96.9% >16894722048/25001191424 (67.6%) @1.4x, remaining 28:28 RBU 100.0% UBU 96.9% >16916348928/25001191424 (67.7%) @1.4x, remaining 28:22 RBU 100.0% UBU 96.9% >16937844736/25001191424 (67.7%) @1.4x, remaining 28:18 RBU 100.0% UBU 96.9% >16959078400/25001191424 (67.8%) @1.4x, remaining 28:12 RBU 100.0% UBU 96.9% >16980312064/25001191424 (67.9%) @1.4x, remaining 28:07 RBU 100.0% UBU 96.9% >17001545728/25001191424 (68.0%) @1.4x, remaining 28:03 RBU 100.0% UBU 96.9% >17021239296/25001191424 (68.1%) @1.3x, remaining 27:58 RBU 100.0% UBU 96.9% >17042767872/25001191424 (68.2%) @1.4x, remaining 27:53 RBU 100.0% UBU 96.9% >17064263680/25001191424 (68.3%) @1.4x, remaining 27:48 RBU 99.9% UBU 96.9% >17085693952/25001191424 (68.3%) @1.4x, remaining 27:43 RBU 100.0% UBU 96.9% >17106927616/25001191424 (68.4%) @1.4x, remaining 27:38 RBU 100.0% UBU 96.9% >17128161280/25001191424 (68.5%) @1.4x, remaining 27:33 RBU 100.0% UBU 96.9% >17149394944/25001191424 (68.6%) @1.4x, remaining 27:28 RBU 100.0% UBU 96.9% >17170628608/25001191424 (68.7%) @1.4x, remaining 27:23 RBU 100.0% UBU 96.9% >17191862272/25001191424 (68.8%) @1.4x, remaining 27:18 RBU 100.0% UBU 96.9% >17213095936/25001191424 (68.8%) @1.4x, remaining 27:13 RBU 100.0% UBU 96.9% >17234329600/25001191424 (68.9%) @1.4x, remaining 27:08 RBU 100.0% UBU 96.9% >17255563264/25001191424 (69.0%) @1.4x, remaining 27:03 RBU 100.0% UBU 96.9% >17276796928/25001191424 (69.1%) @1.4x, remaining 26:58 RBU 100.0% UBU 96.9% >17298030592/25001191424 (69.2%) @1.4x, remaining 26:53 RBU 99.9% UBU 96.9% >17319264256/25001191424 (69.3%) @1.4x, remaining 26:48 RBU 100.0% UBU 96.9% >17340497920/25001191424 (69.4%) @1.4x, remaining 26:43 RBU 100.0% UBU 96.9% >17361731584/25001191424 (69.4%) @1.4x, remaining 26:38 RBU 100.0% UBU 96.9% >17383292928/25001191424 (69.5%) @1.4x, remaining 26:33 RBU 99.9% UBU 96.9% >17405837312/25001191424 (69.6%) @1.5x, remaining 26:28 RBU 100.0% UBU 96.9% >17427988480/25001191424 (69.7%) @1.5x, remaining 26:23 RBU 100.0% UBU 96.9% >17450139648/25001191424 (69.8%) @1.5x, remaining 26:18 RBU 100.0% UBU 96.9% >17472290816/25001191424 (69.9%) @1.5x, remaining 26:12 RBU 100.0% UBU 96.9% >17494900736/25001191424 (70.0%) @1.5x, remaining 26:07 RBU 100.0% UBU 96.9% >17517412352/25001191424 (70.1%) @1.5x, remaining 26:02 RBU 100.0% UBU 96.9% >17539596288/25001191424 (70.2%) @1.5x, remaining 25:57 RBU 100.0% UBU 96.9% >17561747456/25001191424 (70.2%) @1.5x, remaining 25:51 RBU 100.0% UBU 96.9% >17583898624/25001191424 (70.3%) @1.5x, remaining 25:46 RBU 100.0% UBU 96.9% >17606049792/25001191424 (70.4%) @1.5x, remaining 25:41 RBU 100.0% UBU 96.9% >17628463104/25001191424 (70.5%) @1.5x, remaining 25:36 RBU 100.0% UBU 96.9% >17650909184/25001191424 (70.6%) @1.5x, remaining 25:31 RBU 100.0% UBU 96.9% >17673355264/25001191424 (70.7%) @1.5x, remaining 25:25 RBU 100.0% UBU 96.9% >17695506432/25001191424 (70.8%) @1.5x, remaining 25:20 RBU 100.0% UBU 96.9% >17717657600/25001191424 (70.9%) @1.5x, remaining 25:15 RBU 100.0% UBU 96.9% >17739808768/25001191424 (71.0%) @1.5x, remaining 25:10 RBU 100.0% UBU 96.9% >17761959936/25001191424 (71.0%) @1.5x, remaining 25:05 RBU 100.0% UBU 96.9% >17784111104/25001191424 (71.1%) @1.5x, remaining 25:00 RBU 100.0% UBU 96.9% >17806262272/25001191424 (71.2%) @1.5x, remaining 24:55 RBU 100.0% UBU 96.9% >17828413440/25001191424 (71.3%) @1.5x, remaining 24:49 RBU 100.0% UBU 96.9% >17850662912/25001191424 (71.4%) @1.5x, remaining 24:44 RBU 100.0% UBU 96.9% >17872912384/25001191424 (71.5%) @1.5x, remaining 24:39 RBU 100.0% UBU 96.9% >17895194624/25001191424 (71.6%) @1.5x, remaining 24:34 RBU 100.0% UBU 96.9% >17915969536/25001191424 (71.7%) @1.4x, remaining 24:29 RBU 100.0% UBU 96.9% >17938120704/25001191424 (71.7%) @1.5x, remaining 24:24 RBU 100.0% UBU 96.9% >17960337408/25001191424 (71.8%) @1.5x, remaining 24:19 RBU 99.9% UBU 96.9% >17982488576/25001191424 (71.9%) @1.5x, remaining 24:14 RBU 100.0% UBU 96.9% >18003918848/25001191424 (72.0%) @1.4x, remaining 24:09 RBU 100.0% UBU 96.9% >18026070016/25001191424 (72.1%) @1.5x, remaining 24:04 RBU 100.0% UBU 96.9% >18048221184/25001191424 (72.2%) @1.5x, remaining 23:59 RBU 100.0% UBU 96.9% >18070372352/25001191424 (72.3%) @1.5x, remaining 23:54 RBU 100.0% UBU 96.9% >18092523520/25001191424 (72.4%) @1.5x, remaining 23:49 RBU 100.0% UBU 96.9% >18114674688/25001191424 (72.5%) @1.5x, remaining 23:44 RBU 100.0% UBU 96.9% >18136825856/25001191424 (72.5%) @1.5x, remaining 23:39 RBU 100.0% UBU 96.9% >18158977024/25001191424 (72.6%) @1.5x, remaining 23:34 RBU 100.0% UBU 96.9% >18181128192/25001191424 (72.7%) @1.5x, remaining 23:29 RBU 100.0% UBU 96.9% >18203279360/25001191424 (72.8%) @1.5x, remaining 23:24 RBU 100.0% UBU 96.9% >18225430528/25001191424 (72.9%) @1.5x, remaining 23:18 RBU 100.0% UBU 96.9% >18247516160/25001191424 (73.0%) @1.5x, remaining 23:14 RBU 100.0% UBU 96.9% >18269470720/25001191424 (73.1%) @1.5x, remaining 23:09 RBU 100.0% UBU 96.9% >18291359744/25001191424 (73.2%) @1.5x, remaining 23:04 RBU 100.1% UBU 96.9% >18313314304/25001191424 (73.2%) @1.5x, remaining 22:59 RBU 99.9% UBU 96.9% >18335334400/25001191424 (73.3%) @1.5x, remaining 22:54 RBU 100.0% UBU 96.9% >18357485568/25001191424 (73.4%) @1.5x, remaining 22:49 RBU 100.0% UBU 96.9% >18379636736/25001191424 (73.5%) @1.5x, remaining 22:44 RBU 100.0% UBU 96.9% >18401787904/25001191424 (73.6%) @1.5x, remaining 22:39 RBU 100.0% UBU 96.9% >18423939072/25001191424 (73.7%) @1.5x, remaining 22:34 RBU 100.0% UBU 96.9% >18445828096/25001191424 (73.8%) @1.5x, remaining 22:29 RBU 100.0% UBU 96.9% >18467618816/25001191424 (73.9%) @1.5x, remaining 22:24 RBU 100.0% UBU 96.9% >18489540608/25001191424 (74.0%) @1.5x, remaining 22:19 RBU 100.0% UBU 96.9% >18511691776/25001191424 (74.0%) @1.5x, remaining 22:14 RBU 100.0% UBU 96.9% >18533842944/25001191424 (74.1%) @1.5x, remaining 22:09 RBU 100.0% UBU 96.9% >18555994112/25001191424 (74.2%) @1.5x, remaining 22:04 RBU 100.0% UBU 96.9% >18577752064/25001191424 (74.3%) @1.5x, remaining 21:59 RBU 100.0% UBU 96.9% >18599444480/25001191424 (74.4%) @1.4x, remaining 21:54 RBU 100.0% UBU 96.9% >18621595648/25001191424 (74.5%) @1.5x, remaining 21:49 RBU 100.0% UBU 96.9% >18643746816/25001191424 (74.6%) @1.5x, remaining 21:44 RBU 100.0% UBU 96.9% >18665832448/25001191424 (74.7%) @1.5x, remaining 21:39 RBU 100.0% UBU 96.9% >18687459328/25001191424 (74.7%) @1.4x, remaining 21:35 RBU 100.0% UBU 96.9% >18709348352/25001191424 (74.8%) @1.5x, remaining 21:30 RBU 100.0% UBU 96.9% >18731499520/25001191424 (74.9%) @1.5x, remaining 21:25 RBU 100.0% UBU 96.9% >18752798720/25001191424 (75.0%) @1.4x, remaining 21:20 RBU 100.0% UBU 96.9% >18774949888/25001191424 (75.1%) @1.5x, remaining 21:15 RBU 100.0% UBU 96.9% >18797002752/25001191424 (75.2%) @1.5x, remaining 21:10 RBU 100.0% UBU 96.9% >18818531328/25001191424 (75.3%) @1.4x, remaining 21:05 RBU 100.0% UBU 96.9% >18838847488/25001191424 (75.4%) @1.4x, remaining 21:01 RBU 94.0% UBU 96.9% >18860998656/25001191424 (75.4%) @1.5x, remaining 20:56 RBU 100.0% UBU 96.9% >18882953216/25001191424 (75.5%) @1.5x, remaining 20:51 RBU 100.0% UBU 96.9% >18904449024/25001191424 (75.6%) @1.4x, remaining 20:47 RBU 100.0% UBU 96.9% >18926600192/25001191424 (75.7%) @1.5x, remaining 20:42 RBU 100.0% UBU 96.9% >18948653056/25001191424 (75.8%) @1.5x, remaining 20:37 RBU 100.0% UBU 96.9% >18970050560/25001191424 (75.9%) @1.4x, remaining 20:32 RBU 100.0% UBU 96.9% >18992201728/25001191424 (76.0%) @1.5x, remaining 20:27 RBU 100.0% UBU 96.9% >19014221824/25001191424 (76.1%) @1.5x, remaining 20:22 RBU 100.0% UBU 96.9% >19035652096/25001191424 (76.1%) @1.4x, remaining 20:18 RBU 100.0% UBU 96.9% >19057803264/25001191424 (76.2%) @1.5x, remaining 20:13 RBU 100.0% UBU 96.9% >19079593984/25001191424 (76.3%) @1.5x, remaining 20:08 RBU 100.0% UBU 96.9% >19101253632/25001191424 (76.4%) @1.4x, remaining 20:03 RBU 100.0% UBU 96.9% >19123404800/25001191424 (76.5%) @1.5x, remaining 19:58 RBU 100.0% UBU 96.9% >19144835072/25001191424 (76.6%) @1.4x, remaining 19:54 RBU 100.0% UBU 96.9% >19166855168/25001191424 (76.7%) @1.5x, remaining 19:49 RBU 100.0% UBU 96.9% >19188776960/25001191424 (76.8%) @1.5x, remaining 19:44 RBU 100.0% UBU 96.9% >19210305536/25001191424 (76.8%) @1.4x, remaining 19:39 RBU 100.0% UBU 96.9% >19232456704/25001191424 (76.9%) @1.5x, remaining 19:34 RBU 100.0% UBU 96.9% >19253788672/25001191424 (77.0%) @1.4x, remaining 19:30 RBU 100.0% UBU 96.9% >19275907072/25001191424 (77.1%) @1.5x, remaining 19:25 RBU 100.0% UBU 96.9% >19297566720/25001191424 (77.2%) @1.4x, remaining 19:20 RBU 100.0% UBU 96.9% >19319357440/25001191424 (77.3%) @1.5x, remaining 19:15 RBU 100.0% UBU 96.9% >19341246464/25001191424 (77.4%) @1.5x, remaining 19:11 RBU 100.0% UBU 96.9% >19362807808/25001191424 (77.4%) @1.4x, remaining 19:06 RBU 100.0% UBU 96.9% >19384893440/25001191424 (77.5%) @1.5x, remaining 19:01 RBU 100.0% UBU 96.9% >19406258176/25001191424 (77.6%) @1.4x, remaining 18:57 RBU 100.0% UBU 96.9% >19428605952/25001191424 (77.7%) @1.5x, remaining 18:52 RBU 100.0% UBU 96.9% >19451543552/25001191424 (77.8%) @1.5x, remaining 18:46 RBU 100.0% UBU 96.9% >19474481152/25001191424 (77.9%) @1.5x, remaining 18:42 RBU 100.0% UBU 96.9% >19497418752/25001191424 (78.0%) @1.5x, remaining 18:36 RBU 100.0% UBU 96.9% >19519438848/25001191424 (78.1%) @1.5x, remaining 18:32 RBU 100.0% UBU 96.9% >19542376448/25001191424 (78.2%) @1.5x, remaining 18:27 RBU 100.0% UBU 96.9% >19565019136/25001191424 (78.3%) @1.5x, remaining 18:22 RBU 100.0% UBU 96.9% >19587399680/25001191424 (78.3%) @1.5x, remaining 18:17 RBU 100.0% UBU 96.9% >19610271744/25001191424 (78.4%) @1.5x, remaining 18:12 RBU 100.0% UBU 96.9% >19633209344/25001191424 (78.5%) @1.5x, remaining 18:07 RBU 100.0% UBU 96.9% >19655983104/25001191424 (78.6%) @1.5x, remaining 18:02 RBU 100.0% UBU 90.6% >19678330880/25001191424 (78.7%) @1.5x, remaining 17:57 RBU 100.0% UBU 96.9% >19700350976/25001191424 (78.8%) @1.5x, remaining 17:52 RBU 100.0% UBU 96.9% >19723124736/25001191424 (78.9%) @1.5x, remaining 17:47 RBU 100.0% UBU 96.9% >19746062336/25001191424 (79.0%) @1.5x, remaining 17:42 RBU 100.0% UBU 96.9% >19768737792/25001191424 (79.1%) @1.5x, remaining 17:37 RBU 100.0% UBU 96.9% >19789479936/25001191424 (79.2%) @1.4x, remaining 17:33 RBU 100.0% UBU 96.9% >19812122624/25001191424 (79.2%) @1.5x, remaining 17:28 RBU 100.0% UBU 96.9% >19835060224/25001191424 (79.3%) @1.5x, remaining 17:23 RBU 100.0% UBU 96.9% >19857670144/25001191424 (79.4%) @1.5x, remaining 17:18 RBU 100.0% UBU 96.9% >19880017920/25001191424 (79.5%) @1.5x, remaining 17:14 RBU 100.0% UBU 96.9% >19902955520/25001191424 (79.6%) @1.5x, remaining 17:08 RBU 100.0% UBU 96.9% >19925729280/25001191424 (79.7%) @1.5x, remaining 17:03 RBU 100.0% UBU 96.9% >19947913216/25001191424 (79.8%) @1.5x, remaining 16:59 RBU 100.0% UBU 96.9% >19970850816/25001191424 (79.9%) @1.5x, remaining 16:54 RBU 100.0% UBU 96.9% >19993591808/25001191424 (80.0%) @1.5x, remaining 16:49 RBU 100.0% UBU 96.9% >20015808512/25001191424 (80.1%) @1.5x, remaining 16:44 RBU 100.0% UBU 96.9% >20038746112/25001191424 (80.2%) @1.5x, remaining 16:39 RBU 100.0% UBU 96.9% >20061356032/25001191424 (80.2%) @1.5x, remaining 16:34 RBU 100.0% UBU 96.9% >20083703808/25001191424 (80.3%) @1.5x, remaining 16:30 RBU 100.0% UBU 96.9% >20106641408/25001191424 (80.4%) @1.5x, remaining 16:25 RBU 100.0% UBU 96.9% >20128923648/25001191424 (80.5%) @1.5x, remaining 16:20 RBU 100.0% UBU 96.9% >20151599104/25001191424 (80.6%) @1.5x, remaining 16:15 RBU 100.0% UBU 96.9% >20174405632/25001191424 (80.7%) @1.5x, remaining 16:10 RBU 100.0% UBU 96.9% >20196556800/25001191424 (80.8%) @1.5x, remaining 16:05 RBU 100.0% UBU 96.9% >20219494400/25001191424 (80.9%) @1.5x, remaining 16:01 RBU 100.0% UBU 96.9% >20241711104/25001191424 (81.0%) @1.5x, remaining 15:56 RBU 100.1% UBU 96.9% >20263960576/25001191424 (81.1%) @1.5x, remaining 15:51 RBU 100.0% UBU 96.9% >20286472192/25001191424 (81.1%) @1.5x, remaining 15:46 RBU 100.0% UBU 96.9% >20309245952/25001191424 (81.2%) @1.5x, remaining 15:41 RBU 100.0% UBU 96.9% >20331429888/25001191424 (81.3%) @1.5x, remaining 15:37 RBU 100.0% UBU 96.9% >20354367488/25001191424 (81.4%) @1.5x, remaining 15:32 RBU 100.0% UBU 96.9% >20376387584/25001191424 (81.5%) @1.5x, remaining 15:27 RBU 100.0% UBU 96.9% >20399325184/25001191424 (81.6%) @1.5x, remaining 15:22 RBU 100.0% UBU 96.9% >20421410816/25001191424 (81.7%) @1.5x, remaining 15:18 RBU 100.0% UBU 96.9% >20444282880/25001191424 (81.8%) @1.5x, remaining 15:13 RBU 100.0% UBU 96.9% >20466466816/25001191424 (81.9%) @1.5x, remaining 15:08 RBU 100.0% UBU 96.9% >20489240576/25001191424 (82.0%) @1.5x, remaining 15:03 RBU 100.0% UBU 96.9% >20511457280/25001191424 (82.0%) @1.5x, remaining 14:58 RBU 100.0% UBU 96.9% >20534198272/25001191424 (82.1%) @1.5x, remaining 14:54 RBU 100.0% UBU 96.9% >20556414976/25001191424 (82.2%) @1.5x, remaining 14:49 RBU 100.0% UBU 96.9% >20579155968/25001191424 (82.3%) @1.5x, remaining 14:44 RBU 100.0% UBU 96.9% >20601274368/25001191424 (82.4%) @1.5x, remaining 14:39 RBU 100.0% UBU 96.9% >20624113664/25001191424 (82.5%) @1.5x, remaining 14:35 RBU 100.0% UBU 96.9% >20646133760/25001191424 (82.6%) @1.5x, remaining 14:30 RBU 100.0% UBU 96.9% >20669071360/25001191424 (82.7%) @1.5x, remaining 14:25 RBU 100.0% UBU 96.9% >20691091456/25001191424 (82.8%) @1.5x, remaining 14:21 RBU 100.0% UBU 96.9% >20713930752/25001191424 (82.9%) @1.5x, remaining 14:16 RBU 100.0% UBU 96.9% >20736049152/25001191424 (82.9%) @1.5x, remaining 14:11 RBU 100.0% UBU 96.9% >20756987904/25001191424 (83.0%) @1.4x, remaining 14:07 RBU 100.0% UBU 96.9% >20779171840/25001191424 (83.1%) @1.5x, remaining 14:02 RBU 100.0% UBU 96.9% >20801552384/25001191424 (83.2%) @1.5x, remaining 13:57 RBU 99.9% UBU 96.9% >20824129536/25001191424 (83.3%) @1.5x, remaining 13:53 RBU 100.0% UBU 96.9% >20846149632/25001191424 (83.4%) @1.5x, remaining 13:48 RBU 100.0% UBU 96.9% >20869054464/25001191424 (83.5%) @1.5x, remaining 13:43 RBU 100.0% UBU 96.9% >20891107328/25001191424 (83.6%) @1.5x, remaining 13:39 RBU 100.0% UBU 96.9% >20913455104/25001191424 (83.6%) @1.5x, remaining 13:34 RBU 100.0% UBU 96.9% >20936065024/25001191424 (83.7%) @1.5x, remaining 13:29 RBU 100.0% UBU 96.9% >20958085120/25001191424 (83.8%) @1.5x, remaining 13:25 RBU 100.0% UBU 96.9% >20980760576/25001191424 (83.9%) @1.5x, remaining 13:20 RBU 100.0% UBU 96.9% >21003042816/25001191424 (84.0%) @1.5x, remaining 13:15 RBU 100.0% UBU 96.9% >21025062912/25001191424 (84.1%) @1.5x, remaining 13:11 RBU 100.0% UBU 96.9% >21047083008/25001191424 (84.2%) @1.5x, remaining 13:06 RBU 100.0% UBU 96.9% >21069496320/25001191424 (84.3%) @1.5x, remaining 13:01 RBU 100.0% UBU 96.9% >21092040704/25001191424 (84.4%) @1.5x, remaining 12:57 RBU 100.0% UBU 96.9% >21114060800/25001191424 (84.5%) @1.5x, remaining 12:52 RBU 100.0% UBU 96.9% >21136408576/25001191424 (84.5%) @1.5x, remaining 12:47 RBU 100.0% UBU 96.9% >21159018496/25001191424 (84.6%) @1.5x, remaining 12:43 RBU 100.0% UBU 96.9% >21181038592/25001191424 (84.7%) @1.5x, remaining 12:38 RBU 100.0% UBU 96.9% >21203222528/25001191424 (84.8%) @1.5x, remaining 12:34 RBU 100.0% UBU 96.9% >21225963520/25001191424 (84.9%) @1.5x, remaining 12:29 RBU 99.9% UBU 96.9% >21248016384/25001191424 (85.0%) @1.5x, remaining 12:24 RBU 100.0% UBU 96.9% >21270036480/25001191424 (85.1%) @1.5x, remaining 12:20 RBU 100.0% UBU 96.9% >21292580864/25001191424 (85.2%) @1.5x, remaining 12:15 RBU 100.0% UBU 96.9% >21314994176/25001191424 (85.3%) @1.5x, remaining 12:11 RBU 100.0% UBU 96.9% >21337014272/25001191424 (85.3%) @1.5x, remaining 12:06 RBU 100.0% UBU 96.9% >21359034368/25001191424 (85.4%) @1.5x, remaining 12:01 RBU 100.0% UBU 96.9% >21381644288/25001191424 (85.5%) @1.5x, remaining 11:57 RBU 100.0% UBU 96.9% >21403992064/25001191424 (85.6%) @1.5x, remaining 11:52 RBU 100.0% UBU 96.9% >21426012160/25001191424 (85.7%) @1.5x, remaining 11:48 RBU 100.0% UBU 96.9% >21448032256/25001191424 (85.8%) @1.5x, remaining 11:43 RBU 100.0% UBU 96.9% >21470511104/25001191424 (85.9%) @1.5x, remaining 11:39 RBU 100.0% UBU 96.9% >21492989952/25001191424 (86.0%) @1.5x, remaining 11:34 RBU 100.0% UBU 96.9% >21515010048/25001191424 (86.1%) @1.5x, remaining 11:29 RBU 100.0% UBU 96.9% >21537030144/25001191424 (86.1%) @1.5x, remaining 11:25 RBU 100.0% UBU 96.9% >21559115776/25001191424 (86.2%) @1.5x, remaining 11:20 RBU 100.0% UBU 96.9% >21581594624/25001191424 (86.3%) @1.5x, remaining 11:16 RBU 100.0% UBU 96.9% >21604007936/25001191424 (86.4%) @1.5x, remaining 11:11 RBU 100.0% UBU 96.9% >21626028032/25001191424 (86.5%) @1.5x, remaining 11:07 RBU 100.0% UBU 96.9% >21648048128/25001191424 (86.6%) @1.5x, remaining 11:02 RBU 100.0% UBU 96.9% >21670068224/25001191424 (86.7%) @1.5x, remaining 10:58 RBU 100.0% UBU 96.9% >21692284928/25001191424 (86.8%) @1.5x, remaining 10:53 RBU 100.0% UBU 96.9% >21714698240/25001191424 (86.9%) @1.5x, remaining 10:48 RBU 100.0% UBU 96.9% >21735211008/25001191424 (86.9%) @1.4x, remaining 10:44 RBU 100.0% UBU 96.9% >21757231104/25001191424 (87.0%) @1.5x, remaining 10:40 RBU 100.0% UBU 96.9% >21778366464/25001191424 (87.1%) @1.4x, remaining 10:35 RBU 100.0% UBU 96.9% >21800681472/25001191424 (87.2%) @1.5x, remaining 10:31 RBU 100.0% UBU 96.9% >21823029248/25001191424 (87.3%) @1.5x, remaining 10:26 RBU 100.0% UBU 90.6% >21845311488/25001191424 (87.4%) @1.5x, remaining 10:22 RBU 100.0% UBU 96.9% >21867331584/25001191424 (87.5%) @1.5x, remaining 10:17 RBU 100.0% UBU 96.9% >21889351680/25001191424 (87.6%) @1.5x, remaining 10:13 RBU 100.0% UBU 96.9% >21911371776/25001191424 (87.6%) @1.5x, remaining 10:08 RBU 100.0% UBU 96.9% >21933391872/25001191424 (87.7%) @1.5x, remaining 10:04 RBU 100.0% UBU 96.9% >21955411968/25001191424 (87.8%) @1.5x, remaining 9:59 RBU 100.0% UBU 96.9% >21977432064/25001191424 (87.9%) @1.5x, remaining 9:55 RBU 100.0% UBU 96.9% >21999517696/25001191424 (88.0%) @1.5x, remaining 9:50 RBU 100.0% UBU 96.9% >22021701632/25001191424 (88.1%) @1.5x, remaining 9:46 RBU 100.0% UBU 96.9% >22043885568/25001191424 (88.2%) @1.5x, remaining 9:41 RBU 100.0% UBU 96.9% >22066036736/25001191424 (88.3%) @1.5x, remaining 9:37 RBU 100.0% UBU 96.9% >22088187904/25001191424 (88.3%) @1.5x, remaining 9:32 RBU 100.0% UBU 96.9% >22110306304/25001191424 (88.4%) @1.5x, remaining 9:28 RBU 100.0% UBU 96.9% >22132424704/25001191424 (88.5%) @1.5x, remaining 9:23 RBU 100.0% UBU 96.9% >22154510336/25001191424 (88.6%) @1.5x, remaining 9:19 RBU 100.0% UBU 96.9% >22176530432/25001191424 (88.7%) @1.5x, remaining 9:14 RBU 100.0% UBU 96.9% >22198550528/25001191424 (88.8%) @1.5x, remaining 9:10 RBU 100.0% UBU 96.9% >22220570624/25001191424 (88.9%) @1.5x, remaining 9:06 RBU 100.0% UBU 96.9% >22242590720/25001191424 (89.0%) @1.5x, remaining 9:01 RBU 100.0% UBU 96.9% >22264610816/25001191424 (89.1%) @1.5x, remaining 8:57 RBU 100.0% UBU 96.9% >22286630912/25001191424 (89.1%) @1.5x, remaining 8:52 RBU 100.0% UBU 96.9% >22308651008/25001191424 (89.2%) @1.5x, remaining 8:48 RBU 100.0% UBU 96.9% >22330671104/25001191424 (89.3%) @1.5x, remaining 8:43 RBU 100.0% UBU 96.9% >22352691200/25001191424 (89.4%) @1.5x, remaining 8:39 RBU 100.0% UBU 96.9% >22372876288/25001191424 (89.5%) @1.3x, remaining 8:35 RBU 100.0% UBU 96.9% >22394896384/25001191424 (89.6%) @1.5x, remaining 8:31 RBU 100.0% UBU 96.9% >22416916480/25001191424 (89.7%) @1.5x, remaining 8:26 RBU 100.0% UBU 96.9% >22438936576/25001191424 (89.8%) @1.5x, remaining 8:22 RBU 100.0% UBU 96.9% >22460956672/25001191424 (89.8%) @1.5x, remaining 8:17 RBU 100.0% UBU 96.9% >22482976768/25001191424 (89.9%) @1.5x, remaining 8:13 RBU 100.0% UBU 96.9% >22504996864/25001191424 (90.0%) @1.5x, remaining 8:08 RBU 100.0% UBU 96.9% >22526099456/25001191424 (90.1%) @1.4x, remaining 8:04 RBU 100.0% UBU 96.9% >22548119552/25001191424 (90.2%) @1.5x, remaining 8:00 RBU 100.0% UBU 96.9% >22570139648/25001191424 (90.3%) @1.5x, remaining 7:55 RBU 100.0% UBU 96.9% >22592159744/25001191424 (90.4%) @1.5x, remaining 7:51 RBU 100.0% UBU 96.9% >22614179840/25001191424 (90.5%) @1.5x, remaining 7:46 RBU 100.0% UBU 96.9% >22636199936/25001191424 (90.5%) @1.5x, remaining 7:42 RBU 100.0% UBU 96.9% >22658220032/25001191424 (90.6%) @1.5x, remaining 7:38 RBU 100.0% UBU 96.9% >22680109056/25001191424 (90.7%) @1.5x, remaining 7:33 RBU 100.0% UBU 96.9% >22701801472/25001191424 (90.8%) @1.4x, remaining 7:29 RBU 100.0% UBU 96.9% >22721921024/25001191424 (90.9%) @1.3x, remaining 7:25 RBU 100.0% UBU 96.9% >22743613440/25001191424 (91.0%) @1.4x, remaining 7:21 RBU 100.0% UBU 96.9% >22765568000/25001191424 (91.1%) @1.5x, remaining 7:16 RBU 100.0% UBU 96.9% >22787588096/25001191424 (91.1%) @1.5x, remaining 7:12 RBU 100.0% UBU 96.9% >22809608192/25001191424 (91.2%) @1.5x, remaining 7:07 RBU 100.0% UBU 96.9% >22831628288/25001191424 (91.3%) @1.5x, remaining 7:03 RBU 100.0% UBU 96.9% >22853451776/25001191424 (91.4%) @1.5x, remaining 6:59 RBU 100.0% UBU 96.9% >22875078656/25001191424 (91.5%) @1.4x, remaining 6:54 RBU 99.9% UBU 96.9% >22896771072/25001191424 (91.6%) @1.4x, remaining 6:50 RBU 100.0% UBU 96.9% >22918791168/25001191424 (91.7%) @1.5x, remaining 6:46 RBU 100.0% UBU 96.9% >22940811264/25001191424 (91.8%) @1.5x, remaining 6:41 RBU 100.0% UBU 96.9% >22962831360/25001191424 (91.8%) @1.5x, remaining 6:37 RBU 100.0% UBU 96.9% >22984458240/25001191424 (91.9%) @1.4x, remaining 6:33 RBU 100.0% UBU 96.9% >23005986816/25001191424 (92.0%) @1.4x, remaining 6:28 RBU 100.0% UBU 96.9% >23027974144/25001191424 (92.1%) @1.5x, remaining 6:24 RBU 100.0% UBU 96.9% >23049994240/25001191424 (92.2%) @1.5x, remaining 6:20 RBU 100.0% UBU 96.9% >23072014336/25001191424 (92.3%) @1.5x, remaining 6:15 RBU 100.0% UBU 96.9% >23093510144/25001191424 (92.4%) @1.4x, remaining 6:11 RBU 100.0% UBU 96.9% >23115137024/25001191424 (92.5%) @1.4x, remaining 6:07 RBU 100.0% UBU 96.9% >23137157120/25001191424 (92.5%) @1.5x, remaining 6:02 RBU 100.0% UBU 96.9% >23159177216/25001191424 (92.6%) @1.5x, remaining 5:58 RBU 100.0% UBU 96.9% >23180804096/25001191424 (92.7%) @1.4x, remaining 5:54 RBU 100.0% UBU 96.9% >23202299904/25001191424 (92.8%) @1.4x, remaining 5:49 RBU 100.0% UBU 96.9% >23224320000/25001191424 (92.9%) @1.5x, remaining 5:45 RBU 100.0% UBU 96.9% >23246340096/25001191424 (93.0%) @1.5x, remaining 5:41 RBU 100.0% UBU 96.9% >23267901440/25001191424 (93.1%) @1.4x, remaining 5:37 RBU 100.0% UBU 96.9% >23289462784/25001191424 (93.2%) @1.4x, remaining 5:32 RBU 100.0% UBU 96.9% >23310860288/25001191424 (93.2%) @1.4x, remaining 5:28 RBU 100.0% UBU 96.9% >23332585472/25001191424 (93.3%) @1.4x, remaining 5:24 RBU 100.0% UBU 96.9% >23354605568/25001191424 (93.4%) @1.5x, remaining 5:19 RBU 100.0% UBU 96.9% >23376363520/25001191424 (93.5%) @1.5x, remaining 5:15 RBU 100.0% UBU 96.9% >23397728256/25001191424 (93.6%) @1.4x, remaining 5:11 RBU 100.0% UBU 96.9% >23419748352/25001191424 (93.7%) @1.5x, remaining 5:07 RBU 100.0% UBU 96.9% >23441702912/25001191424 (93.8%) @1.5x, remaining 5:02 RBU 100.0% UBU 96.9% >23462903808/25001191424 (93.8%) @1.4x, remaining 4:58 RBU 100.0% UBU 96.9% >23484891136/25001191424 (93.9%) @1.5x, remaining 4:54 RBU 100.0% UBU 96.9% >23506911232/25001191424 (94.0%) @1.5x, remaining 4:49 RBU 100.0% UBU 96.9% >23528079360/25001191424 (94.1%) @1.4x, remaining 4:45 RBU 100.0% UBU 96.9% >23550033920/25001191424 (94.2%) @1.5x, remaining 4:41 RBU 100.0% UBU 96.9% >23571988480/25001191424 (94.3%) @1.5x, remaining 4:37 RBU 100.0% UBU 96.9% >23593156608/25001191424 (94.4%) @1.4x, remaining 4:32 RBU 100.0% UBU 96.9% >23615176704/25001191424 (94.5%) @1.5x, remaining 4:28 RBU 100.0% UBU 96.9% >23636934656/25001191424 (94.5%) @1.5x, remaining 4:24 RBU 100.0% UBU 96.9% >23658299392/25001191424 (94.6%) @1.4x, remaining 4:20 RBU 100.0% UBU 96.9% >23680319488/25001191424 (94.7%) @1.5x, remaining 4:15 RBU 100.0% UBU 96.9% >23701716992/25001191424 (94.8%) @1.4x, remaining 4:11 RBU 100.0% UBU 96.9% >23723442176/25001191424 (94.9%) @1.4x, remaining 4:07 RBU 100.0% UBU 96.9% >23743627264/25001191424 (95.0%) @1.3x, remaining 4:03 RBU 100.0% UBU 96.9% >23765123072/25001191424 (95.1%) @1.4x, remaining 3:59 RBU 100.0% UBU 96.9% >23786749952/25001191424 (95.1%) @1.4x, remaining 3:55 RBU 100.0% UBU 96.9% >23808737280/25001191424 (95.2%) @1.5x, remaining 3:50 RBU 100.0% UBU 96.9% >23829872640/25001191424 (95.3%) @1.4x, remaining 3:46 RBU 100.0% UBU 96.9% >23851892736/25001191424 (95.4%) @1.5x, remaining 3:42 RBU 100.0% UBU 96.9% >23873257472/25001191424 (95.5%) @1.4x, remaining 3:38 RBU 100.0% UBU 96.9% >23895015424/25001191424 (95.6%) @1.5x, remaining 3:33 RBU 100.0% UBU 96.9% >23916707840/25001191424 (95.7%) @1.4x, remaining 3:29 RBU 100.0% UBU 96.9% >23938138112/25001191424 (95.7%) @1.4x, remaining 3:25 RBU 100.0% UBU 96.9% >23960092672/25001191424 (95.8%) @1.5x, remaining 3:21 RBU 100.0% UBU 96.9% >23981260800/25001191424 (95.9%) @1.4x, remaining 3:17 RBU 100.0% UBU 96.9% >24003280896/25001191424 (96.0%) @1.5x, remaining 3:12 RBU 100.0% UBU 96.9% >24024776704/25001191424 (96.1%) @1.4x, remaining 3:08 RBU 100.0% UBU 96.9% >24045682688/25001191424 (96.2%) @1.4x, remaining 3:04 RBU 100.0% UBU 96.9% >24066588672/25001191424 (96.3%) @1.4x, remaining 3:00 RBU 100.0% UBU 96.9% >24088215552/25001191424 (96.3%) @1.4x, remaining 2:56 RBU 100.0% UBU 96.9% >24109449216/25001191424 (96.4%) @1.4x, remaining 2:52 RBU 100.0% UBU 96.9% >24130748416/25001191424 (96.5%) @1.4x, remaining 2:47 RBU 100.0% UBU 96.9% >24152244224/25001191424 (96.6%) @1.4x, remaining 2:43 RBU 100.0% UBU 96.9% >24173281280/25001191424 (96.7%) @1.4x, remaining 2:39 RBU 100.0% UBU 96.9% >24194908160/25001191424 (96.8%) @1.4x, remaining 2:35 RBU 100.0% UBU 96.9% >24215814144/25001191424 (96.9%) @1.4x, remaining 2:31 RBU 100.0% UBU 96.9% >24237441024/25001191424 (96.9%) @1.4x, remaining 2:27 RBU 100.0% UBU 96.9% >24258412544/25001191424 (97.0%) @1.4x, remaining 2:23 RBU 100.0% UBU 96.9% >24279973888/25001191424 (97.1%) @1.4x, remaining 2:19 RBU 100.0% UBU 96.9% >24301043712/25001191424 (97.2%) @1.4x, remaining 2:14 RBU 100.0% UBU 96.9% >24322506752/25001191424 (97.3%) @1.4x, remaining 2:10 RBU 100.0% UBU 96.9% >24343609344/25001191424 (97.4%) @1.4x, remaining 2:06 RBU 100.0% UBU 96.9% >24365039616/25001191424 (97.5%) @1.4x, remaining 2:02 RBU 100.0% UBU 96.9% >24386142208/25001191424 (97.5%) @1.4x, remaining 1:58 RBU 100.0% UBU 96.9% >24407572480/25001191424 (97.6%) @1.4x, remaining 1:54 RBU 100.0% UBU 96.9% >24428609536/25001191424 (97.7%) @1.4x, remaining 1:50 RBU 100.0% UBU 96.9% >24450105344/25001191424 (97.8%) @1.4x, remaining 1:46 RBU 100.0% UBU 96.9% >24471011328/25001191424 (97.9%) @1.4x, remaining 1:42 RBU 100.0% UBU 96.9% >24492638208/25001191424 (98.0%) @1.4x, remaining 1:37 RBU 100.0% UBU 96.9% >24513544192/25001191424 (98.0%) @1.4x, remaining 1:33 RBU 100.0% UBU 96.9% >24535171072/25001191424 (98.1%) @1.4x, remaining 1:29 RBU 100.0% UBU 96.9% >24556077056/25001191424 (98.2%) @1.4x, remaining 1:25 RBU 100.0% UBU 96.9% >24577507328/25001191424 (98.3%) @1.4x, remaining 1:21 RBU 100.0% UBU 96.9% >24598609920/25001191424 (98.4%) @1.4x, remaining 1:17 RBU 100.0% UBU 96.9% >24619712512/25001191424 (98.5%) @1.4x, remaining 1:13 RBU 100.0% UBU 96.9% >24641142784/25001191424 (98.6%) @1.4x, remaining 1:09 RBU 100.0% UBU 96.9% >24662048768/25001191424 (98.6%) @1.4x, remaining 1:05 RBU 100.0% UBU 96.9% >24683610112/25001191424 (98.7%) @1.4x, remaining 1:01 RBU 100.0% UBU 96.9% >24704581632/25001191424 (98.8%) @1.4x, remaining 0:57 RBU 100.0% UBU 96.9% >24725684224/25001191424 (98.9%) @1.4x, remaining 0:52 RBU 100.0% UBU 96.9% >24747114496/25001191424 (99.0%) @1.4x, remaining 0:48 RBU 100.0% UBU 96.9% >:-[ WRITE@LBA=b87400h failed with SK=5h/INVALID ADDRESS FOR WRITE]: Invalid argument >:-( write failed: Invalid argument >/dev/sr0: flushing cache >/dev/sr0: closing track > >growisofs command: >----------------------- >/usr/bin/growisofs -Z /dev/sr0=/dev/fd/0 -use-the-force-luke=notray -use-the-force-luke=tty -use-the-force-luke=4gms -use-the-force-luke=tracksize:12207613 -dvd-compat -speed=4 -use-the-force-luke=bufsize:32m > >mkisofs >----------------------- >12207613 >I: -input-charset not specified, using utf-8 (detected in locale settings) >Using ANNA___SCHLIERSEE___SPIE000.MOV;1 for /Anna - Schliersee - Spielplatz 2.MOV (Anna - Schliersee - Spielplatz.MOV) >Using ANNA___SCHLIERSEE___RUTS000.MOV;1 for /Anna - Schliersee - Rutsche1.MOV (Anna - Schliersee - Rutsche 2.MOV) >Using ANNA___SCHLIERSEE___RUTS001.MOV;1 for /Anna - Schliersee - Rutsche 2.MOV (Anna - Schliersee - Rutsche.MOV) >Using ANNA___SCHLIERSEE___TREP000.MOV;1 for /Anna - Schliersee - Treppe 3.MOV (Anna - Schliersee - Treppe 2.MOV) >Using SKITOUR_ST_ANT__NIEN___S000.AVI;1 for /Skitour St Antönien - Scheetest 2.AVI (Skitour St Antönien - Scheetest.AVI) >Using SKITOUR_M__RSBACHH__TTE_000.AVI;1 for /Skitour_Mörsbachhütte - 332.avi (Skitour_Mörsbachhütte - 311.avi) >Using SKITOUR_M__RSBACHH__TTE_001.AVI;1 for /Skitour_Mörsbachhütte - 311.avi (Skitour_Mörsbachhütte - 305.avi) >Using SKITOUR_M__RSBACHH__TTE_002.AVI;1 for /Skitour_Mörsbachhütte - 305.avi (Skitour_Mörsbachhütte - 300.avi) >Using SKITOUR_M__RSBACHH__TTE_003.AVI;1 for /Skitour_Mörsbachhütte - 298.avi (Skitour_Mörsbachhütte - 284.avi) >Using SKITOUR_M__RSBACHH__TTE_004.AVI;1 for /Skitour_Mörsbachhütte - 284.avi (Skitour_Mörsbachhütte - 271.avi) >Using LANGLAUFEN_SEEFELD___SLO000.MOV;1 for /Langlaufen Seefeld - Slomo 3.MOV (Langlaufen Seefeld - Slomo 2.MOV) > 0.00% done, estimate finish Sat May 26 01:44:18 2018 > 0.01% done, estimate finish Fri May 25 22:24:04 2018 > 0.01% done, estimate finish Fri May 25 21:15:10 2018 > 0.02% done, estimate finish Fri May 25 20:41:56 2018 > 0.02% done, estimate finish Fri May 25 20:21:52 2018 > 0.02% done, estimate finish Fri May 25 20:08:26 2018 > 0.03% done, estimate finish Fri May 25 19:58:32 2018 > 0.03% done, estimate finish Fri May 25 19:51:22 2018 > 0.04% done, estimate finish Fri May 25 19:45:47 2018 > 0.04% done, estimate finish Fri May 25 19:41:18 2018 > 0.05% done, estimate finish Fri May 25 19:37:31 2018 > 0.05% done, estimate finish Fri May 25 19:34:28 2018 > 0.05% done, estimate finish Fri May 25 19:31:53 2018 > 0.06% done, estimate finish Fri May 25 19:29:40 2018 > 0.06% done, estimate finish Fri May 25 19:27:42 2018 > 0.07% done, estimate finish Fri May 25 19:26:01 2018 > 0.07% done, estimate finish Fri May 25 19:24:32 2018 > 0.07% done, estimate finish Fri May 25 19:23:13 2018 > 0.08% done, estimate finish Fri May 25 19:22:00 2018 > 0.08% done, estimate finish Fri May 25 19:20:56 2018 > 0.09% done, estimate finish Fri May 25 19:19:59 2018 > 0.09% done, estimate finish Fri May 25 19:19:06 2018 > 0.09% done, estimate finish Fri May 25 19:18:17 2018 > 0.10% done, estimate finish Fri May 25 19:17:33 2018 > 0.10% done, estimate finish Fri May 25 19:16:53 2018 > 0.11% done, estimate finish Fri May 25 19:16:16 2018 > 0.11% done, estimate finish Fri May 25 19:15:40 2018 > 0.11% done, estimate finish Fri May 25 19:15:08 2018 > 0.12% done, estimate finish Fri May 25 19:14:38 2018 > 0.12% done, estimate finish Fri May 25 19:14:10 2018 > 0.13% done, estimate finish Fri May 25 19:13:43 2018 > 0.13% done, estimate finish Fri May 25 19:13:19 2018 > 0.14% done, estimate finish Sat May 26 00:33:28 2018 > 0.14% done, estimate finish Sat May 26 00:47:41 2018 > 0.14% done, estimate finish Sat May 26 00:37:32 2018 > 0.15% done, estimate finish Sat May 26 00:28:16 2018 > 0.15% done, estimate finish Sat May 26 00:30:28 2018 > 0.16% done, estimate finish Sat May 26 00:21:52 2018 > 0.16% done, estimate finish Sat May 26 00:13:26 2018 > 0.16% done, estimate finish Sat May 26 00:05:41 2018 > 0.17% done, estimate finish Sat May 26 00:08:13 2018 > 0.17% done, estimate finish Sat May 26 00:00:57 2018 > 0.18% done, estimate finish Fri May 25 23:53:48 2018 > 0.18% done, estimate finish Fri May 25 23:47:12 2018 > 0.18% done, estimate finish Fri May 25 23:49:55 2018 > 0.19% done, estimate finish Fri May 25 23:43:41 2018 > 0.19% done, estimate finish Fri May 25 23:37:31 2018 > 0.20% done, estimate finish Fri May 25 23:40:16 2018 > 0.20% done, estimate finish Fri May 25 23:34:37 2018 > 0.20% done, estimate finish Fri May 25 23:29:11 2018 > 0.21% done, estimate finish Fri May 25 23:23:47 2018 > 0.21% done, estimate finish Fri May 25 23:26:35 2018 > 0.22% done, estimate finish Fri May 25 23:21:37 2018 > 0.22% done, estimate finish Fri May 25 23:16:49 2018 > 0.23% done, estimate finish Fri May 25 23:19:27 2018 > 0.23% done, estimate finish Fri May 25 23:14:52 2018 > 0.23% done, estimate finish Fri May 25 23:10:26 2018 > 0.24% done, estimate finish Fri May 25 23:06:10 2018 > 0.24% done, estimate finish Fri May 25 23:08:48 2018 > 0.25% done, estimate finish Fri May 25 23:04:42 2018 > 0.25% done, estimate finish Fri May 25 23:00:44 2018 > 0.25% done, estimate finish Fri May 25 22:56:53 2018 > 0.26% done, estimate finish Fri May 25 22:59:30 2018 > 0.26% done, estimate finish Fri May 25 22:55:48 2018 > 0.27% done, estimate finish Fri May 25 22:52:13 2018 > 0.27% done, estimate finish Fri May 25 22:54:54 2018 > 0.27% done, estimate finish Fri May 25 22:51:19 2018 > 0.28% done, estimate finish Fri May 25 22:47:57 2018 > 0.28% done, estimate finish Fri May 25 22:44:41 2018 > 0.29% done, estimate finish Fri May 25 22:47:19 2018 > 0.29% done, estimate finish Fri May 25 22:44:03 2018 > 0.29% done, estimate finish Fri May 25 22:40:58 2018 > 0.30% done, estimate finish Fri May 25 22:37:59 2018 > 0.30% done, estimate finish Fri May 25 22:40:34 2018 > 0.31% done, estimate finish Fri May 25 22:37:34 2018 > 0.31% done, estimate finish Fri May 25 22:34:44 2018 > 0.32% done, estimate finish Fri May 25 22:31:58 2018 > 0.32% done, estimate finish Fri May 25 22:34:30 2018 > 0.32% done, estimate finish Fri May 25 22:31:44 2018 > 0.33% done, estimate finish Fri May 25 22:29:07 2018 > 0.33% done, estimate finish Fri May 25 22:31:35 2018 > 0.34% done, estimate finish Fri May 25 22:29:02 2018 > 0.34% done, estimate finish Fri May 25 22:26:28 2018 > 0.34% done, estimate finish Fri May 25 22:24:02 2018 > 0.35% done, estimate finish Fri May 25 22:26:27 2018 > 0.35% done, estimate finish Fri May 25 22:24:04 2018 > 0.36% done, estimate finish Fri May 25 22:21:40 2018 > 0.36% done, estimate finish Fri May 25 22:24:02 2018 > 0.36% done, estimate finish Fri May 25 22:21:46 2018 > 0.37% done, estimate finish Fri May 25 22:19:33 2018 > 0.37% done, estimate finish Fri May 25 22:17:19 2018 > 0.38% done, estimate finish Fri May 25 22:19:37 2018 > 0.38% done, estimate finish Fri May 25 22:17:29 2018 > 0.39% done, estimate finish Fri May 25 22:15:25 2018 > 0.39% done, estimate finish Fri May 25 22:13:19 2018 > 0.39% done, estimate finish Fri May 25 22:15:34 2018 > 0.40% done, estimate finish Fri May 25 22:13:34 2018 > 0.40% done, estimate finish Fri May 25 22:11:37 2018 > 0.41% done, estimate finish Fri May 25 22:09:38 2018 > 0.41% done, estimate finish Fri May 25 22:11:50 2018 > 0.41% done, estimate finish Fri May 25 22:09:57 2018 > 0.42% done, estimate finish Fri May 25 22:08:07 2018 > 0.42% done, estimate finish Fri May 25 22:10:12 2018 > 0.43% done, estimate finish Fri May 25 22:08:23 2018 > 0.43% done, estimate finish Fri May 25 22:06:37 2018 > 0.43% done, estimate finish Fri May 25 22:04:52 2018 > 0.44% done, estimate finish Fri May 25 22:06:55 2018 > 0.44% done, estimate finish Fri May 25 22:05:12 2018 > 0.45% done, estimate finish Fri May 25 22:03:31 2018 > 0.45% done, estimate finish Fri May 25 22:01:52 2018 > 0.45% done, estimate finish Fri May 25 22:03:52 2018 > 0.46% done, estimate finish Fri May 25 22:02:15 2018 > 0.46% done, estimate finish Fri May 25 22:00:39 2018 > 0.47% done, estimate finish Fri May 25 22:02:39 2018 > 0.47% done, estimate finish Fri May 25 22:01:02 2018 > 0.48% done, estimate finish Fri May 25 21:59:29 2018 > 0.48% done, estimate finish Fri May 25 21:57:58 2018 > 0.48% done, estimate finish Fri May 25 21:59:56 2018 > 0.49% done, estimate finish Fri May 25 21:58:23 2018 > 0.49% done, estimate finish Fri May 25 21:56:55 2018 > 0.50% done, estimate finish Fri May 25 21:55:28 2018 > 0.50% done, estimate finish Fri May 25 21:57:23 2018 > 0.50% done, estimate finish Fri May 25 21:55:55 2018 > 0.51% done, estimate finish Fri May 25 21:54:31 2018 > 0.51% done, estimate finish Fri May 25 21:56:23 2018 > 0.52% done, estimate finish Fri May 25 21:55:00 2018 > 0.52% done, estimate finish Fri May 25 21:53:36 2018 > 0.52% done, estimate finish Fri May 25 21:52:15 2018 > 0.53% done, estimate finish Fri May 25 21:50:56 2018 > 0.53% done, estimate finish Fri May 25 21:52:46 2018 > 0.54% done, estimate finish Fri May 25 21:51:25 2018 > 0.54% done, estimate finish Fri May 25 21:53:13 2018 > 0.54% done, estimate finish Fri May 25 21:51:56 2018 > 0.55% done, estimate finish Fri May 25 21:50:40 2018 > 0.55% done, estimate finish Fri May 25 21:49:22 2018 > 0.56% done, estimate finish Fri May 25 21:51:08 2018 > 0.56% done, estimate finish Fri May 25 21:49:54 2018 > 0.57% done, estimate finish Fri May 25 21:48:41 2018 > 0.57% done, estimate finish Fri May 25 21:50:22 2018 > 0.57% done, estimate finish Fri May 25 21:49:10 2018 > 0.58% done, estimate finish Fri May 25 21:47:59 2018 > 0.58% done, estimate finish Fri May 25 21:46:49 2018 > 0.59% done, estimate finish Fri May 25 21:48:28 2018 > 0.59% done, estimate finish Fri May 25 21:47:19 2018 > 0.59% done, estimate finish Fri May 25 21:46:10 2018 > 0.60% done, estimate finish Fri May 25 21:45:03 2018 > 0.60% done, estimate finish Fri May 25 21:46:40 2018 > 0.61% done, estimate finish Fri May 25 21:45:33 2018 > 0.61% done, estimate finish Fri May 25 21:44:28 2018 > 0.61% done, estimate finish Fri May 25 21:43:23 2018 > 0.62% done, estimate finish Fri May 25 21:44:58 2018 > 0.62% done, estimate finish Fri May 25 21:43:54 2018 > 0.63% done, estimate finish Fri May 25 21:42:50 2018 > 0.63% done, estimate finish Fri May 25 21:41:47 2018 > 0.63% done, estimate finish Fri May 25 21:43:21 2018 > 0.64% done, estimate finish Fri May 25 21:42:19 2018 > 0.64% done, estimate finish Fri May 25 21:41:18 2018 > 0.65% done, estimate finish Fri May 25 21:40:17 2018 > 0.65% done, estimate finish Fri May 25 21:41:49 2018 > 0.66% done, estimate finish Fri May 25 21:40:49 2018 > 0.66% done, estimate finish Fri May 25 21:39:50 2018 > 0.66% done, estimate finish Fri May 25 21:41:22 2018 > 0.67% done, estimate finish Fri May 25 21:40:21 2018 > 0.67% done, estimate finish Fri May 25 21:39:23 2018 > 0.68% done, estimate finish Fri May 25 21:40:54 2018 > 0.68% done, estimate finish Fri May 25 21:39:57 2018 > 0.68% done, estimate finish Fri May 25 21:38:58 2018 > 0.69% done, estimate finish Fri May 25 21:38:02 2018 > 0.69% done, estimate finish Fri May 25 21:39:31 2018 > 0.70% done, estimate finish Fri May 25 21:38:35 2018 > 0.70% done, estimate finish Fri May 25 21:37:39 2018 > 0.70% done, estimate finish Fri May 25 21:36:44 2018 > 0.71% done, estimate finish Fri May 25 21:38:12 2018 > 0.71% done, estimate finish Fri May 25 21:37:18 2018 > 0.72% done, estimate finish Fri May 25 21:36:23 2018 > 0.72% done, estimate finish Fri May 25 21:37:49 2018 > 0.72% done, estimate finish Fri May 25 21:36:56 2018 > 0.73% done, estimate finish Fri May 25 21:36:04 2018 > 0.73% done, estimate finish Fri May 25 21:35:10 2018 > 0.74% done, estimate finish Fri May 25 21:36:35 2018 > 0.74% done, estimate finish Fri May 25 21:35:44 2018 > 0.75% done, estimate finish Fri May 25 21:34:53 2018 > 0.75% done, estimate finish Fri May 25 21:34:01 2018 > 0.75% done, estimate finish Fri May 25 21:35:24 2018 > 0.76% done, estimate finish Fri May 25 21:34:34 2018 > 0.76% done, estimate finish Fri May 25 21:33:45 2018 > 0.77% done, estimate finish Fri May 25 21:35:05 2018 > 0.77% done, estimate finish Fri May 25 21:34:16 2018 > 0.77% done, estimate finish Fri May 25 21:33:28 2018 > 0.78% done, estimate finish Fri May 25 21:32:40 2018 > 0.78% done, estimate finish Fri May 25 21:31:51 2018 > 0.79% done, estimate finish Fri May 25 21:33:11 2018 > 0.79% done, estimate finish Fri May 25 21:32:24 2018 > 0.79% done, estimate finish Fri May 25 21:31:38 2018 > 0.80% done, estimate finish Fri May 25 21:30:50 2018 > 0.80% done, estimate finish Fri May 25 21:32:09 2018 > 0.81% done, estimate finish Fri May 25 21:31:23 2018 > 0.81% done, estimate finish Fri May 25 21:30:38 2018 > 0.82% done, estimate finish Fri May 25 21:31:54 2018 > 0.82% done, estimate finish Fri May 25 21:31:09 2018 > 0.82% done, estimate finish Fri May 25 21:30:25 2018 > 0.83% done, estimate finish Fri May 25 21:29:41 2018 > 0.83% done, estimate finish Fri May 25 21:30:56 2018 > 0.84% done, estimate finish Fri May 25 21:30:12 2018 > 0.84% done, estimate finish Fri May 25 21:29:29 2018 > 0.84% done, estimate finish Fri May 25 21:30:44 2018 > 0.85% done, estimate finish Fri May 25 21:30:00 2018 > 0.85% done, estimate finish Fri May 25 21:29:17 2018 > 0.86% done, estimate finish Fri May 25 21:28:34 2018 > 0.86% done, estimate finish Fri May 25 21:29:49 2018 > 0.86% done, estimate finish Fri May 25 21:29:05 2018 > 0.87% done, estimate finish Fri May 25 21:28:24 2018 > 0.87% done, estimate finish Fri May 25 21:29:37 2018 > 0.88% done, estimate finish Fri May 25 21:28:56 2018 > 0.88% done, estimate finish Fri May 25 21:28:13 2018 > 0.88% done, estimate finish Fri May 25 21:27:32 2018 > 0.89% done, estimate finish Fri May 25 21:28:45 2018 > 0.89% done, estimate finish Fri May 25 21:28:04 2018 > 0.90% done, estimate finish Fri May 25 21:27:23 2018 > 0.90% done, estimate finish Fri May 25 21:26:43 2018 > 0.91% done, estimate finish Fri May 25 21:27:54 2018 > 0.91% done, estimate finish Fri May 25 21:27:15 2018 > 0.91% done, estimate finish Fri May 25 21:26:34 2018 > 0.92% done, estimate finish Fri May 25 21:25:56 2018 > 0.92% done, estimate finish Fri May 25 21:27:06 2018 > 0.93% done, estimate finish Fri May 25 21:26:27 2018 > 0.93% done, estimate finish Fri May 25 21:25:48 2018 > 0.93% done, estimate finish Fri May 25 21:25:10 2018 > 0.94% done, estimate finish Fri May 25 21:26:19 2018 > 0.94% done, estimate finish Fri May 25 21:25:41 2018 > 0.95% done, estimate finish Fri May 25 21:25:02 2018 > 0.95% done, estimate finish Fri May 25 21:24:25 2018 > 0.95% done, estimate finish Fri May 25 21:25:33 2018 > 0.96% done, estimate finish Fri May 25 21:24:57 2018 > 0.96% done, estimate finish Fri May 25 21:24:19 2018 > 0.97% done, estimate finish Fri May 25 21:23:43 2018 > 0.97% done, estimate finish Fri May 25 21:24:50 2018 > 0.97% done, estimate finish Fri May 25 21:24:14 2018 > 0.98% done, estimate finish Fri May 25 21:23:37 2018 > 0.98% done, estimate finish Fri May 25 21:24:43 2018 > 0.99% done, estimate finish Fri May 25 21:24:07 2018 > 0.99% done, estimate finish Fri May 25 21:23:32 2018 > 1.00% done, estimate finish Fri May 25 21:24:36 2018 > 1.00% done, estimate finish Fri May 25 21:24:01 2018 > 1.00% done, estimate finish Fri May 25 21:23:26 2018 > 1.01% done, estimate finish Fri May 25 21:22:52 2018 > 1.01% done, estimate finish Fri May 25 21:23:55 2018 > 1.02% done, estimate finish Fri May 25 21:23:21 2018 > 1.02% done, estimate finish Fri May 25 21:22:47 2018 > 1.02% done, estimate finish Fri May 25 21:22:13 2018 > 1.03% done, estimate finish Fri May 25 21:23:16 2018 > 1.03% done, estimate finish Fri May 25 21:22:42 2018 > 1.04% done, estimate finish Fri May 25 21:22:08 2018 > 1.04% done, estimate finish Fri May 25 21:21:35 2018 > 1.04% done, estimate finish Fri May 25 21:22:37 2018 > 1.05% done, estimate finish Fri May 25 21:22:04 2018 > 1.05% done, estimate finish Fri May 25 21:21:31 2018 > 1.06% done, estimate finish Fri May 25 21:20:59 2018 > 1.06% done, estimate finish Fri May 25 21:22:00 2018 > 1.06% done, estimate finish Fri May 25 21:21:27 2018 > 1.07% done, estimate finish Fri May 25 21:20:55 2018 > 1.07% done, estimate finish Fri May 25 21:20:23 2018 > 1.08% done, estimate finish Fri May 25 21:21:24 2018 > 1.08% done, estimate finish Fri May 25 21:20:52 2018 > 1.09% done, estimate finish Fri May 25 21:20:20 2018 > 1.09% done, estimate finish Fri May 25 21:21:21 2018 > 1.09% done, estimate finish Fri May 25 21:20:48 2018 > 1.10% done, estimate finish Fri May 25 21:20:17 2018 > 1.10% done, estimate finish Fri May 25 21:19:46 2018 > 1.11% done, estimate finish Fri May 25 21:20:46 2018 > 1.11% done, estimate finish Fri May 25 21:20:14 2018 > 1.11% done, estimate finish Fri May 25 21:19:44 2018 > 1.12% done, estimate finish Fri May 25 21:19:14 2018 > 1.12% done, estimate finish Fri May 25 21:20:13 2018 > 1.13% done, estimate finish Fri May 25 21:19:41 2018 > 1.13% done, estimate finish Fri May 25 21:19:11 2018 > 1.13% done, estimate finish Fri May 25 21:18:42 2018 > 1.14% done, estimate finish Fri May 25 21:19:40 2018 > 1.14% done, estimate finish Fri May 25 21:19:09 2018 > 1.15% done, estimate finish Fri May 25 21:18:40 2018 > 1.15% done, estimate finish Fri May 25 21:19:37 2018 > 1.16% done, estimate finish Fri May 25 21:19:08 2018 > 1.16% done, estimate finish Fri May 25 21:18:38 2018 > 1.16% done, estimate finish Fri May 25 21:18:09 2018 > 1.17% done, estimate finish Fri May 25 21:19:06 2018 > 1.17% done, estimate finish Fri May 25 21:18:37 2018 > 1.18% done, estimate finish Fri May 25 21:18:08 2018 > 1.18% done, estimate finish Fri May 25 21:17:39 2018 > 1.18% done, estimate finish Fri May 25 21:18:35 2018 > 1.19% done, estimate finish Fri May 25 21:18:07 2018 > 1.19% done, estimate finish Fri May 25 21:17:38 2018 > 1.20% done, estimate finish Fri May 25 21:18:34 2018 > 1.20% done, estimate finish Fri May 25 21:18:06 2018 > 1.20% done, estimate finish Fri May 25 21:17:38 2018 > 1.21% done, estimate finish Fri May 25 21:17:09 2018 > 1.21% done, estimate finish Fri May 25 21:18:04 2018 > 1.22% done, estimate finish Fri May 25 21:17:37 2018 > 1.22% done, estimate finish Fri May 25 21:17:10 2018 > 1.22% done, estimate finish Fri May 25 21:16:41 2018 > 1.23% done, estimate finish Fri May 25 21:17:36 2018 > 1.23% done, estimate finish Fri May 25 21:17:09 2018 > 1.24% done, estimate finish Fri May 25 21:16:42 2018 > 1.24% done, estimate finish Fri May 25 21:16:14 2018 > 1.25% done, estimate finish Fri May 25 21:17:08 2018 > 1.25% done, estimate finish Fri May 25 21:16:41 2018 > 1.25% done, estimate finish Fri May 25 21:16:15 2018 > 1.26% done, estimate finish Fri May 25 21:15:48 2018 > 1.26% done, estimate finish Fri May 25 21:16:41 2018 > 1.27% done, estimate finish Fri May 25 21:16:15 2018 > 1.27% done, estimate finish Fri May 25 21:15:49 2018 > 1.27% done, estimate finish Fri May 25 21:16:40 2018 > 1.28% done, estimate finish Fri May 25 21:16:14 2018 > 1.28% done, estimate finish Fri May 25 21:15:49 2018 > 1.29% done, estimate finish Fri May 25 21:15:23 2018 > 1.29% done, estimate finish Fri May 25 21:16:14 2018 > 1.29% done, estimate finish Fri May 25 21:15:49 2018 > 1.30% done, estimate finish Fri May 25 21:15:23 2018 > 1.30% done, estimate finish Fri May 25 21:14:58 2018 > 1.31% done, estimate finish Fri May 25 21:15:49 2018 > 1.31% done, estimate finish Fri May 25 21:15:23 2018 > 1.31% done, estimate finish Fri May 25 21:14:58 2018 > 1.32% done, estimate finish Fri May 25 21:14:34 2018 > 1.32% done, estimate finish Fri May 25 21:15:24 2018 > 1.33% done, estimate finish Fri May 25 21:14:59 2018 > 1.33% done, estimate finish Fri May 25 21:14:34 2018 > 1.34% done, estimate finish Fri May 25 21:14:10 2018 > 1.34% done, estimate finish Fri May 25 21:15:00 2018 > 1.34% done, estimate finish Fri May 25 21:14:35 2018 > 1.35% done, estimate finish Fri May 25 21:14:11 2018 > 1.35% done, estimate finish Fri May 25 21:13:47 2018 > 1.36% done, estimate finish Fri May 25 21:14:36 2018 > 1.36% done, estimate finish Fri May 25 21:14:12 2018 > 1.36% done, estimate finish Fri May 25 21:13:48 2018 > 1.37% done, estimate finish Fri May 25 21:14:37 2018 > 1.37% done, estimate finish Fri May 25 21:14:13 2018 > 1.38% done, estimate finish Fri May 25 21:13:49 2018 > 1.38% done, estimate finish Fri May 25 21:13:26 2018 > 1.38% done, estimate finish Fri May 25 21:14:14 2018 > 1.39% done, estimate finish Fri May 25 21:13:50 2018 > 1.39% done, estimate finish Fri May 25 21:13:27 2018 > 1.40% done, estimate finish Fri May 25 21:13:04 2018 > 1.40% done, estimate finish Fri May 25 21:13:52 2018 > 1.40% done, estimate finish Fri May 25 21:13:28 2018 > 1.41% done, estimate finish Fri May 25 21:13:05 2018 > 1.41% done, estimate finish Fri May 25 21:12:42 2018 > 1.42% done, estimate finish Fri May 25 21:13:30 2018 > 1.42% done, estimate finish Fri May 25 21:13:07 2018 > 1.43% done, estimate finish Fri May 25 21:12:44 2018 > 1.43% done, estimate finish Fri May 25 21:12:21 2018 > 1.43% done, estimate finish Fri May 25 21:13:09 2018 > 1.44% done, estimate finish Fri May 25 21:12:46 2018 > 1.44% done, estimate finish Fri May 25 21:12:23 2018 > 1.45% done, estimate finish Fri May 25 21:13:10 2018 > 1.45% done, estimate finish Fri May 25 21:12:48 2018 > 1.45% done, estimate finish Fri May 25 21:12:25 2018 > 1.46% done, estimate finish Fri May 25 21:13:12 2018 > 1.46% done, estimate finish Fri May 25 21:12:49 2018 > 1.47% done, estimate finish Fri May 25 21:12:27 2018 > 1.47% done, estimate finish Fri May 25 21:12:05 2018 > 1.47% done, estimate finish Fri May 25 21:12:51 2018 > 1.48% done, estimate finish Fri May 25 21:12:29 2018 > 1.48% done, estimate finish Fri May 25 21:12:07 2018 > 1.49% done, estimate finish Fri May 25 21:11:45 2018 > 1.49% done, estimate finish Fri May 25 21:12:31 2018 > 1.50% done, estimate finish Fri May 25 21:12:09 2018 > 1.50% done, estimate finish Fri May 25 21:11:48 2018 > 1.50% done, estimate finish Fri May 25 21:11:26 2018 > 1.51% done, estimate finish Fri May 25 21:12:11 2018 > 1.51% done, estimate finish Fri May 25 21:11:50 2018 > 1.52% done, estimate finish Fri May 25 21:11:29 2018 > 1.52% done, estimate finish Fri May 25 21:11:07 2018 > 1.52% done, estimate finish Fri May 25 21:11:52 2018 > 1.53% done, estimate finish Fri May 25 21:11:31 2018 > 1.53% done, estimate finish Fri May 25 21:11:10 2018 > 1.54% done, estimate finish Fri May 25 21:10:49 2018 > 1.54% done, estimate finish Fri May 25 21:11:33 2018 > 1.54% done, estimate finish Fri May 25 21:11:12 2018 > 1.55% done, estimate finish Fri May 25 21:10:52 2018 > 1.55% done, estimate finish Fri May 25 21:11:35 2018 > 1.56% done, estimate finish Fri May 25 21:11:15 2018 > 1.56% done, estimate finish Fri May 25 21:10:54 2018 > 1.56% done, estimate finish Fri May 25 21:10:34 2018 > 1.57% done, estimate finish Fri May 25 21:11:17 2018 > 1.57% done, estimate finish Fri May 25 21:10:57 2018 > 1.58% done, estimate finish Fri May 25 21:10:36 2018 > 1.58% done, estimate finish Fri May 25 21:10:16 2018 > 1.59% done, estimate finish Fri May 25 21:10:59 2018 > 1.59% done, estimate finish Fri May 25 21:10:39 2018 > 1.59% done, estimate finish Fri May 25 21:10:19 2018 > 1.60% done, estimate finish Fri May 25 21:09:59 2018 > 1.60% done, estimate finish Fri May 25 21:10:41 2018 > 1.61% done, estimate finish Fri May 25 21:11:24 2018 > 1.61% done, estimate finish Fri May 25 21:11:04 2018 > 1.61% done, estimate finish Fri May 25 21:10:44 2018 > 1.62% done, estimate finish Fri May 25 21:10:24 2018 > 1.62% done, estimate finish Fri May 25 21:10:05 2018 > 1.63% done, estimate finish Fri May 25 21:10:47 2018 > 1.63% done, estimate finish Fri May 25 21:10:27 2018 > 1.63% done, estimate finish Fri May 25 21:10:07 2018 > 1.64% done, estimate finish Fri May 25 21:09:48 2018 > 1.64% done, estimate finish Fri May 25 21:09:29 2018 > 1.65% done, estimate finish Fri May 25 21:10:10 2018 > 1.65% done, estimate finish Fri May 25 21:09:51 2018 > 1.65% done, estimate finish Fri May 25 21:09:32 2018 > 1.66% done, estimate finish Fri May 25 21:10:13 2018 > 1.66% done, estimate finish Fri May 25 21:09:54 2018 > 1.67% done, estimate finish Fri May 25 21:09:34 2018 > 1.67% done, estimate finish Fri May 25 21:09:16 2018 > 1.68% done, estimate finish Fri May 25 21:09:57 2018 > 1.68% done, estimate finish Fri May 25 21:09:38 2018 > 1.68% done, estimate finish Fri May 25 21:09:19 2018 > 1.69% done, estimate finish Fri May 25 21:09:00 2018 > 1.69% done, estimate finish Fri May 25 21:09:41 2018 > 1.70% done, estimate finish Fri May 25 21:09:22 2018 > 1.70% done, estimate finish Fri May 25 21:09:03 2018 > 1.70% done, estimate finish Fri May 25 21:08:45 2018 > 1.71% done, estimate finish Fri May 25 21:09:25 2018 > 1.71% done, estimate finish Fri May 25 21:09:06 2018 > 1.72% done, estimate finish Fri May 25 21:08:48 2018 > 1.72% done, estimate finish Fri May 25 21:09:28 2018 > 1.72% done, estimate finish Fri May 25 21:09:09 2018 > 1.73% done, estimate finish Fri May 25 21:08:51 2018 > 1.73% done, estimate finish Fri May 25 21:08:33 2018 > 1.74% done, estimate finish Fri May 25 21:09:12 2018 > 1.74% done, estimate finish Fri May 25 21:08:54 2018 > 1.74% done, estimate finish Fri May 25 21:08:36 2018 > 1.75% done, estimate finish Fri May 25 21:08:18 2018 > 1.75% done, estimate finish Fri May 25 21:08:57 2018 > 1.76% done, estimate finish Fri May 25 21:08:39 2018 > 1.76% done, estimate finish Fri May 25 21:08:22 2018 > 1.77% done, estimate finish Fri May 25 21:08:03 2018 > 1.77% done, estimate finish Fri May 25 21:08:42 2018 > 1.77% done, estimate finish Fri May 25 21:08:25 2018 > 1.78% done, estimate finish Fri May 25 21:08:07 2018 > 1.78% done, estimate finish Fri May 25 21:07:49 2018 > 1.79% done, estimate finish Fri May 25 21:08:28 2018 > 1.79% done, estimate finish Fri May 25 21:08:10 2018 > 1.79% done, estimate finish Fri May 25 21:07:53 2018 > 1.80% done, estimate finish Fri May 25 21:08:31 2018 > 1.80% done, estimate finish Fri May 25 21:08:14 2018 > 1.81% done, estimate finish Fri May 25 21:07:56 2018 > 1.81% done, estimate finish Fri May 25 21:07:39 2018 > 1.81% done, estimate finish Fri May 25 21:08:17 2018 > 1.82% done, estimate finish Fri May 25 21:08:00 2018 > 1.82% done, estimate finish Fri May 25 21:07:43 2018 > 1.83% done, estimate finish Fri May 25 21:07:26 2018 > 1.83% done, estimate finish Fri May 25 21:08:03 2018 > 1.84% done, estimate finish Fri May 25 21:07:46 2018 > 1.84% done, estimate finish Fri May 25 21:07:29 2018 > 1.84% done, estimate finish Fri May 25 21:07:12 2018 > 1.85% done, estimate finish Fri May 25 21:07:49 2018 > 1.85% done, estimate finish Fri May 25 21:07:32 2018 > 1.86% done, estimate finish Fri May 25 21:07:16 2018 > 1.86% done, estimate finish Fri May 25 21:07:53 2018 > 1.86% done, estimate finish Fri May 25 21:07:36 2018 > 1.87% done, estimate finish Fri May 25 21:07:19 2018 > 1.87% done, estimate finish Fri May 25 21:07:03 2018 > 1.88% done, estimate finish Fri May 25 21:07:39 2018 > 1.88% done, estimate finish Fri May 25 21:07:22 2018 > 1.88% done, estimate finish Fri May 25 21:07:06 2018 > 1.89% done, estimate finish Fri May 25 21:06:50 2018 > 1.89% done, estimate finish Fri May 25 21:07:26 2018 > 1.90% done, estimate finish Fri May 25 21:07:10 2018 > 1.90% done, estimate finish Fri May 25 21:06:53 2018 > 1.90% done, estimate finish Fri May 25 21:06:37 2018 > 1.91% done, estimate finish Fri May 25 21:07:13 2018 > 1.91% done, estimate finish Fri May 25 21:06:57 2018 > 1.92% done, estimate finish Fri May 25 21:06:41 2018 > 1.92% done, estimate finish Fri May 25 21:07:17 2018 > 1.93% done, estimate finish Fri May 25 21:07:01 2018 > 1.93% done, estimate finish Fri May 25 21:06:44 2018 > 1.93% done, estimate finish Fri May 25 21:07:20 2018 > 1.94% done, estimate finish Fri May 25 21:07:04 2018 > 1.94% done, estimate finish Fri May 25 21:06:48 2018 > 1.95% done, estimate finish Fri May 25 21:06:32 2018 > 1.95% done, estimate finish Fri May 25 21:06:16 2018 > 1.95% done, estimate finish Fri May 25 21:06:52 2018 > 1.96% done, estimate finish Fri May 25 21:06:36 2018 > 1.96% done, estimate finish Fri May 25 21:06:20 2018 > 1.97% done, estimate finish Fri May 25 21:06:55 2018 > 1.97% done, estimate finish Fri May 25 21:06:39 2018 > 1.97% done, estimate finish Fri May 25 21:06:24 2018 > 1.98% done, estimate finish Fri May 25 21:06:08 2018 > 1.98% done, estimate finish Fri May 25 21:06:43 2018 > 1.99% done, estimate finish Fri May 25 21:06:27 2018 > 1.99% done, estimate finish Fri May 25 21:06:12 2018 > 1.99% done, estimate finish Fri May 25 21:05:56 2018 > 2.00% done, estimate finish Fri May 25 21:06:31 2018 > 2.00% done, estimate finish Fri May 25 21:06:16 2018 > 2.01% done, estimate finish Fri May 25 21:06:00 2018 > 2.01% done, estimate finish Fri May 25 21:05:45 2018 > 2.02% done, estimate finish Fri May 25 21:06:19 2018 > 2.02% done, estimate finish Fri May 25 21:06:04 2018 > 2.02% done, estimate finish Fri May 25 21:05:49 2018 > 2.03% done, estimate finish Fri May 25 21:05:33 2018 > 2.03% done, estimate finish Fri May 25 21:06:07 2018 > 2.04% done, estimate finish Fri May 25 21:05:52 2018 > 2.04% done, estimate finish Fri May 25 21:05:37 2018 > 2.04% done, estimate finish Fri May 25 21:06:11 2018 > 2.05% done, estimate finish Fri May 25 21:05:56 2018 > 2.05% done, estimate finish Fri May 25 21:05:41 2018 > 2.06% done, estimate finish Fri May 25 21:05:26 2018 > 2.06% done, estimate finish Fri May 25 21:06:00 2018 > 2.06% done, estimate finish Fri May 25 21:05:45 2018 > 2.07% done, estimate finish Fri May 25 21:05:30 2018 > 2.07% done, estimate finish Fri May 25 21:06:04 2018 > 2.08% done, estimate finish Fri May 25 21:05:48 2018 > 2.08% done, estimate finish Fri May 25 21:05:34 2018 > 2.08% done, estimate finish Fri May 25 21:05:19 2018 > 2.09% done, estimate finish Fri May 25 21:05:52 2018 > 2.09% done, estimate finish Fri May 25 21:05:37 2018 > 2.10% done, estimate finish Fri May 25 21:05:23 2018 > 2.10% done, estimate finish Fri May 25 21:05:08 2018 > 2.11% done, estimate finish Fri May 25 21:05:41 2018 > 2.11% done, estimate finish Fri May 25 21:05:27 2018 > 2.11% done, estimate finish Fri May 25 21:05:12 2018 > 2.12% done, estimate finish Fri May 25 21:05:45 2018 > 2.12% done, estimate finish Fri May 25 21:05:31 2018 > 2.13% done, estimate finish Fri May 25 21:05:16 2018 > 2.13% done, estimate finish Fri May 25 21:05:02 2018 > 2.13% done, estimate finish Fri May 25 21:05:34 2018 > 2.14% done, estimate finish Fri May 25 21:05:20 2018 > 2.14% done, estimate finish Fri May 25 21:05:05 2018 > 2.15% done, estimate finish Fri May 25 21:04:51 2018 > 2.15% done, estimate finish Fri May 25 21:05:24 2018 > 2.15% done, estimate finish Fri May 25 21:05:10 2018 > 2.16% done, estimate finish Fri May 25 21:04:55 2018 > 2.16% done, estimate finish Fri May 25 21:04:41 2018 > 2.17% done, estimate finish Fri May 25 21:05:13 2018 > 2.17% done, estimate finish Fri May 25 21:04:59 2018 > 2.17% done, estimate finish Fri May 25 21:04:45 2018 > 2.18% done, estimate finish Fri May 25 21:05:17 2018 > 2.18% done, estimate finish Fri May 25 21:05:03 2018 > 2.19% done, estimate finish Fri May 25 21:04:49 2018 > 2.19% done, estimate finish Fri May 25 21:04:35 2018 > 2.20% done, estimate finish Fri May 25 21:05:07 2018 > 2.20% done, estimate finish Fri May 25 21:04:53 2018 > 2.20% done, estimate finish Fri May 25 21:04:39 2018 > 2.21% done, estimate finish Fri May 25 21:04:25 2018 > 2.21% done, estimate finish Fri May 25 21:04:56 2018 > 2.22% done, estimate finish Fri May 25 21:04:43 2018 > 2.22% done, estimate finish Fri May 25 21:04:29 2018 > 2.22% done, estimate finish Fri May 25 21:04:15 2018 > 2.23% done, estimate finish Fri May 25 21:04:46 2018 > 2.23% done, estimate finish Fri May 25 21:04:33 2018 > 2.24% done, estimate finish Fri May 25 21:04:19 2018 > 2.24% done, estimate finish Fri May 25 21:04:05 2018 > 2.24% done, estimate finish Fri May 25 21:04:37 2018 > 2.25% done, estimate finish Fri May 25 21:04:23 2018 > 2.25% done, estimate finish Fri May 25 21:04:10 2018 > 2.26% done, estimate finish Fri May 25 21:04:40 2018 > 2.26% done, estimate finish Fri May 25 21:04:27 2018 > 2.27% done, estimate finish Fri May 25 21:04:14 2018 > 2.27% done, estimate finish Fri May 25 21:04:00 2018 > 2.27% done, estimate finish Fri May 25 21:04:31 2018 > 2.28% done, estimate finish Fri May 25 21:04:17 2018 > 2.28% done, estimate finish Fri May 25 21:04:04 2018 > 2.29% done, estimate finish Fri May 25 21:03:51 2018 > 2.29% done, estimate finish Fri May 25 21:04:21 2018 > 2.29% done, estimate finish Fri May 25 21:04:08 2018 > 2.30% done, estimate finish Fri May 25 21:03:55 2018 > 2.30% done, estimate finish Fri May 25 21:03:42 2018 > 2.31% done, estimate finish Fri May 25 21:04:12 2018 > 2.31% done, estimate finish Fri May 25 21:03:59 2018 > 2.31% done, estimate finish Fri May 25 21:03:46 2018 > 2.32% done, estimate finish Fri May 25 21:04:16 2018 > 2.32% done, estimate finish Fri May 25 21:04:02 2018 > 2.33% done, estimate finish Fri May 25 21:03:50 2018 > 2.33% done, estimate finish Fri May 25 21:03:37 2018 > 2.33% done, estimate finish Fri May 25 21:04:07 2018 > 2.34% done, estimate finish Fri May 25 21:03:53 2018 > 2.34% done, estimate finish Fri May 25 21:03:41 2018 > 2.35% done, estimate finish Fri May 25 21:03:28 2018 > 2.35% done, estimate finish Fri May 25 21:03:58 2018 > 2.36% done, estimate finish Fri May 25 21:03:44 2018 > 2.36% done, estimate finish Fri May 25 21:03:32 2018 > 2.36% done, estimate finish Fri May 25 21:03:19 2018 > 2.37% done, estimate finish Fri May 25 21:03:49 2018 > 2.37% done, estimate finish Fri May 25 21:03:36 2018 > 2.38% done, estimate finish Fri May 25 21:03:23 2018 > 2.38% done, estimate finish Fri May 25 21:03:52 2018 > 2.38% done, estimate finish Fri May 25 21:03:40 2018 > 2.39% done, estimate finish Fri May 25 21:03:27 2018 > 2.39% done, estimate finish Fri May 25 21:03:56 2018 > 2.40% done, estimate finish Fri May 25 21:03:43 2018 > 2.40% done, estimate finish Fri May 25 21:03:31 2018 > 2.40% done, estimate finish Fri May 25 21:03:18 2018 > 2.41% done, estimate finish Fri May 25 21:03:47 2018 > 2.41% done, estimate finish Fri May 25 21:03:35 2018 > 2.42% done, estimate finish Fri May 25 21:03:22 2018 > 2.42% done, estimate finish Fri May 25 21:03:10 2018 > 2.42% done, estimate finish Fri May 25 21:03:39 2018 > 2.43% done, estimate finish Fri May 25 21:03:26 2018 > 2.43% done, estimate finish Fri May 25 21:03:14 2018 > 2.44% done, estimate finish Fri May 25 21:03:01 2018 > 2.44% done, estimate finish Fri May 25 21:03:30 2018 > 2.45% done, estimate finish Fri May 25 21:03:18 2018 > 2.45% done, estimate finish Fri May 25 21:03:05 2018 > 2.45% done, estimate finish Fri May 25 21:02:53 2018 > 2.46% done, estimate finish Fri May 25 21:03:21 2018 > 2.46% done, estimate finish Fri May 25 21:03:09 2018 > 2.47% done, estimate finish Fri May 25 21:02:57 2018 > 2.47% done, estimate finish Fri May 25 21:03:25 2018 > 2.47% done, estimate finish Fri May 25 21:03:13 2018 > 2.48% done, estimate finish Fri May 25 21:03:01 2018 > 2.48% done, estimate finish Fri May 25 21:02:49 2018 > 2.49% done, estimate finish Fri May 25 21:03:17 2018 > 2.49% done, estimate finish Fri May 25 21:03:05 2018 > 2.49% done, estimate finish Fri May 25 21:02:53 2018 > 2.50% done, estimate finish Fri May 25 21:02:41 2018 > 2.50% done, estimate finish Fri May 25 21:03:09 2018 > 2.51% done, estimate finish Fri May 25 21:02:57 2018 > 2.51% done, estimate finish Fri May 25 21:02:45 2018 > 2.51% done, estimate finish Fri May 25 21:02:33 2018 > 2.52% done, estimate finish Fri May 25 21:03:01 2018 > 2.52% done, estimate finish Fri May 25 21:02:49 2018 > 2.53% done, estimate finish Fri May 25 21:03:17 2018 > 2.53% done, estimate finish Fri May 25 21:03:05 2018 > 2.54% done, estimate finish Fri May 25 21:02:53 2018 > 2.54% done, estimate finish Fri May 25 21:02:41 2018 > 2.54% done, estimate finish Fri May 25 21:03:08 2018 > 2.55% done, estimate finish Fri May 25 21:02:57 2018 > 2.55% done, estimate finish Fri May 25 21:02:45 2018 > 2.56% done, estimate finish Fri May 25 21:02:33 2018 > 2.56% done, estimate finish Fri May 25 21:03:00 2018 > 2.56% done, estimate finish Fri May 25 21:02:49 2018 > 2.57% done, estimate finish Fri May 25 21:02:37 2018 > 2.57% done, estimate finish Fri May 25 21:02:25 2018 > 2.58% done, estimate finish Fri May 25 21:02:53 2018 > 2.58% done, estimate finish Fri May 25 21:02:41 2018 > 2.58% done, estimate finish Fri May 25 21:02:29 2018 > 2.59% done, estimate finish Fri May 25 21:02:18 2018 > 2.59% done, estimate finish Fri May 25 21:02:45 2018 > 2.60% done, estimate finish Fri May 25 21:02:33 2018 > 2.60% done, estimate finish Fri May 25 21:02:21 2018 > 2.61% done, estimate finish Fri May 25 21:02:48 2018 > 2.61% done, estimate finish Fri May 25 21:02:37 2018 > 2.61% done, estimate finish Fri May 25 21:02:26 2018 > 2.62% done, estimate finish Fri May 25 21:02:14 2018 > 2.62% done, estimate finish Fri May 25 21:02:41 2018 > 2.63% done, estimate finish Fri May 25 21:02:29 2018 > 2.63% done, estimate finish Fri May 25 21:02:18 2018 > 2.63% done, estimate finish Fri May 25 21:02:07 2018 > 2.64% done, estimate finish Fri May 25 21:02:33 2018 > 2.64% done, estimate finish Fri May 25 21:02:22 2018 > 2.65% done, estimate finish Fri May 25 21:02:11 2018 > 2.65% done, estimate finish Fri May 25 21:01:59 2018 > 2.65% done, estimate finish Fri May 25 21:02:26 2018 > 2.66% done, estimate finish Fri May 25 21:02:15 2018 > 2.66% done, estimate finish Fri May 25 21:02:03 2018 > 2.67% done, estimate finish Fri May 25 21:02:29 2018 > 2.67% done, estimate finish Fri May 25 21:02:18 2018 > 2.67% done, estimate finish Fri May 25 21:02:07 2018 > 2.68% done, estimate finish Fri May 25 21:02:34 2018 > 2.68% done, estimate finish Fri May 25 21:02:22 2018 > 2.69% done, estimate finish Fri May 25 21:02:11 2018 > 2.69% done, estimate finish Fri May 25 21:02:00 2018 > 2.70% done, estimate finish Fri May 25 21:02:26 2018 > 2.70% done, estimate finish Fri May 25 21:02:15 2018 > 2.70% done, estimate finish Fri May 25 21:02:04 2018 > 2.71% done, estimate finish Fri May 25 21:01:53 2018 > 2.71% done, estimate finish Fri May 25 21:02:19 2018 > 2.72% done, estimate finish Fri May 25 21:02:08 2018 > 2.72% done, estimate finish Fri May 25 21:01:57 2018 > 2.72% done, estimate finish Fri May 25 21:01:46 2018 > 2.73% done, estimate finish Fri May 25 21:02:12 2018 > 2.73% done, estimate finish Fri May 25 21:02:00 2018 > 2.74% done, estimate finish Fri May 25 21:01:50 2018 > 2.74% done, estimate finish Fri May 25 21:02:15 2018 > 2.74% done, estimate finish Fri May 25 21:02:05 2018 > 2.75% done, estimate finish Fri May 25 21:01:53 2018 > 2.75% done, estimate finish Fri May 25 21:01:43 2018 > 2.76% done, estimate finish Fri May 25 21:02:08 2018 > 2.76% done, estimate finish Fri May 25 21:01:58 2018 > 2.76% done, estimate finish Fri May 25 21:01:46 2018 > 2.77% done, estimate finish Fri May 25 21:01:36 2018 > 2.77% done, estimate finish Fri May 25 21:02:01 2018 > 2.78% done, estimate finish Fri May 25 21:01:51 2018 > 2.78% done, estimate finish Fri May 25 21:01:40 2018 > 2.79% done, estimate finish Fri May 25 21:02:05 2018 > 2.79% done, estimate finish Fri May 25 21:01:54 2018 > 2.79% done, estimate finish Fri May 25 21:01:44 2018 > 2.80% done, estimate finish Fri May 25 21:01:33 2018 > 2.80% done, estimate finish Fri May 25 21:01:58 2018 > 2.81% done, estimate finish Fri May 25 21:01:47 2018 > 2.81% done, estimate finish Fri May 25 21:01:37 2018 > 2.81% done, estimate finish Fri May 25 21:01:26 2018 > 2.82% done, estimate finish Fri May 25 21:01:51 2018 > 2.82% done, estimate finish Fri May 25 21:01:41 2018 > 2.83% done, estimate finish Fri May 25 21:01:30 2018 > 2.83% done, estimate finish Fri May 25 21:01:19 2018 > 2.83% done, estimate finish Fri May 25 21:01:44 2018 > 2.84% done, estimate finish Fri May 25 21:01:34 2018 > 2.84% done, estimate finish Fri May 25 21:01:24 2018 > 2.85% done, estimate finish Fri May 25 21:01:48 2018 > 2.85% done, estimate finish Fri May 25 21:01:38 2018 > 2.85% done, estimate finish Fri May 25 21:01:27 2018 > 2.86% done, estimate finish Fri May 25 21:01:52 2018 > 2.86% done, estimate finish Fri May 25 21:01:41 2018 > 2.87% done, estimate finish Fri May 25 21:01:31 2018 > 2.87% done, estimate finish Fri May 25 21:01:21 2018 > 2.88% done, estimate finish Fri May 25 21:01:45 2018 > 2.88% done, estimate finish Fri May 25 21:01:35 2018 > 2.88% done, estimate finish Fri May 25 21:01:25 2018 > 2.89% done, estimate finish Fri May 25 21:01:49 2018 > 2.89% done, estimate finish Fri May 25 21:01:39 2018 > 2.90% done, estimate finish Fri May 25 21:01:28 2018 > 2.90% done, estimate finish Fri May 25 21:01:18 2018 > 2.90% done, estimate finish Fri May 25 21:01:42 2018 > 2.91% done, estimate finish Fri May 25 21:01:32 2018 > 2.91% done, estimate finish Fri May 25 21:01:22 2018 > 2.92% done, estimate finish Fri May 25 21:01:46 2018 > 2.92% done, estimate finish Fri May 25 21:01:36 2018 > 2.92% done, estimate finish Fri May 25 21:01:26 2018 > 2.93% done, estimate finish Fri May 25 21:01:15 2018 > 2.93% done, estimate finish Fri May 25 21:01:39 2018 > 2.94% done, estimate finish Fri May 25 21:01:29 2018 > 2.94% done, estimate finish Fri May 25 21:01:19 2018 > 2.95% done, estimate finish Fri May 25 21:01:09 2018 > 2.95% done, estimate finish Fri May 25 21:01:33 2018 > 2.95% done, estimate finish Fri May 25 21:01:23 2018 > 2.96% done, estimate finish Fri May 25 21:01:13 2018 > 2.96% done, estimate finish Fri May 25 21:01:03 2018 > 2.97% done, estimate finish Fri May 25 21:01:27 2018 > 2.97% done, estimate finish Fri May 25 21:01:17 2018 > 2.97% done, estimate finish Fri May 25 21:01:07 2018 > 2.98% done, estimate finish Fri May 25 21:01:30 2018 > 2.98% done, estimate finish Fri May 25 21:01:20 2018 > 2.99% done, estimate finish Fri May 25 21:01:11 2018 > 2.99% done, estimate finish Fri May 25 21:01:01 2018 > 2.99% done, estimate finish Fri May 25 21:01:24 2018 > 3.00% done, estimate finish Fri May 25 21:01:14 2018 > 3.00% done, estimate finish Fri May 25 21:01:04 2018 > 3.01% done, estimate finish Fri May 25 21:01:28 2018 > 3.01% done, estimate finish Fri May 25 21:01:18 2018 > 3.01% done, estimate finish Fri May 25 21:01:08 2018 > 3.02% done, estimate finish Fri May 25 21:00:58 2018 > 3.02% done, estimate finish Fri May 25 21:01:22 2018 > 3.03% done, estimate finish Fri May 25 21:01:12 2018 > 3.03% done, estimate finish Fri May 25 21:01:02 2018 > 3.04% done, estimate finish Fri May 25 21:01:25 2018 > 3.04% done, estimate finish Fri May 25 21:01:15 2018 > 3.04% done, estimate finish Fri May 25 21:01:05 2018 > 3.05% done, estimate finish Fri May 25 21:00:56 2018 > 3.05% done, estimate finish Fri May 25 21:01:19 2018 > 3.06% done, estimate finish Fri May 25 21:01:09 2018 > 3.06% done, estimate finish Fri May 25 21:01:00 2018 > 3.06% done, estimate finish Fri May 25 21:00:50 2018 > 3.07% done, estimate finish Fri May 25 21:01:13 2018 > 3.07% done, estimate finish Fri May 25 21:01:03 2018 > 3.08% done, estimate finish Fri May 25 21:00:54 2018 > 3.08% done, estimate finish Fri May 25 21:01:17 2018 > 3.08% done, estimate finish Fri May 25 21:01:07 2018 > 3.09% done, estimate finish Fri May 25 21:00:57 2018 > 3.09% done, estimate finish Fri May 25 21:00:48 2018 > 3.10% done, estimate finish Fri May 25 21:01:11 2018 > 3.10% done, estimate finish Fri May 25 21:01:01 2018 > 3.10% done, estimate finish Fri May 25 21:00:51 2018 > 3.11% done, estimate finish Fri May 25 21:00:42 2018 > 3.11% done, estimate finish Fri May 25 21:01:05 2018 > 3.12% done, estimate finish Fri May 25 21:00:55 2018 > 3.12% done, estimate finish Fri May 25 21:00:45 2018 > 3.13% done, estimate finish Fri May 25 21:00:36 2018 > 3.13% done, estimate finish Fri May 25 21:00:59 2018 > 3.13% done, estimate finish Fri May 25 21:00:49 2018 > 3.14% done, estimate finish Fri May 25 21:00:40 2018 > 3.14% done, estimate finish Fri May 25 21:01:02 2018 > 3.15% done, estimate finish Fri May 25 21:00:53 2018 > 3.15% done, estimate finish Fri May 25 21:00:44 2018 > 3.15% done, estimate finish Fri May 25 21:00:34 2018 > 3.16% done, estimate finish Fri May 25 21:00:56 2018 > 3.16% done, estimate finish Fri May 25 21:00:47 2018 > 3.17% done, estimate finish Fri May 25 21:00:38 2018 > 3.17% done, estimate finish Fri May 25 21:01:00 2018 > 3.17% done, estimate finish Fri May 25 21:00:51 2018 > 3.18% done, estimate finish Fri May 25 21:00:41 2018 > 3.18% done, estimate finish Fri May 25 21:00:32 2018 > 3.19% done, estimate finish Fri May 25 21:00:54 2018 > 3.19% done, estimate finish Fri May 25 21:00:45 2018 > 3.19% done, estimate finish Fri May 25 21:00:36 2018 > 3.20% done, estimate finish Fri May 25 21:00:27 2018 > 3.20% done, estimate finish Fri May 25 21:00:48 2018 > 3.21% done, estimate finish Fri May 25 21:00:39 2018 > 3.21% done, estimate finish Fri May 25 21:00:30 2018 > 3.22% done, estimate finish Fri May 25 21:00:52 2018 > 3.22% done, estimate finish Fri May 25 21:00:43 2018 > 3.22% done, estimate finish Fri May 25 21:00:34 2018 > 3.23% done, estimate finish Fri May 25 21:00:25 2018 > 3.23% done, estimate finish Fri May 25 21:00:47 2018 > 3.24% done, estimate finish Fri May 25 21:00:37 2018 > 3.24% done, estimate finish Fri May 25 21:00:28 2018 > 3.24% done, estimate finish Fri May 25 21:00:50 2018 > 3.25% done, estimate finish Fri May 25 21:00:41 2018 > 3.25% done, estimate finish Fri May 25 21:00:32 2018 > 3.26% done, estimate finish Fri May 25 21:00:23 2018 > 3.26% done, estimate finish Fri May 25 21:00:44 2018 > 3.26% done, estimate finish Fri May 25 21:00:35 2018 > 3.27% done, estimate finish Fri May 25 21:00:26 2018 > 3.27% done, estimate finish Fri May 25 21:00:17 2018 > 3.28% done, estimate finish Fri May 25 21:00:39 2018 > 3.28% done, estimate finish Fri May 25 21:00:30 2018 > 3.28% done, estimate finish Fri May 25 21:00:51 2018 > 3.29% done, estimate finish Fri May 25 21:00:42 2018 > 3.29% done, estimate finish Fri May 25 21:00:33 2018 > 3.30% done, estimate finish Fri May 25 21:00:25 2018 > 3.30% done, estimate finish Fri May 25 21:00:15 2018 > 3.31% done, estimate finish Fri May 25 21:00:37 2018 > 3.31% done, estimate finish Fri May 25 21:00:28 2018 > 3.31% done, estimate finish Fri May 25 21:00:19 2018 > 3.32% done, estimate finish Fri May 25 21:00:40 2018 > 3.32% done, estimate finish Fri May 25 21:00:31 2018 > 3.33% done, estimate finish Fri May 25 21:00:23 2018 > 3.33% done, estimate finish Fri May 25 21:00:14 2018 > 3.33% done, estimate finish Fri May 25 21:00:35 2018 > 3.34% done, estimate finish Fri May 25 21:00:26 2018 > 3.34% done, estimate finish Fri May 25 21:00:17 2018 > 3.35% done, estimate finish Fri May 25 21:00:09 2018 > 3.35% done, estimate finish Fri May 25 21:00:29 2018 > 3.35% done, estimate finish Fri May 25 21:00:21 2018 > 3.36% done, estimate finish Fri May 25 21:00:12 2018 > 3.36% done, estimate finish Fri May 25 21:00:03 2018 > 3.37% done, estimate finish Fri May 25 21:00:24 2018 > 3.37% done, estimate finish Fri May 25 21:00:16 2018 > 3.38% done, estimate finish Fri May 25 21:00:07 2018 > 3.38% done, estimate finish Fri May 25 21:00:28 2018 > 3.38% done, estimate finish Fri May 25 21:00:19 2018 > 3.39% done, estimate finish Fri May 25 21:00:10 2018 > 3.39% done, estimate finish Fri May 25 21:00:02 2018 > 3.40% done, estimate finish Fri May 25 21:00:23 2018 > 3.40% done, estimate finish Fri May 25 21:00:14 2018 > 3.40% done, estimate finish Fri May 25 21:00:05 2018 > 3.41% done, estimate finish Fri May 25 20:59:57 2018 > 3.41% done, estimate finish Fri May 25 21:00:17 2018 > 3.42% done, estimate finish Fri May 25 21:00:09 2018 > 3.42% done, estimate finish Fri May 25 21:00:00 2018 > 3.42% done, estimate finish Fri May 25 21:00:21 2018 > 3.43% done, estimate finish Fri May 25 21:00:12 2018 > 3.43% done, estimate finish Fri May 25 21:00:03 2018 > 3.44% done, estimate finish Fri May 25 20:59:55 2018 > 3.44% done, estimate finish Fri May 25 21:00:16 2018 > 3.44% done, estimate finish Fri May 25 21:00:07 2018 > 3.45% done, estimate finish Fri May 25 20:59:58 2018 > 3.45% done, estimate finish Fri May 25 21:00:19 2018 > 3.46% done, estimate finish Fri May 25 21:00:11 2018 > 3.46% done, estimate finish Fri May 25 21:00:02 2018 > 3.47% done, estimate finish Fri May 25 20:59:53 2018 > 3.47% done, estimate finish Fri May 25 21:00:14 2018 > 3.47% done, estimate finish Fri May 25 21:00:05 2018 > 3.48% done, estimate finish Fri May 25 20:59:57 2018 > 3.48% done, estimate finish Fri May 25 21:00:17 2018 > 3.49% done, estimate finish Fri May 25 21:00:09 2018 > 3.49% done, estimate finish Fri May 25 21:00:00 2018 > 3.49% done, estimate finish Fri May 25 20:59:52 2018 > 3.50% done, estimate finish Fri May 25 21:00:12 2018 > 3.50% done, estimate finish Fri May 25 21:00:04 2018 > 3.51% done, estimate finish Fri May 25 20:59:56 2018 > 3.51% done, estimate finish Fri May 25 20:59:47 2018 > 3.51% done, estimate finish Fri May 25 21:00:07 2018 > 3.52% done, estimate finish Fri May 25 20:59:59 2018 > 3.52% done, estimate finish Fri May 25 20:59:51 2018 > 3.53% done, estimate finish Fri May 25 20:59:42 2018 > 3.53% done, estimate finish Fri May 25 21:00:02 2018 > 3.53% done, estimate finish Fri May 25 20:59:54 2018 > 3.54% done, estimate finish Fri May 25 20:59:46 2018 > 3.54% done, estimate finish Fri May 25 20:59:38 2018 > 3.55% done, estimate finish Fri May 25 20:59:57 2018 > 3.55% done, estimate finish Fri May 25 20:59:49 2018 > 3.56% done, estimate finish Fri May 25 20:59:41 2018 > 3.56% done, estimate finish Fri May 25 21:00:01 2018 > 3.56% done, estimate finish Fri May 25 20:59:52 2018 > 3.57% done, estimate finish Fri May 25 20:59:44 2018 > 3.57% done, estimate finish Fri May 25 20:59:36 2018 > 3.58% done, estimate finish Fri May 25 20:59:56 2018 > 3.58% done, estimate finish Fri May 25 20:59:48 2018 > 3.58% done, estimate finish Fri May 25 20:59:40 2018 > 3.59% done, estimate finish Fri May 25 20:59:59 2018 > 3.59% done, estimate finish Fri May 25 20:59:51 2018 > 3.60% done, estimate finish Fri May 25 20:59:43 2018 > 3.60% done, estimate finish Fri May 25 20:59:35 2018 > 3.60% done, estimate finish Fri May 25 20:59:54 2018 > 3.61% done, estimate finish Fri May 25 20:59:46 2018 > 3.61% done, estimate finish Fri May 25 20:59:38 2018 > 3.62% done, estimate finish Fri May 25 20:59:30 2018 > 3.62% done, estimate finish Fri May 25 20:59:50 2018 > 3.62% done, estimate finish Fri May 25 20:59:42 2018 > 3.63% done, estimate finish Fri May 25 20:59:33 2018 > 3.63% done, estimate finish Fri May 25 20:59:25 2018 > 3.64% done, estimate finish Fri May 25 20:59:45 2018 > 3.64% done, estimate finish Fri May 25 20:59:37 2018 > 3.65% done, estimate finish Fri May 25 20:59:29 2018 > 3.65% done, estimate finish Fri May 25 20:59:21 2018 > 3.65% done, estimate finish Fri May 25 20:59:40 2018 > 3.66% done, estimate finish Fri May 25 20:59:32 2018 > 3.66% done, estimate finish Fri May 25 20:59:24 2018 > 3.67% done, estimate finish Fri May 25 20:59:44 2018 > 3.67% done, estimate finish Fri May 25 20:59:36 2018 > 3.67% done, estimate finish Fri May 25 20:59:28 2018 > 3.68% done, estimate finish Fri May 25 20:59:20 2018 > 3.68% done, estimate finish Fri May 25 20:59:39 2018 > 3.69% done, estimate finish Fri May 25 20:59:31 2018 > 3.69% done, estimate finish Fri May 25 20:59:23 2018 > 3.69% done, estimate finish Fri May 25 20:59:42 2018 > 3.70% done, estimate finish Fri May 25 20:59:34 2018 > 3.70% done, estimate finish Fri May 25 20:59:26 2018 > 3.71% done, estimate finish Fri May 25 20:59:19 2018 > 3.71% done, estimate finish Fri May 25 20:59:38 2018 > 3.71% done, estimate finish Fri May 25 20:59:30 2018 > 3.72% done, estimate finish Fri May 25 20:59:22 2018 > 3.72% done, estimate finish Fri May 25 20:59:14 2018 > 3.73% done, estimate finish Fri May 25 20:59:33 2018 > 3.73% done, estimate finish Fri May 25 20:59:25 2018 > 3.74% done, estimate finish Fri May 25 20:59:17 2018 > 3.74% done, estimate finish Fri May 25 20:59:10 2018 > 3.74% done, estimate finish Fri May 25 20:59:29 2018 > 3.75% done, estimate finish Fri May 25 20:59:21 2018 > 3.75% done, estimate finish Fri May 25 20:59:13 2018 > 3.76% done, estimate finish Fri May 25 20:59:05 2018 > 3.76% done, estimate finish Fri May 25 20:59:24 2018 > 3.76% done, estimate finish Fri May 25 20:59:16 2018 > 3.77% done, estimate finish Fri May 25 20:59:09 2018 > 3.77% done, estimate finish Fri May 25 20:59:28 2018 > 3.78% done, estimate finish Fri May 25 20:59:20 2018 > 3.78% done, estimate finish Fri May 25 20:59:12 2018 > 3.78% done, estimate finish Fri May 25 20:59:04 2018 > 3.79% done, estimate finish Fri May 25 20:59:23 2018 > 3.79% done, estimate finish Fri May 25 20:59:15 2018 > 3.80% done, estimate finish Fri May 25 20:59:08 2018 > 3.80% done, estimate finish Fri May 25 20:59:00 2018 > 3.81% done, estimate finish Fri May 25 20:59:19 2018 > 3.81% done, estimate finish Fri May 25 20:59:11 2018 > 3.81% done, estimate finish Fri May 25 20:59:03 2018 > 3.82% done, estimate finish Fri May 25 20:58:56 2018 > 3.82% done, estimate finish Fri May 25 20:59:14 2018 > 3.83% done, estimate finish Fri May 25 20:59:07 2018 > 3.83% done, estimate finish Fri May 25 20:58:59 2018 > 3.83% done, estimate finish Fri May 25 20:59:18 2018 > 3.84% done, estimate finish Fri May 25 20:59:10 2018 > 3.84% done, estimate finish Fri May 25 20:59:02 2018 > 3.85% done, estimate finish Fri May 25 20:58:55 2018 > 3.85% done, estimate finish Fri May 25 20:59:13 2018 > 3.85% done, estimate finish Fri May 25 20:59:06 2018 > 3.86% done, estimate finish Fri May 25 20:58:58 2018 > 3.86% done, estimate finish Fri May 25 20:58:51 2018 > 3.87% done, estimate finish Fri May 25 20:59:09 2018 > 3.87% done, estimate finish Fri May 25 20:59:01 2018 > 3.87% done, estimate finish Fri May 25 20:58:54 2018 > 3.88% done, estimate finish Fri May 25 20:59:12 2018 > 3.88% done, estimate finish Fri May 25 20:59:05 2018 > 3.89% done, estimate finish Fri May 25 20:58:57 2018 > 3.89% done, estimate finish Fri May 25 20:58:50 2018 > 3.90% done, estimate finish Fri May 25 20:59:08 2018 > 3.90% done, estimate finish Fri May 25 20:59:00 2018 > 3.90% done, estimate finish Fri May 25 20:58:53 2018 > 3.91% done, estimate finish Fri May 25 20:59:11 2018 > 3.91% done, estimate finish Fri May 25 20:59:04 2018 > 3.92% done, estimate finish Fri May 25 20:58:56 2018 > 3.92% done, estimate finish Fri May 25 20:58:49 2018 > 3.92% done, estimate finish Fri May 25 20:59:07 2018 > 3.93% done, estimate finish Fri May 25 20:59:00 2018 > 3.93% done, estimate finish Fri May 25 20:58:52 2018 > 3.94% done, estimate finish Fri May 25 20:58:45 2018 > 3.94% done, estimate finish Fri May 25 20:59:03 2018 > 3.94% done, estimate finish Fri May 25 20:58:55 2018 > 3.95% done, estimate finish Fri May 25 20:58:48 2018 > 3.95% done, estimate finish Fri May 25 20:59:06 2018 > 3.96% done, estimate finish Fri May 25 20:58:59 2018 > 3.96% done, estimate finish Fri May 25 20:58:51 2018 > 3.96% done, estimate finish Fri May 25 20:58:44 2018 > 3.97% done, estimate finish Fri May 25 20:58:36 2018 > 3.97% done, estimate finish Fri May 25 20:58:54 2018 > 3.98% done, estimate finish Fri May 25 20:58:47 2018 > 3.98% done, estimate finish Fri May 25 20:58:40 2018 > 3.99% done, estimate finish Fri May 25 20:58:58 2018 > 3.99% done, estimate finish Fri May 25 20:58:50 2018 > 3.99% done, estimate finish Fri May 25 20:58:43 2018 > 4.00% done, estimate finish Fri May 25 20:58:36 2018 > 4.00% done, estimate finish Fri May 25 20:58:53 2018 > 4.01% done, estimate finish Fri May 25 20:58:46 2018 > 4.01% done, estimate finish Fri May 25 20:58:39 2018 > 4.01% done, estimate finish Fri May 25 20:58:32 2018 > 4.02% done, estimate finish Fri May 25 20:58:49 2018 > 4.02% done, estimate finish Fri May 25 20:58:42 2018 > 4.03% done, estimate finish Fri May 25 20:58:35 2018 > 4.03% done, estimate finish Fri May 25 20:58:28 2018 > 4.03% done, estimate finish Fri May 25 20:58:45 2018 > 4.04% done, estimate finish Fri May 25 20:58:38 2018 > 4.04% done, estimate finish Fri May 25 20:58:31 2018 > 4.05% done, estimate finish Fri May 25 20:58:49 2018 > 4.05% done, estimate finish Fri May 25 20:58:41 2018 > 4.05% done, estimate finish Fri May 25 20:58:34 2018 > 4.06% done, estimate finish Fri May 25 20:58:27 2018 > 4.06% done, estimate finish Fri May 25 20:58:45 2018 > 4.07% done, estimate finish Fri May 25 20:58:37 2018 > 4.07% done, estimate finish Fri May 25 20:58:30 2018 > 4.08% done, estimate finish Fri May 25 20:58:23 2018 > 4.08% done, estimate finish Fri May 25 20:58:41 2018 > 4.08% done, estimate finish Fri May 25 20:58:34 2018 > 4.09% done, estimate finish Fri May 25 20:58:27 2018 > 4.09% done, estimate finish Fri May 25 20:58:19 2018 > 4.10% done, estimate finish Fri May 25 20:58:37 2018 > 4.10% done, estimate finish Fri May 25 20:58:30 2018 > 4.10% done, estimate finish Fri May 25 20:58:23 2018 > 4.11% done, estimate finish Fri May 25 20:58:16 2018 > 4.11% done, estimate finish Fri May 25 20:58:33 2018 > 4.12% done, estimate finish Fri May 25 20:58:26 2018 > 4.12% done, estimate finish Fri May 25 20:58:19 2018 > 4.12% done, estimate finish Fri May 25 20:58:36 2018 > 4.13% done, estimate finish Fri May 25 20:58:29 2018 > 4.13% done, estimate finish Fri May 25 20:58:22 2018 > 4.14% done, estimate finish Fri May 25 20:58:15 2018 > 4.14% done, estimate finish Fri May 25 20:58:32 2018 > 4.14% done, estimate finish Fri May 25 20:58:25 2018 > 4.15% done, estimate finish Fri May 25 20:58:18 2018 > 4.15% done, estimate finish Fri May 25 20:58:11 2018 > 4.16% done, estimate finish Fri May 25 20:58:28 2018 > 4.16% done, estimate finish Fri May 25 20:58:22 2018 > 4.17% done, estimate finish Fri May 25 20:58:14 2018 > 4.17% done, estimate finish Fri May 25 20:58:08 2018 > 4.17% done, estimate finish Fri May 25 20:58:25 2018 > 4.18% done, estimate finish Fri May 25 20:58:18 2018 > 4.18% done, estimate finish Fri May 25 20:58:11 2018 > 4.19% done, estimate finish Fri May 25 20:58:28 2018 > 4.19% done, estimate finish Fri May 25 20:58:21 2018 > 4.19% done, estimate finish Fri May 25 20:58:14 2018 > 4.20% done, estimate finish Fri May 25 20:58:07 2018 > 4.20% done, estimate finish Fri May 25 20:58:24 2018 > 4.21% done, estimate finish Fri May 25 20:58:17 2018 > 4.21% done, estimate finish Fri May 25 20:58:10 2018 > 4.21% done, estimate finish Fri May 25 20:58:03 2018 > 4.22% done, estimate finish Fri May 25 20:58:20 2018 > 4.22% done, estimate finish Fri May 25 20:58:13 2018 > 4.23% done, estimate finish Fri May 25 20:58:07 2018 > 4.23% done, estimate finish Fri May 25 20:58:00 2018 > 4.24% done, estimate finish Fri May 25 20:58:16 2018 > 4.24% done, estimate finish Fri May 25 20:58:10 2018 > 4.24% done, estimate finish Fri May 25 20:58:03 2018 > 4.25% done, estimate finish Fri May 25 20:57:56 2018 > 4.25% done, estimate finish Fri May 25 20:58:13 2018 > 4.26% done, estimate finish Fri May 25 20:58:06 2018 > 4.26% done, estimate finish Fri May 25 20:57:59 2018 > 4.26% done, estimate finish Fri May 25 20:58:16 2018 > 4.27% done, estimate finish Fri May 25 20:58:09 2018 > 4.27% done, estimate finish Fri May 25 20:58:02 2018 > 4.28% done, estimate finish Fri May 25 20:57:56 2018 > 4.28% done, estimate finish Fri May 25 20:58:12 2018 > 4.28% done, estimate finish Fri May 25 20:58:06 2018 > 4.29% done, estimate finish Fri May 25 20:57:59 2018 > 4.29% done, estimate finish Fri May 25 20:57:52 2018 > 4.30% done, estimate finish Fri May 25 20:58:09 2018 > 4.30% done, estimate finish Fri May 25 20:58:02 2018 > 4.30% done, estimate finish Fri May 25 20:57:55 2018 > 4.31% done, estimate finish Fri May 25 20:57:49 2018 > 4.31% done, estimate finish Fri May 25 20:58:05 2018 > 4.32% done, estimate finish Fri May 25 20:57:58 2018 > 4.32% done, estimate finish Fri May 25 20:57:52 2018 > 4.33% done, estimate finish Fri May 25 20:58:08 2018 > 4.33% done, estimate finish Fri May 25 20:58:01 2018 > 4.33% done, estimate finish Fri May 25 20:57:55 2018 > 4.34% done, estimate finish Fri May 25 20:57:48 2018 > 4.34% done, estimate finish Fri May 25 20:58:05 2018 > 4.35% done, estimate finish Fri May 25 20:57:58 2018 > 4.35% done, estimate finish Fri May 25 20:57:51 2018 > 4.35% done, estimate finish Fri May 25 20:57:45 2018 > 4.36% done, estimate finish Fri May 25 20:58:01 2018 > 4.36% done, estimate finish Fri May 25 20:57:54 2018 > 4.37% done, estimate finish Fri May 25 20:57:48 2018 > 4.37% done, estimate finish Fri May 25 20:57:41 2018 > 4.37% done, estimate finish Fri May 25 20:57:58 2018 > 4.38% done, estimate finish Fri May 25 20:57:51 2018 > 4.38% done, estimate finish Fri May 25 20:57:44 2018 > 4.39% done, estimate finish Fri May 25 20:58:01 2018 > 4.39% done, estimate finish Fri May 25 20:57:54 2018 > 4.39% done, estimate finish Fri May 25 20:57:47 2018 > 4.40% done, estimate finish Fri May 25 20:57:41 2018 > 4.40% done, estimate finish Fri May 25 20:57:57 2018 > 4.41% done, estimate finish Fri May 25 20:57:51 2018 > 4.41% done, estimate finish Fri May 25 20:57:44 2018 > 4.42% done, estimate finish Fri May 25 20:57:37 2018 > 4.42% done, estimate finish Fri May 25 20:57:54 2018 > 4.42% done, estimate finish Fri May 25 20:57:47 2018 > 4.43% done, estimate finish Fri May 25 20:57:41 2018 > 4.43% done, estimate finish Fri May 25 20:57:34 2018 > 4.44% done, estimate finish Fri May 25 20:57:50 2018 > 4.44% done, estimate finish Fri May 25 20:57:44 2018 > 4.44% done, estimate finish Fri May 25 20:57:37 2018 > 4.45% done, estimate finish Fri May 25 20:57:31 2018 > 4.45% done, estimate finish Fri May 25 20:57:47 2018 > 4.46% done, estimate finish Fri May 25 20:57:40 2018 > 4.46% done, estimate finish Fri May 25 20:57:34 2018 > 4.46% done, estimate finish Fri May 25 20:57:50 2018 > 4.47% done, estimate finish Fri May 25 20:57:43 2018 > 4.47% done, estimate finish Fri May 25 20:57:37 2018 > 4.48% done, estimate finish Fri May 25 20:57:30 2018 > 4.48% done, estimate finish Fri May 25 20:57:46 2018 > 4.48% done, estimate finish Fri May 25 20:57:40 2018 > 4.49% done, estimate finish Fri May 25 20:57:34 2018 > 4.49% done, estimate finish Fri May 25 20:57:27 2018 > 4.50% done, estimate finish Fri May 25 20:57:43 2018 > 4.50% done, estimate finish Fri May 25 20:57:37 2018 > 4.51% done, estimate finish Fri May 25 20:57:30 2018 > 4.51% done, estimate finish Fri May 25 20:57:24 2018 > 4.51% done, estimate finish Fri May 25 20:57:40 2018 > 4.52% done, estimate finish Fri May 25 20:57:33 2018 > 4.52% done, estimate finish Fri May 25 20:57:27 2018 > 4.53% done, estimate finish Fri May 25 20:57:43 2018 > 4.53% done, estimate finish Fri May 25 20:57:36 2018 > 4.53% done, estimate finish Fri May 25 20:57:30 2018 > 4.54% done, estimate finish Fri May 25 20:57:24 2018 > 4.54% done, estimate finish Fri May 25 20:57:39 2018 > 4.55% done, estimate finish Fri May 25 20:57:33 2018 > 4.55% done, estimate finish Fri May 25 20:57:27 2018 > 4.55% done, estimate finish Fri May 25 20:57:20 2018 > 4.56% done, estimate finish Fri May 25 20:57:36 2018 > 4.56% done, estimate finish Fri May 25 20:57:30 2018 > 4.57% done, estimate finish Fri May 25 20:57:45 2018 > 4.57% done, estimate finish Fri May 25 20:57:39 2018 > 4.58% done, estimate finish Fri May 25 20:57:33 2018 > 4.58% done, estimate finish Fri May 25 20:57:26 2018 > 4.58% done, estimate finish Fri May 25 20:57:42 2018 > 4.59% done, estimate finish Fri May 25 20:57:36 2018 > 4.59% done, estimate finish Fri May 25 20:57:29 2018 > 4.60% done, estimate finish Fri May 25 20:57:23 2018 > 4.60% done, estimate finish Fri May 25 20:57:17 2018 > 4.60% done, estimate finish Fri May 25 20:57:33 2018 > 4.61% done, estimate finish Fri May 25 20:57:26 2018 > 4.61% done, estimate finish Fri May 25 20:57:20 2018 > 4.62% done, estimate finish Fri May 25 20:57:36 2018 > 4.62% done, estimate finish Fri May 25 20:57:29 2018 > 4.62% done, estimate finish Fri May 25 20:57:23 2018 > 4.63% done, estimate finish Fri May 25 20:57:17 2018 > 4.63% done, estimate finish Fri May 25 20:57:32 2018 > 4.64% done, estimate finish Fri May 25 20:57:26 2018 > 4.64% done, estimate finish Fri May 25 20:57:20 2018 > 4.64% done, estimate finish Fri May 25 20:57:35 2018 > 4.65% done, estimate finish Fri May 25 20:57:29 2018 > 4.65% done, estimate finish Fri May 25 20:57:23 2018 > 4.66% done, estimate finish Fri May 25 20:57:17 2018 > 4.66% done, estimate finish Fri May 25 20:57:11 2018 > 4.67% done, estimate finish Fri May 25 20:57:26 2018 > 4.67% done, estimate finish Fri May 25 20:57:20 2018 > 4.67% done, estimate finish Fri May 25 20:57:14 2018 > 4.68% done, estimate finish Fri May 25 20:57:29 2018 > 4.68% done, estimate finish Fri May 25 20:57:23 2018 > 4.69% done, estimate finish Fri May 25 20:57:17 2018 > 4.69% done, estimate finish Fri May 25 20:57:10 2018 > 4.69% done, estimate finish Fri May 25 20:57:26 2018 > 4.70% done, estimate finish Fri May 25 20:57:20 2018 > 4.70% done, estimate finish Fri May 25 20:57:14 2018 > 4.71% done, estimate finish Fri May 25 20:57:07 2018 > 4.71% done, estimate finish Fri May 25 20:57:22 2018 > 4.71% done, estimate finish Fri May 25 20:57:16 2018 > 4.72% done, estimate finish Fri May 25 20:57:10 2018 > 4.72% done, estimate finish Fri May 25 20:57:04 2018 > 4.73% done, estimate finish Fri May 25 20:57:19 2018 > 4.73% done, estimate finish Fri May 25 20:57:13 2018 > 4.73% done, estimate finish Fri May 25 20:57:07 2018 > 4.74% done, estimate finish Fri May 25 20:57:22 2018 > 4.74% done, estimate finish Fri May 25 20:57:16 2018 > 4.75% done, estimate finish Fri May 25 20:57:10 2018 > 4.75% done, estimate finish Fri May 25 20:57:04 2018 > 4.76% done, estimate finish Fri May 25 20:57:19 2018 > 4.76% done, estimate finish Fri May 25 20:57:13 2018 > 4.76% done, estimate finish Fri May 25 20:57:07 2018 > 4.77% done, estimate finish Fri May 25 20:57:01 2018 > 4.77% done, estimate finish Fri May 25 20:57:16 2018 > 4.78% done, estimate finish Fri May 25 20:57:10 2018 > 4.78% done, estimate finish Fri May 25 20:57:04 2018 > 4.78% done, estimate finish Fri May 25 20:56:58 2018 > 4.79% done, estimate finish Fri May 25 20:57:13 2018 > 4.79% done, estimate finish Fri May 25 20:57:07 2018 > 4.80% done, estimate finish Fri May 25 20:57:01 2018 > 4.80% done, estimate finish Fri May 25 20:57:16 2018 > 4.80% done, estimate finish Fri May 25 20:57:10 2018 > 4.81% done, estimate finish Fri May 25 20:57:04 2018 > 4.81% done, estimate finish Fri May 25 20:56:58 2018 > 4.82% done, estimate finish Fri May 25 20:57:13 2018 > 4.82% done, estimate finish Fri May 25 20:57:07 2018 > 4.82% done, estimate finish Fri May 25 20:57:01 2018 > 4.83% done, estimate finish Fri May 25 20:56:55 2018 > 4.83% done, estimate finish Fri May 25 20:57:10 2018 > 4.84% done, estimate finish Fri May 25 20:57:04 2018 > 4.84% done, estimate finish Fri May 25 20:56:58 2018 > 4.85% done, estimate finish Fri May 25 20:57:13 2018 > 4.85% done, estimate finish Fri May 25 20:57:07 2018 > 4.85% done, estimate finish Fri May 25 20:57:01 2018 > 4.86% done, estimate finish Fri May 25 20:56:55 2018 > 4.86% done, estimate finish Fri May 25 20:57:10 2018 > 4.87% done, estimate finish Fri May 25 20:57:04 2018 > 4.87% done, estimate finish Fri May 25 20:56:58 2018 > 4.87% done, estimate finish Fri May 25 20:56:52 2018 > 4.88% done, estimate finish Fri May 25 20:57:07 2018 > 4.88% done, estimate finish Fri May 25 20:57:01 2018 > 4.89% done, estimate finish Fri May 25 20:56:55 2018 > 4.89% done, estimate finish Fri May 25 20:56:49 2018 > 4.89% done, estimate finish Fri May 25 20:57:04 2018 > 4.90% done, estimate finish Fri May 25 20:56:58 2018 > 4.90% done, estimate finish Fri May 25 20:56:52 2018 > 4.91% done, estimate finish Fri May 25 20:57:07 2018 > 4.91% done, estimate finish Fri May 25 20:57:01 2018 > 4.91% done, estimate finish Fri May 25 20:56:55 2018 > 4.92% done, estimate finish Fri May 25 20:56:49 2018 > 4.92% done, estimate finish Fri May 25 20:57:04 2018 > 4.93% done, estimate finish Fri May 25 20:56:58 2018 > 4.93% done, estimate finish Fri May 25 20:56:52 2018 > 4.94% done, estimate finish Fri May 25 20:56:46 2018 > 4.94% done, estimate finish Fri May 25 20:57:01 2018 > 4.94% done, estimate finish Fri May 25 20:56:55 2018 > 4.95% done, estimate finish Fri May 25 20:56:49 2018 > 4.95% done, estimate finish Fri May 25 20:56:43 2018 > 4.96% done, estimate finish Fri May 25 20:56:58 2018 > 4.96% done, estimate finish Fri May 25 20:56:52 2018 > 4.96% done, estimate finish Fri May 25 20:56:47 2018 > 4.97% done, estimate finish Fri May 25 20:57:01 2018 > 4.97% done, estimate finish Fri May 25 20:56:55 2018 > 4.98% done, estimate finish Fri May 25 20:56:49 2018 > 4.98% done, estimate finish Fri May 25 20:56:44 2018 > 4.98% done, estimate finish Fri May 25 20:56:58 2018 > 4.99% done, estimate finish Fri May 25 20:56:52 2018 > 4.99% done, estimate finish Fri May 25 20:56:46 2018 > 5.00% done, estimate finish Fri May 25 20:56:41 2018 > 5.00% done, estimate finish Fri May 25 20:56:55 2018 > 5.01% done, estimate finish Fri May 25 20:56:49 2018 > 5.01% done, estimate finish Fri May 25 20:56:44 2018 > 5.01% done, estimate finish Fri May 25 20:56:38 2018 > 5.02% done, estimate finish Fri May 25 20:56:52 2018 > 5.02% done, estimate finish Fri May 25 20:56:46 2018 > 5.03% done, estimate finish Fri May 25 20:56:41 2018 > 5.03% done, estimate finish Fri May 25 20:56:55 2018 > 5.03% done, estimate finish Fri May 25 20:56:49 2018 > 5.04% done, estimate finish Fri May 25 20:56:44 2018 > 5.04% done, estimate finish Fri May 25 20:56:38 2018 > 5.05% done, estimate finish Fri May 25 20:56:52 2018 > 5.05% done, estimate finish Fri May 25 20:56:46 2018 > 5.05% done, estimate finish Fri May 25 20:56:41 2018 > 5.06% done, estimate finish Fri May 25 20:56:35 2018 > 5.06% done, estimate finish Fri May 25 20:56:49 2018 > 5.07% done, estimate finish Fri May 25 20:56:44 2018 > 5.07% done, estimate finish Fri May 25 20:56:38 2018 > 5.07% done, estimate finish Fri May 25 20:56:33 2018 > 5.08% done, estimate finish Fri May 25 20:56:47 2018 > 5.08% done, estimate finish Fri May 25 20:56:41 2018 > 5.09% done, estimate finish Fri May 25 20:56:35 2018 > 5.09% done, estimate finish Fri May 25 20:56:49 2018 > 5.10% done, estimate finish Fri May 25 20:56:44 2018 > 5.10% done, estimate finish Fri May 25 20:56:38 2018 > 5.10% done, estimate finish Fri May 25 20:56:33 2018 > 5.11% done, estimate finish Fri May 25 20:56:47 2018 > 5.11% done, estimate finish Fri May 25 20:56:41 2018 > 5.12% done, estimate finish Fri May 25 20:56:35 2018 > 5.12% done, estimate finish Fri May 25 20:56:30 2018 > 5.12% done, estimate finish Fri May 25 20:56:44 2018 > 5.13% done, estimate finish Fri May 25 20:56:38 2018 > 5.13% done, estimate finish Fri May 25 20:56:33 2018 > 5.14% done, estimate finish Fri May 25 20:56:27 2018 > 5.14% done, estimate finish Fri May 25 20:56:41 2018 > 5.14% done, estimate finish Fri May 25 20:56:36 2018 > 5.15% done, estimate finish Fri May 25 20:56:30 2018 > 5.15% done, estimate finish Fri May 25 20:56:44 2018 > 5.16% done, estimate finish Fri May 25 20:56:38 2018 > 5.16% done, estimate finish Fri May 25 20:56:33 2018 > 5.16% done, estimate finish Fri May 25 20:56:27 2018 > 5.17% done, estimate finish Fri May 25 20:56:41 2018 > 5.17% done, estimate finish Fri May 25 20:56:36 2018 > 5.18% done, estimate finish Fri May 25 20:56:30 2018 > 5.18% done, estimate finish Fri May 25 20:56:25 2018 > 5.19% done, estimate finish Fri May 25 20:56:38 2018 > 5.19% done, estimate finish Fri May 25 20:56:33 2018 > 5.19% done, estimate finish Fri May 25 20:56:28 2018 > 5.20% done, estimate finish Fri May 25 20:56:22 2018 > 5.20% done, estimate finish Fri May 25 20:56:36 2018 > 5.21% done, estimate finish Fri May 25 20:56:30 2018 > 5.21% done, estimate finish Fri May 25 20:56:25 2018 > 5.21% done, estimate finish Fri May 25 20:56:38 2018 > 5.22% done, estimate finish Fri May 25 20:56:33 2018 > 5.22% done, estimate finish Fri May 25 20:56:28 2018 > 5.23% done, estimate finish Fri May 25 20:56:22 2018 > 5.23% done, estimate finish Fri May 25 20:56:36 2018 > 5.23% done, estimate finish Fri May 25 20:56:30 2018 > 5.24% done, estimate finish Fri May 25 20:56:25 2018 > 5.24% done, estimate finish Fri May 25 20:56:20 2018 > 5.25% done, estimate finish Fri May 25 20:56:33 2018 > 5.25% done, estimate finish Fri May 25 20:56:28 2018 > 5.25% done, estimate finish Fri May 25 20:56:22 2018 > 5.26% done, estimate finish Fri May 25 20:56:17 2018 > 5.26% done, estimate finish Fri May 25 20:56:30 2018 > 5.27% done, estimate finish Fri May 25 20:56:25 2018 > 5.27% done, estimate finish Fri May 25 20:56:20 2018 > 5.28% done, estimate finish Fri May 25 20:56:33 2018 > 5.28% done, estimate finish Fri May 25 20:56:28 2018 > 5.28% done, estimate finish Fri May 25 20:56:22 2018 > 5.29% done, estimate finish Fri May 25 20:56:17 2018 > 5.29% done, estimate finish Fri May 25 20:56:31 2018 > 5.30% done, estimate finish Fri May 25 20:56:25 2018 > 5.30% done, estimate finish Fri May 25 20:56:20 2018 > 5.30% done, estimate finish Fri May 25 20:56:15 2018 > 5.31% done, estimate finish Fri May 25 20:56:28 2018 > 5.31% done, estimate finish Fri May 25 20:56:23 2018 > 5.32% done, estimate finish Fri May 25 20:56:17 2018 > 5.32% done, estimate finish Fri May 25 20:56:12 2018 > 5.32% done, estimate finish Fri May 25 20:56:25 2018 > 5.33% done, estimate finish Fri May 25 20:56:20 2018 > 5.33% done, estimate finish Fri May 25 20:56:15 2018 > 5.34% done, estimate finish Fri May 25 20:56:28 2018 > 5.34% done, estimate finish Fri May 25 20:56:23 2018 > 5.35% done, estimate finish Fri May 25 20:56:17 2018 > 5.35% done, estimate finish Fri May 25 20:56:12 2018 > 5.35% done, estimate finish Fri May 25 20:56:26 2018 > 5.36% done, estimate finish Fri May 25 20:56:20 2018 > 5.36% done, estimate finish Fri May 25 20:56:15 2018 > 5.37% done, estimate finish Fri May 25 20:56:10 2018 > 5.37% done, estimate finish Fri May 25 20:56:23 2018 > 5.37% done, estimate finish Fri May 25 20:56:18 2018 > 5.38% done, estimate finish Fri May 25 20:56:12 2018 > 5.38% done, estimate finish Fri May 25 20:56:26 2018 > 5.39% done, estimate finish Fri May 25 20:56:20 2018 > 5.39% done, estimate finish Fri May 25 20:56:15 2018 > 5.39% done, estimate finish Fri May 25 20:56:10 2018 > 5.40% done, estimate finish Fri May 25 20:56:23 2018 > 5.40% done, estimate finish Fri May 25 20:56:18 2018 > 5.41% done, estimate finish Fri May 25 20:56:13 2018 > 5.41% done, estimate finish Fri May 25 20:56:07 2018 > 5.41% done, estimate finish Fri May 25 20:56:21 2018 > 5.42% done, estimate finish Fri May 25 20:56:15 2018 > 5.42% done, estimate finish Fri May 25 20:56:10 2018 > 5.43% done, estimate finish Fri May 25 20:56:05 2018 > 5.43% done, estimate finish Fri May 25 20:56:18 2018 > 5.44% done, estimate finish Fri May 25 20:56:13 2018 > 5.44% done, estimate finish Fri May 25 20:56:08 2018 > 5.44% done, estimate finish Fri May 25 20:56:21 2018 > 5.45% done, estimate finish Fri May 25 20:56:15 2018 > 5.45% done, estimate finish Fri May 25 20:56:10 2018 > 5.46% done, estimate finish Fri May 25 20:56:05 2018 > 5.46% done, estimate finish Fri May 25 20:56:18 2018 > 5.46% done, estimate finish Fri May 25 20:56:13 2018 > 5.47% done, estimate finish Fri May 25 20:56:08 2018 > 5.47% done, estimate finish Fri May 25 20:56:03 2018 > 5.48% done, estimate finish Fri May 25 20:56:16 2018 > 5.48% done, estimate finish Fri May 25 20:56:10 2018 > 5.48% done, estimate finish Fri May 25 20:56:05 2018 > 5.49% done, estimate finish Fri May 25 20:56:00 2018 > 5.49% done, estimate finish Fri May 25 20:56:13 2018 > 5.50% done, estimate finish Fri May 25 20:56:08 2018 > 5.50% done, estimate finish Fri May 25 20:56:03 2018 > 5.50% done, estimate finish Fri May 25 20:56:16 2018 > 5.51% done, estimate finish Fri May 25 20:56:11 2018 > 5.51% done, estimate finish Fri May 25 20:56:06 2018 > 5.52% done, estimate finish Fri May 25 20:56:00 2018 > 5.52% done, estimate finish Fri May 25 20:56:13 2018 > 5.53% done, estimate finish Fri May 25 20:56:08 2018 > 5.53% done, estimate finish Fri May 25 20:56:03 2018 > 5.53% done, estimate finish Fri May 25 20:55:58 2018 > 5.54% done, estimate finish Fri May 25 20:56:11 2018 > 5.54% done, estimate finish Fri May 25 20:56:06 2018 > 5.55% done, estimate finish Fri May 25 20:56:01 2018 > 5.55% done, estimate finish Fri May 25 20:55:56 2018 > 5.55% done, estimate finish Fri May 25 20:56:09 2018 > 5.56% done, estimate finish Fri May 25 20:56:03 2018 > 5.56% done, estimate finish Fri May 25 20:55:58 2018 > 5.57% done, estimate finish Fri May 25 20:56:11 2018 > 5.57% done, estimate finish Fri May 25 20:56:06 2018 > 5.57% done, estimate finish Fri May 25 20:56:01 2018 > 5.58% done, estimate finish Fri May 25 20:55:56 2018 > 5.58% done, estimate finish Fri May 25 20:56:09 2018 > 5.59% done, estimate finish Fri May 25 20:56:04 2018 > 5.59% done, estimate finish Fri May 25 20:55:58 2018 > 5.59% done, estimate finish Fri May 25 20:55:53 2018 > 5.60% done, estimate finish Fri May 25 20:56:06 2018 > 5.60% done, estimate finish Fri May 25 20:56:01 2018 > 5.61% done, estimate finish Fri May 25 20:55:56 2018 > 5.61% done, estimate finish Fri May 25 20:55:51 2018 > 5.62% done, estimate finish Fri May 25 20:56:04 2018 > 5.62% done, estimate finish Fri May 25 20:55:59 2018 > 5.62% done, estimate finish Fri May 25 20:55:54 2018 > 5.63% done, estimate finish Fri May 25 20:56:06 2018 > 5.63% done, estimate finish Fri May 25 20:56:01 2018 > 5.64% done, estimate finish Fri May 25 20:55:57 2018 > 5.64% done, estimate finish Fri May 25 20:55:51 2018 > 5.64% done, estimate finish Fri May 25 20:56:04 2018 > 5.65% done, estimate finish Fri May 25 20:55:59 2018 > 5.65% done, estimate finish Fri May 25 20:55:54 2018 > 5.66% done, estimate finish Fri May 25 20:56:07 2018 > 5.66% done, estimate finish Fri May 25 20:56:02 2018 > 5.66% done, estimate finish Fri May 25 20:55:57 2018 > 5.67% done, estimate finish Fri May 25 20:55:52 2018 > 5.67% done, estimate finish Fri May 25 20:56:04 2018 > 5.68% done, estimate finish Fri May 25 20:55:59 2018 > 5.68% done, estimate finish Fri May 25 20:55:54 2018 > 5.68% done, estimate finish Fri May 25 20:55:49 2018 > 5.69% done, estimate finish Fri May 25 20:56:02 2018 > 5.69% done, estimate finish Fri May 25 20:55:57 2018 > 5.70% done, estimate finish Fri May 25 20:55:52 2018 > 5.70% done, estimate finish Fri May 25 20:55:47 2018 > 5.71% done, estimate finish Fri May 25 20:56:00 2018 > 5.71% done, estimate finish Fri May 25 20:55:55 2018 > 5.71% done, estimate finish Fri May 25 20:55:50 2018 > 5.72% done, estimate finish Fri May 25 20:56:02 2018 > 5.72% done, estimate finish Fri May 25 20:55:57 2018 > 5.73% done, estimate finish Fri May 25 20:55:52 2018 > 5.73% done, estimate finish Fri May 25 20:55:47 2018 > 5.73% done, estimate finish Fri May 25 20:56:00 2018 > 5.74% done, estimate finish Fri May 25 20:55:55 2018 > 5.74% done, estimate finish Fri May 25 20:55:50 2018 > 5.75% done, estimate finish Fri May 25 20:55:45 2018 > 5.75% done, estimate finish Fri May 25 20:55:58 2018 > 5.75% done, estimate finish Fri May 25 20:55:53 2018 > 5.76% done, estimate finish Fri May 25 20:55:48 2018 > 5.76% done, estimate finish Fri May 25 20:56:00 2018 > 5.77% done, estimate finish Fri May 25 20:55:55 2018 > 5.77% done, estimate finish Fri May 25 20:55:50 2018 > 5.78% done, estimate finish Fri May 25 20:55:45 2018 > 5.78% done, estimate finish Fri May 25 20:55:58 2018 > 5.78% done, estimate finish Fri May 25 20:55:53 2018 > 5.79% done, estimate finish Fri May 25 20:55:48 2018 > 5.79% done, estimate finish Fri May 25 20:55:43 2018 > 5.80% done, estimate finish Fri May 25 20:55:56 2018 > 5.80% done, estimate finish Fri May 25 20:55:51 2018 > 5.80% done, estimate finish Fri May 25 20:55:46 2018 > 5.81% done, estimate finish Fri May 25 20:55:41 2018 > 5.81% done, estimate finish Fri May 25 20:55:53 2018 > 5.82% done, estimate finish Fri May 25 20:55:48 2018 > 5.82% done, estimate finish Fri May 25 20:55:43 2018 > 5.82% done, estimate finish Fri May 25 20:55:56 2018 > 5.83% done, estimate finish Fri May 25 20:55:51 2018 > 5.83% done, estimate finish Fri May 25 20:55:46 2018 > 5.84% done, estimate finish Fri May 25 20:55:41 2018 > 5.84% done, estimate finish Fri May 25 20:55:53 2018 > 5.84% done, estimate finish Fri May 25 20:55:49 2018 > 5.85% done, estimate finish Fri May 25 20:55:44 2018 > 5.85% done, estimate finish Fri May 25 20:55:39 2018 > 5.86% done, estimate finish Fri May 25 20:55:51 2018 > 5.86% done, estimate finish Fri May 25 20:55:46 2018 > 5.87% done, estimate finish Fri May 25 20:55:42 2018 > 5.87% done, estimate finish Fri May 25 20:55:37 2018 > 5.87% done, estimate finish Fri May 25 20:55:49 2018 > 5.88% done, estimate finish Fri May 25 20:55:44 2018 > 5.88% done, estimate finish Fri May 25 20:55:39 2018 > 5.89% done, estimate finish Fri May 25 20:55:51 2018 > 5.89% done, estimate finish Fri May 25 20:55:47 2018 > 5.89% done, estimate finish Fri May 25 20:55:42 2018 > 5.90% done, estimate finish Fri May 25 20:55:37 2018 > 5.90% done, estimate finish Fri May 25 20:55:49 2018 > 5.91% done, estimate finish Fri May 25 20:55:44 2018 > 5.91% done, estimate finish Fri May 25 20:55:40 2018 > 5.91% done, estimate finish Fri May 25 20:55:35 2018 > 5.92% done, estimate finish Fri May 25 20:55:47 2018 > 5.92% done, estimate finish Fri May 25 20:55:42 2018 > 5.93% done, estimate finish Fri May 25 20:55:38 2018 > 5.93% done, estimate finish Fri May 25 20:55:50 2018 > 5.93% done, estimate finish Fri May 25 20:55:45 2018 > 5.94% done, estimate finish Fri May 25 20:55:40 2018 > 5.94% done, estimate finish Fri May 25 20:55:35 2018 > 5.95% done, estimate finish Fri May 25 20:55:47 2018 > 5.95% done, estimate finish Fri May 25 20:55:43 2018 > 5.96% done, estimate finish Fri May 25 20:55:38 2018 > 5.96% done, estimate finish Fri May 25 20:55:33 2018 > 5.96% done, estimate finish Fri May 25 20:55:45 2018 > 5.97% done, estimate finish Fri May 25 20:55:40 2018 > 5.97% done, estimate finish Fri May 25 20:55:36 2018 > 5.98% done, estimate finish Fri May 25 20:55:31 2018 > 5.98% done, estimate finish Fri May 25 20:55:43 2018 > 5.98% done, estimate finish Fri May 25 20:55:38 2018 > 5.99% done, estimate finish Fri May 25 20:55:33 2018 > 5.99% done, estimate finish Fri May 25 20:55:45 2018 > 6.00% done, estimate finish Fri May 25 20:55:41 2018 > 6.00% done, estimate finish Fri May 25 20:55:36 2018 > 6.00% done, estimate finish Fri May 25 20:55:31 2018 > 6.01% done, estimate finish Fri May 25 20:55:43 2018 > 6.01% done, estimate finish Fri May 25 20:55:39 2018 > 6.02% done, estimate finish Fri May 25 20:55:34 2018 > 6.02% done, estimate finish Fri May 25 20:55:29 2018 > 6.02% done, estimate finish Fri May 25 20:55:41 2018 > 6.03% done, estimate finish Fri May 25 20:55:36 2018 > 6.03% done, estimate finish Fri May 25 20:55:32 2018 > 6.04% done, estimate finish Fri May 25 20:55:44 2018 > 6.04% done, estimate finish Fri May 25 20:55:39 2018 > 6.05% done, estimate finish Fri May 25 20:55:34 2018 > 6.05% done, estimate finish Fri May 25 20:55:30 2018 > 6.05% done, estimate finish Fri May 25 20:55:41 2018 > 6.06% done, estimate finish Fri May 25 20:55:37 2018 > 6.06% done, estimate finish Fri May 25 20:55:32 2018 > 6.07% done, estimate finish Fri May 25 20:55:27 2018 > 6.07% done, estimate finish Fri May 25 20:55:39 2018 > 6.07% done, estimate finish Fri May 25 20:55:35 2018 > 6.08% done, estimate finish Fri May 25 20:55:30 2018 > 6.08% done, estimate finish Fri May 25 20:55:42 2018 > 6.09% done, estimate finish Fri May 25 20:55:37 2018 > 6.09% done, estimate finish Fri May 25 20:55:32 2018 > 6.09% done, estimate finish Fri May 25 20:55:28 2018 > 6.10% done, estimate finish Fri May 25 20:55:40 2018 > 6.10% done, estimate finish Fri May 25 20:55:35 2018 > 6.11% done, estimate finish Fri May 25 20:55:30 2018 > 6.11% done, estimate finish Fri May 25 20:55:26 2018 > 6.12% done, estimate finish Fri May 25 20:55:37 2018 > 6.12% done, estimate finish Fri May 25 20:55:33 2018 > 6.12% done, estimate finish Fri May 25 20:55:28 2018 > 6.13% done, estimate finish Fri May 25 20:55:40 2018 > 6.13% done, estimate finish Fri May 25 20:55:35 2018 > 6.14% done, estimate finish Fri May 25 20:55:31 2018 > 6.14% done, estimate finish Fri May 25 20:55:26 2018 > 6.14% done, estimate finish Fri May 25 20:55:38 2018 > 6.15% done, estimate finish Fri May 25 20:55:33 2018 > 6.15% done, estimate finish Fri May 25 20:55:29 2018 > 6.16% done, estimate finish Fri May 25 20:55:24 2018 > 6.16% done, estimate finish Fri May 25 20:55:36 2018 > 6.16% done, estimate finish Fri May 25 20:55:31 2018 > 6.17% done, estimate finish Fri May 25 20:55:27 2018 > 6.17% done, estimate finish Fri May 25 20:55:22 2018 > 6.18% done, estimate finish Fri May 25 20:55:34 2018 > 6.18% done, estimate finish Fri May 25 20:55:29 2018 > 6.18% done, estimate finish Fri May 25 20:55:24 2018 > 6.19% done, estimate finish Fri May 25 20:55:36 2018 > 6.19% done, estimate finish Fri May 25 20:55:31 2018 > 6.20% done, estimate finish Fri May 25 20:55:27 2018 > 6.20% done, estimate finish Fri May 25 20:55:22 2018 > 6.21% done, estimate finish Fri May 25 20:55:34 2018 > 6.21% done, estimate finish Fri May 25 20:55:29 2018 > 6.21% done, estimate finish Fri May 25 20:55:25 2018 > 6.22% done, estimate finish Fri May 25 20:55:20 2018 > 6.22% done, estimate finish Fri May 25 20:55:32 2018 > 6.23% done, estimate finish Fri May 25 20:55:27 2018 > 6.23% done, estimate finish Fri May 25 20:55:23 2018 > 6.23% done, estimate finish Fri May 25 20:55:34 2018 > 6.24% done, estimate finish Fri May 25 20:55:30 2018 > 6.24% done, estimate finish Fri May 25 20:55:25 2018 > 6.25% done, estimate finish Fri May 25 20:55:21 2018 > 6.25% done, estimate finish Fri May 25 20:55:32 2018 > 6.25% done, estimate finish Fri May 25 20:55:28 2018 > 6.26% done, estimate finish Fri May 25 20:55:23 2018 > 6.26% done, estimate finish Fri May 25 20:55:19 2018 > 6.27% done, estimate finish Fri May 25 20:55:30 2018 > 6.27% done, estimate finish Fri May 25 20:55:26 2018 > 6.27% done, estimate finish Fri May 25 20:55:21 2018 > 6.28% done, estimate finish Fri May 25 20:55:33 2018 > 6.28% done, estimate finish Fri May 25 20:55:28 2018 > 6.29% done, estimate finish Fri May 25 20:55:24 2018 > 6.29% done, estimate finish Fri May 25 20:55:19 2018 > 6.30% done, estimate finish Fri May 25 20:55:31 2018 > 6.30% done, estimate finish Fri May 25 20:55:26 2018 > 6.30% done, estimate finish Fri May 25 20:55:22 2018 > 6.31% done, estimate finish Fri May 25 20:55:17 2018 > 6.31% done, estimate finish Fri May 25 20:55:28 2018 > 6.32% done, estimate finish Fri May 25 20:55:24 2018 > 6.32% done, estimate finish Fri May 25 20:55:19 2018 > 6.32% done, estimate finish Fri May 25 20:55:31 2018 > 6.33% done, estimate finish Fri May 25 20:55:26 2018 > 6.33% done, estimate finish Fri May 25 20:55:22 2018 > 6.34% done, estimate finish Fri May 25 20:55:17 2018 > 6.34% done, estimate finish Fri May 25 20:55:29 2018 > 6.34% done, estimate finish Fri May 25 20:55:24 2018 > 6.35% done, estimate finish Fri May 25 20:55:20 2018 > 6.35% done, estimate finish Fri May 25 20:55:15 2018 > 6.36% done, estimate finish Fri May 25 20:55:27 2018 > 6.36% done, estimate finish Fri May 25 20:55:22 2018 > 6.36% done, estimate finish Fri May 25 20:55:18 2018 > 6.37% done, estimate finish Fri May 25 20:55:29 2018 > 6.37% done, estimate finish Fri May 25 20:55:25 2018 > 6.38% done, estimate finish Fri May 25 20:55:20 2018 > 6.38% done, estimate finish Fri May 25 20:55:16 2018 > 6.39% done, estimate finish Fri May 25 20:55:27 2018 > 6.39% done, estimate finish Fri May 25 20:55:23 2018 > 6.39% done, estimate finish Fri May 25 20:55:18 2018 > 6.40% done, estimate finish Fri May 25 20:55:14 2018 > 6.40% done, estimate finish Fri May 25 20:55:25 2018 > 6.41% done, estimate finish Fri May 25 20:55:21 2018 > 6.41% done, estimate finish Fri May 25 20:55:16 2018 > 6.41% done, estimate finish Fri May 25 20:55:12 2018 > 6.42% done, estimate finish Fri May 25 20:55:23 2018 > 6.42% done, estimate finish Fri May 25 20:55:19 2018 > 6.43% done, estimate finish Fri May 25 20:55:14 2018 > 6.43% done, estimate finish Fri May 25 20:55:10 2018 > 6.43% done, estimate finish Fri May 25 20:55:21 2018 > 6.44% done, estimate finish Fri May 25 20:55:17 2018 > 6.44% done, estimate finish Fri May 25 20:55:12 2018 > 6.45% done, estimate finish Fri May 25 20:55:08 2018 > 6.45% done, estimate finish Fri May 25 20:55:19 2018 > 6.46% done, estimate finish Fri May 25 20:55:15 2018 > 6.46% done, estimate finish Fri May 25 20:55:10 2018 > 6.46% done, estimate finish Fri May 25 20:55:22 2018 > 6.47% done, estimate finish Fri May 25 20:55:17 2018 > 6.47% done, estimate finish Fri May 25 20:55:13 2018 > 6.48% done, estimate finish Fri May 25 20:55:09 2018 > 6.48% done, estimate finish Fri May 25 20:55:20 2018 > 6.48% done, estimate finish Fri May 25 20:55:15 2018 > 6.49% done, estimate finish Fri May 25 20:55:11 2018 > 6.49% done, estimate finish Fri May 25 20:55:07 2018 > 6.50% done, estimate finish Fri May 25 20:55:18 2018 > 6.50% done, estimate finish Fri May 25 20:55:13 2018 > 6.50% done, estimate finish Fri May 25 20:55:09 2018 > 6.51% done, estimate finish Fri May 25 20:55:20 2018 > 6.51% done, estimate finish Fri May 25 20:55:16 2018 > 6.52% done, estimate finish Fri May 25 20:55:11 2018 > 6.52% done, estimate finish Fri May 25 20:55:07 2018 > 6.52% done, estimate finish Fri May 25 20:55:18 2018 > 6.53% done, estimate finish Fri May 25 20:55:14 2018 > 6.53% done, estimate finish Fri May 25 20:55:09 2018 > 6.54% done, estimate finish Fri May 25 20:55:20 2018 > 6.54% done, estimate finish Fri May 25 20:55:16 2018 > 6.55% done, estimate finish Fri May 25 20:55:12 2018 > 6.55% done, estimate finish Fri May 25 20:55:23 2018 > 6.55% done, estimate finish Fri May 25 20:55:18 2018 > 6.56% done, estimate finish Fri May 25 20:55:14 2018 > 6.56% done, estimate finish Fri May 25 20:55:10 2018 > 6.57% done, estimate finish Fri May 25 20:55:21 2018 > 6.57% done, estimate finish Fri May 25 20:55:17 2018 > 6.57% done, estimate finish Fri May 25 20:55:12 2018 > 6.58% done, estimate finish Fri May 25 20:55:08 2018 > 6.58% done, estimate finish Fri May 25 20:55:19 2018 > 6.59% done, estimate finish Fri May 25 20:55:15 2018 > 6.59% done, estimate finish Fri May 25 20:55:10 2018 > 6.59% done, estimate finish Fri May 25 20:55:06 2018 > 6.60% done, estimate finish Fri May 25 20:55:17 2018 > 6.60% done, estimate finish Fri May 25 20:55:13 2018 > 6.61% done, estimate finish Fri May 25 20:55:08 2018 > 6.61% done, estimate finish Fri May 25 20:55:04 2018 > 6.61% done, estimate finish Fri May 25 20:55:15 2018 > 6.62% done, estimate finish Fri May 25 20:55:11 2018 > 6.62% done, estimate finish Fri May 25 20:55:07 2018 > 6.63% done, estimate finish Fri May 25 20:55:02 2018 > 6.63% done, estimate finish Fri May 25 20:55:13 2018 > 6.64% done, estimate finish Fri May 25 20:55:09 2018 > 6.64% done, estimate finish Fri May 25 20:55:05 2018 > 6.64% done, estimate finish Fri May 25 20:55:15 2018 > 6.65% done, estimate finish Fri May 25 20:55:11 2018 > 6.65% done, estimate finish Fri May 25 20:55:07 2018 > 6.66% done, estimate finish Fri May 25 20:55:03 2018 > 6.66% done, estimate finish Fri May 25 20:55:14 2018 > 6.66% done, estimate finish Fri May 25 20:55:09 2018 > 6.67% done, estimate finish Fri May 25 20:55:05 2018 > 6.67% done, estimate finish Fri May 25 20:55:01 2018 > 6.68% done, estimate finish Fri May 25 20:55:12 2018 > 6.68% done, estimate finish Fri May 25 20:55:07 2018 > 6.68% done, estimate finish Fri May 25 20:55:03 2018 > 6.69% done, estimate finish Fri May 25 20:54:59 2018 > 6.69% done, estimate finish Fri May 25 20:55:10 2018 > 6.70% done, estimate finish Fri May 25 20:55:05 2018 > 6.70% done, estimate finish Fri May 25 20:55:01 2018 > 6.70% done, estimate finish Fri May 25 20:54:57 2018 > 6.71% done, estimate finish Fri May 25 20:55:08 2018 > 6.71% done, estimate finish Fri May 25 20:55:04 2018 > 6.72% done, estimate finish Fri May 25 20:54:59 2018 > 6.72% done, estimate finish Fri May 25 20:55:10 2018 > 6.73% done, estimate finish Fri May 25 20:55:06 2018 > 6.73% done, estimate finish Fri May 25 20:55:02 2018 > 6.73% done, estimate finish Fri May 25 20:54:58 2018 > 6.74% done, estimate finish Fri May 25 20:55:08 2018 > 6.74% done, estimate finish Fri May 25 20:55:04 2018 > 6.75% done, estimate finish Fri May 25 20:55:00 2018 > 6.75% done, estimate finish Fri May 25 20:54:56 2018 > 6.75% done, estimate finish Fri May 25 20:55:06 2018 > 6.76% done, estimate finish Fri May 25 20:55:02 2018 > 6.76% done, estimate finish Fri May 25 20:54:58 2018 > 6.77% done, estimate finish Fri May 25 20:54:54 2018 > 6.77% done, estimate finish Fri May 25 20:55:05 2018 > 6.77% done, estimate finish Fri May 25 20:55:00 2018 > 6.78% done, estimate finish Fri May 25 20:54:56 2018 > 6.78% done, estimate finish Fri May 25 20:55:07 2018 > 6.79% done, estimate finish Fri May 25 20:55:03 2018 > 6.79% done, estimate finish Fri May 25 20:54:59 2018 > 6.80% done, estimate finish Fri May 25 20:54:54 2018 > 6.80% done, estimate finish Fri May 25 20:54:50 2018 > 6.80% done, estimate finish Fri May 25 20:55:01 2018 > 6.81% done, estimate finish Fri May 25 20:54:57 2018 > 6.81% done, estimate finish Fri May 25 20:54:53 2018 > 6.82% done, estimate finish Fri May 25 20:55:03 2018 > 6.82% done, estimate finish Fri May 25 20:54:59 2018 > 6.82% done, estimate finish Fri May 25 20:54:55 2018 > 6.83% done, estimate finish Fri May 25 20:54:51 2018 > 6.83% done, estimate finish Fri May 25 20:55:01 2018 > 6.84% done, estimate finish Fri May 25 20:54:57 2018 > 6.84% done, estimate finish Fri May 25 20:54:53 2018 > 6.84% done, estimate finish Fri May 25 20:54:49 2018 > 6.85% done, estimate finish Fri May 25 20:55:00 2018 > 6.85% done, estimate finish Fri May 25 20:54:55 2018 > 6.86% done, estimate finish Fri May 25 20:54:51 2018 > 6.86% done, estimate finish Fri May 25 20:54:47 2018 > 6.86% done, estimate finish Fri May 25 20:54:58 2018 > 6.87% done, estimate finish Fri May 25 20:54:54 2018 > 6.87% done, estimate finish Fri May 25 20:54:50 2018 > 6.88% done, estimate finish Fri May 25 20:54:45 2018 > 6.88% done, estimate finish Fri May 25 20:54:56 2018 > 6.89% done, estimate finish Fri May 25 20:54:52 2018 > 6.89% done, estimate finish Fri May 25 20:54:48 2018 > 6.89% done, estimate finish Fri May 25 20:54:58 2018 > 6.90% done, estimate finish Fri May 25 20:54:54 2018 > 6.90% done, estimate finish Fri May 25 20:54:50 2018 > 6.91% done, estimate finish Fri May 25 20:54:46 2018 > 6.91% done, estimate finish Fri May 25 20:54:42 2018 > 6.91% done, estimate finish Fri May 25 20:54:52 2018 > 6.92% done, estimate finish Fri May 25 20:54:48 2018 > 6.92% done, estimate finish Fri May 25 20:54:44 2018 > 6.93% done, estimate finish Fri May 25 20:54:55 2018 > 6.93% done, estimate finish Fri May 25 20:54:51 2018 > 6.93% done, estimate finish Fri May 25 20:54:46 2018 > 6.94% done, estimate finish Fri May 25 20:54:42 2018 > 6.94% done, estimate finish Fri May 25 20:54:53 2018 > 6.95% done, estimate finish Fri May 25 20:54:49 2018 > 6.95% done, estimate finish Fri May 25 20:54:45 2018 > 6.95% done, estimate finish Fri May 25 20:54:41 2018 > 6.96% done, estimate finish Fri May 25 20:54:51 2018 > 6.96% done, estimate finish Fri May 25 20:54:47 2018 > 6.97% done, estimate finish Fri May 25 20:54:43 2018 > 6.97% done, estimate finish Fri May 25 20:54:39 2018 > 6.98% done, estimate finish Fri May 25 20:54:49 2018 > 6.98% done, estimate finish Fri May 25 20:54:45 2018 > 6.98% done, estimate finish Fri May 25 20:54:41 2018 > 6.99% done, estimate finish Fri May 25 20:54:37 2018 > 6.99% done, estimate finish Fri May 25 20:54:48 2018 > 7.00% done, estimate finish Fri May 25 20:54:44 2018 > 7.00% done, estimate finish Fri May 25 20:54:40 2018 > 7.00% done, estimate finish Fri May 25 20:54:50 2018 > 7.01% done, estimate finish Fri May 25 20:54:46 2018 > 7.01% done, estimate finish Fri May 25 20:54:42 2018 > 7.02% done, estimate finish Fri May 25 20:54:38 2018 > 7.02% done, estimate finish Fri May 25 20:54:48 2018 > 7.02% done, estimate finish Fri May 25 20:54:44 2018 > 7.03% done, estimate finish Fri May 25 20:54:40 2018 > 7.03% done, estimate finish Fri May 25 20:54:36 2018 > 7.04% done, estimate finish Fri May 25 20:54:46 2018 > 7.04% done, estimate finish Fri May 25 20:54:42 2018 > 7.04% done, estimate finish Fri May 25 20:54:38 2018 > 7.05% done, estimate finish Fri May 25 20:54:34 2018 > 7.05% done, estimate finish Fri May 25 20:54:45 2018 > 7.06% done, estimate finish Fri May 25 20:54:41 2018 > 7.06% done, estimate finish Fri May 25 20:54:37 2018 > 7.07% done, estimate finish Fri May 25 20:54:33 2018 > 7.07% done, estimate finish Fri May 25 20:54:43 2018 > 7.07% done, estimate finish Fri May 25 20:54:39 2018 > 7.08% done, estimate finish Fri May 25 20:54:35 2018 > 7.08% done, estimate finish Fri May 25 20:54:31 2018 > 7.09% done, estimate finish Fri May 25 20:54:41 2018 > 7.09% done, estimate finish Fri May 25 20:54:37 2018 > 7.09% done, estimate finish Fri May 25 20:54:33 2018 > 7.10% done, estimate finish Fri May 25 20:54:43 2018 > 7.10% done, estimate finish Fri May 25 20:54:39 2018 > 7.11% done, estimate finish Fri May 25 20:54:36 2018 > 7.11% done, estimate finish Fri May 25 20:54:32 2018 > 7.11% done, estimate finish Fri May 25 20:54:42 2018 > 7.12% done, estimate finish Fri May 25 20:54:38 2018 > 7.12% done, estimate finish Fri May 25 20:54:34 2018 > 7.13% done, estimate finish Fri May 25 20:54:30 2018 > 7.13% done, estimate finish Fri May 25 20:54:40 2018 > 7.13% done, estimate finish Fri May 25 20:54:36 2018 > 7.14% done, estimate finish Fri May 25 20:54:32 2018 > 7.14% done, estimate finish Fri May 25 20:54:28 2018 > 7.15% done, estimate finish Fri May 25 20:54:38 2018 > 7.15% done, estimate finish Fri May 25 20:54:34 2018 > 7.16% done, estimate finish Fri May 25 20:54:30 2018 > 7.16% done, estimate finish Fri May 25 20:54:27 2018 > 7.16% done, estimate finish Fri May 25 20:54:37 2018 > 7.17% done, estimate finish Fri May 25 20:54:33 2018 > 7.17% done, estimate finish Fri May 25 20:54:29 2018 > 7.18% done, estimate finish Fri May 25 20:54:39 2018 > 7.18% done, estimate finish Fri May 25 20:54:35 2018 > 7.18% done, estimate finish Fri May 25 20:54:31 2018 > 7.19% done, estimate finish Fri May 25 20:54:27 2018 > 7.19% done, estimate finish Fri May 25 20:54:37 2018 > 7.20% done, estimate finish Fri May 25 20:54:33 2018 > 7.20% done, estimate finish Fri May 25 20:54:29 2018 > 7.20% done, estimate finish Fri May 25 20:54:25 2018 > 7.21% done, estimate finish Fri May 25 20:54:36 2018 > 7.21% done, estimate finish Fri May 25 20:54:32 2018 > 7.22% done, estimate finish Fri May 25 20:54:28 2018 > 7.22% done, estimate finish Fri May 25 20:54:24 2018 > 7.23% done, estimate finish Fri May 25 20:54:34 2018 > 7.23% done, estimate finish Fri May 25 20:54:30 2018 > 7.23% done, estimate finish Fri May 25 20:54:26 2018 > 7.24% done, estimate finish Fri May 25 20:54:22 2018 > 7.24% done, estimate finish Fri May 25 20:54:32 2018 > 7.25% done, estimate finish Fri May 25 20:54:28 2018 > 7.25% done, estimate finish Fri May 25 20:54:24 2018 > 7.25% done, estimate finish Fri May 25 20:54:21 2018 > 7.26% done, estimate finish Fri May 25 20:54:31 2018 > 7.26% done, estimate finish Fri May 25 20:54:27 2018 > 7.27% done, estimate finish Fri May 25 20:54:23 2018 > 7.27% done, estimate finish Fri May 25 20:54:19 2018 > 7.27% done, estimate finish Fri May 25 20:54:29 2018 > 7.28% done, estimate finish Fri May 25 20:54:25 2018 > 7.28% done, estimate finish Fri May 25 20:54:21 2018 > 7.29% done, estimate finish Fri May 25 20:54:31 2018 > 7.29% done, estimate finish Fri May 25 20:54:27 2018 > 7.29% done, estimate finish Fri May 25 20:54:23 2018 > 7.30% done, estimate finish Fri May 25 20:54:20 2018 > 7.30% done, estimate finish Fri May 25 20:54:29 2018 > 7.31% done, estimate finish Fri May 25 20:54:26 2018 > 7.31% done, estimate finish Fri May 25 20:54:22 2018 > 7.32% done, estimate finish Fri May 25 20:54:18 2018 > 7.32% done, estimate finish Fri May 25 20:54:28 2018 > 7.32% done, estimate finish Fri May 25 20:54:24 2018 > 7.33% done, estimate finish Fri May 25 20:54:20 2018 > 7.33% done, estimate finish Fri May 25 20:54:16 2018 > 7.34% done, estimate finish Fri May 25 20:54:26 2018 > 7.34% done, estimate finish Fri May 25 20:54:22 2018 > 7.34% done, estimate finish Fri May 25 20:54:18 2018 > 7.35% done, estimate finish Fri May 25 20:54:28 2018 > 7.35% done, estimate finish Fri May 25 20:54:25 2018 > 7.36% done, estimate finish Fri May 25 20:54:21 2018 > 7.36% done, estimate finish Fri May 25 20:54:17 2018 > 7.36% done, estimate finish Fri May 25 20:54:27 2018 > 7.37% done, estimate finish Fri May 25 20:54:23 2018 > 7.37% done, estimate finish Fri May 25 20:54:19 2018 > 7.38% done, estimate finish Fri May 25 20:54:15 2018 > 7.38% done, estimate finish Fri May 25 20:54:25 2018 > 7.38% done, estimate finish Fri May 25 20:54:21 2018 > 7.39% done, estimate finish Fri May 25 20:54:18 2018 > 7.39% done, estimate finish Fri May 25 20:54:14 2018 > 7.40% done, estimate finish Fri May 25 20:54:23 2018 > 7.40% done, estimate finish Fri May 25 20:54:20 2018 > 7.41% done, estimate finish Fri May 25 20:54:16 2018 > 7.41% done, estimate finish Fri May 25 20:54:12 2018 > 7.41% done, estimate finish Fri May 25 20:54:22 2018 > 7.42% done, estimate finish Fri May 25 20:54:18 2018 > 7.42% done, estimate finish Fri May 25 20:54:14 2018 > 7.43% done, estimate finish Fri May 25 20:54:11 2018 > 7.43% done, estimate finish Fri May 25 20:54:20 2018 > 7.43% done, estimate finish Fri May 25 20:54:17 2018 > 7.44% done, estimate finish Fri May 25 20:54:13 2018 > 7.44% done, estimate finish Fri May 25 20:54:09 2018 > 7.45% done, estimate finish Fri May 25 20:54:19 2018 > 7.45% done, estimate finish Fri May 25 20:54:15 2018 > 7.45% done, estimate finish Fri May 25 20:54:11 2018 > 7.46% done, estimate finish Fri May 25 20:54:21 2018 > 7.46% done, estimate finish Fri May 25 20:54:17 2018 > 7.47% done, estimate finish Fri May 25 20:54:13 2018 > 7.47% done, estimate finish Fri May 25 20:54:10 2018 > 7.47% done, estimate finish Fri May 25 20:54:19 2018 > 7.48% done, estimate finish Fri May 25 20:54:16 2018 > 7.48% done, estimate finish Fri May 25 20:54:12 2018 > 7.49% done, estimate finish Fri May 25 20:54:08 2018 > 7.49% done, estimate finish Fri May 25 20:54:18 2018 > 7.50% done, estimate finish Fri May 25 20:54:14 2018 > 7.50% done, estimate finish Fri May 25 20:54:10 2018 > 7.50% done, estimate finish Fri May 25 20:54:07 2018 > 7.51% done, estimate finish Fri May 25 20:54:16 2018 > 7.51% done, estimate finish Fri May 25 20:54:12 2018 > 7.52% done, estimate finish Fri May 25 20:54:09 2018 > 7.52% done, estimate finish Fri May 25 20:54:18 2018 > 7.52% done, estimate finish Fri May 25 20:54:15 2018 > 7.53% done, estimate finish Fri May 25 20:54:11 2018 > 7.53% done, estimate finish Fri May 25 20:54:07 2018 > 7.54% done, estimate finish Fri May 25 20:54:17 2018 > 7.54% done, estimate finish Fri May 25 20:54:13 2018 > 7.54% done, estimate finish Fri May 25 20:54:09 2018 > 7.55% done, estimate finish Fri May 25 20:54:06 2018 > 7.55% done, estimate finish Fri May 25 20:54:15 2018 > 7.56% done, estimate finish Fri May 25 20:54:11 2018 > 7.56% done, estimate finish Fri May 25 20:54:08 2018 > 7.57% done, estimate finish Fri May 25 20:54:04 2018 > 7.57% done, estimate finish Fri May 25 20:54:14 2018 > 7.57% done, estimate finish Fri May 25 20:54:10 2018 > 7.58% done, estimate finish Fri May 25 20:54:06 2018 > 7.58% done, estimate finish Fri May 25 20:54:03 2018 > 7.59% done, estimate finish Fri May 25 20:54:12 2018 > 7.59% done, estimate finish Fri May 25 20:54:08 2018 > 7.59% done, estimate finish Fri May 25 20:54:05 2018 > 7.60% done, estimate finish Fri May 25 20:54:14 2018 > 7.60% done, estimate finish Fri May 25 20:54:11 2018 > 7.61% done, estimate finish Fri May 25 20:54:07 2018 > 7.61% done, estimate finish Fri May 25 20:54:03 2018 > 7.61% done, estimate finish Fri May 25 20:54:00 2018 > 7.62% done, estimate finish Fri May 25 20:54:09 2018 > 7.62% done, estimate finish Fri May 25 20:54:05 2018 > 7.63% done, estimate finish Fri May 25 20:54:02 2018 > 7.63% done, estimate finish Fri May 25 20:54:11 2018 > 7.63% done, estimate finish Fri May 25 20:54:08 2018 > 7.64% done, estimate finish Fri May 25 20:54:04 2018 > 7.64% done, estimate finish Fri May 25 20:54:00 2018 > 7.65% done, estimate finish Fri May 25 20:54:10 2018 > 7.65% done, estimate finish Fri May 25 20:54:06 2018 > 7.66% done, estimate finish Fri May 25 20:54:02 2018 > 7.66% done, estimate finish Fri May 25 20:53:59 2018 > 7.66% done, estimate finish Fri May 25 20:54:08 2018 > 7.67% done, estimate finish Fri May 25 20:54:05 2018 > 7.67% done, estimate finish Fri May 25 20:54:01 2018 > 7.68% done, estimate finish Fri May 25 20:53:57 2018 > 7.68% done, estimate finish Fri May 25 20:54:07 2018 > 7.68% done, estimate finish Fri May 25 20:54:03 2018 > 7.69% done, estimate finish Fri May 25 20:53:59 2018 > 7.69% done, estimate finish Fri May 25 20:53:56 2018 > 7.70% done, estimate finish Fri May 25 20:54:05 2018 > 7.70% done, estimate finish Fri May 25 20:54:02 2018 > 7.70% done, estimate finish Fri May 25 20:53:58 2018 > 7.71% done, estimate finish Fri May 25 20:54:07 2018 > 7.71% done, estimate finish Fri May 25 20:54:04 2018 > 7.72% done, estimate finish Fri May 25 20:54:00 2018 > 7.72% done, estimate finish Fri May 25 20:53:56 2018 > 7.72% done, estimate finish Fri May 25 20:54:06 2018 > 7.73% done, estimate finish Fri May 25 20:54:02 2018 > 7.73% done, estimate finish Fri May 25 20:53:59 2018 > 7.74% done, estimate finish Fri May 25 20:53:55 2018 > 7.74% done, estimate finish Fri May 25 20:54:04 2018 > 7.75% done, estimate finish Fri May 25 20:54:01 2018 > 7.75% done, estimate finish Fri May 25 20:53:57 2018 > 7.75% done, estimate finish Fri May 25 20:53:53 2018 > 7.76% done, estimate finish Fri May 25 20:54:03 2018 > 7.76% done, estimate finish Fri May 25 20:53:59 2018 > 7.77% done, estimate finish Fri May 25 20:53:56 2018 > 7.77% done, estimate finish Fri May 25 20:54:05 2018 > 7.77% done, estimate finish Fri May 25 20:54:01 2018 > 7.78% done, estimate finish Fri May 25 20:53:58 2018 > 7.78% done, estimate finish Fri May 25 20:53:54 2018 > 7.79% done, estimate finish Fri May 25 20:54:03 2018 > 7.79% done, estimate finish Fri May 25 20:54:00 2018 > 7.79% done, estimate finish Fri May 25 20:53:56 2018 > 7.80% done, estimate finish Fri May 25 20:53:53 2018 > 7.80% done, estimate finish Fri May 25 20:54:02 2018 > 7.81% done, estimate finish Fri May 25 20:53:58 2018 > 7.81% done, estimate finish Fri May 25 20:53:55 2018 > 7.81% done, estimate finish Fri May 25 20:53:51 2018 > 7.82% done, estimate finish Fri May 25 20:54:00 2018 > 7.82% done, estimate finish Fri May 25 20:53:57 2018 > 7.83% done, estimate finish Fri May 25 20:53:53 2018 > 7.83% done, estimate finish Fri May 25 20:53:50 2018 > 7.84% done, estimate finish Fri May 25 20:53:59 2018 > 7.84% done, estimate finish Fri May 25 20:53:55 2018 > 7.84% done, estimate finish Fri May 25 20:53:52 2018 > 7.85% done, estimate finish Fri May 25 20:54:01 2018 > 7.85% done, estimate finish Fri May 25 20:53:58 2018 > 7.86% done, estimate finish Fri May 25 20:53:54 2018 > 7.86% done, estimate finish Fri May 25 20:53:50 2018 > 7.86% done, estimate finish Fri May 25 20:54:00 2018 > 7.87% done, estimate finish Fri May 25 20:53:56 2018 > 7.87% done, estimate finish Fri May 25 20:53:53 2018 > 7.88% done, estimate finish Fri May 25 20:53:49 2018 > 7.88% done, estimate finish Fri May 25 20:53:58 2018 > 7.88% done, estimate finish Fri May 25 20:53:55 2018 > 7.89% done, estimate finish Fri May 25 20:53:51 2018 > 7.89% done, estimate finish Fri May 25 20:53:48 2018 > 7.90% done, estimate finish Fri May 25 20:53:57 2018 > 7.90% done, estimate finish Fri May 25 20:53:53 2018 > 7.90% done, estimate finish Fri May 25 20:53:50 2018 > 7.91% done, estimate finish Fri May 25 20:53:59 2018 > 7.91% done, estimate finish Fri May 25 20:53:55 2018 > 7.92% done, estimate finish Fri May 25 20:53:52 2018 > 7.92% done, estimate finish Fri May 25 20:53:48 2018 > 7.93% done, estimate finish Fri May 25 20:53:57 2018 > 7.93% done, estimate finish Fri May 25 20:53:54 2018 > 7.93% done, estimate finish Fri May 25 20:53:50 2018 > 7.94% done, estimate finish Fri May 25 20:53:47 2018 > 7.94% done, estimate finish Fri May 25 20:53:43 2018 > 7.95% done, estimate finish Fri May 25 20:53:52 2018 > 7.95% done, estimate finish Fri May 25 20:53:49 2018 > 7.95% done, estimate finish Fri May 25 20:53:45 2018 > 7.96% done, estimate finish Fri May 25 20:53:55 2018 > 7.96% done, estimate finish Fri May 25 20:53:51 2018 > 7.97% done, estimate finish Fri May 25 20:53:47 2018 > 7.97% done, estimate finish Fri May 25 20:53:44 2018 > 7.97% done, estimate finish Fri May 25 20:53:53 2018 > 7.98% done, estimate finish Fri May 25 20:53:50 2018 > 7.98% done, estimate finish Fri May 25 20:53:46 2018 > 7.99% done, estimate finish Fri May 25 20:53:43 2018 > 7.99% done, estimate finish Fri May 25 20:53:52 2018 > 8.00% done, estimate finish Fri May 25 20:53:48 2018 > 8.00% done, estimate finish Fri May 25 20:53:45 2018 > 8.00% done, estimate finish Fri May 25 20:53:41 2018 > 8.01% done, estimate finish Fri May 25 20:53:50 2018 > 8.01% done, estimate finish Fri May 25 20:53:47 2018 > 8.02% done, estimate finish Fri May 25 20:53:43 2018 > 8.02% done, estimate finish Fri May 25 20:53:52 2018 > 8.02% done, estimate finish Fri May 25 20:53:49 2018 > 8.03% done, estimate finish Fri May 25 20:53:45 2018 > 8.03% done, estimate finish Fri May 25 20:53:42 2018 > 8.04% done, estimate finish Fri May 25 20:53:51 2018 > 8.04% done, estimate finish Fri May 25 20:53:47 2018 > 8.04% done, estimate finish Fri May 25 20:53:44 2018 > 8.05% done, estimate finish Fri May 25 20:53:40 2018 > 8.05% done, estimate finish Fri May 25 20:53:49 2018 > 8.06% done, estimate finish Fri May 25 20:53:46 2018 > 8.06% done, estimate finish Fri May 25 20:53:43 2018 > 8.06% done, estimate finish Fri May 25 20:53:39 2018 > 8.07% done, estimate finish Fri May 25 20:53:48 2018 > 8.07% done, estimate finish Fri May 25 20:53:45 2018 > 8.08% done, estimate finish Fri May 25 20:53:41 2018 > 8.08% done, estimate finish Fri May 25 20:53:38 2018 > 8.09% done, estimate finish Fri May 25 20:53:47 2018 > 8.09% done, estimate finish Fri May 25 20:53:43 2018 > 8.09% done, estimate finish Fri May 25 20:53:40 2018 > 8.10% done, estimate finish Fri May 25 20:53:49 2018 > 8.10% done, estimate finish Fri May 25 20:53:45 2018 > 8.11% done, estimate finish Fri May 25 20:53:42 2018 > 8.11% done, estimate finish Fri May 25 20:53:38 2018 > 8.11% done, estimate finish Fri May 25 20:53:47 2018 > 8.12% done, estimate finish Fri May 25 20:53:44 2018 > 8.12% done, estimate finish Fri May 25 20:53:41 2018 > 8.13% done, estimate finish Fri May 25 20:53:37 2018 > 8.13% done, estimate finish Fri May 25 20:53:46 2018 > 8.13% done, estimate finish Fri May 25 20:53:43 2018 > 8.14% done, estimate finish Fri May 25 20:53:39 2018 > 8.14% done, estimate finish Fri May 25 20:53:36 2018 > 8.15% done, estimate finish Fri May 25 20:53:45 2018 > 8.15% done, estimate finish Fri May 25 20:53:41 2018 > 8.15% done, estimate finish Fri May 25 20:53:38 2018 > 8.16% done, estimate finish Fri May 25 20:53:47 2018 > 8.16% done, estimate finish Fri May 25 20:53:43 2018 > 8.17% done, estimate finish Fri May 25 20:53:40 2018 > 8.17% done, estimate finish Fri May 25 20:53:36 2018 > 8.18% done, estimate finish Fri May 25 20:53:45 2018 > 8.18% done, estimate finish Fri May 25 20:53:42 2018 > 8.18% done, estimate finish Fri May 25 20:53:38 2018 > 8.19% done, estimate finish Fri May 25 20:53:35 2018 > 8.19% done, estimate finish Fri May 25 20:53:44 2018 > 8.20% done, estimate finish Fri May 25 20:53:40 2018 > 8.20% done, estimate finish Fri May 25 20:53:37 2018 > 8.20% done, estimate finish Fri May 25 20:53:34 2018 > 8.21% done, estimate finish Fri May 25 20:53:43 2018 > 8.21% done, estimate finish Fri May 25 20:53:39 2018 > 8.22% done, estimate finish Fri May 25 20:53:36 2018 > 8.22% done, estimate finish Fri May 25 20:53:32 2018 > 8.22% done, estimate finish Fri May 25 20:53:41 2018 > 8.23% done, estimate finish Fri May 25 20:53:38 2018 > 8.23% done, estimate finish Fri May 25 20:53:34 2018 > 8.24% done, estimate finish Fri May 25 20:53:43 2018 > 8.24% done, estimate finish Fri May 25 20:53:40 2018 > 8.24% done, estimate finish Fri May 25 20:53:36 2018 > 8.25% done, estimate finish Fri May 25 20:53:33 2018 > 8.25% done, estimate finish Fri May 25 20:53:42 2018 > 8.26% done, estimate finish Fri May 25 20:53:38 2018 > 8.26% done, estimate finish Fri May 25 20:53:35 2018 > 8.27% done, estimate finish Fri May 25 20:53:32 2018 > 8.27% done, estimate finish Fri May 25 20:53:40 2018 > 8.27% done, estimate finish Fri May 25 20:53:37 2018 > 8.28% done, estimate finish Fri May 25 20:53:34 2018 > 8.28% done, estimate finish Fri May 25 20:53:30 2018 > 8.29% done, estimate finish Fri May 25 20:53:39 2018 > 8.29% done, estimate finish Fri May 25 20:53:36 2018 > 8.29% done, estimate finish Fri May 25 20:53:32 2018 > 8.30% done, estimate finish Fri May 25 20:53:41 2018 > 8.30% done, estimate finish Fri May 25 20:53:38 2018 > 8.31% done, estimate finish Fri May 25 20:53:34 2018 > 8.31% done, estimate finish Fri May 25 20:53:31 2018 > 8.31% done, estimate finish Fri May 25 20:53:40 2018 > 8.32% done, estimate finish Fri May 25 20:53:36 2018 > 8.32% done, estimate finish Fri May 25 20:53:33 2018 > 8.33% done, estimate finish Fri May 25 20:53:30 2018 > 8.33% done, estimate finish Fri May 25 20:53:38 2018 > 8.34% done, estimate finish Fri May 25 20:53:35 2018 > 8.34% done, estimate finish Fri May 25 20:53:32 2018 > 8.34% done, estimate finish Fri May 25 20:53:28 2018 > 8.35% done, estimate finish Fri May 25 20:53:37 2018 > 8.35% done, estimate finish Fri May 25 20:53:34 2018 > 8.36% done, estimate finish Fri May 25 20:53:31 2018 > 8.36% done, estimate finish Fri May 25 20:53:27 2018 > 8.36% done, estimate finish Fri May 25 20:53:36 2018 > 8.37% done, estimate finish Fri May 25 20:53:32 2018 > 8.37% done, estimate finish Fri May 25 20:53:29 2018 > 8.38% done, estimate finish Fri May 25 20:53:38 2018 > 8.38% done, estimate finish Fri May 25 20:53:34 2018 > 8.38% done, estimate finish Fri May 25 20:53:31 2018 > 8.39% done, estimate finish Fri May 25 20:53:28 2018 > 8.39% done, estimate finish Fri May 25 20:53:36 2018 > 8.40% done, estimate finish Fri May 25 20:53:33 2018 > 8.40% done, estimate finish Fri May 25 20:53:30 2018 > 8.40% done, estimate finish Fri May 25 20:53:27 2018 > 8.41% done, estimate finish Fri May 25 20:53:35 2018 > 8.41% done, estimate finish Fri May 25 20:53:32 2018 > 8.42% done, estimate finish Fri May 25 20:53:29 2018 > 8.42% done, estimate finish Fri May 25 20:53:25 2018 > 8.43% done, estimate finish Fri May 25 20:53:34 2018 > 8.43% done, estimate finish Fri May 25 20:53:31 2018 > 8.43% done, estimate finish Fri May 25 20:53:27 2018 > 8.44% done, estimate finish Fri May 25 20:53:36 2018 > 8.44% done, estimate finish Fri May 25 20:53:32 2018 > 8.45% done, estimate finish Fri May 25 20:53:29 2018 > 8.45% done, estimate finish Fri May 25 20:53:26 2018 > 8.45% done, estimate finish Fri May 25 20:53:35 2018 > 8.46% done, estimate finish Fri May 25 20:53:31 2018 > 8.46% done, estimate finish Fri May 25 20:53:28 2018 > 8.47% done, estimate finish Fri May 25 20:53:25 2018 > 8.47% done, estimate finish Fri May 25 20:53:33 2018 > 8.47% done, estimate finish Fri May 25 20:53:30 2018 > 8.48% done, estimate finish Fri May 25 20:53:27 2018 > 8.48% done, estimate finish Fri May 25 20:53:23 2018 > 8.49% done, estimate finish Fri May 25 20:53:32 2018 > 8.49% done, estimate finish Fri May 25 20:53:29 2018 > 8.49% done, estimate finish Fri May 25 20:53:25 2018 > 8.50% done, estimate finish Fri May 25 20:53:22 2018 > 8.50% done, estimate finish Fri May 25 20:53:31 2018 > 8.51% done, estimate finish Fri May 25 20:53:27 2018 > 8.51% done, estimate finish Fri May 25 20:53:24 2018 > 8.52% done, estimate finish Fri May 25 20:53:33 2018 > 8.52% done, estimate finish Fri May 25 20:53:29 2018 > 8.52% done, estimate finish Fri May 25 20:53:26 2018 > 8.53% done, estimate finish Fri May 25 20:53:23 2018 > 8.53% done, estimate finish Fri May 25 20:53:31 2018 > 8.54% done, estimate finish Fri May 25 20:53:28 2018 > 8.54% done, estimate finish Fri May 25 20:53:25 2018 > 8.54% done, estimate finish Fri May 25 20:53:22 2018 > 8.55% done, estimate finish Fri May 25 20:53:30 2018 > 8.55% done, estimate finish Fri May 25 20:53:27 2018 > 8.56% done, estimate finish Fri May 25 20:53:23 2018 > 8.56% done, estimate finish Fri May 25 20:53:20 2018 > 8.56% done, estimate finish Fri May 25 20:53:29 2018 > 8.57% done, estimate finish Fri May 25 20:53:26 2018 > 8.57% done, estimate finish Fri May 25 20:53:22 2018 > 8.58% done, estimate finish Fri May 25 20:53:19 2018 > 8.58% done, estimate finish Fri May 25 20:53:27 2018 > 8.58% done, estimate finish Fri May 25 20:53:24 2018 > 8.59% done, estimate finish Fri May 25 20:53:33 2018 > 8.59% done, estimate finish Fri May 25 20:53:29 2018 > 8.60% done, estimate finish Fri May 25 20:53:26 2018 > 8.60% done, estimate finish Fri May 25 20:53:23 2018 > 8.61% done, estimate finish Fri May 25 20:53:31 2018 > 8.61% done, estimate finish Fri May 25 20:53:28 2018 > 8.61% done, estimate finish Fri May 25 20:53:25 2018 > 8.62% done, estimate finish Fri May 25 20:53:22 2018 > 8.62% done, estimate finish Fri May 25 20:53:30 2018 > 8.63% done, estimate finish Fri May 25 20:53:27 2018 > 8.63% done, estimate finish Fri May 25 20:53:24 2018 > 8.63% done, estimate finish Fri May 25 20:53:20 2018 > 8.64% done, estimate finish Fri May 25 20:53:29 2018 > 8.64% done, estimate finish Fri May 25 20:53:26 2018 > 8.65% done, estimate finish Fri May 25 20:53:22 2018 > 8.65% done, estimate finish Fri May 25 20:53:31 2018 > 8.65% done, estimate finish Fri May 25 20:53:28 2018 > 8.66% done, estimate finish Fri May 25 20:53:24 2018 > 8.66% done, estimate finish Fri May 25 20:53:21 2018 > 8.67% done, estimate finish Fri May 25 20:53:30 2018 > 8.67% done, estimate finish Fri May 25 20:53:26 2018 > 8.67% done, estimate finish Fri May 25 20:53:23 2018 > 8.68% done, estimate finish Fri May 25 20:53:20 2018 > 8.68% done, estimate finish Fri May 25 20:53:28 2018 > 8.69% done, estimate finish Fri May 25 20:53:25 2018 > 8.69% done, estimate finish Fri May 25 20:53:22 2018 > 8.70% done, estimate finish Fri May 25 20:53:19 2018 > 8.70% done, estimate finish Fri May 25 20:53:27 2018 > 8.70% done, estimate finish Fri May 25 20:53:35 2018 > 8.71% done, estimate finish Fri May 25 20:53:32 2018 > 8.71% done, estimate finish Fri May 25 20:53:29 2018 > 8.72% done, estimate finish Fri May 25 20:53:26 2018 > 8.72% done, estimate finish Fri May 25 20:53:22 2018 > 8.72% done, estimate finish Fri May 25 20:53:19 2018 > 8.73% done, estimate finish Fri May 25 20:53:28 2018 > 8.73% done, estimate finish Fri May 25 20:53:24 2018 > 8.74% done, estimate finish Fri May 25 20:53:21 2018 > 8.74% done, estimate finish Fri May 25 20:53:18 2018 > 8.74% done, estimate finish Fri May 25 20:53:26 2018 > 8.75% done, estimate finish Fri May 25 20:53:23 2018 > 8.75% done, estimate finish Fri May 25 20:53:20 2018 > 8.76% done, estimate finish Fri May 25 20:53:28 2018 > 8.76% done, estimate finish Fri May 25 20:53:25 2018 > 8.77% done, estimate finish Fri May 25 20:53:22 2018 > 8.77% done, estimate finish Fri May 25 20:53:19 2018 > 8.77% done, estimate finish Fri May 25 20:53:16 2018 > 8.78% done, estimate finish Fri May 25 20:53:24 2018 > 8.78% done, estimate finish Fri May 25 20:53:21 2018 > 8.79% done, estimate finish Fri May 25 20:53:18 2018 > 8.79% done, estimate finish Fri May 25 20:53:26 2018 > 8.79% done, estimate finish Fri May 25 20:53:23 2018 > 8.80% done, estimate finish Fri May 25 20:53:20 2018 > 8.80% done, estimate finish Fri May 25 20:53:16 2018 > 8.81% done, estimate finish Fri May 25 20:53:25 2018 > 8.81% done, estimate finish Fri May 25 20:53:21 2018 > 8.81% done, estimate finish Fri May 25 20:53:18 2018 > 8.82% done, estimate finish Fri May 25 20:53:15 2018 > 8.82% done, estimate finish Fri May 25 20:53:23 2018 > 8.83% done, estimate finish Fri May 25 20:53:20 2018 > 8.83% done, estimate finish Fri May 25 20:53:17 2018 > 8.83% done, estimate finish Fri May 25 20:53:25 2018 > 8.84% done, estimate finish Fri May 25 20:53:22 2018 > 8.84% done, estimate finish Fri May 25 20:53:19 2018 > 8.85% done, estimate finish Fri May 25 20:53:16 2018 > 8.85% done, estimate finish Fri May 25 20:53:24 2018 > 8.86% done, estimate finish Fri May 25 20:53:21 2018 > 8.86% done, estimate finish Fri May 25 20:53:18 2018 > 8.86% done, estimate finish Fri May 25 20:53:15 2018 > 8.87% done, estimate finish Fri May 25 20:53:23 2018 > 8.87% done, estimate finish Fri May 25 20:53:20 2018 > 8.88% done, estimate finish Fri May 25 20:53:17 2018 > 8.88% done, estimate finish Fri May 25 20:53:13 2018 > 8.88% done, estimate finish Fri May 25 20:53:22 2018 > 8.89% done, estimate finish Fri May 25 20:53:18 2018 > 8.89% done, estimate finish Fri May 25 20:53:15 2018 > 8.90% done, estimate finish Fri May 25 20:53:24 2018 > 8.90% done, estimate finish Fri May 25 20:53:20 2018 > 8.90% done, estimate finish Fri May 25 20:53:17 2018 > 8.91% done, estimate finish Fri May 25 20:53:14 2018 > 8.91% done, estimate finish Fri May 25 20:53:22 2018 > 8.92% done, estimate finish Fri May 25 20:53:19 2018 > 8.92% done, estimate finish Fri May 25 20:53:16 2018 > 8.92% done, estimate finish Fri May 25 20:53:13 2018 > 8.93% done, estimate finish Fri May 25 20:53:21 2018 > 8.93% done, estimate finish Fri May 25 20:53:18 2018 > 8.94% done, estimate finish Fri May 25 20:53:15 2018 > 8.94% done, estimate finish Fri May 25 20:53:12 2018 > 8.95% done, estimate finish Fri May 25 20:53:20 2018 > 8.95% done, estimate finish Fri May 25 20:53:17 2018 > 8.95% done, estimate finish Fri May 25 20:53:14 2018 > 8.96% done, estimate finish Fri May 25 20:53:11 2018 > 8.96% done, estimate finish Fri May 25 20:53:19 2018 > 8.97% done, estimate finish Fri May 25 20:53:15 2018 > 8.97% done, estimate finish Fri May 25 20:53:12 2018 > 8.97% done, estimate finish Fri May 25 20:53:21 2018 > 8.98% done, estimate finish Fri May 25 20:53:17 2018 > 8.98% done, estimate finish Fri May 25 20:53:14 2018 > 8.99% done, estimate finish Fri May 25 20:53:11 2018 > 8.99% done, estimate finish Fri May 25 20:53:19 2018 > 8.99% done, estimate finish Fri May 25 20:53:16 2018 > 9.00% done, estimate finish Fri May 25 20:53:13 2018 > 9.00% done, estimate finish Fri May 25 20:53:21 2018 > 9.01% done, estimate finish Fri May 25 20:53:18 2018 > 9.01% done, estimate finish Fri May 25 20:53:15 2018 > 9.01% done, estimate finish Fri May 25 20:53:12 2018 > 9.02% done, estimate finish Fri May 25 20:53:20 2018 > 9.02% done, estimate finish Fri May 25 20:53:17 2018 > 9.03% done, estimate finish Fri May 25 20:53:14 2018 > 9.03% done, estimate finish Fri May 25 20:53:11 2018 > 9.04% done, estimate finish Fri May 25 20:53:19 2018 > 9.04% done, estimate finish Fri May 25 20:53:16 2018 > 9.04% done, estimate finish Fri May 25 20:53:13 2018 > 9.05% done, estimate finish Fri May 25 20:53:10 2018 > 9.05% done, estimate finish Fri May 25 20:53:18 2018 > 9.06% done, estimate finish Fri May 25 20:53:15 2018 > 9.06% done, estimate finish Fri May 25 20:53:12 2018 > 9.06% done, estimate finish Fri May 25 20:53:08 2018 > 9.07% done, estimate finish Fri May 25 20:53:16 2018 > 9.07% done, estimate finish Fri May 25 20:53:13 2018 > 9.08% done, estimate finish Fri May 25 20:53:10 2018 > 9.08% done, estimate finish Fri May 25 20:53:18 2018 > 9.08% done, estimate finish Fri May 25 20:53:15 2018 > 9.09% done, estimate finish Fri May 25 20:53:12 2018 > 9.09% done, estimate finish Fri May 25 20:53:09 2018 > 9.10% done, estimate finish Fri May 25 20:53:17 2018 > 9.10% done, estimate finish Fri May 25 20:53:14 2018 > 9.11% done, estimate finish Fri May 25 20:53:11 2018 > 9.11% done, estimate finish Fri May 25 20:53:08 2018 > 9.11% done, estimate finish Fri May 25 20:53:16 2018 > 9.12% done, estimate finish Fri May 25 20:53:13 2018 > 9.12% done, estimate finish Fri May 25 20:53:10 2018 > 9.13% done, estimate finish Fri May 25 20:53:07 2018 > 9.13% done, estimate finish Fri May 25 20:53:15 2018 > 9.13% done, estimate finish Fri May 25 20:53:12 2018 > 9.14% done, estimate finish Fri May 25 20:53:09 2018 > 9.14% done, estimate finish Fri May 25 20:53:06 2018 > 9.15% done, estimate finish Fri May 25 20:53:14 2018 > 9.15% done, estimate finish Fri May 25 20:53:11 2018 > 9.15% done, estimate finish Fri May 25 20:53:08 2018 > 9.16% done, estimate finish Fri May 25 20:53:15 2018 > 9.16% done, estimate finish Fri May 25 20:53:12 2018 > 9.17% done, estimate finish Fri May 25 20:53:09 2018 > 9.17% done, estimate finish Fri May 25 20:53:06 2018 > 9.17% done, estimate finish Fri May 25 20:53:14 2018 > 9.18% done, estimate finish Fri May 25 20:53:11 2018 > 9.18% done, estimate finish Fri May 25 20:53:08 2018 > 9.19% done, estimate finish Fri May 25 20:53:05 2018 > 9.19% done, estimate finish Fri May 25 20:53:13 2018 > 9.20% done, estimate finish Fri May 25 20:53:10 2018 > 9.20% done, estimate finish Fri May 25 20:53:07 2018 > 9.20% done, estimate finish Fri May 25 20:53:15 2018 > 9.21% done, estimate finish Fri May 25 20:53:12 2018 > 9.21% done, estimate finish Fri May 25 20:53:09 2018 > 9.22% done, estimate finish Fri May 25 20:53:06 2018 > 9.22% done, estimate finish Fri May 25 20:53:14 2018 > 9.22% done, estimate finish Fri May 25 20:53:11 2018 > 9.23% done, estimate finish Fri May 25 20:53:08 2018 > 9.23% done, estimate finish Fri May 25 20:53:05 2018 > 9.24% done, estimate finish Fri May 25 20:53:13 2018 > 9.24% done, estimate finish Fri May 25 20:53:10 2018 > 9.24% done, estimate finish Fri May 25 20:53:07 2018 > 9.25% done, estimate finish Fri May 25 20:53:14 2018 > 9.25% done, estimate finish Fri May 25 20:53:11 2018 > 9.26% done, estimate finish Fri May 25 20:53:08 2018 > 9.26% done, estimate finish Fri May 25 20:53:05 2018 > 9.26% done, estimate finish Fri May 25 20:53:13 2018 > 9.27% done, estimate finish Fri May 25 20:53:10 2018 > 9.27% done, estimate finish Fri May 25 20:53:07 2018 > 9.28% done, estimate finish Fri May 25 20:53:15 2018 > 9.28% done, estimate finish Fri May 25 20:53:12 2018 > 9.29% done, estimate finish Fri May 25 20:53:09 2018 > 9.29% done, estimate finish Fri May 25 20:53:06 2018 > 9.29% done, estimate finish Fri May 25 20:53:14 2018 > 9.30% done, estimate finish Fri May 25 20:53:11 2018 > 9.30% done, estimate finish Fri May 25 20:53:08 2018 > 9.31% done, estimate finish Fri May 25 20:53:05 2018 > 9.31% done, estimate finish Fri May 25 20:53:13 2018 > 9.31% done, estimate finish Fri May 25 20:53:10 2018 > 9.32% done, estimate finish Fri May 25 20:53:07 2018 > 9.32% done, estimate finish Fri May 25 20:53:15 2018 > 9.33% done, estimate finish Fri May 25 20:53:12 2018 > 9.33% done, estimate finish Fri May 25 20:53:09 2018 > 9.33% done, estimate finish Fri May 25 20:53:06 2018 > 9.34% done, estimate finish Fri May 25 20:53:14 2018 > 9.34% done, estimate finish Fri May 25 20:53:10 2018 > 9.35% done, estimate finish Fri May 25 20:53:08 2018 > 9.35% done, estimate finish Fri May 25 20:53:05 2018 > 9.35% done, estimate finish Fri May 25 20:53:12 2018 > 9.36% done, estimate finish Fri May 25 20:53:09 2018 > 9.36% done, estimate finish Fri May 25 20:53:06 2018 > 9.37% done, estimate finish Fri May 25 20:53:03 2018 > 9.37% done, estimate finish Fri May 25 20:53:11 2018 > 9.38% done, estimate finish Fri May 25 20:53:08 2018 > 9.38% done, estimate finish Fri May 25 20:53:05 2018 > 9.38% done, estimate finish Fri May 25 20:53:13 2018 > 9.39% done, estimate finish Fri May 25 20:53:10 2018 > 9.39% done, estimate finish Fri May 25 20:53:07 2018 > 9.40% done, estimate finish Fri May 25 20:53:04 2018 > 9.40% done, estimate finish Fri May 25 20:53:12 2018 > 9.40% done, estimate finish Fri May 25 20:53:09 2018 > 9.41% done, estimate finish Fri May 25 20:53:06 2018 > 9.41% done, estimate finish Fri May 25 20:53:03 2018 > 9.42% done, estimate finish Fri May 25 20:53:11 2018 > 9.42% done, estimate finish Fri May 25 20:53:08 2018 > 9.42% done, estimate finish Fri May 25 20:53:05 2018 > 9.43% done, estimate finish Fri May 25 20:53:13 2018 > 9.43% done, estimate finish Fri May 25 20:53:10 2018 > 9.44% done, estimate finish Fri May 25 20:53:07 2018 > 9.44% done, estimate finish Fri May 25 20:53:04 2018 > 9.44% done, estimate finish Fri May 25 20:53:11 2018 > 9.45% done, estimate finish Fri May 25 20:53:08 2018 > 9.45% done, estimate finish Fri May 25 20:53:06 2018 > 9.46% done, estimate finish Fri May 25 20:53:03 2018 > 9.46% done, estimate finish Fri May 25 20:53:10 2018 > 9.47% done, estimate finish Fri May 25 20:53:07 2018 > 9.47% done, estimate finish Fri May 25 20:53:04 2018 > 9.47% done, estimate finish Fri May 25 20:53:12 2018 > 9.48% done, estimate finish Fri May 25 20:53:09 2018 > 9.48% done, estimate finish Fri May 25 20:53:06 2018 > 9.49% done, estimate finish Fri May 25 20:53:14 2018 > 9.49% done, estimate finish Fri May 25 20:53:11 2018 > 9.49% done, estimate finish Fri May 25 20:53:08 2018 > 9.50% done, estimate finish Fri May 25 20:53:05 2018 > 9.50% done, estimate finish Fri May 25 20:53:13 2018 > 9.51% done, estimate finish Fri May 25 20:53:10 2018 > 9.51% done, estimate finish Fri May 25 20:53:07 2018 > 9.51% done, estimate finish Fri May 25 20:53:04 2018 > 9.52% done, estimate finish Fri May 25 20:53:12 2018 > 9.52% done, estimate finish Fri May 25 20:53:09 2018 > 9.53% done, estimate finish Fri May 25 20:53:06 2018 > 9.53% done, estimate finish Fri May 25 20:53:13 2018 > 9.54% done, estimate finish Fri May 25 20:53:11 2018 > 9.54% done, estimate finish Fri May 25 20:53:08 2018 > 9.54% done, estimate finish Fri May 25 20:53:05 2018 > 9.55% done, estimate finish Fri May 25 20:53:12 2018 > 9.55% done, estimate finish Fri May 25 20:53:09 2018 > 9.56% done, estimate finish Fri May 25 20:53:06 2018 > 9.56% done, estimate finish Fri May 25 20:53:04 2018 > 9.56% done, estimate finish Fri May 25 20:53:11 2018 > 9.57% done, estimate finish Fri May 25 20:53:08 2018 > 9.57% done, estimate finish Fri May 25 20:53:05 2018 > 9.58% done, estimate finish Fri May 25 20:53:13 2018 > 9.58% done, estimate finish Fri May 25 20:53:10 2018 > 9.58% done, estimate finish Fri May 25 20:53:07 2018 > 9.59% done, estimate finish Fri May 25 20:53:04 2018 > 9.59% done, estimate finish Fri May 25 20:53:12 2018 > 9.60% done, estimate finish Fri May 25 20:53:09 2018 > 9.60% done, estimate finish Fri May 25 20:53:06 2018 > 9.60% done, estimate finish Fri May 25 20:53:03 2018 > 9.61% done, estimate finish Fri May 25 20:53:11 2018 > 9.61% done, estimate finish Fri May 25 20:53:08 2018 > 9.62% done, estimate finish Fri May 25 20:53:05 2018 > 9.62% done, estimate finish Fri May 25 20:53:02 2018 > 9.63% done, estimate finish Fri May 25 20:53:10 2018 > 9.63% done, estimate finish Fri May 25 20:53:07 2018 > 9.63% done, estimate finish Fri May 25 20:53:04 2018 > 9.64% done, estimate finish Fri May 25 20:53:11 2018 > 9.64% done, estimate finish Fri May 25 20:53:08 2018 > 9.65% done, estimate finish Fri May 25 20:53:06 2018 > 9.65% done, estimate finish Fri May 25 20:53:03 2018 > 9.65% done, estimate finish Fri May 25 20:53:10 2018 > 9.66% done, estimate finish Fri May 25 20:53:07 2018 > 9.66% done, estimate finish Fri May 25 20:53:05 2018 > 9.67% done, estimate finish Fri May 25 20:53:02 2018 > 9.67% done, estimate finish Fri May 25 20:53:09 2018 > 9.67% done, estimate finish Fri May 25 20:53:06 2018 > 9.68% done, estimate finish Fri May 25 20:53:03 2018 > 9.68% done, estimate finish Fri May 25 20:53:11 2018 > 9.69% done, estimate finish Fri May 25 20:53:08 2018 > 9.69% done, estimate finish Fri May 25 20:53:05 2018 > 9.69% done, estimate finish Fri May 25 20:53:02 2018 > 9.70% done, estimate finish Fri May 25 20:53:10 2018 > 9.70% done, estimate finish Fri May 25 20:53:07 2018 > 9.71% done, estimate finish Fri May 25 20:53:04 2018 > 9.71% done, estimate finish Fri May 25 20:53:01 2018 > 9.72% done, estimate finish Fri May 25 20:53:09 2018 > 9.72% done, estimate finish Fri May 25 20:53:06 2018 > 9.72% done, estimate finish Fri May 25 20:53:03 2018 > 9.73% done, estimate finish Fri May 25 20:53:00 2018 > 9.73% done, estimate finish Fri May 25 20:53:08 2018 > 9.74% done, estimate finish Fri May 25 20:53:05 2018 > 9.74% done, estimate finish Fri May 25 20:53:02 2018 > 9.74% done, estimate finish Fri May 25 20:53:09 2018 > 9.75% done, estimate finish Fri May 25 20:53:07 2018 > 9.75% done, estimate finish Fri May 25 20:53:04 2018 > 9.76% done, estimate finish Fri May 25 20:53:01 2018 > 9.76% done, estimate finish Fri May 25 20:53:08 2018 > 9.76% done, estimate finish Fri May 25 20:53:06 2018 > 9.77% done, estimate finish Fri May 25 20:53:03 2018 > 9.77% done, estimate finish Fri May 25 20:53:00 2018 > 9.78% done, estimate finish Fri May 25 20:53:07 2018 > 9.78% done, estimate finish Fri May 25 20:53:04 2018 > 9.78% done, estimate finish Fri May 25 20:53:02 2018 > 9.79% done, estimate finish Fri May 25 20:52:59 2018 > 9.79% done, estimate finish Fri May 25 20:53:06 2018 > 9.80% done, estimate finish Fri May 25 20:53:03 2018 > 9.80% done, estimate finish Fri May 25 20:53:00 2018 > 9.81% done, estimate finish Fri May 25 20:53:08 2018 > 9.81% done, estimate finish Fri May 25 20:53:05 2018 > 9.81% done, estimate finish Fri May 25 20:53:02 2018 > 9.82% done, estimate finish Fri May 25 20:52:59 2018 > 9.82% done, estimate finish Fri May 25 20:53:07 2018 > 9.83% done, estimate finish Fri May 25 20:53:04 2018 > 9.83% done, estimate finish Fri May 25 20:53:01 2018 > 9.83% done, estimate finish Fri May 25 20:52:58 2018 > 9.84% done, estimate finish Fri May 25 20:53:06 2018 > 9.84% done, estimate finish Fri May 25 20:53:03 2018 > 9.85% done, estimate finish Fri May 25 20:53:00 2018 > 9.85% done, estimate finish Fri May 25 20:53:07 2018 > 9.85% done, estimate finish Fri May 25 20:53:05 2018 > 9.86% done, estimate finish Fri May 25 20:53:02 2018 > 9.86% done, estimate finish Fri May 25 20:52:59 2018 > 9.87% done, estimate finish Fri May 25 20:53:06 2018 > 9.87% done, estimate finish Fri May 25 20:53:04 2018 > 9.88% done, estimate finish Fri May 25 20:53:01 2018 > 9.88% done, estimate finish Fri May 25 20:52:58 2018 > 9.88% done, estimate finish Fri May 25 20:53:05 2018 > 9.89% done, estimate finish Fri May 25 20:53:02 2018 > 9.89% done, estimate finish Fri May 25 20:53:00 2018 > 9.90% done, estimate finish Fri May 25 20:52:57 2018 > 9.90% done, estimate finish Fri May 25 20:53:04 2018 > 9.90% done, estimate finish Fri May 25 20:53:01 2018 > 9.91% done, estimate finish Fri May 25 20:52:59 2018 > 9.91% done, estimate finish Fri May 25 20:52:56 2018 > 9.92% done, estimate finish Fri May 25 20:53:03 2018 > 9.92% done, estimate finish Fri May 25 20:53:00 2018 > 9.92% done, estimate finish Fri May 25 20:52:58 2018 > 9.93% done, estimate finish Fri May 25 20:53:05 2018 > 9.93% done, estimate finish Fri May 25 20:53:02 2018 > 9.94% done, estimate finish Fri May 25 20:52:59 2018 > 9.94% done, estimate finish Fri May 25 20:52:57 2018 > 9.94% done, estimate finish Fri May 25 20:53:04 2018 > 9.95% done, estimate finish Fri May 25 20:53:01 2018 > 9.95% done, estimate finish Fri May 25 20:52:58 2018 > 9.96% done, estimate finish Fri May 25 20:53:06 2018 > 9.96% done, estimate finish Fri May 25 20:53:03 2018 > 9.97% done, estimate finish Fri May 25 20:53:00 2018 > 9.97% done, estimate finish Fri May 25 20:52:57 2018 > 9.97% done, estimate finish Fri May 25 20:53:04 2018 > 9.98% done, estimate finish Fri May 25 20:53:02 2018 > 9.98% done, estimate finish Fri May 25 20:52:59 2018 > 9.99% done, estimate finish Fri May 25 20:52:56 2018 > 9.99% done, estimate finish Fri May 25 20:53:03 2018 > 9.99% done, estimate finish Fri May 25 20:53:01 2018 > 10.00% done, estimate finish Fri May 25 20:52:58 2018 > 10.00% done, estimate finish Fri May 25 20:52:55 2018 > 10.01% done, estimate finish Fri May 25 20:53:02 2018 > 10.01% done, estimate finish Fri May 25 20:53:00 2018 > 10.01% done, estimate finish Fri May 25 20:52:57 2018 > 10.02% done, estimate finish Fri May 25 20:52:54 2018 > 10.02% done, estimate finish Fri May 25 20:53:01 2018 > 10.03% done, estimate finish Fri May 25 20:52:59 2018 > 10.03% done, estimate finish Fri May 25 20:52:56 2018 > 10.03% done, estimate finish Fri May 25 20:53:03 2018 > 10.04% done, estimate finish Fri May 25 20:53:00 2018 > 10.04% done, estimate finish Fri May 25 20:52:58 2018 > 10.05% done, estimate finish Fri May 25 20:52:55 2018 > 10.05% done, estimate finish Fri May 25 20:53:02 2018 > 10.06% done, estimate finish Fri May 25 20:52:59 2018 > 10.06% done, estimate finish Fri May 25 20:52:57 2018 > 10.06% done, estimate finish Fri May 25 20:53:04 2018 > 10.07% done, estimate finish Fri May 25 20:53:01 2018 > 10.07% done, estimate finish Fri May 25 20:52:58 2018 > 10.08% done, estimate finish Fri May 25 20:52:55 2018 > 10.08% done, estimate finish Fri May 25 20:53:03 2018 > 10.08% done, estimate finish Fri May 25 20:53:00 2018 > 10.09% done, estimate finish Fri May 25 20:52:57 2018 > 10.09% done, estimate finish Fri May 25 20:52:54 2018 > 10.10% done, estimate finish Fri May 25 20:53:02 2018 > 10.10% done, estimate finish Fri May 25 20:52:59 2018 > 10.10% done, estimate finish Fri May 25 20:52:56 2018 > 10.11% done, estimate finish Fri May 25 20:52:53 2018 > 10.11% done, estimate finish Fri May 25 20:53:01 2018 > 10.12% done, estimate finish Fri May 25 20:52:58 2018 > 10.12% done, estimate finish Fri May 25 20:52:55 2018 > 10.12% done, estimate finish Fri May 25 20:52:52 2018 > 10.13% done, estimate finish Fri May 25 20:52:59 2018 > 10.13% done, estimate finish Fri May 25 20:52:57 2018 > 10.14% done, estimate finish Fri May 25 20:52:54 2018 > 10.14% done, estimate finish Fri May 25 20:53:01 2018 > 10.15% done, estimate finish Fri May 25 20:52:58 2018 > 10.15% done, estimate finish Fri May 25 20:52:56 2018 > 10.15% done, estimate finish Fri May 25 20:52:53 2018 > 10.16% done, estimate finish Fri May 25 20:53:00 2018 > 10.16% done, estimate finish Fri May 25 20:52:57 2018 > 10.17% done, estimate finish Fri May 25 20:52:55 2018 > 10.17% done, estimate finish Fri May 25 20:53:02 2018 > 10.17% done, estimate finish Fri May 25 20:52:59 2018 > 10.18% done, estimate finish Fri May 25 20:52:56 2018 > 10.18% done, estimate finish Fri May 25 20:52:54 2018 > 10.19% done, estimate finish Fri May 25 20:53:01 2018 > 10.19% done, estimate finish Fri May 25 20:52:58 2018 > 10.19% done, estimate finish Fri May 25 20:52:55 2018 > 10.20% done, estimate finish Fri May 25 20:52:53 2018 > 10.20% done, estimate finish Fri May 25 20:53:00 2018 > 10.21% done, estimate finish Fri May 25 20:52:57 2018 > 10.21% done, estimate finish Fri May 25 20:52:54 2018 > 10.22% done, estimate finish Fri May 25 20:52:52 2018 > 10.22% done, estimate finish Fri May 25 20:52:59 2018 > 10.22% done, estimate finish Fri May 25 20:52:56 2018 > 10.23% done, estimate finish Fri May 25 20:52:53 2018 > 10.23% done, estimate finish Fri May 25 20:52:51 2018 > 10.24% done, estimate finish Fri May 25 20:52:58 2018 > 10.24% done, estimate finish Fri May 25 20:52:55 2018 > 10.24% done, estimate finish Fri May 25 20:52:52 2018 > 10.25% done, estimate finish Fri May 25 20:52:59 2018 > 10.25% done, estimate finish Fri May 25 20:52:57 2018 > 10.26% done, estimate finish Fri May 25 20:52:54 2018 > 10.26% done, estimate finish Fri May 25 20:52:51 2018 > 10.26% done, estimate finish Fri May 25 20:52:58 2018 > 10.27% done, estimate finish Fri May 25 20:52:56 2018 > 10.27% done, estimate finish Fri May 25 20:52:53 2018 > 10.28% done, estimate finish Fri May 25 20:53:00 2018 > 10.28% done, estimate finish Fri May 25 20:52:57 2018 > 10.28% done, estimate finish Fri May 25 20:52:55 2018 > 10.29% done, estimate finish Fri May 25 20:52:52 2018 > 10.29% done, estimate finish Fri May 25 20:52:59 2018 > 10.30% done, estimate finish Fri May 25 20:52:56 2018 > 10.30% done, estimate finish Fri May 25 20:52:54 2018 > 10.31% done, estimate finish Fri May 25 20:52:51 2018 > 10.31% done, estimate finish Fri May 25 20:52:58 2018 > 10.31% done, estimate finish Fri May 25 20:52:55 2018 > 10.32% done, estimate finish Fri May 25 20:52:53 2018 > 10.32% done, estimate finish Fri May 25 20:52:50 2018 > 10.33% done, estimate finish Fri May 25 20:52:57 2018 > 10.33% done, estimate finish Fri May 25 20:52:54 2018 > 10.33% done, estimate finish Fri May 25 20:52:52 2018 > 10.34% done, estimate finish Fri May 25 20:52:49 2018 > 10.34% done, estimate finish Fri May 25 20:52:56 2018 > 10.35% done, estimate finish Fri May 25 20:52:53 2018 > 10.35% done, estimate finish Fri May 25 20:52:51 2018 > 10.35% done, estimate finish Fri May 25 20:52:58 2018 > 10.36% done, estimate finish Fri May 25 20:52:55 2018 > 10.36% done, estimate finish Fri May 25 20:52:52 2018 > 10.37% done, estimate finish Fri May 25 20:52:50 2018 > 10.37% done, estimate finish Fri May 25 20:52:57 2018 > 10.37% done, estimate finish Fri May 25 20:52:54 2018 > 10.38% done, estimate finish Fri May 25 20:52:51 2018 > 10.38% done, estimate finish Fri May 25 20:52:58 2018 > 10.39% done, estimate finish Fri May 25 20:52:56 2018 > 10.39% done, estimate finish Fri May 25 20:52:53 2018 > 10.40% done, estimate finish Fri May 25 20:52:50 2018 > 10.40% done, estimate finish Fri May 25 20:52:57 2018 > 10.40% done, estimate finish Fri May 25 20:52:55 2018 > 10.41% done, estimate finish Fri May 25 20:52:52 2018 > 10.41% done, estimate finish Fri May 25 20:52:49 2018 > 10.42% done, estimate finish Fri May 25 20:52:56 2018 > 10.42% done, estimate finish Fri May 25 20:52:54 2018 > 10.42% done, estimate finish Fri May 25 20:52:51 2018 > 10.43% done, estimate finish Fri May 25 20:52:48 2018 > 10.43% done, estimate finish Fri May 25 20:52:55 2018 > 10.44% done, estimate finish Fri May 25 20:52:53 2018 > 10.44% done, estimate finish Fri May 25 20:52:50 2018 > 10.44% done, estimate finish Fri May 25 20:52:47 2018 > 10.45% done, estimate finish Fri May 25 20:52:54 2018 > 10.45% done, estimate finish Fri May 25 20:52:52 2018 > 10.46% done, estimate finish Fri May 25 20:52:49 2018 > 10.46% done, estimate finish Fri May 25 20:52:56 2018 > 10.46% done, estimate finish Fri May 25 20:52:53 2018 > 10.47% done, estimate finish Fri May 25 20:52:51 2018 > 10.47% done, estimate finish Fri May 25 20:52:48 2018 > 10.48% done, estimate finish Fri May 25 20:52:55 2018 > 10.48% done, estimate finish Fri May 25 20:52:52 2018 > 10.49% done, estimate finish Fri May 25 20:52:50 2018 > 10.49% done, estimate finish Fri May 25 20:52:57 2018 > 10.49% done, estimate finish Fri May 25 20:52:54 2018 > 10.50% done, estimate finish Fri May 25 20:52:51 2018 > 10.50% done, estimate finish Fri May 25 20:52:49 2018 > 10.51% done, estimate finish Fri May 25 20:52:56 2018 > 10.51% done, estimate finish Fri May 25 20:52:53 2018 > 10.51% done, estimate finish Fri May 25 20:52:50 2018 > 10.52% done, estimate finish Fri May 25 20:52:48 2018 > 10.52% done, estimate finish Fri May 25 20:52:55 2018 > 10.53% done, estimate finish Fri May 25 20:52:52 2018 > 10.53% done, estimate finish Fri May 25 20:52:49 2018 > 10.53% done, estimate finish Fri May 25 20:52:47 2018 > 10.54% done, estimate finish Fri May 25 20:52:54 2018 > 10.54% done, estimate finish Fri May 25 20:52:51 2018 > 10.55% done, estimate finish Fri May 25 20:52:48 2018 > 10.55% done, estimate finish Fri May 25 20:52:46 2018 > 10.55% done, estimate finish Fri May 25 20:52:53 2018 > 10.56% done, estimate finish Fri May 25 20:52:50 2018 > 10.56% done, estimate finish Fri May 25 20:52:47 2018 > 10.57% done, estimate finish Fri May 25 20:52:54 2018 > 10.57% done, estimate finish Fri May 25 20:52:52 2018 > 10.58% done, estimate finish Fri May 25 20:52:49 2018 > 10.58% done, estimate finish Fri May 25 20:52:46 2018 > 10.58% done, estimate finish Fri May 25 20:52:53 2018 > 10.59% done, estimate finish Fri May 25 20:52:51 2018 > 10.59% done, estimate finish Fri May 25 20:52:48 2018 > 10.60% done, estimate finish Fri May 25 20:52:55 2018 > 10.60% done, estimate finish Fri May 25 20:52:52 2018 > 10.60% done, estimate finish Fri May 25 20:52:50 2018 > 10.61% done, estimate finish Fri May 25 20:52:47 2018 > 10.61% done, estimate finish Fri May 25 20:52:54 2018 > 10.62% done, estimate finish Fri May 25 20:52:51 2018 > 10.62% done, estimate finish Fri May 25 20:52:49 2018 > 10.62% done, estimate finish Fri May 25 20:52:46 2018 > 10.63% done, estimate finish Fri May 25 20:52:53 2018 > 10.63% done, estimate finish Fri May 25 20:52:50 2018 > 10.64% done, estimate finish Fri May 25 20:52:48 2018 > 10.64% done, estimate finish Fri May 25 20:52:45 2018 > 10.65% done, estimate finish Fri May 25 20:52:52 2018 > 10.65% done, estimate finish Fri May 25 20:52:49 2018 > 10.65% done, estimate finish Fri May 25 20:52:47 2018 > 10.66% done, estimate finish Fri May 25 20:52:44 2018 > 10.66% done, estimate finish Fri May 25 20:52:51 2018 > 10.67% done, estimate finish Fri May 25 20:52:48 2018 > 10.67% done, estimate finish Fri May 25 20:52:46 2018 > 10.67% done, estimate finish Fri May 25 20:52:53 2018 > 10.68% done, estimate finish Fri May 25 20:52:50 2018 > 10.68% done, estimate finish Fri May 25 20:52:48 2018 > 10.69% done, estimate finish Fri May 25 20:52:45 2018 > 10.69% done, estimate finish Fri May 25 20:52:52 2018 > 10.69% done, estimate finish Fri May 25 20:52:49 2018 > 10.70% done, estimate finish Fri May 25 20:52:47 2018 > 10.70% done, estimate finish Fri May 25 20:52:53 2018 > 10.71% done, estimate finish Fri May 25 20:52:51 2018 > 10.71% done, estimate finish Fri May 25 20:52:48 2018 > 10.71% done, estimate finish Fri May 25 20:52:55 2018 > 10.72% done, estimate finish Fri May 25 20:52:52 2018 > 10.72% done, estimate finish Fri May 25 20:52:50 2018 > 10.73% done, estimate finish Fri May 25 20:52:47 2018 > 10.73% done, estimate finish Fri May 25 20:52:54 2018 > 10.74% done, estimate finish Fri May 25 20:52:51 2018 > 10.74% done, estimate finish Fri May 25 20:52:49 2018 > 10.74% done, estimate finish Fri May 25 20:52:56 2018 > 10.75% done, estimate finish Fri May 25 20:52:53 2018 > 10.75% done, estimate finish Fri May 25 20:52:50 2018 > 10.76% done, estimate finish Fri May 25 20:52:48 2018 > 10.76% done, estimate finish Fri May 25 20:52:55 2018 > 10.76% done, estimate finish Fri May 25 20:52:52 2018 > 10.77% done, estimate finish Fri May 25 20:52:49 2018 > 10.77% done, estimate finish Fri May 25 20:52:47 2018 > 10.78% done, estimate finish Fri May 25 20:52:54 2018 > 10.78% done, estimate finish Fri May 25 20:52:51 2018 > 10.78% done, estimate finish Fri May 25 20:52:48 2018 > 10.79% done, estimate finish Fri May 25 20:52:46 2018 > 10.79% done, estimate finish Fri May 25 20:52:53 2018 > 10.80% done, estimate finish Fri May 25 20:52:50 2018 > 10.80% done, estimate finish Fri May 25 20:52:48 2018 > 10.80% done, estimate finish Fri May 25 20:52:54 2018 > 10.81% done, estimate finish Fri May 25 20:52:52 2018 > 10.81% done, estimate finish Fri May 25 20:52:49 2018 > 10.82% done, estimate finish Fri May 25 20:52:47 2018 > 10.82% done, estimate finish Fri May 25 20:52:53 2018 > 10.83% done, estimate finish Fri May 25 20:52:51 2018 > 10.83% done, estimate finish Fri May 25 20:52:48 2018 > 10.83% done, estimate finish Fri May 25 20:52:46 2018 > 10.84% done, estimate finish Fri May 25 20:52:52 2018 > 10.84% done, estimate finish Fri May 25 20:52:50 2018 > 10.85% done, estimate finish Fri May 25 20:52:47 2018 > 10.85% done, estimate finish Fri May 25 20:52:54 2018 > 10.85% done, estimate finish Fri May 25 20:52:51 2018 > 10.86% done, estimate finish Fri May 25 20:52:49 2018 > 10.86% done, estimate finish Fri May 25 20:52:46 2018 > 10.87% done, estimate finish Fri May 25 20:52:53 2018 > 10.87% done, estimate finish Fri May 25 20:52:50 2018 > 10.87% done, estimate finish Fri May 25 20:52:48 2018 > 10.88% done, estimate finish Fri May 25 20:52:45 2018 > 10.88% done, estimate finish Fri May 25 20:52:52 2018 > 10.89% done, estimate finish Fri May 25 20:52:49 2018 > 10.89% done, estimate finish Fri May 25 20:52:47 2018 > 10.89% done, estimate finish Fri May 25 20:52:44 2018 > 10.90% done, estimate finish Fri May 25 20:52:51 2018 > 10.90% done, estimate finish Fri May 25 20:52:49 2018 > 10.91% done, estimate finish Fri May 25 20:52:46 2018 > 10.91% done, estimate finish Fri May 25 20:52:53 2018 > 10.92% done, estimate finish Fri May 25 20:52:50 2018 > 10.92% done, estimate finish Fri May 25 20:52:48 2018 > 10.92% done, estimate finish Fri May 25 20:52:45 2018 > 10.93% done, estimate finish Fri May 25 20:52:52 2018 > 10.93% done, estimate finish Fri May 25 20:52:49 2018 > 10.94% done, estimate finish Fri May 25 20:52:47 2018 > 10.94% done, estimate finish Fri May 25 20:52:44 2018 > 10.94% done, estimate finish Fri May 25 20:52:51 2018 > 10.95% done, estimate finish Fri May 25 20:52:48 2018 > 10.95% done, estimate finish Fri May 25 20:52:46 2018 > 10.96% done, estimate finish Fri May 25 20:52:52 2018 > 10.96% done, estimate finish Fri May 25 20:52:50 2018 > 10.96% done, estimate finish Fri May 25 20:52:47 2018 > 10.97% done, estimate finish Fri May 25 20:52:45 2018 > 10.97% done, estimate finish Fri May 25 20:52:51 2018 > 10.98% done, estimate finish Fri May 25 20:52:49 2018 > 10.98% done, estimate finish Fri May 25 20:52:46 2018 > 10.98% done, estimate finish Fri May 25 20:52:53 2018 > 10.99% done, estimate finish Fri May 25 20:52:50 2018 > 10.99% done, estimate finish Fri May 25 20:52:48 2018 > 11.00% done, estimate finish Fri May 25 20:52:45 2018 > 11.00% done, estimate finish Fri May 25 20:52:52 2018 > 11.01% done, estimate finish Fri May 25 20:52:50 2018 > 11.01% done, estimate finish Fri May 25 20:52:47 2018 > 11.01% done, estimate finish Fri May 25 20:52:44 2018 > 11.02% done, estimate finish Fri May 25 20:52:51 2018 > 11.02% done, estimate finish Fri May 25 20:52:49 2018 > 11.03% done, estimate finish Fri May 25 20:52:46 2018 > 11.03% done, estimate finish Fri May 25 20:52:44 2018 > 11.03% done, estimate finish Fri May 25 20:52:50 2018 > 11.04% done, estimate finish Fri May 25 20:52:48 2018 > 11.04% done, estimate finish Fri May 25 20:52:45 2018 > 11.05% done, estimate finish Fri May 25 20:52:43 2018 > 11.05% done, estimate finish Fri May 25 20:52:49 2018 > 11.05% done, estimate finish Fri May 25 20:52:47 2018 > 11.06% done, estimate finish Fri May 25 20:52:44 2018 > 11.06% done, estimate finish Fri May 25 20:52:51 2018 > 11.07% done, estimate finish Fri May 25 20:52:48 2018 > 11.07% done, estimate finish Fri May 25 20:52:46 2018 > 11.08% done, estimate finish Fri May 25 20:52:43 2018 > 11.08% done, estimate finish Fri May 25 20:52:50 2018 > 11.08% done, estimate finish Fri May 25 20:52:47 2018 > 11.09% done, estimate finish Fri May 25 20:52:45 2018 > 11.09% done, estimate finish Fri May 25 20:52:51 2018 > 11.10% done, estimate finish Fri May 25 20:52:49 2018 > 11.10% done, estimate finish Fri May 25 20:52:46 2018 > 11.10% done, estimate finish Fri May 25 20:52:44 2018 > 11.11% done, estimate finish Fri May 25 20:52:50 2018 > 11.11% done, estimate finish Fri May 25 20:52:48 2018 > 11.12% done, estimate finish Fri May 25 20:52:46 2018 > 11.12% done, estimate finish Fri May 25 20:52:43 2018 > 11.12% done, estimate finish Fri May 25 20:52:49 2018 > 11.13% done, estimate finish Fri May 25 20:52:47 2018 > 11.13% done, estimate finish Fri May 25 20:52:45 2018 > 11.14% done, estimate finish Fri May 25 20:52:51 2018 > 11.14% done, estimate finish Fri May 25 20:52:49 2018 > 11.14% done, estimate finish Fri May 25 20:52:46 2018 > 11.15% done, estimate finish Fri May 25 20:52:44 2018 > 11.15% done, estimate finish Fri May 25 20:52:50 2018 > 11.16% done, estimate finish Fri May 25 20:52:48 2018 > 11.16% done, estimate finish Fri May 25 20:52:45 2018 > 11.17% done, estimate finish Fri May 25 20:52:43 2018 > 11.17% done, estimate finish Fri May 25 20:52:49 2018 > 11.17% done, estimate finish Fri May 25 20:52:47 2018 > 11.18% done, estimate finish Fri May 25 20:52:44 2018 > 11.18% done, estimate finish Fri May 25 20:52:42 2018 > 11.19% done, estimate finish Fri May 25 20:52:48 2018 > 11.19% done, estimate finish Fri May 25 20:52:46 2018 > 11.19% done, estimate finish Fri May 25 20:52:43 2018 > 11.20% done, estimate finish Fri May 25 20:52:50 2018 > 11.20% done, estimate finish Fri May 25 20:52:47 2018 > 11.21% done, estimate finish Fri May 25 20:52:45 2018 > 11.21% done, estimate finish Fri May 25 20:52:42 2018 > 11.21% done, estimate finish Fri May 25 20:52:49 2018 > 11.22% done, estimate finish Fri May 25 20:52:46 2018 > 11.22% done, estimate finish Fri May 25 20:52:44 2018 > 11.23% done, estimate finish Fri May 25 20:52:42 2018 > 11.23% done, estimate finish Fri May 25 20:52:48 2018 > 11.23% done, estimate finish Fri May 25 20:52:46 2018 > 11.24% done, estimate finish Fri May 25 20:52:43 2018 > 11.24% done, estimate finish Fri May 25 20:52:41 2018 > 11.25% done, estimate finish Fri May 25 20:52:47 2018 > 11.25% done, estimate finish Fri May 25 20:52:45 2018 > 11.26% done, estimate finish Fri May 25 20:52:42 2018 > 11.26% done, estimate finish Fri May 25 20:52:49 2018 > 11.26% done, estimate finish Fri May 25 20:52:46 2018 > 11.27% done, estimate finish Fri May 25 20:52:44 2018 > 11.27% done, estimate finish Fri May 25 20:52:41 2018 > 11.28% done, estimate finish Fri May 25 20:52:48 2018 > 11.28% done, estimate finish Fri May 25 20:52:45 2018 > 11.28% done, estimate finish Fri May 25 20:52:43 2018 > 11.29% done, estimate finish Fri May 25 20:52:40 2018 > 11.29% done, estimate finish Fri May 25 20:52:47 2018 > 11.30% done, estimate finish Fri May 25 20:52:44 2018 > 11.30% done, estimate finish Fri May 25 20:52:42 2018 > 11.30% done, estimate finish Fri May 25 20:52:48 2018 > 11.31% done, estimate finish Fri May 25 20:52:46 2018 > 11.31% done, estimate finish Fri May 25 20:52:43 2018 > 11.32% done, estimate finish Fri May 25 20:52:50 2018 > 11.32% done, estimate finish Fri May 25 20:52:47 2018 > 11.32% done, estimate finish Fri May 25 20:52:45 2018 > 11.33% done, estimate finish Fri May 25 20:52:43 2018 > 11.33% done, estimate finish Fri May 25 20:52:49 2018 > 11.34% done, estimate finish Fri May 25 20:52:46 2018 > 11.34% done, estimate finish Fri May 25 20:52:44 2018 > 11.35% done, estimate finish Fri May 25 20:52:42 2018 > 11.35% done, estimate finish Fri May 25 20:52:48 2018 > 11.35% done, estimate finish Fri May 25 20:52:46 2018 > 11.36% done, estimate finish Fri May 25 20:52:43 2018 > 11.36% done, estimate finish Fri May 25 20:52:41 2018 > 11.37% done, estimate finish Fri May 25 20:52:47 2018 > 11.37% done, estimate finish Fri May 25 20:52:45 2018 > 11.37% done, estimate finish Fri May 25 20:52:42 2018 > 11.38% done, estimate finish Fri May 25 20:52:49 2018 > 11.38% done, estimate finish Fri May 25 20:52:46 2018 > 11.39% done, estimate finish Fri May 25 20:52:44 2018 > 11.39% done, estimate finish Fri May 25 20:52:41 2018 > 11.39% done, estimate finish Fri May 25 20:52:39 2018 > 11.40% done, estimate finish Fri May 25 20:52:45 2018 > 11.40% done, estimate finish Fri May 25 20:52:43 2018 > 11.41% done, estimate finish Fri May 25 20:52:41 2018 > 11.41% done, estimate finish Fri May 25 20:52:47 2018 > 11.42% done, estimate finish Fri May 25 20:52:44 2018 > 11.42% done, estimate finish Fri May 25 20:52:42 2018 > 11.42% done, estimate finish Fri May 25 20:52:40 2018 > 11.43% done, estimate finish Fri May 25 20:52:46 2018 > 11.43% done, estimate finish Fri May 25 20:52:44 2018 > 11.44% done, estimate finish Fri May 25 20:52:41 2018 > 11.44% done, estimate finish Fri May 25 20:52:39 2018 > 11.44% done, estimate finish Fri May 25 20:52:45 2018 > 11.45% done, estimate finish Fri May 25 20:52:43 2018 > 11.45% done, estimate finish Fri May 25 20:52:40 2018 > 11.46% done, estimate finish Fri May 25 20:52:38 2018 > 11.46% done, estimate finish Fri May 25 20:52:44 2018 > 11.46% done, estimate finish Fri May 25 20:52:42 2018 > 11.47% done, estimate finish Fri May 25 20:52:39 2018 > 11.47% done, estimate finish Fri May 25 20:52:46 2018 > 11.48% done, estimate finish Fri May 25 20:52:43 2018 > 11.48% done, estimate finish Fri May 25 20:52:41 2018 > 11.48% done, estimate finish Fri May 25 20:52:38 2018 > 11.49% done, estimate finish Fri May 25 20:52:45 2018 > 11.49% done, estimate finish Fri May 25 20:52:42 2018 > 11.50% done, estimate finish Fri May 25 20:52:40 2018 > 11.50% done, estimate finish Fri May 25 20:52:38 2018 > 11.51% done, estimate finish Fri May 25 20:52:44 2018 > 11.51% done, estimate finish Fri May 25 20:52:42 2018 > 11.51% done, estimate finish Fri May 25 20:52:39 2018 > 11.52% done, estimate finish Fri May 25 20:52:37 2018 > 11.52% done, estimate finish Fri May 25 20:52:43 2018 > 11.53% done, estimate finish Fri May 25 20:52:41 2018 > 11.53% done, estimate finish Fri May 25 20:52:38 2018 > 11.53% done, estimate finish Fri May 25 20:52:36 2018 > 11.54% done, estimate finish Fri May 25 20:52:42 2018 > 11.54% done, estimate finish Fri May 25 20:52:40 2018 > 11.55% done, estimate finish Fri May 25 20:52:37 2018 > 11.55% done, estimate finish Fri May 25 20:52:44 2018 > 11.55% done, estimate finish Fri May 25 20:52:41 2018 > 11.56% done, estimate finish Fri May 25 20:52:39 2018 > 11.56% done, estimate finish Fri May 25 20:52:37 2018 > 11.57% done, estimate finish Fri May 25 20:52:43 2018 > 11.57% done, estimate finish Fri May 25 20:52:40 2018 > 11.57% done, estimate finish Fri May 25 20:52:38 2018 > 11.58% done, estimate finish Fri May 25 20:52:36 2018 > 11.58% done, estimate finish Fri May 25 20:52:42 2018 > 11.59% done, estimate finish Fri May 25 20:52:39 2018 > 11.59% done, estimate finish Fri May 25 20:52:37 2018 > 11.60% done, estimate finish Fri May 25 20:52:35 2018 > 11.60% done, estimate finish Fri May 25 20:52:41 2018 > 11.60% done, estimate finish Fri May 25 20:52:39 2018 > 11.61% done, estimate finish Fri May 25 20:52:36 2018 > 11.61% done, estimate finish Fri May 25 20:52:34 2018 > 11.62% done, estimate finish Fri May 25 20:52:40 2018 > 11.62% done, estimate finish Fri May 25 20:52:38 2018 > 11.62% done, estimate finish Fri May 25 20:52:35 2018 > 11.63% done, estimate finish Fri May 25 20:52:42 2018 > 11.63% done, estimate finish Fri May 25 20:52:39 2018 > 11.64% done, estimate finish Fri May 25 20:52:37 2018 > 11.64% done, estimate finish Fri May 25 20:52:35 2018 > 11.64% done, estimate finish Fri May 25 20:52:41 2018 > 11.65% done, estimate finish Fri May 25 20:52:38 2018 > 11.65% done, estimate finish Fri May 25 20:52:36 2018 > 11.66% done, estimate finish Fri May 25 20:52:34 2018 > 11.66% done, estimate finish Fri May 25 20:52:40 2018 > 11.66% done, estimate finish Fri May 25 20:52:37 2018 > 11.67% done, estimate finish Fri May 25 20:52:35 2018 > 11.67% done, estimate finish Fri May 25 20:52:33 2018 > 11.68% done, estimate finish Fri May 25 20:52:39 2018 > 11.68% done, estimate finish Fri May 25 20:52:37 2018 > 11.69% done, estimate finish Fri May 25 20:52:34 2018 > 11.69% done, estimate finish Fri May 25 20:52:32 2018 > 11.69% done, estimate finish Fri May 25 20:52:38 2018 > 11.70% done, estimate finish Fri May 25 20:52:36 2018 > 11.70% done, estimate finish Fri May 25 20:52:33 2018 > 11.71% done, estimate finish Fri May 25 20:52:40 2018 > 11.71% done, estimate finish Fri May 25 20:52:37 2018 > 11.71% done, estimate finish Fri May 25 20:52:35 2018 > 11.72% done, estimate finish Fri May 25 20:52:33 2018 > 11.72% done, estimate finish Fri May 25 20:52:39 2018 > 11.73% done, estimate finish Fri May 25 20:52:36 2018 > 11.73% done, estimate finish Fri May 25 20:52:34 2018 > 11.73% done, estimate finish Fri May 25 20:52:32 2018 > 11.74% done, estimate finish Fri May 25 20:52:38 2018 > 11.74% done, estimate finish Fri May 25 20:52:36 2018 > 11.75% done, estimate finish Fri May 25 20:52:33 2018 > 11.75% done, estimate finish Fri May 25 20:52:31 2018 > 11.76% done, estimate finish Fri May 25 20:52:37 2018 > 11.76% done, estimate finish Fri May 25 20:52:35 2018 > 11.76% done, estimate finish Fri May 25 20:52:32 2018 > 11.77% done, estimate finish Fri May 25 20:52:39 2018 > 11.77% done, estimate finish Fri May 25 20:52:36 2018 > 11.78% done, estimate finish Fri May 25 20:52:34 2018 > 11.78% done, estimate finish Fri May 25 20:52:31 2018 > 11.78% done, estimate finish Fri May 25 20:52:38 2018 > 11.79% done, estimate finish Fri May 25 20:52:35 2018 > 11.79% done, estimate finish Fri May 25 20:52:33 2018 > 11.80% done, estimate finish Fri May 25 20:52:31 2018 > 11.80% done, estimate finish Fri May 25 20:52:37 2018 > 11.80% done, estimate finish Fri May 25 20:52:34 2018 > 11.81% done, estimate finish Fri May 25 20:52:32 2018 > 11.81% done, estimate finish Fri May 25 20:52:30 2018 > 11.82% done, estimate finish Fri May 25 20:52:36 2018 > 11.82% done, estimate finish Fri May 25 20:52:34 2018 > 11.82% done, estimate finish Fri May 25 20:52:31 2018 > 11.83% done, estimate finish Fri May 25 20:52:29 2018 > 11.83% done, estimate finish Fri May 25 20:52:35 2018 > 11.84% done, estimate finish Fri May 25 20:52:33 2018 > 11.84% done, estimate finish Fri May 25 20:52:30 2018 > 11.85% done, estimate finish Fri May 25 20:52:37 2018 > 11.85% done, estimate finish Fri May 25 20:52:34 2018 > 11.85% done, estimate finish Fri May 25 20:52:32 2018 > 11.86% done, estimate finish Fri May 25 20:52:30 2018 > 11.86% done, estimate finish Fri May 25 20:52:36 2018 > 11.87% done, estimate finish Fri May 25 20:52:33 2018 > 11.87% done, estimate finish Fri May 25 20:52:31 2018 > 11.87% done, estimate finish Fri May 25 20:52:29 2018 > 11.88% done, estimate finish Fri May 25 20:52:35 2018 > 11.88% done, estimate finish Fri May 25 20:52:33 2018 > 11.89% done, estimate finish Fri May 25 20:52:30 2018 > 11.89% done, estimate finish Fri May 25 20:52:28 2018 > 11.89% done, estimate finish Fri May 25 20:52:34 2018 > 11.90% done, estimate finish Fri May 25 20:52:32 2018 > 11.90% done, estimate finish Fri May 25 20:52:29 2018 > 11.91% done, estimate finish Fri May 25 20:52:36 2018 > 11.91% done, estimate finish Fri May 25 20:52:33 2018 > 11.91% done, estimate finish Fri May 25 20:52:31 2018 > 11.92% done, estimate finish Fri May 25 20:52:29 2018 > 11.92% done, estimate finish Fri May 25 20:52:26 2018 > 11.93% done, estimate finish Fri May 25 20:52:32 2018 > 11.93% done, estimate finish Fri May 25 20:52:30 2018 > 11.94% done, estimate finish Fri May 25 20:52:28 2018 > 11.94% done, estimate finish Fri May 25 20:52:34 2018 > 11.94% done, estimate finish Fri May 25 20:52:31 2018 > 11.95% done, estimate finish Fri May 25 20:52:29 2018 > 11.95% done, estimate finish Fri May 25 20:52:27 2018 > 11.96% done, estimate finish Fri May 25 20:52:33 2018 > 11.96% done, estimate finish Fri May 25 20:52:31 2018 > 11.96% done, estimate finish Fri May 25 20:52:28 2018 > 11.97% done, estimate finish Fri May 25 20:52:26 2018 > 11.97% done, estimate finish Fri May 25 20:52:32 2018 > 11.98% done, estimate finish Fri May 25 20:52:30 2018 > 11.98% done, estimate finish Fri May 25 20:52:28 2018 > 11.98% done, estimate finish Fri May 25 20:52:25 2018 > 11.99% done, estimate finish Fri May 25 20:52:31 2018 > 11.99% done, estimate finish Fri May 25 20:52:29 2018 > 12.00% done, estimate finish Fri May 25 20:52:27 2018 > 12.00% done, estimate finish Fri May 25 20:52:24 2018 > 12.00% done, estimate finish Fri May 25 20:52:30 2018 > 12.01% done, estimate finish Fri May 25 20:52:28 2018 > 12.01% done, estimate finish Fri May 25 20:52:26 2018 > 12.02% done, estimate finish Fri May 25 20:52:32 2018 > 12.02% done, estimate finish Fri May 25 20:52:30 2018 > 12.03% done, estimate finish Fri May 25 20:52:27 2018 > 12.03% done, estimate finish Fri May 25 20:52:25 2018 > 12.03% done, estimate finish Fri May 25 20:52:31 2018 > 12.04% done, estimate finish Fri May 25 20:52:29 2018 > 12.04% done, estimate finish Fri May 25 20:52:26 2018 > 12.05% done, estimate finish Fri May 25 20:52:33 2018 > 12.05% done, estimate finish Fri May 25 20:52:30 2018 > 12.05% done, estimate finish Fri May 25 20:52:28 2018 > 12.06% done, estimate finish Fri May 25 20:52:26 2018 > 12.06% done, estimate finish Fri May 25 20:52:23 2018 > 12.07% done, estimate finish Fri May 25 20:52:29 2018 > 12.07% done, estimate finish Fri May 25 20:52:27 2018 > 12.07% done, estimate finish Fri May 25 20:52:25 2018 > 12.08% done, estimate finish Fri May 25 20:52:31 2018 > 12.08% done, estimate finish Fri May 25 20:52:29 2018 > 12.09% done, estimate finish Fri May 25 20:52:26 2018 > 12.09% done, estimate finish Fri May 25 20:52:24 2018 > 12.09% done, estimate finish Fri May 25 20:52:30 2018 > 12.10% done, estimate finish Fri May 25 20:52:28 2018 > 12.10% done, estimate finish Fri May 25 20:52:26 2018 > 12.11% done, estimate finish Fri May 25 20:52:23 2018 > 12.11% done, estimate finish Fri May 25 20:52:29 2018 > 12.12% done, estimate finish Fri May 25 20:52:27 2018 > 12.12% done, estimate finish Fri May 25 20:52:25 2018 > 12.12% done, estimate finish Fri May 25 20:52:22 2018 > 12.13% done, estimate finish Fri May 25 20:52:28 2018 > 12.13% done, estimate finish Fri May 25 20:52:26 2018 > 12.14% done, estimate finish Fri May 25 20:52:24 2018 > 12.14% done, estimate finish Fri May 25 20:52:22 2018 > 12.14% done, estimate finish Fri May 25 20:52:28 2018 > 12.15% done, estimate finish Fri May 25 20:52:25 2018 > 12.15% done, estimate finish Fri May 25 20:52:23 2018 > 12.16% done, estimate finish Fri May 25 20:52:29 2018 > 12.16% done, estimate finish Fri May 25 20:52:27 2018 > 12.16% done, estimate finish Fri May 25 20:52:24 2018 > 12.17% done, estimate finish Fri May 25 20:52:22 2018 > 12.17% done, estimate finish Fri May 25 20:52:28 2018 > 12.18% done, estimate finish Fri May 25 20:52:26 2018 > 12.18% done, estimate finish Fri May 25 20:52:24 2018 > 12.19% done, estimate finish Fri May 25 20:52:21 2018 > 12.19% done, estimate finish Fri May 25 20:52:27 2018 > 12.19% done, estimate finish Fri May 25 20:52:25 2018 > 12.20% done, estimate finish Fri May 25 20:52:23 2018 > 12.20% done, estimate finish Fri May 25 20:52:21 2018 > 12.21% done, estimate finish Fri May 25 20:52:27 2018 > 12.21% done, estimate finish Fri May 25 20:52:24 2018 > 12.21% done, estimate finish Fri May 25 20:52:22 2018 > 12.22% done, estimate finish Fri May 25 20:52:28 2018 > 12.22% done, estimate finish Fri May 25 20:52:26 2018 > 12.23% done, estimate finish Fri May 25 20:52:23 2018 > 12.23% done, estimate finish Fri May 25 20:52:21 2018 > 12.23% done, estimate finish Fri May 25 20:52:27 2018 > 12.24% done, estimate finish Fri May 25 20:52:25 2018 > 12.24% done, estimate finish Fri May 25 20:52:23 2018 > 12.25% done, estimate finish Fri May 25 20:52:20 2018 > 12.25% done, estimate finish Fri May 25 20:52:26 2018 > 12.25% done, estimate finish Fri May 25 20:52:24 2018 > 12.26% done, estimate finish Fri May 25 20:52:22 2018 > 12.26% done, estimate finish Fri May 25 20:52:20 2018 > 12.27% done, estimate finish Fri May 25 20:52:26 2018 > 12.27% done, estimate finish Fri May 25 20:52:23 2018 > 12.28% done, estimate finish Fri May 25 20:52:21 2018 > 12.28% done, estimate finish Fri May 25 20:52:27 2018 > 12.28% done, estimate finish Fri May 25 20:52:25 2018 > 12.29% done, estimate finish Fri May 25 20:52:22 2018 > 12.29% done, estimate finish Fri May 25 20:52:20 2018 > 12.30% done, estimate finish Fri May 25 20:52:26 2018 > 12.30% done, estimate finish Fri May 25 20:52:24 2018 > 12.30% done, estimate finish Fri May 25 20:52:22 2018 > 12.31% done, estimate finish Fri May 25 20:52:19 2018 > 12.31% done, estimate finish Fri May 25 20:52:25 2018 > 12.32% done, estimate finish Fri May 25 20:52:23 2018 > 12.32% done, estimate finish Fri May 25 20:52:21 2018 > 12.32% done, estimate finish Fri May 25 20:52:19 2018 > 12.33% done, estimate finish Fri May 25 20:52:25 2018 > 12.33% done, estimate finish Fri May 25 20:52:22 2018 > 12.34% done, estimate finish Fri May 25 20:52:20 2018 > 12.34% done, estimate finish Fri May 25 20:52:26 2018 > 12.34% done, estimate finish Fri May 25 20:52:24 2018 > 12.35% done, estimate finish Fri May 25 20:52:22 2018 > 12.35% done, estimate finish Fri May 25 20:52:19 2018 > 12.36% done, estimate finish Fri May 25 20:52:25 2018 > 12.36% done, estimate finish Fri May 25 20:52:23 2018 > 12.37% done, estimate finish Fri May 25 20:52:21 2018 > 12.37% done, estimate finish Fri May 25 20:52:18 2018 > 12.37% done, estimate finish Fri May 25 20:52:24 2018 > 12.38% done, estimate finish Fri May 25 20:52:22 2018 > 12.38% done, estimate finish Fri May 25 20:52:20 2018 > 12.39% done, estimate finish Fri May 25 20:52:18 2018 > 12.39% done, estimate finish Fri May 25 20:52:24 2018 > 12.39% done, estimate finish Fri May 25 20:52:21 2018 > 12.40% done, estimate finish Fri May 25 20:52:19 2018 > 12.40% done, estimate finish Fri May 25 20:52:25 2018 > 12.41% done, estimate finish Fri May 25 20:52:23 2018 > 12.41% done, estimate finish Fri May 25 20:52:21 2018 > 12.41% done, estimate finish Fri May 25 20:52:18 2018 > 12.42% done, estimate finish Fri May 25 20:52:24 2018 > 12.42% done, estimate finish Fri May 25 20:52:22 2018 > 12.43% done, estimate finish Fri May 25 20:52:20 2018 > 12.43% done, estimate finish Fri May 25 20:52:18 2018 > 12.43% done, estimate finish Fri May 25 20:52:23 2018 > 12.44% done, estimate finish Fri May 25 20:52:21 2018 > 12.44% done, estimate finish Fri May 25 20:52:19 2018 > 12.45% done, estimate finish Fri May 25 20:52:17 2018 > 12.45% done, estimate finish Fri May 25 20:52:23 2018 > 12.46% done, estimate finish Fri May 25 20:52:20 2018 > 12.46% done, estimate finish Fri May 25 20:52:18 2018 > 12.46% done, estimate finish Fri May 25 20:52:16 2018 > 12.47% done, estimate finish Fri May 25 20:52:22 2018 > 12.47% done, estimate finish Fri May 25 20:52:20 2018 > 12.48% done, estimate finish Fri May 25 20:52:17 2018 > 12.48% done, estimate finish Fri May 25 20:52:23 2018 > 12.48% done, estimate finish Fri May 25 20:52:21 2018 > 12.49% done, estimate finish Fri May 25 20:52:19 2018 > 12.49% done, estimate finish Fri May 25 20:52:17 2018 > 12.50% done, estimate finish Fri May 25 20:52:22 2018 > 12.50% done, estimate finish Fri May 25 20:52:20 2018 > 12.50% done, estimate finish Fri May 25 20:52:18 2018 > 12.51% done, estimate finish Fri May 25 20:52:24 2018 > 12.51% done, estimate finish Fri May 25 20:52:22 2018 > 12.52% done, estimate finish Fri May 25 20:52:19 2018 > 12.52% done, estimate finish Fri May 25 20:52:17 2018 > 12.53% done, estimate finish Fri May 25 20:52:23 2018 > 12.53% done, estimate finish Fri May 25 20:52:21 2018 > 12.53% done, estimate finish Fri May 25 20:52:19 2018 > 12.54% done, estimate finish Fri May 25 20:52:16 2018 > 12.54% done, estimate finish Fri May 25 20:52:22 2018 > 12.55% done, estimate finish Fri May 25 20:52:20 2018 > 12.55% done, estimate finish Fri May 25 20:52:18 2018 > 12.55% done, estimate finish Fri May 25 20:52:24 2018 > 12.56% done, estimate finish Fri May 25 20:52:22 2018 > 12.56% done, estimate finish Fri May 25 20:52:19 2018 > 12.57% done, estimate finish Fri May 25 20:52:17 2018 > 12.57% done, estimate finish Fri May 25 20:52:15 2018 > 12.57% done, estimate finish Fri May 25 20:52:21 2018 > 12.58% done, estimate finish Fri May 25 20:52:19 2018 > 12.58% done, estimate finish Fri May 25 20:52:16 2018 > 12.59% done, estimate finish Fri May 25 20:52:22 2018 > 12.59% done, estimate finish Fri May 25 20:52:20 2018 > 12.59% done, estimate finish Fri May 25 20:52:18 2018 > 12.60% done, estimate finish Fri May 25 20:52:16 2018 > 12.60% done, estimate finish Fri May 25 20:52:21 2018 > 12.61% done, estimate finish Fri May 25 20:52:19 2018 > 12.61% done, estimate finish Fri May 25 20:52:17 2018 > 12.62% done, estimate finish Fri May 25 20:52:15 2018 > 12.62% done, estimate finish Fri May 25 20:52:21 2018 > 12.62% done, estimate finish Fri May 25 20:52:18 2018 > 12.63% done, estimate finish Fri May 25 20:52:16 2018 > 12.63% done, estimate finish Fri May 25 20:52:14 2018 > 12.64% done, estimate finish Fri May 25 20:52:20 2018 > 12.64% done, estimate finish Fri May 25 20:52:18 2018 > 12.64% done, estimate finish Fri May 25 20:52:15 2018 > 12.65% done, estimate finish Fri May 25 20:52:21 2018 > 12.65% done, estimate finish Fri May 25 20:52:19 2018 > 12.66% done, estimate finish Fri May 25 20:52:17 2018 > 12.66% done, estimate finish Fri May 25 20:52:15 2018 > 12.66% done, estimate finish Fri May 25 20:52:20 2018 > 12.67% done, estimate finish Fri May 25 20:52:18 2018 > 12.67% done, estimate finish Fri May 25 20:52:16 2018 > 12.68% done, estimate finish Fri May 25 20:52:14 2018 > 12.68% done, estimate finish Fri May 25 20:52:20 2018 > 12.68% done, estimate finish Fri May 25 20:52:17 2018 > 12.69% done, estimate finish Fri May 25 20:52:15 2018 > 12.69% done, estimate finish Fri May 25 20:52:13 2018 > 12.70% done, estimate finish Fri May 25 20:52:19 2018 > 12.70% done, estimate finish Fri May 25 20:52:17 2018 > 12.71% done, estimate finish Fri May 25 20:52:15 2018 > 12.71% done, estimate finish Fri May 25 20:52:20 2018 > 12.71% done, estimate finish Fri May 25 20:52:18 2018 > 12.72% done, estimate finish Fri May 25 20:52:16 2018 > 12.72% done, estimate finish Fri May 25 20:52:14 2018 > 12.73% done, estimate finish Fri May 25 20:52:19 2018 > 12.73% done, estimate finish Fri May 25 20:52:17 2018 > 12.73% done, estimate finish Fri May 25 20:52:15 2018 > 12.74% done, estimate finish Fri May 25 20:52:13 2018 > 12.74% done, estimate finish Fri May 25 20:52:19 2018 > 12.75% done, estimate finish Fri May 25 20:52:17 2018 > 12.75% done, estimate finish Fri May 25 20:52:14 2018 > 12.75% done, estimate finish Fri May 25 20:52:12 2018 > 12.76% done, estimate finish Fri May 25 20:52:18 2018 > 12.76% done, estimate finish Fri May 25 20:52:16 2018 > 12.77% done, estimate finish Fri May 25 20:52:14 2018 > 12.77% done, estimate finish Fri May 25 20:52:19 2018 > 12.77% done, estimate finish Fri May 25 20:52:17 2018 > 12.78% done, estimate finish Fri May 25 20:52:15 2018 > 12.78% done, estimate finish Fri May 25 20:52:13 2018 > 12.79% done, estimate finish Fri May 25 20:52:19 2018 > 12.79% done, estimate finish Fri May 25 20:52:16 2018 > 12.80% done, estimate finish Fri May 25 20:52:14 2018 > 12.80% done, estimate finish Fri May 25 20:52:12 2018 > 12.80% done, estimate finish Fri May 25 20:52:18 2018 > 12.81% done, estimate finish Fri May 25 20:52:16 2018 > 12.81% done, estimate finish Fri May 25 20:52:13 2018 > 12.82% done, estimate finish Fri May 25 20:52:11 2018 > 12.82% done, estimate finish Fri May 25 20:52:17 2018 > 12.82% done, estimate finish Fri May 25 20:52:15 2018 > 12.83% done, estimate finish Fri May 25 20:52:13 2018 > 12.83% done, estimate finish Fri May 25 20:52:11 2018 > 12.84% done, estimate finish Fri May 25 20:52:16 2018 > 12.84% done, estimate finish Fri May 25 20:52:14 2018 > 12.84% done, estimate finish Fri May 25 20:52:12 2018 > 12.85% done, estimate finish Fri May 25 20:52:18 2018 > 12.85% done, estimate finish Fri May 25 20:52:15 2018 > 12.86% done, estimate finish Fri May 25 20:52:13 2018 > 12.86% done, estimate finish Fri May 25 20:52:11 2018 > 12.87% done, estimate finish Fri May 25 20:52:17 2018 > 12.87% done, estimate finish Fri May 25 20:52:15 2018 > 12.87% done, estimate finish Fri May 25 20:52:13 2018 > 12.88% done, estimate finish Fri May 25 20:52:18 2018 > 12.88% done, estimate finish Fri May 25 20:52:16 2018 > 12.89% done, estimate finish Fri May 25 20:52:14 2018 > 12.89% done, estimate finish Fri May 25 20:52:12 2018 > 12.89% done, estimate finish Fri May 25 20:52:17 2018 > 12.90% done, estimate finish Fri May 25 20:52:23 2018 > 12.90% done, estimate finish Fri May 25 20:52:21 2018 > 12.91% done, estimate finish Fri May 25 20:52:19 2018 > 12.91% done, estimate finish Fri May 25 20:52:17 2018 > 12.91% done, estimate finish Fri May 25 20:52:15 2018 > 12.92% done, estimate finish Fri May 25 20:52:12 2018 > 12.92% done, estimate finish Fri May 25 20:52:18 2018 > 12.93% done, estimate finish Fri May 25 20:52:16 2018 > 12.93% done, estimate finish Fri May 25 20:52:14 2018 > 12.93% done, estimate finish Fri May 25 20:52:12 2018 > 12.94% done, estimate finish Fri May 25 20:52:17 2018 > 12.94% done, estimate finish Fri May 25 20:52:15 2018 > 12.95% done, estimate finish Fri May 25 20:52:13 2018 > 12.95% done, estimate finish Fri May 25 20:52:11 2018 > 12.96% done, estimate finish Fri May 25 20:52:17 2018 > 12.96% done, estimate finish Fri May 25 20:52:14 2018 > 12.96% done, estimate finish Fri May 25 20:52:12 2018 > 12.97% done, estimate finish Fri May 25 20:52:18 2018 > 12.97% done, estimate finish Fri May 25 20:52:16 2018 > 12.98% done, estimate finish Fri May 25 20:52:14 2018 > 12.98% done, estimate finish Fri May 25 20:52:12 2018 > 12.98% done, estimate finish Fri May 25 20:52:17 2018 > 12.99% done, estimate finish Fri May 25 20:52:15 2018 > 12.99% done, estimate finish Fri May 25 20:52:13 2018 > 13.00% done, estimate finish Fri May 25 20:52:11 2018 > 13.00% done, estimate finish Fri May 25 20:52:16 2018 > 13.00% done, estimate finish Fri May 25 20:52:14 2018 > 13.01% done, estimate finish Fri May 25 20:52:12 2018 > 13.01% done, estimate finish Fri May 25 20:52:10 2018 > 13.02% done, estimate finish Fri May 25 20:52:16 2018 > 13.02% done, estimate finish Fri May 25 20:52:14 2018 > 13.02% done, estimate finish Fri May 25 20:52:11 2018 > 13.03% done, estimate finish Fri May 25 20:52:17 2018 > 13.03% done, estimate finish Fri May 25 20:52:15 2018 > 13.04% done, estimate finish Fri May 25 20:52:13 2018 > 13.04% done, estimate finish Fri May 25 20:52:11 2018 > 13.05% done, estimate finish Fri May 25 20:52:16 2018 > 13.05% done, estimate finish Fri May 25 20:52:14 2018 > 13.05% done, estimate finish Fri May 25 20:52:12 2018 > 13.06% done, estimate finish Fri May 25 20:52:10 2018 > 13.06% done, estimate finish Fri May 25 20:52:16 2018 > 13.07% done, estimate finish Fri May 25 20:52:13 2018 > 13.07% done, estimate finish Fri May 25 20:52:11 2018 > 13.07% done, estimate finish Fri May 25 20:52:09 2018 > 13.08% done, estimate finish Fri May 25 20:52:15 2018 > 13.08% done, estimate finish Fri May 25 20:52:13 2018 > 13.09% done, estimate finish Fri May 25 20:52:11 2018 > 13.09% done, estimate finish Fri May 25 20:52:16 2018 > 13.09% done, estimate finish Fri May 25 20:52:14 2018 > 13.10% done, estimate finish Fri May 25 20:52:12 2018 > 13.10% done, estimate finish Fri May 25 20:52:10 2018 > 13.11% done, estimate finish Fri May 25 20:52:15 2018 > 13.11% done, estimate finish Fri May 25 20:52:13 2018 > 13.11% done, estimate finish Fri May 25 20:52:11 2018 > 13.12% done, estimate finish Fri May 25 20:52:09 2018 > 13.12% done, estimate finish Fri May 25 20:52:15 2018 > 13.13% done, estimate finish Fri May 25 20:52:13 2018 > 13.13% done, estimate finish Fri May 25 20:52:10 2018 > 13.14% done, estimate finish Fri May 25 20:52:08 2018 > 13.14% done, estimate finish Fri May 25 20:52:14 2018 > 13.14% done, estimate finish Fri May 25 20:52:12 2018 > 13.15% done, estimate finish Fri May 25 20:52:10 2018 > 13.15% done, estimate finish Fri May 25 20:52:15 2018 > 13.16% done, estimate finish Fri May 25 20:52:13 2018 > 13.16% done, estimate finish Fri May 25 20:52:11 2018 > 13.16% done, estimate finish Fri May 25 20:52:09 2018 > 13.17% done, estimate finish Fri May 25 20:52:15 2018 > 13.17% done, estimate finish Fri May 25 20:52:12 2018 > 13.18% done, estimate finish Fri May 25 20:52:10 2018 > 13.18% done, estimate finish Fri May 25 20:52:08 2018 > 13.18% done, estimate finish Fri May 25 20:52:14 2018 > 13.19% done, estimate finish Fri May 25 20:52:12 2018 > 13.19% done, estimate finish Fri May 25 20:52:10 2018 > 13.20% done, estimate finish Fri May 25 20:52:08 2018 > 13.20% done, estimate finish Fri May 25 20:52:13 2018 > 13.20% done, estimate finish Fri May 25 20:52:11 2018 > 13.21% done, estimate finish Fri May 25 20:52:09 2018 > 13.21% done, estimate finish Fri May 25 20:52:14 2018 > 13.22% done, estimate finish Fri May 25 20:52:12 2018 > 13.22% done, estimate finish Fri May 25 20:52:10 2018 > 13.23% done, estimate finish Fri May 25 20:52:08 2018 > 13.23% done, estimate finish Fri May 25 20:52:14 2018 > 13.23% done, estimate finish Fri May 25 20:52:12 2018 > 13.24% done, estimate finish Fri May 25 20:52:09 2018 > 13.24% done, estimate finish Fri May 25 20:52:07 2018 > 13.25% done, estimate finish Fri May 25 20:52:13 2018 > 13.25% done, estimate finish Fri May 25 20:52:11 2018 > 13.25% done, estimate finish Fri May 25 20:52:09 2018 > 13.26% done, estimate finish Fri May 25 20:52:07 2018 > 13.26% done, estimate finish Fri May 25 20:52:12 2018 > 13.27% done, estimate finish Fri May 25 20:52:10 2018 > 13.27% done, estimate finish Fri May 25 20:52:08 2018 > 13.27% done, estimate finish Fri May 25 20:52:14 2018 > 13.28% done, estimate finish Fri May 25 20:52:11 2018 > 13.28% done, estimate finish Fri May 25 20:52:09 2018 > 13.29% done, estimate finish Fri May 25 20:52:07 2018 > 13.29% done, estimate finish Fri May 25 20:52:13 2018 > 13.30% done, estimate finish Fri May 25 20:52:11 2018 > 13.30% done, estimate finish Fri May 25 20:52:09 2018 > 13.30% done, estimate finish Fri May 25 20:52:07 2018 > 13.31% done, estimate finish Fri May 25 20:52:12 2018 > 13.31% done, estimate finish Fri May 25 20:52:10 2018 > 13.32% done, estimate finish Fri May 25 20:52:08 2018 > 13.32% done, estimate finish Fri May 25 20:52:06 2018 > 13.32% done, estimate finish Fri May 25 20:52:11 2018 > 13.33% done, estimate finish Fri May 25 20:52:09 2018 > 13.33% done, estimate finish Fri May 25 20:52:07 2018 > 13.34% done, estimate finish Fri May 25 20:52:13 2018 > 13.34% done, estimate finish Fri May 25 20:52:11 2018 > 13.34% done, estimate finish Fri May 25 20:52:09 2018 > 13.35% done, estimate finish Fri May 25 20:52:06 2018 > 13.35% done, estimate finish Fri May 25 20:52:12 2018 > 13.36% done, estimate finish Fri May 25 20:52:10 2018 > 13.36% done, estimate finish Fri May 25 20:52:08 2018 > 13.36% done, estimate finish Fri May 25 20:52:13 2018 > 13.37% done, estimate finish Fri May 25 20:52:11 2018 > 13.37% done, estimate finish Fri May 25 20:52:09 2018 > 13.38% done, estimate finish Fri May 25 20:52:07 2018 > 13.38% done, estimate finish Fri May 25 20:52:05 2018 > 13.39% done, estimate finish Fri May 25 20:52:10 2018 > 13.39% done, estimate finish Fri May 25 20:52:08 2018 > 13.39% done, estimate finish Fri May 25 20:52:06 2018 > 13.40% done, estimate finish Fri May 25 20:52:12 2018 > 13.40% done, estimate finish Fri May 25 20:52:10 2018 > 13.41% done, estimate finish Fri May 25 20:52:08 2018 > 13.41% done, estimate finish Fri May 25 20:52:06 2018 > 13.41% done, estimate finish Fri May 25 20:52:11 2018 > 13.42% done, estimate finish Fri May 25 20:52:09 2018 > 13.42% done, estimate finish Fri May 25 20:52:07 2018 > 13.43% done, estimate finish Fri May 25 20:52:12 2018 > 13.43% done, estimate finish Fri May 25 20:52:10 2018 > 13.43% done, estimate finish Fri May 25 20:52:08 2018 > 13.44% done, estimate finish Fri May 25 20:52:06 2018 > 13.44% done, estimate finish Fri May 25 20:52:04 2018 > 13.45% done, estimate finish Fri May 25 20:52:10 2018 > 13.45% done, estimate finish Fri May 25 20:52:08 2018 > 13.45% done, estimate finish Fri May 25 20:52:06 2018 > 13.46% done, estimate finish Fri May 25 20:52:11 2018 > 13.46% done, estimate finish Fri May 25 20:52:09 2018 > 13.47% done, estimate finish Fri May 25 20:52:07 2018 > 13.47% done, estimate finish Fri May 25 20:52:05 2018 > 13.48% done, estimate finish Fri May 25 20:52:10 2018 > 13.48% done, estimate finish Fri May 25 20:52:08 2018 > 13.48% done, estimate finish Fri May 25 20:52:06 2018 > 13.49% done, estimate finish Fri May 25 20:52:12 2018 > 13.49% done, estimate finish Fri May 25 20:52:10 2018 > 13.50% done, estimate finish Fri May 25 20:52:07 2018 > 13.50% done, estimate finish Fri May 25 20:52:05 2018 > 13.50% done, estimate finish Fri May 25 20:52:03 2018 > 13.51% done, estimate finish Fri May 25 20:52:09 2018 > 13.51% done, estimate finish Fri May 25 20:52:07 2018 > 13.52% done, estimate finish Fri May 25 20:52:05 2018 > 13.52% done, estimate finish Fri May 25 20:52:10 2018 > 13.52% done, estimate finish Fri May 25 20:52:08 2018 > 13.53% done, estimate finish Fri May 25 20:52:06 2018 > 13.53% done, estimate finish Fri May 25 20:52:04 2018 > 13.54% done, estimate finish Fri May 25 20:52:09 2018 > 13.54% done, estimate finish Fri May 25 20:52:07 2018 > 13.54% done, estimate finish Fri May 25 20:52:05 2018 > 13.55% done, estimate finish Fri May 25 20:52:11 2018 > 13.55% done, estimate finish Fri May 25 20:52:09 2018 > 13.56% done, estimate finish Fri May 25 20:52:07 2018 > 13.56% done, estimate finish Fri May 25 20:52:05 2018 > 13.57% done, estimate finish Fri May 25 20:52:03 2018 > 13.57% done, estimate finish Fri May 25 20:52:08 2018 > 13.57% done, estimate finish Fri May 25 20:52:06 2018 > 13.58% done, estimate finish Fri May 25 20:52:04 2018 > 13.58% done, estimate finish Fri May 25 20:52:09 2018 > 13.59% done, estimate finish Fri May 25 20:52:07 2018 > 13.59% done, estimate finish Fri May 25 20:52:05 2018 > 13.59% done, estimate finish Fri May 25 20:52:03 2018 > 13.60% done, estimate finish Fri May 25 20:52:09 2018 > 13.60% done, estimate finish Fri May 25 20:52:07 2018 > 13.61% done, estimate finish Fri May 25 20:52:05 2018 > 13.61% done, estimate finish Fri May 25 20:52:10 2018 > 13.61% done, estimate finish Fri May 25 20:52:08 2018 > 13.62% done, estimate finish Fri May 25 20:52:06 2018 > 13.62% done, estimate finish Fri May 25 20:52:04 2018 > 13.63% done, estimate finish Fri May 25 20:52:09 2018 > 13.63% done, estimate finish Fri May 25 20:52:07 2018 > 13.63% done, estimate finish Fri May 25 20:52:05 2018 > 13.64% done, estimate finish Fri May 25 20:52:03 2018 > 13.64% done, estimate finish Fri May 25 20:52:08 2018 > 13.65% done, estimate finish Fri May 25 20:52:06 2018 > 13.65% done, estimate finish Fri May 25 20:52:04 2018 > 13.66% done, estimate finish Fri May 25 20:52:02 2018 > 13.66% done, estimate finish Fri May 25 20:52:08 2018 > 13.66% done, estimate finish Fri May 25 20:52:06 2018 > 13.67% done, estimate finish Fri May 25 20:52:04 2018 > 13.67% done, estimate finish Fri May 25 20:52:09 2018 > 13.68% done, estimate finish Fri May 25 20:52:07 2018 > 13.68% done, estimate finish Fri May 25 20:52:05 2018 > 13.68% done, estimate finish Fri May 25 20:52:03 2018 > 13.69% done, estimate finish Fri May 25 20:52:08 2018 > 13.69% done, estimate finish Fri May 25 20:52:06 2018 > 13.70% done, estimate finish Fri May 25 20:52:04 2018 > 13.70% done, estimate finish Fri May 25 20:52:02 2018 > 13.70% done, estimate finish Fri May 25 20:52:08 2018 > 13.71% done, estimate finish Fri May 25 20:52:06 2018 > 13.71% done, estimate finish Fri May 25 20:52:04 2018 > 13.72% done, estimate finish Fri May 25 20:52:02 2018 > 13.72% done, estimate finish Fri May 25 20:52:07 2018 > 13.73% done, estimate finish Fri May 25 20:52:05 2018 > 13.73% done, estimate finish Fri May 25 20:52:03 2018 > 13.73% done, estimate finish Fri May 25 20:52:08 2018 > 13.74% done, estimate finish Fri May 25 20:52:06 2018 > 13.74% done, estimate finish Fri May 25 20:52:04 2018 > 13.75% done, estimate finish Fri May 25 20:52:02 2018 > 13.75% done, estimate finish Fri May 25 20:52:08 2018 > 13.75% done, estimate finish Fri May 25 20:52:06 2018 > 13.76% done, estimate finish Fri May 25 20:52:04 2018 > 13.76% done, estimate finish Fri May 25 20:52:02 2018 > 13.77% done, estimate finish Fri May 25 20:52:07 2018 > 13.77% done, estimate finish Fri May 25 20:52:05 2018 > 13.77% done, estimate finish Fri May 25 20:52:03 2018 > 13.78% done, estimate finish Fri May 25 20:52:01 2018 > 13.78% done, estimate finish Fri May 25 20:52:06 2018 > 13.79% done, estimate finish Fri May 25 20:52:04 2018 > 13.79% done, estimate finish Fri May 25 20:52:02 2018 > 13.79% done, estimate finish Fri May 25 20:52:07 2018 > 13.80% done, estimate finish Fri May 25 20:52:05 2018 > 13.80% done, estimate finish Fri May 25 20:52:03 2018 > 13.81% done, estimate finish Fri May 25 20:52:01 2018 > 13.81% done, estimate finish Fri May 25 20:52:07 2018 > 13.82% done, estimate finish Fri May 25 20:52:05 2018 > 13.82% done, estimate finish Fri May 25 20:52:03 2018 > 13.82% done, estimate finish Fri May 25 20:52:01 2018 > 13.83% done, estimate finish Fri May 25 20:52:06 2018 > 13.83% done, estimate finish Fri May 25 20:52:04 2018 > 13.84% done, estimate finish Fri May 25 20:52:02 2018 > 13.84% done, estimate finish Fri May 25 20:52:07 2018 > 13.84% done, estimate finish Fri May 25 20:52:05 2018 > 13.85% done, estimate finish Fri May 25 20:52:03 2018 > 13.85% done, estimate finish Fri May 25 20:52:01 2018 > 13.86% done, estimate finish Fri May 25 20:52:07 2018 > 13.86% done, estimate finish Fri May 25 20:52:05 2018 > 13.86% done, estimate finish Fri May 25 20:52:03 2018 > 13.87% done, estimate finish Fri May 25 20:52:01 2018 > 13.87% done, estimate finish Fri May 25 20:52:06 2018 > 13.88% done, estimate finish Fri May 25 20:52:04 2018 > 13.88% done, estimate finish Fri May 25 20:52:02 2018 > 13.88% done, estimate finish Fri May 25 20:52:00 2018 > 13.89% done, estimate finish Fri May 25 20:52:05 2018 > 13.89% done, estimate finish Fri May 25 20:52:03 2018 > 13.90% done, estimate finish Fri May 25 20:52:01 2018 > 13.90% done, estimate finish Fri May 25 20:52:07 2018 > 13.91% done, estimate finish Fri May 25 20:52:05 2018 > 13.91% done, estimate finish Fri May 25 20:52:03 2018 > 13.91% done, estimate finish Fri May 25 20:52:01 2018 > 13.92% done, estimate finish Fri May 25 20:52:06 2018 > 13.92% done, estimate finish Fri May 25 20:52:04 2018 > 13.93% done, estimate finish Fri May 25 20:52:02 2018 > 13.93% done, estimate finish Fri May 25 20:52:00 2018 > 13.93% done, estimate finish Fri May 25 20:52:05 2018 > 13.94% done, estimate finish Fri May 25 20:52:03 2018 > 13.94% done, estimate finish Fri May 25 20:52:01 2018 > 13.95% done, estimate finish Fri May 25 20:51:59 2018 > 13.95% done, estimate finish Fri May 25 20:52:04 2018 > 13.95% done, estimate finish Fri May 25 20:52:03 2018 > 13.96% done, estimate finish Fri May 25 20:52:01 2018 > 13.96% done, estimate finish Fri May 25 20:52:06 2018 > 13.97% done, estimate finish Fri May 25 20:52:04 2018 > 13.97% done, estimate finish Fri May 25 20:52:02 2018 > 13.97% done, estimate finish Fri May 25 20:52:00 2018 > 13.98% done, estimate finish Fri May 25 20:52:05 2018 > 13.98% done, estimate finish Fri May 25 20:52:03 2018 > 13.99% done, estimate finish Fri May 25 20:52:01 2018 > 13.99% done, estimate finish Fri May 25 20:51:59 2018 > 14.00% done, estimate finish Fri May 25 20:52:04 2018 > 14.00% done, estimate finish Fri May 25 20:52:02 2018 > 14.00% done, estimate finish Fri May 25 20:52:00 2018 > 14.01% done, estimate finish Fri May 25 20:51:59 2018 > 14.01% done, estimate finish Fri May 25 20:52:04 2018 > 14.02% done, estimate finish Fri May 25 20:52:02 2018 > 14.02% done, estimate finish Fri May 25 20:52:00 2018 > 14.02% done, estimate finish Fri May 25 20:52:05 2018 > 14.03% done, estimate finish Fri May 25 20:52:03 2018 > 14.03% done, estimate finish Fri May 25 20:52:01 2018 > 14.04% done, estimate finish Fri May 25 20:51:59 2018 > 14.04% done, estimate finish Fri May 25 20:52:04 2018 > 14.04% done, estimate finish Fri May 25 20:52:02 2018 > 14.05% done, estimate finish Fri May 25 20:52:00 2018 > 14.05% done, estimate finish Fri May 25 20:51:58 2018 > 14.06% done, estimate finish Fri May 25 20:52:04 2018 > 14.06% done, estimate finish Fri May 25 20:52:02 2018 > 14.07% done, estimate finish Fri May 25 20:52:00 2018 > 14.07% done, estimate finish Fri May 25 20:52:05 2018 > 14.07% done, estimate finish Fri May 25 20:52:03 2018 > 14.08% done, estimate finish Fri May 25 20:52:01 2018 > 14.08% done, estimate finish Fri May 25 20:51:59 2018 > 14.09% done, estimate finish Fri May 25 20:52:04 2018 > 14.09% done, estimate finish Fri May 25 20:52:02 2018 > 14.09% done, estimate finish Fri May 25 20:52:00 2018 > 14.10% done, estimate finish Fri May 25 20:51:58 2018 > 14.10% done, estimate finish Fri May 25 20:52:04 2018 > 14.11% done, estimate finish Fri May 25 20:52:02 2018 > 14.11% done, estimate finish Fri May 25 20:52:00 2018 > 14.11% done, estimate finish Fri May 25 20:51:58 2018 > 14.12% done, estimate finish Fri May 25 20:52:03 2018 > 14.12% done, estimate finish Fri May 25 20:52:01 2018 > 14.13% done, estimate finish Fri May 25 20:51:59 2018 > 14.13% done, estimate finish Fri May 25 20:52:04 2018 > 14.13% done, estimate finish Fri May 25 20:52:02 2018 > 14.14% done, estimate finish Fri May 25 20:52:00 2018 > 14.14% done, estimate finish Fri May 25 20:51:58 2018 > 14.15% done, estimate finish Fri May 25 20:52:03 2018 > 14.15% done, estimate finish Fri May 25 20:52:02 2018 > 14.16% done, estimate finish Fri May 25 20:52:00 2018 > 14.16% done, estimate finish Fri May 25 20:51:58 2018 > 14.16% done, estimate finish Fri May 25 20:52:03 2018 > 14.17% done, estimate finish Fri May 25 20:52:01 2018 > 14.17% done, estimate finish Fri May 25 20:51:59 2018 > 14.18% done, estimate finish Fri May 25 20:51:57 2018 > 14.18% done, estimate finish Fri May 25 20:52:02 2018 > 14.18% done, estimate finish Fri May 25 20:52:00 2018 > 14.19% done, estimate finish Fri May 25 20:51:58 2018 > 14.19% done, estimate finish Fri May 25 20:52:03 2018 > 14.20% done, estimate finish Fri May 25 20:52:01 2018 > 14.20% done, estimate finish Fri May 25 20:51:59 2018 > 14.20% done, estimate finish Fri May 25 20:51:58 2018 > 14.21% done, estimate finish Fri May 25 20:52:03 2018 > 14.21% done, estimate finish Fri May 25 20:52:01 2018 > 14.22% done, estimate finish Fri May 25 20:51:59 2018 > 14.22% done, estimate finish Fri May 25 20:52:04 2018 > 14.22% done, estimate finish Fri May 25 20:52:02 2018 > 14.23% done, estimate finish Fri May 25 20:52:00 2018 > 14.23% done, estimate finish Fri May 25 20:51:58 2018 > 14.24% done, estimate finish Fri May 25 20:52:03 2018 > 14.24% done, estimate finish Fri May 25 20:52:01 2018 > 14.25% done, estimate finish Fri May 25 20:51:59 2018 > 14.25% done, estimate finish Fri May 25 20:51:57 2018 > 14.25% done, estimate finish Fri May 25 20:52:03 2018 > 14.26% done, estimate finish Fri May 25 20:52:01 2018 > 14.26% done, estimate finish Fri May 25 20:51:59 2018 > 14.27% done, estimate finish Fri May 25 20:51:57 2018 > 14.27% done, estimate finish Fri May 25 20:52:02 2018 > 14.27% done, estimate finish Fri May 25 20:52:00 2018 > 14.28% done, estimate finish Fri May 25 20:51:58 2018 > 14.28% done, estimate finish Fri May 25 20:52:03 2018 > 14.29% done, estimate finish Fri May 25 20:52:01 2018 > 14.29% done, estimate finish Fri May 25 20:51:59 2018 > 14.29% done, estimate finish Fri May 25 20:51:57 2018 > 14.30% done, estimate finish Fri May 25 20:52:03 2018 > 14.30% done, estimate finish Fri May 25 20:52:01 2018 > 14.31% done, estimate finish Fri May 25 20:51:59 2018 > 14.31% done, estimate finish Fri May 25 20:51:57 2018 > 14.31% done, estimate finish Fri May 25 20:52:02 2018 > 14.32% done, estimate finish Fri May 25 20:52:00 2018 > 14.32% done, estimate finish Fri May 25 20:51:58 2018 > 14.33% done, estimate finish Fri May 25 20:52:03 2018 > 14.33% done, estimate finish Fri May 25 20:52:01 2018 > 14.34% done, estimate finish Fri May 25 20:51:59 2018 > 14.34% done, estimate finish Fri May 25 20:51:57 2018 > 14.34% done, estimate finish Fri May 25 20:52:02 2018 > 14.35% done, estimate finish Fri May 25 20:52:01 2018 > 14.35% done, estimate finish Fri May 25 20:51:59 2018 > 14.36% done, estimate finish Fri May 25 20:51:57 2018 > 14.36% done, estimate finish Fri May 25 20:52:02 2018 > 14.36% done, estimate finish Fri May 25 20:52:00 2018 > 14.37% done, estimate finish Fri May 25 20:51:58 2018 > 14.37% done, estimate finish Fri May 25 20:51:56 2018 > 14.38% done, estimate finish Fri May 25 20:52:01 2018 > 14.38% done, estimate finish Fri May 25 20:51:59 2018 > 14.38% done, estimate finish Fri May 25 20:51:57 2018 > 14.39% done, estimate finish Fri May 25 20:52:02 2018 > 14.39% done, estimate finish Fri May 25 20:52:00 2018 > 14.40% done, estimate finish Fri May 25 20:51:59 2018 > 14.40% done, estimate finish Fri May 25 20:51:57 2018 > 14.40% done, estimate finish Fri May 25 20:52:02 2018 > 14.41% done, estimate finish Fri May 25 20:52:00 2018 > 14.41% done, estimate finish Fri May 25 20:51:58 2018 > 14.42% done, estimate finish Fri May 25 20:51:56 2018 > 14.42% done, estimate finish Fri May 25 20:52:01 2018 > 14.43% done, estimate finish Fri May 25 20:51:59 2018 > 14.43% done, estimate finish Fri May 25 20:51:57 2018 > 14.43% done, estimate finish Fri May 25 20:51:55 2018 > 14.44% done, estimate finish Fri May 25 20:52:00 2018 > 14.44% done, estimate finish Fri May 25 20:51:58 2018 > 14.45% done, estimate finish Fri May 25 20:51:57 2018 > 14.45% done, estimate finish Fri May 25 20:52:02 2018 > 14.45% done, estimate finish Fri May 25 20:52:00 2018 > 14.46% done, estimate finish Fri May 25 20:51:58 2018 > 14.46% done, estimate finish Fri May 25 20:51:56 2018 > 14.47% done, estimate finish Fri May 25 20:52:01 2018 > 14.47% done, estimate finish Fri May 25 20:51:59 2018 > 14.47% done, estimate finish Fri May 25 20:51:57 2018 > 14.48% done, estimate finish Fri May 25 20:51:55 2018 > 14.48% done, estimate finish Fri May 25 20:52:00 2018 > 14.49% done, estimate finish Fri May 25 20:51:58 2018 > 14.49% done, estimate finish Fri May 25 20:51:56 2018 > 14.50% done, estimate finish Fri May 25 20:52:02 2018 > 14.50% done, estimate finish Fri May 25 20:52:00 2018 > 14.50% done, estimate finish Fri May 25 20:51:58 2018 > 14.51% done, estimate finish Fri May 25 20:51:56 2018 > 14.51% done, estimate finish Fri May 25 20:51:54 2018 > 14.52% done, estimate finish Fri May 25 20:51:59 2018 > 14.52% done, estimate finish Fri May 25 20:51:57 2018 > 14.52% done, estimate finish Fri May 25 20:51:55 2018 > 14.53% done, estimate finish Fri May 25 20:52:00 2018 > 14.53% done, estimate finish Fri May 25 20:51:58 2018 > 14.54% done, estimate finish Fri May 25 20:51:56 2018 > 14.54% done, estimate finish Fri May 25 20:51:55 2018 > 14.54% done, estimate finish Fri May 25 20:52:00 2018 > 14.55% done, estimate finish Fri May 25 20:51:58 2018 > 14.55% done, estimate finish Fri May 25 20:51:56 2018 > 14.56% done, estimate finish Fri May 25 20:51:54 2018 > 14.56% done, estimate finish Fri May 25 20:51:59 2018 > 14.56% done, estimate finish Fri May 25 20:51:57 2018 > 14.57% done, estimate finish Fri May 25 20:51:55 2018 > 14.57% done, estimate finish Fri May 25 20:51:53 2018 > 14.58% done, estimate finish Fri May 25 20:51:58 2018 > 14.58% done, estimate finish Fri May 25 20:51:56 2018 > 14.59% done, estimate finish Fri May 25 20:51:55 2018 > 14.59% done, estimate finish Fri May 25 20:51:59 2018 > 14.59% done, estimate finish Fri May 25 20:51:58 2018 > 14.60% done, estimate finish Fri May 25 20:51:56 2018 > 14.60% done, estimate finish Fri May 25 20:51:54 2018 > 14.61% done, estimate finish Fri May 25 20:51:52 2018 > 14.61% done, estimate finish Fri May 25 20:51:57 2018 > 14.61% done, estimate finish Fri May 25 20:51:55 2018 > 14.62% done, estimate finish Fri May 25 20:51:53 2018 > 14.62% done, estimate finish Fri May 25 20:51:58 2018 > 14.63% done, estimate finish Fri May 25 20:51:56 2018 > 14.63% done, estimate finish Fri May 25 20:51:54 2018 > 14.63% done, estimate finish Fri May 25 20:51:53 2018 > 14.64% done, estimate finish Fri May 25 20:51:58 2018 > 14.64% done, estimate finish Fri May 25 20:51:56 2018 > 14.65% done, estimate finish Fri May 25 20:51:54 2018 > 14.65% done, estimate finish Fri May 25 20:51:52 2018 > 14.65% done, estimate finish Fri May 25 20:51:57 2018 > 14.66% done, estimate finish Fri May 25 20:51:55 2018 > 14.66% done, estimate finish Fri May 25 20:51:53 2018 > 14.67% done, estimate finish Fri May 25 20:51:51 2018 > 14.67% done, estimate finish Fri May 25 20:51:56 2018 > 14.68% done, estimate finish Fri May 25 20:51:54 2018 > 14.68% done, estimate finish Fri May 25 20:51:53 2018 > 14.68% done, estimate finish Fri May 25 20:51:51 2018 > 14.69% done, estimate finish Fri May 25 20:51:56 2018 > 14.69% done, estimate finish Fri May 25 20:51:54 2018 > 14.70% done, estimate finish Fri May 25 20:51:52 2018 > 14.70% done, estimate finish Fri May 25 20:51:57 2018 > 14.70% done, estimate finish Fri May 25 20:51:55 2018 > 14.71% done, estimate finish Fri May 25 20:51:53 2018 > 14.71% done, estimate finish Fri May 25 20:51:51 2018 > 14.72% done, estimate finish Fri May 25 20:51:56 2018 > 14.72% done, estimate finish Fri May 25 20:51:54 2018 > 14.72% done, estimate finish Fri May 25 20:51:52 2018 > 14.73% done, estimate finish Fri May 25 20:51:57 2018 > 14.73% done, estimate finish Fri May 25 20:51:56 2018 > 14.74% done, estimate finish Fri May 25 20:51:54 2018 > 14.74% done, estimate finish Fri May 25 20:51:59 2018 > 14.74% done, estimate finish Fri May 25 20:51:57 2018 > 14.75% done, estimate finish Fri May 25 20:51:55 2018 > 14.75% done, estimate finish Fri May 25 20:51:53 2018 > 14.76% done, estimate finish Fri May 25 20:51:58 2018 > 14.76% done, estimate finish Fri May 25 20:51:56 2018 > 14.77% done, estimate finish Fri May 25 20:51:54 2018 > 14.77% done, estimate finish Fri May 25 20:51:52 2018 > 14.77% done, estimate finish Fri May 25 20:51:57 2018 > 14.78% done, estimate finish Fri May 25 20:51:55 2018 > 14.78% done, estimate finish Fri May 25 20:51:54 2018 > 14.79% done, estimate finish Fri May 25 20:51:52 2018 > 14.79% done, estimate finish Fri May 25 20:51:57 2018 > 14.79% done, estimate finish Fri May 25 20:51:55 2018 > 14.80% done, estimate finish Fri May 25 20:51:53 2018 > 14.80% done, estimate finish Fri May 25 20:51:51 2018 > 14.81% done, estimate finish Fri May 25 20:51:56 2018 > 14.81% done, estimate finish Fri May 25 20:51:54 2018 > 14.81% done, estimate finish Fri May 25 20:51:52 2018 > 14.82% done, estimate finish Fri May 25 20:51:50 2018 > 14.82% done, estimate finish Fri May 25 20:51:55 2018 > 14.83% done, estimate finish Fri May 25 20:51:54 2018 > 14.83% done, estimate finish Fri May 25 20:51:52 2018 > 14.84% done, estimate finish Fri May 25 20:51:57 2018 > 14.84% done, estimate finish Fri May 25 20:51:55 2018 > 14.84% done, estimate finish Fri May 25 20:51:53 2018 > 14.85% done, estimate finish Fri May 25 20:51:51 2018 > 14.85% done, estimate finish Fri May 25 20:51:56 2018 > 14.86% done, estimate finish Fri May 25 20:51:54 2018 > 14.86% done, estimate finish Fri May 25 20:51:52 2018 > 14.86% done, estimate finish Fri May 25 20:51:50 2018 > 14.87% done, estimate finish Fri May 25 20:51:55 2018 > 14.87% done, estimate finish Fri May 25 20:51:54 2018 > 14.88% done, estimate finish Fri May 25 20:51:52 2018 > 14.88% done, estimate finish Fri May 25 20:51:50 2018 > 14.88% done, estimate finish Fri May 25 20:51:55 2018 > 14.89% done, estimate finish Fri May 25 20:51:53 2018 > 14.89% done, estimate finish Fri May 25 20:51:51 2018 > 14.90% done, estimate finish Fri May 25 20:51:49 2018 > 14.90% done, estimate finish Fri May 25 20:51:54 2018 > 14.90% done, estimate finish Fri May 25 20:51:52 2018 > 14.91% done, estimate finish Fri May 25 20:51:50 2018 > 14.91% done, estimate finish Fri May 25 20:51:49 2018 > 14.92% done, estimate finish Fri May 25 20:51:53 2018 > 14.92% done, estimate finish Fri May 25 20:51:52 2018 > 14.93% done, estimate finish Fri May 25 20:51:50 2018 > 14.93% done, estimate finish Fri May 25 20:51:55 2018 > 14.93% done, estimate finish Fri May 25 20:51:53 2018 > 14.94% done, estimate finish Fri May 25 20:51:51 2018 > 14.94% done, estimate finish Fri May 25 20:51:49 2018 > 14.95% done, estimate finish Fri May 25 20:51:54 2018 > 14.95% done, estimate finish Fri May 25 20:51:52 2018 > 14.95% done, estimate finish Fri May 25 20:51:50 2018 > 14.96% done, estimate finish Fri May 25 20:51:55 2018 > 14.96% done, estimate finish Fri May 25 20:51:53 2018 > 14.97% done, estimate finish Fri May 25 20:51:52 2018 > 14.97% done, estimate finish Fri May 25 20:51:56 2018 > 14.97% done, estimate finish Fri May 25 20:51:55 2018 > 14.98% done, estimate finish Fri May 25 20:51:53 2018 > 14.98% done, estimate finish Fri May 25 20:51:51 2018 > 14.99% done, estimate finish Fri May 25 20:51:56 2018 > 14.99% done, estimate finish Fri May 25 20:51:54 2018 > 14.99% done, estimate finish Fri May 25 20:51:52 2018 > 15.00% done, estimate finish Fri May 25 20:51:50 2018 > 15.00% done, estimate finish Fri May 25 20:51:55 2018 > 15.01% done, estimate finish Fri May 25 20:51:53 2018 > 15.01% done, estimate finish Fri May 25 20:51:52 2018 > 15.02% done, estimate finish Fri May 25 20:51:50 2018 > 15.02% done, estimate finish Fri May 25 20:51:55 2018 > 15.02% done, estimate finish Fri May 25 20:51:53 2018 > 15.03% done, estimate finish Fri May 25 20:51:51 2018 > 15.03% done, estimate finish Fri May 25 20:51:49 2018 > 15.04% done, estimate finish Fri May 25 20:51:54 2018 > 15.04% done, estimate finish Fri May 25 20:51:52 2018 > 15.04% done, estimate finish Fri May 25 20:51:50 2018 > 15.05% done, estimate finish Fri May 25 20:51:48 2018 > 15.05% done, estimate finish Fri May 25 20:51:53 2018 > 15.06% done, estimate finish Fri May 25 20:51:51 2018 > 15.06% done, estimate finish Fri May 25 20:51:50 2018 > 15.06% done, estimate finish Fri May 25 20:51:48 2018 > 15.07% done, estimate finish Fri May 25 20:51:53 2018 > 15.07% done, estimate finish Fri May 25 20:51:51 2018 > 15.08% done, estimate finish Fri May 25 20:51:49 2018 > 15.08% done, estimate finish Fri May 25 20:51:54 2018 > 15.08% done, estimate finish Fri May 25 20:51:52 2018 > 15.09% done, estimate finish Fri May 25 20:51:50 2018 > 15.09% done, estimate finish Fri May 25 20:51:48 2018 > 15.10% done, estimate finish Fri May 25 20:51:53 2018 > 15.10% done, estimate finish Fri May 25 20:51:51 2018 > 15.11% done, estimate finish Fri May 25 20:51:50 2018 > 15.11% done, estimate finish Fri May 25 20:51:48 2018 > 15.11% done, estimate finish Fri May 25 20:51:53 2018 > 15.12% done, estimate finish Fri May 25 20:51:51 2018 > 15.12% done, estimate finish Fri May 25 20:51:49 2018 > 15.13% done, estimate finish Fri May 25 20:51:47 2018 > 15.13% done, estimate finish Fri May 25 20:51:52 2018 > 15.13% done, estimate finish Fri May 25 20:51:50 2018 > 15.14% done, estimate finish Fri May 25 20:51:48 2018 > 15.14% done, estimate finish Fri May 25 20:51:47 2018 > 15.15% done, estimate finish Fri May 25 20:51:51 2018 > 15.15% done, estimate finish Fri May 25 20:51:50 2018 > 15.15% done, estimate finish Fri May 25 20:51:54 2018 > 15.16% done, estimate finish Fri May 25 20:51:53 2018 > 15.16% done, estimate finish Fri May 25 20:51:57 2018 > 15.17% done, estimate finish Fri May 25 20:51:56 2018 > 15.17% done, estimate finish Fri May 25 20:51:54 2018 > 15.17% done, estimate finish Fri May 25 20:51:52 2018 > 15.18% done, estimate finish Fri May 25 20:51:50 2018 > 15.18% done, estimate finish Fri May 25 20:51:48 2018 > 15.19% done, estimate finish Fri May 25 20:51:53 2018 > 15.19% done, estimate finish Fri May 25 20:51:51 2018 > 15.20% done, estimate finish Fri May 25 20:51:50 2018 > 15.20% done, estimate finish Fri May 25 20:51:48 2018 > 15.20% done, estimate finish Fri May 25 20:51:53 2018 > 15.21% done, estimate finish Fri May 25 20:51:51 2018 > 15.21% done, estimate finish Fri May 25 20:51:49 2018 > 15.22% done, estimate finish Fri May 25 20:51:47 2018 > 15.22% done, estimate finish Fri May 25 20:51:52 2018 > 15.22% done, estimate finish Fri May 25 20:51:50 2018 > 15.23% done, estimate finish Fri May 25 20:51:48 2018 > 15.23% done, estimate finish Fri May 25 20:51:47 2018 > 15.24% done, estimate finish Fri May 25 20:51:51 2018 > 15.24% done, estimate finish Fri May 25 20:51:50 2018 > 15.24% done, estimate finish Fri May 25 20:51:48 2018 > 15.25% done, estimate finish Fri May 25 20:51:52 2018 > 15.25% done, estimate finish Fri May 25 20:51:51 2018 > 15.26% done, estimate finish Fri May 25 20:51:49 2018 > 15.26% done, estimate finish Fri May 25 20:51:47 2018 > 15.27% done, estimate finish Fri May 25 20:51:52 2018 > 15.27% done, estimate finish Fri May 25 20:51:50 2018 > 15.27% done, estimate finish Fri May 25 20:51:48 2018 > 15.28% done, estimate finish Fri May 25 20:51:46 2018 > 15.28% done, estimate finish Fri May 25 20:51:51 2018 > 15.29% done, estimate finish Fri May 25 20:51:49 2018 > 15.29% done, estimate finish Fri May 25 20:51:48 2018 > 15.29% done, estimate finish Fri May 25 20:51:46 2018 > 15.30% done, estimate finish Fri May 25 20:51:51 2018 > 15.30% done, estimate finish Fri May 25 20:51:49 2018 > 15.31% done, estimate finish Fri May 25 20:51:47 2018 > 15.31% done, estimate finish Fri May 25 20:51:45 2018 > 15.31% done, estimate finish Fri May 25 20:51:50 2018 > 15.32% done, estimate finish Fri May 25 20:51:48 2018 > 15.32% done, estimate finish Fri May 25 20:51:46 2018 > 15.33% done, estimate finish Fri May 25 20:51:45 2018 > 15.33% done, estimate finish Fri May 25 20:51:49 2018 > 15.33% done, estimate finish Fri May 25 20:51:48 2018 > 15.34% done, estimate finish Fri May 25 20:51:46 2018 > 15.34% done, estimate finish Fri May 25 20:51:44 2018 > 15.35% done, estimate finish Fri May 25 20:51:49 2018 > 15.35% done, estimate finish Fri May 25 20:51:47 2018 > 15.36% done, estimate finish Fri May 25 20:51:45 2018 > 15.36% done, estimate finish Fri May 25 20:51:50 2018 > 15.36% done, estimate finish Fri May 25 20:51:48 2018 > 15.37% done, estimate finish Fri May 25 20:51:46 2018 > 15.37% done, estimate finish Fri May 25 20:51:45 2018 > 15.38% done, estimate finish Fri May 25 20:51:49 2018 > 15.38% done, estimate finish Fri May 25 20:51:48 2018 > 15.38% done, estimate finish Fri May 25 20:51:46 2018 > 15.39% done, estimate finish Fri May 25 20:51:44 2018 > 15.39% done, estimate finish Fri May 25 20:51:49 2018 > 15.40% done, estimate finish Fri May 25 20:51:47 2018 > 15.40% done, estimate finish Fri May 25 20:51:45 2018 > 15.40% done, estimate finish Fri May 25 20:51:43 2018 > 15.41% done, estimate finish Fri May 25 20:51:48 2018 > 15.41% done, estimate finish Fri May 25 20:51:46 2018 > 15.42% done, estimate finish Fri May 25 20:51:45 2018 > 15.42% done, estimate finish Fri May 25 20:51:49 2018 > 15.42% done, estimate finish Fri May 25 20:51:48 2018 > 15.43% done, estimate finish Fri May 25 20:51:46 2018 > 15.43% done, estimate finish Fri May 25 20:51:44 2018 > 15.44% done, estimate finish Fri May 25 20:51:42 2018 > 15.44% done, estimate finish Fri May 25 20:51:47 2018 > 15.45% done, estimate finish Fri May 25 20:51:45 2018 > 15.45% done, estimate finish Fri May 25 20:51:43 2018 > 15.45% done, estimate finish Fri May 25 20:51:48 2018 > 15.46% done, estimate finish Fri May 25 20:51:46 2018 > 15.46% done, estimate finish Fri May 25 20:51:45 2018 > 15.47% done, estimate finish Fri May 25 20:51:49 2018 > 15.47% done, estimate finish Fri May 25 20:51:47 2018 > 15.47% done, estimate finish Fri May 25 20:51:46 2018 > 15.48% done, estimate finish Fri May 25 20:51:44 2018 > 15.48% done, estimate finish Fri May 25 20:51:49 2018 > 15.49% done, estimate finish Fri May 25 20:51:47 2018 > 15.49% done, estimate finish Fri May 25 20:51:45 2018 > 15.49% done, estimate finish Fri May 25 20:51:43 2018 > 15.50% done, estimate finish Fri May 25 20:51:48 2018 > 15.50% done, estimate finish Fri May 25 20:51:46 2018 > 15.51% done, estimate finish Fri May 25 20:51:45 2018 > 15.51% done, estimate finish Fri May 25 20:51:43 2018 > 15.51% done, estimate finish Fri May 25 20:51:47 2018 > 15.52% done, estimate finish Fri May 25 20:51:46 2018 > 15.52% done, estimate finish Fri May 25 20:51:44 2018 > 15.53% done, estimate finish Fri May 25 20:51:42 2018 > 15.53% done, estimate finish Fri May 25 20:51:47 2018 > 15.54% done, estimate finish Fri May 25 20:51:45 2018 > 15.54% done, estimate finish Fri May 25 20:51:43 2018 > 15.54% done, estimate finish Fri May 25 20:51:42 2018 > 15.55% done, estimate finish Fri May 25 20:51:46 2018 > 15.55% done, estimate finish Fri May 25 20:51:45 2018 > 15.56% done, estimate finish Fri May 25 20:51:43 2018 > 15.56% done, estimate finish Fri May 25 20:51:41 2018 > 15.56% done, estimate finish Fri May 25 20:51:46 2018 > 15.57% done, estimate finish Fri May 25 20:51:44 2018 > 15.57% done, estimate finish Fri May 25 20:51:42 2018 > 15.58% done, estimate finish Fri May 25 20:51:47 2018 > 15.58% done, estimate finish Fri May 25 20:51:45 2018 > 15.58% done, estimate finish Fri May 25 20:51:43 2018 > 15.59% done, estimate finish Fri May 25 20:51:42 2018 > 15.59% done, estimate finish Fri May 25 20:51:46 2018 > 15.60% done, estimate finish Fri May 25 20:51:45 2018 > 15.60% done, estimate finish Fri May 25 20:51:43 2018 > 15.61% done, estimate finish Fri May 25 20:51:41 2018 > 15.61% done, estimate finish Fri May 25 20:51:46 2018 > 15.61% done, estimate finish Fri May 25 20:51:44 2018 > 15.62% done, estimate finish Fri May 25 20:51:42 2018 > 15.62% done, estimate finish Fri May 25 20:51:40 2018 > 15.63% done, estimate finish Fri May 25 20:51:45 2018 > 15.63% done, estimate finish Fri May 25 20:51:43 2018 > 15.63% done, estimate finish Fri May 25 20:51:42 2018 > 15.64% done, estimate finish Fri May 25 20:51:40 2018 > 15.64% done, estimate finish Fri May 25 20:51:44 2018 > 15.65% done, estimate finish Fri May 25 20:51:43 2018 > 15.65% done, estimate finish Fri May 25 20:51:41 2018 > 15.65% done, estimate finish Fri May 25 20:51:39 2018 > 15.66% done, estimate finish Fri May 25 20:51:44 2018 > 15.66% done, estimate finish Fri May 25 20:51:42 2018 > 15.67% done, estimate finish Fri May 25 20:51:40 2018 > 15.67% done, estimate finish Fri May 25 20:51:45 2018 > 15.67% done, estimate finish Fri May 25 20:51:43 2018 > 15.68% done, estimate finish Fri May 25 20:51:42 2018 > 15.68% done, estimate finish Fri May 25 20:51:40 2018 > 15.69% done, estimate finish Fri May 25 20:51:44 2018 > 15.69% done, estimate finish Fri May 25 20:51:43 2018 > 15.70% done, estimate finish Fri May 25 20:51:41 2018 > 15.70% done, estimate finish Fri May 25 20:51:39 2018 > 15.70% done, estimate finish Fri May 25 20:51:44 2018 > 15.71% done, estimate finish Fri May 25 20:51:42 2018 > 15.71% done, estimate finish Fri May 25 20:51:40 2018 > 15.72% done, estimate finish Fri May 25 20:51:39 2018 > 15.72% done, estimate finish Fri May 25 20:51:43 2018 > 15.72% done, estimate finish Fri May 25 20:51:42 2018 > 15.73% done, estimate finish Fri May 25 20:51:40 2018 > 15.73% done, estimate finish Fri May 25 20:51:38 2018 > 15.74% done, estimate finish Fri May 25 20:51:43 2018 > 15.74% done, estimate finish Fri May 25 20:51:41 2018 > 15.74% done, estimate finish Fri May 25 20:51:39 2018 > 15.75% done, estimate finish Fri May 25 20:51:44 2018 > 15.75% done, estimate finish Fri May 25 20:51:42 2018 > 15.76% done, estimate finish Fri May 25 20:51:40 2018 > 15.76% done, estimate finish Fri May 25 20:51:39 2018 > 15.76% done, estimate finish Fri May 25 20:51:37 2018 > 15.77% done, estimate finish Fri May 25 20:51:42 2018 > 15.77% done, estimate finish Fri May 25 20:51:40 2018 > 15.78% done, estimate finish Fri May 25 20:51:38 2018 > 15.78% done, estimate finish Fri May 25 20:51:43 2018 > 15.79% done, estimate finish Fri May 25 20:51:41 2018 > 15.79% done, estimate finish Fri May 25 20:51:39 2018 > 15.79% done, estimate finish Fri May 25 20:51:37 2018 > 15.80% done, estimate finish Fri May 25 20:51:42 2018 > 15.80% done, estimate finish Fri May 25 20:51:40 2018 > 15.81% done, estimate finish Fri May 25 20:51:39 2018 > 15.81% done, estimate finish Fri May 25 20:51:37 2018 > 15.81% done, estimate finish Fri May 25 20:51:41 2018 > 15.82% done, estimate finish Fri May 25 20:51:40 2018 > 15.82% done, estimate finish Fri May 25 20:51:38 2018 > 15.83% done, estimate finish Fri May 25 20:51:36 2018 > 15.83% done, estimate finish Fri May 25 20:51:41 2018 > 15.83% done, estimate finish Fri May 25 20:51:39 2018 > 15.84% done, estimate finish Fri May 25 20:51:37 2018 > 15.84% done, estimate finish Fri May 25 20:51:36 2018 > 15.85% done, estimate finish Fri May 25 20:51:40 2018 > 15.85% done, estimate finish Fri May 25 20:51:39 2018 > 15.85% done, estimate finish Fri May 25 20:51:37 2018 > 15.86% done, estimate finish Fri May 25 20:51:41 2018 > 15.86% done, estimate finish Fri May 25 20:51:40 2018 > 15.87% done, estimate finish Fri May 25 20:51:38 2018 > 15.87% done, estimate finish Fri May 25 20:51:36 2018 > 15.88% done, estimate finish Fri May 25 20:51:41 2018 > 15.88% done, estimate finish Fri May 25 20:51:39 2018 > 15.88% done, estimate finish Fri May 25 20:51:37 2018 > 15.89% done, estimate finish Fri May 25 20:51:36 2018 > 15.89% done, estimate finish Fri May 25 20:51:40 2018 > 15.90% done, estimate finish Fri May 25 20:51:39 2018 > 15.90% done, estimate finish Fri May 25 20:51:37 2018 > 15.90% done, estimate finish Fri May 25 20:51:35 2018 > 15.91% done, estimate finish Fri May 25 20:51:40 2018 > 15.91% done, estimate finish Fri May 25 20:51:38 2018 > 15.92% done, estimate finish Fri May 25 20:51:36 2018 > 15.92% done, estimate finish Fri May 25 20:51:35 2018 > 15.92% done, estimate finish Fri May 25 20:51:39 2018 > 15.93% done, estimate finish Fri May 25 20:51:37 2018 > 15.93% done, estimate finish Fri May 25 20:51:36 2018 > 15.94% done, estimate finish Fri May 25 20:51:34 2018 > 15.94% done, estimate finish Fri May 25 20:51:39 2018 > 15.95% done, estimate finish Fri May 25 20:51:37 2018 > 15.95% done, estimate finish Fri May 25 20:51:35 2018 > 15.95% done, estimate finish Fri May 25 20:51:40 2018 > 15.96% done, estimate finish Fri May 25 20:51:38 2018 > 15.96% done, estimate finish Fri May 25 20:51:36 2018 > 15.97% done, estimate finish Fri May 25 20:51:35 2018 > 15.97% done, estimate finish Fri May 25 20:51:39 2018 > 15.97% done, estimate finish Fri May 25 20:51:37 2018 > 15.98% done, estimate finish Fri May 25 20:51:36 2018 > 15.98% done, estimate finish Fri May 25 20:51:34 2018 > 15.99% done, estimate finish Fri May 25 20:51:39 2018 > 15.99% done, estimate finish Fri May 25 20:51:37 2018 > 15.99% done, estimate finish Fri May 25 20:51:35 2018 > 16.00% done, estimate finish Fri May 25 20:51:33 2018 > 16.00% done, estimate finish Fri May 25 20:51:38 2018 > 16.01% done, estimate finish Fri May 25 20:51:36 2018 > 16.01% done, estimate finish Fri May 25 20:51:35 2018 > 16.01% done, estimate finish Fri May 25 20:51:33 2018 > 16.02% done, estimate finish Fri May 25 20:51:37 2018 > 16.02% done, estimate finish Fri May 25 20:51:36 2018 > 16.03% done, estimate finish Fri May 25 20:51:34 2018 > 16.03% done, estimate finish Fri May 25 20:51:39 2018 > 16.04% done, estimate finish Fri May 25 20:51:37 2018 > 16.04% done, estimate finish Fri May 25 20:51:35 2018 > 16.04% done, estimate finish Fri May 25 20:51:33 2018 > 16.05% done, estimate finish Fri May 25 20:51:38 2018 > 16.05% done, estimate finish Fri May 25 20:51:36 2018 > 16.06% done, estimate finish Fri May 25 20:51:35 2018 > 16.06% done, estimate finish Fri May 25 20:51:33 2018 > 16.06% done, estimate finish Fri May 25 20:51:37 2018 > 16.07% done, estimate finish Fri May 25 20:51:36 2018 > 16.07% done, estimate finish Fri May 25 20:51:34 2018 > 16.08% done, estimate finish Fri May 25 20:51:32 2018 > 16.08% done, estimate finish Fri May 25 20:51:37 2018 > 16.08% done, estimate finish Fri May 25 20:51:35 2018 > 16.09% done, estimate finish Fri May 25 20:51:33 2018 > 16.09% done, estimate finish Fri May 25 20:51:32 2018 > 16.10% done, estimate finish Fri May 25 20:51:36 2018 > 16.10% done, estimate finish Fri May 25 20:51:35 2018 > 16.10% done, estimate finish Fri May 25 20:51:33 2018 > 16.11% done, estimate finish Fri May 25 20:51:31 2018 > 16.11% done, estimate finish Fri May 25 20:51:36 2018 > 16.12% done, estimate finish Fri May 25 20:51:34 2018 > 16.12% done, estimate finish Fri May 25 20:51:32 2018 > 16.13% done, estimate finish Fri May 25 20:51:31 2018 > 16.13% done, estimate finish Fri May 25 20:51:35 2018 > 16.13% done, estimate finish Fri May 25 20:51:33 2018 > 16.14% done, estimate finish Fri May 25 20:51:32 2018 > 16.14% done, estimate finish Fri May 25 20:51:36 2018 > 16.15% done, estimate finish Fri May 25 20:51:35 2018 > 16.15% done, estimate finish Fri May 25 20:51:33 2018 > 16.15% done, estimate finish Fri May 25 20:51:31 2018 > 16.16% done, estimate finish Fri May 25 20:51:36 2018 > 16.16% done, estimate finish Fri May 25 20:51:34 2018 > 16.17% done, estimate finish Fri May 25 20:51:32 2018 > 16.17% done, estimate finish Fri May 25 20:51:31 2018 > 16.17% done, estimate finish Fri May 25 20:51:35 2018 > 16.18% done, estimate finish Fri May 25 20:51:33 2018 > 16.18% done, estimate finish Fri May 25 20:51:32 2018 > 16.19% done, estimate finish Fri May 25 20:51:30 2018 > 16.19% done, estimate finish Fri May 25 20:51:35 2018 > 16.19% done, estimate finish Fri May 25 20:51:33 2018 > 16.20% done, estimate finish Fri May 25 20:51:31 2018 > 16.20% done, estimate finish Fri May 25 20:51:36 2018 > 16.21% done, estimate finish Fri May 25 20:51:34 2018 > 16.21% done, estimate finish Fri May 25 20:51:32 2018 > 16.22% done, estimate finish Fri May 25 20:51:31 2018 > 16.22% done, estimate finish Fri May 25 20:51:35 2018 > 16.22% done, estimate finish Fri May 25 20:51:33 2018 > 16.23% done, estimate finish Fri May 25 20:51:32 2018 > 16.23% done, estimate finish Fri May 25 20:51:30 2018 > 16.24% done, estimate finish Fri May 25 20:51:35 2018 > 16.24% done, estimate finish Fri May 25 20:51:33 2018 > 16.24% done, estimate finish Fri May 25 20:51:31 2018 > 16.25% done, estimate finish Fri May 25 20:51:30 2018 > 16.25% done, estimate finish Fri May 25 20:51:34 2018 > 16.26% done, estimate finish Fri May 25 20:51:32 2018 > 16.26% done, estimate finish Fri May 25 20:51:31 2018 > 16.26% done, estimate finish Fri May 25 20:51:29 2018 > 16.27% done, estimate finish Fri May 25 20:51:34 2018 > 16.27% done, estimate finish Fri May 25 20:51:32 2018 > 16.28% done, estimate finish Fri May 25 20:51:30 2018 > 16.28% done, estimate finish Fri May 25 20:51:28 2018 > 16.28% done, estimate finish Fri May 25 20:51:33 2018 > 16.29% done, estimate finish Fri May 25 20:51:31 2018 > 16.29% done, estimate finish Fri May 25 20:51:30 2018 > 16.30% done, estimate finish Fri May 25 20:51:28 2018 > 16.30% done, estimate finish Fri May 25 20:51:32 2018 > 16.31% done, estimate finish Fri May 25 20:51:31 2018 > 16.31% done, estimate finish Fri May 25 20:51:29 2018 > 16.31% done, estimate finish Fri May 25 20:51:34 2018 > 16.32% done, estimate finish Fri May 25 20:51:32 2018 > 16.32% done, estimate finish Fri May 25 20:51:30 2018 > 16.33% done, estimate finish Fri May 25 20:51:28 2018 > 16.33% done, estimate finish Fri May 25 20:51:33 2018 > 16.33% done, estimate finish Fri May 25 20:51:31 2018 > 16.34% done, estimate finish Fri May 25 20:51:30 2018 > 16.34% done, estimate finish Fri May 25 20:51:28 2018 > 16.35% done, estimate finish Fri May 25 20:51:32 2018 > 16.35% done, estimate finish Fri May 25 20:51:31 2018 > 16.35% done, estimate finish Fri May 25 20:51:29 2018 > 16.36% done, estimate finish Fri May 25 20:51:27 2018 > 16.36% done, estimate finish Fri May 25 20:51:32 2018 > 16.37% done, estimate finish Fri May 25 20:51:30 2018 > 16.37% done, estimate finish Fri May 25 20:51:28 2018 > 16.38% done, estimate finish Fri May 25 20:51:33 2018 > 16.38% done, estimate finish Fri May 25 20:51:31 2018 > 16.38% done, estimate finish Fri May 25 20:51:30 2018 > 16.39% done, estimate finish Fri May 25 20:51:28 2018 > 16.39% done, estimate finish Fri May 25 20:51:32 2018 > 16.40% done, estimate finish Fri May 25 20:51:31 2018 > 16.40% done, estimate finish Fri May 25 20:51:29 2018 > 16.40% done, estimate finish Fri May 25 20:51:27 2018 > 16.41% done, estimate finish Fri May 25 20:51:32 2018 > 16.41% done, estimate finish Fri May 25 20:51:30 2018 > 16.42% done, estimate finish Fri May 25 20:51:29 2018 > 16.42% done, estimate finish Fri May 25 20:51:27 2018 > 16.42% done, estimate finish Fri May 25 20:51:31 2018 > 16.43% done, estimate finish Fri May 25 20:51:30 2018 > 16.43% done, estimate finish Fri May 25 20:51:28 2018 > 16.44% done, estimate finish Fri May 25 20:51:26 2018 > 16.44% done, estimate finish Fri May 25 20:51:31 2018 > 16.44% done, estimate finish Fri May 25 20:51:29 2018 > 16.45% done, estimate finish Fri May 25 20:51:27 2018 > 16.45% done, estimate finish Fri May 25 20:51:26 2018 > 16.46% done, estimate finish Fri May 25 20:51:30 2018 > 16.46% done, estimate finish Fri May 25 20:51:29 2018 > 16.47% done, estimate finish Fri May 25 20:51:27 2018 > 16.47% done, estimate finish Fri May 25 20:51:25 2018 > 16.47% done, estimate finish Fri May 25 20:51:30 2018 > 16.48% done, estimate finish Fri May 25 20:51:28 2018 > 16.48% done, estimate finish Fri May 25 20:51:26 2018 > 16.49% done, estimate finish Fri May 25 20:51:31 2018 > 16.49% done, estimate finish Fri May 25 20:51:29 2018 > 16.49% done, estimate finish Fri May 25 20:51:27 2018 > 16.50% done, estimate finish Fri May 25 20:51:26 2018 > 16.50% done, estimate finish Fri May 25 20:51:30 2018 > 16.51% done, estimate finish Fri May 25 20:51:29 2018 > 16.51% done, estimate finish Fri May 25 20:51:27 2018 > 16.51% done, estimate finish Fri May 25 20:51:25 2018 > 16.52% done, estimate finish Fri May 25 20:51:30 2018 > 16.52% done, estimate finish Fri May 25 20:51:28 2018 > 16.53% done, estimate finish Fri May 25 20:51:26 2018 > 16.53% done, estimate finish Fri May 25 20:51:25 2018 > 16.53% done, estimate finish Fri May 25 20:51:29 2018 > 16.54% done, estimate finish Fri May 25 20:51:27 2018 > 16.54% done, estimate finish Fri May 25 20:51:26 2018 > 16.55% done, estimate finish Fri May 25 20:51:24 2018 > 16.55% done, estimate finish Fri May 25 20:51:29 2018 > 16.56% done, estimate finish Fri May 25 20:51:27 2018 > 16.56% done, estimate finish Fri May 25 20:51:25 2018 > 16.56% done, estimate finish Fri May 25 20:51:30 2018 > 16.57% done, estimate finish Fri May 25 20:51:28 2018 > 16.57% done, estimate finish Fri May 25 20:51:26 2018 > 16.58% done, estimate finish Fri May 25 20:51:25 2018 > 16.58% done, estimate finish Fri May 25 20:51:29 2018 > 16.58% done, estimate finish Fri May 25 20:51:27 2018 > 16.59% done, estimate finish Fri May 25 20:51:26 2018 > 16.59% done, estimate finish Fri May 25 20:51:24 2018 > 16.60% done, estimate finish Fri May 25 20:51:29 2018 > 16.60% done, estimate finish Fri May 25 20:51:27 2018 > 16.60% done, estimate finish Fri May 25 20:51:25 2018 > 16.61% done, estimate finish Fri May 25 20:51:24 2018 > 16.61% done, estimate finish Fri May 25 20:51:28 2018 > 16.62% done, estimate finish Fri May 25 20:51:26 2018 > 16.62% done, estimate finish Fri May 25 20:51:25 2018 > 16.62% done, estimate finish Fri May 25 20:51:29 2018 > 16.63% done, estimate finish Fri May 25 20:51:28 2018 > 16.63% done, estimate finish Fri May 25 20:51:26 2018 > 16.64% done, estimate finish Fri May 25 20:51:24 2018 > 16.64% done, estimate finish Fri May 25 20:51:29 2018 > 16.65% done, estimate finish Fri May 25 20:51:27 2018 > 16.65% done, estimate finish Fri May 25 20:51:25 2018 > 16.65% done, estimate finish Fri May 25 20:51:24 2018 > 16.66% done, estimate finish Fri May 25 20:51:28 2018 > 16.66% done, estimate finish Fri May 25 20:51:26 2018 > 16.67% done, estimate finish Fri May 25 20:51:25 2018 > 16.67% done, estimate finish Fri May 25 20:51:23 2018 > 16.67% done, estimate finish Fri May 25 20:51:28 2018 > 16.68% done, estimate finish Fri May 25 20:51:26 2018 > 16.68% done, estimate finish Fri May 25 20:51:24 2018 > 16.69% done, estimate finish Fri May 25 20:51:23 2018 > 16.69% done, estimate finish Fri May 25 20:51:27 2018 > 16.69% done, estimate finish Fri May 25 20:51:25 2018 > 16.70% done, estimate finish Fri May 25 20:51:24 2018 > 16.70% done, estimate finish Fri May 25 20:51:28 2018 > 16.71% done, estimate finish Fri May 25 20:51:26 2018 > 16.71% done, estimate finish Fri May 25 20:51:25 2018 > 16.72% done, estimate finish Fri May 25 20:51:23 2018 > 16.72% done, estimate finish Fri May 25 20:51:28 2018 > 16.72% done, estimate finish Fri May 25 20:51:26 2018 > 16.73% done, estimate finish Fri May 25 20:51:24 2018 > 16.73% done, estimate finish Fri May 25 20:51:23 2018 > 16.74% done, estimate finish Fri May 25 20:51:27 2018 > 16.74% done, estimate finish Fri May 25 20:51:25 2018 > 16.74% done, estimate finish Fri May 25 20:51:24 2018 > 16.75% done, estimate finish Fri May 25 20:51:22 2018 > 16.75% done, estimate finish Fri May 25 20:51:26 2018 > 16.76% done, estimate finish Fri May 25 20:51:25 2018 > 16.76% done, estimate finish Fri May 25 20:51:23 2018 > 16.76% done, estimate finish Fri May 25 20:51:28 2018 > 16.77% done, estimate finish Fri May 25 20:51:26 2018 > 16.77% done, estimate finish Fri May 25 20:51:24 2018 > 16.78% done, estimate finish Fri May 25 20:51:23 2018 > 16.78% done, estimate finish Fri May 25 20:51:21 2018 > 16.78% done, estimate finish Fri May 25 20:51:25 2018 > 16.79% done, estimate finish Fri May 25 20:51:24 2018 > 16.79% done, estimate finish Fri May 25 20:51:22 2018 > 16.80% done, estimate finish Fri May 25 20:51:26 2018 > 16.80% done, estimate finish Fri May 25 20:51:25 2018 > 16.81% done, estimate finish Fri May 25 20:51:23 2018 > 16.81% done, estimate finish Fri May 25 20:51:22 2018 > 16.81% done, estimate finish Fri May 25 20:51:26 2018 > 16.82% done, estimate finish Fri May 25 20:51:24 2018 > 16.82% done, estimate finish Fri May 25 20:51:23 2018 > 16.83% done, estimate finish Fri May 25 20:51:21 2018 > 16.83% done, estimate finish Fri May 25 20:51:25 2018 > 16.83% done, estimate finish Fri May 25 20:51:24 2018 > 16.84% done, estimate finish Fri May 25 20:51:22 2018 > 16.84% done, estimate finish Fri May 25 20:51:21 2018 > 16.85% done, estimate finish Fri May 25 20:51:25 2018 > 16.85% done, estimate finish Fri May 25 20:51:23 2018 > 16.85% done, estimate finish Fri May 25 20:51:22 2018 > 16.86% done, estimate finish Fri May 25 20:51:20 2018 > 16.86% done, estimate finish Fri May 25 20:51:24 2018 > 16.87% done, estimate finish Fri May 25 20:51:23 2018 > 16.87% done, estimate finish Fri May 25 20:51:21 2018 > 16.87% done, estimate finish Fri May 25 20:51:25 2018 > 16.88% done, estimate finish Fri May 25 20:51:24 2018 > 16.88% done, estimate finish Fri May 25 20:51:22 2018 > 16.89% done, estimate finish Fri May 25 20:51:21 2018 > 16.89% done, estimate finish Fri May 25 20:51:25 2018 > 16.90% done, estimate finish Fri May 25 20:51:23 2018 > 16.90% done, estimate finish Fri May 25 20:51:22 2018 > 16.90% done, estimate finish Fri May 25 20:51:20 2018 > 16.91% done, estimate finish Fri May 25 20:51:24 2018 > 16.91% done, estimate finish Fri May 25 20:51:23 2018 > 16.92% done, estimate finish Fri May 25 20:51:21 2018 > 16.92% done, estimate finish Fri May 25 20:51:20 2018 > 16.92% done, estimate finish Fri May 25 20:51:24 2018 > 16.93% done, estimate finish Fri May 25 20:51:22 2018 > 16.93% done, estimate finish Fri May 25 20:51:21 2018 > 16.94% done, estimate finish Fri May 25 20:51:19 2018 > 16.94% done, estimate finish Fri May 25 20:51:23 2018 > 16.94% done, estimate finish Fri May 25 20:51:22 2018 > 16.95% done, estimate finish Fri May 25 20:51:20 2018 > 16.95% done, estimate finish Fri May 25 20:51:24 2018 > 16.96% done, estimate finish Fri May 25 20:51:23 2018 > 16.96% done, estimate finish Fri May 25 20:51:21 2018 > 16.96% done, estimate finish Fri May 25 20:51:20 2018 > 16.97% done, estimate finish Fri May 25 20:51:24 2018 > 16.97% done, estimate finish Fri May 25 20:51:22 2018 > 16.98% done, estimate finish Fri May 25 20:51:21 2018 > 16.98% done, estimate finish Fri May 25 20:51:19 2018 > 16.99% done, estimate finish Fri May 25 20:51:23 2018 > 16.99% done, estimate finish Fri May 25 20:51:22 2018 > 16.99% done, estimate finish Fri May 25 20:51:20 2018 > 17.00% done, estimate finish Fri May 25 20:51:19 2018 > 17.00% done, estimate finish Fri May 25 20:51:23 2018 > 17.01% done, estimate finish Fri May 25 20:51:21 2018 > 17.01% done, estimate finish Fri May 25 20:51:20 2018 > 17.01% done, estimate finish Fri May 25 20:51:24 2018 > 17.02% done, estimate finish Fri May 25 20:51:22 2018 > 17.02% done, estimate finish Fri May 25 20:51:21 2018 > 17.03% done, estimate finish Fri May 25 20:51:19 2018 > 17.03% done, estimate finish Fri May 25 20:51:23 2018 > 17.03% done, estimate finish Fri May 25 20:51:22 2018 > 17.04% done, estimate finish Fri May 25 20:51:20 2018 > 17.04% done, estimate finish Fri May 25 20:51:19 2018 > 17.05% done, estimate finish Fri May 25 20:51:23 2018 > 17.05% done, estimate finish Fri May 25 20:51:21 2018 > 17.05% done, estimate finish Fri May 25 20:51:20 2018 > 17.06% done, estimate finish Fri May 25 20:51:18 2018 > 17.06% done, estimate finish Fri May 25 20:51:22 2018 > 17.07% done, estimate finish Fri May 25 20:51:21 2018 > 17.07% done, estimate finish Fri May 25 20:51:19 2018 > 17.08% done, estimate finish Fri May 25 20:51:18 2018 > 17.08% done, estimate finish Fri May 25 20:51:22 2018 > 17.08% done, estimate finish Fri May 25 20:51:20 2018 > 17.09% done, estimate finish Fri May 25 20:51:19 2018 > 17.09% done, estimate finish Fri May 25 20:51:23 2018 > 17.10% done, estimate finish Fri May 25 20:51:21 2018 > 17.10% done, estimate finish Fri May 25 20:51:20 2018 > 17.10% done, estimate finish Fri May 25 20:51:18 2018 > 17.11% done, estimate finish Fri May 25 20:51:22 2018 > 17.11% done, estimate finish Fri May 25 20:51:21 2018 > 17.12% done, estimate finish Fri May 25 20:51:19 2018 > 17.12% done, estimate finish Fri May 25 20:51:18 2018 > 17.12% done, estimate finish Fri May 25 20:51:22 2018 > 17.13% done, estimate finish Fri May 25 20:51:20 2018 > 17.13% done, estimate finish Fri May 25 20:51:19 2018 > 17.14% done, estimate finish Fri May 25 20:51:17 2018 > 17.14% done, estimate finish Fri May 25 20:51:21 2018 > 17.15% done, estimate finish Fri May 25 20:51:20 2018 > 17.15% done, estimate finish Fri May 25 20:51:18 2018 > 17.15% done, estimate finish Fri May 25 20:51:22 2018 > 17.16% done, estimate finish Fri May 25 20:51:21 2018 > 17.16% done, estimate finish Fri May 25 20:51:19 2018 > 17.17% done, estimate finish Fri May 25 20:51:18 2018 > 17.17% done, estimate finish Fri May 25 20:51:22 2018 > 17.17% done, estimate finish Fri May 25 20:51:20 2018 > 17.18% done, estimate finish Fri May 25 20:51:19 2018 > 17.18% done, estimate finish Fri May 25 20:51:17 2018 > 17.19% done, estimate finish Fri May 25 20:51:21 2018 > 17.19% done, estimate finish Fri May 25 20:51:20 2018 > 17.19% done, estimate finish Fri May 25 20:51:18 2018 > 17.20% done, estimate finish Fri May 25 20:51:17 2018 > 17.20% done, estimate finish Fri May 25 20:51:21 2018 > 17.21% done, estimate finish Fri May 25 20:51:19 2018 > 17.21% done, estimate finish Fri May 25 20:51:18 2018 > 17.21% done, estimate finish Fri May 25 20:51:16 2018 > 17.22% done, estimate finish Fri May 25 20:51:20 2018 > 17.22% done, estimate finish Fri May 25 20:51:19 2018 > 17.23% done, estimate finish Fri May 25 20:51:17 2018 > 17.23% done, estimate finish Fri May 25 20:51:16 2018 > 17.24% done, estimate finish Fri May 25 20:51:20 2018 > 17.24% done, estimate finish Fri May 25 20:51:18 2018 > 17.24% done, estimate finish Fri May 25 20:51:17 2018 > 17.25% done, estimate finish Fri May 25 20:51:15 2018 > 17.25% done, estimate finish Fri May 25 20:51:19 2018 > 17.26% done, estimate finish Fri May 25 20:51:18 2018 > 17.26% done, estimate finish Fri May 25 20:51:16 2018 > 17.26% done, estimate finish Fri May 25 20:51:20 2018 > 17.27% done, estimate finish Fri May 25 20:51:19 2018 > 17.27% done, estimate finish Fri May 25 20:51:17 2018 > 17.28% done, estimate finish Fri May 25 20:51:16 2018 > 17.28% done, estimate finish Fri May 25 20:51:20 2018 > 17.28% done, estimate finish Fri May 25 20:51:18 2018 > 17.29% done, estimate finish Fri May 25 20:51:17 2018 > 17.29% done, estimate finish Fri May 25 20:51:15 2018 > 17.30% done, estimate finish Fri May 25 20:51:19 2018 > 17.30% done, estimate finish Fri May 25 20:51:18 2018 > 17.30% done, estimate finish Fri May 25 20:51:16 2018 > 17.31% done, estimate finish Fri May 25 20:51:15 2018 > 17.31% done, estimate finish Fri May 25 20:51:19 2018 > 17.32% done, estimate finish Fri May 25 20:51:17 2018 > 17.32% done, estimate finish Fri May 25 20:51:16 2018 > 17.33% done, estimate finish Fri May 25 20:51:14 2018 > 17.33% done, estimate finish Fri May 25 20:51:18 2018 > 17.33% done, estimate finish Fri May 25 20:51:17 2018 > 17.34% done, estimate finish Fri May 25 20:51:15 2018 > 17.34% done, estimate finish Fri May 25 20:51:19 2018 > 17.35% done, estimate finish Fri May 25 20:51:18 2018 > 17.35% done, estimate finish Fri May 25 20:51:16 2018 > 17.35% done, estimate finish Fri May 25 20:51:15 2018 > 17.36% done, estimate finish Fri May 25 20:51:19 2018 > 17.36% done, estimate finish Fri May 25 20:51:17 2018 > 17.37% done, estimate finish Fri May 25 20:51:16 2018 > 17.37% done, estimate finish Fri May 25 20:51:14 2018 > 17.37% done, estimate finish Fri May 25 20:51:18 2018 > 17.38% done, estimate finish Fri May 25 20:51:17 2018 > 17.38% done, estimate finish Fri May 25 20:51:15 2018 > 17.39% done, estimate finish Fri May 25 20:51:14 2018 > 17.39% done, estimate finish Fri May 25 20:51:18 2018 > 17.39% done, estimate finish Fri May 25 20:51:16 2018 > 17.40% done, estimate finish Fri May 25 20:51:15 2018 > 17.40% done, estimate finish Fri May 25 20:51:19 2018 > 17.41% done, estimate finish Fri May 25 20:51:17 2018 > 17.41% done, estimate finish Fri May 25 20:51:16 2018 > 17.42% done, estimate finish Fri May 25 20:51:14 2018 > 17.42% done, estimate finish Fri May 25 20:51:18 2018 > 17.42% done, estimate finish Fri May 25 20:51:17 2018 > 17.43% done, estimate finish Fri May 25 20:51:15 2018 > 17.43% done, estimate finish Fri May 25 20:51:14 2018 > 17.44% done, estimate finish Fri May 25 20:51:18 2018 > 17.44% done, estimate finish Fri May 25 20:51:16 2018 > 17.44% done, estimate finish Fri May 25 20:51:15 2018 > 17.45% done, estimate finish Fri May 25 20:51:13 2018 > 17.45% done, estimate finish Fri May 25 20:51:17 2018 > 17.46% done, estimate finish Fri May 25 20:51:16 2018 > 17.46% done, estimate finish Fri May 25 20:51:14 2018 > 17.46% done, estimate finish Fri May 25 20:51:13 2018 > 17.47% done, estimate finish Fri May 25 20:51:17 2018 > 17.47% done, estimate finish Fri May 25 20:51:15 2018 > 17.48% done, estimate finish Fri May 25 20:51:14 2018 > 17.48% done, estimate finish Fri May 25 20:51:18 2018 > 17.49% done, estimate finish Fri May 25 20:51:16 2018 > 17.49% done, estimate finish Fri May 25 20:51:15 2018 > 17.49% done, estimate finish Fri May 25 20:51:19 2018 > 17.50% done, estimate finish Fri May 25 20:51:18 2018 > 17.50% done, estimate finish Fri May 25 20:51:16 2018 > 17.51% done, estimate finish Fri May 25 20:51:14 2018 > 17.51% done, estimate finish Fri May 25 20:51:19 2018 > 17.51% done, estimate finish Fri May 25 20:51:17 2018 > 17.52% done, estimate finish Fri May 25 20:51:15 2018 > 17.52% done, estimate finish Fri May 25 20:51:14 2018 > 17.53% done, estimate finish Fri May 25 20:51:18 2018 > 17.53% done, estimate finish Fri May 25 20:51:17 2018 > 17.53% done, estimate finish Fri May 25 20:51:15 2018 > 17.54% done, estimate finish Fri May 25 20:51:19 2018 > 17.54% done, estimate finish Fri May 25 20:51:18 2018 > 17.55% done, estimate finish Fri May 25 20:51:16 2018 > 17.55% done, estimate finish Fri May 25 20:51:14 2018 > 17.55% done, estimate finish Fri May 25 20:51:19 2018 > 17.56% done, estimate finish Fri May 25 20:51:17 2018 > 17.56% done, estimate finish Fri May 25 20:51:16 2018 > 17.57% done, estimate finish Fri May 25 20:51:14 2018 > 17.57% done, estimate finish Fri May 25 20:51:18 2018 > 17.58% done, estimate finish Fri May 25 20:51:17 2018 > 17.58% done, estimate finish Fri May 25 20:51:15 2018 > 17.58% done, estimate finish Fri May 25 20:51:13 2018 > 17.59% done, estimate finish Fri May 25 20:51:18 2018 > 17.59% done, estimate finish Fri May 25 20:51:16 2018 > 17.60% done, estimate finish Fri May 25 20:51:15 2018 > 17.60% done, estimate finish Fri May 25 20:51:13 2018 > 17.60% done, estimate finish Fri May 25 20:51:17 2018 > 17.61% done, estimate finish Fri May 25 20:51:16 2018 > 17.61% done, estimate finish Fri May 25 20:51:14 2018 > 17.62% done, estimate finish Fri May 25 20:51:18 2018 > 17.62% done, estimate finish Fri May 25 20:51:17 2018 > 17.62% done, estimate finish Fri May 25 20:51:15 2018 > 17.63% done, estimate finish Fri May 25 20:51:14 2018 > 17.63% done, estimate finish Fri May 25 20:51:18 2018 > 17.64% done, estimate finish Fri May 25 20:51:16 2018 > 17.64% done, estimate finish Fri May 25 20:51:15 2018 > 17.64% done, estimate finish Fri May 25 20:51:13 2018 > 17.65% done, estimate finish Fri May 25 20:51:17 2018 > 17.65% done, estimate finish Fri May 25 20:51:16 2018 > 17.66% done, estimate finish Fri May 25 20:51:14 2018 > 17.66% done, estimate finish Fri May 25 20:51:13 2018 > 17.67% done, estimate finish Fri May 25 20:51:17 2018 > 17.67% done, estimate finish Fri May 25 20:51:15 2018 > 17.67% done, estimate finish Fri May 25 20:51:14 2018 > 17.68% done, estimate finish Fri May 25 20:51:12 2018 > 17.68% done, estimate finish Fri May 25 20:51:16 2018 > 17.69% done, estimate finish Fri May 25 20:51:15 2018 > 17.69% done, estimate finish Fri May 25 20:51:13 2018 > 17.69% done, estimate finish Fri May 25 20:51:17 2018 > 17.70% done, estimate finish Fri May 25 20:51:16 2018 > 17.70% done, estimate finish Fri May 25 20:51:14 2018 > 17.71% done, estimate finish Fri May 25 20:51:13 2018 > 17.71% done, estimate finish Fri May 25 20:51:17 2018 > 17.71% done, estimate finish Fri May 25 20:51:15 2018 > 17.72% done, estimate finish Fri May 25 20:51:14 2018 > 17.72% done, estimate finish Fri May 25 20:51:12 2018 > 17.73% done, estimate finish Fri May 25 20:51:16 2018 > 17.73% done, estimate finish Fri May 25 20:51:15 2018 > 17.73% done, estimate finish Fri May 25 20:51:13 2018 > 17.74% done, estimate finish Fri May 25 20:51:12 2018 > 17.74% done, estimate finish Fri May 25 20:51:16 2018 > 17.75% done, estimate finish Fri May 25 20:51:14 2018 > 17.75% done, estimate finish Fri May 25 20:51:13 2018 > 17.76% done, estimate finish Fri May 25 20:51:17 2018 > 17.76% done, estimate finish Fri May 25 20:51:15 2018 > 17.76% done, estimate finish Fri May 25 20:51:14 2018 > 17.77% done, estimate finish Fri May 25 20:51:12 2018 > 17.77% done, estimate finish Fri May 25 20:51:16 2018 > 17.78% done, estimate finish Fri May 25 20:51:15 2018 > 17.78% done, estimate finish Fri May 25 20:51:13 2018 > 17.78% done, estimate finish Fri May 25 20:51:12 2018 > 17.79% done, estimate finish Fri May 25 20:51:16 2018 > 17.79% done, estimate finish Fri May 25 20:51:14 2018 > 17.80% done, estimate finish Fri May 25 20:51:13 2018 > 17.80% done, estimate finish Fri May 25 20:51:11 2018 > 17.80% done, estimate finish Fri May 25 20:51:15 2018 > 17.81% done, estimate finish Fri May 25 20:51:14 2018 > 17.81% done, estimate finish Fri May 25 20:51:12 2018 > 17.82% done, estimate finish Fri May 25 20:51:11 2018 > 17.82% done, estimate finish Fri May 25 20:51:15 2018 > 17.83% done, estimate finish Fri May 25 20:51:13 2018 > 17.83% done, estimate finish Fri May 25 20:51:12 2018 > 17.83% done, estimate finish Fri May 25 20:51:16 2018 > 17.84% done, estimate finish Fri May 25 20:51:14 2018 > 17.84% done, estimate finish Fri May 25 20:51:13 2018 > 17.85% done, estimate finish Fri May 25 20:51:11 2018 > 17.85% done, estimate finish Fri May 25 20:51:15 2018 > 17.85% done, estimate finish Fri May 25 20:51:14 2018 > 17.86% done, estimate finish Fri May 25 20:51:12 2018 > 17.86% done, estimate finish Fri May 25 20:51:16 2018 > 17.87% done, estimate finish Fri May 25 20:51:15 2018 > 17.87% done, estimate finish Fri May 25 20:51:13 2018 > 17.87% done, estimate finish Fri May 25 20:51:12 2018 > 17.88% done, estimate finish Fri May 25 20:51:10 2018 > 17.88% done, estimate finish Fri May 25 20:51:14 2018 > 17.89% done, estimate finish Fri May 25 20:51:13 2018 > 17.89% done, estimate finish Fri May 25 20:51:11 2018 > 17.89% done, estimate finish Fri May 25 20:51:15 2018 > 17.90% done, estimate finish Fri May 25 20:51:14 2018 > 17.90% done, estimate finish Fri May 25 20:51:12 2018 > 17.91% done, estimate finish Fri May 25 20:51:11 2018 > 17.91% done, estimate finish Fri May 25 20:51:15 2018 > 17.92% done, estimate finish Fri May 25 20:51:13 2018 > 17.92% done, estimate finish Fri May 25 20:51:12 2018 > 17.92% done, estimate finish Fri May 25 20:51:10 2018 > 17.93% done, estimate finish Fri May 25 20:51:14 2018 > 17.93% done, estimate finish Fri May 25 20:51:13 2018 > 17.94% done, estimate finish Fri May 25 20:51:11 2018 > 17.94% done, estimate finish Fri May 25 20:51:15 2018 > 17.94% done, estimate finish Fri May 25 20:51:14 2018 > 17.95% done, estimate finish Fri May 25 20:51:12 2018 > 17.95% done, estimate finish Fri May 25 20:51:11 2018 > 17.96% done, estimate finish Fri May 25 20:51:15 2018 > 17.96% done, estimate finish Fri May 25 20:51:13 2018 > 17.96% done, estimate finish Fri May 25 20:51:12 2018 > 17.97% done, estimate finish Fri May 25 20:51:10 2018 > 17.97% done, estimate finish Fri May 25 20:51:14 2018 > 17.98% done, estimate finish Fri May 25 20:51:13 2018 > 17.98% done, estimate finish Fri May 25 20:51:11 2018 > 17.98% done, estimate finish Fri May 25 20:51:10 2018 > 17.99% done, estimate finish Fri May 25 20:51:14 2018 > 17.99% done, estimate finish Fri May 25 20:51:12 2018 > 18.00% done, estimate finish Fri May 25 20:51:11 2018 > 18.00% done, estimate finish Fri May 25 20:51:15 2018 > 18.01% done, estimate finish Fri May 25 20:51:13 2018 > 18.01% done, estimate finish Fri May 25 20:51:12 2018 > 18.01% done, estimate finish Fri May 25 20:51:10 2018 > 18.02% done, estimate finish Fri May 25 20:51:14 2018 > 18.02% done, estimate finish Fri May 25 20:51:13 2018 > 18.03% done, estimate finish Fri May 25 20:51:11 2018 > 18.03% done, estimate finish Fri May 25 20:51:10 2018 > 18.03% done, estimate finish Fri May 25 20:51:14 2018 > 18.04% done, estimate finish Fri May 25 20:51:12 2018 > 18.04% done, estimate finish Fri May 25 20:51:11 2018 > 18.05% done, estimate finish Fri May 25 20:51:10 2018 > 18.05% done, estimate finish Fri May 25 20:51:14 2018 > 18.05% done, estimate finish Fri May 25 20:51:12 2018 > 18.06% done, estimate finish Fri May 25 20:51:11 2018 > 18.06% done, estimate finish Fri May 25 20:51:09 2018 > 18.07% done, estimate finish Fri May 25 20:51:13 2018 > 18.07% done, estimate finish Fri May 25 20:51:12 2018 > 18.07% done, estimate finish Fri May 25 20:51:10 2018 > 18.08% done, estimate finish Fri May 25 20:51:14 2018 > 18.08% done, estimate finish Fri May 25 20:51:13 2018 > 18.09% done, estimate finish Fri May 25 20:51:11 2018 > 18.09% done, estimate finish Fri May 25 20:51:10 2018 > 18.10% done, estimate finish Fri May 25 20:51:14 2018 > 18.10% done, estimate finish Fri May 25 20:51:12 2018 > 18.10% done, estimate finish Fri May 25 20:51:11 2018 > 18.11% done, estimate finish Fri May 25 20:51:09 2018 > 18.11% done, estimate finish Fri May 25 20:51:13 2018 > 18.12% done, estimate finish Fri May 25 20:51:12 2018 > 18.12% done, estimate finish Fri May 25 20:51:10 2018 > 18.12% done, estimate finish Fri May 25 20:51:09 2018 > 18.13% done, estimate finish Fri May 25 20:51:13 2018 > 18.13% done, estimate finish Fri May 25 20:51:11 2018 > 18.14% done, estimate finish Fri May 25 20:51:10 2018 > 18.14% done, estimate finish Fri May 25 20:51:14 2018 > 18.14% done, estimate finish Fri May 25 20:51:12 2018 > 18.15% done, estimate finish Fri May 25 20:51:11 2018 > 18.15% done, estimate finish Fri May 25 20:51:09 2018 > 18.16% done, estimate finish Fri May 25 20:51:13 2018 > 18.16% done, estimate finish Fri May 25 20:51:12 2018 > 18.16% done, estimate finish Fri May 25 20:51:10 2018 > 18.17% done, estimate finish Fri May 25 20:51:09 2018 > 18.17% done, estimate finish Fri May 25 20:51:13 2018 > 18.18% done, estimate finish Fri May 25 20:51:11 2018 > 18.18% done, estimate finish Fri May 25 20:51:10 2018 > 18.19% done, estimate finish Fri May 25 20:51:08 2018 > 18.19% done, estimate finish Fri May 25 20:51:12 2018 > 18.19% done, estimate finish Fri May 25 20:51:11 2018 > 18.20% done, estimate finish Fri May 25 20:51:09 2018 > 18.20% done, estimate finish Fri May 25 20:51:08 2018 > 18.21% done, estimate finish Fri May 25 20:51:12 2018 > 18.21% done, estimate finish Fri May 25 20:51:10 2018 > 18.21% done, estimate finish Fri May 25 20:51:09 2018 > 18.22% done, estimate finish Fri May 25 20:51:13 2018 > 18.22% done, estimate finish Fri May 25 20:51:11 2018 > 18.23% done, estimate finish Fri May 25 20:51:10 2018 > 18.23% done, estimate finish Fri May 25 20:51:08 2018 > 18.23% done, estimate finish Fri May 25 20:51:12 2018 > 18.24% done, estimate finish Fri May 25 20:51:11 2018 > 18.24% done, estimate finish Fri May 25 20:51:09 2018 > 18.25% done, estimate finish Fri May 25 20:51:08 2018 > 18.25% done, estimate finish Fri May 25 20:51:12 2018 > 18.26% done, estimate finish Fri May 25 20:51:10 2018 > 18.26% done, estimate finish Fri May 25 20:51:09 2018 > 18.26% done, estimate finish Fri May 25 20:51:07 2018 > 18.27% done, estimate finish Fri May 25 20:51:11 2018 > 18.27% done, estimate finish Fri May 25 20:51:10 2018 > 18.28% done, estimate finish Fri May 25 20:51:08 2018 > 18.28% done, estimate finish Fri May 25 20:51:12 2018 > 18.28% done, estimate finish Fri May 25 20:51:11 2018 > 18.29% done, estimate finish Fri May 25 20:51:09 2018 > 18.29% done, estimate finish Fri May 25 20:51:08 2018 > 18.30% done, estimate finish Fri May 25 20:51:12 2018 > 18.30% done, estimate finish Fri May 25 20:51:10 2018 > 18.30% done, estimate finish Fri May 25 20:51:09 2018 > 18.31% done, estimate finish Fri May 25 20:51:13 2018 > 18.31% done, estimate finish Fri May 25 20:51:11 2018 > 18.32% done, estimate finish Fri May 25 20:51:10 2018 > 18.32% done, estimate finish Fri May 25 20:51:08 2018 > 18.32% done, estimate finish Fri May 25 20:51:12 2018 > 18.33% done, estimate finish Fri May 25 20:51:11 2018 > 18.33% done, estimate finish Fri May 25 20:51:09 2018 > 18.34% done, estimate finish Fri May 25 20:51:08 2018 > 18.34% done, estimate finish Fri May 25 20:51:12 2018 > 18.35% done, estimate finish Fri May 25 20:51:10 2018 > 18.35% done, estimate finish Fri May 25 20:51:09 2018 > 18.35% done, estimate finish Fri May 25 20:51:07 2018 > 18.36% done, estimate finish Fri May 25 20:51:11 2018 > 18.36% done, estimate finish Fri May 25 20:51:10 2018 > 18.37% done, estimate finish Fri May 25 20:51:08 2018 > 18.37% done, estimate finish Fri May 25 20:51:07 2018 > 18.37% done, estimate finish Fri May 25 20:51:11 2018 > 18.38% done, estimate finish Fri May 25 20:51:09 2018 > 18.38% done, estimate finish Fri May 25 20:51:08 2018 > 18.39% done, estimate finish Fri May 25 20:51:12 2018 > 18.39% done, estimate finish Fri May 25 20:51:10 2018 > 18.39% done, estimate finish Fri May 25 20:51:09 2018 > 18.40% done, estimate finish Fri May 25 20:51:08 2018 > 18.40% done, estimate finish Fri May 25 20:51:11 2018 > 18.41% done, estimate finish Fri May 25 20:51:10 2018 > 18.41% done, estimate finish Fri May 25 20:51:08 2018 > 18.41% done, estimate finish Fri May 25 20:51:07 2018 > 18.42% done, estimate finish Fri May 25 20:51:11 2018 > 18.42% done, estimate finish Fri May 25 20:51:10 2018 > 18.43% done, estimate finish Fri May 25 20:51:08 2018 > 18.43% done, estimate finish Fri May 25 20:51:07 2018 > 18.44% done, estimate finish Fri May 25 20:51:11 2018 > 18.44% done, estimate finish Fri May 25 20:51:09 2018 > 18.44% done, estimate finish Fri May 25 20:51:08 2018 > 18.45% done, estimate finish Fri May 25 20:51:12 2018 > 18.45% done, estimate finish Fri May 25 20:51:10 2018 > 18.46% done, estimate finish Fri May 25 20:51:09 2018 > 18.46% done, estimate finish Fri May 25 20:51:07 2018 > 18.46% done, estimate finish Fri May 25 20:51:11 2018 > 18.47% done, estimate finish Fri May 25 20:51:10 2018 > 18.47% done, estimate finish Fri May 25 20:51:08 2018 > 18.48% done, estimate finish Fri May 25 20:51:07 2018 > 18.48% done, estimate finish Fri May 25 20:51:11 2018 > 18.48% done, estimate finish Fri May 25 20:51:09 2018 > 18.49% done, estimate finish Fri May 25 20:51:08 2018 > 18.49% done, estimate finish Fri May 25 20:51:06 2018 > 18.50% done, estimate finish Fri May 25 20:51:10 2018 > 18.50% done, estimate finish Fri May 25 20:51:09 2018 > 18.50% done, estimate finish Fri May 25 20:51:07 2018 > 18.51% done, estimate finish Fri May 25 20:51:11 2018 > 18.51% done, estimate finish Fri May 25 20:51:10 2018 > 18.52% done, estimate finish Fri May 25 20:51:08 2018 > 18.52% done, estimate finish Fri May 25 20:51:07 2018 > 18.53% done, estimate finish Fri May 25 20:51:11 2018 > 18.53% done, estimate finish Fri May 25 20:51:09 2018 > 18.53% done, estimate finish Fri May 25 20:51:08 2018 > 18.54% done, estimate finish Fri May 25 20:51:06 2018 > 18.54% done, estimate finish Fri May 25 20:51:10 2018 > 18.55% done, estimate finish Fri May 25 20:51:09 2018 > 18.55% done, estimate finish Fri May 25 20:51:07 2018 > 18.55% done, estimate finish Fri May 25 20:51:06 2018 > 18.56% done, estimate finish Fri May 25 20:51:10 2018 > 18.56% done, estimate finish Fri May 25 20:51:08 2018 > 18.57% done, estimate finish Fri May 25 20:51:07 2018 > 18.57% done, estimate finish Fri May 25 20:51:05 2018 > 18.57% done, estimate finish Fri May 25 20:51:09 2018 > 18.58% done, estimate finish Fri May 25 20:51:08 2018 > 18.58% done, estimate finish Fri May 25 20:51:06 2018 > 18.59% done, estimate finish Fri May 25 20:51:10 2018 > 18.59% done, estimate finish Fri May 25 20:51:09 2018 > 18.60% done, estimate finish Fri May 25 20:51:07 2018 > 18.60% done, estimate finish Fri May 25 20:51:06 2018 > 18.60% done, estimate finish Fri May 25 20:51:10 2018 > 18.61% done, estimate finish Fri May 25 20:51:08 2018 > 18.61% done, estimate finish Fri May 25 20:51:07 2018 > 18.62% done, estimate finish Fri May 25 20:51:05 2018 > 18.62% done, estimate finish Fri May 25 20:51:09 2018 > 18.62% done, estimate finish Fri May 25 20:51:08 2018 > 18.63% done, estimate finish Fri May 25 20:51:06 2018 > 18.63% done, estimate finish Fri May 25 20:51:10 2018 > 18.64% done, estimate finish Fri May 25 20:51:09 2018 > 18.64% done, estimate finish Fri May 25 20:51:07 2018 > 18.64% done, estimate finish Fri May 25 20:51:06 2018 > 18.65% done, estimate finish Fri May 25 20:51:10 2018 > 18.65% done, estimate finish Fri May 25 20:51:08 2018 > 18.66% done, estimate finish Fri May 25 20:51:07 2018 > 18.66% done, estimate finish Fri May 25 20:51:05 2018 > 18.66% done, estimate finish Fri May 25 20:51:09 2018 > 18.67% done, estimate finish Fri May 25 20:51:08 2018 > 18.67% done, estimate finish Fri May 25 20:51:06 2018 > 18.68% done, estimate finish Fri May 25 20:51:05 2018 > 18.68% done, estimate finish Fri May 25 20:51:09 2018 > 18.69% done, estimate finish Fri May 25 20:51:07 2018 > 18.69% done, estimate finish Fri May 25 20:51:06 2018 > 18.69% done, estimate finish Fri May 25 20:51:05 2018 > 18.70% done, estimate finish Fri May 25 20:51:08 2018 > 18.70% done, estimate finish Fri May 25 20:51:07 2018 > 18.71% done, estimate finish Fri May 25 20:51:06 2018 > 18.71% done, estimate finish Fri May 25 20:51:09 2018 > 18.71% done, estimate finish Fri May 25 20:51:08 2018 > 18.72% done, estimate finish Fri May 25 20:51:07 2018 > 18.72% done, estimate finish Fri May 25 20:51:05 2018 > 18.73% done, estimate finish Fri May 25 20:51:09 2018 > 18.73% done, estimate finish Fri May 25 20:51:08 2018 > 18.73% done, estimate finish Fri May 25 20:51:06 2018 > 18.74% done, estimate finish Fri May 25 20:51:10 2018 > 18.74% done, estimate finish Fri May 25 20:51:08 2018 > 18.75% done, estimate finish Fri May 25 20:51:07 2018 > 18.75% done, estimate finish Fri May 25 20:51:06 2018 > 18.75% done, estimate finish Fri May 25 20:51:09 2018 > 18.76% done, estimate finish Fri May 25 20:51:08 2018 > 18.76% done, estimate finish Fri May 25 20:51:07 2018 > 18.77% done, estimate finish Fri May 25 20:51:05 2018 > 18.77% done, estimate finish Fri May 25 20:51:09 2018 > 18.78% done, estimate finish Fri May 25 20:51:08 2018 > 18.78% done, estimate finish Fri May 25 20:51:06 2018 > 18.78% done, estimate finish Fri May 25 20:51:05 2018 > 18.79% done, estimate finish Fri May 25 20:51:09 2018 > 18.79% done, estimate finish Fri May 25 20:51:07 2018 > 18.80% done, estimate finish Fri May 25 20:51:06 2018 > 18.80% done, estimate finish Fri May 25 20:51:04 2018 > 18.80% done, estimate finish Fri May 25 20:51:08 2018 > 18.81% done, estimate finish Fri May 25 20:51:07 2018 > 18.81% done, estimate finish Fri May 25 20:51:05 2018 > 18.82% done, estimate finish Fri May 25 20:51:04 2018 > 18.82% done, estimate finish Fri May 25 20:51:08 2018 > 18.82% done, estimate finish Fri May 25 20:51:06 2018 > 18.83% done, estimate finish Fri May 25 20:51:05 2018 > 18.83% done, estimate finish Fri May 25 20:51:09 2018 > 18.84% done, estimate finish Fri May 25 20:51:07 2018 > 18.84% done, estimate finish Fri May 25 20:51:06 2018 > 18.84% done, estimate finish Fri May 25 20:51:04 2018 > 18.85% done, estimate finish Fri May 25 20:51:08 2018 > 18.85% done, estimate finish Fri May 25 20:51:07 2018 > 18.86% done, estimate finish Fri May 25 20:51:05 2018 > 18.86% done, estimate finish Fri May 25 20:51:04 2018 > 18.87% done, estimate finish Fri May 25 20:51:08 2018 > 18.87% done, estimate finish Fri May 25 20:51:06 2018 > 18.87% done, estimate finish Fri May 25 20:51:05 2018 > 18.88% done, estimate finish Fri May 25 20:51:09 2018 > 18.88% done, estimate finish Fri May 25 20:51:07 2018 > 18.89% done, estimate finish Fri May 25 20:51:06 2018 > 18.89% done, estimate finish Fri May 25 20:51:04 2018 > 18.89% done, estimate finish Fri May 25 20:51:08 2018 > 18.90% done, estimate finish Fri May 25 20:51:07 2018 > 18.90% done, estimate finish Fri May 25 20:51:05 2018 > 18.91% done, estimate finish Fri May 25 20:51:04 2018 > 18.91% done, estimate finish Fri May 25 20:51:08 2018 > 18.91% done, estimate finish Fri May 25 20:51:06 2018 > 18.92% done, estimate finish Fri May 25 20:51:05 2018 > 18.92% done, estimate finish Fri May 25 20:51:03 2018 > 18.93% done, estimate finish Fri May 25 20:51:07 2018 > 18.93% done, estimate finish Fri May 25 20:51:06 2018 > 18.94% done, estimate finish Fri May 25 20:51:04 2018 > 18.94% done, estimate finish Fri May 25 20:51:03 2018 > 18.94% done, estimate finish Fri May 25 20:51:07 2018 > 18.95% done, estimate finish Fri May 25 20:51:05 2018 > 18.95% done, estimate finish Fri May 25 20:51:04 2018 > 18.96% done, estimate finish Fri May 25 20:51:08 2018 > 18.96% done, estimate finish Fri May 25 20:51:06 2018 > 18.96% done, estimate finish Fri May 25 20:51:05 2018 > 18.97% done, estimate finish Fri May 25 20:51:04 2018 > 18.97% done, estimate finish Fri May 25 20:51:07 2018 > 18.98% done, estimate finish Fri May 25 20:51:06 2018 > 18.98% done, estimate finish Fri May 25 20:51:05 2018 > 18.98% done, estimate finish Fri May 25 20:51:08 2018 > 18.99% done, estimate finish Fri May 25 20:51:07 2018 > 18.99% done, estimate finish Fri May 25 20:51:06 2018 > 19.00% done, estimate finish Fri May 25 20:51:04 2018 > 19.00% done, estimate finish Fri May 25 20:51:08 2018 > 19.00% done, estimate finish Fri May 25 20:51:06 2018 > 19.01% done, estimate finish Fri May 25 20:51:05 2018 > 19.01% done, estimate finish Fri May 25 20:51:04 2018 > 19.02% done, estimate finish Fri May 25 20:51:07 2018 > 19.02% done, estimate finish Fri May 25 20:51:06 2018 > 19.03% done, estimate finish Fri May 25 20:51:05 2018 > 19.03% done, estimate finish Fri May 25 20:51:03 2018 > 19.03% done, estimate finish Fri May 25 20:51:07 2018 > 19.04% done, estimate finish Fri May 25 20:51:06 2018 > 19.04% done, estimate finish Fri May 25 20:51:04 2018 > 19.05% done, estimate finish Fri May 25 20:51:08 2018 > 19.05% done, estimate finish Fri May 25 20:51:07 2018 > 19.05% done, estimate finish Fri May 25 20:51:05 2018 > 19.06% done, estimate finish Fri May 25 20:51:04 2018 > 19.06% done, estimate finish Fri May 25 20:51:08 2018 > 19.07% done, estimate finish Fri May 25 20:51:06 2018 > 19.07% done, estimate finish Fri May 25 20:51:05 2018 > 19.07% done, estimate finish Fri May 25 20:51:03 2018 > 19.08% done, estimate finish Fri May 25 20:51:07 2018 > 19.08% done, estimate finish Fri May 25 20:51:06 2018 > 19.09% done, estimate finish Fri May 25 20:51:04 2018 > 19.09% done, estimate finish Fri May 25 20:51:03 2018 > 19.09% done, estimate finish Fri May 25 20:51:07 2018 > 19.10% done, estimate finish Fri May 25 20:51:05 2018 > 19.10% done, estimate finish Fri May 25 20:51:04 2018 > 19.11% done, estimate finish Fri May 25 20:51:08 2018 > 19.11% done, estimate finish Fri May 25 20:51:06 2018 > 19.12% done, estimate finish Fri May 25 20:51:05 2018 > 19.12% done, estimate finish Fri May 25 20:51:03 2018 > 19.12% done, estimate finish Fri May 25 20:51:07 2018 > 19.13% done, estimate finish Fri May 25 20:51:06 2018 > 19.13% done, estimate finish Fri May 25 20:51:04 2018 > 19.14% done, estimate finish Fri May 25 20:51:03 2018 > 19.14% done, estimate finish Fri May 25 20:51:07 2018 > 19.14% done, estimate finish Fri May 25 20:51:05 2018 > 19.15% done, estimate finish Fri May 25 20:51:04 2018 > 19.15% done, estimate finish Fri May 25 20:51:08 2018 > 19.16% done, estimate finish Fri May 25 20:51:06 2018 > 19.16% done, estimate finish Fri May 25 20:51:05 2018 > 19.16% done, estimate finish Fri May 25 20:51:03 2018 > 19.17% done, estimate finish Fri May 25 20:51:07 2018 > 19.17% done, estimate finish Fri May 25 20:51:06 2018 > 19.18% done, estimate finish Fri May 25 20:51:04 2018 > 19.18% done, estimate finish Fri May 25 20:51:03 2018 > 19.18% done, estimate finish Fri May 25 20:51:07 2018 > 19.19% done, estimate finish Fri May 25 20:51:05 2018 > 19.19% done, estimate finish Fri May 25 20:51:04 2018 > 19.20% done, estimate finish Fri May 25 20:51:02 2018 > 19.20% done, estimate finish Fri May 25 20:51:06 2018 > 19.21% done, estimate finish Fri May 25 20:51:05 2018 > 19.21% done, estimate finish Fri May 25 20:51:03 2018 > 19.21% done, estimate finish Fri May 25 20:51:07 2018 > 19.22% done, estimate finish Fri May 25 20:51:06 2018 > 19.22% done, estimate finish Fri May 25 20:51:04 2018 > 19.23% done, estimate finish Fri May 25 20:51:03 2018 > 19.23% done, estimate finish Fri May 25 20:51:07 2018 > 19.23% done, estimate finish Fri May 25 20:51:05 2018 > 19.24% done, estimate finish Fri May 25 20:51:04 2018 > 19.24% done, estimate finish Fri May 25 20:51:03 2018 > 19.25% done, estimate finish Fri May 25 20:51:06 2018 > 19.25% done, estimate finish Fri May 25 20:51:05 2018 > 19.25% done, estimate finish Fri May 25 20:51:04 2018 > 19.26% done, estimate finish Fri May 25 20:51:02 2018 > 19.26% done, estimate finish Fri May 25 20:51:06 2018 > 19.27% done, estimate finish Fri May 25 20:51:05 2018 > 19.27% done, estimate finish Fri May 25 20:51:03 2018 > 19.27% done, estimate finish Fri May 25 20:51:07 2018 > 19.28% done, estimate finish Fri May 25 20:51:05 2018 > 19.28% done, estimate finish Fri May 25 20:51:04 2018 > 19.29% done, estimate finish Fri May 25 20:51:03 2018 > 19.29% done, estimate finish Fri May 25 20:51:06 2018 > 19.30% done, estimate finish Fri May 25 20:51:05 2018 > 19.30% done, estimate finish Fri May 25 20:51:04 2018 > 19.30% done, estimate finish Fri May 25 20:51:02 2018 > 19.31% done, estimate finish Fri May 25 20:51:06 2018 > 19.31% done, estimate finish Fri May 25 20:51:05 2018 > 19.32% done, estimate finish Fri May 25 20:51:03 2018 > 19.32% done, estimate finish Fri May 25 20:51:02 2018 > 19.32% done, estimate finish Fri May 25 20:51:06 2018 > 19.33% done, estimate finish Fri May 25 20:51:04 2018 > 19.33% done, estimate finish Fri May 25 20:51:03 2018 > 19.34% done, estimate finish Fri May 25 20:51:07 2018 > 19.34% done, estimate finish Fri May 25 20:51:05 2018 > 19.34% done, estimate finish Fri May 25 20:51:04 2018 > 19.35% done, estimate finish Fri May 25 20:51:02 2018 > 19.35% done, estimate finish Fri May 25 20:51:06 2018 > 19.36% done, estimate finish Fri May 25 20:51:05 2018 > 19.36% done, estimate finish Fri May 25 20:51:03 2018 > 19.37% done, estimate finish Fri May 25 20:51:02 2018 > 19.37% done, estimate finish Fri May 25 20:51:06 2018 > 19.37% done, estimate finish Fri May 25 20:51:04 2018 > 19.38% done, estimate finish Fri May 25 20:51:03 2018 > 19.38% done, estimate finish Fri May 25 20:51:07 2018 > 19.39% done, estimate finish Fri May 25 20:51:05 2018 > 19.39% done, estimate finish Fri May 25 20:51:04 2018 > 19.39% done, estimate finish Fri May 25 20:51:02 2018 > 19.40% done, estimate finish Fri May 25 20:51:06 2018 > 19.40% done, estimate finish Fri May 25 20:51:05 2018 > 19.41% done, estimate finish Fri May 25 20:51:03 2018 > 19.41% done, estimate finish Fri May 25 20:51:02 2018 > 19.41% done, estimate finish Fri May 25 20:51:06 2018 > 19.42% done, estimate finish Fri May 25 20:51:04 2018 > 19.42% done, estimate finish Fri May 25 20:51:03 2018 > 19.43% done, estimate finish Fri May 25 20:51:01 2018 > 19.43% done, estimate finish Fri May 25 20:51:05 2018 > 19.43% done, estimate finish Fri May 25 20:51:04 2018 > 19.44% done, estimate finish Fri May 25 20:51:02 2018 > 19.44% done, estimate finish Fri May 25 20:51:06 2018 > 19.45% done, estimate finish Fri May 25 20:51:05 2018 > 19.45% done, estimate finish Fri May 25 20:51:03 2018 > 19.46% done, estimate finish Fri May 25 20:51:02 2018 > 19.46% done, estimate finish Fri May 25 20:51:06 2018 > 19.46% done, estimate finish Fri May 25 20:51:04 2018 > 19.47% done, estimate finish Fri May 25 20:51:03 2018 > 19.47% done, estimate finish Fri May 25 20:51:02 2018 > 19.48% done, estimate finish Fri May 25 20:51:05 2018 > 19.48% done, estimate finish Fri May 25 20:51:04 2018 > 19.48% done, estimate finish Fri May 25 20:51:03 2018 > 19.49% done, estimate finish Fri May 25 20:51:06 2018 > 19.49% done, estimate finish Fri May 25 20:51:05 2018 > 19.50% done, estimate finish Fri May 25 20:51:03 2018 > 19.50% done, estimate finish Fri May 25 20:51:02 2018 > 19.50% done, estimate finish Fri May 25 20:51:06 2018 > 19.51% done, estimate finish Fri May 25 20:51:04 2018 > 19.51% done, estimate finish Fri May 25 20:51:03 2018 > 19.52% done, estimate finish Fri May 25 20:51:02 2018 > 19.52% done, estimate finish Fri May 25 20:51:05 2018 > 19.52% done, estimate finish Fri May 25 20:51:04 2018 > 19.53% done, estimate finish Fri May 25 20:51:03 2018 > 19.53% done, estimate finish Fri May 25 20:51:01 2018 > 19.54% done, estimate finish Fri May 25 20:51:05 2018 > 19.54% done, estimate finish Fri May 25 20:51:04 2018 > 19.55% done, estimate finish Fri May 25 20:51:02 2018 > 19.55% done, estimate finish Fri May 25 20:51:01 2018 > 19.55% done, estimate finish Fri May 25 20:51:05 2018 > 19.56% done, estimate finish Fri May 25 20:51:03 2018 > 19.56% done, estimate finish Fri May 25 20:51:02 2018 > 19.57% done, estimate finish Fri May 25 20:51:05 2018 > 19.57% done, estimate finish Fri May 25 20:51:04 2018 > 19.57% done, estimate finish Fri May 25 20:51:03 2018 > 19.58% done, estimate finish Fri May 25 20:51:01 2018 > 19.58% done, estimate finish Fri May 25 20:51:05 2018 > 19.59% done, estimate finish Fri May 25 20:51:04 2018 > 19.59% done, estimate finish Fri May 25 20:51:02 2018 > 19.59% done, estimate finish Fri May 25 20:51:06 2018 > 19.60% done, estimate finish Fri May 25 20:51:05 2018 > 19.60% done, estimate finish Fri May 25 20:51:03 2018 > 19.61% done, estimate finish Fri May 25 20:51:02 2018 > 19.61% done, estimate finish Fri May 25 20:51:06 2018 > 19.61% done, estimate finish Fri May 25 20:51:04 2018 > 19.62% done, estimate finish Fri May 25 20:51:03 2018 > 19.62% done, estimate finish Fri May 25 20:51:01 2018 > 19.63% done, estimate finish Fri May 25 20:51:05 2018 > 19.63% done, estimate finish Fri May 25 20:51:04 2018 > 19.64% done, estimate finish Fri May 25 20:51:02 2018 > 19.64% done, estimate finish Fri May 25 20:51:01 2018 > 19.64% done, estimate finish Fri May 25 20:51:05 2018 > 19.65% done, estimate finish Fri May 25 20:51:03 2018 > 19.65% done, estimate finish Fri May 25 20:51:02 2018 > 19.66% done, estimate finish Fri May 25 20:51:00 2018 > 19.66% done, estimate finish Fri May 25 20:51:04 2018 > 19.66% done, estimate finish Fri May 25 20:51:03 2018 > 19.67% done, estimate finish Fri May 25 20:51:01 2018 > 19.67% done, estimate finish Fri May 25 20:51:05 2018 > 19.68% done, estimate finish Fri May 25 20:51:04 2018 > 19.68% done, estimate finish Fri May 25 20:51:02 2018 > 19.68% done, estimate finish Fri May 25 20:51:01 2018 > 19.69% done, estimate finish Fri May 25 20:51:05 2018 > 19.69% done, estimate finish Fri May 25 20:51:03 2018 > 19.70% done, estimate finish Fri May 25 20:51:02 2018 > 19.70% done, estimate finish Fri May 25 20:51:06 2018 > 19.71% done, estimate finish Fri May 25 20:51:04 2018 > 19.71% done, estimate finish Fri May 25 20:51:03 2018 > 19.71% done, estimate finish Fri May 25 20:51:02 2018 > 19.72% done, estimate finish Fri May 25 20:51:05 2018 > 19.72% done, estimate finish Fri May 25 20:51:04 2018 > 19.73% done, estimate finish Fri May 25 20:51:02 2018 > 19.73% done, estimate finish Fri May 25 20:51:01 2018 > 19.73% done, estimate finish Fri May 25 20:51:05 2018 > 19.74% done, estimate finish Fri May 25 20:51:03 2018 > 19.74% done, estimate finish Fri May 25 20:51:02 2018 > 19.75% done, estimate finish Fri May 25 20:51:01 2018 > 19.75% done, estimate finish Fri May 25 20:51:04 2018 > 19.75% done, estimate finish Fri May 25 20:51:03 2018 > 19.76% done, estimate finish Fri May 25 20:51:02 2018 > 19.76% done, estimate finish Fri May 25 20:51:00 2018 > 19.77% done, estimate finish Fri May 25 20:51:04 2018 > 19.77% done, estimate finish Fri May 25 20:51:03 2018 > 19.77% done, estimate finish Fri May 25 20:51:01 2018 > 19.78% done, estimate finish Fri May 25 20:51:05 2018 > 19.78% done, estimate finish Fri May 25 20:51:03 2018 > 19.79% done, estimate finish Fri May 25 20:51:02 2018 > 19.79% done, estimate finish Fri May 25 20:51:01 2018 > 19.80% done, estimate finish Fri May 25 20:51:04 2018 > 19.80% done, estimate finish Fri May 25 20:51:03 2018 > 19.80% done, estimate finish Fri May 25 20:51:02 2018 > 19.81% done, estimate finish Fri May 25 20:51:00 2018 > 19.81% done, estimate finish Fri May 25 20:51:04 2018 > 19.82% done, estimate finish Fri May 25 20:51:03 2018 > 19.82% done, estimate finish Fri May 25 20:51:01 2018 > 19.82% done, estimate finish Fri May 25 20:51:05 2018 > 19.83% done, estimate finish Fri May 25 20:51:04 2018 > 19.83% done, estimate finish Fri May 25 20:51:02 2018 > 19.84% done, estimate finish Fri May 25 20:51:01 2018 > 19.84% done, estimate finish Fri May 25 20:51:04 2018 > 19.84% done, estimate finish Fri May 25 20:51:03 2018 > 19.85% done, estimate finish Fri May 25 20:51:02 2018 > 19.85% done, estimate finish Fri May 25 20:51:00 2018 > 19.86% done, estimate finish Fri May 25 20:51:04 2018 > 19.86% done, estimate finish Fri May 25 20:51:03 2018 > 19.86% done, estimate finish Fri May 25 20:51:01 2018 > 19.87% done, estimate finish Fri May 25 20:51:00 2018 > 19.87% done, estimate finish Fri May 25 20:51:04 2018 > 19.88% done, estimate finish Fri May 25 20:51:02 2018 > 19.88% done, estimate finish Fri May 25 20:51:01 2018 > 19.89% done, estimate finish Fri May 25 20:51:05 2018 > 19.89% done, estimate finish Fri May 25 20:51:03 2018 > 19.89% done, estimate finish Fri May 25 20:51:02 2018 > 19.90% done, estimate finish Fri May 25 20:51:06 2018 > 19.90% done, estimate finish Fri May 25 20:51:04 2018 > 19.91% done, estimate finish Fri May 25 20:51:03 2018 > 19.91% done, estimate finish Fri May 25 20:51:01 2018 > 19.91% done, estimate finish Fri May 25 20:51:05 2018 > 19.92% done, estimate finish Fri May 25 20:51:04 2018 > 19.92% done, estimate finish Fri May 25 20:51:02 2018 > 19.93% done, estimate finish Fri May 25 20:51:06 2018 > 19.93% done, estimate finish Fri May 25 20:51:05 2018 > 19.93% done, estimate finish Fri May 25 20:51:03 2018 > 19.94% done, estimate finish Fri May 25 20:51:02 2018 > 19.94% done, estimate finish Fri May 25 20:51:06 2018 > 19.95% done, estimate finish Fri May 25 20:51:04 2018 > 19.95% done, estimate finish Fri May 25 20:51:03 2018 > 19.95% done, estimate finish Fri May 25 20:51:01 2018 > 19.96% done, estimate finish Fri May 25 20:51:05 2018 > 19.96% done, estimate finish Fri May 25 20:51:04 2018 > 19.97% done, estimate finish Fri May 25 20:51:02 2018 > 19.97% done, estimate finish Fri May 25 20:51:01 2018 > 19.98% done, estimate finish Fri May 25 20:51:05 2018 > 19.98% done, estimate finish Fri May 25 20:51:03 2018 > 19.98% done, estimate finish Fri May 25 20:51:02 2018 > 19.99% done, estimate finish Fri May 25 20:51:06 2018 > 19.99% done, estimate finish Fri May 25 20:51:04 2018 > 20.00% done, estimate finish Fri May 25 20:51:03 2018 > 20.00% done, estimate finish Fri May 25 20:51:02 2018 > 20.00% done, estimate finish Fri May 25 20:51:05 2018 > 20.01% done, estimate finish Fri May 25 20:51:04 2018 > 20.01% done, estimate finish Fri May 25 20:51:02 2018 > 20.02% done, estimate finish Fri May 25 20:51:01 2018 > 20.02% done, estimate finish Fri May 25 20:51:05 2018 > 20.02% done, estimate finish Fri May 25 20:51:03 2018 > 20.03% done, estimate finish Fri May 25 20:51:02 2018 > 20.03% done, estimate finish Fri May 25 20:51:06 2018 > 20.04% done, estimate finish Fri May 25 20:51:04 2018 > 20.04% done, estimate finish Fri May 25 20:51:03 2018 > 20.04% done, estimate finish Fri May 25 20:51:02 2018 > 20.05% done, estimate finish Fri May 25 20:51:05 2018 > 20.05% done, estimate finish Fri May 25 20:51:04 2018 > 20.06% done, estimate finish Fri May 25 20:51:03 2018 > 20.06% done, estimate finish Fri May 25 20:51:01 2018 > 20.07% done, estimate finish Fri May 25 20:51:05 2018 > 20.07% done, estimate finish Fri May 25 20:51:03 2018 > 20.07% done, estimate finish Fri May 25 20:51:02 2018 > 20.08% done, estimate finish Fri May 25 20:51:01 2018 > 20.08% done, estimate finish Fri May 25 20:51:04 2018 > 20.09% done, estimate finish Fri May 25 20:51:03 2018 > 20.09% done, estimate finish Fri May 25 20:51:02 2018 > 20.09% done, estimate finish Fri May 25 20:51:05 2018 > 20.10% done, estimate finish Fri May 25 20:51:04 2018 > 20.10% done, estimate finish Fri May 25 20:51:03 2018 > 20.11% done, estimate finish Fri May 25 20:51:01 2018 > 20.11% done, estimate finish Fri May 25 20:51:05 2018 > 20.11% done, estimate finish Fri May 25 20:51:04 2018 > 20.12% done, estimate finish Fri May 25 20:51:02 2018 > 20.12% done, estimate finish Fri May 25 20:51:01 2018 > 20.13% done, estimate finish Fri May 25 20:51:04 2018 > 20.13% done, estimate finish Fri May 25 20:51:03 2018 > 20.14% done, estimate finish Fri May 25 20:51:02 2018 > 20.14% done, estimate finish Fri May 25 20:51:05 2018 > 20.14% done, estimate finish Fri May 25 20:51:04 2018 > 20.15% done, estimate finish Fri May 25 20:51:03 2018 > 20.15% done, estimate finish Fri May 25 20:51:01 2018 > 20.16% done, estimate finish Fri May 25 20:51:05 2018 > 20.16% done, estimate finish Fri May 25 20:51:04 2018 > 20.16% done, estimate finish Fri May 25 20:51:02 2018 > 20.17% done, estimate finish Fri May 25 20:51:01 2018 > 20.17% done, estimate finish Fri May 25 20:51:05 2018 > 20.18% done, estimate finish Fri May 25 20:51:03 2018 > 20.18% done, estimate finish Fri May 25 20:51:02 2018 > 20.18% done, estimate finish Fri May 25 20:51:00 2018 > 20.19% done, estimate finish Fri May 25 20:51:04 2018 > 20.19% done, estimate finish Fri May 25 20:51:03 2018 > 20.20% done, estimate finish Fri May 25 20:51:01 2018 > 20.20% done, estimate finish Fri May 25 20:51:05 2018 > 20.20% done, estimate finish Fri May 25 20:51:04 2018 > 20.21% done, estimate finish Fri May 25 20:51:02 2018 > 20.21% done, estimate finish Fri May 25 20:51:01 2018 > 20.22% done, estimate finish Fri May 25 20:51:05 2018 > 20.22% done, estimate finish Fri May 25 20:51:03 2018 > 20.23% done, estimate finish Fri May 25 20:51:02 2018 > 20.23% done, estimate finish Fri May 25 20:51:06 2018 > 20.23% done, estimate finish Fri May 25 20:51:04 2018 > 20.24% done, estimate finish Fri May 25 20:51:03 2018 > 20.24% done, estimate finish Fri May 25 20:51:02 2018 > 20.25% done, estimate finish Fri May 25 20:51:05 2018 > 20.25% done, estimate finish Fri May 25 20:51:04 2018 > 20.25% done, estimate finish Fri May 25 20:51:02 2018 > 20.26% done, estimate finish Fri May 25 20:51:01 2018 > 20.26% done, estimate finish Fri May 25 20:51:05 2018 > 20.27% done, estimate finish Fri May 25 20:51:03 2018 > 20.27% done, estimate finish Fri May 25 20:51:02 2018 > 20.27% done, estimate finish Fri May 25 20:51:01 2018 > 20.28% done, estimate finish Fri May 25 20:51:04 2018 > 20.28% done, estimate finish Fri May 25 20:51:03 2018 > 20.29% done, estimate finish Fri May 25 20:51:02 2018 > 20.29% done, estimate finish Fri May 25 20:51:00 2018 > 20.29% done, estimate finish Fri May 25 20:51:04 2018 > 20.30% done, estimate finish Fri May 25 20:51:02 2018 > 20.30% done, estimate finish Fri May 25 20:51:01 2018 > 20.31% done, estimate finish Fri May 25 20:51:05 2018 > 20.31% done, estimate finish Fri May 25 20:51:03 2018 > 20.32% done, estimate finish Fri May 25 20:51:02 2018 > 20.32% done, estimate finish Fri May 25 20:51:01 2018 > 20.32% done, estimate finish Fri May 25 20:51:04 2018 > 20.33% done, estimate finish Fri May 25 20:51:03 2018 > 20.33% done, estimate finish Fri May 25 20:51:02 2018 > 20.34% done, estimate finish Fri May 25 20:51:00 2018 > 20.34% done, estimate finish Fri May 25 20:51:04 2018 > 20.34% done, estimate finish Fri May 25 20:51:03 2018 > 20.35% done, estimate finish Fri May 25 20:51:01 2018 > 20.35% done, estimate finish Fri May 25 20:51:05 2018 > 20.36% done, estimate finish Fri May 25 20:51:03 2018 > 20.36% done, estimate finish Fri May 25 20:51:02 2018 > 20.36% done, estimate finish Fri May 25 20:51:01 2018 > 20.37% done, estimate finish Fri May 25 20:51:04 2018 > 20.37% done, estimate finish Fri May 25 20:51:03 2018 > 20.38% done, estimate finish Fri May 25 20:51:02 2018 > 20.38% done, estimate finish Fri May 25 20:51:00 2018 > 20.38% done, estimate finish Fri May 25 20:51:04 2018 > 20.39% done, estimate finish Fri May 25 20:51:03 2018 > 20.39% done, estimate finish Fri May 25 20:51:01 2018 > 20.40% done, estimate finish Fri May 25 20:51:05 2018 > 20.40% done, estimate finish Fri May 25 20:51:04 2018 > 20.41% done, estimate finish Fri May 25 20:51:02 2018 > 20.41% done, estimate finish Fri May 25 20:51:01 2018 > 20.41% done, estimate finish Fri May 25 20:51:04 2018 > 20.42% done, estimate finish Fri May 25 20:51:03 2018 > 20.42% done, estimate finish Fri May 25 20:51:02 2018 > 20.43% done, estimate finish Fri May 25 20:51:00 2018 > 20.43% done, estimate finish Fri May 25 20:51:04 2018 > 20.43% done, estimate finish Fri May 25 20:51:03 2018 > 20.44% done, estimate finish Fri May 25 20:51:01 2018 > 20.44% done, estimate finish Fri May 25 20:51:00 2018 > 20.45% done, estimate finish Fri May 25 20:51:04 2018 > 20.45% done, estimate finish Fri May 25 20:51:02 2018 > 20.45% done, estimate finish Fri May 25 20:51:01 2018 > 20.46% done, estimate finish Fri May 25 20:51:05 2018 > 20.46% done, estimate finish Fri May 25 20:51:03 2018 > 20.47% done, estimate finish Fri May 25 20:51:02 2018 > 20.47% done, estimate finish Fri May 25 20:51:01 2018 > 20.48% done, estimate finish Fri May 25 20:51:04 2018 > 20.48% done, estimate finish Fri May 25 20:51:03 2018 > 20.48% done, estimate finish Fri May 25 20:51:01 2018 > 20.49% done, estimate finish Fri May 25 20:51:05 2018 > 20.49% done, estimate finish Fri May 25 20:51:04 2018 > 20.50% done, estimate finish Fri May 25 20:51:02 2018 > 20.50% done, estimate finish Fri May 25 20:51:01 2018 > 20.50% done, estimate finish Fri May 25 20:51:05 2018 > 20.51% done, estimate finish Fri May 25 20:51:03 2018 > 20.51% done, estimate finish Fri May 25 20:51:02 2018 > 20.52% done, estimate finish Fri May 25 20:51:01 2018 > 20.52% done, estimate finish Fri May 25 20:51:04 2018 > 20.52% done, estimate finish Fri May 25 20:51:03 2018 > 20.53% done, estimate finish Fri May 25 20:51:02 2018 > 20.53% done, estimate finish Fri May 25 20:51:00 2018 > 20.54% done, estimate finish Fri May 25 20:51:04 2018 > 20.54% done, estimate finish Fri May 25 20:51:02 2018 > 20.54% done, estimate finish Fri May 25 20:51:01 2018 > 20.55% done, estimate finish Fri May 25 20:51:05 2018 > 20.55% done, estimate finish Fri May 25 20:51:03 2018 > 20.56% done, estimate finish Fri May 25 20:51:02 2018 > 20.56% done, estimate finish Fri May 25 20:51:01 2018 > 20.57% done, estimate finish Fri May 25 20:51:04 2018 > 20.57% done, estimate finish Fri May 25 20:51:03 2018 > 20.57% done, estimate finish Fri May 25 20:51:02 2018 > 20.58% done, estimate finish Fri May 25 20:51:00 2018 > 20.58% done, estimate finish Fri May 25 20:51:04 2018 > 20.59% done, estimate finish Fri May 25 20:51:03 2018 > 20.59% done, estimate finish Fri May 25 20:51:01 2018 > 20.59% done, estimate finish Fri May 25 20:51:00 2018 > 20.60% done, estimate finish Fri May 25 20:51:03 2018 > 20.60% done, estimate finish Fri May 25 20:51:02 2018 > 20.61% done, estimate finish Fri May 25 20:51:01 2018 > 20.61% done, estimate finish Fri May 25 20:51:04 2018 > 20.61% done, estimate finish Fri May 25 20:51:03 2018 > 20.62% done, estimate finish Fri May 25 20:51:02 2018 > 20.62% done, estimate finish Fri May 25 20:51:00 2018 > 20.63% done, estimate finish Fri May 25 20:51:04 2018 > 20.63% done, estimate finish Fri May 25 20:51:03 2018 > 20.63% done, estimate finish Fri May 25 20:51:01 2018 > 20.64% done, estimate finish Fri May 25 20:51:00 2018 > 20.64% done, estimate finish Fri May 25 20:51:03 2018 > 20.65% done, estimate finish Fri May 25 20:51:02 2018 > 20.65% done, estimate finish Fri May 25 20:51:01 2018 > 20.66% done, estimate finish Fri May 25 20:51:04 2018 > 20.66% done, estimate finish Fri May 25 20:51:03 2018 > 20.66% done, estimate finish Fri May 25 20:51:02 2018 > 20.67% done, estimate finish Fri May 25 20:51:00 2018 > 20.67% done, estimate finish Fri May 25 20:51:04 2018 > 20.68% done, estimate finish Fri May 25 20:51:03 2018 > 20.68% done, estimate finish Fri May 25 20:51:01 2018 > 20.68% done, estimate finish Fri May 25 20:51:00 2018 > 20.69% done, estimate finish Fri May 25 20:51:04 2018 > 20.69% done, estimate finish Fri May 25 20:51:02 2018 > 20.70% done, estimate finish Fri May 25 20:51:01 2018 > 20.70% done, estimate finish Fri May 25 20:51:00 2018 > 20.70% done, estimate finish Fri May 25 20:51:03 2018 > 20.71% done, estimate finish Fri May 25 20:51:02 2018 > 20.71% done, estimate finish Fri May 25 20:51:01 2018 > 20.72% done, estimate finish Fri May 25 20:51:04 2018 > 20.72% done, estimate finish Fri May 25 20:51:03 2018 > 20.72% done, estimate finish Fri May 25 20:51:01 2018 > 20.73% done, estimate finish Fri May 25 20:51:00 2018 > 20.73% done, estimate finish Fri May 25 20:51:04 2018 > 20.74% done, estimate finish Fri May 25 20:51:02 2018 > 20.74% done, estimate finish Fri May 25 20:51:01 2018 > 20.75% done, estimate finish Fri May 25 20:51:05 2018 > 20.75% done, estimate finish Fri May 25 20:51:03 2018 > 20.75% done, estimate finish Fri May 25 20:51:02 2018 > 20.76% done, estimate finish Fri May 25 20:51:01 2018 > 20.76% done, estimate finish Fri May 25 20:51:04 2018 > 20.77% done, estimate finish Fri May 25 20:51:03 2018 > 20.77% done, estimate finish Fri May 25 20:51:01 2018 > 20.77% done, estimate finish Fri May 25 20:51:00 2018 > 20.78% done, estimate finish Fri May 25 20:51:04 2018 > 20.78% done, estimate finish Fri May 25 20:51:02 2018 > 20.79% done, estimate finish Fri May 25 20:51:01 2018 > 20.79% done, estimate finish Fri May 25 20:51:00 2018 > 20.79% done, estimate finish Fri May 25 20:51:03 2018 > 20.80% done, estimate finish Fri May 25 20:51:02 2018 > 20.80% done, estimate finish Fri May 25 20:51:01 2018 > 20.81% done, estimate finish Fri May 25 20:51:04 2018 > 20.81% done, estimate finish Fri May 25 20:51:03 2018 > 20.81% done, estimate finish Fri May 25 20:51:02 2018 > 20.82% done, estimate finish Fri May 25 20:51:00 2018 > 20.82% done, estimate finish Fri May 25 20:51:04 2018 > 20.83% done, estimate finish Fri May 25 20:51:02 2018 > 20.83% done, estimate finish Fri May 25 20:51:01 2018 > 20.84% done, estimate finish Fri May 25 20:51:00 2018 > 20.84% done, estimate finish Fri May 25 20:51:03 2018 > 20.84% done, estimate finish Fri May 25 20:51:02 2018 > 20.85% done, estimate finish Fri May 25 20:51:01 2018 > 20.85% done, estimate finish Fri May 25 20:50:59 2018 > 20.86% done, estimate finish Fri May 25 20:51:03 2018 > 20.86% done, estimate finish Fri May 25 20:51:02 2018 > 20.86% done, estimate finish Fri May 25 20:51:00 2018 > 20.87% done, estimate finish Fri May 25 20:51:04 2018 > 20.87% done, estimate finish Fri May 25 20:51:03 2018 > 20.88% done, estimate finish Fri May 25 20:51:01 2018 > 20.88% done, estimate finish Fri May 25 20:51:00 2018 > 20.88% done, estimate finish Fri May 25 20:51:03 2018 > 20.89% done, estimate finish Fri May 25 20:51:02 2018 > 20.89% done, estimate finish Fri May 25 20:51:01 2018 > 20.90% done, estimate finish Fri May 25 20:51:04 2018 > 20.90% done, estimate finish Fri May 25 20:51:03 2018 > 20.91% done, estimate finish Fri May 25 20:51:02 2018 > 20.91% done, estimate finish Fri May 25 20:51:00 2018 > 20.91% done, estimate finish Fri May 25 20:51:04 2018 > 20.92% done, estimate finish Fri May 25 20:51:03 2018 > 20.92% done, estimate finish Fri May 25 20:51:01 2018 > 20.93% done, estimate finish Fri May 25 20:51:00 2018 > 20.93% done, estimate finish Fri May 25 20:51:03 2018 > 20.93% done, estimate finish Fri May 25 20:51:02 2018 > 20.94% done, estimate finish Fri May 25 20:51:01 2018 > 20.94% done, estimate finish Fri May 25 20:51:00 2018 > 20.95% done, estimate finish Fri May 25 20:51:03 2018 > 20.95% done, estimate finish Fri May 25 20:51:02 2018 > 20.95% done, estimate finish Fri May 25 20:51:00 2018 > 20.96% done, estimate finish Fri May 25 20:51:04 2018 > 20.96% done, estimate finish Fri May 25 20:51:03 2018 > 20.97% done, estimate finish Fri May 25 20:51:01 2018 > 20.97% done, estimate finish Fri May 25 20:51:00 2018 > 20.97% done, estimate finish Fri May 25 20:51:04 2018 > 20.98% done, estimate finish Fri May 25 20:51:02 2018 > 20.98% done, estimate finish Fri May 25 20:51:01 2018 > 20.99% done, estimate finish Fri May 25 20:51:00 2018 > 20.99% done, estimate finish Fri May 25 20:51:03 2018 > 21.00% done, estimate finish Fri May 25 20:51:02 2018 > 21.00% done, estimate finish Fri May 25 20:51:01 2018 > 21.00% done, estimate finish Fri May 25 20:51:04 2018 > 21.01% done, estimate finish Fri May 25 20:51:03 2018 > 21.01% done, estimate finish Fri May 25 20:51:01 2018 > 21.02% done, estimate finish Fri May 25 20:51:00 2018 > 21.02% done, estimate finish Fri May 25 20:51:04 2018 > 21.02% done, estimate finish Fri May 25 20:51:02 2018 > 21.03% done, estimate finish Fri May 25 20:51:01 2018 > 21.03% done, estimate finish Fri May 25 20:51:00 2018 > 21.04% done, estimate finish Fri May 25 20:51:03 2018 > 21.04% done, estimate finish Fri May 25 20:51:02 2018 > 21.04% done, estimate finish Fri May 25 20:51:01 2018 > 21.05% done, estimate finish Fri May 25 20:51:04 2018 > 21.05% done, estimate finish Fri May 25 20:51:03 2018 > 21.06% done, estimate finish Fri May 25 20:51:02 2018 > 21.06% done, estimate finish Fri May 25 20:51:00 2018 > 21.06% done, estimate finish Fri May 25 20:51:04 2018 > 21.07% done, estimate finish Fri May 25 20:51:02 2018 > 21.07% done, estimate finish Fri May 25 20:51:01 2018 > 21.08% done, estimate finish Fri May 25 20:51:00 2018 > 21.08% done, estimate finish Fri May 25 20:51:03 2018 > 21.09% done, estimate finish Fri May 25 20:51:02 2018 > 21.09% done, estimate finish Fri May 25 20:51:01 2018 > 21.09% done, estimate finish Fri May 25 20:50:59 2018 > 21.10% done, estimate finish Fri May 25 20:51:03 2018 > 21.10% done, estimate finish Fri May 25 20:51:02 2018 > 21.11% done, estimate finish Fri May 25 20:51:00 2018 > 21.11% done, estimate finish Fri May 25 20:51:04 2018 > 21.11% done, estimate finish Fri May 25 20:51:02 2018 > 21.12% done, estimate finish Fri May 25 20:51:01 2018 > 21.12% done, estimate finish Fri May 25 20:51:00 2018 > 21.13% done, estimate finish Fri May 25 20:51:03 2018 > 21.13% done, estimate finish Fri May 25 20:51:02 2018 > 21.13% done, estimate finish Fri May 25 20:51:01 2018 > 21.14% done, estimate finish Fri May 25 20:51:04 2018 > 21.14% done, estimate finish Fri May 25 20:51:03 2018 > 21.15% done, estimate finish Fri May 25 20:51:02 2018 > 21.15% done, estimate finish Fri May 25 20:51:00 2018 > 21.15% done, estimate finish Fri May 25 20:51:04 2018 > 21.16% done, estimate finish Fri May 25 20:51:03 2018 > 21.16% done, estimate finish Fri May 25 20:51:01 2018 > 21.17% done, estimate finish Fri May 25 20:51:00 2018 > 21.17% done, estimate finish Fri May 25 20:51:03 2018 > 21.18% done, estimate finish Fri May 25 20:51:02 2018 > 21.18% done, estimate finish Fri May 25 20:51:01 2018 > 21.18% done, estimate finish Fri May 25 20:51:04 2018 > 21.19% done, estimate finish Fri May 25 20:51:03 2018 > 21.19% done, estimate finish Fri May 25 20:51:02 2018 > 21.20% done, estimate finish Fri May 25 20:51:00 2018 > 21.20% done, estimate finish Fri May 25 20:51:04 2018 > 21.20% done, estimate finish Fri May 25 20:51:03 2018 > 21.21% done, estimate finish Fri May 25 20:51:01 2018 > 21.21% done, estimate finish Fri May 25 20:51:00 2018 > 21.22% done, estimate finish Fri May 25 20:51:03 2018 > 21.22% done, estimate finish Fri May 25 20:51:02 2018 > 21.22% done, estimate finish Fri May 25 20:51:01 2018 > 21.23% done, estimate finish Fri May 25 20:51:00 2018 > 21.23% done, estimate finish Fri May 25 20:51:03 2018 > 21.24% done, estimate finish Fri May 25 20:51:02 2018 > 21.24% done, estimate finish Fri May 25 20:51:01 2018 > 21.25% done, estimate finish Fri May 25 20:51:04 2018 > 21.25% done, estimate finish Fri May 25 20:51:03 2018 > 21.25% done, estimate finish Fri May 25 20:51:01 2018 > 21.26% done, estimate finish Fri May 25 20:51:00 2018 > 21.26% done, estimate finish Fri May 25 20:51:04 2018 > 21.27% done, estimate finish Fri May 25 20:51:02 2018 > 21.27% done, estimate finish Fri May 25 20:51:01 2018 > 21.27% done, estimate finish Fri May 25 20:51:04 2018 > 21.28% done, estimate finish Fri May 25 20:51:03 2018 > 21.28% done, estimate finish Fri May 25 20:51:02 2018 > 21.29% done, estimate finish Fri May 25 20:51:01 2018 > 21.29% done, estimate finish Fri May 25 20:51:04 2018 > 21.29% done, estimate finish Fri May 25 20:51:03 2018 > 21.30% done, estimate finish Fri May 25 20:51:01 2018 > 21.30% done, estimate finish Fri May 25 20:51:00 2018 > 21.31% done, estimate finish Fri May 25 20:51:04 2018 > 21.31% done, estimate finish Fri May 25 20:51:02 2018 > 21.31% done, estimate finish Fri May 25 20:51:01 2018 > 21.32% done, estimate finish Fri May 25 20:51:04 2018 > 21.32% done, estimate finish Fri May 25 20:51:03 2018 > 21.33% done, estimate finish Fri May 25 20:51:02 2018 > 21.33% done, estimate finish Fri May 25 20:51:01 2018 > 21.34% done, estimate finish Fri May 25 20:51:04 2018 > 21.34% done, estimate finish Fri May 25 20:51:03 2018 > 21.34% done, estimate finish Fri May 25 20:51:02 2018 > 21.35% done, estimate finish Fri May 25 20:51:00 2018 > 21.35% done, estimate finish Fri May 25 20:51:04 2018 > 21.36% done, estimate finish Fri May 25 20:51:02 2018 > 21.36% done, estimate finish Fri May 25 20:51:01 2018 > 21.36% done, estimate finish Fri May 25 20:51:05 2018 > 21.37% done, estimate finish Fri May 25 20:51:03 2018 > 21.37% done, estimate finish Fri May 25 20:51:02 2018 > 21.38% done, estimate finish Fri May 25 20:51:01 2018 > 21.38% done, estimate finish Fri May 25 20:51:04 2018 > 21.38% done, estimate finish Fri May 25 20:51:03 2018 > 21.39% done, estimate finish Fri May 25 20:51:02 2018 > 21.39% done, estimate finish Fri May 25 20:51:00 2018 > 21.40% done, estimate finish Fri May 25 20:51:04 2018 > 21.40% done, estimate finish Fri May 25 20:51:02 2018 > 21.40% done, estimate finish Fri May 25 20:51:01 2018 > 21.41% done, estimate finish Fri May 25 20:51:05 2018 > 21.41% done, estimate finish Fri May 25 20:51:03 2018 > 21.42% done, estimate finish Fri May 25 20:51:02 2018 > 21.42% done, estimate finish Fri May 25 20:51:01 2018 > 21.43% done, estimate finish Fri May 25 20:51:04 2018 > 21.43% done, estimate finish Fri May 25 20:51:03 2018 > 21.43% done, estimate finish Fri May 25 20:51:02 2018 > 21.44% done, estimate finish Fri May 25 20:51:00 2018 > 21.44% done, estimate finish Fri May 25 20:51:04 2018 > 21.45% done, estimate finish Fri May 25 20:51:03 2018 > 21.45% done, estimate finish Fri May 25 20:51:01 2018 > 21.45% done, estimate finish Fri May 25 20:51:05 2018 > 21.46% done, estimate finish Fri May 25 20:51:03 2018 > 21.46% done, estimate finish Fri May 25 20:51:02 2018 > 21.47% done, estimate finish Fri May 25 20:51:01 2018 > 21.47% done, estimate finish Fri May 25 20:51:04 2018 > 21.47% done, estimate finish Fri May 25 20:51:03 2018 > 21.48% done, estimate finish Fri May 25 20:51:02 2018 > 21.48% done, estimate finish Fri May 25 20:51:00 2018 > 21.49% done, estimate finish Fri May 25 20:51:04 2018 > 21.49% done, estimate finish Fri May 25 20:51:03 2018 > 21.49% done, estimate finish Fri May 25 20:51:01 2018 > 21.50% done, estimate finish Fri May 25 20:51:00 2018 > 21.50% done, estimate finish Fri May 25 20:51:03 2018 > 21.51% done, estimate finish Fri May 25 20:51:02 2018 > 21.51% done, estimate finish Fri May 25 20:51:01 2018 > 21.52% done, estimate finish Fri May 25 20:51:04 2018 > 21.52% done, estimate finish Fri May 25 20:51:03 2018 > 21.52% done, estimate finish Fri May 25 20:51:02 2018 > 21.53% done, estimate finish Fri May 25 20:51:01 2018 > 21.53% done, estimate finish Fri May 25 20:51:04 2018 > 21.54% done, estimate finish Fri May 25 20:51:03 2018 > 21.54% done, estimate finish Fri May 25 20:51:01 2018 > 21.54% done, estimate finish Fri May 25 20:51:00 2018 > 21.55% done, estimate finish Fri May 25 20:51:04 2018 > 21.55% done, estimate finish Fri May 25 20:51:02 2018 > 21.56% done, estimate finish Fri May 25 20:51:01 2018 > 21.56% done, estimate finish Fri May 25 20:51:04 2018 > 21.56% done, estimate finish Fri May 25 20:51:03 2018 > 21.57% done, estimate finish Fri May 25 20:51:02 2018 > 21.57% done, estimate finish Fri May 25 20:51:01 2018 > 21.58% done, estimate finish Fri May 25 20:51:04 2018 > 21.58% done, estimate finish Fri May 25 20:51:03 2018 > 21.58% done, estimate finish Fri May 25 20:51:02 2018 > 21.59% done, estimate finish Fri May 25 20:51:05 2018 > 21.59% done, estimate finish Fri May 25 20:51:04 2018 > 21.60% done, estimate finish Fri May 25 20:51:02 2018 > 21.60% done, estimate finish Fri May 25 20:51:01 2018 > 21.61% done, estimate finish Fri May 25 20:51:04 2018 > 21.61% done, estimate finish Fri May 25 20:51:03 2018 > 21.61% done, estimate finish Fri May 25 20:51:02 2018 > 21.62% done, estimate finish Fri May 25 20:51:01 2018 > 21.62% done, estimate finish Fri May 25 20:51:04 2018 > 21.63% done, estimate finish Fri May 25 20:51:03 2018 > 21.63% done, estimate finish Fri May 25 20:51:02 2018 > 21.63% done, estimate finish Fri May 25 20:51:00 2018 > 21.64% done, estimate finish Fri May 25 20:51:04 2018 > 21.64% done, estimate finish Fri May 25 20:51:02 2018 > 21.65% done, estimate finish Fri May 25 20:51:01 2018 > 21.65% done, estimate finish Fri May 25 20:51:05 2018 > 21.65% done, estimate finish Fri May 25 20:51:03 2018 > 21.66% done, estimate finish Fri May 25 20:51:02 2018 > 21.66% done, estimate finish Fri May 25 20:51:01 2018 > 21.67% done, estimate finish Fri May 25 20:51:04 2018 > 21.67% done, estimate finish Fri May 25 20:51:03 2018 > 21.68% done, estimate finish Fri May 25 20:51:02 2018 > 21.68% done, estimate finish Fri May 25 20:51:00 2018 > 21.68% done, estimate finish Fri May 25 20:51:04 2018 > 21.69% done, estimate finish Fri May 25 20:51:02 2018 > 21.69% done, estimate finish Fri May 25 20:51:01 2018 > 21.70% done, estimate finish Fri May 25 20:51:05 2018 > 21.70% done, estimate finish Fri May 25 20:51:03 2018 > 21.70% done, estimate finish Fri May 25 20:51:02 2018 > 21.71% done, estimate finish Fri May 25 20:51:01 2018 > 21.71% done, estimate finish Fri May 25 20:51:04 2018 > 21.72% done, estimate finish Fri May 25 20:51:03 2018 > 21.72% done, estimate finish Fri May 25 20:51:02 2018 > 21.72% done, estimate finish Fri May 25 20:51:05 2018 > 21.73% done, estimate finish Fri May 25 20:51:04 2018 > 21.73% done, estimate finish Fri May 25 20:51:03 2018 > 21.74% done, estimate finish Fri May 25 20:51:01 2018 > 21.74% done, estimate finish Fri May 25 20:51:05 2018 > 21.74% done, estimate finish Fri May 25 20:51:03 2018 > 21.75% done, estimate finish Fri May 25 20:51:02 2018 > 21.75% done, estimate finish Fri May 25 20:51:01 2018 > 21.76% done, estimate finish Fri May 25 20:51:04 2018 > 21.76% done, estimate finish Fri May 25 20:51:03 2018 > 21.77% done, estimate finish Fri May 25 20:51:02 2018 > 21.77% done, estimate finish Fri May 25 20:51:01 2018 > 21.77% done, estimate finish Fri May 25 20:51:04 2018 > 21.78% done, estimate finish Fri May 25 20:51:03 2018 > 21.78% done, estimate finish Fri May 25 20:51:01 2018 > 21.79% done, estimate finish Fri May 25 20:51:05 2018 > 21.79% done, estimate finish Fri May 25 20:51:03 2018 > 21.79% done, estimate finish Fri May 25 20:51:02 2018 > 21.80% done, estimate finish Fri May 25 20:51:01 2018 > 21.80% done, estimate finish Fri May 25 20:51:04 2018 > 21.81% done, estimate finish Fri May 25 20:51:03 2018 > 21.81% done, estimate finish Fri May 25 20:51:02 2018 > 21.81% done, estimate finish Fri May 25 20:51:01 2018 > 21.82% done, estimate finish Fri May 25 20:51:04 2018 > 21.82% done, estimate finish Fri May 25 20:51:03 2018 > 21.83% done, estimate finish Fri May 25 20:51:01 2018 > 21.83% done, estimate finish Fri May 25 20:51:05 2018 > 21.83% done, estimate finish Fri May 25 20:51:04 2018 > 21.84% done, estimate finish Fri May 25 20:51:02 2018 > 21.84% done, estimate finish Fri May 25 20:51:01 2018 > 21.85% done, estimate finish Fri May 25 20:51:04 2018 > 21.85% done, estimate finish Fri May 25 20:51:03 2018 > 21.86% done, estimate finish Fri May 25 20:51:02 2018 > 21.86% done, estimate finish Fri May 25 20:51:05 2018 > 21.86% done, estimate finish Fri May 25 20:51:04 2018 > 21.87% done, estimate finish Fri May 25 20:51:03 2018 > 21.87% done, estimate finish Fri May 25 20:51:02 2018 > 21.88% done, estimate finish Fri May 25 20:51:05 2018 > 21.88% done, estimate finish Fri May 25 20:51:04 2018 > 21.88% done, estimate finish Fri May 25 20:51:02 2018 > 21.89% done, estimate finish Fri May 25 20:51:01 2018 > 21.89% done, estimate finish Fri May 25 20:51:04 2018 > 21.90% done, estimate finish Fri May 25 20:51:03 2018 > 21.90% done, estimate finish Fri May 25 20:51:02 2018 > 21.90% done, estimate finish Fri May 25 20:51:01 2018 > 21.91% done, estimate finish Fri May 25 20:51:04 2018 > 21.91% done, estimate finish Fri May 25 20:51:03 2018 > 21.92% done, estimate finish Fri May 25 20:51:02 2018 > 21.92% done, estimate finish Fri May 25 20:51:05 2018 > 21.92% done, estimate finish Fri May 25 20:51:04 2018 > 21.93% done, estimate finish Fri May 25 20:51:02 2018 > 21.93% done, estimate finish Fri May 25 20:51:01 2018 > 21.94% done, estimate finish Fri May 25 20:51:05 2018 > 21.94% done, estimate finish Fri May 25 20:51:03 2018 > 21.95% done, estimate finish Fri May 25 20:51:02 2018 > 21.95% done, estimate finish Fri May 25 20:51:01 2018 > 21.95% done, estimate finish Fri May 25 20:51:04 2018 > 21.96% done, estimate finish Fri May 25 20:51:03 2018 > 21.96% done, estimate finish Fri May 25 20:51:02 2018 > 21.97% done, estimate finish Fri May 25 20:51:05 2018 > 21.97% done, estimate finish Fri May 25 20:51:04 2018 > 21.97% done, estimate finish Fri May 25 20:51:03 2018 > 21.98% done, estimate finish Fri May 25 20:51:01 2018 > 21.98% done, estimate finish Fri May 25 20:51:05 2018 > 21.99% done, estimate finish Fri May 25 20:51:03 2018 > 21.99% done, estimate finish Fri May 25 20:51:02 2018 > 21.99% done, estimate finish Fri May 25 20:51:05 2018 > 22.00% done, estimate finish Fri May 25 20:51:04 2018 > 22.00% done, estimate finish Fri May 25 20:51:03 2018 > 22.01% done, estimate finish Fri May 25 20:51:02 2018 > 22.01% done, estimate finish Fri May 25 20:51:05 2018 > 22.02% done, estimate finish Fri May 25 20:51:04 2018 > 22.02% done, estimate finish Fri May 25 20:51:03 2018 > 22.02% done, estimate finish Fri May 25 20:51:01 2018 > 22.03% done, estimate finish Fri May 25 20:51:05 2018 > 22.03% done, estimate finish Fri May 25 20:51:03 2018 > 22.04% done, estimate finish Fri May 25 20:51:02 2018 > 22.04% done, estimate finish Fri May 25 20:51:01 2018 > 22.04% done, estimate finish Fri May 25 20:51:04 2018 > 22.05% done, estimate finish Fri May 25 20:51:03 2018 > 22.05% done, estimate finish Fri May 25 20:51:02 2018 > 22.06% done, estimate finish Fri May 25 20:51:05 2018 > 22.06% done, estimate finish Fri May 25 20:51:04 2018 > 22.06% done, estimate finish Fri May 25 20:51:03 2018 > 22.07% done, estimate finish Fri May 25 20:51:01 2018 > 22.07% done, estimate finish Fri May 25 20:51:05 2018 > 22.08% done, estimate finish Fri May 25 20:51:03 2018 > 22.08% done, estimate finish Fri May 25 20:51:02 2018 > 22.08% done, estimate finish Fri May 25 20:51:01 2018 > 22.09% done, estimate finish Fri May 25 20:51:04 2018 > 22.09% done, estimate finish Fri May 25 20:51:03 2018 > 22.10% done, estimate finish Fri May 25 20:51:02 2018 > 22.10% done, estimate finish Fri May 25 20:51:05 2018 > 22.11% done, estimate finish Fri May 25 20:51:04 2018 > 22.11% done, estimate finish Fri May 25 20:51:03 2018 > 22.11% done, estimate finish Fri May 25 20:51:01 2018 > 22.12% done, estimate finish Fri May 25 20:51:05 2018 > 22.12% done, estimate finish Fri May 25 20:51:04 2018 > 22.13% done, estimate finish Fri May 25 20:51:02 2018 > 22.13% done, estimate finish Fri May 25 20:51:01 2018 > 22.13% done, estimate finish Fri May 25 20:51:04 2018 > 22.14% done, estimate finish Fri May 25 20:51:03 2018 > 22.14% done, estimate finish Fri May 25 20:51:02 2018 > 22.15% done, estimate finish Fri May 25 20:51:01 2018 > 22.15% done, estimate finish Fri May 25 20:51:04 2018 > 22.15% done, estimate finish Fri May 25 20:51:03 2018 > 22.16% done, estimate finish Fri May 25 20:51:02 2018 > 22.16% done, estimate finish Fri May 25 20:51:05 2018 > 22.17% done, estimate finish Fri May 25 20:51:04 2018 > 22.17% done, estimate finish Fri May 25 20:51:02 2018 > 22.17% done, estimate finish Fri May 25 20:51:01 2018 > 22.18% done, estimate finish Fri May 25 20:51:04 2018 > 22.18% done, estimate finish Fri May 25 20:51:03 2018 > 22.19% done, estimate finish Fri May 25 20:51:02 2018 > 22.19% done, estimate finish Fri May 25 20:51:01 2018 > 22.20% done, estimate finish Fri May 25 20:51:04 2018 > 22.20% done, estimate finish Fri May 25 20:51:03 2018 > 22.20% done, estimate finish Fri May 25 20:51:02 2018 > 22.21% done, estimate finish Fri May 25 20:51:00 2018 > 22.21% done, estimate finish Fri May 25 20:51:04 2018 > 22.22% done, estimate finish Fri May 25 20:51:02 2018 > 22.22% done, estimate finish Fri May 25 20:51:01 2018 > 22.22% done, estimate finish Fri May 25 20:51:05 2018 > 22.23% done, estimate finish Fri May 25 20:51:03 2018 > 22.23% done, estimate finish Fri May 25 20:51:02 2018 > 22.24% done, estimate finish Fri May 25 20:51:01 2018 > 22.24% done, estimate finish Fri May 25 20:51:04 2018 > 22.24% done, estimate finish Fri May 25 20:51:03 2018 > 22.25% done, estimate finish Fri May 25 20:51:02 2018 > 22.25% done, estimate finish Fri May 25 20:51:00 2018 > 22.26% done, estimate finish Fri May 25 20:51:04 2018 > 22.26% done, estimate finish Fri May 25 20:51:02 2018 > 22.26% done, estimate finish Fri May 25 20:51:01 2018 > 22.27% done, estimate finish Fri May 25 20:51:00 2018 > 22.27% done, estimate finish Fri May 25 20:51:03 2018 > 22.28% done, estimate finish Fri May 25 20:51:02 2018 > 22.28% done, estimate finish Fri May 25 20:51:01 2018 > 22.29% done, estimate finish Fri May 25 20:51:00 2018 > 22.29% done, estimate finish Fri May 25 20:51:03 2018 > 22.29% done, estimate finish Fri May 25 20:51:02 2018 > 22.30% done, estimate finish Fri May 25 20:51:01 2018 > 22.30% done, estimate finish Fri May 25 20:51:04 2018 > 22.31% done, estimate finish Fri May 25 20:51:03 2018 > 22.31% done, estimate finish Fri May 25 20:51:01 2018 > 22.31% done, estimate finish Fri May 25 20:51:00 2018 > 22.32% done, estimate finish Fri May 25 20:50:59 2018 > 22.32% done, estimate finish Fri May 25 20:51:02 2018 > 22.33% done, estimate finish Fri May 25 20:51:01 2018 > 22.33% done, estimate finish Fri May 25 20:51:00 2018 > 22.33% done, estimate finish Fri May 25 20:51:03 2018 > 22.34% done, estimate finish Fri May 25 20:51:02 2018 > 22.34% done, estimate finish Fri May 25 20:51:01 2018 > 22.35% done, estimate finish Fri May 25 20:51:04 2018 > 22.35% done, estimate finish Fri May 25 20:51:03 2018 > 22.35% done, estimate finish Fri May 25 20:51:01 2018 > 22.36% done, estimate finish Fri May 25 20:51:00 2018 > 22.36% done, estimate finish Fri May 25 20:51:03 2018 > 22.37% done, estimate finish Fri May 25 20:51:02 2018 > 22.37% done, estimate finish Fri May 25 20:51:01 2018 > 22.38% done, estimate finish Fri May 25 20:51:04 2018 > 22.38% done, estimate finish Fri May 25 20:51:03 2018 > 22.38% done, estimate finish Fri May 25 20:51:02 2018 > 22.39% done, estimate finish Fri May 25 20:51:05 2018 > 22.39% done, estimate finish Fri May 25 20:51:04 2018 > 22.40% done, estimate finish Fri May 25 20:51:03 2018 > 22.40% done, estimate finish Fri May 25 20:51:02 2018 > 22.40% done, estimate finish Fri May 25 20:51:05 2018 > 22.41% done, estimate finish Fri May 25 20:51:04 2018 > 22.41% done, estimate finish Fri May 25 20:51:02 2018 > 22.42% done, estimate finish Fri May 25 20:51:01 2018 > 22.42% done, estimate finish Fri May 25 20:51:04 2018 > 22.42% done, estimate finish Fri May 25 20:51:03 2018 > 22.43% done, estimate finish Fri May 25 20:51:02 2018 > 22.43% done, estimate finish Fri May 25 20:51:01 2018 > 22.44% done, estimate finish Fri May 25 20:51:04 2018 > 22.44% done, estimate finish Fri May 25 20:51:03 2018 > 22.45% done, estimate finish Fri May 25 20:51:02 2018 > 22.45% done, estimate finish Fri May 25 20:51:05 2018 > 22.45% done, estimate finish Fri May 25 20:51:04 2018 > 22.46% done, estimate finish Fri May 25 20:51:02 2018 > 22.46% done, estimate finish Fri May 25 20:51:01 2018 > 22.47% done, estimate finish Fri May 25 20:51:04 2018 > 22.47% done, estimate finish Fri May 25 20:51:03 2018 > 22.47% done, estimate finish Fri May 25 20:51:02 2018 > 22.48% done, estimate finish Fri May 25 20:51:01 2018 > 22.48% done, estimate finish Fri May 25 20:51:04 2018 > 22.49% done, estimate finish Fri May 25 20:51:03 2018 > 22.49% done, estimate finish Fri May 25 20:51:02 2018 > 22.49% done, estimate finish Fri May 25 20:51:00 2018 > 22.50% done, estimate finish Fri May 25 20:51:04 2018 > 22.50% done, estimate finish Fri May 25 20:51:02 2018 > 22.51% done, estimate finish Fri May 25 20:51:01 2018 > 22.51% done, estimate finish Fri May 25 20:51:00 2018 > 22.51% done, estimate finish Fri May 25 20:51:03 2018 > 22.52% done, estimate finish Fri May 25 20:51:02 2018 > 22.52% done, estimate finish Fri May 25 20:51:01 2018 > 22.53% done, estimate finish Fri May 25 20:51:04 2018 > 22.53% done, estimate finish Fri May 25 20:51:03 2018 > 22.54% done, estimate finish Fri May 25 20:51:02 2018 > 22.54% done, estimate finish Fri May 25 20:51:00 2018 > 22.54% done, estimate finish Fri May 25 20:51:04 2018 > 22.55% done, estimate finish Fri May 25 20:51:03 2018 > 22.55% done, estimate finish Fri May 25 20:51:01 2018 > 22.56% done, estimate finish Fri May 25 20:51:00 2018 > 22.56% done, estimate finish Fri May 25 20:51:03 2018 > 22.56% done, estimate finish Fri May 25 20:51:02 2018 > 22.57% done, estimate finish Fri May 25 20:51:01 2018 > 22.57% done, estimate finish Fri May 25 20:51:00 2018 > 22.58% done, estimate finish Fri May 25 20:51:03 2018 > 22.58% done, estimate finish Fri May 25 20:51:02 2018 > 22.58% done, estimate finish Fri May 25 20:51:01 2018 > 22.59% done, estimate finish Fri May 25 20:50:59 2018 > 22.59% done, estimate finish Fri May 25 20:51:03 2018 > 22.60% done, estimate finish Fri May 25 20:51:01 2018 > 22.60% done, estimate finish Fri May 25 20:51:00 2018 > 22.60% done, estimate finish Fri May 25 20:50:59 2018 > 22.61% done, estimate finish Fri May 25 20:51:02 2018 > 22.61% done, estimate finish Fri May 25 20:51:01 2018 > 22.62% done, estimate finish Fri May 25 20:51:00 2018 > 22.62% done, estimate finish Fri May 25 20:50:59 2018 > 22.63% done, estimate finish Fri May 25 20:51:02 2018 > 22.63% done, estimate finish Fri May 25 20:51:01 2018 > 22.63% done, estimate finish Fri May 25 20:50:59 2018 > 22.64% done, estimate finish Fri May 25 20:51:03 2018 > 22.64% done, estimate finish Fri May 25 20:51:01 2018 > 22.65% done, estimate finish Fri May 25 20:51:00 2018 > 22.65% done, estimate finish Fri May 25 20:51:03 2018 > 22.65% done, estimate finish Fri May 25 20:51:02 2018 > 22.66% done, estimate finish Fri May 25 20:51:01 2018 > 22.66% done, estimate finish Fri May 25 20:51:00 2018 > 22.67% done, estimate finish Fri May 25 20:51:03 2018 > 22.67% done, estimate finish Fri May 25 20:51:02 2018 > 22.67% done, estimate finish Fri May 25 20:51:01 2018 > 22.68% done, estimate finish Fri May 25 20:51:04 2018 > 22.68% done, estimate finish Fri May 25 20:51:03 2018 > 22.69% done, estimate finish Fri May 25 20:51:02 2018 > 22.69% done, estimate finish Fri May 25 20:51:05 2018 > 22.69% done, estimate finish Fri May 25 20:51:04 2018 > 22.70% done, estimate finish Fri May 25 20:51:02 2018 > 22.70% done, estimate finish Fri May 25 20:51:01 2018 > 22.71% done, estimate finish Fri May 25 20:51:04 2018 > 22.71% done, estimate finish Fri May 25 20:51:03 2018 > 22.72% done, estimate finish Fri May 25 20:51:02 2018 > 22.72% done, estimate finish Fri May 25 20:51:01 2018 > 22.72% done, estimate finish Fri May 25 20:51:04 2018 > 22.73% done, estimate finish Fri May 25 20:51:03 2018 > 22.73% done, estimate finish Fri May 25 20:51:02 2018 > 22.74% done, estimate finish Fri May 25 20:51:05 2018 > 22.74% done, estimate finish Fri May 25 20:51:04 2018 > 22.74% done, estimate finish Fri May 25 20:51:02 2018 > 22.75% done, estimate finish Fri May 25 20:51:01 2018 > 22.75% done, estimate finish Fri May 25 20:51:04 2018 > 22.76% done, estimate finish Fri May 25 20:51:03 2018 > 22.76% done, estimate finish Fri May 25 20:51:02 2018 > 22.76% done, estimate finish Fri May 25 20:51:01 2018 > 22.77% done, estimate finish Fri May 25 20:51:04 2018 > 22.77% done, estimate finish Fri May 25 20:51:03 2018 > 22.78% done, estimate finish Fri May 25 20:51:02 2018 > 22.78% done, estimate finish Fri May 25 20:51:00 2018 > 22.79% done, estimate finish Fri May 25 20:51:04 2018 > 22.79% done, estimate finish Fri May 25 20:51:02 2018 > 22.79% done, estimate finish Fri May 25 20:51:01 2018 > 22.80% done, estimate finish Fri May 25 20:51:00 2018 > 22.80% done, estimate finish Fri May 25 20:51:03 2018 > 22.81% done, estimate finish Fri May 25 20:51:02 2018 > 22.81% done, estimate finish Fri May 25 20:51:01 2018 > 22.81% done, estimate finish Fri May 25 20:51:04 2018 > 22.82% done, estimate finish Fri May 25 20:51:03 2018 > 22.82% done, estimate finish Fri May 25 20:51:02 2018 > 22.83% done, estimate finish Fri May 25 20:51:01 2018 > 22.83% done, estimate finish Fri May 25 20:51:04 2018 > 22.83% done, estimate finish Fri May 25 20:51:03 2018 > 22.84% done, estimate finish Fri May 25 20:51:01 2018 > 22.84% done, estimate finish Fri May 25 20:51:00 2018 > 22.85% done, estimate finish Fri May 25 20:51:03 2018 > 22.85% done, estimate finish Fri May 25 20:51:02 2018 > 22.85% done, estimate finish Fri May 25 20:51:01 2018 > 22.86% done, estimate finish Fri May 25 20:51:00 2018 > 22.86% done, estimate finish Fri May 25 20:51:03 2018 > 22.87% done, estimate finish Fri May 25 20:51:02 2018 > 22.87% done, estimate finish Fri May 25 20:51:01 2018 > 22.88% done, estimate finish Fri May 25 20:50:59 2018 > 22.88% done, estimate finish Fri May 25 20:51:03 2018 > 22.88% done, estimate finish Fri May 25 20:51:01 2018 > 22.89% done, estimate finish Fri May 25 20:51:00 2018 > 22.89% done, estimate finish Fri May 25 20:50:59 2018 > 22.90% done, estimate finish Fri May 25 20:51:02 2018 > 22.90% done, estimate finish Fri May 25 20:51:01 2018 > 22.90% done, estimate finish Fri May 25 20:51:00 2018 > 22.91% done, estimate finish Fri May 25 20:50:59 2018 > 22.91% done, estimate finish Fri May 25 20:51:02 2018 > 22.92% done, estimate finish Fri May 25 20:51:01 2018 > 22.92% done, estimate finish Fri May 25 20:50:59 2018 > 22.92% done, estimate finish Fri May 25 20:51:03 2018 > 22.93% done, estimate finish Fri May 25 20:51:01 2018 > 22.93% done, estimate finish Fri May 25 20:51:00 2018 > 22.94% done, estimate finish Fri May 25 20:50:59 2018 > 22.94% done, estimate finish Fri May 25 20:51:02 2018 > 22.94% done, estimate finish Fri May 25 20:51:01 2018 > 22.95% done, estimate finish Fri May 25 20:51:00 2018 > 22.95% done, estimate finish Fri May 25 20:51:03 2018 > 22.96% done, estimate finish Fri May 25 20:51:02 2018 > 22.96% done, estimate finish Fri May 25 20:51:01 2018 > 22.97% done, estimate finish Fri May 25 20:51:00 2018 > 22.97% done, estimate finish Fri May 25 20:51:03 2018 > 22.97% done, estimate finish Fri May 25 20:51:02 2018 > 22.98% done, estimate finish Fri May 25 20:51:00 2018 > 22.98% done, estimate finish Fri May 25 20:50:59 2018 > 22.99% done, estimate finish Fri May 25 20:51:02 2018 > 22.99% done, estimate finish Fri May 25 20:51:01 2018 > 22.99% done, estimate finish Fri May 25 20:51:00 2018 > 23.00% done, estimate finish Fri May 25 20:50:59 2018 > 23.00% done, estimate finish Fri May 25 20:51:02 2018 > 23.01% done, estimate finish Fri May 25 20:51:01 2018 > 23.01% done, estimate finish Fri May 25 20:51:00 2018 > 23.01% done, estimate finish Fri May 25 20:51:03 2018 > 23.02% done, estimate finish Fri May 25 20:51:02 2018 > 23.02% done, estimate finish Fri May 25 20:51:00 2018 > 23.03% done, estimate finish Fri May 25 20:50:59 2018 > 23.03% done, estimate finish Fri May 25 20:51:02 2018 > 23.03% done, estimate finish Fri May 25 20:51:01 2018 > 23.04% done, estimate finish Fri May 25 20:51:00 2018 > 23.04% done, estimate finish Fri May 25 20:50:59 2018 > 23.05% done, estimate finish Fri May 25 20:51:02 2018 > 23.05% done, estimate finish Fri May 25 20:51:01 2018 > 23.06% done, estimate finish Fri May 25 20:51:00 2018 > 23.06% done, estimate finish Fri May 25 20:50:59 2018 > 23.06% done, estimate finish Fri May 25 20:51:02 2018 > 23.07% done, estimate finish Fri May 25 20:51:00 2018 > 23.07% done, estimate finish Fri May 25 20:50:59 2018 > 23.08% done, estimate finish Fri May 25 20:50:58 2018 > 23.08% done, estimate finish Fri May 25 20:51:01 2018 > 23.08% done, estimate finish Fri May 25 20:51:00 2018 > 23.09% done, estimate finish Fri May 25 20:50:59 2018 > 23.09% done, estimate finish Fri May 25 20:51:02 2018 > 23.10% done, estimate finish Fri May 25 20:51:01 2018 > 23.10% done, estimate finish Fri May 25 20:51:00 2018 > 23.10% done, estimate finish Fri May 25 20:50:59 2018 > 23.11% done, estimate finish Fri May 25 20:51:02 2018 > 23.11% done, estimate finish Fri May 25 20:51:01 2018 > 23.12% done, estimate finish Fri May 25 20:50:59 2018 > 23.12% done, estimate finish Fri May 25 20:50:58 2018 > 23.12% done, estimate finish Fri May 25 20:51:01 2018 > 23.13% done, estimate finish Fri May 25 20:51:00 2018 > 23.13% done, estimate finish Fri May 25 20:50:59 2018 > 23.14% done, estimate finish Fri May 25 20:50:58 2018 > 23.14% done, estimate finish Fri May 25 20:51:01 2018 > 23.15% done, estimate finish Fri May 25 20:51:00 2018 > 23.15% done, estimate finish Fri May 25 20:50:59 2018 > 23.15% done, estimate finish Fri May 25 20:50:57 2018 > 23.16% done, estimate finish Fri May 25 20:51:01 2018 > 23.16% done, estimate finish Fri May 25 20:50:59 2018 > 23.17% done, estimate finish Fri May 25 20:50:58 2018 > 23.17% done, estimate finish Fri May 25 20:50:57 2018 > 23.17% done, estimate finish Fri May 25 20:51:00 2018 > 23.18% done, estimate finish Fri May 25 20:50:59 2018 > 23.18% done, estimate finish Fri May 25 20:50:58 2018 > 23.19% done, estimate finish Fri May 25 20:51:01 2018 > 23.19% done, estimate finish Fri May 25 20:51:00 2018 > 23.19% done, estimate finish Fri May 25 20:50:59 2018 > 23.20% done, estimate finish Fri May 25 20:50:58 2018 > 23.20% done, estimate finish Fri May 25 20:51:01 2018 > 23.21% done, estimate finish Fri May 25 20:51:00 2018 > 23.21% done, estimate finish Fri May 25 20:50:58 2018 > 23.22% done, estimate finish Fri May 25 20:50:57 2018 > 23.22% done, estimate finish Fri May 25 20:51:00 2018 > 23.22% done, estimate finish Fri May 25 20:50:59 2018 > 23.23% done, estimate finish Fri May 25 20:50:58 2018 > 23.23% done, estimate finish Fri May 25 20:50:57 2018 > 23.24% done, estimate finish Fri May 25 20:51:00 2018 > 23.24% done, estimate finish Fri May 25 20:50:59 2018 > 23.24% done, estimate finish Fri May 25 20:50:58 2018 > 23.25% done, estimate finish Fri May 25 20:50:56 2018 > 23.25% done, estimate finish Fri May 25 20:51:00 2018 > 23.26% done, estimate finish Fri May 25 20:50:58 2018 > 23.26% done, estimate finish Fri May 25 20:50:57 2018 > 23.26% done, estimate finish Fri May 25 20:51:00 2018 > 23.27% done, estimate finish Fri May 25 20:50:59 2018 > 23.27% done, estimate finish Fri May 25 20:50:58 2018 > 23.28% done, estimate finish Fri May 25 20:50:57 2018 > 23.28% done, estimate finish Fri May 25 20:51:00 2018 > 23.28% done, estimate finish Fri May 25 20:50:59 2018 > 23.29% done, estimate finish Fri May 25 20:50:58 2018 > 23.29% done, estimate finish Fri May 25 20:50:57 2018 > 23.30% done, estimate finish Fri May 25 20:51:00 2018 > 23.30% done, estimate finish Fri May 25 20:50:59 2018 > 23.31% done, estimate finish Fri May 25 20:50:57 2018 > 23.31% done, estimate finish Fri May 25 20:50:56 2018 > 23.31% done, estimate finish Fri May 25 20:50:59 2018 > 23.32% done, estimate finish Fri May 25 20:50:58 2018 > 23.32% done, estimate finish Fri May 25 20:50:57 2018 > 23.33% done, estimate finish Fri May 25 20:50:56 2018 > 23.33% done, estimate finish Fri May 25 20:50:59 2018 > 23.33% done, estimate finish Fri May 25 20:50:58 2018 > 23.34% done, estimate finish Fri May 25 20:50:57 2018 > 23.34% done, estimate finish Fri May 25 20:51:00 2018 > 23.35% done, estimate finish Fri May 25 20:50:59 2018 > 23.35% done, estimate finish Fri May 25 20:50:57 2018 > 23.35% done, estimate finish Fri May 25 20:50:56 2018 > 23.36% done, estimate finish Fri May 25 20:50:59 2018 > 23.36% done, estimate finish Fri May 25 20:50:58 2018 > 23.37% done, estimate finish Fri May 25 20:50:57 2018 > 23.37% done, estimate finish Fri May 25 20:50:56 2018 > 23.37% done, estimate finish Fri May 25 20:50:59 2018 > 23.38% done, estimate finish Fri May 25 20:50:58 2018 > 23.38% done, estimate finish Fri May 25 20:50:57 2018 > 23.39% done, estimate finish Fri May 25 20:50:56 2018 > 23.39% done, estimate finish Fri May 25 20:50:59 2018 > 23.40% done, estimate finish Fri May 25 20:50:57 2018 > 23.40% done, estimate finish Fri May 25 20:50:56 2018 > 23.40% done, estimate finish Fri May 25 20:50:55 2018 > 23.41% done, estimate finish Fri May 25 20:50:58 2018 > 23.41% done, estimate finish Fri May 25 20:50:57 2018 > 23.42% done, estimate finish Fri May 25 20:50:56 2018 > 23.42% done, estimate finish Fri May 25 20:50:59 2018 > 23.42% done, estimate finish Fri May 25 20:50:58 2018 > 23.43% done, estimate finish Fri May 25 20:50:57 2018 > 23.43% done, estimate finish Fri May 25 20:50:56 2018 > 23.44% done, estimate finish Fri May 25 20:50:59 2018 > 23.44% done, estimate finish Fri May 25 20:50:58 2018 > 23.44% done, estimate finish Fri May 25 20:50:56 2018 > 23.45% done, estimate finish Fri May 25 20:50:55 2018 > 23.45% done, estimate finish Fri May 25 20:50:58 2018 > 23.46% done, estimate finish Fri May 25 20:50:57 2018 > 23.46% done, estimate finish Fri May 25 20:50:56 2018 > 23.46% done, estimate finish Fri May 25 20:50:55 2018 > 23.47% done, estimate finish Fri May 25 20:50:58 2018 > 23.47% done, estimate finish Fri May 25 20:50:57 2018 > 23.48% done, estimate finish Fri May 25 20:50:56 2018 > 23.48% done, estimate finish Fri May 25 20:50:55 2018 > 23.49% done, estimate finish Fri May 25 20:50:58 2018 > 23.49% done, estimate finish Fri May 25 20:50:56 2018 > 23.49% done, estimate finish Fri May 25 20:50:55 2018 > 23.50% done, estimate finish Fri May 25 20:50:58 2018 > 23.50% done, estimate finish Fri May 25 20:50:57 2018 > 23.51% done, estimate finish Fri May 25 20:50:56 2018 > 23.51% done, estimate finish Fri May 25 20:50:55 2018 > 23.51% done, estimate finish Fri May 25 20:50:58 2018 > 23.52% done, estimate finish Fri May 25 20:50:57 2018 > 23.52% done, estimate finish Fri May 25 20:50:56 2018 > 23.53% done, estimate finish Fri May 25 20:50:55 2018 > 23.53% done, estimate finish Fri May 25 20:50:58 2018 > 23.53% done, estimate finish Fri May 25 20:50:57 2018 > 23.54% done, estimate finish Fri May 25 20:50:55 2018 > 23.54% done, estimate finish Fri May 25 20:50:54 2018 > 23.55% done, estimate finish Fri May 25 20:50:57 2018 > 23.55% done, estimate finish Fri May 25 20:50:56 2018 > 23.56% done, estimate finish Fri May 25 20:50:55 2018 > 23.56% done, estimate finish Fri May 25 20:50:58 2018 > 23.56% done, estimate finish Fri May 25 20:50:57 2018 > 23.57% done, estimate finish Fri May 25 20:50:56 2018 > 23.57% done, estimate finish Fri May 25 20:50:55 2018 > 23.58% done, estimate finish Fri May 25 20:50:54 2018 > 23.58% done, estimate finish Fri May 25 20:50:57 2018 > 23.58% done, estimate finish Fri May 25 20:50:55 2018 > 23.59% done, estimate finish Fri May 25 20:50:54 2018 > 23.59% done, estimate finish Fri May 25 20:50:57 2018 > 23.60% done, estimate finish Fri May 25 20:50:56 2018 > 23.60% done, estimate finish Fri May 25 20:50:55 2018 > 23.60% done, estimate finish Fri May 25 20:50:54 2018 > 23.61% done, estimate finish Fri May 25 20:50:57 2018 > 23.61% done, estimate finish Fri May 25 20:50:56 2018 > 23.62% done, estimate finish Fri May 25 20:50:55 2018 > 23.62% done, estimate finish Fri May 25 20:50:54 2018 > 23.62% done, estimate finish Fri May 25 20:50:57 2018 > 23.63% done, estimate finish Fri May 25 20:50:56 2018 > 23.63% done, estimate finish Fri May 25 20:50:54 2018 > 23.64% done, estimate finish Fri May 25 20:50:53 2018 > 23.64% done, estimate finish Fri May 25 20:50:56 2018 > 23.65% done, estimate finish Fri May 25 20:50:55 2018 > 23.65% done, estimate finish Fri May 25 20:50:54 2018 > 23.65% done, estimate finish Fri May 25 20:50:53 2018 > 23.66% done, estimate finish Fri May 25 20:50:56 2018 > 23.66% done, estimate finish Fri May 25 20:50:55 2018 > 23.67% done, estimate finish Fri May 25 20:50:54 2018 > 23.67% done, estimate finish Fri May 25 20:50:57 2018 > 23.67% done, estimate finish Fri May 25 20:50:56 2018 > 23.68% done, estimate finish Fri May 25 20:50:54 2018 > 23.68% done, estimate finish Fri May 25 20:50:53 2018 > 23.69% done, estimate finish Fri May 25 20:50:56 2018 > 23.69% done, estimate finish Fri May 25 20:50:55 2018 > 23.69% done, estimate finish Fri May 25 20:50:54 2018 > 23.70% done, estimate finish Fri May 25 20:50:53 2018 > 23.70% done, estimate finish Fri May 25 20:50:56 2018 > 23.71% done, estimate finish Fri May 25 20:50:55 2018 > 23.71% done, estimate finish Fri May 25 20:50:54 2018 > 23.71% done, estimate finish Fri May 25 20:50:53 2018 > 23.72% done, estimate finish Fri May 25 20:50:56 2018 > 23.72% done, estimate finish Fri May 25 20:50:55 2018 > 23.73% done, estimate finish Fri May 25 20:50:53 2018 > 23.73% done, estimate finish Fri May 25 20:50:52 2018 > 23.74% done, estimate finish Fri May 25 20:50:55 2018 > 23.74% done, estimate finish Fri May 25 20:50:54 2018 > 23.74% done, estimate finish Fri May 25 20:50:53 2018 > 23.75% done, estimate finish Fri May 25 20:50:56 2018 > 23.75% done, estimate finish Fri May 25 20:50:55 2018 > 23.76% done, estimate finish Fri May 25 20:50:54 2018 > 23.76% done, estimate finish Fri May 25 20:50:53 2018 > 23.76% done, estimate finish Fri May 25 20:50:56 2018 > 23.77% done, estimate finish Fri May 25 20:50:55 2018 > 23.77% done, estimate finish Fri May 25 20:50:53 2018 > 23.78% done, estimate finish Fri May 25 20:50:52 2018 > 23.78% done, estimate finish Fri May 25 20:50:55 2018 > 23.78% done, estimate finish Fri May 25 20:50:54 2018 > 23.79% done, estimate finish Fri May 25 20:50:53 2018 > 23.79% done, estimate finish Fri May 25 20:50:52 2018 > 23.80% done, estimate finish Fri May 25 20:50:55 2018 > 23.80% done, estimate finish Fri May 25 20:50:54 2018 > 23.80% done, estimate finish Fri May 25 20:50:53 2018 > 23.81% done, estimate finish Fri May 25 20:50:56 2018 > 23.81% done, estimate finish Fri May 25 20:50:55 2018 > 23.82% done, estimate finish Fri May 25 20:50:54 2018 > 23.82% done, estimate finish Fri May 25 20:50:52 2018 > 23.83% done, estimate finish Fri May 25 20:50:56 2018 > 23.83% done, estimate finish Fri May 25 20:50:54 2018 > 23.83% done, estimate finish Fri May 25 20:50:53 2018 > 23.84% done, estimate finish Fri May 25 20:50:52 2018 > 23.84% done, estimate finish Fri May 25 20:50:55 2018 > 23.85% done, estimate finish Fri May 25 20:50:54 2018 > 23.85% done, estimate finish Fri May 25 20:50:53 2018 > 23.85% done, estimate finish Fri May 25 20:50:52 2018 > 23.86% done, estimate finish Fri May 25 20:50:55 2018 > 23.86% done, estimate finish Fri May 25 20:50:54 2018 > 23.87% done, estimate finish Fri May 25 20:50:53 2018 > 23.87% done, estimate finish Fri May 25 20:50:51 2018 > 23.87% done, estimate finish Fri May 25 20:50:54 2018 > 23.88% done, estimate finish Fri May 25 20:50:53 2018 > 23.88% done, estimate finish Fri May 25 20:50:52 2018 > 23.89% done, estimate finish Fri May 25 20:50:55 2018 > 23.89% done, estimate finish Fri May 25 20:50:54 2018 > 23.89% done, estimate finish Fri May 25 20:50:53 2018 > 23.90% done, estimate finish Fri May 25 20:50:52 2018 > 23.90% done, estimate finish Fri May 25 20:50:55 2018 > 23.91% done, estimate finish Fri May 25 20:50:54 2018 > 23.91% done, estimate finish Fri May 25 20:50:53 2018 > 23.92% done, estimate finish Fri May 25 20:50:51 2018 > 23.92% done, estimate finish Fri May 25 20:50:55 2018 > 23.92% done, estimate finish Fri May 25 20:50:53 2018 > 23.93% done, estimate finish Fri May 25 20:50:52 2018 > 23.93% done, estimate finish Fri May 25 20:50:51 2018 > 23.94% done, estimate finish Fri May 25 20:50:54 2018 > 23.94% done, estimate finish Fri May 25 20:50:53 2018 > 23.94% done, estimate finish Fri May 25 20:50:52 2018 > 23.95% done, estimate finish Fri May 25 20:50:51 2018 > 23.95% done, estimate finish Fri May 25 20:50:54 2018 > 23.96% done, estimate finish Fri May 25 20:50:53 2018 > 23.96% done, estimate finish Fri May 25 20:50:52 2018 > 23.96% done, estimate finish Fri May 25 20:50:55 2018 > 23.97% done, estimate finish Fri May 25 20:50:53 2018 > 23.97% done, estimate finish Fri May 25 20:50:52 2018 > 23.98% done, estimate finish Fri May 25 20:50:51 2018 > 23.98% done, estimate finish Fri May 25 20:50:54 2018 > 23.99% done, estimate finish Fri May 25 20:50:53 2018 > 23.99% done, estimate finish Fri May 25 20:50:52 2018 > 23.99% done, estimate finish Fri May 25 20:50:51 2018 > 24.00% done, estimate finish Fri May 25 20:50:54 2018 > 24.00% done, estimate finish Fri May 25 20:50:53 2018 > 24.01% done, estimate finish Fri May 25 20:50:52 2018 > 24.01% done, estimate finish Fri May 25 20:50:51 2018 > 24.01% done, estimate finish Fri May 25 20:50:54 2018 > 24.02% done, estimate finish Fri May 25 20:50:52 2018 > 24.02% done, estimate finish Fri May 25 20:50:51 2018 > 24.03% done, estimate finish Fri May 25 20:50:54 2018 > 24.03% done, estimate finish Fri May 25 20:50:53 2018 > 24.03% done, estimate finish Fri May 25 20:50:52 2018 > 24.04% done, estimate finish Fri May 25 20:50:51 2018 > 24.04% done, estimate finish Fri May 25 20:50:50 2018 > 24.05% done, estimate finish Fri May 25 20:50:53 2018 > 24.05% done, estimate finish Fri May 25 20:50:52 2018 > 24.05% done, estimate finish Fri May 25 20:50:51 2018 > 24.06% done, estimate finish Fri May 25 20:50:54 2018 > 24.06% done, estimate finish Fri May 25 20:50:52 2018 > 24.07% done, estimate finish Fri May 25 20:50:51 2018 > 24.07% done, estimate finish Fri May 25 20:50:50 2018 > 24.08% done, estimate finish Fri May 25 20:50:53 2018 > 24.08% done, estimate finish Fri May 25 20:50:52 2018 > 24.08% done, estimate finish Fri May 25 20:50:51 2018 > 24.09% done, estimate finish Fri May 25 20:50:50 2018 > 24.09% done, estimate finish Fri May 25 20:50:53 2018 > 24.10% done, estimate finish Fri May 25 20:50:52 2018 > 24.10% done, estimate finish Fri May 25 20:50:51 2018 > 24.10% done, estimate finish Fri May 25 20:50:50 2018 > 24.11% done, estimate finish Fri May 25 20:50:53 2018 > 24.11% done, estimate finish Fri May 25 20:50:51 2018 > 24.12% done, estimate finish Fri May 25 20:50:50 2018 > 24.12% done, estimate finish Fri May 25 20:50:53 2018 > 24.12% done, estimate finish Fri May 25 20:50:52 2018 > 24.13% done, estimate finish Fri May 25 20:50:51 2018 > 24.13% done, estimate finish Fri May 25 20:50:50 2018 > 24.14% done, estimate finish Fri May 25 20:50:53 2018 > 24.14% done, estimate finish Fri May 25 20:50:52 2018 > 24.14% done, estimate finish Fri May 25 20:50:51 2018 > 24.15% done, estimate finish Fri May 25 20:50:50 2018 > 24.15% done, estimate finish Fri May 25 20:50:53 2018 > 24.16% done, estimate finish Fri May 25 20:50:52 2018 > 24.16% done, estimate finish Fri May 25 20:50:50 2018 > 24.17% done, estimate finish Fri May 25 20:50:49 2018 > 24.17% done, estimate finish Fri May 25 20:50:52 2018 > 24.17% done, estimate finish Fri May 25 20:50:51 2018 > 24.18% done, estimate finish Fri May 25 20:50:50 2018 > 24.18% done, estimate finish Fri May 25 20:50:49 2018 > 24.19% done, estimate finish Fri May 25 20:50:52 2018 > 24.19% done, estimate finish Fri May 25 20:50:51 2018 > 24.19% done, estimate finish Fri May 25 20:50:50 2018 > 24.20% done, estimate finish Fri May 25 20:50:53 2018 > 24.20% done, estimate finish Fri May 25 20:50:52 2018 > 24.21% done, estimate finish Fri May 25 20:50:51 2018 > 24.21% done, estimate finish Fri May 25 20:50:49 2018 > 24.21% done, estimate finish Fri May 25 20:50:52 2018 > 24.22% done, estimate finish Fri May 25 20:50:51 2018 > 24.22% done, estimate finish Fri May 25 20:50:50 2018 > 24.23% done, estimate finish Fri May 25 20:50:49 2018 > 24.23% done, estimate finish Fri May 25 20:50:52 2018 > 24.23% done, estimate finish Fri May 25 20:50:51 2018 > 24.24% done, estimate finish Fri May 25 20:50:50 2018 > 24.24% done, estimate finish Fri May 25 20:50:49 2018 > 24.25% done, estimate finish Fri May 25 20:50:52 2018 > 24.25% done, estimate finish Fri May 25 20:50:51 2018 > 24.26% done, estimate finish Fri May 25 20:50:49 2018 > 24.26% done, estimate finish Fri May 25 20:50:52 2018 > 24.26% done, estimate finish Fri May 25 20:50:51 2018 > 24.27% done, estimate finish Fri May 25 20:50:50 2018 > 24.27% done, estimate finish Fri May 25 20:50:49 2018 > 24.28% done, estimate finish Fri May 25 20:50:52 2018 > 24.28% done, estimate finish Fri May 25 20:50:51 2018 > 24.28% done, estimate finish Fri May 25 20:50:50 2018 > 24.29% done, estimate finish Fri May 25 20:50:49 2018 > 24.29% done, estimate finish Fri May 25 20:50:52 2018 > 24.30% done, estimate finish Fri May 25 20:50:51 2018 > 24.30% done, estimate finish Fri May 25 20:50:50 2018 > 24.30% done, estimate finish Fri May 25 20:50:48 2018 > 24.31% done, estimate finish Fri May 25 20:50:51 2018 > 24.31% done, estimate finish Fri May 25 20:50:54 2018 > 24.32% done, estimate finish Fri May 25 20:50:53 2018 > 24.32% done, estimate finish Fri May 25 20:50:52 2018 > 24.33% done, estimate finish Fri May 25 20:50:51 2018 > 24.33% done, estimate finish Fri May 25 20:50:50 2018 > 24.33% done, estimate finish Fri May 25 20:50:49 2018 > 24.34% done, estimate finish Fri May 25 20:50:52 2018 > 24.34% done, estimate finish Fri May 25 20:50:51 2018 > 24.35% done, estimate finish Fri May 25 20:50:50 2018 > 24.35% done, estimate finish Fri May 25 20:50:53 2018 > 24.35% done, estimate finish Fri May 25 20:50:52 2018 > 24.36% done, estimate finish Fri May 25 20:50:50 2018 > 24.36% done, estimate finish Fri May 25 20:50:49 2018 > 24.37% done, estimate finish Fri May 25 20:50:48 2018 > 24.37% done, estimate finish Fri May 25 20:50:51 2018 > 24.37% done, estimate finish Fri May 25 20:50:50 2018 > 24.38% done, estimate finish Fri May 25 20:50:49 2018 > 24.38% done, estimate finish Fri May 25 20:50:52 2018 > 24.39% done, estimate finish Fri May 25 20:50:51 2018 > 24.39% done, estimate finish Fri May 25 20:50:50 2018 > 24.39% done, estimate finish Fri May 25 20:50:49 2018 > 24.40% done, estimate finish Fri May 25 20:50:52 2018 > 24.40% done, estimate finish Fri May 25 20:50:50 2018 > 24.41% done, estimate finish Fri May 25 20:50:49 2018 > 24.41% done, estimate finish Fri May 25 20:50:48 2018 > 24.42% done, estimate finish Fri May 25 20:50:51 2018 > 24.42% done, estimate finish Fri May 25 20:50:50 2018 > 24.42% done, estimate finish Fri May 25 20:50:49 2018 > 24.43% done, estimate finish Fri May 25 20:50:48 2018 > 24.43% done, estimate finish Fri May 25 20:50:51 2018 > 24.44% done, estimate finish Fri May 25 20:50:50 2018 > 24.44% done, estimate finish Fri May 25 20:50:49 2018 > 24.44% done, estimate finish Fri May 25 20:50:52 2018 > 24.45% done, estimate finish Fri May 25 20:50:51 2018 > 24.45% done, estimate finish Fri May 25 20:50:49 2018 > 24.46% done, estimate finish Fri May 25 20:50:48 2018 > 24.46% done, estimate finish Fri May 25 20:50:51 2018 > 24.46% done, estimate finish Fri May 25 20:50:50 2018 > 24.47% done, estimate finish Fri May 25 20:50:49 2018 > 24.47% done, estimate finish Fri May 25 20:50:48 2018 > 24.48% done, estimate finish Fri May 25 20:50:51 2018 > 24.48% done, estimate finish Fri May 25 20:50:50 2018 > 24.48% done, estimate finish Fri May 25 20:50:49 2018 > 24.49% done, estimate finish Fri May 25 20:50:48 2018 > 24.49% done, estimate finish Fri May 25 20:50:51 2018 > 24.50% done, estimate finish Fri May 25 20:50:50 2018 > 24.50% done, estimate finish Fri May 25 20:50:48 2018 > 24.51% done, estimate finish Fri May 25 20:50:47 2018 > 24.51% done, estimate finish Fri May 25 20:50:50 2018 > 24.51% done, estimate finish Fri May 25 20:50:49 2018 > 24.52% done, estimate finish Fri May 25 20:50:48 2018 > 24.52% done, estimate finish Fri May 25 20:50:51 2018 > 24.53% done, estimate finish Fri May 25 20:50:50 2018 > 24.53% done, estimate finish Fri May 25 20:50:49 2018 > 24.53% done, estimate finish Fri May 25 20:50:48 2018 > 24.54% done, estimate finish Fri May 25 20:50:51 2018 > 24.54% done, estimate finish Fri May 25 20:50:50 2018 > 24.55% done, estimate finish Fri May 25 20:50:49 2018 > 24.55% done, estimate finish Fri May 25 20:50:47 2018 > 24.55% done, estimate finish Fri May 25 20:50:50 2018 > 24.56% done, estimate finish Fri May 25 20:50:49 2018 > 24.56% done, estimate finish Fri May 25 20:50:48 2018 > 24.57% done, estimate finish Fri May 25 20:50:47 2018 > 24.57% done, estimate finish Fri May 25 20:50:50 2018 > 24.57% done, estimate finish Fri May 25 20:50:49 2018 > 24.58% done, estimate finish Fri May 25 20:50:48 2018 > 24.58% done, estimate finish Fri May 25 20:50:51 2018 > 24.59% done, estimate finish Fri May 25 20:50:50 2018 > 24.59% done, estimate finish Fri May 25 20:50:49 2018 > 24.60% done, estimate finish Fri May 25 20:50:48 2018 > 24.60% done, estimate finish Fri May 25 20:50:50 2018 > 24.60% done, estimate finish Fri May 25 20:50:49 2018 > 24.61% done, estimate finish Fri May 25 20:50:48 2018 > 24.61% done, estimate finish Fri May 25 20:50:47 2018 > 24.62% done, estimate finish Fri May 25 20:50:50 2018 > 24.62% done, estimate finish Fri May 25 20:50:49 2018 > 24.62% done, estimate finish Fri May 25 20:50:48 2018 > 24.63% done, estimate finish Fri May 25 20:50:47 2018 > 24.63% done, estimate finish Fri May 25 20:50:50 2018 > 24.64% done, estimate finish Fri May 25 20:50:49 2018 > 24.64% done, estimate finish Fri May 25 20:50:48 2018 > 24.64% done, estimate finish Fri May 25 20:50:46 2018 > 24.65% done, estimate finish Fri May 25 20:50:49 2018 > 24.65% done, estimate finish Fri May 25 20:50:48 2018 > 24.66% done, estimate finish Fri May 25 20:50:47 2018 > 24.66% done, estimate finish Fri May 25 20:50:50 2018 > 24.66% done, estimate finish Fri May 25 20:50:49 2018 > 24.67% done, estimate finish Fri May 25 20:50:48 2018 > 24.67% done, estimate finish Fri May 25 20:50:47 2018 > 24.68% done, estimate finish Fri May 25 20:50:50 2018 > 24.68% done, estimate finish Fri May 25 20:50:49 2018 > 24.69% done, estimate finish Fri May 25 20:50:48 2018 > 24.69% done, estimate finish Fri May 25 20:50:47 2018 > 24.69% done, estimate finish Fri May 25 20:50:50 2018 > 24.70% done, estimate finish Fri May 25 20:50:48 2018 > 24.70% done, estimate finish Fri May 25 20:50:47 2018 > 24.71% done, estimate finish Fri May 25 20:50:46 2018 > 24.71% done, estimate finish Fri May 25 20:50:49 2018 > 24.71% done, estimate finish Fri May 25 20:50:48 2018 > 24.72% done, estimate finish Fri May 25 20:50:47 2018 > 24.72% done, estimate finish Fri May 25 20:50:50 2018 > 24.73% done, estimate finish Fri May 25 20:50:49 2018 > 24.73% done, estimate finish Fri May 25 20:50:48 2018 > 24.73% done, estimate finish Fri May 25 20:50:47 2018 > 24.74% done, estimate finish Fri May 25 20:50:50 2018 > 24.74% done, estimate finish Fri May 25 20:50:49 2018 > 24.75% done, estimate finish Fri May 25 20:50:47 2018 > 24.75% done, estimate finish Fri May 25 20:50:46 2018 > 24.76% done, estimate finish Fri May 25 20:50:49 2018 > 24.76% done, estimate finish Fri May 25 20:50:48 2018 > 24.76% done, estimate finish Fri May 25 20:50:47 2018 > 24.77% done, estimate finish Fri May 25 20:50:46 2018 > 24.77% done, estimate finish Fri May 25 20:50:49 2018 > 24.78% done, estimate finish Fri May 25 20:50:48 2018 > 24.78% done, estimate finish Fri May 25 20:50:47 2018 > 24.78% done, estimate finish Fri May 25 20:50:50 2018 > 24.79% done, estimate finish Fri May 25 20:50:49 2018 > 24.79% done, estimate finish Fri May 25 20:50:48 2018 > 24.80% done, estimate finish Fri May 25 20:50:46 2018 > 24.80% done, estimate finish Fri May 25 20:50:49 2018 > 24.80% done, estimate finish Fri May 25 20:50:48 2018 > 24.81% done, estimate finish Fri May 25 20:50:47 2018 > 24.81% done, estimate finish Fri May 25 20:50:46 2018 > 24.82% done, estimate finish Fri May 25 20:50:49 2018 > 24.82% done, estimate finish Fri May 25 20:50:48 2018 > 24.82% done, estimate finish Fri May 25 20:50:47 2018 > 24.83% done, estimate finish Fri May 25 20:50:46 2018 > 24.83% done, estimate finish Fri May 25 20:50:49 2018 > 24.84% done, estimate finish Fri May 25 20:50:48 2018 > 24.84% done, estimate finish Fri May 25 20:50:47 2018 > 24.85% done, estimate finish Fri May 25 20:50:45 2018 > 24.85% done, estimate finish Fri May 25 20:50:48 2018 > 24.85% done, estimate finish Fri May 25 20:50:47 2018 > 24.86% done, estimate finish Fri May 25 20:50:46 2018 > 24.86% done, estimate finish Fri May 25 20:50:49 2018 > 24.87% done, estimate finish Fri May 25 20:50:48 2018 > 24.87% done, estimate finish Fri May 25 20:50:47 2018 > 24.87% done, estimate finish Fri May 25 20:50:46 2018 > 24.88% done, estimate finish Fri May 25 20:50:49 2018 > 24.88% done, estimate finish Fri May 25 20:50:48 2018 > 24.89% done, estimate finish Fri May 25 20:50:47 2018 > 24.89% done, estimate finish Fri May 25 20:50:46 2018 > 24.89% done, estimate finish Fri May 25 20:50:48 2018 > 24.90% done, estimate finish Fri May 25 20:50:47 2018 > 24.90% done, estimate finish Fri May 25 20:50:46 2018 > 24.91% done, estimate finish Fri May 25 20:50:45 2018 > 24.91% done, estimate finish Fri May 25 20:50:48 2018 > 24.91% done, estimate finish Fri May 25 20:50:47 2018 > 24.92% done, estimate finish Fri May 25 20:50:50 2018 > 24.92% done, estimate finish Fri May 25 20:50:49 2018 > 24.93% done, estimate finish Fri May 25 20:50:48 2018 > 24.93% done, estimate finish Fri May 25 20:50:47 2018 > 24.94% done, estimate finish Fri May 25 20:50:50 2018 > 24.94% done, estimate finish Fri May 25 20:50:49 2018 > 24.94% done, estimate finish Fri May 25 20:50:47 2018 > 24.95% done, estimate finish Fri May 25 20:50:46 2018 > 24.95% done, estimate finish Fri May 25 20:50:49 2018 > 24.96% done, estimate finish Fri May 25 20:50:48 2018 > 24.96% done, estimate finish Fri May 25 20:50:47 2018 > 24.96% done, estimate finish Fri May 25 20:50:46 2018 > 24.97% done, estimate finish Fri May 25 20:50:49 2018 > 24.97% done, estimate finish Fri May 25 20:50:48 2018 > 24.98% done, estimate finish Fri May 25 20:50:47 2018 > 24.98% done, estimate finish Fri May 25 20:50:50 2018 > 24.98% done, estimate finish Fri May 25 20:50:49 2018 > 24.99% done, estimate finish Fri May 25 20:50:48 2018 > 24.99% done, estimate finish Fri May 25 20:50:46 2018 > 25.00% done, estimate finish Fri May 25 20:50:49 2018 > 25.00% done, estimate finish Fri May 25 20:50:48 2018 > 25.00% done, estimate finish Fri May 25 20:50:47 2018 > 25.01% done, estimate finish Fri May 25 20:50:46 2018 > 25.01% done, estimate finish Fri May 25 20:50:49 2018 > 25.02% done, estimate finish Fri May 25 20:50:48 2018 > 25.02% done, estimate finish Fri May 25 20:50:47 2018 > 25.03% done, estimate finish Fri May 25 20:50:46 2018 > 25.03% done, estimate finish Fri May 25 20:50:49 2018 > 25.03% done, estimate finish Fri May 25 20:50:48 2018 > 25.04% done, estimate finish Fri May 25 20:50:47 2018 > 25.04% done, estimate finish Fri May 25 20:50:49 2018 > 25.05% done, estimate finish Fri May 25 20:50:48 2018 > 25.05% done, estimate finish Fri May 25 20:50:47 2018 > 25.05% done, estimate finish Fri May 25 20:50:46 2018 > 25.06% done, estimate finish Fri May 25 20:50:49 2018 > 25.06% done, estimate finish Fri May 25 20:50:48 2018 > 25.07% done, estimate finish Fri May 25 20:50:47 2018 > 25.07% done, estimate finish Fri May 25 20:50:46 2018 > 25.07% done, estimate finish Fri May 25 20:50:49 2018 > 25.08% done, estimate finish Fri May 25 20:50:48 2018 > 25.08% done, estimate finish Fri May 25 20:50:47 2018 > 25.09% done, estimate finish Fri May 25 20:50:46 2018 > 25.09% done, estimate finish Fri May 25 20:50:48 2018 > 25.10% done, estimate finish Fri May 25 20:50:47 2018 > 25.10% done, estimate finish Fri May 25 20:50:46 2018 > 25.10% done, estimate finish Fri May 25 20:50:49 2018 > 25.11% done, estimate finish Fri May 25 20:50:48 2018 > 25.11% done, estimate finish Fri May 25 20:50:47 2018 > 25.12% done, estimate finish Fri May 25 20:50:46 2018 > 25.12% done, estimate finish Fri May 25 20:50:49 2018 > 25.12% done, estimate finish Fri May 25 20:50:48 2018 > 25.13% done, estimate finish Fri May 25 20:50:47 2018 > 25.13% done, estimate finish Fri May 25 20:50:46 2018 > 25.14% done, estimate finish Fri May 25 20:50:49 2018 > 25.14% done, estimate finish Fri May 25 20:50:47 2018 > 25.14% done, estimate finish Fri May 25 20:50:46 2018 > 25.15% done, estimate finish Fri May 25 20:50:45 2018 > 25.15% done, estimate finish Fri May 25 20:50:48 2018 > 25.16% done, estimate finish Fri May 25 20:50:47 2018 > 25.16% done, estimate finish Fri May 25 20:50:46 2018 > 25.16% done, estimate finish Fri May 25 20:50:49 2018 > 25.17% done, estimate finish Fri May 25 20:50:48 2018 > 25.17% done, estimate finish Fri May 25 20:50:47 2018 > 25.18% done, estimate finish Fri May 25 20:50:46 2018 > 25.18% done, estimate finish Fri May 25 20:50:49 2018 > 25.19% done, estimate finish Fri May 25 20:50:48 2018 > 25.19% done, estimate finish Fri May 25 20:50:46 2018 > 25.19% done, estimate finish Fri May 25 20:50:45 2018 > 25.20% done, estimate finish Fri May 25 20:50:48 2018 > 25.20% done, estimate finish Fri May 25 20:50:47 2018 > 25.21% done, estimate finish Fri May 25 20:50:46 2018 > 25.21% done, estimate finish Fri May 25 20:50:45 2018 > 25.21% done, estimate finish Fri May 25 20:50:48 2018 > 25.22% done, estimate finish Fri May 25 20:50:47 2018 > 25.22% done, estimate finish Fri May 25 20:50:46 2018 > 25.23% done, estimate finish Fri May 25 20:50:49 2018 > 25.23% done, estimate finish Fri May 25 20:50:48 2018 > 25.23% done, estimate finish Fri May 25 20:50:47 2018 > 25.24% done, estimate finish Fri May 25 20:50:45 2018 > 25.24% done, estimate finish Fri May 25 20:50:48 2018 > 25.25% done, estimate finish Fri May 25 20:50:47 2018 > 25.25% done, estimate finish Fri May 25 20:50:46 2018 > 25.25% done, estimate finish Fri May 25 20:50:45 2018 > 25.26% done, estimate finish Fri May 25 20:50:48 2018 > 25.26% done, estimate finish Fri May 25 20:50:47 2018 > 25.27% done, estimate finish Fri May 25 20:50:46 2018 > 25.27% done, estimate finish Fri May 25 20:50:45 2018 > 25.28% done, estimate finish Fri May 25 20:50:48 2018 > 25.28% done, estimate finish Fri May 25 20:50:47 2018 > 25.28% done, estimate finish Fri May 25 20:50:46 2018 > 25.29% done, estimate finish Fri May 25 20:50:45 2018 > 25.29% done, estimate finish Fri May 25 20:50:47 2018 > 25.30% done, estimate finish Fri May 25 20:50:46 2018 > 25.30% done, estimate finish Fri May 25 20:50:45 2018 > 25.30% done, estimate finish Fri May 25 20:50:48 2018 > 25.31% done, estimate finish Fri May 25 20:50:47 2018 > 25.31% done, estimate finish Fri May 25 20:50:46 2018 > 25.32% done, estimate finish Fri May 25 20:50:45 2018 > 25.32% done, estimate finish Fri May 25 20:50:48 2018 > 25.32% done, estimate finish Fri May 25 20:50:47 2018 > 25.33% done, estimate finish Fri May 25 20:50:46 2018 > 25.33% done, estimate finish Fri May 25 20:50:45 2018 > 25.34% done, estimate finish Fri May 25 20:50:47 2018 > 25.34% done, estimate finish Fri May 25 20:50:46 2018 > 25.34% done, estimate finish Fri May 25 20:50:45 2018 > 25.35% done, estimate finish Fri May 25 20:50:44 2018 > 25.35% done, estimate finish Fri May 25 20:50:47 2018 > 25.36% done, estimate finish Fri May 25 20:50:46 2018 > 25.36% done, estimate finish Fri May 25 20:50:45 2018 > 25.37% done, estimate finish Fri May 25 20:50:48 2018 > 25.37% done, estimate finish Fri May 25 20:50:47 2018 > 25.37% done, estimate finish Fri May 25 20:50:46 2018 > 25.38% done, estimate finish Fri May 25 20:50:45 2018 > 25.38% done, estimate finish Fri May 25 20:50:48 2018 > 25.39% done, estimate finish Fri May 25 20:50:46 2018 > 25.39% done, estimate finish Fri May 25 20:50:45 2018 > 25.39% done, estimate finish Fri May 25 20:50:44 2018 > 25.40% done, estimate finish Fri May 25 20:50:47 2018 > 25.40% done, estimate finish Fri May 25 20:50:46 2018 > 25.41% done, estimate finish Fri May 25 20:50:45 2018 > 25.41% done, estimate finish Fri May 25 20:50:44 2018 > 25.41% done, estimate finish Fri May 25 20:50:47 2018 > 25.42% done, estimate finish Fri May 25 20:50:46 2018 > 25.42% done, estimate finish Fri May 25 20:50:45 2018 > 25.43% done, estimate finish Fri May 25 20:50:48 2018 > 25.43% done, estimate finish Fri May 25 20:50:47 2018 > 25.43% done, estimate finish Fri May 25 20:50:46 2018 > 25.44% done, estimate finish Fri May 25 20:50:44 2018 > 25.44% done, estimate finish Fri May 25 20:50:47 2018 > 25.45% done, estimate finish Fri May 25 20:50:46 2018 > 25.45% done, estimate finish Fri May 25 20:50:45 2018 > 25.46% done, estimate finish Fri May 25 20:50:44 2018 > 25.46% done, estimate finish Fri May 25 20:50:47 2018 > 25.46% done, estimate finish Fri May 25 20:50:46 2018 > 25.47% done, estimate finish Fri May 25 20:50:45 2018 > 25.47% done, estimate finish Fri May 25 20:50:44 2018 > 25.48% done, estimate finish Fri May 25 20:50:47 2018 > 25.48% done, estimate finish Fri May 25 20:50:46 2018 > 25.48% done, estimate finish Fri May 25 20:50:45 2018 > 25.49% done, estimate finish Fri May 25 20:50:47 2018 > 25.49% done, estimate finish Fri May 25 20:50:46 2018 > 25.50% done, estimate finish Fri May 25 20:50:45 2018 > 25.50% done, estimate finish Fri May 25 20:50:44 2018 > 25.50% done, estimate finish Fri May 25 20:50:47 2018 > 25.51% done, estimate finish Fri May 25 20:50:46 2018 > 25.51% done, estimate finish Fri May 25 20:50:45 2018 > 25.52% done, estimate finish Fri May 25 20:50:44 2018 > 25.52% done, estimate finish Fri May 25 20:50:47 2018 > 25.53% done, estimate finish Fri May 25 20:50:46 2018 > 25.53% done, estimate finish Fri May 25 20:50:45 2018 > 25.53% done, estimate finish Fri May 25 20:50:44 2018 > 25.54% done, estimate finish Fri May 25 20:50:46 2018 > 25.54% done, estimate finish Fri May 25 20:50:45 2018 > 25.55% done, estimate finish Fri May 25 20:50:44 2018 > 25.55% done, estimate finish Fri May 25 20:50:47 2018 > 25.55% done, estimate finish Fri May 25 20:50:46 2018 > 25.56% done, estimate finish Fri May 25 20:50:45 2018 > 25.56% done, estimate finish Fri May 25 20:50:44 2018 > 25.57% done, estimate finish Fri May 25 20:50:47 2018 > 25.57% done, estimate finish Fri May 25 20:50:46 2018 > 25.57% done, estimate finish Fri May 25 20:50:45 2018 > 25.58% done, estimate finish Fri May 25 20:50:44 2018 > 25.58% done, estimate finish Fri May 25 20:50:47 2018 > 25.59% done, estimate finish Fri May 25 20:50:45 2018 > 25.59% done, estimate finish Fri May 25 20:50:44 2018 > 25.59% done, estimate finish Fri May 25 20:50:43 2018 > 25.60% done, estimate finish Fri May 25 20:50:46 2018 > 25.60% done, estimate finish Fri May 25 20:50:45 2018 > 25.61% done, estimate finish Fri May 25 20:50:44 2018 > 25.61% done, estimate finish Fri May 25 20:50:47 2018 > 25.62% done, estimate finish Fri May 25 20:50:46 2018 > 25.62% done, estimate finish Fri May 25 20:50:45 2018 > 25.62% done, estimate finish Fri May 25 20:50:44 2018 > 25.63% done, estimate finish Fri May 25 20:50:47 2018 > 25.63% done, estimate finish Fri May 25 20:50:46 2018 > 25.64% done, estimate finish Fri May 25 20:50:44 2018 > 25.64% done, estimate finish Fri May 25 20:50:43 2018 > 25.64% done, estimate finish Fri May 25 20:50:46 2018 > 25.65% done, estimate finish Fri May 25 20:50:45 2018 > 25.65% done, estimate finish Fri May 25 20:50:44 2018 > 25.66% done, estimate finish Fri May 25 20:50:43 2018 > 25.66% done, estimate finish Fri May 25 20:50:46 2018 > 25.66% done, estimate finish Fri May 25 20:50:45 2018 > 25.67% done, estimate finish Fri May 25 20:50:44 2018 > 25.67% done, estimate finish Fri May 25 20:50:47 2018 > 25.68% done, estimate finish Fri May 25 20:50:46 2018 > 25.68% done, estimate finish Fri May 25 20:50:45 2018 > 25.68% done, estimate finish Fri May 25 20:50:43 2018 > 25.69% done, estimate finish Fri May 25 20:50:46 2018 > 25.69% done, estimate finish Fri May 25 20:50:45 2018 > 25.70% done, estimate finish Fri May 25 20:50:44 2018 > 25.70% done, estimate finish Fri May 25 20:50:43 2018 > 25.71% done, estimate finish Fri May 25 20:50:46 2018 > 25.71% done, estimate finish Fri May 25 20:50:45 2018 > 25.71% done, estimate finish Fri May 25 20:50:44 2018 > 25.72% done, estimate finish Fri May 25 20:50:43 2018 > 25.72% done, estimate finish Fri May 25 20:50:46 2018 > 25.73% done, estimate finish Fri May 25 20:50:45 2018 > 25.73% done, estimate finish Fri May 25 20:50:44 2018 > 25.73% done, estimate finish Fri May 25 20:50:46 2018 > 25.74% done, estimate finish Fri May 25 20:50:45 2018 > 25.74% done, estimate finish Fri May 25 20:50:44 2018 > 25.75% done, estimate finish Fri May 25 20:50:43 2018 > 25.75% done, estimate finish Fri May 25 20:50:46 2018 > 25.75% done, estimate finish Fri May 25 20:50:45 2018 > 25.76% done, estimate finish Fri May 25 20:50:44 2018 > 25.76% done, estimate finish Fri May 25 20:50:43 2018 > 25.77% done, estimate finish Fri May 25 20:50:46 2018 > 25.77% done, estimate finish Fri May 25 20:50:45 2018 > 25.77% done, estimate finish Fri May 25 20:50:44 2018 > 25.78% done, estimate finish Fri May 25 20:50:43 2018 > 25.78% done, estimate finish Fri May 25 20:50:45 2018 > 25.79% done, estimate finish Fri May 25 20:50:44 2018 > 25.79% done, estimate finish Fri May 25 20:50:43 2018 > 25.80% done, estimate finish Fri May 25 20:50:46 2018 > 25.80% done, estimate finish Fri May 25 20:50:45 2018 > 25.80% done, estimate finish Fri May 25 20:50:44 2018 > 25.81% done, estimate finish Fri May 25 20:50:43 2018 > 25.81% done, estimate finish Fri May 25 20:50:46 2018 > 25.82% done, estimate finish Fri May 25 20:50:45 2018 > 25.82% done, estimate finish Fri May 25 20:50:44 2018 > 25.82% done, estimate finish Fri May 25 20:50:43 2018 > 25.83% done, estimate finish Fri May 25 20:50:46 2018 > 25.83% done, estimate finish Fri May 25 20:50:44 2018 > 25.84% done, estimate finish Fri May 25 20:50:43 2018 > 25.84% done, estimate finish Fri May 25 20:50:42 2018 > 25.84% done, estimate finish Fri May 25 20:50:45 2018 > 25.85% done, estimate finish Fri May 25 20:50:44 2018 > 25.85% done, estimate finish Fri May 25 20:50:43 2018 > 25.86% done, estimate finish Fri May 25 20:50:46 2018 > 25.86% done, estimate finish Fri May 25 20:50:45 2018 > 25.87% done, estimate finish Fri May 25 20:50:44 2018 > 25.87% done, estimate finish Fri May 25 20:50:43 2018 > 25.87% done, estimate finish Fri May 25 20:50:46 2018 > 25.88% done, estimate finish Fri May 25 20:50:45 2018 > 25.88% done, estimate finish Fri May 25 20:50:44 2018 > 25.89% done, estimate finish Fri May 25 20:50:42 2018 > 25.89% done, estimate finish Fri May 25 20:50:45 2018 > 25.89% done, estimate finish Fri May 25 20:50:44 2018 > 25.90% done, estimate finish Fri May 25 20:50:43 2018 > 25.90% done, estimate finish Fri May 25 20:50:42 2018 > 25.91% done, estimate finish Fri May 25 20:50:45 2018 > 25.91% done, estimate finish Fri May 25 20:50:44 2018 > 25.91% done, estimate finish Fri May 25 20:50:43 2018 > 25.92% done, estimate finish Fri May 25 20:50:46 2018 > 25.92% done, estimate finish Fri May 25 20:50:45 2018 > 25.93% done, estimate finish Fri May 25 20:50:44 2018 > 25.93% done, estimate finish Fri May 25 20:50:43 2018 > 25.93% done, estimate finish Fri May 25 20:50:45 2018 > 25.94% done, estimate finish Fri May 25 20:50:44 2018 > 25.94% done, estimate finish Fri May 25 20:50:43 2018 > 25.95% done, estimate finish Fri May 25 20:50:42 2018 > 25.95% done, estimate finish Fri May 25 20:50:45 2018 > 25.96% done, estimate finish Fri May 25 20:50:44 2018 > 25.96% done, estimate finish Fri May 25 20:50:43 2018 > 25.96% done, estimate finish Fri May 25 20:50:53 2018 > 25.97% done, estimate finish Fri May 25 20:50:52 2018 > 25.97% done, estimate finish Fri May 25 20:50:55 2018 > 25.98% done, estimate finish Fri May 25 20:50:54 2018 > 25.98% done, estimate finish Fri May 25 20:50:53 2018 > 25.98% done, estimate finish Fri May 25 20:50:52 2018 > 25.99% done, estimate finish Fri May 25 20:50:51 2018 > 25.99% done, estimate finish Fri May 25 20:50:50 2018 > 26.00% done, estimate finish Fri May 25 20:50:53 2018 > 26.00% done, estimate finish Fri May 25 20:50:52 2018 > 26.00% done, estimate finish Fri May 25 20:50:51 2018 > 26.01% done, estimate finish Fri May 25 20:50:54 2018 > 26.01% done, estimate finish Fri May 25 20:50:53 2018 > 26.02% done, estimate finish Fri May 25 20:50:51 2018 > 26.02% done, estimate finish Fri May 25 20:50:50 2018 > 26.02% done, estimate finish Fri May 25 20:50:53 2018 > 26.03% done, estimate finish Fri May 25 20:50:52 2018 > 26.03% done, estimate finish Fri May 25 20:50:51 2018 > 26.04% done, estimate finish Fri May 25 20:50:50 2018 > 26.04% done, estimate finish Fri May 25 20:50:53 2018 > 26.05% done, estimate finish Fri May 25 20:50:52 2018 > 26.05% done, estimate finish Fri May 25 20:50:51 2018 > 26.05% done, estimate finish Fri May 25 20:50:54 2018 > 26.06% done, estimate finish Fri May 25 20:50:53 2018 > 26.06% done, estimate finish Fri May 25 20:50:52 2018 > 26.07% done, estimate finish Fri May 25 20:50:51 2018 > 26.07% done, estimate finish Fri May 25 20:50:53 2018 > 26.07% done, estimate finish Fri May 25 20:50:52 2018 > 26.08% done, estimate finish Fri May 25 20:50:51 2018 > 26.08% done, estimate finish Fri May 25 20:50:50 2018 > 26.09% done, estimate finish Fri May 25 20:50:53 2018 > 26.09% done, estimate finish Fri May 25 20:50:52 2018 > 26.09% done, estimate finish Fri May 25 20:50:51 2018 > 26.10% done, estimate finish Fri May 25 20:50:50 2018 > 26.10% done, estimate finish Fri May 25 20:50:53 2018 > 26.11% done, estimate finish Fri May 25 20:50:52 2018 > 26.11% done, estimate finish Fri May 25 20:50:51 2018 > 26.11% done, estimate finish Fri May 25 20:50:53 2018 > 26.12% done, estimate finish Fri May 25 20:50:52 2018 > 26.12% done, estimate finish Fri May 25 20:50:51 2018 > 26.13% done, estimate finish Fri May 25 20:50:50 2018 > 26.13% done, estimate finish Fri May 25 20:50:53 2018 > 26.14% done, estimate finish Fri May 25 20:50:52 2018 > 26.14% done, estimate finish Fri May 25 20:50:51 2018 > 26.14% done, estimate finish Fri May 25 20:50:50 2018 > 26.15% done, estimate finish Fri May 25 20:50:53 2018 > 26.15% done, estimate finish Fri May 25 20:50:52 2018 > 26.16% done, estimate finish Fri May 25 20:50:51 2018 > 26.16% done, estimate finish Fri May 25 20:50:50 2018 > 26.16% done, estimate finish Fri May 25 20:50:52 2018 > 26.17% done, estimate finish Fri May 25 20:50:51 2018 > 26.17% done, estimate finish Fri May 25 20:50:50 2018 > 26.18% done, estimate finish Fri May 25 20:50:53 2018 > 26.18% done, estimate finish Fri May 25 20:50:52 2018 > 26.18% done, estimate finish Fri May 25 20:50:51 2018 > 26.19% done, estimate finish Fri May 25 20:50:50 2018 > 26.19% done, estimate finish Fri May 25 20:50:53 2018 > 26.20% done, estimate finish Fri May 25 20:50:52 2018 > 26.20% done, estimate finish Fri May 25 20:50:51 2018 > 26.20% done, estimate finish Fri May 25 20:50:50 2018 > 26.21% done, estimate finish Fri May 25 20:50:53 2018 > 26.21% done, estimate finish Fri May 25 20:50:51 2018 > 26.22% done, estimate finish Fri May 25 20:50:50 2018 > 26.22% done, estimate finish Fri May 25 20:50:49 2018 > 26.23% done, estimate finish Fri May 25 20:50:52 2018 > 26.23% done, estimate finish Fri May 25 20:50:51 2018 > 26.23% done, estimate finish Fri May 25 20:50:50 2018 > 26.24% done, estimate finish Fri May 25 20:50:53 2018 > 26.24% done, estimate finish Fri May 25 20:50:52 2018 > 26.25% done, estimate finish Fri May 25 20:50:51 2018 > 26.25% done, estimate finish Fri May 25 20:50:50 2018 > 26.25% done, estimate finish Fri May 25 20:50:53 2018 > 26.26% done, estimate finish Fri May 25 20:50:52 2018 > 26.26% done, estimate finish Fri May 25 20:50:51 2018 > 26.27% done, estimate finish Fri May 25 20:50:49 2018 > 26.27% done, estimate finish Fri May 25 20:50:52 2018 > 26.27% done, estimate finish Fri May 25 20:50:51 2018 > 26.28% done, estimate finish Fri May 25 20:50:50 2018 > 26.28% done, estimate finish Fri May 25 20:50:49 2018 > 26.29% done, estimate finish Fri May 25 20:50:52 2018 > 26.29% done, estimate finish Fri May 25 20:50:51 2018 > 26.30% done, estimate finish Fri May 25 20:50:50 2018 > 26.30% done, estimate finish Fri May 25 20:50:53 2018 > 26.30% done, estimate finish Fri May 25 20:50:52 2018 > 26.31% done, estimate finish Fri May 25 20:50:51 2018 > 26.31% done, estimate finish Fri May 25 20:50:50 2018 > 26.32% done, estimate finish Fri May 25 20:50:52 2018 > 26.32% done, estimate finish Fri May 25 20:50:51 2018 > 26.32% done, estimate finish Fri May 25 20:50:50 2018 > 26.33% done, estimate finish Fri May 25 20:50:49 2018 > 26.33% done, estimate finish Fri May 25 20:50:52 2018 > 26.34% done, estimate finish Fri May 25 20:50:51 2018 > 26.34% done, estimate finish Fri May 25 20:50:50 2018 > 26.34% done, estimate finish Fri May 25 20:50:53 2018 > 26.35% done, estimate finish Fri May 25 20:50:52 2018 > 26.35% done, estimate finish Fri May 25 20:50:51 2018 > 26.36% done, estimate finish Fri May 25 20:50:50 2018 > 26.36% done, estimate finish Fri May 25 20:50:52 2018 > 26.36% done, estimate finish Fri May 25 20:50:51 2018 > 26.37% done, estimate finish Fri May 25 20:50:50 2018 > 26.37% done, estimate finish Fri May 25 20:50:49 2018 > 26.38% done, estimate finish Fri May 25 20:50:52 2018 > 26.38% done, estimate finish Fri May 25 20:50:51 2018 > 26.39% done, estimate finish Fri May 25 20:50:50 2018 > 26.39% done, estimate finish Fri May 25 20:50:49 2018 > 26.39% done, estimate finish Fri May 25 20:50:52 2018 > 26.40% done, estimate finish Fri May 25 20:50:51 2018 > 26.40% done, estimate finish Fri May 25 20:50:50 2018 > 26.41% done, estimate finish Fri May 25 20:50:52 2018 > 26.41% done, estimate finish Fri May 25 20:50:51 2018 > 26.41% done, estimate finish Fri May 25 20:50:50 2018 > 26.42% done, estimate finish Fri May 25 20:50:49 2018 > 26.42% done, estimate finish Fri May 25 20:50:52 2018 > 26.43% done, estimate finish Fri May 25 20:50:51 2018 > 26.43% done, estimate finish Fri May 25 20:50:50 2018 > 26.43% done, estimate finish Fri May 25 20:50:49 2018 > 26.44% done, estimate finish Fri May 25 20:50:52 2018 > 26.44% done, estimate finish Fri May 25 20:50:51 2018 > 26.45% done, estimate finish Fri May 25 20:50:50 2018 > 26.45% done, estimate finish Fri May 25 20:50:49 2018 > 26.45% done, estimate finish Fri May 25 20:50:52 2018 > 26.46% done, estimate finish Fri May 25 20:50:51 2018 > 26.46% done, estimate finish Fri May 25 20:50:49 2018 > 26.47% done, estimate finish Fri May 25 20:50:52 2018 > 26.47% done, estimate finish Fri May 25 20:50:51 2018 > 26.48% done, estimate finish Fri May 25 20:50:50 2018 > 26.48% done, estimate finish Fri May 25 20:50:49 2018 > 26.48% done, estimate finish Fri May 25 20:50:52 2018 > 26.49% done, estimate finish Fri May 25 20:50:51 2018 > 26.49% done, estimate finish Fri May 25 20:50:50 2018 > 26.50% done, estimate finish Fri May 25 20:50:49 2018 > 26.50% done, estimate finish Fri May 25 20:50:52 2018 > 26.50% done, estimate finish Fri May 25 20:50:51 2018 > 26.51% done, estimate finish Fri May 25 20:50:50 2018 > 26.51% done, estimate finish Fri May 25 20:50:49 2018 > 26.52% done, estimate finish Fri May 25 20:50:51 2018 > 26.52% done, estimate finish Fri May 25 20:50:50 2018 > 26.52% done, estimate finish Fri May 25 20:50:49 2018 > 26.53% done, estimate finish Fri May 25 20:50:52 2018 > 26.53% done, estimate finish Fri May 25 20:50:51 2018 > 26.54% done, estimate finish Fri May 25 20:50:50 2018 > 26.54% done, estimate finish Fri May 25 20:50:49 2018 > 26.54% done, estimate finish Fri May 25 20:50:52 2018 > 26.55% done, estimate finish Fri May 25 20:50:51 2018 > 26.55% done, estimate finish Fri May 25 20:50:50 2018 > 26.56% done, estimate finish Fri May 25 20:50:49 2018 > 26.56% done, estimate finish Fri May 25 20:50:51 2018 > 26.57% done, estimate finish Fri May 25 20:50:50 2018 > 26.57% done, estimate finish Fri May 25 20:50:49 2018 > 26.57% done, estimate finish Fri May 25 20:50:48 2018 > 26.58% done, estimate finish Fri May 25 20:50:51 2018 > 26.58% done, estimate finish Fri May 25 20:50:50 2018 > 26.59% done, estimate finish Fri May 25 20:50:49 2018 > 26.59% done, estimate finish Fri May 25 20:50:52 2018 > 26.59% done, estimate finish Fri May 25 20:50:51 2018 > 26.60% done, estimate finish Fri May 25 20:50:50 2018 > 26.60% done, estimate finish Fri May 25 20:50:49 2018 > 26.61% done, estimate finish Fri May 25 20:50:51 2018 > 26.61% done, estimate finish Fri May 25 20:50:50 2018 > 26.61% done, estimate finish Fri May 25 20:50:49 2018 > 26.62% done, estimate finish Fri May 25 20:50:48 2018 > 26.62% done, estimate finish Fri May 25 20:50:51 2018 > 26.63% done, estimate finish Fri May 25 20:50:50 2018 > 26.63% done, estimate finish Fri May 25 20:50:49 2018 > 26.64% done, estimate finish Fri May 25 20:50:48 2018 > 26.64% done, estimate finish Fri May 25 20:50:51 2018 > 26.64% done, estimate finish Fri May 25 20:50:50 2018 > 26.65% done, estimate finish Fri May 25 20:50:49 2018 > 26.65% done, estimate finish Fri May 25 20:50:52 2018 > 26.66% done, estimate finish Fri May 25 20:50:50 2018 > 26.66% done, estimate finish Fri May 25 20:50:49 2018 > 26.66% done, estimate finish Fri May 25 20:50:48 2018 > 26.67% done, estimate finish Fri May 25 20:50:51 2018 > 26.67% done, estimate finish Fri May 25 20:50:50 2018 > 26.68% done, estimate finish Fri May 25 20:50:49 2018 > 26.68% done, estimate finish Fri May 25 20:50:48 2018 > 26.68% done, estimate finish Fri May 25 20:50:51 2018 > 26.69% done, estimate finish Fri May 25 20:50:50 2018 > 26.69% done, estimate finish Fri May 25 20:50:49 2018 > 26.70% done, estimate finish Fri May 25 20:50:48 2018 > 26.70% done, estimate finish Fri May 25 20:50:51 2018 > 26.70% done, estimate finish Fri May 25 20:50:50 2018 > 26.71% done, estimate finish Fri May 25 20:50:49 2018 > 26.71% done, estimate finish Fri May 25 20:50:51 2018 > 26.72% done, estimate finish Fri May 25 20:50:50 2018 > 26.72% done, estimate finish Fri May 25 20:50:49 2018 > 26.73% done, estimate finish Fri May 25 20:50:48 2018 > 26.73% done, estimate finish Fri May 25 20:50:51 2018 > 26.73% done, estimate finish Fri May 25 20:50:50 2018 > 26.74% done, estimate finish Fri May 25 20:50:49 2018 > 26.74% done, estimate finish Fri May 25 20:50:48 2018 > 26.75% done, estimate finish Fri May 25 20:50:51 2018 > 26.75% done, estimate finish Fri May 25 20:50:50 2018 > 26.75% done, estimate finish Fri May 25 20:50:49 2018 > 26.76% done, estimate finish Fri May 25 20:50:51 2018 > 26.76% done, estimate finish Fri May 25 20:50:50 2018 > 26.77% done, estimate finish Fri May 25 20:50:49 2018 > 26.77% done, estimate finish Fri May 25 20:50:48 2018 > 26.77% done, estimate finish Fri May 25 20:50:51 2018 > 26.78% done, estimate finish Fri May 25 20:50:50 2018 > 26.78% done, estimate finish Fri May 25 20:50:49 2018 > 26.79% done, estimate finish Fri May 25 20:50:48 2018 > 26.79% done, estimate finish Fri May 25 20:50:51 2018 > 26.79% done, estimate finish Fri May 25 20:50:50 2018 > 26.80% done, estimate finish Fri May 25 20:50:49 2018 > 26.80% done, estimate finish Fri May 25 20:50:51 2018 > 26.81% done, estimate finish Fri May 25 20:50:50 2018 > 26.81% done, estimate finish Fri May 25 20:50:49 2018 > 26.82% done, estimate finish Fri May 25 20:50:48 2018 > 26.82% done, estimate finish Fri May 25 20:50:51 2018 > 26.82% done, estimate finish Fri May 25 20:50:50 2018 > 26.83% done, estimate finish Fri May 25 20:50:49 2018 > 26.83% done, estimate finish Fri May 25 20:50:48 2018 > 26.84% done, estimate finish Fri May 25 20:50:51 2018 > 26.84% done, estimate finish Fri May 25 20:50:50 2018 > 26.84% done, estimate finish Fri May 25 20:50:49 2018 > 26.85% done, estimate finish Fri May 25 20:50:48 2018 > 26.85% done, estimate finish Fri May 25 20:50:50 2018 > 26.86% done, estimate finish Fri May 25 20:50:49 2018 > 26.86% done, estimate finish Fri May 25 20:50:48 2018 > 26.86% done, estimate finish Fri May 25 20:50:51 2018 > 26.87% done, estimate finish Fri May 25 20:50:50 2018 > 26.87% done, estimate finish Fri May 25 20:50:49 2018 > 26.88% done, estimate finish Fri May 25 20:50:48 2018 > 26.88% done, estimate finish Fri May 25 20:50:51 2018 > 26.88% done, estimate finish Fri May 25 20:50:50 2018 > 26.89% done, estimate finish Fri May 25 20:50:49 2018 > 26.89% done, estimate finish Fri May 25 20:50:48 2018 > 26.90% done, estimate finish Fri May 25 20:50:51 2018 > 26.90% done, estimate finish Fri May 25 20:50:50 2018 > 26.91% done, estimate finish Fri May 25 20:50:49 2018 > 26.91% done, estimate finish Fri May 25 20:50:51 2018 > 26.91% done, estimate finish Fri May 25 20:50:50 2018 > 26.92% done, estimate finish Fri May 25 20:50:49 2018 > 26.92% done, estimate finish Fri May 25 20:50:48 2018 > 26.93% done, estimate finish Fri May 25 20:50:51 2018 > 26.93% done, estimate finish Fri May 25 20:50:50 2018 > 26.93% done, estimate finish Fri May 25 20:50:49 2018 > 26.94% done, estimate finish Fri May 25 20:50:48 2018 > 26.94% done, estimate finish Fri May 25 20:50:51 2018 > 26.95% done, estimate finish Fri May 25 20:50:50 2018 > 26.95% done, estimate finish Fri May 25 20:50:49 2018 > 26.95% done, estimate finish Fri May 25 20:50:48 2018 > 26.96% done, estimate finish Fri May 25 20:50:50 2018 > 26.96% done, estimate finish Fri May 25 20:50:49 2018 > 26.97% done, estimate finish Fri May 25 20:50:48 2018 > 26.97% done, estimate finish Fri May 25 20:50:51 2018 > 26.97% done, estimate finish Fri May 25 20:50:50 2018 > 26.98% done, estimate finish Fri May 25 20:50:49 2018 > 26.98% done, estimate finish Fri May 25 20:50:48 2018 > 26.99% done, estimate finish Fri May 25 20:50:51 2018 > 26.99% done, estimate finish Fri May 25 20:50:50 2018 > 27.00% done, estimate finish Fri May 25 20:50:49 2018 > 27.00% done, estimate finish Fri May 25 20:50:48 2018 > 27.00% done, estimate finish Fri May 25 20:50:50 2018 > 27.01% done, estimate finish Fri May 25 20:50:49 2018 > 27.01% done, estimate finish Fri May 25 20:50:48 2018 > 27.02% done, estimate finish Fri May 25 20:50:47 2018 > 27.02% done, estimate finish Fri May 25 20:50:50 2018 > 27.02% done, estimate finish Fri May 25 20:50:49 2018 > 27.03% done, estimate finish Fri May 25 20:50:48 2018 > 27.03% done, estimate finish Fri May 25 20:50:47 2018 > 27.04% done, estimate finish Fri May 25 20:50:50 2018 > 27.04% done, estimate finish Fri May 25 20:50:49 2018 > 27.04% done, estimate finish Fri May 25 20:50:48 2018 > 27.05% done, estimate finish Fri May 25 20:50:50 2018 > 27.05% done, estimate finish Fri May 25 20:50:49 2018 > 27.06% done, estimate finish Fri May 25 20:50:48 2018 > 27.06% done, estimate finish Fri May 25 20:50:47 2018 > 27.07% done, estimate finish Fri May 25 20:50:50 2018 > 27.07% done, estimate finish Fri May 25 20:50:49 2018 > 27.07% done, estimate finish Fri May 25 20:50:48 2018 > 27.08% done, estimate finish Fri May 25 20:50:47 2018 > 27.08% done, estimate finish Fri May 25 20:50:50 2018 > 27.09% done, estimate finish Fri May 25 20:50:49 2018 > 27.09% done, estimate finish Fri May 25 20:50:48 2018 > 27.09% done, estimate finish Fri May 25 20:50:47 2018 > 27.10% done, estimate finish Fri May 25 20:50:50 2018 > 27.10% done, estimate finish Fri May 25 20:50:49 2018 > 27.11% done, estimate finish Fri May 25 20:50:48 2018 > 27.11% done, estimate finish Fri May 25 20:50:47 2018 > 27.11% done, estimate finish Fri May 25 20:50:49 2018 > 27.12% done, estimate finish Fri May 25 20:50:48 2018 > 27.12% done, estimate finish Fri May 25 20:50:47 2018 > 27.13% done, estimate finish Fri May 25 20:50:46 2018 > 27.13% done, estimate finish Fri May 25 20:50:49 2018 > 27.13% done, estimate finish Fri May 25 20:50:48 2018 > 27.14% done, estimate finish Fri May 25 20:50:47 2018 > 27.14% done, estimate finish Fri May 25 20:50:46 2018 > 27.15% done, estimate finish Fri May 25 20:50:49 2018 > 27.15% done, estimate finish Fri May 25 20:50:48 2018 > 27.16% done, estimate finish Fri May 25 20:50:47 2018 > 27.16% done, estimate finish Fri May 25 20:50:46 2018 > 27.16% done, estimate finish Fri May 25 20:50:48 2018 > 27.17% done, estimate finish Fri May 25 20:50:47 2018 > 27.17% done, estimate finish Fri May 25 20:50:46 2018 > 27.18% done, estimate finish Fri May 25 20:50:45 2018 > 27.18% done, estimate finish Fri May 25 20:50:48 2018 > 27.18% done, estimate finish Fri May 25 20:50:47 2018 > 27.19% done, estimate finish Fri May 25 20:50:46 2018 > 27.19% done, estimate finish Fri May 25 20:50:49 2018 > 27.20% done, estimate finish Fri May 25 20:50:48 2018 > 27.20% done, estimate finish Fri May 25 20:50:47 2018 > 27.20% done, estimate finish Fri May 25 20:50:46 2018 > 27.21% done, estimate finish Fri May 25 20:50:48 2018 > 27.21% done, estimate finish Fri May 25 20:50:47 2018 > 27.22% done, estimate finish Fri May 25 20:50:46 2018 > 27.22% done, estimate finish Fri May 25 20:50:45 2018 > 27.22% done, estimate finish Fri May 25 20:50:48 2018 > 27.23% done, estimate finish Fri May 25 20:50:47 2018 > 27.23% done, estimate finish Fri May 25 20:50:46 2018 > 27.24% done, estimate finish Fri May 25 20:50:45 2018 > 27.24% done, estimate finish Fri May 25 20:50:48 2018 > 27.25% done, estimate finish Fri May 25 20:50:47 2018 > 27.25% done, estimate finish Fri May 25 20:50:46 2018 > 27.25% done, estimate finish Fri May 25 20:50:48 2018 > 27.26% done, estimate finish Fri May 25 20:50:47 2018 > 27.26% done, estimate finish Fri May 25 20:50:46 2018 > 27.27% done, estimate finish Fri May 25 20:50:46 2018 > 27.27% done, estimate finish Fri May 25 20:50:48 2018 > 27.27% done, estimate finish Fri May 25 20:50:47 2018 > 27.28% done, estimate finish Fri May 25 20:50:46 2018 > 27.28% done, estimate finish Fri May 25 20:50:49 2018 > 27.29% done, estimate finish Fri May 25 20:50:48 2018 > 27.29% done, estimate finish Fri May 25 20:50:47 2018 > 27.29% done, estimate finish Fri May 25 20:50:50 2018 > 27.30% done, estimate finish Fri May 25 20:50:49 2018 > 27.30% done, estimate finish Fri May 25 20:50:48 2018 > 27.31% done, estimate finish Fri May 25 20:50:47 2018 > 27.31% done, estimate finish Fri May 25 20:50:49 2018 > 27.31% done, estimate finish Fri May 25 20:50:48 2018 > 27.32% done, estimate finish Fri May 25 20:50:47 2018 > 27.32% done, estimate finish Fri May 25 20:50:50 2018 > 27.33% done, estimate finish Fri May 25 20:50:49 2018 > 27.33% done, estimate finish Fri May 25 20:50:48 2018 > 27.34% done, estimate finish Fri May 25 20:50:47 2018 > 27.34% done, estimate finish Fri May 25 20:50:50 2018 > 27.34% done, estimate finish Fri May 25 20:50:49 2018 > 27.35% done, estimate finish Fri May 25 20:50:48 2018 > 27.35% done, estimate finish Fri May 25 20:50:47 2018 > 27.36% done, estimate finish Fri May 25 20:50:49 2018 > 27.36% done, estimate finish Fri May 25 20:50:48 2018 > 27.36% done, estimate finish Fri May 25 20:50:47 2018 > 27.37% done, estimate finish Fri May 25 20:50:46 2018 > 27.37% done, estimate finish Fri May 25 20:50:49 2018 > 27.38% done, estimate finish Fri May 25 20:50:48 2018 > 27.38% done, estimate finish Fri May 25 20:50:47 2018 > 27.38% done, estimate finish Fri May 25 20:50:46 2018 > 27.39% done, estimate finish Fri May 25 20:50:49 2018 > 27.39% done, estimate finish Fri May 25 20:50:48 2018 > 27.40% done, estimate finish Fri May 25 20:50:47 2018 > 27.40% done, estimate finish Fri May 25 20:50:49 2018 > 27.41% done, estimate finish Fri May 25 20:50:48 2018 > 27.41% done, estimate finish Fri May 25 20:50:47 2018 > 27.41% done, estimate finish Fri May 25 20:50:46 2018 > 27.42% done, estimate finish Fri May 25 20:50:49 2018 > 27.42% done, estimate finish Fri May 25 20:50:48 2018 > 27.43% done, estimate finish Fri May 25 20:50:47 2018 > 27.43% done, estimate finish Fri May 25 20:50:46 2018 > 27.43% done, estimate finish Fri May 25 20:50:49 2018 > 27.44% done, estimate finish Fri May 25 20:50:48 2018 > 27.44% done, estimate finish Fri May 25 20:50:47 2018 > 27.45% done, estimate finish Fri May 25 20:50:46 2018 > 27.45% done, estimate finish Fri May 25 20:50:48 2018 > 27.45% done, estimate finish Fri May 25 20:50:47 2018 > 27.46% done, estimate finish Fri May 25 20:50:47 2018 > 27.46% done, estimate finish Fri May 25 20:50:46 2018 > 27.47% done, estimate finish Fri May 25 20:50:48 2018 > 27.47% done, estimate finish Fri May 25 20:50:47 2018 > 27.47% done, estimate finish Fri May 25 20:50:46 2018 > 27.48% done, estimate finish Fri May 25 20:50:45 2018 > 27.48% done, estimate finish Fri May 25 20:50:48 2018 > 27.49% done, estimate finish Fri May 25 20:50:47 2018 > 27.49% done, estimate finish Fri May 25 20:50:46 2018 > 27.50% done, estimate finish Fri May 25 20:50:45 2018 > 27.50% done, estimate finish Fri May 25 20:50:48 2018 > 27.50% done, estimate finish Fri May 25 20:50:47 2018 > 27.51% done, estimate finish Fri May 25 20:50:46 2018 > 27.51% done, estimate finish Fri May 25 20:50:45 2018 > 27.52% done, estimate finish Fri May 25 20:50:47 2018 > 27.52% done, estimate finish Fri May 25 20:50:46 2018 > 27.52% done, estimate finish Fri May 25 20:50:45 2018 > 27.53% done, estimate finish Fri May 25 20:50:44 2018 > 27.53% done, estimate finish Fri May 25 20:50:47 2018 > 27.54% done, estimate finish Fri May 25 20:50:46 2018 > 27.54% done, estimate finish Fri May 25 20:50:49 2018 > 27.54% done, estimate finish Fri May 25 20:50:48 2018 > 27.55% done, estimate finish Fri May 25 20:50:47 2018 > 27.55% done, estimate finish Fri May 25 20:50:46 2018 > 27.56% done, estimate finish Fri May 25 20:50:48 2018 > 27.56% done, estimate finish Fri May 25 20:50:47 2018 > 27.56% done, estimate finish Fri May 25 20:50:46 2018 > 27.57% done, estimate finish Fri May 25 20:50:45 2018 > 27.57% done, estimate finish Fri May 25 20:50:48 2018 > 27.58% done, estimate finish Fri May 25 20:50:47 2018 > 27.58% done, estimate finish Fri May 25 20:50:46 2018 > 27.59% done, estimate finish Fri May 25 20:50:49 2018 > 27.59% done, estimate finish Fri May 25 20:50:48 2018 > 27.59% done, estimate finish Fri May 25 20:50:47 2018 > 27.60% done, estimate finish Fri May 25 20:50:49 2018 > 27.60% done, estimate finish Fri May 25 20:50:48 2018 > 27.61% done, estimate finish Fri May 25 20:50:47 2018 > 27.61% done, estimate finish Fri May 25 20:50:50 2018 > 27.61% done, estimate finish Fri May 25 20:50:49 2018 > 27.62% done, estimate finish Fri May 25 20:50:48 2018 > 27.62% done, estimate finish Fri May 25 20:50:51 2018 > 27.63% done, estimate finish Fri May 25 20:50:50 2018 > 27.63% done, estimate finish Fri May 25 20:50:49 2018 > 27.63% done, estimate finish Fri May 25 20:50:48 2018 > 27.64% done, estimate finish Fri May 25 20:50:47 2018 > 27.64% done, estimate finish Fri May 25 20:50:49 2018 > 27.65% done, estimate finish Fri May 25 20:50:48 2018 > 27.65% done, estimate finish Fri May 25 20:50:47 2018 > 27.65% done, estimate finish Fri May 25 20:50:50 2018 > 27.66% done, estimate finish Fri May 25 20:50:49 2018 > 27.66% done, estimate finish Fri May 25 20:50:48 2018 > 27.67% done, estimate finish Fri May 25 20:50:47 2018 > 27.67% done, estimate finish Fri May 25 20:50:50 2018 > 27.68% done, estimate finish Fri May 25 20:50:49 2018 > 27.68% done, estimate finish Fri May 25 20:50:48 2018 > 27.68% done, estimate finish Fri May 25 20:50:47 2018 > 27.69% done, estimate finish Fri May 25 20:50:50 2018 > 27.69% done, estimate finish Fri May 25 20:50:49 2018 > 27.70% done, estimate finish Fri May 25 20:50:48 2018 > 27.70% done, estimate finish Fri May 25 20:50:47 2018 > 27.70% done, estimate finish Fri May 25 20:50:49 2018 > 27.71% done, estimate finish Fri May 25 20:50:48 2018 > 27.71% done, estimate finish Fri May 25 20:50:47 2018 > 27.72% done, estimate finish Fri May 25 20:50:46 2018 > 27.72% done, estimate finish Fri May 25 20:50:49 2018 > 27.72% done, estimate finish Fri May 25 20:50:48 2018 > 27.73% done, estimate finish Fri May 25 20:50:47 2018 > 27.73% done, estimate finish Fri May 25 20:50:46 2018 > 27.74% done, estimate finish Fri May 25 20:50:49 2018 > 27.74% done, estimate finish Fri May 25 20:50:48 2018 > 27.75% done, estimate finish Fri May 25 20:50:47 2018 > 27.75% done, estimate finish Fri May 25 20:50:49 2018 > 27.75% done, estimate finish Fri May 25 20:50:48 2018 > 27.76% done, estimate finish Fri May 25 20:50:47 2018 > 27.76% done, estimate finish Fri May 25 20:50:46 2018 > 27.77% done, estimate finish Fri May 25 20:50:49 2018 > 27.77% done, estimate finish Fri May 25 20:50:48 2018 > 27.77% done, estimate finish Fri May 25 20:50:47 2018 > 27.78% done, estimate finish Fri May 25 20:50:46 2018 > 27.78% done, estimate finish Fri May 25 20:50:49 2018 > 27.79% done, estimate finish Fri May 25 20:50:48 2018 > 27.79% done, estimate finish Fri May 25 20:50:47 2018 > 27.79% done, estimate finish Fri May 25 20:50:46 2018 > 27.80% done, estimate finish Fri May 25 20:50:48 2018 > 27.80% done, estimate finish Fri May 25 20:50:47 2018 > 27.81% done, estimate finish Fri May 25 20:50:46 2018 >=== last message repeated 2 times. === > 27.81% done, estimate finish Fri May 25 20:50:48 2018 > 27.82% done, estimate finish Fri May 25 20:50:47 2018 > 27.82% done, estimate finish Fri May 25 20:50:46 2018 > 27.83% done, estimate finish Fri May 25 20:50:45 2018 > 27.83% done, estimate finish Fri May 25 20:50:48 2018 > 27.84% done, estimate finish Fri May 25 20:50:47 2018 > 27.84% done, estimate finish Fri May 25 20:50:46 2018 > 27.84% done, estimate finish Fri May 25 20:50:45 2018 > 27.85% done, estimate finish Fri May 25 20:50:48 2018 > 27.85% done, estimate finish Fri May 25 20:50:47 2018 > 27.86% done, estimate finish Fri May 25 20:50:46 2018 > 27.86% done, estimate finish Fri May 25 20:50:48 2018 > 27.86% done, estimate finish Fri May 25 20:50:47 2018 > 27.87% done, estimate finish Fri May 25 20:50:46 2018 > 27.87% done, estimate finish Fri May 25 20:50:45 2018 > 27.88% done, estimate finish Fri May 25 20:50:44 2018 > 27.88% done, estimate finish Fri May 25 20:50:47 2018 > 27.88% done, estimate finish Fri May 25 20:50:46 2018 > 27.89% done, estimate finish Fri May 25 20:50:45 2018 > 27.89% done, estimate finish Fri May 25 20:50:48 2018 > 27.90% done, estimate finish Fri May 25 20:50:47 2018 > 27.90% done, estimate finish Fri May 25 20:50:46 2018 > 27.90% done, estimate finish Fri May 25 20:50:45 2018 > 27.91% done, estimate finish Fri May 25 20:50:47 2018 > 27.91% done, estimate finish Fri May 25 20:50:46 2018 > 27.92% done, estimate finish Fri May 25 20:50:45 2018 > 27.92% done, estimate finish Fri May 25 20:50:44 2018 > 27.93% done, estimate finish Fri May 25 20:50:47 2018 > 27.93% done, estimate finish Fri May 25 20:50:46 2018 > 27.93% done, estimate finish Fri May 25 20:50:45 2018 > 27.94% done, estimate finish Fri May 25 20:50:48 2018 > 27.94% done, estimate finish Fri May 25 20:50:47 2018 > 27.95% done, estimate finish Fri May 25 20:50:46 2018 > 27.95% done, estimate finish Fri May 25 20:50:45 2018 > 27.95% done, estimate finish Fri May 25 20:50:47 2018 > 27.96% done, estimate finish Fri May 25 20:50:46 2018 > 27.96% done, estimate finish Fri May 25 20:50:45 2018 > 27.97% done, estimate finish Fri May 25 20:50:44 2018 > 27.97% done, estimate finish Fri May 25 20:50:47 2018 > 27.97% done, estimate finish Fri May 25 20:50:46 2018 > 27.98% done, estimate finish Fri May 25 20:50:45 2018 > 27.98% done, estimate finish Fri May 25 20:50:44 2018 > 27.99% done, estimate finish Fri May 25 20:50:47 2018 > 27.99% done, estimate finish Fri May 25 20:50:46 2018 > 27.99% done, estimate finish Fri May 25 20:50:45 2018 > 28.00% done, estimate finish Fri May 25 20:50:44 2018 > 28.00% done, estimate finish Fri May 25 20:50:46 2018 > 28.01% done, estimate finish Fri May 25 20:50:46 2018 > 28.01% done, estimate finish Fri May 25 20:50:45 2018 > 28.02% done, estimate finish Fri May 25 20:50:44 2018 > 28.02% done, estimate finish Fri May 25 20:50:46 2018 > 28.02% done, estimate finish Fri May 25 20:50:45 2018 > 28.03% done, estimate finish Fri May 25 20:50:44 2018 > 28.03% done, estimate finish Fri May 25 20:50:47 2018 > 28.04% done, estimate finish Fri May 25 20:50:46 2018 > 28.04% done, estimate finish Fri May 25 20:50:45 2018 > 28.04% done, estimate finish Fri May 25 20:50:44 2018 > 28.05% done, estimate finish Fri May 25 20:50:47 2018 > 28.05% done, estimate finish Fri May 25 20:50:46 2018 > 28.06% done, estimate finish Fri May 25 20:50:45 2018 > 28.06% done, estimate finish Fri May 25 20:50:44 2018 > 28.06% done, estimate finish Fri May 25 20:50:46 2018 > 28.07% done, estimate finish Fri May 25 20:50:45 2018 > 28.07% done, estimate finish Fri May 25 20:50:44 2018 > 28.08% done, estimate finish Fri May 25 20:50:43 2018 > 28.08% done, estimate finish Fri May 25 20:50:46 2018 > 28.08% done, estimate finish Fri May 25 20:50:45 2018 > 28.09% done, estimate finish Fri May 25 20:50:44 2018 > 28.09% done, estimate finish Fri May 25 20:50:43 2018 > 28.10% done, estimate finish Fri May 25 20:50:46 2018 > 28.10% done, estimate finish Fri May 25 20:50:45 2018 > 28.11% done, estimate finish Fri May 25 20:50:44 2018 > 28.11% done, estimate finish Fri May 25 20:50:43 2018 > 28.11% done, estimate finish Fri May 25 20:50:45 2018 > 28.12% done, estimate finish Fri May 25 20:50:44 2018 > 28.12% done, estimate finish Fri May 25 20:50:43 2018 > 28.13% done, estimate finish Fri May 25 20:50:42 2018 > 28.13% done, estimate finish Fri May 25 20:50:45 2018 > 28.13% done, estimate finish Fri May 25 20:50:44 2018 > 28.14% done, estimate finish Fri May 25 20:50:43 2018 > 28.14% done, estimate finish Fri May 25 20:50:46 2018 > 28.15% done, estimate finish Fri May 25 20:50:45 2018 > 28.15% done, estimate finish Fri May 25 20:50:44 2018 > 28.15% done, estimate finish Fri May 25 20:50:43 2018 > 28.16% done, estimate finish Fri May 25 20:50:42 2018 > 28.16% done, estimate finish Fri May 25 20:50:44 2018 > 28.17% done, estimate finish Fri May 25 20:50:44 2018 > 28.17% done, estimate finish Fri May 25 20:50:43 2018 > 28.18% done, estimate finish Fri May 25 20:50:45 2018 > 28.18% done, estimate finish Fri May 25 20:50:44 2018 > 28.18% done, estimate finish Fri May 25 20:50:43 2018 > 28.19% done, estimate finish Fri May 25 20:50:42 2018 > 28.19% done, estimate finish Fri May 25 20:50:45 2018 > 28.20% done, estimate finish Fri May 25 20:50:44 2018 > 28.20% done, estimate finish Fri May 25 20:50:43 2018 > 28.20% done, estimate finish Fri May 25 20:50:42 2018 > 28.21% done, estimate finish Fri May 25 20:50:45 2018 > 28.21% done, estimate finish Fri May 25 20:50:44 2018 > 28.22% done, estimate finish Fri May 25 20:50:43 2018 > 28.22% done, estimate finish Fri May 25 20:50:42 2018 > 28.22% done, estimate finish Fri May 25 20:50:44 2018 > 28.23% done, estimate finish Fri May 25 20:50:43 2018 > 28.23% done, estimate finish Fri May 25 20:50:42 2018 > 28.24% done, estimate finish Fri May 25 20:50:41 2018 > 28.24% done, estimate finish Fri May 25 20:50:44 2018 > 28.24% done, estimate finish Fri May 25 20:50:43 2018 > 28.25% done, estimate finish Fri May 25 20:50:42 2018 > 28.25% done, estimate finish Fri May 25 20:50:41 2018 > 28.26% done, estimate finish Fri May 25 20:50:44 2018 > 28.26% done, estimate finish Fri May 25 20:50:43 2018 > 28.27% done, estimate finish Fri May 25 20:50:42 2018 > 28.27% done, estimate finish Fri May 25 20:50:41 2018 > 28.27% done, estimate finish Fri May 25 20:50:43 2018 > 28.28% done, estimate finish Fri May 25 20:50:42 2018 >=== last message repeated 2 times. === > 28.29% done, estimate finish Fri May 25 20:50:44 2018 > 28.29% done, estimate finish Fri May 25 20:50:43 2018 > 28.29% done, estimate finish Fri May 25 20:50:42 2018 > 28.30% done, estimate finish Fri May 25 20:50:41 2018 > 28.30% done, estimate finish Fri May 25 20:50:44 2018 > 28.31% done, estimate finish Fri May 25 20:50:43 2018 > 28.31% done, estimate finish Fri May 25 20:50:42 2018 > 28.31% done, estimate finish Fri May 25 20:50:41 2018 > 28.32% done, estimate finish Fri May 25 20:50:44 2018 > 28.32% done, estimate finish Fri May 25 20:50:43 2018 > 28.33% done, estimate finish Fri May 25 20:50:42 2018 > 28.33% done, estimate finish Fri May 25 20:50:41 2018 > 28.33% done, estimate finish Fri May 25 20:50:43 2018 > 28.34% done, estimate finish Fri May 25 20:50:42 2018 > 28.34% done, estimate finish Fri May 25 20:50:41 2018 > 28.35% done, estimate finish Fri May 25 20:50:40 2018 > 28.35% done, estimate finish Fri May 25 20:50:43 2018 > 28.36% done, estimate finish Fri May 25 20:50:42 2018 > 28.36% done, estimate finish Fri May 25 20:50:41 2018 > 28.36% done, estimate finish Fri May 25 20:50:40 2018 > 28.37% done, estimate finish Fri May 25 20:50:43 2018 > 28.37% done, estimate finish Fri May 25 20:50:42 2018 > 28.38% done, estimate finish Fri May 25 20:50:41 2018 > 28.38% done, estimate finish Fri May 25 20:50:40 2018 > 28.38% done, estimate finish Fri May 25 20:50:42 2018 > 28.39% done, estimate finish Fri May 25 20:50:41 2018 > 28.39% done, estimate finish Fri May 25 20:50:40 2018 > 28.40% done, estimate finish Fri May 25 20:50:43 2018 > 28.40% done, estimate finish Fri May 25 20:50:42 2018 > 28.40% done, estimate finish Fri May 25 20:50:41 2018 > 28.41% done, estimate finish Fri May 25 20:50:40 2018 > 28.41% done, estimate finish Fri May 25 20:50:43 2018 > 28.42% done, estimate finish Fri May 25 20:50:42 2018 > 28.42% done, estimate finish Fri May 25 20:50:41 2018 > 28.42% done, estimate finish Fri May 25 20:50:40 2018 > 28.43% done, estimate finish Fri May 25 20:50:42 2018 > 28.43% done, estimate finish Fri May 25 20:50:41 2018 > 28.44% done, estimate finish Fri May 25 20:50:41 2018 > 28.44% done, estimate finish Fri May 25 20:50:40 2018 > 28.45% done, estimate finish Fri May 25 20:50:42 2018 > 28.45% done, estimate finish Fri May 25 20:50:41 2018 > 28.45% done, estimate finish Fri May 25 20:50:40 2018 > 28.46% done, estimate finish Fri May 25 20:50:39 2018 > 28.46% done, estimate finish Fri May 25 20:50:42 2018 > 28.47% done, estimate finish Fri May 25 20:50:41 2018 > 28.47% done, estimate finish Fri May 25 20:50:40 2018 > 28.47% done, estimate finish Fri May 25 20:50:39 2018 > 28.48% done, estimate finish Fri May 25 20:50:42 2018 > 28.48% done, estimate finish Fri May 25 20:50:41 2018 > 28.49% done, estimate finish Fri May 25 20:50:40 2018 > 28.49% done, estimate finish Fri May 25 20:50:42 2018 > 28.49% done, estimate finish Fri May 25 20:50:41 2018 > 28.50% done, estimate finish Fri May 25 20:50:40 2018 > 28.50% done, estimate finish Fri May 25 20:50:39 2018 > 28.51% done, estimate finish Fri May 25 20:50:42 2018 > 28.51% done, estimate finish Fri May 25 20:50:41 2018 > 28.52% done, estimate finish Fri May 25 20:50:40 2018 > 28.52% done, estimate finish Fri May 25 20:50:39 2018 > 28.52% done, estimate finish Fri May 25 20:50:42 2018 > 28.53% done, estimate finish Fri May 25 20:50:41 2018 > 28.53% done, estimate finish Fri May 25 20:50:40 2018 > 28.54% done, estimate finish Fri May 25 20:50:39 2018 > 28.54% done, estimate finish Fri May 25 20:50:41 2018 > 28.54% done, estimate finish Fri May 25 20:50:40 2018 > 28.55% done, estimate finish Fri May 25 20:50:39 2018 > 28.55% done, estimate finish Fri May 25 20:50:38 2018 > 28.56% done, estimate finish Fri May 25 20:50:41 2018 > 28.56% done, estimate finish Fri May 25 20:50:40 2018 > 28.56% done, estimate finish Fri May 25 20:50:39 2018 > 28.57% done, estimate finish Fri May 25 20:50:38 2018 > 28.57% done, estimate finish Fri May 25 20:50:41 2018 > 28.58% done, estimate finish Fri May 25 20:50:40 2018 > 28.58% done, estimate finish Fri May 25 20:50:39 2018 > 28.58% done, estimate finish Fri May 25 20:50:38 2018 > 28.59% done, estimate finish Fri May 25 20:50:40 2018 >=== last message repeated 2 times. === > 28.60% done, estimate finish Fri May 25 20:50:39 2018 > 28.60% done, estimate finish Fri May 25 20:50:41 2018 > 28.61% done, estimate finish Fri May 25 20:50:40 2018 > 28.61% done, estimate finish Fri May 25 20:50:39 2018 > 28.61% done, estimate finish Fri May 25 20:50:38 2018 > 28.62% done, estimate finish Fri May 25 20:50:41 2018 > 28.62% done, estimate finish Fri May 25 20:50:40 2018 > 28.63% done, estimate finish Fri May 25 20:50:39 2018 > 28.63% done, estimate finish Fri May 25 20:50:38 2018 > 28.63% done, estimate finish Fri May 25 20:50:41 2018 > 28.64% done, estimate finish Fri May 25 20:50:40 2018 > 28.64% done, estimate finish Fri May 25 20:50:39 2018 > 28.65% done, estimate finish Fri May 25 20:50:38 2018 > 28.65% done, estimate finish Fri May 25 20:50:40 2018 > 28.65% done, estimate finish Fri May 25 20:50:39 2018 > 28.66% done, estimate finish Fri May 25 20:50:38 2018 > 28.66% done, estimate finish Fri May 25 20:50:37 2018 > 28.67% done, estimate finish Fri May 25 20:50:40 2018 > 28.67% done, estimate finish Fri May 25 20:50:39 2018 > 28.67% done, estimate finish Fri May 25 20:50:38 2018 > 28.68% done, estimate finish Fri May 25 20:50:37 2018 > 28.68% done, estimate finish Fri May 25 20:50:40 2018 > 28.69% done, estimate finish Fri May 25 20:50:39 2018 > 28.69% done, estimate finish Fri May 25 20:50:38 2018 > 28.70% done, estimate finish Fri May 25 20:50:37 2018 > 28.70% done, estimate finish Fri May 25 20:50:39 2018 > 28.70% done, estimate finish Fri May 25 20:50:38 2018 > 28.71% done, estimate finish Fri May 25 20:50:38 2018 > 28.71% done, estimate finish Fri May 25 20:50:40 2018 > 28.72% done, estimate finish Fri May 25 20:50:39 2018 > 28.72% done, estimate finish Fri May 25 20:50:38 2018 > 28.72% done, estimate finish Fri May 25 20:50:37 2018 > 28.73% done, estimate finish Fri May 25 20:50:40 2018 > 28.73% done, estimate finish Fri May 25 20:50:39 2018 > 28.74% done, estimate finish Fri May 25 20:50:38 2018 > 28.74% done, estimate finish Fri May 25 20:50:37 2018 > 28.74% done, estimate finish Fri May 25 20:50:40 2018 > 28.75% done, estimate finish Fri May 25 20:50:39 2018 > 28.75% done, estimate finish Fri May 25 20:50:38 2018 > 28.76% done, estimate finish Fri May 25 20:50:37 2018 > 28.76% done, estimate finish Fri May 25 20:50:39 2018 > 28.76% done, estimate finish Fri May 25 20:50:38 2018 > 28.77% done, estimate finish Fri May 25 20:50:37 2018 > 28.77% done, estimate finish Fri May 25 20:50:36 2018 > 28.78% done, estimate finish Fri May 25 20:50:39 2018 > 28.78% done, estimate finish Fri May 25 20:50:38 2018 > 28.79% done, estimate finish Fri May 25 20:50:37 2018 > 28.79% done, estimate finish Fri May 25 20:50:36 2018 > 28.79% done, estimate finish Fri May 25 20:50:39 2018 > 28.80% done, estimate finish Fri May 25 20:50:38 2018 > 28.80% done, estimate finish Fri May 25 20:50:37 2018 > 28.81% done, estimate finish Fri May 25 20:50:39 2018 > 28.81% done, estimate finish Fri May 25 20:50:38 2018 > 28.81% done, estimate finish Fri May 25 20:50:37 2018 > 28.82% done, estimate finish Fri May 25 20:50:37 2018 > 28.82% done, estimate finish Fri May 25 20:50:39 2018 > 28.83% done, estimate finish Fri May 25 20:50:38 2018 > 28.83% done, estimate finish Fri May 25 20:50:37 2018 > 28.83% done, estimate finish Fri May 25 20:50:36 2018 > 28.84% done, estimate finish Fri May 25 20:50:39 2018 > 28.84% done, estimate finish Fri May 25 20:50:38 2018 > 28.85% done, estimate finish Fri May 25 20:50:37 2018 > 28.85% done, estimate finish Fri May 25 20:50:36 2018 > 28.86% done, estimate finish Fri May 25 20:50:38 2018 >=== last message repeated 2 times. === > 28.86% done, estimate finish Fri May 25 20:50:37 2018 > 28.87% done, estimate finish Fri May 25 20:50:36 2018 > 28.87% done, estimate finish Fri May 25 20:50:38 2018 > 28.88% done, estimate finish Fri May 25 20:50:37 2018 > 28.88% done, estimate finish Fri May 25 20:50:36 2018 > 28.88% done, estimate finish Fri May 25 20:50:35 2018 > 28.89% done, estimate finish Fri May 25 20:50:38 2018 > 28.89% done, estimate finish Fri May 25 20:50:37 2018 > 28.90% done, estimate finish Fri May 25 20:50:36 2018 > 28.90% done, estimate finish Fri May 25 20:50:35 2018 > 28.90% done, estimate finish Fri May 25 20:50:38 2018 > 28.91% done, estimate finish Fri May 25 20:50:37 2018 > 28.91% done, estimate finish Fri May 25 20:50:36 2018 > 28.92% done, estimate finish Fri May 25 20:50:38 2018 > 28.92% done, estimate finish Fri May 25 20:50:37 2018 > 28.92% done, estimate finish Fri May 25 20:50:36 2018 > 28.93% done, estimate finish Fri May 25 20:50:35 2018 > 28.93% done, estimate finish Fri May 25 20:50:38 2018 > 28.94% done, estimate finish Fri May 25 20:50:37 2018 > 28.94% done, estimate finish Fri May 25 20:50:36 2018 > 28.95% done, estimate finish Fri May 25 20:50:35 2018 > 28.95% done, estimate finish Fri May 25 20:50:38 2018 > 28.95% done, estimate finish Fri May 25 20:50:37 2018 > 28.96% done, estimate finish Fri May 25 20:50:36 2018 > 28.96% done, estimate finish Fri May 25 20:50:35 2018 > 28.97% done, estimate finish Fri May 25 20:50:37 2018 >=== last message repeated 2 times. === > 28.97% done, estimate finish Fri May 25 20:50:36 2018 > 28.98% done, estimate finish Fri May 25 20:50:35 2018 > 28.98% done, estimate finish Fri May 25 20:50:37 2018 > 28.99% done, estimate finish Fri May 25 20:50:36 2018 > 28.99% done, estimate finish Fri May 25 20:50:35 2018 > 28.99% done, estimate finish Fri May 25 20:50:34 2018 > 29.00% done, estimate finish Fri May 25 20:50:37 2018 > 29.00% done, estimate finish Fri May 25 20:50:36 2018 > 29.01% done, estimate finish Fri May 25 20:50:35 2018 > 29.01% done, estimate finish Fri May 25 20:50:34 2018 > 29.01% done, estimate finish Fri May 25 20:50:37 2018 > 29.02% done, estimate finish Fri May 25 20:50:36 2018 > 29.02% done, estimate finish Fri May 25 20:50:35 2018 > 29.03% done, estimate finish Fri May 25 20:50:37 2018 > 29.03% done, estimate finish Fri May 25 20:50:36 2018 > 29.04% done, estimate finish Fri May 25 20:50:35 2018 > 29.04% done, estimate finish Fri May 25 20:50:34 2018 > 29.04% done, estimate finish Fri May 25 20:50:37 2018 > 29.05% done, estimate finish Fri May 25 20:50:36 2018 > 29.05% done, estimate finish Fri May 25 20:50:35 2018 > 29.06% done, estimate finish Fri May 25 20:50:34 2018 > 29.06% done, estimate finish Fri May 25 20:50:37 2018 > 29.06% done, estimate finish Fri May 25 20:50:36 2018 > 29.07% done, estimate finish Fri May 25 20:50:35 2018 > 29.07% done, estimate finish Fri May 25 20:50:34 2018 > 29.08% done, estimate finish Fri May 25 20:50:36 2018 > 29.08% done, estimate finish Fri May 25 20:50:35 2018 >=== last message repeated 2 times. === > 29.09% done, estimate finish Fri May 25 20:50:37 2018 > 29.09% done, estimate finish Fri May 25 20:50:36 2018 > 29.10% done, estimate finish Fri May 25 20:50:35 2018 > 29.10% done, estimate finish Fri May 25 20:50:34 2018 > 29.10% done, estimate finish Fri May 25 20:50:37 2018 > 29.11% done, estimate finish Fri May 25 20:50:36 2018 > 29.11% done, estimate finish Fri May 25 20:50:35 2018 > 29.12% done, estimate finish Fri May 25 20:50:34 2018 > 29.12% done, estimate finish Fri May 25 20:50:33 2018 > 29.13% done, estimate finish Fri May 25 20:50:36 2018 > 29.13% done, estimate finish Fri May 25 20:50:35 2018 > 29.13% done, estimate finish Fri May 25 20:50:34 2018 > 29.14% done, estimate finish Fri May 25 20:50:36 2018 > 29.14% done, estimate finish Fri May 25 20:50:35 2018 > 29.15% done, estimate finish Fri May 25 20:50:34 2018 > 29.15% done, estimate finish Fri May 25 20:50:33 2018 > 29.15% done, estimate finish Fri May 25 20:50:36 2018 > 29.16% done, estimate finish Fri May 25 20:50:35 2018 > 29.16% done, estimate finish Fri May 25 20:50:34 2018 > 29.17% done, estimate finish Fri May 25 20:50:33 2018 > 29.17% done, estimate finish Fri May 25 20:50:36 2018 > 29.17% done, estimate finish Fri May 25 20:50:35 2018 > 29.18% done, estimate finish Fri May 25 20:50:34 2018 > 29.18% done, estimate finish Fri May 25 20:50:33 2018 > 29.19% done, estimate finish Fri May 25 20:50:35 2018 > 29.19% done, estimate finish Fri May 25 20:50:34 2018 >=== last message repeated 2 times. === > 29.20% done, estimate finish Fri May 25 20:50:36 2018 > 29.20% done, estimate finish Fri May 25 20:50:35 2018 > 29.21% done, estimate finish Fri May 25 20:50:34 2018 > 29.21% done, estimate finish Fri May 25 20:50:33 2018 > 29.22% done, estimate finish Fri May 25 20:50:36 2018 > 29.22% done, estimate finish Fri May 25 20:50:35 2018 > 29.22% done, estimate finish Fri May 25 20:50:34 2018 > 29.23% done, estimate finish Fri May 25 20:50:33 2018 > 29.23% done, estimate finish Fri May 25 20:50:35 2018 > 29.24% done, estimate finish Fri May 25 20:50:35 2018 > 29.24% done, estimate finish Fri May 25 20:50:34 2018 > 29.24% done, estimate finish Fri May 25 20:50:33 2018 > 29.25% done, estimate finish Fri May 25 20:50:35 2018 > 29.25% done, estimate finish Fri May 25 20:50:34 2018 > 29.26% done, estimate finish Fri May 25 20:50:33 2018 > 29.26% done, estimate finish Fri May 25 20:50:32 2018 > 29.26% done, estimate finish Fri May 25 20:50:35 2018 > 29.27% done, estimate finish Fri May 25 20:50:34 2018 > 29.27% done, estimate finish Fri May 25 20:50:33 2018 > 29.28% done, estimate finish Fri May 25 20:50:32 2018 > 29.28% done, estimate finish Fri May 25 20:50:35 2018 > 29.29% done, estimate finish Fri May 25 20:50:34 2018 > 29.29% done, estimate finish Fri May 25 20:50:33 2018 > 29.29% done, estimate finish Fri May 25 20:50:32 2018 > 29.30% done, estimate finish Fri May 25 20:50:34 2018 > 29.30% done, estimate finish Fri May 25 20:50:33 2018 > 29.31% done, estimate finish Fri May 25 20:50:33 2018 > 29.31% done, estimate finish Fri May 25 20:50:35 2018 > 29.31% done, estimate finish Fri May 25 20:50:34 2018 > 29.32% done, estimate finish Fri May 25 20:50:33 2018 > 29.32% done, estimate finish Fri May 25 20:50:32 2018 > 29.33% done, estimate finish Fri May 25 20:50:35 2018 > 29.33% done, estimate finish Fri May 25 20:50:34 2018 > 29.33% done, estimate finish Fri May 25 20:50:33 2018 > 29.34% done, estimate finish Fri May 25 20:50:32 2018 > 29.34% done, estimate finish Fri May 25 20:50:34 2018 > 29.35% done, estimate finish Fri May 25 20:50:34 2018 > 29.35% done, estimate finish Fri May 25 20:50:33 2018 > 29.35% done, estimate finish Fri May 25 20:50:32 2018 > 29.36% done, estimate finish Fri May 25 20:50:34 2018 > 29.36% done, estimate finish Fri May 25 20:50:33 2018 > 29.37% done, estimate finish Fri May 25 20:50:32 2018 > 29.37% done, estimate finish Fri May 25 20:50:35 2018 > 29.38% done, estimate finish Fri May 25 20:50:34 2018 > 29.38% done, estimate finish Fri May 25 20:50:33 2018 > 29.38% done, estimate finish Fri May 25 20:50:32 2018 > 29.39% done, estimate finish Fri May 25 20:50:31 2018 > 29.39% done, estimate finish Fri May 25 20:50:34 2018 > 29.40% done, estimate finish Fri May 25 20:50:33 2018 > 29.40% done, estimate finish Fri May 25 20:50:32 2018 > 29.40% done, estimate finish Fri May 25 20:50:34 2018 > 29.41% done, estimate finish Fri May 25 20:50:33 2018 > 29.41% done, estimate finish Fri May 25 20:50:32 2018 > 29.42% done, estimate finish Fri May 25 20:50:32 2018 > 29.42% done, estimate finish Fri May 25 20:50:34 2018 > 29.42% done, estimate finish Fri May 25 20:50:33 2018 > 29.43% done, estimate finish Fri May 25 20:50:32 2018 > 29.43% done, estimate finish Fri May 25 20:50:31 2018 > 29.44% done, estimate finish Fri May 25 20:50:34 2018 > 29.44% done, estimate finish Fri May 25 20:50:33 2018 > 29.44% done, estimate finish Fri May 25 20:50:32 2018 > 29.45% done, estimate finish Fri May 25 20:50:31 2018 > 29.45% done, estimate finish Fri May 25 20:50:33 2018 > 29.46% done, estimate finish Fri May 25 20:50:33 2018 > 29.46% done, estimate finish Fri May 25 20:50:32 2018 > 29.47% done, estimate finish Fri May 25 20:50:31 2018 > 29.47% done, estimate finish Fri May 25 20:50:33 2018 > 29.47% done, estimate finish Fri May 25 20:50:32 2018 > 29.48% done, estimate finish Fri May 25 20:50:31 2018 > 29.48% done, estimate finish Fri May 25 20:50:34 2018 > 29.49% done, estimate finish Fri May 25 20:50:33 2018 > 29.49% done, estimate finish Fri May 25 20:50:32 2018 > 29.49% done, estimate finish Fri May 25 20:50:31 2018 > 29.50% done, estimate finish Fri May 25 20:50:34 2018 > 29.50% done, estimate finish Fri May 25 20:50:33 2018 > 29.51% done, estimate finish Fri May 25 20:50:32 2018 > 29.51% done, estimate finish Fri May 25 20:50:31 2018 > 29.51% done, estimate finish Fri May 25 20:50:33 2018 > 29.52% done, estimate finish Fri May 25 20:50:32 2018 > 29.52% done, estimate finish Fri May 25 20:50:31 2018 > 29.53% done, estimate finish Fri May 25 20:50:31 2018 > 29.53% done, estimate finish Fri May 25 20:50:33 2018 > 29.53% done, estimate finish Fri May 25 20:50:32 2018 > 29.54% done, estimate finish Fri May 25 20:50:31 2018 > 29.54% done, estimate finish Fri May 25 20:50:30 2018 > 29.55% done, estimate finish Fri May 25 20:50:33 2018 > 29.55% done, estimate finish Fri May 25 20:50:32 2018 > 29.56% done, estimate finish Fri May 25 20:50:31 2018 > 29.56% done, estimate finish Fri May 25 20:50:30 2018 > 29.56% done, estimate finish Fri May 25 20:50:32 2018 > 29.57% done, estimate finish Fri May 25 20:50:32 2018 > 29.57% done, estimate finish Fri May 25 20:50:31 2018 > 29.58% done, estimate finish Fri May 25 20:50:30 2018 > 29.58% done, estimate finish Fri May 25 20:50:32 2018 > 29.58% done, estimate finish Fri May 25 20:50:31 2018 > 29.59% done, estimate finish Fri May 25 20:50:30 2018 > 29.59% done, estimate finish Fri May 25 20:50:33 2018 > 29.60% done, estimate finish Fri May 25 20:50:32 2018 > 29.60% done, estimate finish Fri May 25 20:50:31 2018 > 29.60% done, estimate finish Fri May 25 20:50:30 2018 > 29.61% done, estimate finish Fri May 25 20:50:33 2018 > 29.61% done, estimate finish Fri May 25 20:50:32 2018 > 29.62% done, estimate finish Fri May 25 20:50:31 2018 > 29.62% done, estimate finish Fri May 25 20:50:30 2018 > 29.63% done, estimate finish Fri May 25 20:50:32 2018 > 29.63% done, estimate finish Fri May 25 20:50:31 2018 > 29.63% done, estimate finish Fri May 25 20:50:30 2018 > 29.64% done, estimate finish Fri May 25 20:50:30 2018 > 29.64% done, estimate finish Fri May 25 20:50:32 2018 > 29.65% done, estimate finish Fri May 25 20:50:31 2018 > 29.65% done, estimate finish Fri May 25 20:50:30 2018 > 29.65% done, estimate finish Fri May 25 20:50:33 2018 > 29.66% done, estimate finish Fri May 25 20:50:32 2018 > 29.66% done, estimate finish Fri May 25 20:50:31 2018 > 29.67% done, estimate finish Fri May 25 20:50:30 2018 > 29.67% done, estimate finish Fri May 25 20:50:32 2018 > 29.67% done, estimate finish Fri May 25 20:50:31 2018 > 29.68% done, estimate finish Fri May 25 20:50:31 2018 > 29.68% done, estimate finish Fri May 25 20:50:30 2018 > 29.69% done, estimate finish Fri May 25 20:50:32 2018 > 29.69% done, estimate finish Fri May 25 20:50:31 2018 > 29.69% done, estimate finish Fri May 25 20:50:30 2018 > 29.70% done, estimate finish Fri May 25 20:50:29 2018 > 29.70% done, estimate finish Fri May 25 20:50:32 2018 > 29.71% done, estimate finish Fri May 25 20:50:31 2018 > 29.71% done, estimate finish Fri May 25 20:50:30 2018 > 29.72% done, estimate finish Fri May 25 20:50:29 2018 > 29.72% done, estimate finish Fri May 25 20:50:32 2018 > 29.72% done, estimate finish Fri May 25 20:50:31 2018 > 29.73% done, estimate finish Fri May 25 20:50:30 2018 > 29.73% done, estimate finish Fri May 25 20:50:29 2018 > 29.74% done, estimate finish Fri May 25 20:50:31 2018 > 29.74% done, estimate finish Fri May 25 20:50:30 2018 > 29.74% done, estimate finish Fri May 25 20:50:29 2018 > 29.75% done, estimate finish Fri May 25 20:50:29 2018 > 29.75% done, estimate finish Fri May 25 20:50:31 2018 > 29.76% done, estimate finish Fri May 25 20:50:30 2018 > 29.76% done, estimate finish Fri May 25 20:50:29 2018 > 29.76% done, estimate finish Fri May 25 20:50:32 2018 > 29.77% done, estimate finish Fri May 25 20:50:31 2018 > 29.77% done, estimate finish Fri May 25 20:50:30 2018 > 29.78% done, estimate finish Fri May 25 20:50:29 2018 > 29.78% done, estimate finish Fri May 25 20:50:31 2018 > 29.78% done, estimate finish Fri May 25 20:50:30 2018 > 29.79% done, estimate finish Fri May 25 20:50:30 2018 > 29.79% done, estimate finish Fri May 25 20:50:29 2018 > 29.80% done, estimate finish Fri May 25 20:50:31 2018 > 29.80% done, estimate finish Fri May 25 20:50:30 2018 > 29.81% done, estimate finish Fri May 25 20:50:29 2018 > 29.81% done, estimate finish Fri May 25 20:50:28 2018 > 29.81% done, estimate finish Fri May 25 20:50:31 2018 > 29.82% done, estimate finish Fri May 25 20:50:30 2018 > 29.82% done, estimate finish Fri May 25 20:50:29 2018 > 29.83% done, estimate finish Fri May 25 20:50:28 2018 > 29.83% done, estimate finish Fri May 25 20:50:31 2018 > 29.83% done, estimate finish Fri May 25 20:50:30 2018 > 29.84% done, estimate finish Fri May 25 20:50:29 2018 > 29.84% done, estimate finish Fri May 25 20:50:31 2018 > 29.85% done, estimate finish Fri May 25 20:50:30 2018 > 29.85% done, estimate finish Fri May 25 20:50:29 2018 > 29.85% done, estimate finish Fri May 25 20:50:28 2018 > 29.86% done, estimate finish Fri May 25 20:50:28 2018 > 29.86% done, estimate finish Fri May 25 20:50:30 2018 > 29.87% done, estimate finish Fri May 25 20:50:29 2018 > 29.87% done, estimate finish Fri May 25 20:50:28 2018 > 29.87% done, estimate finish Fri May 25 20:50:31 2018 > 29.88% done, estimate finish Fri May 25 20:50:30 2018 > 29.88% done, estimate finish Fri May 25 20:50:29 2018 > 29.89% done, estimate finish Fri May 25 20:50:28 2018 > 29.89% done, estimate finish Fri May 25 20:50:30 2018 > 29.90% done, estimate finish Fri May 25 20:50:29 2018 >=== last message repeated 2 times. === > 29.90% done, estimate finish Fri May 25 20:50:28 2018 > 29.91% done, estimate finish Fri May 25 20:50:30 2018 > 29.91% done, estimate finish Fri May 25 20:50:29 2018 > 29.92% done, estimate finish Fri May 25 20:50:28 2018 > 29.92% done, estimate finish Fri May 25 20:50:27 2018 > 29.92% done, estimate finish Fri May 25 20:50:30 2018 > 29.93% done, estimate finish Fri May 25 20:50:29 2018 > 29.93% done, estimate finish Fri May 25 20:50:28 2018 > 29.94% done, estimate finish Fri May 25 20:50:31 2018 > 29.94% done, estimate finish Fri May 25 20:50:30 2018 > 29.94% done, estimate finish Fri May 25 20:50:29 2018 > 29.95% done, estimate finish Fri May 25 20:50:28 2018 > 29.95% done, estimate finish Fri May 25 20:50:30 2018 > 29.96% done, estimate finish Fri May 25 20:50:29 2018 > 29.96% done, estimate finish Fri May 25 20:50:28 2018 >=== last message repeated 2 times. === > 29.97% done, estimate finish Fri May 25 20:50:30 2018 > 29.97% done, estimate finish Fri May 25 20:50:29 2018 > 29.98% done, estimate finish Fri May 25 20:50:28 2018 > 29.98% done, estimate finish Fri May 25 20:50:27 2018 > 29.99% done, estimate finish Fri May 25 20:50:30 2018 > 29.99% done, estimate finish Fri May 25 20:50:29 2018 > 29.99% done, estimate finish Fri May 25 20:50:28 2018 > 30.00% done, estimate finish Fri May 25 20:50:27 2018 > 30.00% done, estimate finish Fri May 25 20:50:29 2018 > 30.01% done, estimate finish Fri May 25 20:50:29 2018 > 30.01% done, estimate finish Fri May 25 20:50:28 2018 > 30.01% done, estimate finish Fri May 25 20:50:30 2018 > 30.02% done, estimate finish Fri May 25 20:50:29 2018 > 30.02% done, estimate finish Fri May 25 20:50:28 2018 > 30.03% done, estimate finish Fri May 25 20:50:27 2018 > 30.03% done, estimate finish Fri May 25 20:50:26 2018 > 30.03% done, estimate finish Fri May 25 20:50:29 2018 > 30.04% done, estimate finish Fri May 25 20:50:28 2018 > 30.04% done, estimate finish Fri May 25 20:50:27 2018 > 30.05% done, estimate finish Fri May 25 20:50:30 2018 > 30.05% done, estimate finish Fri May 25 20:50:29 2018 > 30.06% done, estimate finish Fri May 25 20:50:28 2018 > 30.06% done, estimate finish Fri May 25 20:50:27 2018 > 30.06% done, estimate finish Fri May 25 20:50:29 2018 > 30.07% done, estimate finish Fri May 25 20:50:28 2018 > 30.07% done, estimate finish Fri May 25 20:50:27 2018 > 30.08% done, estimate finish Fri May 25 20:50:27 2018 > 30.08% done, estimate finish Fri May 25 20:50:29 2018 > 30.08% done, estimate finish Fri May 25 20:50:28 2018 > 30.09% done, estimate finish Fri May 25 20:50:27 2018 > 30.09% done, estimate finish Fri May 25 20:50:26 2018 > 30.10% done, estimate finish Fri May 25 20:50:29 2018 > 30.10% done, estimate finish Fri May 25 20:50:28 2018 > 30.10% done, estimate finish Fri May 25 20:50:27 2018 > 30.11% done, estimate finish Fri May 25 20:50:29 2018 > 30.11% done, estimate finish Fri May 25 20:50:28 2018 > 30.12% done, estimate finish Fri May 25 20:50:28 2018 > 30.12% done, estimate finish Fri May 25 20:50:27 2018 > 30.12% done, estimate finish Fri May 25 20:50:29 2018 > 30.13% done, estimate finish Fri May 25 20:50:28 2018 > 30.13% done, estimate finish Fri May 25 20:50:27 2018 > 30.14% done, estimate finish Fri May 25 20:50:26 2018 > 30.14% done, estimate finish Fri May 25 20:50:29 2018 > 30.15% done, estimate finish Fri May 25 20:50:28 2018 > 30.15% done, estimate finish Fri May 25 20:50:27 2018 > 30.15% done, estimate finish Fri May 25 20:50:26 2018 > 30.16% done, estimate finish Fri May 25 20:50:29 2018 > 30.16% done, estimate finish Fri May 25 20:50:28 2018 > 30.17% done, estimate finish Fri May 25 20:50:27 2018 > 30.17% done, estimate finish Fri May 25 20:50:26 2018 > 30.17% done, estimate finish Fri May 25 20:50:28 2018 > 30.18% done, estimate finish Fri May 25 20:50:27 2018 >=== last message repeated 2 times. === > 30.19% done, estimate finish Fri May 25 20:50:29 2018 > 30.19% done, estimate finish Fri May 25 20:50:28 2018 > 30.19% done, estimate finish Fri May 25 20:50:27 2018 > 30.20% done, estimate finish Fri May 25 20:50:26 2018 > 30.20% done, estimate finish Fri May 25 20:50:29 2018 > 30.21% done, estimate finish Fri May 25 20:50:28 2018 > 30.21% done, estimate finish Fri May 25 20:50:27 2018 > 30.21% done, estimate finish Fri May 25 20:50:26 2018 > 30.22% done, estimate finish Fri May 25 20:50:28 2018 >=== last message repeated 2 times. === > 30.23% done, estimate finish Fri May 25 20:50:27 2018 > 30.23% done, estimate finish Fri May 25 20:50:26 2018 > 30.24% done, estimate finish Fri May 25 20:50:28 2018 > 30.24% done, estimate finish Fri May 25 20:50:27 2018 > 30.24% done, estimate finish Fri May 25 20:50:26 2018 > 30.25% done, estimate finish Fri May 25 20:50:29 2018 > 30.25% done, estimate finish Fri May 25 20:50:28 2018 > 30.26% done, estimate finish Fri May 25 20:50:27 2018 > 30.26% done, estimate finish Fri May 25 20:50:29 2018 > 30.26% done, estimate finish Fri May 25 20:50:28 2018 > 30.27% done, estimate finish Fri May 25 20:50:28 2018 > 30.27% done, estimate finish Fri May 25 20:50:27 2018 > 30.28% done, estimate finish Fri May 25 20:50:29 2018 > 30.28% done, estimate finish Fri May 25 20:50:28 2018 > 30.28% done, estimate finish Fri May 25 20:50:27 2018 > 30.29% done, estimate finish Fri May 25 20:50:26 2018 > 30.29% done, estimate finish Fri May 25 20:50:29 2018 > 30.30% done, estimate finish Fri May 25 20:50:28 2018 > 30.30% done, estimate finish Fri May 25 20:50:27 2018 > 30.30% done, estimate finish Fri May 25 20:50:26 2018 > 30.31% done, estimate finish Fri May 25 20:50:29 2018 > 30.31% done, estimate finish Fri May 25 20:50:28 2018 > 30.32% done, estimate finish Fri May 25 20:50:27 2018 > 30.32% done, estimate finish Fri May 25 20:50:26 2018 > 30.33% done, estimate finish Fri May 25 20:50:28 2018 > 30.33% done, estimate finish Fri May 25 20:50:27 2018 >=== last message repeated 2 times. === > 30.34% done, estimate finish Fri May 25 20:50:26 2018 > 30.34% done, estimate finish Fri May 25 20:50:28 2018 > 30.35% done, estimate finish Fri May 25 20:50:27 2018 > 30.35% done, estimate finish Fri May 25 20:50:26 2018 > 30.35% done, estimate finish Fri May 25 20:50:29 2018 > 30.36% done, estimate finish Fri May 25 20:50:31 2018 > 30.36% done, estimate finish Fri May 25 20:50:30 2018 > 30.37% done, estimate finish Fri May 25 20:50:29 2018 > 30.37% done, estimate finish Fri May 25 20:50:28 2018 >=== last message repeated 2 times. === > 30.38% done, estimate finish Fri May 25 20:50:27 2018 > 30.38% done, estimate finish Fri May 25 20:50:26 2018 > 30.39% done, estimate finish Fri May 25 20:50:28 2018 > 30.39% done, estimate finish Fri May 25 20:50:27 2018 > 30.40% done, estimate finish Fri May 25 20:50:26 2018 > 30.40% done, estimate finish Fri May 25 20:50:29 2018 > 30.40% done, estimate finish Fri May 25 20:50:28 2018 > 30.41% done, estimate finish Fri May 25 20:50:27 2018 > 30.41% done, estimate finish Fri May 25 20:50:26 2018 > 30.42% done, estimate finish Fri May 25 20:50:29 2018 > 30.42% done, estimate finish Fri May 25 20:50:28 2018 > 30.42% done, estimate finish Fri May 25 20:50:27 2018 > 30.43% done, estimate finish Fri May 25 20:50:26 2018 > 30.43% done, estimate finish Fri May 25 20:50:28 2018 > 30.44% done, estimate finish Fri May 25 20:50:27 2018 >=== last message repeated 2 times. === > 30.44% done, estimate finish Fri May 25 20:50:26 2018 > 30.45% done, estimate finish Fri May 25 20:50:28 2018 > 30.45% done, estimate finish Fri May 25 20:50:27 2018 > 30.46% done, estimate finish Fri May 25 20:50:26 2018 > 30.46% done, estimate finish Fri May 25 20:50:25 2018 > 30.46% done, estimate finish Fri May 25 20:50:28 2018 > 30.47% done, estimate finish Fri May 25 20:50:27 2018 > 30.47% done, estimate finish Fri May 25 20:50:26 2018 > 30.48% done, estimate finish Fri May 25 20:50:28 2018 > 30.48% done, estimate finish Fri May 25 20:50:27 2018 > 30.49% done, estimate finish Fri May 25 20:50:27 2018 > 30.49% done, estimate finish Fri May 25 20:50:26 2018 > 30.49% done, estimate finish Fri May 25 20:50:28 2018 > 30.50% done, estimate finish Fri May 25 20:50:27 2018 > 30.50% done, estimate finish Fri May 25 20:50:26 2018 > 30.51% done, estimate finish Fri May 25 20:50:25 2018 > 30.51% done, estimate finish Fri May 25 20:50:28 2018 > 30.51% done, estimate finish Fri May 25 20:50:27 2018 > 30.52% done, estimate finish Fri May 25 20:50:26 2018 > 30.52% done, estimate finish Fri May 25 20:50:25 2018 > 30.53% done, estimate finish Fri May 25 20:50:28 2018 > 30.53% done, estimate finish Fri May 25 20:50:27 2018 > 30.53% done, estimate finish Fri May 25 20:50:26 2018 > 30.54% done, estimate finish Fri May 25 20:50:25 2018 > 30.54% done, estimate finish Fri May 25 20:50:27 2018 > 30.55% done, estimate finish Fri May 25 20:50:26 2018 >=== last message repeated 2 times. === > 30.55% done, estimate finish Fri May 25 20:50:25 2018 > 30.56% done, estimate finish Fri May 25 20:50:27 2018 > 30.56% done, estimate finish Fri May 25 20:50:26 2018 > 30.57% done, estimate finish Fri May 25 20:50:25 2018 > 30.57% done, estimate finish Fri May 25 20:50:28 2018 > 30.58% done, estimate finish Fri May 25 20:50:27 2018 > 30.58% done, estimate finish Fri May 25 20:50:26 2018 > 30.58% done, estimate finish Fri May 25 20:50:25 2018 > 30.59% done, estimate finish Fri May 25 20:50:27 2018 >=== last message repeated 2 times. === > 30.60% done, estimate finish Fri May 25 20:50:26 2018 > 30.60% done, estimate finish Fri May 25 20:50:25 2018 > 30.60% done, estimate finish Fri May 25 20:50:27 2018 > 30.61% done, estimate finish Fri May 25 20:50:26 2018 > 30.61% done, estimate finish Fri May 25 20:50:25 2018 > 30.62% done, estimate finish Fri May 25 20:50:25 2018 > 30.62% done, estimate finish Fri May 25 20:50:27 2018 > 30.62% done, estimate finish Fri May 25 20:50:26 2018 > 30.63% done, estimate finish Fri May 25 20:50:25 2018 > 30.63% done, estimate finish Fri May 25 20:50:24 2018 > 30.64% done, estimate finish Fri May 25 20:50:27 2018 > 30.64% done, estimate finish Fri May 25 20:50:26 2018 > 30.64% done, estimate finish Fri May 25 20:50:25 2018 > 30.65% done, estimate finish Fri May 25 20:50:27 2018 > 30.65% done, estimate finish Fri May 25 20:50:26 2018 > 30.66% done, estimate finish Fri May 25 20:50:25 2018 >=== last message repeated 2 times. === > 30.67% done, estimate finish Fri May 25 20:50:27 2018 > 30.67% done, estimate finish Fri May 25 20:50:26 2018 > 30.67% done, estimate finish Fri May 25 20:50:25 2018 > 30.68% done, estimate finish Fri May 25 20:50:24 2018 > 30.68% done, estimate finish Fri May 25 20:50:27 2018 > 30.69% done, estimate finish Fri May 25 20:50:26 2018 > 30.69% done, estimate finish Fri May 25 20:50:25 2018 > 30.69% done, estimate finish Fri May 25 20:50:24 2018 > 30.70% done, estimate finish Fri May 25 20:50:26 2018 >=== last message repeated 2 times. === > 30.71% done, estimate finish Fri May 25 20:50:25 2018 > 30.71% done, estimate finish Fri May 25 20:50:27 2018 > 30.71% done, estimate finish Fri May 25 20:50:26 2018 > 30.72% done, estimate finish Fri May 25 20:50:25 2018 > 30.72% done, estimate finish Fri May 25 20:50:24 2018 > 30.73% done, estimate finish Fri May 25 20:50:27 2018 > 30.73% done, estimate finish Fri May 25 20:50:26 2018 > 30.73% done, estimate finish Fri May 25 20:50:25 2018 > 30.74% done, estimate finish Fri May 25 20:50:24 2018 > 30.74% done, estimate finish Fri May 25 20:50:27 2018 > 30.75% done, estimate finish Fri May 25 20:50:26 2018 > 30.75% done, estimate finish Fri May 25 20:50:25 2018 > 30.76% done, estimate finish Fri May 25 20:50:24 2018 > 30.76% done, estimate finish Fri May 25 20:50:26 2018 > 30.76% done, estimate finish Fri May 25 20:50:25 2018 > 30.77% done, estimate finish Fri May 25 20:50:25 2018 > 30.77% done, estimate finish Fri May 25 20:50:24 2018 > 30.78% done, estimate finish Fri May 25 20:50:26 2018 > 30.78% done, estimate finish Fri May 25 20:50:25 2018 > 30.78% done, estimate finish Fri May 25 20:50:24 2018 > 30.79% done, estimate finish Fri May 25 20:50:27 2018 > 30.79% done, estimate finish Fri May 25 20:50:26 2018 > 30.80% done, estimate finish Fri May 25 20:50:25 2018 > 30.80% done, estimate finish Fri May 25 20:50:24 2018 > 30.80% done, estimate finish Fri May 25 20:50:26 2018 > 30.81% done, estimate finish Fri May 25 20:50:26 2018 > 30.81% done, estimate finish Fri May 25 20:50:25 2018 > 30.82% done, estimate finish Fri May 25 20:50:24 2018 > 30.82% done, estimate finish Fri May 25 20:50:26 2018 > 30.83% done, estimate finish Fri May 25 20:50:25 2018 > 30.83% done, estimate finish Fri May 25 20:50:24 2018 >=== last message repeated 2 times. === > 30.84% done, estimate finish Fri May 25 20:50:26 2018 > 30.84% done, estimate finish Fri May 25 20:50:25 2018 > 30.85% done, estimate finish Fri May 25 20:50:24 2018 > 30.85% done, estimate finish Fri May 25 20:50:23 2018 > 30.85% done, estimate finish Fri May 25 20:50:26 2018 > 30.86% done, estimate finish Fri May 25 20:50:25 2018 > 30.86% done, estimate finish Fri May 25 20:50:24 2018 > 30.87% done, estimate finish Fri May 25 20:50:23 2018 > 30.87% done, estimate finish Fri May 25 20:50:25 2018 >=== last message repeated 2 times. === > 30.88% done, estimate finish Fri May 25 20:50:24 2018 > 30.88% done, estimate finish Fri May 25 20:50:23 2018 > 30.89% done, estimate finish Fri May 25 20:50:25 2018 > 30.89% done, estimate finish Fri May 25 20:50:24 2018 > 30.89% done, estimate finish Fri May 25 20:50:23 2018 > 30.90% done, estimate finish Fri May 25 20:50:26 2018 > 30.90% done, estimate finish Fri May 25 20:50:25 2018 > 30.91% done, estimate finish Fri May 25 20:50:24 2018 > 30.91% done, estimate finish Fri May 25 20:50:23 2018 > 30.92% done, estimate finish Fri May 25 20:50:26 2018 > 30.92% done, estimate finish Fri May 25 20:50:25 2018 > 30.92% done, estimate finish Fri May 25 20:50:24 2018 > 30.93% done, estimate finish Fri May 25 20:50:23 2018 > 30.93% done, estimate finish Fri May 25 20:50:25 2018 > 30.94% done, estimate finish Fri May 25 20:50:24 2018 > 30.94% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 30.95% done, estimate finish Fri May 25 20:50:25 2018 > 30.95% done, estimate finish Fri May 25 20:50:24 2018 > 30.96% done, estimate finish Fri May 25 20:50:23 2018 > 30.96% done, estimate finish Fri May 25 20:50:26 2018 > 30.96% done, estimate finish Fri May 25 20:50:25 2018 > 30.97% done, estimate finish Fri May 25 20:50:24 2018 > 30.97% done, estimate finish Fri May 25 20:50:23 2018 > 30.98% done, estimate finish Fri May 25 20:50:25 2018 > 30.98% done, estimate finish Fri May 25 20:50:24 2018 >=== last message repeated 2 times. === > 30.99% done, estimate finish Fri May 25 20:50:23 2018 > 30.99% done, estimate finish Fri May 25 20:50:25 2018 > 31.00% done, estimate finish Fri May 25 20:50:24 2018 > 31.00% done, estimate finish Fri May 25 20:50:23 2018 > 31.01% done, estimate finish Fri May 25 20:50:22 2018 > 31.01% done, estimate finish Fri May 25 20:50:25 2018 > 31.01% done, estimate finish Fri May 25 20:50:24 2018 > 31.02% done, estimate finish Fri May 25 20:50:23 2018 > 31.02% done, estimate finish Fri May 25 20:50:22 2018 > 31.03% done, estimate finish Fri May 25 20:50:25 2018 > 31.03% done, estimate finish Fri May 25 20:50:24 2018 > 31.03% done, estimate finish Fri May 25 20:50:23 2018 > 31.04% done, estimate finish Fri May 25 20:50:25 2018 > 31.04% done, estimate finish Fri May 25 20:50:24 2018 > 31.05% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 31.05% done, estimate finish Fri May 25 20:50:25 2018 > 31.06% done, estimate finish Fri May 25 20:50:24 2018 > 31.06% done, estimate finish Fri May 25 20:50:23 2018 > 31.07% done, estimate finish Fri May 25 20:50:22 2018 > 31.07% done, estimate finish Fri May 25 20:50:25 2018 > 31.07% done, estimate finish Fri May 25 20:50:24 2018 > 31.08% done, estimate finish Fri May 25 20:50:23 2018 > 31.08% done, estimate finish Fri May 25 20:50:22 2018 > 31.09% done, estimate finish Fri May 25 20:50:24 2018 >=== last message repeated 2 times. === > 31.10% done, estimate finish Fri May 25 20:50:23 2018 > 31.10% done, estimate finish Fri May 25 20:50:25 2018 > 31.10% done, estimate finish Fri May 25 20:50:24 2018 > 31.11% done, estimate finish Fri May 25 20:50:23 2018 > 31.11% done, estimate finish Fri May 25 20:50:22 2018 > 31.12% done, estimate finish Fri May 25 20:50:25 2018 > 31.12% done, estimate finish Fri May 25 20:50:24 2018 > 31.12% done, estimate finish Fri May 25 20:50:23 2018 > 31.13% done, estimate finish Fri May 25 20:50:22 2018 > 31.13% done, estimate finish Fri May 25 20:50:25 2018 > 31.14% done, estimate finish Fri May 25 20:50:24 2018 > 31.14% done, estimate finish Fri May 25 20:50:23 2018 > 31.14% done, estimate finish Fri May 25 20:50:22 2018 > 31.15% done, estimate finish Fri May 25 20:50:24 2018 > 31.15% done, estimate finish Fri May 25 20:50:23 2018 > 31.16% done, estimate finish Fri May 25 20:50:23 2018 > 31.16% done, estimate finish Fri May 25 20:50:22 2018 > 31.17% done, estimate finish Fri May 25 20:50:24 2018 > 31.17% done, estimate finish Fri May 25 20:50:23 2018 > 31.17% done, estimate finish Fri May 25 20:50:22 2018 > 31.18% done, estimate finish Fri May 25 20:50:25 2018 > 31.18% done, estimate finish Fri May 25 20:50:24 2018 > 31.19% done, estimate finish Fri May 25 20:50:23 2018 > 31.19% done, estimate finish Fri May 25 20:50:22 2018 > 31.19% done, estimate finish Fri May 25 20:50:24 2018 > 31.20% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 31.21% done, estimate finish Fri May 25 20:50:22 2018 > 31.21% done, estimate finish Fri May 25 20:50:24 2018 > 31.21% done, estimate finish Fri May 25 20:50:23 2018 > 31.22% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 31.23% done, estimate finish Fri May 25 20:50:24 2018 > 31.23% done, estimate finish Fri May 25 20:50:23 2018 > 31.23% done, estimate finish Fri May 25 20:50:22 2018 > 31.24% done, estimate finish Fri May 25 20:50:21 2018 > 31.24% done, estimate finish Fri May 25 20:50:24 2018 > 31.25% done, estimate finish Fri May 25 20:50:23 2018 > 31.25% done, estimate finish Fri May 25 20:50:22 2018 > 31.26% done, estimate finish Fri May 25 20:50:24 2018 > 31.26% done, estimate finish Fri May 25 20:50:23 2018 > 31.26% done, estimate finish Fri May 25 20:50:22 2018 > 31.27% done, estimate finish Fri May 25 20:50:22 2018 > 31.27% done, estimate finish Fri May 25 20:50:21 2018 > 31.28% done, estimate finish Fri May 25 20:50:23 2018 > 31.28% done, estimate finish Fri May 25 20:50:22 2018 > 31.28% done, estimate finish Fri May 25 20:50:21 2018 > 31.29% done, estimate finish Fri May 25 20:50:24 2018 > 31.29% done, estimate finish Fri May 25 20:50:23 2018 > 31.30% done, estimate finish Fri May 25 20:50:22 2018 > 31.30% done, estimate finish Fri May 25 20:50:21 2018 > 31.30% done, estimate finish Fri May 25 20:50:23 2018 > 31.31% done, estimate finish Fri May 25 20:50:23 2018 > 31.31% done, estimate finish Fri May 25 20:50:22 2018 > 31.32% done, estimate finish Fri May 25 20:50:21 2018 > 31.32% done, estimate finish Fri May 25 20:50:23 2018 > 31.32% done, estimate finish Fri May 25 20:50:22 2018 > 31.33% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 31.34% done, estimate finish Fri May 25 20:50:23 2018 > 31.34% done, estimate finish Fri May 25 20:50:22 2018 > 31.35% done, estimate finish Fri May 25 20:50:21 2018 > 31.35% done, estimate finish Fri May 25 20:50:24 2018 > 31.35% done, estimate finish Fri May 25 20:50:23 2018 > 31.36% done, estimate finish Fri May 25 20:50:22 2018 > 31.36% done, estimate finish Fri May 25 20:50:21 2018 > 31.37% done, estimate finish Fri May 25 20:50:23 2018 > 31.37% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 31.38% done, estimate finish Fri May 25 20:50:21 2018 > 31.38% done, estimate finish Fri May 25 20:50:23 2018 > 31.39% done, estimate finish Fri May 25 20:50:22 2018 > 31.39% done, estimate finish Fri May 25 20:50:21 2018 > 31.39% done, estimate finish Fri May 25 20:50:20 2018 > 31.40% done, estimate finish Fri May 25 20:50:23 2018 > 31.40% done, estimate finish Fri May 25 20:50:22 2018 > 31.41% done, estimate finish Fri May 25 20:50:21 2018 > 31.41% done, estimate finish Fri May 25 20:50:20 2018 > 31.41% done, estimate finish Fri May 25 20:50:23 2018 > 31.42% done, estimate finish Fri May 25 20:50:22 2018 > 31.42% done, estimate finish Fri May 25 20:50:21 2018 > 31.43% done, estimate finish Fri May 25 20:50:23 2018 > 31.43% done, estimate finish Fri May 25 20:50:22 2018 > 31.44% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 31.44% done, estimate finish Fri May 25 20:50:23 2018 > 31.45% done, estimate finish Fri May 25 20:50:22 2018 > 31.45% done, estimate finish Fri May 25 20:50:21 2018 > 31.46% done, estimate finish Fri May 25 20:50:20 2018 > 31.46% done, estimate finish Fri May 25 20:50:23 2018 > 31.46% done, estimate finish Fri May 25 20:50:22 2018 > 31.47% done, estimate finish Fri May 25 20:50:21 2018 > 31.47% done, estimate finish Fri May 25 20:50:20 2018 > 31.48% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 31.48% done, estimate finish Fri May 25 20:50:21 2018 > 31.49% done, estimate finish Fri May 25 20:50:23 2018 > 31.49% done, estimate finish Fri May 25 20:50:22 2018 > 31.50% done, estimate finish Fri May 25 20:50:21 2018 > 31.50% done, estimate finish Fri May 25 20:50:20 2018 > 31.50% done, estimate finish Fri May 25 20:50:23 2018 > 31.51% done, estimate finish Fri May 25 20:50:22 2018 > 31.51% done, estimate finish Fri May 25 20:50:21 2018 > 31.52% done, estimate finish Fri May 25 20:50:20 2018 > 31.52% done, estimate finish Fri May 25 20:50:23 2018 > 31.53% done, estimate finish Fri May 25 20:50:22 2018 > 31.53% done, estimate finish Fri May 25 20:50:21 2018 > 31.53% done, estimate finish Fri May 25 20:50:20 2018 > 31.54% done, estimate finish Fri May 25 20:50:22 2018 > 31.54% done, estimate finish Fri May 25 20:50:21 2018 > 31.55% done, estimate finish Fri May 25 20:50:21 2018 > 31.55% done, estimate finish Fri May 25 20:50:20 2018 > 31.55% done, estimate finish Fri May 25 20:50:22 2018 > 31.56% done, estimate finish Fri May 25 20:50:21 2018 > 31.56% done, estimate finish Fri May 25 20:50:20 2018 > 31.57% done, estimate finish Fri May 25 20:50:23 2018 > 31.57% done, estimate finish Fri May 25 20:50:22 2018 > 31.57% done, estimate finish Fri May 25 20:50:21 2018 > 31.58% done, estimate finish Fri May 25 20:50:20 2018 > 31.58% done, estimate finish Fri May 25 20:50:22 2018 > 31.59% done, estimate finish Fri May 25 20:50:22 2018 > 31.59% done, estimate finish Fri May 25 20:50:21 2018 > 31.60% done, estimate finish Fri May 25 20:50:20 2018 > 31.60% done, estimate finish Fri May 25 20:50:22 2018 > 31.60% done, estimate finish Fri May 25 20:50:21 2018 > 31.61% done, estimate finish Fri May 25 20:50:20 2018 >=== last message repeated 2 times. === > 31.62% done, estimate finish Fri May 25 20:50:22 2018 > 31.62% done, estimate finish Fri May 25 20:50:21 2018 > 31.62% done, estimate finish Fri May 25 20:50:20 2018 > 31.63% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 31.64% done, estimate finish Fri May 25 20:50:21 2018 > 31.64% done, estimate finish Fri May 25 20:50:20 2018 > 31.64% done, estimate finish Fri May 25 20:50:22 2018 > 31.65% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 31.66% done, estimate finish Fri May 25 20:50:20 2018 > 31.66% done, estimate finish Fri May 25 20:50:22 2018 > 31.66% done, estimate finish Fri May 25 20:50:21 2018 > 31.67% done, estimate finish Fri May 25 20:50:20 2018 > 31.67% done, estimate finish Fri May 25 20:50:19 2018 > 31.68% done, estimate finish Fri May 25 20:50:22 2018 > 31.68% done, estimate finish Fri May 25 20:50:21 2018 > 31.69% done, estimate finish Fri May 25 20:50:20 2018 > 31.69% done, estimate finish Fri May 25 20:50:19 2018 > 31.69% done, estimate finish Fri May 25 20:50:21 2018 > 31.70% done, estimate finish Fri May 25 20:50:21 2018 > 31.70% done, estimate finish Fri May 25 20:50:20 2018 > 31.71% done, estimate finish Fri May 25 20:50:22 2018 > 31.71% done, estimate finish Fri May 25 20:50:21 2018 > 31.71% done, estimate finish Fri May 25 20:50:20 2018 > 31.72% done, estimate finish Fri May 25 20:50:20 2018 > 31.72% done, estimate finish Fri May 25 20:50:22 2018 > 31.73% done, estimate finish Fri May 25 20:50:21 2018 > 31.73% done, estimate finish Fri May 25 20:50:20 2018 > 31.73% done, estimate finish Fri May 25 20:50:19 2018 > 31.74% done, estimate finish Fri May 25 20:50:22 2018 > 31.74% done, estimate finish Fri May 25 20:50:21 2018 > 31.75% done, estimate finish Fri May 25 20:50:20 2018 > 31.75% done, estimate finish Fri May 25 20:50:19 2018 > 31.75% done, estimate finish Fri May 25 20:50:21 2018 > 31.76% done, estimate finish Fri May 25 20:50:20 2018 >=== last message repeated 2 times. === > 31.77% done, estimate finish Fri May 25 20:50:19 2018 > 31.77% done, estimate finish Fri May 25 20:50:21 2018 > 31.78% done, estimate finish Fri May 25 20:50:20 2018 > 31.78% done, estimate finish Fri May 25 20:50:19 2018 > 31.78% done, estimate finish Fri May 25 20:50:22 2018 > 31.79% done, estimate finish Fri May 25 20:50:21 2018 > 31.79% done, estimate finish Fri May 25 20:50:20 2018 > 31.80% done, estimate finish Fri May 25 20:50:19 2018 > 31.80% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 31.81% done, estimate finish Fri May 25 20:50:20 2018 > 31.81% done, estimate finish Fri May 25 20:50:19 2018 > 31.82% done, estimate finish Fri May 25 20:50:21 2018 > 31.82% done, estimate finish Fri May 25 20:50:20 2018 > 31.82% done, estimate finish Fri May 25 20:50:19 2018 > 31.83% done, estimate finish Fri May 25 20:50:19 2018 > 31.83% done, estimate finish Fri May 25 20:50:21 2018 > 31.84% done, estimate finish Fri May 25 20:50:20 2018 > 31.84% done, estimate finish Fri May 25 20:50:19 2018 > 31.84% done, estimate finish Fri May 25 20:50:22 2018 > 31.85% done, estimate finish Fri May 25 20:50:21 2018 > 31.85% done, estimate finish Fri May 25 20:50:20 2018 > 31.86% done, estimate finish Fri May 25 20:50:19 2018 > 31.86% done, estimate finish Fri May 25 20:50:21 2018 > 31.87% done, estimate finish Fri May 25 20:50:20 2018 >=== last message repeated 2 times. === > 31.87% done, estimate finish Fri May 25 20:50:19 2018 > 31.88% done, estimate finish Fri May 25 20:50:21 2018 > 31.88% done, estimate finish Fri May 25 20:50:20 2018 > 31.89% done, estimate finish Fri May 25 20:50:19 2018 >=== last message repeated 2 times. === > 31.89% done, estimate finish Fri May 25 20:50:21 2018 > 31.90% done, estimate finish Fri May 25 20:50:20 2018 > 31.90% done, estimate finish Fri May 25 20:50:19 2018 > 31.91% done, estimate finish Fri May 25 20:50:18 2018 > 31.91% done, estimate finish Fri May 25 20:50:21 2018 > 31.91% done, estimate finish Fri May 25 20:50:20 2018 > 31.92% done, estimate finish Fri May 25 20:50:19 2018 > 31.92% done, estimate finish Fri May 25 20:50:21 2018 > 31.93% done, estimate finish Fri May 25 20:50:20 2018 > 31.93% done, estimate finish Fri May 25 20:50:19 2018 > 31.94% done, estimate finish Fri May 25 20:50:19 2018 > 31.94% done, estimate finish Fri May 25 20:50:21 2018 > 31.94% done, estimate finish Fri May 25 20:50:20 2018 > 31.95% done, estimate finish Fri May 25 20:50:19 2018 > 31.95% done, estimate finish Fri May 25 20:50:18 2018 > 31.96% done, estimate finish Fri May 25 20:50:21 2018 > 31.96% done, estimate finish Fri May 25 20:50:20 2018 > 31.96% done, estimate finish Fri May 25 20:50:19 2018 > 31.97% done, estimate finish Fri May 25 20:50:18 2018 > 31.97% done, estimate finish Fri May 25 20:50:20 2018 > 31.98% done, estimate finish Fri May 25 20:50:20 2018 > 31.98% done, estimate finish Fri May 25 20:50:19 2018 > 31.98% done, estimate finish Fri May 25 20:50:21 2018 > 31.99% done, estimate finish Fri May 25 20:50:20 2018 > 31.99% done, estimate finish Fri May 25 20:50:19 2018 > 32.00% done, estimate finish Fri May 25 20:50:18 2018 > 32.00% done, estimate finish Fri May 25 20:50:21 2018 > 32.00% done, estimate finish Fri May 25 20:50:20 2018 > 32.01% done, estimate finish Fri May 25 20:50:19 2018 > 32.01% done, estimate finish Fri May 25 20:50:18 2018 > 32.02% done, estimate finish Fri May 25 20:50:21 2018 > 32.02% done, estimate finish Fri May 25 20:50:20 2018 > 32.03% done, estimate finish Fri May 25 20:50:19 2018 > 32.03% done, estimate finish Fri May 25 20:50:18 2018 > 32.03% done, estimate finish Fri May 25 20:50:20 2018 > 32.04% done, estimate finish Fri May 25 20:50:19 2018 >=== last message repeated 2 times. === > 32.05% done, estimate finish Fri May 25 20:50:18 2018 > 32.05% done, estimate finish Fri May 25 20:50:20 2018 > 32.05% done, estimate finish Fri May 25 20:50:19 2018 > 32.06% done, estimate finish Fri May 25 20:50:18 2018 > 32.06% done, estimate finish Fri May 25 20:50:21 2018 > 32.07% done, estimate finish Fri May 25 20:50:20 2018 > 32.07% done, estimate finish Fri May 25 20:50:19 2018 > 32.07% done, estimate finish Fri May 25 20:50:18 2018 > 32.08% done, estimate finish Fri May 25 20:50:20 2018 >=== last message repeated 2 times. === > 32.09% done, estimate finish Fri May 25 20:50:19 2018 > 32.09% done, estimate finish Fri May 25 20:50:18 2018 > 32.09% done, estimate finish Fri May 25 20:50:20 2018 > 32.10% done, estimate finish Fri May 25 20:50:19 2018 > 32.10% done, estimate finish Fri May 25 20:50:18 2018 > 32.11% done, estimate finish Fri May 25 20:50:18 2018 > 32.11% done, estimate finish Fri May 25 20:50:20 2018 > 32.12% done, estimate finish Fri May 25 20:50:19 2018 > 32.12% done, estimate finish Fri May 25 20:50:18 2018 > 32.12% done, estimate finish Fri May 25 20:50:20 2018 > 32.13% done, estimate finish Fri May 25 20:50:20 2018 > 32.13% done, estimate finish Fri May 25 20:50:19 2018 > 32.14% done, estimate finish Fri May 25 20:50:18 2018 > 32.14% done, estimate finish Fri May 25 20:50:20 2018 > 32.14% done, estimate finish Fri May 25 20:50:19 2018 > 32.15% done, estimate finish Fri May 25 20:50:19 2018 > 32.15% done, estimate finish Fri May 25 20:50:18 2018 > 32.16% done, estimate finish Fri May 25 20:50:20 2018 > 32.16% done, estimate finish Fri May 25 20:50:19 2018 > 32.16% done, estimate finish Fri May 25 20:50:18 2018 > 32.17% done, estimate finish Fri May 25 20:50:17 2018 > 32.17% done, estimate finish Fri May 25 20:50:20 2018 > 32.18% done, estimate finish Fri May 25 20:50:19 2018 > 32.18% done, estimate finish Fri May 25 20:50:18 2018 > 32.18% done, estimate finish Fri May 25 20:50:17 2018 > 32.19% done, estimate finish Fri May 25 20:50:20 2018 > 32.19% done, estimate finish Fri May 25 20:50:19 2018 > 32.20% done, estimate finish Fri May 25 20:50:18 2018 > 32.20% done, estimate finish Fri May 25 20:50:20 2018 > 32.21% done, estimate finish Fri May 25 20:50:19 2018 > 32.21% done, estimate finish Fri May 25 20:50:18 2018 >=== last message repeated 2 times. === > 32.22% done, estimate finish Fri May 25 20:50:20 2018 > 32.22% done, estimate finish Fri May 25 20:50:19 2018 > 32.23% done, estimate finish Fri May 25 20:50:18 2018 > 32.23% done, estimate finish Fri May 25 20:50:17 2018 > 32.23% done, estimate finish Fri May 25 20:50:20 2018 > 32.24% done, estimate finish Fri May 25 20:50:19 2018 > 32.24% done, estimate finish Fri May 25 20:50:18 2018 > 32.25% done, estimate finish Fri May 25 20:50:17 2018 > 32.25% done, estimate finish Fri May 25 20:50:19 2018 >=== last message repeated 2 times. === > 32.26% done, estimate finish Fri May 25 20:50:18 2018 > 32.26% done, estimate finish Fri May 25 20:50:20 2018 > 32.27% done, estimate finish Fri May 25 20:50:19 2018 > 32.27% done, estimate finish Fri May 25 20:50:18 2018 > 32.28% done, estimate finish Fri May 25 20:50:17 2018 > 32.28% done, estimate finish Fri May 25 20:50:20 2018 > 32.28% done, estimate finish Fri May 25 20:50:19 2018 > 32.29% done, estimate finish Fri May 25 20:50:18 2018 > 32.29% done, estimate finish Fri May 25 20:50:17 2018 > 32.30% done, estimate finish Fri May 25 20:50:19 2018 >=== last message repeated 2 times. === > 32.30% done, estimate finish Fri May 25 20:50:18 2018 > 32.31% done, estimate finish Fri May 25 20:50:17 2018 > 32.31% done, estimate finish Fri May 25 20:50:19 2018 > 32.32% done, estimate finish Fri May 25 20:50:18 2018 >=== last message repeated 2 times. === > 32.32% done, estimate finish Fri May 25 20:50:17 2018 > 32.33% done, estimate finish Fri May 25 20:50:19 2018 > 32.33% done, estimate finish Fri May 25 20:50:18 2018 > 32.34% done, estimate finish Fri May 25 20:50:17 2018 > 32.34% done, estimate finish Fri May 25 20:50:20 2018 > 32.34% done, estimate finish Fri May 25 20:50:19 2018 > 32.35% done, estimate finish Fri May 25 20:50:18 2018 > 32.35% done, estimate finish Fri May 25 20:50:17 2018 > 32.36% done, estimate finish Fri May 25 20:50:19 2018 > 32.36% done, estimate finish Fri May 25 20:50:18 2018 > 32.37% done, estimate finish Fri May 25 20:50:18 2018 > 32.37% done, estimate finish Fri May 25 20:50:17 2018 > 32.37% done, estimate finish Fri May 25 20:50:19 2018 > 32.38% done, estimate finish Fri May 25 20:50:18 2018 > 32.38% done, estimate finish Fri May 25 20:50:17 2018 > 32.39% done, estimate finish Fri May 25 20:50:17 2018 > 32.39% done, estimate finish Fri May 25 20:50:19 2018 > 32.39% done, estimate finish Fri May 25 20:50:18 2018 > 32.40% done, estimate finish Fri May 25 20:50:17 2018 > 32.40% done, estimate finish Fri May 25 20:50:16 2018 > 32.41% done, estimate finish Fri May 25 20:50:19 2018 > 32.41% done, estimate finish Fri May 25 20:50:18 2018 > 32.41% done, estimate finish Fri May 25 20:50:17 2018 > 32.42% done, estimate finish Fri May 25 20:50:19 2018 > 32.42% done, estimate finish Fri May 25 20:50:18 2018 > 32.43% done, estimate finish Fri May 25 20:50:18 2018 > 32.43% done, estimate finish Fri May 25 20:50:17 2018 > 32.43% done, estimate finish Fri May 25 20:50:19 2018 > 32.44% done, estimate finish Fri May 25 20:50:18 2018 > 32.44% done, estimate finish Fri May 25 20:50:17 2018 > 32.45% done, estimate finish Fri May 25 20:50:20 2018 > 32.45% done, estimate finish Fri May 25 20:50:19 2018 > 32.46% done, estimate finish Fri May 25 20:50:18 2018 > 32.46% done, estimate finish Fri May 25 20:50:17 2018 > 32.46% done, estimate finish Fri May 25 20:50:19 2018 > 32.47% done, estimate finish Fri May 25 20:50:18 2018 >=== last message repeated 2 times. === > 32.48% done, estimate finish Fri May 25 20:50:20 2018 > 32.48% done, estimate finish Fri May 25 20:50:19 2018 > 32.48% done, estimate finish Fri May 25 20:50:18 2018 > 32.49% done, estimate finish Fri May 25 20:50:17 2018 > 32.49% done, estimate finish Fri May 25 20:50:20 2018 > 32.50% done, estimate finish Fri May 25 20:50:19 2018 > 32.50% done, estimate finish Fri May 25 20:50:18 2018 > 32.50% done, estimate finish Fri May 25 20:50:17 2018 > 32.51% done, estimate finish Fri May 25 20:50:19 2018 >=== last message repeated 2 times. === > 32.52% done, estimate finish Fri May 25 20:50:18 2018 > 32.52% done, estimate finish Fri May 25 20:50:20 2018 > 32.52% done, estimate finish Fri May 25 20:50:19 2018 > 32.53% done, estimate finish Fri May 25 20:50:18 2018 >=== last message repeated 2 times. === > 32.54% done, estimate finish Fri May 25 20:50:20 2018 > 32.54% done, estimate finish Fri May 25 20:50:19 2018 > 32.55% done, estimate finish Fri May 25 20:50:18 2018 > 32.55% done, estimate finish Fri May 25 20:50:20 2018 > 32.55% done, estimate finish Fri May 25 20:50:19 2018 > 32.56% done, estimate finish Fri May 25 20:50:19 2018 > 32.56% done, estimate finish Fri May 25 20:50:18 2018 > 32.57% done, estimate finish Fri May 25 20:50:20 2018 > 32.57% done, estimate finish Fri May 25 20:50:19 2018 > 32.57% done, estimate finish Fri May 25 20:50:18 2018 > 32.58% done, estimate finish Fri May 25 20:50:18 2018 > 32.58% done, estimate finish Fri May 25 20:50:20 2018 > 32.59% done, estimate finish Fri May 25 20:50:19 2018 > 32.59% done, estimate finish Fri May 25 20:50:18 2018 > 32.59% done, estimate finish Fri May 25 20:50:17 2018 > 32.60% done, estimate finish Fri May 25 20:50:20 2018 > 32.60% done, estimate finish Fri May 25 20:50:19 2018 > 32.61% done, estimate finish Fri May 25 20:50:18 2018 > 32.61% done, estimate finish Fri May 25 20:50:17 2018 > 32.61% done, estimate finish Fri May 25 20:50:19 2018 > 32.62% done, estimate finish Fri May 25 20:50:19 2018 > 32.62% done, estimate finish Fri May 25 20:50:18 2018 > 32.63% done, estimate finish Fri May 25 20:50:20 2018 > 32.63% done, estimate finish Fri May 25 20:50:19 2018 > 32.64% done, estimate finish Fri May 25 20:50:18 2018 > 32.64% done, estimate finish Fri May 25 20:50:17 2018 > 32.64% done, estimate finish Fri May 25 20:50:20 2018 > 32.65% done, estimate finish Fri May 25 20:50:19 2018 > 32.65% done, estimate finish Fri May 25 20:50:18 2018 > 32.66% done, estimate finish Fri May 25 20:50:17 2018 > 32.66% done, estimate finish Fri May 25 20:50:19 2018 >=== last message repeated 2 times. === > 32.67% done, estimate finish Fri May 25 20:50:18 2018 > 32.67% done, estimate finish Fri May 25 20:50:17 2018 > 32.68% done, estimate finish Fri May 25 20:50:19 2018 > 32.68% done, estimate finish Fri May 25 20:50:18 2018 >=== last message repeated 2 times. === > 32.69% done, estimate finish Fri May 25 20:50:20 2018 > 32.69% done, estimate finish Fri May 25 20:50:19 2018 > 32.70% done, estimate finish Fri May 25 20:50:18 2018 > 32.70% done, estimate finish Fri May 25 20:50:17 2018 > 32.71% done, estimate finish Fri May 25 20:50:20 2018 > 32.71% done, estimate finish Fri May 25 20:50:19 2018 > 32.71% done, estimate finish Fri May 25 20:50:18 2018 > 32.72% done, estimate finish Fri May 25 20:50:17 2018 > 32.72% done, estimate finish Fri May 25 20:50:19 2018 > 32.73% done, estimate finish Fri May 25 20:50:19 2018 > 32.73% done, estimate finish Fri May 25 20:50:18 2018 > 32.73% done, estimate finish Fri May 25 20:50:20 2018 > 32.74% done, estimate finish Fri May 25 20:50:19 2018 > 32.74% done, estimate finish Fri May 25 20:50:18 2018 > 32.75% done, estimate finish Fri May 25 20:50:17 2018 >=== last message repeated 2 times. === > 32.75% done, estimate finish Fri May 25 20:50:19 2018 > 32.76% done, estimate finish Fri May 25 20:50:18 2018 > 32.76% done, estimate finish Fri May 25 20:50:17 2018 > 32.77% done, estimate finish Fri May 25 20:50:19 2018 >=== last message repeated 2 times. === > 32.77% done, estimate finish Fri May 25 20:50:18 2018 > 32.78% done, estimate finish Fri May 25 20:50:20 2018 > 32.78% done, estimate finish Fri May 25 20:50:19 2018 > 32.79% done, estimate finish Fri May 25 20:50:18 2018 >=== last message repeated 2 times. === > 32.80% done, estimate finish Fri May 25 20:50:20 2018 > 32.80% done, estimate finish Fri May 25 20:50:19 2018 > 32.80% done, estimate finish Fri May 25 20:50:18 2018 > 32.81% done, estimate finish Fri May 25 20:50:20 2018 >=== last message repeated 2 times. === > 32.82% done, estimate finish Fri May 25 20:50:19 2018 > 32.82% done, estimate finish Fri May 25 20:50:18 2018 > 32.82% done, estimate finish Fri May 25 20:50:20 2018 > 32.83% done, estimate finish Fri May 25 20:50:19 2018 > 32.83% done, estimate finish Fri May 25 20:50:18 2018 > 32.84% done, estimate finish Fri May 25 20:50:21 2018 > 32.84% done, estimate finish Fri May 25 20:50:20 2018 > 32.84% done, estimate finish Fri May 25 20:50:19 2018 > 32.85% done, estimate finish Fri May 25 20:50:18 2018 > 32.85% done, estimate finish Fri May 25 20:50:20 2018 > 32.86% done, estimate finish Fri May 25 20:50:20 2018 > 32.86% done, estimate finish Fri May 25 20:50:19 2018 > 32.86% done, estimate finish Fri May 25 20:50:18 2018 > 32.87% done, estimate finish Fri May 25 20:50:20 2018 > 32.87% done, estimate finish Fri May 25 20:50:19 2018 > 32.88% done, estimate finish Fri May 25 20:50:19 2018 > 32.88% done, estimate finish Fri May 25 20:50:18 2018 > 32.89% done, estimate finish Fri May 25 20:50:20 2018 > 32.89% done, estimate finish Fri May 25 20:50:19 2018 > 32.89% done, estimate finish Fri May 25 20:50:18 2018 > 32.90% done, estimate finish Fri May 25 20:50:21 2018 > 32.90% done, estimate finish Fri May 25 20:50:20 2018 > 32.91% done, estimate finish Fri May 25 20:50:19 2018 > 32.91% done, estimate finish Fri May 25 20:50:18 2018 > 32.91% done, estimate finish Fri May 25 20:50:20 2018 > 32.92% done, estimate finish Fri May 25 20:50:20 2018 > 32.92% done, estimate finish Fri May 25 20:50:19 2018 > 32.93% done, estimate finish Fri May 25 20:50:18 2018 > 32.93% done, estimate finish Fri May 25 20:50:20 2018 > 32.93% done, estimate finish Fri May 25 20:50:19 2018 > 32.94% done, estimate finish Fri May 25 20:50:18 2018 >=== last message repeated 2 times. === > 32.95% done, estimate finish Fri May 25 20:50:20 2018 > 32.95% done, estimate finish Fri May 25 20:50:19 2018 > 32.95% done, estimate finish Fri May 25 20:50:18 2018 > 32.96% done, estimate finish Fri May 25 20:50:17 2018 > 32.96% done, estimate finish Fri May 25 20:50:20 2018 > 32.97% done, estimate finish Fri May 25 20:50:19 2018 > 32.97% done, estimate finish Fri May 25 20:50:18 2018 > 32.98% done, estimate finish Fri May 25 20:50:20 2018 > 32.98% done, estimate finish Fri May 25 20:50:19 2018 >=== last message repeated 2 times. === > 32.99% done, estimate finish Fri May 25 20:50:18 2018 > 32.99% done, estimate finish Fri May 25 20:50:20 2018 > 33.00% done, estimate finish Fri May 25 20:50:19 2018 > 33.00% done, estimate finish Fri May 25 20:50:21 2018 > 33.00% done, estimate finish Fri May 25 20:50:24 2018 > 33.01% done, estimate finish Fri May 25 20:50:23 2018 > 33.01% done, estimate finish Fri May 25 20:50:22 2018 > 33.02% done, estimate finish Fri May 25 20:50:24 2018 > 33.02% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 33.03% done, estimate finish Fri May 25 20:50:22 2018 > 33.03% done, estimate finish Fri May 25 20:50:24 2018 > 33.04% done, estimate finish Fri May 25 20:50:23 2018 > 33.04% done, estimate finish Fri May 25 20:50:22 2018 > 33.05% done, estimate finish Fri May 25 20:50:24 2018 >=== last message repeated 2 times. === > 33.05% done, estimate finish Fri May 25 20:50:23 2018 > 33.06% done, estimate finish Fri May 25 20:50:22 2018 > 33.06% done, estimate finish Fri May 25 20:50:24 2018 > 33.07% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 33.07% done, estimate finish Fri May 25 20:50:22 2018 > 33.08% done, estimate finish Fri May 25 20:50:24 2018 > 33.08% done, estimate finish Fri May 25 20:50:23 2018 > 33.09% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 33.09% done, estimate finish Fri May 25 20:50:24 2018 > 33.10% done, estimate finish Fri May 25 20:50:23 2018 > 33.10% done, estimate finish Fri May 25 20:50:22 2018 > 33.11% done, estimate finish Fri May 25 20:50:24 2018 >=== last message repeated 2 times. === > 33.11% done, estimate finish Fri May 25 20:50:23 2018 > 33.12% done, estimate finish Fri May 25 20:50:22 2018 > 33.12% done, estimate finish Fri May 25 20:50:24 2018 > 33.13% done, estimate finish Fri May 25 20:50:23 2018 > 33.13% done, estimate finish Fri May 25 20:50:22 2018 > 33.14% done, estimate finish Fri May 25 20:50:25 2018 > 33.14% done, estimate finish Fri May 25 20:50:24 2018 > 33.14% done, estimate finish Fri May 25 20:50:23 2018 > 33.15% done, estimate finish Fri May 25 20:50:22 2018 > 33.15% done, estimate finish Fri May 25 20:50:24 2018 > 33.16% done, estimate finish Fri May 25 20:50:24 2018 > 33.16% done, estimate finish Fri May 25 20:50:23 2018 > 33.16% done, estimate finish Fri May 25 20:50:22 2018 > 33.17% done, estimate finish Fri May 25 20:50:24 2018 > 33.17% done, estimate finish Fri May 25 20:50:23 2018 > 33.18% done, estimate finish Fri May 25 20:50:23 2018 > 33.18% done, estimate finish Fri May 25 20:50:25 2018 > 33.18% done, estimate finish Fri May 25 20:50:24 2018 > 33.19% done, estimate finish Fri May 25 20:50:23 2018 > 33.19% done, estimate finish Fri May 25 20:50:22 2018 > 33.20% done, estimate finish Fri May 25 20:50:25 2018 > 33.20% done, estimate finish Fri May 25 20:50:24 2018 > 33.20% done, estimate finish Fri May 25 20:50:23 2018 > 33.21% done, estimate finish Fri May 25 20:50:22 2018 > 33.21% done, estimate finish Fri May 25 20:50:24 2018 > 33.22% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 33.23% done, estimate finish Fri May 25 20:50:22 2018 > 33.23% done, estimate finish Fri May 25 20:50:24 2018 > 33.23% done, estimate finish Fri May 25 20:50:23 2018 > 33.24% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 33.25% done, estimate finish Fri May 25 20:50:24 2018 > 33.25% done, estimate finish Fri May 25 20:50:23 2018 > 33.25% done, estimate finish Fri May 25 20:50:22 2018 > 33.26% done, estimate finish Fri May 25 20:50:24 2018 >=== last message repeated 2 times. === > 33.27% done, estimate finish Fri May 25 20:50:23 2018 > 33.27% done, estimate finish Fri May 25 20:50:22 2018 > 33.27% done, estimate finish Fri May 25 20:50:24 2018 > 33.28% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 33.29% done, estimate finish Fri May 25 20:50:22 2018 > 33.29% done, estimate finish Fri May 25 20:50:24 2018 > 33.29% done, estimate finish Fri May 25 20:50:23 2018 > 33.30% done, estimate finish Fri May 25 20:50:22 2018 > 33.30% done, estimate finish Fri May 25 20:50:21 2018 > 33.31% done, estimate finish Fri May 25 20:50:24 2018 > 33.31% done, estimate finish Fri May 25 20:50:23 2018 > 33.32% done, estimate finish Fri May 25 20:50:22 2018 > 33.32% done, estimate finish Fri May 25 20:50:21 2018 > 33.32% done, estimate finish Fri May 25 20:50:23 2018 > 33.33% done, estimate finish Fri May 25 20:50:23 2018 > 33.33% done, estimate finish Fri May 25 20:50:22 2018 > 33.34% done, estimate finish Fri May 25 20:50:24 2018 > 33.34% done, estimate finish Fri May 25 20:50:23 2018 > 33.34% done, estimate finish Fri May 25 20:50:22 2018 > 33.35% done, estimate finish Fri May 25 20:50:22 2018 > 33.35% done, estimate finish Fri May 25 20:50:24 2018 > 33.36% done, estimate finish Fri May 25 20:50:23 2018 > 33.36% done, estimate finish Fri May 25 20:50:22 2018 > 33.36% done, estimate finish Fri May 25 20:50:21 2018 > 33.37% done, estimate finish Fri May 25 20:50:24 2018 > 33.37% done, estimate finish Fri May 25 20:50:23 2018 > 33.38% done, estimate finish Fri May 25 20:50:22 2018 > 33.38% done, estimate finish Fri May 25 20:50:24 2018 > 33.38% done, estimate finish Fri May 25 20:50:23 2018 > 33.39% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 33.40% done, estimate finish Fri May 25 20:50:24 2018 > 33.40% done, estimate finish Fri May 25 20:50:23 2018 > 33.41% done, estimate finish Fri May 25 20:50:22 2018 > 33.41% done, estimate finish Fri May 25 20:50:21 2018 > 33.41% done, estimate finish Fri May 25 20:50:24 2018 > 33.42% done, estimate finish Fri May 25 20:50:23 2018 > 33.42% done, estimate finish Fri May 25 20:50:22 2018 > 33.43% done, estimate finish Fri May 25 20:50:21 2018 > 33.43% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 33.44% done, estimate finish Fri May 25 20:50:22 2018 > 33.44% done, estimate finish Fri May 25 20:50:24 2018 > 33.45% done, estimate finish Fri May 25 20:50:23 2018 > 33.45% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 33.46% done, estimate finish Fri May 25 20:50:24 2018 > 33.46% done, estimate finish Fri May 25 20:50:23 2018 > 33.47% done, estimate finish Fri May 25 20:50:22 2018 > 33.47% done, estimate finish Fri May 25 20:50:24 2018 > 33.48% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 33.48% done, estimate finish Fri May 25 20:50:22 2018 > 33.49% done, estimate finish Fri May 25 20:50:24 2018 > 33.49% done, estimate finish Fri May 25 20:50:23 2018 > 33.50% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 33.50% done, estimate finish Fri May 25 20:50:24 2018 > 33.51% done, estimate finish Fri May 25 20:50:23 2018 > 33.51% done, estimate finish Fri May 25 20:50:22 2018 > 33.52% done, estimate finish Fri May 25 20:50:21 2018 > 33.52% done, estimate finish Fri May 25 20:50:24 2018 > 33.52% done, estimate finish Fri May 25 20:50:23 2018 > 33.53% done, estimate finish Fri May 25 20:50:22 2018 > 33.53% done, estimate finish Fri May 25 20:50:21 2018 > 33.54% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 33.54% done, estimate finish Fri May 25 20:50:22 2018 > 33.55% done, estimate finish Fri May 25 20:50:24 2018 > 33.55% done, estimate finish Fri May 25 20:50:23 2018 > 33.56% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 33.57% done, estimate finish Fri May 25 20:50:24 2018 > 33.57% done, estimate finish Fri May 25 20:50:23 2018 > 33.57% done, estimate finish Fri May 25 20:50:22 2018 > 33.58% done, estimate finish Fri May 25 20:50:21 2018 > 33.58% done, estimate finish Fri May 25 20:50:23 2018 > 33.59% done, estimate finish Fri May 25 20:50:23 2018 > 33.59% done, estimate finish Fri May 25 20:50:22 2018 > 33.59% done, estimate finish Fri May 25 20:50:21 2018 > 33.60% done, estimate finish Fri May 25 20:50:23 2018 > 33.60% done, estimate finish Fri May 25 20:50:22 2018 > 33.61% done, estimate finish Fri May 25 20:50:22 2018 > 33.61% done, estimate finish Fri May 25 20:50:24 2018 > 33.61% done, estimate finish Fri May 25 20:50:23 2018 > 33.62% done, estimate finish Fri May 25 20:50:22 2018 > 33.62% done, estimate finish Fri May 25 20:50:21 2018 > 33.63% done, estimate finish Fri May 25 20:50:24 2018 > 33.63% done, estimate finish Fri May 25 20:50:23 2018 > 33.63% done, estimate finish Fri May 25 20:50:22 2018 > 33.64% done, estimate finish Fri May 25 20:50:24 2018 > 33.64% done, estimate finish Fri May 25 20:50:23 2018 > 33.65% done, estimate finish Fri May 25 20:50:23 2018 > 33.65% done, estimate finish Fri May 25 20:50:22 2018 > 33.66% done, estimate finish Fri May 25 20:50:24 2018 > 33.66% done, estimate finish Fri May 25 20:50:23 2018 > 33.66% done, estimate finish Fri May 25 20:50:22 2018 > 33.67% done, estimate finish Fri May 25 20:50:21 2018 > 33.67% done, estimate finish Fri May 25 20:50:24 2018 > 33.68% done, estimate finish Fri May 25 20:50:23 2018 > 33.68% done, estimate finish Fri May 25 20:50:22 2018 > 33.68% done, estimate finish Fri May 25 20:50:21 2018 > 33.69% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 33.70% done, estimate finish Fri May 25 20:50:22 2018 > 33.70% done, estimate finish Fri May 25 20:50:21 2018 > 33.70% done, estimate finish Fri May 25 20:50:23 2018 > 33.71% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 33.72% done, estimate finish Fri May 25 20:50:24 2018 > 33.72% done, estimate finish Fri May 25 20:50:23 2018 > 33.72% done, estimate finish Fri May 25 20:50:22 2018 > 33.73% done, estimate finish Fri May 25 20:50:21 2018 > 33.73% done, estimate finish Fri May 25 20:50:23 2018 > 33.74% done, estimate finish Fri May 25 20:50:23 2018 > 33.74% done, estimate finish Fri May 25 20:50:22 2018 > 33.75% done, estimate finish Fri May 25 20:50:21 2018 > 33.75% done, estimate finish Fri May 25 20:50:23 2018 > 33.75% done, estimate finish Fri May 25 20:50:22 2018 > 33.76% done, estimate finish Fri May 25 20:50:22 2018 > 33.76% done, estimate finish Fri May 25 20:50:21 2018 > 33.77% done, estimate finish Fri May 25 20:50:23 2018 > 33.77% done, estimate finish Fri May 25 20:50:22 2018 > 33.77% done, estimate finish Fri May 25 20:50:21 2018 > 33.78% done, estimate finish Fri May 25 20:50:21 2018 > 33.78% done, estimate finish Fri May 25 20:50:23 2018 > 33.79% done, estimate finish Fri May 25 20:50:22 2018 > 33.79% done, estimate finish Fri May 25 20:50:21 2018 > 33.79% done, estimate finish Fri May 25 20:50:23 2018 > 33.80% done, estimate finish Fri May 25 20:50:23 2018 > 33.80% done, estimate finish Fri May 25 20:50:22 2018 > 33.81% done, estimate finish Fri May 25 20:50:21 2018 > 33.81% done, estimate finish Fri May 25 20:50:23 2018 > 33.82% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 33.82% done, estimate finish Fri May 25 20:50:24 2018 > 33.83% done, estimate finish Fri May 25 20:50:23 2018 > 33.83% done, estimate finish Fri May 25 20:50:22 2018 > 33.84% done, estimate finish Fri May 25 20:50:21 2018 > 33.84% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 33.85% done, estimate finish Fri May 25 20:50:22 2018 > 33.85% done, estimate finish Fri May 25 20:50:21 2018 > 33.86% done, estimate finish Fri May 25 20:50:23 2018 > 33.86% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 33.87% done, estimate finish Fri May 25 20:50:21 2018 > 33.87% done, estimate finish Fri May 25 20:50:23 2018 > 33.88% done, estimate finish Fri May 25 20:50:22 2018 > 33.88% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 33.89% done, estimate finish Fri May 25 20:50:23 2018 > 33.89% done, estimate finish Fri May 25 20:50:22 2018 > 33.90% done, estimate finish Fri May 25 20:50:21 2018 > 33.90% done, estimate finish Fri May 25 20:50:23 2018 > 33.91% done, estimate finish Fri May 25 20:50:23 2018 > 33.91% done, estimate finish Fri May 25 20:50:22 2018 > 33.91% done, estimate finish Fri May 25 20:50:21 2018 > 33.92% done, estimate finish Fri May 25 20:50:23 2018 > 33.92% done, estimate finish Fri May 25 20:50:22 2018 > 33.93% done, estimate finish Fri May 25 20:50:22 2018 > 33.93% done, estimate finish Fri May 25 20:50:21 2018 > 33.93% done, estimate finish Fri May 25 20:50:23 2018 > 33.94% done, estimate finish Fri May 25 20:50:22 2018 > 33.94% done, estimate finish Fri May 25 20:50:21 2018 > 33.95% done, estimate finish Fri May 25 20:50:20 2018 > 33.95% done, estimate finish Fri May 25 20:50:23 2018 > 33.95% done, estimate finish Fri May 25 20:50:22 2018 > 33.96% done, estimate finish Fri May 25 20:50:21 2018 > 33.96% done, estimate finish Fri May 25 20:50:23 2018 > 33.97% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 33.97% done, estimate finish Fri May 25 20:50:21 2018 > 33.98% done, estimate finish Fri May 25 20:50:23 2018 > 33.98% done, estimate finish Fri May 25 20:50:22 2018 > 33.99% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 34.00% done, estimate finish Fri May 25 20:50:23 2018 > 34.00% done, estimate finish Fri May 25 20:50:22 2018 > 34.00% done, estimate finish Fri May 25 20:50:21 2018 > 34.01% done, estimate finish Fri May 25 20:50:23 2018 > 34.01% done, estimate finish Fri May 25 20:50:22 2018 > 34.02% done, estimate finish Fri May 25 20:50:22 2018 > 34.02% done, estimate finish Fri May 25 20:50:21 2018 > 34.02% done, estimate finish Fri May 25 20:50:23 2018 > 34.03% done, estimate finish Fri May 25 20:50:22 2018 > 34.03% done, estimate finish Fri May 25 20:50:21 2018 > 34.04% done, estimate finish Fri May 25 20:50:21 2018 > 34.04% done, estimate finish Fri May 25 20:50:23 2018 > 34.04% done, estimate finish Fri May 25 20:50:22 2018 > 34.05% done, estimate finish Fri May 25 20:50:21 2018 > 34.05% done, estimate finish Fri May 25 20:50:20 2018 > 34.06% done, estimate finish Fri May 25 20:50:23 2018 > 34.06% done, estimate finish Fri May 25 20:50:22 2018 > 34.06% done, estimate finish Fri May 25 20:50:21 2018 > 34.07% done, estimate finish Fri May 25 20:50:23 2018 > 34.07% done, estimate finish Fri May 25 20:50:22 2018 > 34.08% done, estimate finish Fri May 25 20:50:22 2018 > 34.08% done, estimate finish Fri May 25 20:50:21 2018 > 34.09% done, estimate finish Fri May 25 20:50:23 2018 > 34.09% done, estimate finish Fri May 25 20:50:22 2018 > 34.09% done, estimate finish Fri May 25 20:50:21 2018 > 34.10% done, estimate finish Fri May 25 20:50:21 2018 > 34.10% done, estimate finish Fri May 25 20:50:23 2018 > 34.11% done, estimate finish Fri May 25 20:50:22 2018 > 34.11% done, estimate finish Fri May 25 20:50:21 2018 > 34.11% done, estimate finish Fri May 25 20:50:20 2018 > 34.12% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 34.13% done, estimate finish Fri May 25 20:50:21 2018 > 34.13% done, estimate finish Fri May 25 20:50:20 2018 > 34.13% done, estimate finish Fri May 25 20:50:22 2018 > 34.14% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 34.15% done, estimate finish Fri May 25 20:50:23 2018 > 34.15% done, estimate finish Fri May 25 20:50:22 2018 > 34.15% done, estimate finish Fri May 25 20:50:21 2018 > 34.16% done, estimate finish Fri May 25 20:50:20 2018 > 34.16% done, estimate finish Fri May 25 20:50:23 2018 > 34.17% done, estimate finish Fri May 25 20:50:22 2018 > 34.17% done, estimate finish Fri May 25 20:50:21 2018 > 34.18% done, estimate finish Fri May 25 20:50:23 2018 > 34.18% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 34.19% done, estimate finish Fri May 25 20:50:21 2018 > 34.19% done, estimate finish Fri May 25 20:50:23 2018 > 34.20% done, estimate finish Fri May 25 20:50:22 2018 > 34.20% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 34.21% done, estimate finish Fri May 25 20:50:23 2018 > 34.21% done, estimate finish Fri May 25 20:50:22 2018 > 34.22% done, estimate finish Fri May 25 20:50:21 2018 > 34.22% done, estimate finish Fri May 25 20:50:20 2018 > 34.22% done, estimate finish Fri May 25 20:50:22 2018 > 34.23% done, estimate finish Fri May 25 20:50:22 2018 > 34.23% done, estimate finish Fri May 25 20:50:21 2018 > 34.24% done, estimate finish Fri May 25 20:50:20 2018 > 34.24% done, estimate finish Fri May 25 20:50:22 2018 > 34.25% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 34.25% done, estimate finish Fri May 25 20:50:23 2018 > 34.26% done, estimate finish Fri May 25 20:50:22 2018 > 34.26% done, estimate finish Fri May 25 20:50:21 2018 > 34.27% done, estimate finish Fri May 25 20:50:20 2018 > 34.27% done, estimate finish Fri May 25 20:50:23 2018 > 34.27% done, estimate finish Fri May 25 20:50:22 2018 > 34.28% done, estimate finish Fri May 25 20:50:21 2018 > 34.28% done, estimate finish Fri May 25 20:50:23 2018 > 34.29% done, estimate finish Fri May 25 20:50:22 2018 > 34.29% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 34.30% done, estimate finish Fri May 25 20:50:23 2018 > 34.30% done, estimate finish Fri May 25 20:50:22 2018 > 34.31% done, estimate finish Fri May 25 20:50:21 2018 > 34.31% done, estimate finish Fri May 25 20:50:20 2018 > 34.31% done, estimate finish Fri May 25 20:50:23 2018 > 34.32% done, estimate finish Fri May 25 20:50:22 2018 > 34.32% done, estimate finish Fri May 25 20:50:21 2018 > 34.33% done, estimate finish Fri May 25 20:50:20 2018 > 34.33% done, estimate finish Fri May 25 20:50:22 2018 > 34.34% done, estimate finish Fri May 25 20:50:22 2018 > 34.34% done, estimate finish Fri May 25 20:50:21 2018 > 34.34% done, estimate finish Fri May 25 20:50:20 2018 > 34.35% done, estimate finish Fri May 25 20:50:22 2018 > 34.35% done, estimate finish Fri May 25 20:50:21 2018 > 34.36% done, estimate finish Fri May 25 20:50:21 2018 > 34.36% done, estimate finish Fri May 25 20:50:23 2018 > 34.36% done, estimate finish Fri May 25 20:50:22 2018 > 34.37% done, estimate finish Fri May 25 20:50:21 2018 > 34.37% done, estimate finish Fri May 25 20:50:20 2018 > 34.38% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 34.38% done, estimate finish Fri May 25 20:50:21 2018 > 34.39% done, estimate finish Fri May 25 20:50:20 2018 > 34.39% done, estimate finish Fri May 25 20:50:22 2018 > 34.40% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 34.40% done, estimate finish Fri May 25 20:50:20 2018 > 34.41% done, estimate finish Fri May 25 20:50:22 2018 > 34.41% done, estimate finish Fri May 25 20:50:21 2018 > 34.42% done, estimate finish Fri May 25 20:50:20 2018 > 34.42% done, estimate finish Fri May 25 20:50:23 2018 > 34.43% done, estimate finish Fri May 25 20:50:22 2018 > 34.43% done, estimate finish Fri May 25 20:50:21 2018 > 34.43% done, estimate finish Fri May 25 20:50:20 2018 > 34.44% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 34.45% done, estimate finish Fri May 25 20:50:21 2018 > 34.45% done, estimate finish Fri May 25 20:50:20 2018 > 34.45% done, estimate finish Fri May 25 20:50:22 2018 > 34.46% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 34.47% done, estimate finish Fri May 25 20:50:23 2018 > 34.47% done, estimate finish Fri May 25 20:50:22 2018 > 34.47% done, estimate finish Fri May 25 20:50:21 2018 > 34.48% done, estimate finish Fri May 25 20:50:20 2018 > 34.48% done, estimate finish Fri May 25 20:50:22 2018 > 34.49% done, estimate finish Fri May 25 20:50:22 2018 > 34.49% done, estimate finish Fri May 25 20:50:21 2018 > 34.49% done, estimate finish Fri May 25 20:50:20 2018 > 34.50% done, estimate finish Fri May 25 20:50:22 2018 > 34.50% done, estimate finish Fri May 25 20:50:21 2018 > 34.51% done, estimate finish Fri May 25 20:50:21 2018 > 34.51% done, estimate finish Fri May 25 20:50:20 2018 > 34.52% done, estimate finish Fri May 25 20:50:22 2018 > 34.52% done, estimate finish Fri May 25 20:50:21 2018 > 34.52% done, estimate finish Fri May 25 20:50:20 2018 > 34.53% done, estimate finish Fri May 25 20:50:23 2018 > 34.53% done, estimate finish Fri May 25 20:50:22 2018 > 34.54% done, estimate finish Fri May 25 20:50:21 2018 > 34.54% done, estimate finish Fri May 25 20:50:20 2018 > 34.54% done, estimate finish Fri May 25 20:50:22 2018 > 34.55% done, estimate finish Fri May 25 20:50:22 2018 > 34.55% done, estimate finish Fri May 25 20:50:21 2018 > 34.56% done, estimate finish Fri May 25 20:50:20 2018 > 34.56% done, estimate finish Fri May 25 20:50:22 2018 > 34.56% done, estimate finish Fri May 25 20:50:21 2018 > 34.57% done, estimate finish Fri May 25 20:50:20 2018 >=== last message repeated 2 times. === > 34.58% done, estimate finish Fri May 25 20:50:22 2018 > 34.58% done, estimate finish Fri May 25 20:50:21 2018 > 34.59% done, estimate finish Fri May 25 20:50:20 2018 > 34.59% done, estimate finish Fri May 25 20:50:19 2018 > 34.59% done, estimate finish Fri May 25 20:50:22 2018 > 34.60% done, estimate finish Fri May 25 20:50:21 2018 > 34.60% done, estimate finish Fri May 25 20:50:20 2018 > 34.61% done, estimate finish Fri May 25 20:50:22 2018 > 34.61% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 34.62% done, estimate finish Fri May 25 20:50:20 2018 > 34.62% done, estimate finish Fri May 25 20:50:22 2018 > 34.63% done, estimate finish Fri May 25 20:50:21 2018 > 34.63% done, estimate finish Fri May 25 20:50:20 2018 >=== last message repeated 2 times. === > 34.64% done, estimate finish Fri May 25 20:50:22 2018 > 34.64% done, estimate finish Fri May 25 20:50:21 2018 > 34.65% done, estimate finish Fri May 25 20:50:20 2018 > 34.65% done, estimate finish Fri May 25 20:50:22 2018 > 34.65% done, estimate finish Fri May 25 20:50:21 2018 > 34.66% done, estimate finish Fri May 25 20:50:21 2018 > 34.66% done, estimate finish Fri May 25 20:50:23 2018 > 34.67% done, estimate finish Fri May 25 20:50:22 2018 > 34.67% done, estimate finish Fri May 25 20:50:21 2018 > 34.68% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 34.68% done, estimate finish Fri May 25 20:50:22 2018 > 34.69% done, estimate finish Fri May 25 20:50:24 2018 > 34.69% done, estimate finish Fri May 25 20:50:23 2018 > 34.70% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 34.70% done, estimate finish Fri May 25 20:50:24 2018 > 34.71% done, estimate finish Fri May 25 20:50:23 2018 > 34.71% done, estimate finish Fri May 25 20:50:22 2018 > 34.72% done, estimate finish Fri May 25 20:50:24 2018 > 34.72% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 34.73% done, estimate finish Fri May 25 20:50:25 2018 > 34.73% done, estimate finish Fri May 25 20:50:24 2018 > 34.74% done, estimate finish Fri May 25 20:50:23 2018 > 34.74% done, estimate finish Fri May 25 20:50:22 2018 > 34.74% done, estimate finish Fri May 25 20:50:25 2018 > 34.75% done, estimate finish Fri May 25 20:50:24 2018 > 34.75% done, estimate finish Fri May 25 20:50:23 2018 > 34.76% done, estimate finish Fri May 25 20:50:25 2018 > 34.76% done, estimate finish Fri May 25 20:50:24 2018 > 34.77% done, estimate finish Fri May 25 20:50:24 2018 > 34.77% done, estimate finish Fri May 25 20:50:23 2018 > 34.77% done, estimate finish Fri May 25 20:50:25 2018 > 34.78% done, estimate finish Fri May 25 20:50:24 2018 > 34.78% done, estimate finish Fri May 25 20:50:23 2018 > 34.79% done, estimate finish Fri May 25 20:50:23 2018 > 34.79% done, estimate finish Fri May 25 20:50:25 2018 > 34.79% done, estimate finish Fri May 25 20:50:24 2018 > 34.80% done, estimate finish Fri May 25 20:50:23 2018 > 34.80% done, estimate finish Fri May 25 20:50:22 2018 > 34.81% done, estimate finish Fri May 25 20:50:24 2018 >=== last message repeated 2 times. === > 34.81% done, estimate finish Fri May 25 20:50:23 2018 > 34.82% done, estimate finish Fri May 25 20:50:22 2018 > 34.82% done, estimate finish Fri May 25 20:50:24 2018 > 34.83% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 34.83% done, estimate finish Fri May 25 20:50:25 2018 > 34.84% done, estimate finish Fri May 25 20:50:24 2018 > 34.84% done, estimate finish Fri May 25 20:50:23 2018 > 34.85% done, estimate finish Fri May 25 20:50:22 2018 > 34.85% done, estimate finish Fri May 25 20:50:24 2018 > 34.86% done, estimate finish Fri May 25 20:50:24 2018 > 34.86% done, estimate finish Fri May 25 20:50:23 2018 > 34.86% done, estimate finish Fri May 25 20:50:22 2018 > 34.87% done, estimate finish Fri May 25 20:50:24 2018 > 34.87% done, estimate finish Fri May 25 20:50:23 2018 > 34.88% done, estimate finish Fri May 25 20:50:23 2018 > 34.88% done, estimate finish Fri May 25 20:50:25 2018 > 34.88% done, estimate finish Fri May 25 20:50:24 2018 > 34.89% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 34.90% done, estimate finish Fri May 25 20:50:25 2018 > 34.90% done, estimate finish Fri May 25 20:50:24 2018 > 34.90% done, estimate finish Fri May 25 20:50:23 2018 > 34.91% done, estimate finish Fri May 25 20:50:22 2018 > 34.91% done, estimate finish Fri May 25 20:50:24 2018 > 34.92% done, estimate finish Fri May 25 20:50:24 2018 > 34.92% done, estimate finish Fri May 25 20:50:23 2018 > 34.92% done, estimate finish Fri May 25 20:50:22 2018 > 34.93% done, estimate finish Fri May 25 20:50:24 2018 > 34.93% done, estimate finish Fri May 25 20:50:23 2018 > 34.94% done, estimate finish Fri May 25 20:50:23 2018 > 34.94% done, estimate finish Fri May 25 20:50:22 2018 > 34.95% done, estimate finish Fri May 25 20:50:24 2018 > 34.95% done, estimate finish Fri May 25 20:50:23 2018 > 34.95% done, estimate finish Fri May 25 20:50:22 2018 > 34.96% done, estimate finish Fri May 25 20:50:22 2018 > 34.96% done, estimate finish Fri May 25 20:50:24 2018 > 34.97% done, estimate finish Fri May 25 20:50:23 2018 > 34.97% done, estimate finish Fri May 25 20:50:22 2018 > 34.97% done, estimate finish Fri May 25 20:50:24 2018 > 34.98% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 34.99% done, estimate finish Fri May 25 20:50:22 2018 > 34.99% done, estimate finish Fri May 25 20:50:24 2018 > 34.99% done, estimate finish Fri May 25 20:50:23 2018 > 35.00% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 35.01% done, estimate finish Fri May 25 20:50:24 2018 > 35.01% done, estimate finish Fri May 25 20:50:23 2018 > 35.02% done, estimate finish Fri May 25 20:50:22 2018 > 35.02% done, estimate finish Fri May 25 20:50:21 2018 > 35.02% done, estimate finish Fri May 25 20:50:24 2018 > 35.03% done, estimate finish Fri May 25 20:50:23 2018 > 35.03% done, estimate finish Fri May 25 20:50:22 2018 > 35.04% done, estimate finish Fri May 25 20:50:24 2018 > 35.04% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 35.05% done, estimate finish Fri May 25 20:50:22 2018 > 35.05% done, estimate finish Fri May 25 20:50:24 2018 > 35.06% done, estimate finish Fri May 25 20:50:23 2018 > 35.06% done, estimate finish Fri May 25 20:50:22 2018 > 35.06% done, estimate finish Fri May 25 20:50:24 2018 > 35.07% done, estimate finish Fri May 25 20:50:24 2018 > 35.07% done, estimate finish Fri May 25 20:50:23 2018 > 35.08% done, estimate finish Fri May 25 20:50:25 2018 > 35.08% done, estimate finish Fri May 25 20:50:24 2018 > 35.08% done, estimate finish Fri May 25 20:50:23 2018 > 35.09% done, estimate finish Fri May 25 20:50:26 2018 > 35.09% done, estimate finish Fri May 25 20:50:25 2018 > 35.10% done, estimate finish Fri May 25 20:50:24 2018 > 35.10% done, estimate finish Fri May 25 20:50:26 2018 > 35.11% done, estimate finish Fri May 25 20:50:25 2018 > 35.11% done, estimate finish Fri May 25 20:50:24 2018 > 35.11% done, estimate finish Fri May 25 20:50:27 2018 > 35.12% done, estimate finish Fri May 25 20:50:26 2018 > 35.12% done, estimate finish Fri May 25 20:50:25 2018 > 35.13% done, estimate finish Fri May 25 20:50:27 2018 > 35.13% done, estimate finish Fri May 25 20:50:26 2018 >=== last message repeated 2 times. === > 35.14% done, estimate finish Fri May 25 20:50:25 2018 > 35.14% done, estimate finish Fri May 25 20:50:27 2018 > 35.15% done, estimate finish Fri May 25 20:50:26 2018 > 35.15% done, estimate finish Fri May 25 20:50:25 2018 >=== last message repeated 2 times. === > 35.16% done, estimate finish Fri May 25 20:50:27 2018 > 35.16% done, estimate finish Fri May 25 20:50:26 2018 > 35.17% done, estimate finish Fri May 25 20:50:25 2018 > 35.17% done, estimate finish Fri May 25 20:50:24 2018 > 35.17% done, estimate finish Fri May 25 20:50:26 2018 > 35.18% done, estimate finish Fri May 25 20:50:26 2018 > 35.18% done, estimate finish Fri May 25 20:50:25 2018 > 35.19% done, estimate finish Fri May 25 20:50:24 2018 > 35.19% done, estimate finish Fri May 25 20:50:26 2018 > 35.20% done, estimate finish Fri May 25 20:50:25 2018 >=== last message repeated 2 times. === > 35.20% done, estimate finish Fri May 25 20:50:27 2018 > 35.21% done, estimate finish Fri May 25 20:50:26 2018 > 35.21% done, estimate finish Fri May 25 20:50:25 2018 > 35.22% done, estimate finish Fri May 25 20:50:24 2018 > 35.22% done, estimate finish Fri May 25 20:50:27 2018 > 35.22% done, estimate finish Fri May 25 20:50:26 2018 > 35.23% done, estimate finish Fri May 25 20:50:25 2018 > 35.23% done, estimate finish Fri May 25 20:50:24 2018 > 35.24% done, estimate finish Fri May 25 20:50:26 2018 >=== last message repeated 2 times. === > 35.24% done, estimate finish Fri May 25 20:50:25 2018 > 35.25% done, estimate finish Fri May 25 20:50:27 2018 > 35.25% done, estimate finish Fri May 25 20:50:26 2018 > 35.26% done, estimate finish Fri May 25 20:50:25 2018 >=== last message repeated 2 times. === > 35.26% done, estimate finish Fri May 25 20:50:27 2018 > 35.27% done, estimate finish Fri May 25 20:50:26 2018 > 35.27% done, estimate finish Fri May 25 20:50:25 2018 > 35.28% done, estimate finish Fri May 25 20:50:24 2018 > 35.28% done, estimate finish Fri May 25 20:50:26 2018 > 35.29% done, estimate finish Fri May 25 20:50:26 2018 > 35.29% done, estimate finish Fri May 25 20:50:25 2018 > 35.29% done, estimate finish Fri May 25 20:50:24 2018 > 35.30% done, estimate finish Fri May 25 20:50:26 2018 > 35.30% done, estimate finish Fri May 25 20:50:25 2018 > 35.31% done, estimate finish Fri May 25 20:50:25 2018 > 35.31% done, estimate finish Fri May 25 20:50:24 2018 > 35.31% done, estimate finish Fri May 25 20:50:26 2018 > 35.32% done, estimate finish Fri May 25 20:50:25 2018 > 35.32% done, estimate finish Fri May 25 20:50:24 2018 > 35.33% done, estimate finish Fri May 25 20:50:26 2018 >=== last message repeated 2 times. === > 35.33% done, estimate finish Fri May 25 20:50:25 2018 > 35.34% done, estimate finish Fri May 25 20:50:24 2018 > 35.34% done, estimate finish Fri May 25 20:50:26 2018 > 35.35% done, estimate finish Fri May 25 20:50:25 2018 >=== last message repeated 2 times. === > 35.36% done, estimate finish Fri May 25 20:50:24 2018 > 35.36% done, estimate finish Fri May 25 20:50:26 2018 > 35.36% done, estimate finish Fri May 25 20:50:25 2018 > 35.37% done, estimate finish Fri May 25 20:50:25 2018 > 35.37% done, estimate finish Fri May 25 20:50:24 2018 > 35.38% done, estimate finish Fri May 25 20:50:26 2018 > 35.38% done, estimate finish Fri May 25 20:50:25 2018 > 35.38% done, estimate finish Fri May 25 20:50:24 2018 > 35.39% done, estimate finish Fri May 25 20:50:24 2018 > 35.39% done, estimate finish Fri May 25 20:50:26 2018 > 35.40% done, estimate finish Fri May 25 20:50:25 2018 > 35.40% done, estimate finish Fri May 25 20:50:24 2018 > 35.40% done, estimate finish Fri May 25 20:50:26 2018 > 35.41% done, estimate finish Fri May 25 20:50:25 2018 >=== last message repeated 2 times. === > 35.42% done, estimate finish Fri May 25 20:50:24 2018 > 35.42% done, estimate finish Fri May 25 20:50:26 2018 > 35.42% done, estimate finish Fri May 25 20:50:25 2018 > 35.43% done, estimate finish Fri May 25 20:50:24 2018 >=== last message repeated 2 times. === > 35.44% done, estimate finish Fri May 25 20:50:26 2018 > 35.44% done, estimate finish Fri May 25 20:50:25 2018 > 35.45% done, estimate finish Fri May 25 20:50:24 2018 > 35.45% done, estimate finish Fri May 25 20:50:26 2018 > 35.45% done, estimate finish Fri May 25 20:50:25 2018 > 35.46% done, estimate finish Fri May 25 20:50:25 2018 > 35.46% done, estimate finish Fri May 25 20:50:24 2018 > 35.47% done, estimate finish Fri May 25 20:50:26 2018 > 35.47% done, estimate finish Fri May 25 20:50:25 2018 > 35.47% done, estimate finish Fri May 25 20:50:24 2018 > 35.48% done, estimate finish Fri May 25 20:50:24 2018 > 35.48% done, estimate finish Fri May 25 20:50:26 2018 > 35.49% done, estimate finish Fri May 25 20:50:25 2018 > 35.49% done, estimate finish Fri May 25 20:50:24 2018 > 35.49% done, estimate finish Fri May 25 20:50:23 2018 > 35.50% done, estimate finish Fri May 25 20:50:26 2018 > 35.50% done, estimate finish Fri May 25 20:50:25 2018 > 35.51% done, estimate finish Fri May 25 20:50:24 2018 > 35.51% done, estimate finish Fri May 25 20:50:23 2018 > 35.51% done, estimate finish Fri May 25 20:50:25 2018 > 35.52% done, estimate finish Fri May 25 20:50:25 2018 > 35.52% done, estimate finish Fri May 25 20:50:24 2018 > 35.53% done, estimate finish Fri May 25 20:50:23 2018 > 35.53% done, estimate finish Fri May 25 20:50:25 2018 > 35.54% done, estimate finish Fri May 25 20:50:24 2018 >=== last message repeated 2 times. === > 35.54% done, estimate finish Fri May 25 20:50:26 2018 > 35.55% done, estimate finish Fri May 25 20:50:25 2018 > 35.55% done, estimate finish Fri May 25 20:50:24 2018 > 35.56% done, estimate finish Fri May 25 20:50:23 2018 > 35.56% done, estimate finish Fri May 25 20:50:25 2018 >=== last message repeated 2 times. === > 35.57% done, estimate finish Fri May 25 20:50:24 2018 > 35.57% done, estimate finish Fri May 25 20:50:23 2018 > 35.58% done, estimate finish Fri May 25 20:50:25 2018 > 35.58% done, estimate finish Fri May 25 20:50:24 2018 >=== last message repeated 2 times. === > 35.59% done, estimate finish Fri May 25 20:50:26 2018 > 35.59% done, estimate finish Fri May 25 20:50:25 2018 > 35.60% done, estimate finish Fri May 25 20:50:24 2018 > 35.60% done, estimate finish Fri May 25 20:50:23 2018 > 35.60% done, estimate finish Fri May 25 20:50:25 2018 > 35.61% done, estimate finish Fri May 25 20:50:25 2018 > 35.61% done, estimate finish Fri May 25 20:50:24 2018 > 35.62% done, estimate finish Fri May 25 20:50:23 2018 > 35.62% done, estimate finish Fri May 25 20:50:25 2018 > 35.63% done, estimate finish Fri May 25 20:50:25 2018 > 35.63% done, estimate finish Fri May 25 20:50:24 2018 > 35.63% done, estimate finish Fri May 25 20:50:23 2018 > 35.64% done, estimate finish Fri May 25 20:50:25 2018 > 35.64% done, estimate finish Fri May 25 20:50:24 2018 > 35.65% done, estimate finish Fri May 25 20:50:24 2018 > 35.65% done, estimate finish Fri May 25 20:50:26 2018 > 35.65% done, estimate finish Fri May 25 20:50:25 2018 > 35.66% done, estimate finish Fri May 25 20:50:24 2018 > 35.66% done, estimate finish Fri May 25 20:50:23 2018 > 35.67% done, estimate finish Fri May 25 20:50:25 2018 >=== last message repeated 2 times. === > 35.67% done, estimate finish Fri May 25 20:50:24 2018 > 35.68% done, estimate finish Fri May 25 20:50:23 2018 > 35.68% done, estimate finish Fri May 25 20:50:25 2018 > 35.69% done, estimate finish Fri May 25 20:50:24 2018 >=== last message repeated 2 times. === > 35.69% done, estimate finish Fri May 25 20:50:23 2018 > 35.70% done, estimate finish Fri May 25 20:50:25 2018 > 35.70% done, estimate finish Fri May 25 20:50:24 2018 > 35.71% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 35.72% done, estimate finish Fri May 25 20:50:25 2018 > 35.72% done, estimate finish Fri May 25 20:50:24 2018 > 35.72% done, estimate finish Fri May 25 20:50:23 2018 > 35.73% done, estimate finish Fri May 25 20:50:25 2018 > 35.73% done, estimate finish Fri May 25 20:50:24 2018 > 35.74% done, estimate finish Fri May 25 20:50:24 2018 > 35.74% done, estimate finish Fri May 25 20:50:23 2018 > 35.74% done, estimate finish Fri May 25 20:50:25 2018 > 35.75% done, estimate finish Fri May 25 20:50:24 2018 > 35.75% done, estimate finish Fri May 25 20:50:23 2018 > 35.76% done, estimate finish Fri May 25 20:50:23 2018 > 35.76% done, estimate finish Fri May 25 20:50:25 2018 > 35.76% done, estimate finish Fri May 25 20:50:24 2018 > 35.77% done, estimate finish Fri May 25 20:50:23 2018 > 35.77% done, estimate finish Fri May 25 20:50:25 2018 > 35.78% done, estimate finish Fri May 25 20:50:25 2018 > 35.78% done, estimate finish Fri May 25 20:50:24 2018 > 35.79% done, estimate finish Fri May 25 20:50:23 2018 > 35.79% done, estimate finish Fri May 25 20:50:25 2018 > 35.79% done, estimate finish Fri May 25 20:50:24 2018 > 35.80% done, estimate finish Fri May 25 20:50:24 2018 > 35.80% done, estimate finish Fri May 25 20:50:23 2018 > 35.81% done, estimate finish Fri May 25 20:50:25 2018 > 35.81% done, estimate finish Fri May 25 20:50:24 2018 > 35.81% done, estimate finish Fri May 25 20:50:23 2018 > 35.82% done, estimate finish Fri May 25 20:50:23 2018 > 35.82% done, estimate finish Fri May 25 20:50:25 2018 > 35.83% done, estimate finish Fri May 25 20:50:24 2018 > 35.83% done, estimate finish Fri May 25 20:50:23 2018 > 35.83% done, estimate finish Fri May 25 20:50:31 2018 > 35.84% done, estimate finish Fri May 25 20:50:33 2018 > 35.84% done, estimate finish Fri May 25 20:50:32 2018 > 35.85% done, estimate finish Fri May 25 20:50:34 2018 > 35.85% done, estimate finish Fri May 25 20:50:33 2018 >=== last message repeated 2 times. === > 35.86% done, estimate finish Fri May 25 20:50:32 2018 > 35.86% done, estimate finish Fri May 25 20:50:31 2018 > 35.87% done, estimate finish Fri May 25 20:50:30 2018 > 35.87% done, estimate finish Fri May 25 20:50:32 2018 > 35.88% done, estimate finish Fri May 25 20:50:32 2018 > 35.88% done, estimate finish Fri May 25 20:50:31 2018 > 35.88% done, estimate finish Fri May 25 20:50:30 2018 > 35.89% done, estimate finish Fri May 25 20:50:29 2018 >=== last message repeated 2 times. === > 35.90% done, estimate finish Fri May 25 20:50:28 2018 > 35.90% done, estimate finish Fri May 25 20:50:30 2018 > 35.90% done, estimate finish Fri May 25 20:50:29 2018 > 35.91% done, estimate finish Fri May 25 20:50:28 2018 >=== last message repeated 2 times. === > 35.92% done, estimate finish Fri May 25 20:50:27 2018 > 35.92% done, estimate finish Fri May 25 20:50:26 2018 > 35.92% done, estimate finish Fri May 25 20:50:28 2018 > 35.93% done, estimate finish Fri May 25 20:50:27 2018 >=== last message repeated 2 times. === > 35.94% done, estimate finish Fri May 25 20:50:26 2018 > 35.94% done, estimate finish Fri May 25 20:50:25 2018 > 35.94% done, estimate finish Fri May 25 20:50:24 2018 > 35.95% done, estimate finish Fri May 25 20:50:24 2018 > 35.95% done, estimate finish Fri May 25 20:50:26 2018 > 35.96% done, estimate finish Fri May 25 20:50:25 2018 > 35.96% done, estimate finish Fri May 25 20:50:24 2018 > 35.97% done, estimate finish Fri May 25 20:50:23 2018 >=== last message repeated 2 times. === > 35.97% done, estimate finish Fri May 25 20:50:22 2018 > 35.98% done, estimate finish Fri May 25 20:50:24 2018 > 35.98% done, estimate finish Fri May 25 20:50:23 2018 > 35.99% done, estimate finish Fri May 25 20:50:22 2018 >=== last message repeated 2 times. === > 35.99% done, estimate finish Fri May 25 20:50:21 2018 > 36.00% done, estimate finish Fri May 25 20:50:20 2018 > 36.00% done, estimate finish Fri May 25 20:50:22 2018 > 36.01% done, estimate finish Fri May 25 20:50:21 2018 >=== last message repeated 2 times. === > 36.01% done, estimate finish Fri May 25 20:50:20 2018 > 36.02% done, estimate finish Fri May 25 20:50:19 2018 > 36.02% done, estimate finish Fri May 25 20:50:18 2018 > 36.03% done, estimate finish Fri May 25 20:50:18 2018 > 36.03% done, estimate finish Fri May 25 20:50:20 2018 > 36.03% done, estimate finish Fri May 25 20:50:19 2018 > 36.04% done, estimate finish Fri May 25 20:50:18 2018 > 36.04% done, estimate finish Fri May 25 20:50:17 2018 > 36.05% done, estimate finish Fri May 25 20:50:17 2018 > 36.05% done, estimate finish Fri May 25 20:50:16 2018 > 36.06% done, estimate finish Fri May 25 20:50:18 2018 > 36.06% done, estimate finish Fri May 25 20:50:17 2018 >=== last message repeated 2 times. === > 36.07% done, estimate finish Fri May 25 20:50:16 2018 > 36.07% done, estimate finish Fri May 25 20:50:15 2018 > 36.08% done, estimate finish Fri May 25 20:50:14 2018 >=== last message repeated 2 times. === > 36.08% done, estimate finish Fri May 25 20:50:16 2018 > 36.09% done, estimate finish Fri May 25 20:50:15 2018 > 36.09% done, estimate finish Fri May 25 20:50:14 2018 > 36.10% done, estimate finish Fri May 25 20:50:13 2018 >=== last message repeated 2 times. === > 36.10% done, estimate finish Fri May 25 20:50:12 2018 > 36.11% done, estimate finish Fri May 25 20:50:14 2018 > 36.11% done, estimate finish Fri May 25 20:50:13 2018 > 36.12% done, estimate finish Fri May 25 20:50:12 2018 >=== last message repeated 2 times. === > 36.13% done, estimate finish Fri May 25 20:50:11 2018 > 36.13% done, estimate finish Fri May 25 20:50:10 2018 > 36.13% done, estimate finish Fri May 25 20:50:12 2018 > 36.14% done, estimate finish Fri May 25 20:50:11 2018 >=== last message repeated 2 times. === > 36.15% done, estimate finish Fri May 25 20:50:10 2018 > 36.15% done, estimate finish Fri May 25 20:50:09 2018 > 36.15% done, estimate finish Fri May 25 20:50:08 2018 > 36.16% done, estimate finish Fri May 25 20:50:08 2018 > 36.16% done, estimate finish Fri May 25 20:50:10 2018 > 36.17% done, estimate finish Fri May 25 20:50:09 2018 > 36.17% done, estimate finish Fri May 25 20:50:08 2018 > 36.17% done, estimate finish Fri May 25 20:50:07 2018 > 36.18% done, estimate finish Fri May 25 20:50:07 2018 > 36.18% done, estimate finish Fri May 25 20:50:06 2018 > 36.19% done, estimate finish Fri May 25 20:50:08 2018 > 36.19% done, estimate finish Fri May 25 20:50:07 2018 >=== last message repeated 2 times. === > 36.20% done, estimate finish Fri May 25 20:50:06 2018 > 36.20% done, estimate finish Fri May 25 20:50:05 2018 > 36.21% done, estimate finish Fri May 25 20:50:04 2018 > 36.21% done, estimate finish Fri May 25 20:50:06 2018 > 36.22% done, estimate finish Fri May 25 20:50:06 2018 > 36.22% done, estimate finish Fri May 25 20:50:05 2018 > 36.22% done, estimate finish Fri May 25 20:50:04 2018 > 36.23% done, estimate finish Fri May 25 20:50:03 2018 >=== last message repeated 2 times. === > 36.24% done, estimate finish Fri May 25 20:50:02 2018 > 36.24% done, estimate finish Fri May 25 20:50:04 2018 > 36.24% done, estimate finish Fri May 25 20:50:03 2018 > 36.25% done, estimate finish Fri May 25 20:50:02 2018 >=== last message repeated 2 times. === > 36.26% done, estimate finish Fri May 25 20:50:01 2018 > 36.26% done, estimate finish Fri May 25 20:50:00 2018 > 36.26% done, estimate finish Fri May 25 20:49:59 2018 > 36.27% done, estimate finish Fri May 25 20:50:01 2018 >=== last message repeated 2 times. === > 36.28% done, estimate finish Fri May 25 20:50:00 2018 > 36.28% done, estimate finish Fri May 25 20:49:59 2018 > 36.28% done, estimate finish Fri May 25 20:49:58 2018 > 36.29% done, estimate finish Fri May 25 20:49:58 2018 > 36.29% done, estimate finish Fri May 25 20:50:00 2018 > 36.30% done, estimate finish Fri May 25 20:49:59 2018 > 36.30% done, estimate finish Fri May 25 20:49:58 2018 > 36.31% done, estimate finish Fri May 25 20:49:58 2018 > 36.31% done, estimate finish Fri May 25 20:49:57 2018 > 36.31% done, estimate finish Fri May 25 20:49:56 2018 > 36.32% done, estimate finish Fri May 25 20:49:58 2018 > 36.32% done, estimate finish Fri May 25 20:49:57 2018 > 36.33% done, estimate finish Fri May 25 20:49:57 2018 > 36.33% done, estimate finish Fri May 25 20:49:56 2018 > 36.33% done, estimate finish Fri May 25 20:49:55 2018 > 36.34% done, estimate finish Fri May 25 20:49:54 2018 > 36.34% done, estimate finish Fri May 25 20:49:56 2018 > 36.35% done, estimate finish Fri May 25 20:49:56 2018 > 36.35% done, estimate finish Fri May 25 20:49:55 2018 > 36.35% done, estimate finish Fri May 25 20:49:54 2018 > 36.36% done, estimate finish Fri May 25 20:49:53 2018 >=== last message repeated 2 times. === > 36.37% done, estimate finish Fri May 25 20:49:52 2018 > 36.37% done, estimate finish Fri May 25 20:49:54 2018 > 36.37% done, estimate finish Fri May 25 20:49:53 2018 > 36.38% done, estimate finish Fri May 25 20:49:52 2018 >=== last message repeated 2 times. === > 36.39% done, estimate finish Fri May 25 20:49:51 2018 > 36.39% done, estimate finish Fri May 25 20:49:50 2018 > 36.40% done, estimate finish Fri May 25 20:49:52 2018 >=== last message repeated 2 times. === > 36.40% done, estimate finish Fri May 25 20:49:51 2018 > 36.41% done, estimate finish Fri May 25 20:49:50 2018 > 36.41% done, estimate finish Fri May 25 20:49:49 2018 > 36.42% done, estimate finish Fri May 25 20:49:49 2018 > 36.42% done, estimate finish Fri May 25 20:49:48 2018 > 36.42% done, estimate finish Fri May 25 20:49:50 2018 > 36.43% done, estimate finish Fri May 25 20:49:49 2018 > 36.43% done, estimate finish Fri May 25 20:49:48 2018 > 36.44% done, estimate finish Fri May 25 20:49:48 2018 > 36.44% done, estimate finish Fri May 25 20:49:47 2018 > 36.44% done, estimate finish Fri May 25 20:49:46 2018 > 36.45% done, estimate finish Fri May 25 20:49:48 2018 > 36.45% done, estimate finish Fri May 25 20:49:47 2018 > 36.46% done, estimate finish Fri May 25 20:49:47 2018 > 36.46% done, estimate finish Fri May 25 20:49:46 2018 > 36.46% done, estimate finish Fri May 25 20:49:45 2018 > 36.47% done, estimate finish Fri May 25 20:49:44 2018 >=== last message repeated 2 times. === > 36.48% done, estimate finish Fri May 25 20:49:46 2018 > 36.48% done, estimate finish Fri May 25 20:49:45 2018 > 36.49% done, estimate finish Fri May 25 20:49:44 2018 >=== last message repeated 2 times. === > 36.49% done, estimate finish Fri May 25 20:49:43 2018 > 36.50% done, estimate finish Fri May 25 20:49:42 2018 > 36.50% done, estimate finish Fri May 25 20:49:44 2018 > 36.51% done, estimate finish Fri May 25 20:49:43 2018 >=== last message repeated 2 times. === > 36.51% done, estimate finish Fri May 25 20:49:42 2018 > 36.52% done, estimate finish Fri May 25 20:49:41 2018 > 36.52% done, estimate finish Fri May 25 20:49:40 2018 > 36.53% done, estimate finish Fri May 25 20:49:42 2018 >=== last message repeated 2 times. === > 36.53% done, estimate finish Fri May 25 20:49:41 2018 > 36.54% done, estimate finish Fri May 25 20:49:40 2018 >=== last message repeated 2 times. === > 36.55% done, estimate finish Fri May 25 20:49:39 2018 > 36.55% done, estimate finish Fri May 25 20:49:38 2018 > 36.56% done, estimate finish Fri May 25 20:49:40 2018 > 36.56% done, estimate finish Fri May 25 20:49:39 2018 >=== last message repeated 2 times. === > 36.57% done, estimate finish Fri May 25 20:49:38 2018 > 36.57% done, estimate finish Fri May 25 20:49:37 2018 > 36.58% done, estimate finish Fri May 25 20:49:36 2018 > 36.58% done, estimate finish Fri May 25 20:49:38 2018 >=== last message repeated 2 times. === > 36.59% done, estimate finish Fri May 25 20:49:37 2018 > 36.59% done, estimate finish Fri May 25 20:49:36 2018 > 36.60% done, estimate finish Fri May 25 20:49:35 2018 >=== last message repeated 2 times. === > 36.60% done, estimate finish Fri May 25 20:49:37 2018 > 36.61% done, estimate finish Fri May 25 20:49:36 2018 > 36.61% done, estimate finish Fri May 25 20:49:35 2018 > 36.62% done, estimate finish Fri May 25 20:49:35 2018 > 36.62% done, estimate finish Fri May 25 20:49:34 2018 > 36.62% done, estimate finish Fri May 25 20:49:33 2018 > 36.63% done, estimate finish Fri May 25 20:49:32 2018 > 36.63% done, estimate finish Fri May 25 20:49:34 2018 > 36.64% done, estimate finish Fri May 25 20:49:34 2018 > 36.64% done, estimate finish Fri May 25 20:49:33 2018 > 36.65% done, estimate finish Fri May 25 20:49:32 2018 > 36.65% done, estimate finish Fri May 25 20:49:31 2018 >=== last message repeated 2 times. === > 36.66% done, estimate finish Fri May 25 20:49:33 2018 > 36.66% done, estimate finish Fri May 25 20:49:32 2018 > 36.67% done, estimate finish Fri May 25 20:49:31 2018 > 36.67% done, estimate finish Fri May 25 20:49:30 2018 >=== last message repeated 2 times. === > 36.68% done, estimate finish Fri May 25 20:49:29 2018 > 36.68% done, estimate finish Fri May 25 20:49:28 2018 > 36.69% done, estimate finish Fri May 25 20:49:30 2018 >=== last message repeated 2 times. === > 36.69% done, estimate finish Fri May 25 20:49:29 2018 > 36.70% done, estimate finish Fri May 25 20:49:28 2018 > 36.70% done, estimate finish Fri May 25 20:49:27 2018 > 36.71% done, estimate finish Fri May 25 20:49:27 2018 > 36.71% done, estimate finish Fri May 25 20:49:29 2018 > 36.71% done, estimate finish Fri May 25 20:49:28 2018 > 36.72% done, estimate finish Fri May 25 20:49:27 2018 > 36.72% done, estimate finish Fri May 25 20:49:26 2018 > 36.73% done, estimate finish Fri May 25 20:49:26 2018 > 36.73% done, estimate finish Fri May 25 20:49:25 2018 > 36.74% done, estimate finish Fri May 25 20:49:27 2018 > 36.74% done, estimate finish Fri May 25 20:49:26 2018 >=== last message repeated 2 times. === > 36.75% done, estimate finish Fri May 25 20:49:25 2018 > 36.75% done, estimate finish Fri May 25 20:49:24 2018 > 36.76% done, estimate finish Fri May 25 20:49:23 2018 >=== last message repeated 2 times. === > 36.76% done, estimate finish Fri May 25 20:49:25 2018 > 36.77% done, estimate finish Fri May 25 20:49:24 2018 > 36.77% done, estimate finish Fri May 25 20:49:23 2018 > 36.78% done, estimate finish Fri May 25 20:49:22 2018 >=== last message repeated 2 times. === > 36.78% done, estimate finish Fri May 25 20:49:21 2018 > 36.79% done, estimate finish Fri May 25 20:49:23 2018 > 36.79% done, estimate finish Fri May 25 20:49:22 2018 > 36.80% done, estimate finish Fri May 25 20:49:22 2018 > 36.80% done, estimate finish Fri May 25 20:49:21 2018 > 36.80% done, estimate finish Fri May 25 20:49:20 2018 > 36.81% done, estimate finish Fri May 25 20:49:19 2018 > 36.81% done, estimate finish Fri May 25 20:49:21 2018 > 36.82% done, estimate finish Fri May 25 20:49:21 2018 > 36.82% done, estimate finish Fri May 25 20:49:20 2018 > 36.83% done, estimate finish Fri May 25 20:49:19 2018 > 36.83% done, estimate finish Fri May 25 20:49:18 2018 >=== last message repeated 2 times. === > 36.84% done, estimate finish Fri May 25 20:49:17 2018 > 36.84% done, estimate finish Fri May 25 20:49:19 2018 > 36.85% done, estimate finish Fri May 25 20:49:18 2018 >=== last message repeated 2 times. === > 36.85% done, estimate finish Fri May 25 20:49:17 2018 > 36.86% done, estimate finish Fri May 25 20:49:16 2018 > 36.86% done, estimate finish Fri May 25 20:49:15 2018 > 36.87% done, estimate finish Fri May 25 20:49:17 2018 >=== last message repeated 2 times. === > 36.87% done, estimate finish Fri May 25 20:49:16 2018 > 36.88% done, estimate finish Fri May 25 20:49:15 2018 > 36.88% done, estimate finish Fri May 25 20:49:14 2018 > 36.89% done, estimate finish Fri May 25 20:49:14 2018 > 36.89% done, estimate finish Fri May 25 20:49:13 2018 > 36.90% done, estimate finish Fri May 25 20:49:15 2018 > 36.90% done, estimate finish Fri May 25 20:49:14 2018 >=== last message repeated 2 times. === > 36.91% done, estimate finish Fri May 25 20:49:13 2018 > 36.91% done, estimate finish Fri May 25 20:49:12 2018 > 36.92% done, estimate finish Fri May 25 20:49:11 2018 > 36.92% done, estimate finish Fri May 25 20:49:13 2018 >=== last message repeated 2 times. === > 36.93% done, estimate finish Fri May 25 20:49:12 2018 > 36.93% done, estimate finish Fri May 25 20:49:11 2018 > 36.94% done, estimate finish Fri May 25 20:49:10 2018 >=== last message repeated 2 times. === > 36.94% done, estimate finish Fri May 25 20:49:12 2018 > 36.95% done, estimate finish Fri May 25 20:49:11 2018 > 36.95% done, estimate finish Fri May 25 20:49:10 2018 > 36.96% done, estimate finish Fri May 25 20:49:10 2018 > 36.96% done, estimate finish Fri May 25 20:49:09 2018 > 36.96% done, estimate finish Fri May 25 20:49:08 2018 > 36.97% done, estimate finish Fri May 25 20:49:07 2018 > 36.97% done, estimate finish Fri May 25 20:49:09 2018 > 36.98% done, estimate finish Fri May 25 20:49:09 2018 > 36.98% done, estimate finish Fri May 25 20:49:08 2018 > 36.99% done, estimate finish Fri May 25 20:49:07 2018 >=== last message repeated 2 times. === > 36.99% done, estimate finish Fri May 25 20:49:06 2018 > 37.00% done, estimate finish Fri May 25 20:49:08 2018 > 37.00% done, estimate finish Fri May 25 20:49:07 2018 > 37.01% done, estimate finish Fri May 25 20:49:06 2018 >=== last message repeated 2 times. === > 37.01% done, estimate finish Fri May 25 20:49:05 2018 > 37.02% done, estimate finish Fri May 25 20:49:04 2018 > 37.02% done, estimate finish Fri May 25 20:49:06 2018 > 37.03% done, estimate finish Fri May 25 20:49:05 2018 >=== last message repeated 2 times. === > 37.03% done, estimate finish Fri May 25 20:49:04 2018 > 37.04% done, estimate finish Fri May 25 20:49:03 2018 >=== last message repeated 2 times. === > 37.05% done, estimate finish Fri May 25 20:49:05 2018 > 37.05% done, estimate finish Fri May 25 20:49:04 2018 > 37.05% done, estimate finish Fri May 25 20:49:03 2018 > 37.06% done, estimate finish Fri May 25 20:49:02 2018 >=== last message repeated 2 times. === > 37.07% done, estimate finish Fri May 25 20:49:01 2018 > 37.07% done, estimate finish Fri May 25 20:49:00 2018 > 37.08% done, estimate finish Fri May 25 20:49:02 2018 > 37.08% done, estimate finish Fri May 25 20:49:01 2018 >=== last message repeated 2 times. === > 37.09% done, estimate finish Fri May 25 20:49:00 2018 > 37.09% done, estimate finish Fri May 25 20:48:59 2018 > 37.10% done, estimate finish Fri May 25 20:48:59 2018 > 37.10% done, estimate finish Fri May 25 20:48:58 2018 > 37.10% done, estimate finish Fri May 25 20:49:00 2018 > 37.11% done, estimate finish Fri May 25 20:48:59 2018 > 37.11% done, estimate finish Fri May 25 20:48:58 2018 > 37.12% done, estimate finish Fri May 25 20:48:58 2018 > 37.12% done, estimate finish Fri May 25 20:48:57 2018 > 37.12% done, estimate finish Fri May 25 20:48:56 2018 > 37.13% done, estimate finish Fri May 25 20:48:58 2018 >=== last message repeated 2 times. === > 37.14% done, estimate finish Fri May 25 20:48:57 2018 > 37.14% done, estimate finish Fri May 25 20:48:56 2018 > 37.14% done, estimate finish Fri May 25 20:48:55 2018 > 37.15% done, estimate finish Fri May 25 20:48:55 2018 > 37.15% done, estimate finish Fri May 25 20:48:57 2018 > 37.16% done, estimate finish Fri May 25 20:48:56 2018 > 37.16% done, estimate finish Fri May 25 20:48:55 2018 > 37.17% done, estimate finish Fri May 25 20:48:54 2018 >=== last message repeated 2 times. === > 37.17% done, estimate finish Fri May 25 20:48:53 2018 > 37.18% done, estimate finish Fri May 25 20:48:52 2018 > 37.18% done, estimate finish Fri May 25 20:48:54 2018 > 37.19% done, estimate finish Fri May 25 20:48:54 2018 > 37.19% done, estimate finish Fri May 25 20:48:53 2018 > 37.19% done, estimate finish Fri May 25 20:48:52 2018 > 37.20% done, estimate finish Fri May 25 20:48:51 2018 >=== last message repeated 2 times. === > 37.21% done, estimate finish Fri May 25 20:48:53 2018 > 37.21% done, estimate finish Fri May 25 20:48:52 2018 > 37.21% done, estimate finish Fri May 25 20:48:51 2018 > 37.22% done, estimate finish Fri May 25 20:48:51 2018 > 37.22% done, estimate finish Fri May 25 20:48:50 2018 > 37.23% done, estimate finish Fri May 25 20:48:49 2018 > 37.23% done, estimate finish Fri May 25 20:48:51 2018 > 37.23% done, estimate finish Fri May 25 20:48:50 2018 > 37.24% done, estimate finish Fri May 25 20:48:50 2018 > 37.24% done, estimate finish Fri May 25 20:48:49 2018 > 37.25% done, estimate finish Fri May 25 20:48:48 2018 >=== last message repeated 2 times. === > 37.26% done, estimate finish Fri May 25 20:48:47 2018 > 37.26% done, estimate finish Fri May 25 20:48:49 2018 > 37.26% done, estimate finish Fri May 25 20:48:48 2018 > 37.27% done, estimate finish Fri May 25 20:48:47 2018 >=== last message repeated 2 times. === > 37.28% done, estimate finish Fri May 25 20:48:46 2018 > 37.28% done, estimate finish Fri May 25 20:48:45 2018 > 37.28% done, estimate finish Fri May 25 20:48:47 2018 > 37.29% done, estimate finish Fri May 25 20:48:46 2018 >=== last message repeated 2 times. === > 37.30% done, estimate finish Fri May 25 20:48:45 2018 > 37.30% done, estimate finish Fri May 25 20:48:44 2018 >=== last message repeated 2 times. === > 37.31% done, estimate finish Fri May 25 20:48:46 2018 > 37.31% done, estimate finish Fri May 25 20:48:45 2018 > 37.32% done, estimate finish Fri May 25 20:48:44 2018 > 37.32% done, estimate finish Fri May 25 20:48:43 2018 > 37.33% done, estimate finish Fri May 25 20:48:43 2018 > 37.33% done, estimate finish Fri May 25 20:48:42 2018 > 37.33% done, estimate finish Fri May 25 20:48:41 2018 > 37.34% done, estimate finish Fri May 25 20:48:43 2018 >=== last message repeated 2 times. === > 37.35% done, estimate finish Fri May 25 20:48:42 2018 > 37.35% done, estimate finish Fri May 25 20:48:41 2018 > 37.35% done, estimate finish Fri May 25 20:48:40 2018 > 37.36% done, estimate finish Fri May 25 20:48:40 2018 > 37.36% done, estimate finish Fri May 25 20:48:42 2018 > 37.37% done, estimate finish Fri May 25 20:48:41 2018 > 37.37% done, estimate finish Fri May 25 20:48:40 2018 >=== last message repeated 2 times. === > 37.38% done, estimate finish Fri May 25 20:48:39 2018 > 37.38% done, estimate finish Fri May 25 20:48:38 2018 > 37.39% done, estimate finish Fri May 25 20:48:37 2018 > 37.39% done, estimate finish Fri May 25 20:48:39 2018 >=== last message repeated 2 times. === > 37.40% done, estimate finish Fri May 25 20:48:38 2018 > 37.40% done, estimate finish Fri May 25 20:48:37 2018 > 37.41% done, estimate finish Fri May 25 20:48:37 2018 > 37.41% done, estimate finish Fri May 25 20:48:36 2018 > 37.42% done, estimate finish Fri May 25 20:48:38 2018 > 37.42% done, estimate finish Fri May 25 20:48:37 2018 > 37.42% done, estimate finish Fri May 25 20:48:36 2018 > 37.43% done, estimate finish Fri May 25 20:48:36 2018 > 37.43% done, estimate finish Fri May 25 20:48:35 2018 > 37.44% done, estimate finish Fri May 25 20:48:34 2018 > 37.44% done, estimate finish Fri May 25 20:48:36 2018 >=== last message repeated 2 times. === > 37.45% done, estimate finish Fri May 25 20:48:35 2018 > 37.45% done, estimate finish Fri May 25 20:48:34 2018 > 37.46% done, estimate finish Fri May 25 20:48:33 2018 >=== last message repeated 2 times. === > 37.46% done, estimate finish Fri May 25 20:48:32 2018 > 37.47% done, estimate finish Fri May 25 20:48:34 2018 > 37.47% done, estimate finish Fri May 25 20:48:33 2018 > 37.48% done, estimate finish Fri May 25 20:48:33 2018 > 37.48% done, estimate finish Fri May 25 20:48:32 2018 > 37.48% done, estimate finish Fri May 25 20:48:31 2018 > 37.49% done, estimate finish Fri May 25 20:48:30 2018 > 37.49% done, estimate finish Fri May 25 20:48:32 2018 > 37.50% done, estimate finish Fri May 25 20:48:32 2018 > 37.50% done, estimate finish Fri May 25 20:48:31 2018 > 37.51% done, estimate finish Fri May 25 20:48:30 2018 >=== last message repeated 2 times. === > 37.51% done, estimate finish Fri May 25 20:48:29 2018 > 37.52% done, estimate finish Fri May 25 20:48:31 2018 > 37.52% done, estimate finish Fri May 25 20:48:30 2018 > 37.53% done, estimate finish Fri May 25 20:48:29 2018 >=== last message repeated 2 times. === > 37.53% done, estimate finish Fri May 25 20:48:28 2018 > 37.54% done, estimate finish Fri May 25 20:48:27 2018 > 37.54% done, estimate finish Fri May 25 20:48:29 2018 > 37.55% done, estimate finish Fri May 25 20:48:29 2018 > 37.55% done, estimate finish Fri May 25 20:48:28 2018 > 37.55% done, estimate finish Fri May 25 20:48:27 2018 > 37.56% done, estimate finish Fri May 25 20:48:26 2018 >=== last message repeated 2 times. === > 37.57% done, estimate finish Fri May 25 20:48:25 2018 > 37.57% done, estimate finish Fri May 25 20:48:27 2018 > 37.57% done, estimate finish Fri May 25 20:48:26 2018 > 37.58% done, estimate finish Fri May 25 20:48:26 2018 > 37.58% done, estimate finish Fri May 25 20:48:25 2018 > 37.59% done, estimate finish Fri May 25 20:48:24 2018 > 37.59% done, estimate finish Fri May 25 20:48:23 2018 > 37.60% done, estimate finish Fri May 25 20:48:25 2018 >=== last message repeated 2 times. === > 37.60% done, estimate finish Fri May 25 20:48:24 2018 > 37.61% done, estimate finish Fri May 25 20:48:23 2018 >=== last message repeated 2 times. === > 37.62% done, estimate finish Fri May 25 20:48:22 2018 > 37.62% done, estimate finish Fri May 25 20:48:24 2018 > 37.62% done, estimate finish Fri May 25 20:48:23 2018 > 37.63% done, estimate finish Fri May 25 20:48:22 2018 >=== last message repeated 2 times. === > 37.64% done, estimate finish Fri May 25 20:48:21 2018 > 37.64% done, estimate finish Fri May 25 20:48:20 2018 >=== last message repeated 2 times. === > 37.65% done, estimate finish Fri May 25 20:48:22 2018 > 37.65% done, estimate finish Fri May 25 20:48:21 2018 > 37.66% done, estimate finish Fri May 25 20:48:20 2018 > 37.66% done, estimate finish Fri May 25 20:48:19 2018 > 37.67% done, estimate finish Fri May 25 20:48:19 2018 > 37.67% done, estimate finish Fri May 25 20:48:18 2018 > 37.67% done, estimate finish Fri May 25 20:48:20 2018 > 37.68% done, estimate finish Fri May 25 20:48:19 2018 >=== last message repeated 2 times. === > 37.69% done, estimate finish Fri May 25 20:48:18 2018 > 37.69% done, estimate finish Fri May 25 20:48:17 2018 > 37.69% done, estimate finish Fri May 25 20:48:16 2018 > 37.70% done, estimate finish Fri May 25 20:48:16 2018 > 37.70% done, estimate finish Fri May 25 20:48:18 2018 > 37.71% done, estimate finish Fri May 25 20:48:17 2018 > 37.71% done, estimate finish Fri May 25 20:48:16 2018 >=== last message repeated 2 times. === > 37.72% done, estimate finish Fri May 25 20:48:15 2018 > 37.72% done, estimate finish Fri May 25 20:48:14 2018 > 37.73% done, estimate finish Fri May 25 20:48:16 2018 > 37.73% done, estimate finish Fri May 25 20:48:15 2018 >=== last message repeated 2 times. === > 37.74% done, estimate finish Fri May 25 20:48:14 2018 > 37.74% done, estimate finish Fri May 25 20:48:13 2018 > 37.75% done, estimate finish Fri May 25 20:48:13 2018 > 37.75% done, estimate finish Fri May 25 20:48:12 2018 > 37.76% done, estimate finish Fri May 25 20:48:14 2018 > 37.76% done, estimate finish Fri May 25 20:48:13 2018 > 37.76% done, estimate finish Fri May 25 20:48:12 2018 > 37.77% done, estimate finish Fri May 25 20:48:12 2018 > 37.77% done, estimate finish Fri May 25 20:48:11 2018 > 37.78% done, estimate finish Fri May 25 20:48:10 2018 > 37.78% done, estimate finish Fri May 25 20:48:12 2018 >=== last message repeated 2 times. === > 37.79% done, estimate finish Fri May 25 20:48:11 2018 > 37.79% done, estimate finish Fri May 25 20:48:10 2018 > 37.80% done, estimate finish Fri May 25 20:48:10 2018 > 37.80% done, estimate finish Fri May 25 20:48:09 2018 > 37.80% done, estimate finish Fri May 25 20:48:11 2018 > 37.81% done, estimate finish Fri May 25 20:48:10 2018 > 37.81% done, estimate finish Fri May 25 20:48:09 2018 > 37.82% done, estimate finish Fri May 25 20:48:09 2018 > 37.82% done, estimate finish Fri May 25 20:48:08 2018 > 37.82% done, estimate finish Fri May 25 20:48:07 2018 > 37.83% done, estimate finish Fri May 25 20:48:09 2018 >=== last message repeated 2 times. === > 37.84% done, estimate finish Fri May 25 20:48:08 2018 > 37.84% done, estimate finish Fri May 25 20:48:07 2018 > 37.85% done, estimate finish Fri May 25 20:48:06 2018 >=== last message repeated 2 times. === > 37.85% done, estimate finish Fri May 25 20:48:05 2018 > 37.86% done, estimate finish Fri May 25 20:48:07 2018 > 37.86% done, estimate finish Fri May 25 20:48:06 2018 > 37.87% done, estimate finish Fri May 25 20:48:06 2018 > 37.87% done, estimate finish Fri May 25 20:48:05 2018 > 37.87% done, estimate finish Fri May 25 20:48:04 2018 > 37.88% done, estimate finish Fri May 25 20:48:03 2018 > 37.88% done, estimate finish Fri May 25 20:48:05 2018 > 37.89% done, estimate finish Fri May 25 20:48:05 2018 > 37.89% done, estimate finish Fri May 25 20:48:04 2018 > 37.89% done, estimate finish Fri May 25 20:48:03 2018 > 37.90% done, estimate finish Fri May 25 20:48:03 2018 > 37.90% done, estimate finish Fri May 25 20:48:02 2018 > 37.91% done, estimate finish Fri May 25 20:48:01 2018 > 37.91% done, estimate finish Fri May 25 20:48:03 2018 >=== last message repeated 2 times. === > 37.92% done, estimate finish Fri May 25 20:48:02 2018 > 37.92% done, estimate finish Fri May 25 20:48:01 2018 > 37.93% done, estimate finish Fri May 25 20:48:00 2018 >=== last message repeated 2 times. === > 37.94% done, estimate finish Fri May 25 20:48:02 2018 > 37.94% done, estimate finish Fri May 25 20:48:01 2018 > 37.94% done, estimate finish Fri May 25 20:48:00 2018 > 37.95% done, estimate finish Fri May 25 20:48:00 2018 > 37.95% done, estimate finish Fri May 25 20:47:59 2018 > 37.96% done, estimate finish Fri May 25 20:47:58 2018 > 37.96% done, estimate finish Fri May 25 20:48:00 2018 > 37.96% done, estimate finish Fri May 25 20:47:59 2018 > 37.97% done, estimate finish Fri May 25 20:47:59 2018 > 37.97% done, estimate finish Fri May 25 20:47:58 2018 > 37.98% done, estimate finish Fri May 25 20:47:57 2018 >=== last message repeated 2 times. === > 37.98% done, estimate finish Fri May 25 20:47:56 2018 > 37.99% done, estimate finish Fri May 25 20:47:58 2018 > 37.99% done, estimate finish Fri May 25 20:47:57 2018 > 38.00% done, estimate finish Fri May 25 20:47:57 2018 > 38.00% done, estimate finish Fri May 25 20:47:56 2018 > 38.00% done, estimate finish Fri May 25 20:47:55 2018 > 38.01% done, estimate finish Fri May 25 20:47:54 2018 > 38.01% done, estimate finish Fri May 25 20:47:56 2018 > 38.02% done, estimate finish Fri May 25 20:47:56 2018 > 38.02% done, estimate finish Fri May 25 20:47:55 2018 > 38.03% done, estimate finish Fri May 25 20:47:54 2018 >=== last message repeated 2 times. === > 38.03% done, estimate finish Fri May 25 20:47:53 2018 > 38.04% done, estimate finish Fri May 25 20:47:55 2018 > 38.04% done, estimate finish Fri May 25 20:47:54 2018 > 38.05% done, estimate finish Fri May 25 20:47:53 2018 >=== last message repeated 2 times. === > 38.05% done, estimate finish Fri May 25 20:47:52 2018 > 38.06% done, estimate finish Fri May 25 20:47:51 2018 > 38.06% done, estimate finish Fri May 25 20:47:53 2018 > 38.07% done, estimate finish Fri May 25 20:47:53 2018 > 38.07% done, estimate finish Fri May 25 20:47:52 2018 > 38.07% done, estimate finish Fri May 25 20:47:51 2018 > 38.08% done, estimate finish Fri May 25 20:47:51 2018 > 38.08% done, estimate finish Fri May 25 20:47:50 2018 > 38.09% done, estimate finish Fri May 25 20:47:49 2018 > 38.09% done, estimate finish Fri May 25 20:47:51 2018 > 38.10% done, estimate finish Fri May 25 20:47:50 2018 >=== last message repeated 2 times. === > 38.10% done, estimate finish Fri May 25 20:47:49 2018 > 38.11% done, estimate finish Fri May 25 20:47:48 2018 >=== last message repeated 2 times. === > 38.12% done, estimate finish Fri May 25 20:47:50 2018 > 38.12% done, estimate finish Fri May 25 20:47:49 2018 > 38.12% done, estimate finish Fri May 25 20:47:48 2018 > 38.13% done, estimate finish Fri May 25 20:47:47 2018 >=== last message repeated 2 times. === > 38.14% done, estimate finish Fri May 25 20:47:46 2018 > 38.14% done, estimate finish Fri May 25 20:47:48 2018 > 38.14% done, estimate finish Fri May 25 20:47:47 2018 > 38.15% done, estimate finish Fri May 25 20:47:47 2018 > 38.15% done, estimate finish Fri May 25 20:47:46 2018 > 38.16% done, estimate finish Fri May 25 20:47:45 2018 >=== last message repeated 2 times. === > 38.16% done, estimate finish Fri May 25 20:47:44 2018 > 38.17% done, estimate finish Fri May 25 20:47:46 2018 > 38.17% done, estimate finish Fri May 25 20:47:45 2018 > 38.18% done, estimate finish Fri May 25 20:47:44 2018 >=== last message repeated 2 times. === > 38.19% done, estimate finish Fri May 25 20:47:43 2018 > 38.19% done, estimate finish Fri May 25 20:47:42 2018 > 38.19% done, estimate finish Fri May 25 20:47:44 2018 > 38.20% done, estimate finish Fri May 25 20:47:44 2018 > 38.20% done, estimate finish Fri May 25 20:47:43 2018 > 38.21% done, estimate finish Fri May 25 20:47:42 2018 >=== last message repeated 2 times. === > 38.21% done, estimate finish Fri May 25 20:47:41 2018 > 38.22% done, estimate finish Fri May 25 20:47:40 2018 > 38.22% done, estimate finish Fri May 25 20:47:42 2018 > 38.23% done, estimate finish Fri May 25 20:47:41 2018 >=== last message repeated 2 times. === > 38.23% done, estimate finish Fri May 25 20:47:40 2018 > 38.24% done, estimate finish Fri May 25 20:47:39 2018 >=== last message repeated 2 times. === > 38.25% done, estimate finish Fri May 25 20:47:41 2018 > 38.25% done, estimate finish Fri May 25 20:47:40 2018 > 38.25% done, estimate finish Fri May 25 20:47:39 2018 > 38.26% done, estimate finish Fri May 25 20:47:39 2018 > 38.26% done, estimate finish Fri May 25 20:47:38 2018 > 38.27% done, estimate finish Fri May 25 20:47:37 2018 > 38.27% done, estimate finish Fri May 25 20:47:39 2018 > 38.28% done, estimate finish Fri May 25 20:47:38 2018 >=== last message repeated 2 times. === > 38.28% done, estimate finish Fri May 25 20:47:37 2018 > 38.29% done, estimate finish Fri May 25 20:47:36 2018 >=== last message repeated 2 times. === > 38.30% done, estimate finish Fri May 25 20:47:38 2018 > 38.30% done, estimate finish Fri May 25 20:47:37 2018 > 38.30% done, estimate finish Fri May 25 20:47:36 2018 > 38.31% done, estimate finish Fri May 25 20:47:36 2018 > 38.31% done, estimate finish Fri May 25 20:47:35 2018 > 38.32% done, estimate finish Fri May 25 20:47:34 2018 > 38.32% done, estimate finish Fri May 25 20:47:33 2018 > 38.32% done, estimate finish Fri May 25 20:47:35 2018 > 38.33% done, estimate finish Fri May 25 20:47:35 2018 > 38.33% done, estimate finish Fri May 25 20:47:34 2018 > 38.34% done, estimate finish Fri May 25 20:47:33 2018 >=== last message repeated 2 times. === > 38.34% done, estimate finish Fri May 25 20:47:32 2018 > 38.35% done, estimate finish Fri May 25 20:47:34 2018 > 38.35% done, estimate finish Fri May 25 20:47:33 2018 > 38.36% done, estimate finish Fri May 25 20:47:32 2018 >=== last message repeated 2 times. === > 38.37% done, estimate finish Fri May 25 20:47:31 2018 > 38.37% done, estimate finish Fri May 25 20:47:30 2018 > 38.37% done, estimate finish Fri May 25 20:47:32 2018 > 38.38% done, estimate finish Fri May 25 20:47:32 2018 > 38.38% done, estimate finish Fri May 25 20:47:31 2018 > 38.39% done, estimate finish Fri May 25 20:47:30 2018 >=== last message repeated 2 times. === > 38.39% done, estimate finish Fri May 25 20:47:29 2018 > 38.40% done, estimate finish Fri May 25 20:47:28 2018 > 38.40% done, estimate finish Fri May 25 20:47:30 2018 > 38.41% done, estimate finish Fri May 25 20:47:29 2018 >=== last message repeated 2 times. === > 38.41% done, estimate finish Fri May 25 20:47:28 2018 > 38.42% done, estimate finish Fri May 25 20:47:27 2018 >=== last message repeated 2 times. === > 38.43% done, estimate finish Fri May 25 20:47:29 2018 > 38.43% done, estimate finish Fri May 25 20:47:28 2018 > 38.44% done, estimate finish Fri May 25 20:47:27 2018 >=== last message repeated 2 times. === > 38.44% done, estimate finish Fri May 25 20:47:26 2018 > 38.45% done, estimate finish Fri May 25 20:47:25 2018 > 38.45% done, estimate finish Fri May 25 20:47:27 2018 > 38.46% done, estimate finish Fri May 25 20:47:26 2018 >=== last message repeated 2 times. === > 38.46% done, estimate finish Fri May 25 20:47:25 2018 > 38.47% done, estimate finish Fri May 25 20:47:24 2018 >=== last message repeated 2 times. === > 38.48% done, estimate finish Fri May 25 20:47:23 2018 > 38.48% done, estimate finish Fri May 25 20:47:25 2018 > 38.48% done, estimate finish Fri May 25 20:47:24 2018 > 38.49% done, estimate finish Fri May 25 20:47:24 2018 > 38.49% done, estimate finish Fri May 25 20:47:23 2018 > 38.50% done, estimate finish Fri May 25 20:47:22 2018 >=== last message repeated 2 times. === > 38.50% done, estimate finish Fri May 25 20:47:24 2018 > 38.51% done, estimate finish Fri May 25 20:47:23 2018 > 38.51% done, estimate finish Fri May 25 20:47:22 2018 > 38.52% done, estimate finish Fri May 25 20:47:21 2018 >=== last message repeated 2 times. === > 38.53% done, estimate finish Fri May 25 20:47:20 2018 > 38.53% done, estimate finish Fri May 25 20:47:22 2018 > 38.53% done, estimate finish Fri May 25 20:47:21 2018 > 38.54% done, estimate finish Fri May 25 20:47:21 2018 > 38.54% done, estimate finish Fri May 25 20:47:20 2018 > 38.55% done, estimate finish Fri May 25 20:47:19 2018 >=== last message repeated 2 times. === > 38.55% done, estimate finish Fri May 25 20:47:18 2018 > 38.56% done, estimate finish Fri May 25 20:47:20 2018 > 38.56% done, estimate finish Fri May 25 20:47:19 2018 > 38.57% done, estimate finish Fri May 25 20:47:18 2018 >=== last message repeated 2 times. === > 38.57% done, estimate finish Fri May 25 20:47:17 2018 > 38.58% done, estimate finish Fri May 25 20:47:16 2018 > 38.58% done, estimate finish Fri May 25 20:47:18 2018 > 38.59% done, estimate finish Fri May 25 20:47:18 2018 > 38.59% done, estimate finish Fri May 25 20:47:17 2018 > 38.59% done, estimate finish Fri May 25 20:47:16 2018 > 38.60% done, estimate finish Fri May 25 20:47:16 2018 > 38.60% done, estimate finish Fri May 25 20:47:15 2018 > 38.61% done, estimate finish Fri May 25 20:47:17 2018 > 38.61% done, estimate finish Fri May 25 20:47:16 2018 > 38.62% done, estimate finish Fri May 25 20:47:16 2018 > 38.62% done, estimate finish Fri May 25 20:47:15 2018 > 38.62% done, estimate finish Fri May 25 20:47:14 2018 > 38.63% done, estimate finish Fri May 25 20:47:13 2018 > 38.63% done, estimate finish Fri May 25 20:47:15 2018 > 38.64% done, estimate finish Fri May 25 20:47:15 2018 > 38.64% done, estimate finish Fri May 25 20:47:14 2018 > 38.64% done, estimate finish Fri May 25 20:47:13 2018 > 38.65% done, estimate finish Fri May 25 20:47:13 2018 > 38.65% done, estimate finish Fri May 25 20:47:12 2018 > 38.66% done, estimate finish Fri May 25 20:47:11 2018 > 38.66% done, estimate finish Fri May 25 20:47:13 2018 >=== last message repeated 2 times. === > 38.67% done, estimate finish Fri May 25 20:47:12 2018 > 38.67% done, estimate finish Fri May 25 20:47:11 2018 > 38.68% done, estimate finish Fri May 25 20:47:11 2018 > 38.68% done, estimate finish Fri May 25 20:47:10 2018 > 38.68% done, estimate finish Fri May 25 20:47:12 2018 > 38.69% done, estimate finish Fri May 25 20:47:11 2018 > 38.69% done, estimate finish Fri May 25 20:47:10 2018 > 38.70% done, estimate finish Fri May 25 20:47:10 2018 > 38.70% done, estimate finish Fri May 25 20:47:09 2018 > 38.71% done, estimate finish Fri May 25 20:47:08 2018 > 38.71% done, estimate finish Fri May 25 20:47:10 2018 >=== last message repeated 2 times. === > 38.72% done, estimate finish Fri May 25 20:47:09 2018 > 38.72% done, estimate finish Fri May 25 20:47:08 2018 > 38.73% done, estimate finish Fri May 25 20:47:08 2018 > 38.73% done, estimate finish Fri May 25 20:47:07 2018 > 38.73% done, estimate finish Fri May 25 20:47:06 2018 > 38.74% done, estimate finish Fri May 25 20:47:08 2018 > 38.74% done, estimate finish Fri May 25 20:47:07 2018 > 38.75% done, estimate finish Fri May 25 20:47:07 2018 > 38.75% done, estimate finish Fri May 25 20:47:06 2018 > 38.75% done, estimate finish Fri May 25 20:47:05 2018 > 38.76% done, estimate finish Fri May 25 20:47:07 2018 >=== last message repeated 2 times. === > 38.77% done, estimate finish Fri May 25 20:47:06 2018 > 38.77% done, estimate finish Fri May 25 20:47:05 2018 > 38.78% done, estimate finish Fri May 25 20:47:05 2018 > 38.78% done, estimate finish Fri May 25 20:47:04 2018 > 38.78% done, estimate finish Fri May 25 20:47:06 2018 > 38.79% done, estimate finish Fri May 25 20:47:05 2018 >=== last message repeated 2 times. === > 38.80% done, estimate finish Fri May 25 20:47:04 2018 > 38.80% done, estimate finish Fri May 25 20:47:03 2018 > 38.80% done, estimate finish Fri May 25 20:47:02 2018 > 38.81% done, estimate finish Fri May 25 20:47:04 2018 >=== last message repeated 2 times. === > 38.82% done, estimate finish Fri May 25 20:47:03 2018 > 38.82% done, estimate finish Fri May 25 20:47:02 2018 >=== last message repeated 2 times. === > 38.83% done, estimate finish Fri May 25 20:47:01 2018 > 38.83% done, estimate finish Fri May 25 20:47:03 2018 > 38.84% done, estimate finish Fri May 25 20:47:02 2018 >=== last message repeated 2 times. === > 38.84% done, estimate finish Fri May 25 20:47:01 2018 > 38.85% done, estimate finish Fri May 25 20:47:00 2018 >=== last message repeated 2 times. === > 38.86% done, estimate finish Fri May 25 20:47:01 2018 >=== last message repeated 2 times. === > 38.87% done, estimate finish Fri May 25 20:47:00 2018 > 38.87% done, estimate finish Fri May 25 20:46:59 2018 >=== last message repeated 2 times. === > 38.88% done, estimate finish Fri May 25 20:46:58 2018 > 38.88% done, estimate finish Fri May 25 20:46:57 2018 > 38.89% done, estimate finish Fri May 25 20:46:59 2018 >=== last message repeated 2 times. === > 38.89% done, estimate finish Fri May 25 20:46:58 2018 > 38.90% done, estimate finish Fri May 25 20:46:57 2018 >=== last message repeated 2 times. === > 38.91% done, estimate finish Fri May 25 20:46:56 2018 > 38.91% done, estimate finish Fri May 25 20:46:58 2018 > 38.91% done, estimate finish Fri May 25 20:46:57 2018 > 38.92% done, estimate finish Fri May 25 20:46:57 2018 > 38.92% done, estimate finish Fri May 25 20:46:56 2018 > 38.93% done, estimate finish Fri May 25 20:46:55 2018 >=== last message repeated 2 times. === > 38.93% done, estimate finish Fri May 25 20:46:56 2018 > 38.94% done, estimate finish Fri May 25 20:46:56 2018 > 38.94% done, estimate finish Fri May 25 20:46:55 2018 > 38.95% done, estimate finish Fri May 25 20:46:54 2018 >=== last message repeated 2 times. === > 38.96% done, estimate finish Fri May 25 20:46:53 2018 > 38.96% done, estimate finish Fri May 25 20:46:55 2018 > 38.96% done, estimate finish Fri May 25 20:46:54 2018 > 38.97% done, estimate finish Fri May 25 20:46:54 2018 > 38.97% done, estimate finish Fri May 25 20:46:53 2018 > 38.98% done, estimate finish Fri May 25 20:46:52 2018 >=== last message repeated 2 times. === > 38.98% done, estimate finish Fri May 25 20:46:53 2018 > 38.99% done, estimate finish Fri May 25 20:46:53 2018 > 38.99% done, estimate finish Fri May 25 20:46:52 2018 > 39.00% done, estimate finish Fri May 25 20:46:51 2018 >=== last message repeated 2 times. === > 39.00% done, estimate finish Fri May 25 20:46:50 2018 > 39.01% done, estimate finish Fri May 25 20:46:49 2018 > 39.01% done, estimate finish Fri May 25 20:46:51 2018 > 39.02% done, estimate finish Fri May 25 20:46:51 2018 > 39.02% done, estimate finish Fri May 25 20:46:50 2018 > 39.02% done, estimate finish Fri May 25 20:46:49 2018 > 39.03% done, estimate finish Fri May 25 20:46:49 2018 > 39.03% done, estimate finish Fri May 25 20:46:48 2018 > 39.04% done, estimate finish Fri May 25 20:46:50 2018 > 39.04% done, estimate finish Fri May 25 20:46:49 2018 > 39.05% done, estimate finish Fri May 25 20:46:49 2018 > 39.05% done, estimate finish Fri May 25 20:46:48 2018 > 39.05% done, estimate finish Fri May 25 20:46:47 2018 > 39.06% done, estimate finish Fri May 25 20:46:47 2018 > 39.06% done, estimate finish Fri May 25 20:46:48 2018 > 39.07% done, estimate finish Fri May 25 20:46:48 2018 > 39.07% done, estimate finish Fri May 25 20:46:47 2018 > 39.07% done, estimate finish Fri May 25 20:46:46 2018 > 39.08% done, estimate finish Fri May 25 20:46:46 2018 > 39.08% done, estimate finish Fri May 25 20:46:45 2018 > 39.09% done, estimate finish Fri May 25 20:46:44 2018 > 39.09% done, estimate finish Fri May 25 20:46:46 2018 >=== last message repeated 2 times. === > 39.10% done, estimate finish Fri May 25 20:46:45 2018 > 39.10% done, estimate finish Fri May 25 20:46:44 2018 > 39.11% done, estimate finish Fri May 25 20:46:44 2018 > 39.11% done, estimate finish Fri May 25 20:46:43 2018 > 39.11% done, estimate finish Fri May 25 20:46:45 2018 > 39.12% done, estimate finish Fri May 25 20:46:44 2018 >=== last message repeated 2 times. === > 39.13% done, estimate finish Fri May 25 20:46:43 2018 > 39.13% done, estimate finish Fri May 25 20:46:42 2018 > 39.14% done, estimate finish Fri May 25 20:46:42 2018 > 39.14% done, estimate finish Fri May 25 20:46:43 2018 >=== last message repeated 2 times. === > 39.15% done, estimate finish Fri May 25 20:46:42 2018 > 39.15% done, estimate finish Fri May 25 20:46:41 2018 > 39.16% done, estimate finish Fri May 25 20:46:41 2018 > 39.16% done, estimate finish Fri May 25 20:46:40 2018 > 39.16% done, estimate finish Fri May 25 20:46:39 2018 > 39.17% done, estimate finish Fri May 25 20:46:41 2018 >=== last message repeated 2 times. === > 39.18% done, estimate finish Fri May 25 20:46:40 2018 > 39.18% done, estimate finish Fri May 25 20:46:39 2018 >=== last message repeated 2 times. === > 39.19% done, estimate finish Fri May 25 20:46:38 2018 > 39.19% done, estimate finish Fri May 25 20:46:40 2018 > 39.20% done, estimate finish Fri May 25 20:46:39 2018 >=== last message repeated 2 times. === > 39.21% done, estimate finish Fri May 25 20:46:38 2018 > 39.21% done, estimate finish Fri May 25 20:46:37 2018 >=== last message repeated 2 times. === > 39.22% done, estimate finish Fri May 25 20:46:38 2018 >=== last message repeated 2 times. === > 39.23% done, estimate finish Fri May 25 20:46:37 2018 > 39.23% done, estimate finish Fri May 25 20:46:36 2018 >=== last message repeated 2 times. === > 39.24% done, estimate finish Fri May 25 20:46:35 2018 > 39.24% done, estimate finish Fri May 25 20:46:37 2018 > 39.25% done, estimate finish Fri May 25 20:46:36 2018 >=== last message repeated 2 times. === > 39.25% done, estimate finish Fri May 25 20:46:35 2018 > 39.26% done, estimate finish Fri May 25 20:46:34 2018 >=== last message repeated 2 times. === > 39.27% done, estimate finish Fri May 25 20:46:33 2018 > 39.27% done, estimate finish Fri May 25 20:46:35 2018 > 39.27% done, estimate finish Fri May 25 20:46:34 2018 > 39.28% done, estimate finish Fri May 25 20:46:34 2018 > 39.28% done, estimate finish Fri May 25 20:46:33 2018 > 39.29% done, estimate finish Fri May 25 20:46:32 2018 >=== last message repeated 2 times. === > 39.30% done, estimate finish Fri May 25 20:46:34 2018 > 39.30% done, estimate finish Fri May 25 20:46:33 2018 > 39.30% done, estimate finish Fri May 25 20:46:32 2018 > 39.31% done, estimate finish Fri May 25 20:46:32 2018 > 39.31% done, estimate finish Fri May 25 20:46:31 2018 > 39.32% done, estimate finish Fri May 25 20:46:30 2018 > 39.32% done, estimate finish Fri May 25 20:46:32 2018 > 39.32% done, estimate finish Fri May 25 20:46:31 2018 > 39.33% done, estimate finish Fri May 25 20:46:31 2018 > 39.33% done, estimate finish Fri May 25 20:46:30 2018 > 39.34% done, estimate finish Fri May 25 20:46:29 2018 >=== last message repeated 2 times. === > 39.34% done, estimate finish Fri May 25 20:46:28 2018 > 39.35% done, estimate finish Fri May 25 20:46:30 2018 > 39.35% done, estimate finish Fri May 25 20:46:29 2018 > 39.36% done, estimate finish Fri May 25 20:46:29 2018 > 39.36% done, estimate finish Fri May 25 20:46:28 2018 > 39.36% done, estimate finish Fri May 25 20:46:27 2018 > 39.37% done, estimate finish Fri May 25 20:46:27 2018 > 39.37% done, estimate finish Fri May 25 20:46:29 2018 > 39.38% done, estimate finish Fri May 25 20:46:28 2018 > 39.38% done, estimate finish Fri May 25 20:46:27 2018 > 39.39% done, estimate finish Fri May 25 20:46:27 2018 > 39.39% done, estimate finish Fri May 25 20:46:26 2018 > 39.39% done, estimate finish Fri May 25 20:46:25 2018 > 39.40% done, estimate finish Fri May 25 20:46:27 2018 > 39.40% done, estimate finish Fri May 25 20:46:26 2018 > 39.41% done, estimate finish Fri May 25 20:46:26 2018 > 39.41% done, estimate finish Fri May 25 20:46:25 2018 >=== last message repeated 2 times. === > 39.42% done, estimate finish Fri May 25 20:46:24 2018 > 39.42% done, estimate finish Fri May 25 20:46:23 2018 > 39.43% done, estimate finish Fri May 25 20:46:25 2018 > 39.43% done, estimate finish Fri May 25 20:46:24 2018 >=== last message repeated 2 times. === > 39.44% done, estimate finish Fri May 25 20:46:23 2018 > 39.44% done, estimate finish Fri May 25 20:46:22 2018 > 39.45% done, estimate finish Fri May 25 20:46:22 2018 > 39.45% done, estimate finish Fri May 25 20:46:24 2018 > 39.45% done, estimate finish Fri May 25 20:46:23 2018 > 39.46% done, estimate finish Fri May 25 20:46:22 2018 >=== last message repeated 2 times. === > 39.47% done, estimate finish Fri May 25 20:46:21 2018 > 39.47% done, estimate finish Fri May 25 20:46:20 2018 > 39.48% done, estimate finish Fri May 25 20:46:22 2018 >=== last message repeated 2 times. === > 39.48% done, estimate finish Fri May 25 20:46:21 2018 > 39.49% done, estimate finish Fri May 25 20:46:20 2018 >=== last message repeated 2 times. === > 39.50% done, estimate finish Fri May 25 20:46:19 2018 > 39.50% done, estimate finish Fri May 25 20:46:21 2018 > 39.50% done, estimate finish Fri May 25 20:46:20 2018 > 39.51% done, estimate finish Fri May 25 20:46:19 2018 >=== last message repeated 2 times. === > 39.52% done, estimate finish Fri May 25 20:46:18 2018 >=== last message repeated 2 times. === > 39.52% done, estimate finish Fri May 25 20:46:19 2018 > 39.53% done, estimate finish Fri May 25 20:46:19 2018 > 39.53% done, estimate finish Fri May 25 20:46:18 2018 > 39.54% done, estimate finish Fri May 25 20:46:17 2018 >=== last message repeated 2 times. === > 39.55% done, estimate finish Fri May 25 20:46:16 2018 > 39.55% done, estimate finish Fri May 25 20:46:15 2018 > 39.55% done, estimate finish Fri May 25 20:46:17 2018 > 39.56% done, estimate finish Fri May 25 20:46:17 2018 > 39.56% done, estimate finish Fri May 25 20:46:16 2018 > 39.57% done, estimate finish Fri May 25 20:46:15 2018 >=== last message repeated 2 times. === > 39.57% done, estimate finish Fri May 25 20:46:14 2018 > 39.58% done, estimate finish Fri May 25 20:46:16 2018 > 39.58% done, estimate finish Fri May 25 20:46:15 2018 > 39.59% done, estimate finish Fri May 25 20:46:15 2018 > 39.59% done, estimate finish Fri May 25 20:46:14 2018 > 39.59% done, estimate finish Fri May 25 20:46:13 2018 > 39.60% done, estimate finish Fri May 25 20:46:13 2018 > 39.60% done, estimate finish Fri May 25 20:46:14 2018 > 39.61% done, estimate finish Fri May 25 20:46:14 2018 > 39.61% done, estimate finish Fri May 25 20:46:13 2018 >=== last message repeated 2 times. === > 39.62% done, estimate finish Fri May 25 20:46:12 2018 > 39.62% done, estimate finish Fri May 25 20:46:11 2018 > 39.63% done, estimate finish Fri May 25 20:46:11 2018 > 39.63% done, estimate finish Fri May 25 20:46:12 2018 > 39.64% done, estimate finish Fri May 25 20:46:12 2018 > 39.64% done, estimate finish Fri May 25 20:46:11 2018 > 39.64% done, estimate finish Fri May 25 20:46:10 2018 > 39.65% done, estimate finish Fri May 25 20:46:10 2018 > 39.65% done, estimate finish Fri May 25 20:46:09 2018 > 39.66% done, estimate finish Fri May 25 20:46:11 2018 > 39.66% done, estimate finish Fri May 25 20:46:10 2018 >=== last message repeated 2 times. === > 39.67% done, estimate finish Fri May 25 20:46:09 2018 > 39.67% done, estimate finish Fri May 25 20:46:08 2018 > 39.68% done, estimate finish Fri May 25 20:46:08 2018 > 39.68% done, estimate finish Fri May 25 20:46:10 2018 > 39.68% done, estimate finish Fri May 25 20:46:09 2018 > 39.69% done, estimate finish Fri May 25 20:46:08 2018 >=== last message repeated 2 times. === > 39.70% done, estimate finish Fri May 25 20:46:07 2018 > 39.70% done, estimate finish Fri May 25 20:46:06 2018 >=== last message repeated 2 times. === > 39.71% done, estimate finish Fri May 25 20:46:08 2018 > 39.71% done, estimate finish Fri May 25 20:46:07 2018 > 39.72% done, estimate finish Fri May 25 20:46:06 2018 >=== last message repeated 2 times. === > 39.73% done, estimate finish Fri May 25 20:46:05 2018 > 39.73% done, estimate finish Fri May 25 20:46:04 2018 > 39.73% done, estimate finish Fri May 25 20:46:06 2018 > 39.74% done, estimate finish Fri May 25 20:46:06 2018 > 39.74% done, estimate finish Fri May 25 20:46:05 2018 > 39.75% done, estimate finish Fri May 25 20:46:04 2018 >=== last message repeated 2 times. === > 39.75% done, estimate finish Fri May 25 20:46:03 2018 > 39.76% done, estimate finish Fri May 25 20:46:05 2018 > 39.76% done, estimate finish Fri May 25 20:46:04 2018 > 39.77% done, estimate finish Fri May 25 20:46:03 2018 >=== last message repeated 2 times. === > 39.77% done, estimate finish Fri May 25 20:46:02 2018 > 39.78% done, estimate finish Fri May 25 20:46:02 2018 > 39.78% done, estimate finish Fri May 25 20:46:03 2018 > 39.79% done, estimate finish Fri May 25 20:46:03 2018 > 39.79% done, estimate finish Fri May 25 20:46:02 2018 > 39.79% done, estimate finish Fri May 25 20:46:01 2018 > 39.80% done, estimate finish Fri May 25 20:46:01 2018 > 39.80% done, estimate finish Fri May 25 20:46:00 2018 > 39.81% done, estimate finish Fri May 25 20:46:02 2018 > 39.81% done, estimate finish Fri May 25 20:46:01 2018 > 39.82% done, estimate finish Fri May 25 20:46:01 2018 > 39.82% done, estimate finish Fri May 25 20:46:00 2018 > 39.82% done, estimate finish Fri May 25 20:45:59 2018 > 39.83% done, estimate finish Fri May 25 20:45:59 2018 > 39.83% done, estimate finish Fri May 25 20:45:58 2018 > 39.84% done, estimate finish Fri May 25 20:46:00 2018 > 39.84% done, estimate finish Fri May 25 20:45:59 2018 >=== last message repeated 2 times. === > 39.85% done, estimate finish Fri May 25 20:45:58 2018 > 39.85% done, estimate finish Fri May 25 20:45:57 2018 > 39.86% done, estimate finish Fri May 25 20:45:57 2018 > 39.86% done, estimate finish Fri May 25 20:45:59 2018 > 39.86% done, estimate finish Fri May 25 20:45:58 2018 > 39.87% done, estimate finish Fri May 25 20:45:57 2018 >=== last message repeated 2 times. === > 39.88% done, estimate finish Fri May 25 20:45:56 2018 > 39.88% done, estimate finish Fri May 25 20:45:55 2018 > 39.89% done, estimate finish Fri May 25 20:45:55 2018 > 39.89% done, estimate finish Fri May 25 20:45:57 2018 > 39.89% done, estimate finish Fri May 25 20:45:56 2018 > 39.90% done, estimate finish Fri May 25 20:45:55 2018 >=== last message repeated 2 times. === > 39.91% done, estimate finish Fri May 25 20:45:54 2018 > 39.91% done, estimate finish Fri May 25 20:45:53 2018 > 39.91% done, estimate finish Fri May 25 20:45:55 2018 > 39.92% done, estimate finish Fri May 25 20:45:54 2018 >=== last message repeated 2 times. === > 39.93% done, estimate finish Fri May 25 20:45:53 2018 >=== last message repeated 2 times. === > 39.93% done, estimate finish Fri May 25 20:45:52 2018 > 39.94% done, estimate finish Fri May 25 20:45:54 2018 > 39.94% done, estimate finish Fri May 25 20:45:53 2018 > 39.95% done, estimate finish Fri May 25 20:45:52 2018 >=== last message repeated 2 times. === > 39.95% done, estimate finish Fri May 25 20:45:51 2018 > 39.96% done, estimate finish Fri May 25 20:45:51 2018 > 39.96% done, estimate finish Fri May 25 20:45:52 2018 > 39.97% done, estimate finish Fri May 25 20:45:52 2018 > 39.97% done, estimate finish Fri May 25 20:45:51 2018 > 39.98% done, estimate finish Fri May 25 20:45:50 2018 >=== last message repeated 2 times. === > 39.98% done, estimate finish Fri May 25 20:45:49 2018 > 39.99% done, estimate finish Fri May 25 20:45:51 2018 > 39.99% done, estimate finish Fri May 25 20:45:50 2018 > 40.00% done, estimate finish Fri May 25 20:45:50 2018 > 40.00% done, estimate finish Fri May 25 20:45:49 2018 > 40.00% done, estimate finish Fri May 25 20:45:48 2018 > 40.01% done, estimate finish Fri May 25 20:45:48 2018 > 40.01% done, estimate finish Fri May 25 20:45:47 2018 > 40.02% done, estimate finish Fri May 25 20:45:49 2018 > 40.02% done, estimate finish Fri May 25 20:45:48 2018 >=== last message repeated 2 times. === > 40.03% done, estimate finish Fri May 25 20:45:47 2018 > 40.03% done, estimate finish Fri May 25 20:45:46 2018 > 40.04% done, estimate finish Fri May 25 20:45:46 2018 > 40.04% done, estimate finish Fri May 25 20:45:48 2018 > 40.04% done, estimate finish Fri May 25 20:45:47 2018 > 40.05% done, estimate finish Fri May 25 20:45:46 2018 >=== last message repeated 2 times. === > 40.06% done, estimate finish Fri May 25 20:45:45 2018 > 40.06% done, estimate finish Fri May 25 20:45:44 2018 > 40.07% done, estimate finish Fri May 25 20:45:46 2018 >=== last message repeated 2 times. === > 40.07% done, estimate finish Fri May 25 20:45:45 2018 > 40.08% done, estimate finish Fri May 25 20:45:44 2018 >=== last message repeated 2 times. === > 40.09% done, estimate finish Fri May 25 20:45:43 2018 > 40.09% done, estimate finish Fri May 25 20:45:42 2018 > 40.09% done, estimate finish Fri May 25 20:45:44 2018 > 40.10% done, estimate finish Fri May 25 20:45:44 2018 > 40.10% done, estimate finish Fri May 25 20:45:43 2018 > 40.11% done, estimate finish Fri May 25 20:45:42 2018 >=== last message repeated 2 times. === > 40.11% done, estimate finish Fri May 25 20:45:41 2018 > 40.12% done, estimate finish Fri May 25 20:45:43 2018 > 40.12% done, estimate finish Fri May 25 20:45:42 2018 > 40.13% done, estimate finish Fri May 25 20:45:42 2018 > 40.13% done, estimate finish Fri May 25 20:45:41 2018 > 40.13% done, estimate finish Fri May 25 20:45:40 2018 > 40.14% done, estimate finish Fri May 25 20:45:40 2018 > 40.14% done, estimate finish Fri May 25 20:45:41 2018 > 40.15% done, estimate finish Fri May 25 20:45:41 2018 > 40.15% done, estimate finish Fri May 25 20:45:40 2018 > 40.16% done, estimate finish Fri May 25 20:45:40 2018 > 40.16% done, estimate finish Fri May 25 20:45:39 2018 > 40.16% done, estimate finish Fri May 25 20:45:38 2018 > 40.17% done, estimate finish Fri May 25 20:45:40 2018 > 40.17% done, estimate finish Fri May 25 20:45:39 2018 > 40.18% done, estimate finish Fri May 25 20:45:39 2018 > 40.18% done, estimate finish Fri May 25 20:45:38 2018 >=== last message repeated 2 times. === > 40.19% done, estimate finish Fri May 25 20:45:37 2018 > 40.19% done, estimate finish Fri May 25 20:45:36 2018 > 40.20% done, estimate finish Fri May 25 20:45:38 2018 > 40.20% done, estimate finish Fri May 25 20:45:37 2018 >=== last message repeated 2 times. === > 40.21% done, estimate finish Fri May 25 20:45:36 2018 >=== last message repeated 2 times. === > 40.22% done, estimate finish Fri May 25 20:45:35 2018 > 40.22% done, estimate finish Fri May 25 20:45:37 2018 > 40.23% done, estimate finish Fri May 25 20:45:36 2018 > 40.23% done, estimate finish Fri May 25 20:45:35 2018 >=== last message repeated 2 times. === > 40.24% done, estimate finish Fri May 25 20:45:34 2018 >=== last message repeated 2 times. === > 40.25% done, estimate finish Fri May 25 20:45:35 2018 >=== last message repeated 2 times. === > 40.25% done, estimate finish Fri May 25 20:45:34 2018 > 40.26% done, estimate finish Fri May 25 20:45:33 2018 >=== last message repeated 2 times. === > 40.27% done, estimate finish Fri May 25 20:45:32 2018 > 40.27% done, estimate finish Fri May 25 20:45:34 2018 > 40.27% done, estimate finish Fri May 25 20:45:33 2018 > 40.28% done, estimate finish Fri May 25 20:45:33 2018 > 40.28% done, estimate finish Fri May 25 20:45:32 2018 > 40.29% done, estimate finish Fri May 25 20:45:31 2018 >=== last message repeated 2 times. === > 40.29% done, estimate finish Fri May 25 20:45:33 2018 > 40.30% done, estimate finish Fri May 25 20:45:32 2018 > 40.30% done, estimate finish Fri May 25 20:45:31 2018 > 40.31% done, estimate finish Fri May 25 20:45:31 2018 > 40.31% done, estimate finish Fri May 25 20:45:30 2018 > 40.32% done, estimate finish Fri May 25 20:45:29 2018 >=== last message repeated 2 times. === > 40.32% done, estimate finish Fri May 25 20:45:31 2018 > 40.33% done, estimate finish Fri May 25 20:45:30 2018 > 40.33% done, estimate finish Fri May 25 20:45:29 2018 > 40.34% done, estimate finish Fri May 25 20:45:29 2018 > 40.34% done, estimate finish Fri May 25 20:45:28 2018 > 40.34% done, estimate finish Fri May 25 20:45:27 2018 > 40.35% done, estimate finish Fri May 25 20:45:29 2018 >=== last message repeated 2 times. === > 40.36% done, estimate finish Fri May 25 20:45:28 2018 > 40.36% done, estimate finish Fri May 25 20:45:27 2018 >=== last message repeated 2 times. === > 40.37% done, estimate finish Fri May 25 20:45:26 2018 > 40.37% done, estimate finish Fri May 25 20:45:25 2018 > 40.38% done, estimate finish Fri May 25 20:45:27 2018 >=== last message repeated 2 times. === > 40.38% done, estimate finish Fri May 25 20:45:26 2018 > 40.39% done, estimate finish Fri May 25 20:45:25 2018 >=== last message repeated 2 times. === > 40.40% done, estimate finish Fri May 25 20:45:24 2018 > 40.40% done, estimate finish Fri May 25 20:45:26 2018 > 40.41% done, estimate finish Fri May 25 20:45:25 2018 >=== last message repeated 2 times. === > 40.41% done, estimate finish Fri May 25 20:45:24 2018 > 40.42% done, estimate finish Fri May 25 20:45:23 2018 >=== last message repeated 2 times. === > 40.43% done, estimate finish Fri May 25 20:45:25 2018 > 40.43% done, estimate finish Fri May 25 20:45:24 2018 > 40.43% done, estimate finish Fri May 25 20:45:23 2018 > 40.44% done, estimate finish Fri May 25 20:45:23 2018 > 40.44% done, estimate finish Fri May 25 20:45:22 2018 > 40.45% done, estimate finish Fri May 25 20:45:21 2018 > 40.45% done, estimate finish Fri May 25 20:45:23 2018 >=== last message repeated 2 times. === > 40.46% done, estimate finish Fri May 25 20:45:22 2018 > 40.46% done, estimate finish Fri May 25 20:45:21 2018 > 40.47% done, estimate finish Fri May 25 20:45:21 2018 > 40.47% done, estimate finish Fri May 25 20:45:20 2018 > 40.47% done, estimate finish Fri May 25 20:45:22 2018 > 40.48% done, estimate finish Fri May 25 20:45:21 2018 >=== last message repeated 2 times. === > 40.49% done, estimate finish Fri May 25 20:45:20 2018 > 40.49% done, estimate finish Fri May 25 20:45:19 2018 > 40.50% done, estimate finish Fri May 25 20:45:19 2018 > 40.50% done, estimate finish Fri May 25 20:45:18 2018 > 40.50% done, estimate finish Fri May 25 20:45:20 2018 > 40.51% done, estimate finish Fri May 25 20:45:19 2018 >=== last message repeated 2 times. === > 40.52% done, estimate finish Fri May 25 20:45:18 2018 > 40.52% done, estimate finish Fri May 25 20:45:17 2018 >=== last message repeated 2 times. === > 40.53% done, estimate finish Fri May 25 20:45:19 2018 > 40.53% done, estimate finish Fri May 25 20:45:18 2018 > 40.54% done, estimate finish Fri May 25 20:45:17 2018 >=== last message repeated 2 times. === > 40.54% done, estimate finish Fri May 25 20:45:16 2018 > 40.55% done, estimate finish Fri May 25 20:45:15 2018 > 40.55% done, estimate finish Fri May 25 20:45:17 2018 > 40.56% done, estimate finish Fri May 25 20:45:17 2018 > 40.56% done, estimate finish Fri May 25 20:45:16 2018 > 40.56% done, estimate finish Fri May 25 20:45:15 2018 > 40.57% done, estimate finish Fri May 25 20:45:15 2018 > 40.57% done, estimate finish Fri May 25 20:45:14 2018 > 40.58% done, estimate finish Fri May 25 20:45:13 2018 > 40.58% done, estimate finish Fri May 25 20:45:15 2018 > 40.59% done, estimate finish Fri May 25 20:45:15 2018 > 40.59% done, estimate finish Fri May 25 20:45:14 2018 > 40.59% done, estimate finish Fri May 25 20:45:13 2018 > 40.60% done, estimate finish Fri May 25 20:45:13 2018 > 40.60% done, estimate finish Fri May 25 20:45:12 2018 > 40.61% done, estimate finish Fri May 25 20:45:14 2018 > 40.61% done, estimate finish Fri May 25 20:45:13 2018 >=== last message repeated 2 times. === > 40.62% done, estimate finish Fri May 25 20:45:12 2018 > 40.62% done, estimate finish Fri May 25 20:45:11 2018 > 40.63% done, estimate finish Fri May 25 20:45:11 2018 > 40.63% done, estimate finish Fri May 25 20:45:13 2018 > 40.63% done, estimate finish Fri May 25 20:45:12 2018 > 40.64% done, estimate finish Fri May 25 20:45:11 2018 >=== last message repeated 2 times. === > 40.65% done, estimate finish Fri May 25 20:45:10 2018 > 40.65% done, estimate finish Fri May 25 20:45:09 2018 > 40.65% done, estimate finish Fri May 25 20:45:11 2018 > 40.66% done, estimate finish Fri May 25 20:45:11 2018 > 40.66% done, estimate finish Fri May 25 20:45:10 2018 > 40.67% done, estimate finish Fri May 25 20:45:09 2018 >=== last message repeated 2 times. === > 40.68% done, estimate finish Fri May 25 20:45:08 2018 > 40.68% done, estimate finish Fri May 25 20:45:10 2018 > 40.68% done, estimate finish Fri May 25 20:45:09 2018 > 40.69% done, estimate finish Fri May 25 20:45:09 2018 > 40.69% done, estimate finish Fri May 25 20:45:08 2018 > 40.70% done, estimate finish Fri May 25 20:45:07 2018 >=== last message repeated 2 times. === > 40.70% done, estimate finish Fri May 25 20:45:06 2018 > 40.71% done, estimate finish Fri May 25 20:45:08 2018 > 40.71% done, estimate finish Fri May 25 20:45:07 2018 > 40.72% done, estimate finish Fri May 25 20:45:07 2018 > 40.72% done, estimate finish Fri May 25 20:45:06 2018 > 40.72% done, estimate finish Fri May 25 20:45:05 2018 > 40.73% done, estimate finish Fri May 25 20:45:05 2018 > 40.73% done, estimate finish Fri May 25 20:45:07 2018 > 40.74% done, estimate finish Fri May 25 20:45:06 2018 > 40.74% done, estimate finish Fri May 25 20:45:05 2018 > 40.75% done, estimate finish Fri May 25 20:45:05 2018 > 40.75% done, estimate finish Fri May 25 20:45:04 2018 > 40.75% done, estimate finish Fri May 25 20:45:03 2018 > 40.76% done, estimate finish Fri May 25 20:45:05 2018 >=== last message repeated 2 times. === > 40.77% done, estimate finish Fri May 25 20:45:04 2018 > 40.77% done, estimate finish Fri May 25 20:45:03 2018 >=== last message repeated 2 times. === > 40.78% done, estimate finish Fri May 25 20:45:02 2018 > 40.78% done, estimate finish Fri May 25 20:45:04 2018 > 40.79% done, estimate finish Fri May 25 20:45:03 2018 >=== last message repeated 2 times. === > 40.79% done, estimate finish Fri May 25 20:45:02 2018 > 40.80% done, estimate finish Fri May 25 20:45:01 2018 >=== last message repeated 2 times. === > 40.81% done, estimate finish Fri May 25 20:45:00 2018 > 40.81% done, estimate finish Fri May 25 20:45:02 2018 > 40.81% done, estimate finish Fri May 25 20:45:01 2018 > 40.82% done, estimate finish Fri May 25 20:45:01 2018 > 40.82% done, estimate finish Fri May 25 20:45:00 2018 > 40.83% done, estimate finish Fri May 25 20:44:59 2018 >=== last message repeated 2 times. === > 40.84% done, estimate finish Fri May 25 20:45:01 2018 > 40.84% done, estimate finish Fri May 25 20:45:00 2018 > 40.84% done, estimate finish Fri May 25 20:44:59 2018 > 40.85% done, estimate finish Fri May 25 20:44:59 2018 > 40.85% done, estimate finish Fri May 25 20:44:58 2018 > 40.86% done, estimate finish Fri May 25 20:44:58 2018 > 40.86% done, estimate finish Fri May 25 20:44:59 2018 >=== last message repeated 2 times. === > 40.87% done, estimate finish Fri May 25 20:44:58 2018 >=== last message repeated 2 times. === > 40.88% done, estimate finish Fri May 25 20:44:57 2018 > 40.88% done, estimate finish Fri May 25 20:44:56 2018 > 40.88% done, estimate finish Fri May 25 20:44:58 2018 > 40.89% done, estimate finish Fri May 25 20:44:57 2018 >=== last message repeated 2 times. === > 40.90% done, estimate finish Fri May 25 20:44:56 2018 >=== last message repeated 2 times. === > 40.90% done, estimate finish Fri May 25 20:44:55 2018 > 40.91% done, estimate finish Fri May 25 20:44:54 2018 > 40.91% done, estimate finish Fri May 25 20:44:56 2018 > 40.92% done, estimate finish Fri May 25 20:44:55 2018 >=== last message repeated 2 times. === > 40.93% done, estimate finish Fri May 25 20:44:54 2018 >=== last message repeated 2 times. === > 40.93% done, estimate finish Fri May 25 20:44:53 2018 > 40.94% done, estimate finish Fri May 25 20:44:55 2018 > 40.94% done, estimate finish Fri May 25 20:44:54 2018 > 40.95% done, estimate finish Fri May 25 20:44:54 2018 > 40.95% done, estimate finish Fri May 25 20:44:53 2018 > 40.95% done, estimate finish Fri May 25 20:44:52 2018 > 40.96% done, estimate finish Fri May 25 20:44:52 2018 > 40.96% done, estimate finish Fri May 25 20:44:53 2018 > 40.97% done, estimate finish Fri May 25 20:44:53 2018 > 40.97% done, estimate finish Fri May 25 20:44:52 2018 >=== last message repeated 2 times. === > 40.98% done, estimate finish Fri May 25 20:44:51 2018 > 40.98% done, estimate finish Fri May 25 20:44:50 2018 > 40.99% done, estimate finish Fri May 25 20:44:52 2018 >=== last message repeated 2 times. === > 40.99% done, estimate finish Fri May 25 20:44:51 2018 > 41.00% done, estimate finish Fri May 25 20:44:50 2018 >=== last message repeated 2 times. === > 41.01% done, estimate finish Fri May 25 20:44:49 2018 > 41.01% done, estimate finish Fri May 25 20:44:48 2018 > 41.02% done, estimate finish Fri May 25 20:44:50 2018 >=== last message repeated 2 times. === > 41.02% done, estimate finish Fri May 25 20:44:49 2018 > 41.03% done, estimate finish Fri May 25 20:44:48 2018 >=== last message repeated 2 times. === > 41.04% done, estimate finish Fri May 25 20:44:47 2018 > 41.04% done, estimate finish Fri May 25 20:44:49 2018 > 41.04% done, estimate finish Fri May 25 20:44:48 2018 > 41.05% done, estimate finish Fri May 25 20:44:48 2018 > 41.05% done, estimate finish Fri May 25 20:44:47 2018 > 41.06% done, estimate finish Fri May 25 20:44:46 2018 >=== last message repeated 2 times. === > 41.06% done, estimate finish Fri May 25 20:44:48 2018 > 41.07% done, estimate finish Fri May 25 20:44:47 2018 > 41.07% done, estimate finish Fri May 25 20:44:46 2018 > 41.08% done, estimate finish Fri May 25 20:44:46 2018 > 41.08% done, estimate finish Fri May 25 20:44:45 2018 > 41.09% done, estimate finish Fri May 25 20:44:45 2018 > 41.09% done, estimate finish Fri May 25 20:44:46 2018 >=== last message repeated 2 times. === > 41.10% done, estimate finish Fri May 25 20:44:45 2018 > 41.10% done, estimate finish Fri May 25 20:44:44 2018 > 41.11% done, estimate finish Fri May 25 20:44:44 2018 > 41.11% done, estimate finish Fri May 25 20:44:43 2018 > 41.11% done, estimate finish Fri May 25 20:44:45 2018 > 41.12% done, estimate finish Fri May 25 20:44:44 2018 >=== last message repeated 2 times. === > 41.13% done, estimate finish Fri May 25 20:44:43 2018 >=== last message repeated 2 times. === > 41.13% done, estimate finish Fri May 25 20:44:42 2018 > 41.14% done, estimate finish Fri May 25 20:44:41 2018 > 41.14% done, estimate finish Fri May 25 20:44:43 2018 > 41.15% done, estimate finish Fri May 25 20:44:42 2018 >=== last message repeated 2 times. === > 41.15% done, estimate finish Fri May 25 20:44:41 2018 > 41.16% done, estimate finish Fri May 25 20:44:41 2018 > 41.16% done, estimate finish Fri May 25 20:44:40 2018 > 41.17% done, estimate finish Fri May 25 20:44:42 2018 > 41.17% done, estimate finish Fri May 25 20:44:41 2018 > 41.18% done, estimate finish Fri May 25 20:44:41 2018 > 41.18% done, estimate finish Fri May 25 20:44:40 2018 > 41.18% done, estimate finish Fri May 25 20:44:39 2018 > 41.19% done, estimate finish Fri May 25 20:44:39 2018 > 41.19% done, estimate finish Fri May 25 20:44:40 2018 > 41.20% done, estimate finish Fri May 25 20:44:40 2018 > 41.20% done, estimate finish Fri May 25 20:44:39 2018 >=== last message repeated 2 times. === > 41.21% done, estimate finish Fri May 25 20:44:38 2018 > 41.21% done, estimate finish Fri May 25 20:44:37 2018 > 41.22% done, estimate finish Fri May 25 20:44:39 2018 >=== last message repeated 2 times. === > 41.22% done, estimate finish Fri May 25 20:44:38 2018 > 41.23% done, estimate finish Fri May 25 20:44:37 2018 >=== last message repeated 2 times. === > 41.24% done, estimate finish Fri May 25 20:44:36 2018 > 41.24% done, estimate finish Fri May 25 20:44:38 2018 > 41.24% done, estimate finish Fri May 25 20:44:37 2018 > 41.25% done, estimate finish Fri May 25 20:44:37 2018 > 41.25% done, estimate finish Fri May 25 20:44:36 2018 > 41.26% done, estimate finish Fri May 25 20:44:35 2018 >=== last message repeated 2 times. === > 41.27% done, estimate finish Fri May 25 20:44:34 2018 > 41.27% done, estimate finish Fri May 25 20:44:36 2018 > 41.27% done, estimate finish Fri May 25 20:44:35 2018 > 41.28% done, estimate finish Fri May 25 20:44:35 2018 > 41.28% done, estimate finish Fri May 25 20:44:34 2018 > 41.29% done, estimate finish Fri May 25 20:44:34 2018 > 41.29% done, estimate finish Fri May 25 20:44:33 2018 > 41.29% done, estimate finish Fri May 25 20:44:35 2018 > 41.30% done, estimate finish Fri May 25 20:44:34 2018 > 41.30% done, estimate finish Fri May 25 20:44:33 2018 > 41.31% done, estimate finish Fri May 25 20:44:33 2018 > 41.31% done, estimate finish Fri May 25 20:44:32 2018 >=== last message repeated 2 times. === > 41.32% done, estimate finish Fri May 25 20:44:33 2018 >=== last message repeated 2 times. === > 41.33% done, estimate finish Fri May 25 20:44:32 2018 >=== last message repeated 2 times. === > 41.33% done, estimate finish Fri May 25 20:44:31 2018 > 41.34% done, estimate finish Fri May 25 20:44:30 2018 >=== last message repeated 2 times. === > 41.35% done, estimate finish Fri May 25 20:44:32 2018 > 41.35% done, estimate finish Fri May 25 20:44:31 2018 > 41.36% done, estimate finish Fri May 25 20:44:30 2018 >=== last message repeated 2 times. === > 41.36% done, estimate finish Fri May 25 20:44:29 2018 > 41.37% done, estimate finish Fri May 25 20:44:28 2018 > 41.37% done, estimate finish Fri May 25 20:44:30 2018 > 41.38% done, estimate finish Fri May 25 20:44:30 2018 > 41.38% done, estimate finish Fri May 25 20:44:29 2018 > 41.38% done, estimate finish Fri May 25 20:44:28 2018 > 41.39% done, estimate finish Fri May 25 20:44:28 2018 > 41.39% done, estimate finish Fri May 25 20:44:27 2018 > 41.40% done, estimate finish Fri May 25 20:44:29 2018 > 41.40% done, estimate finish Fri May 25 20:44:28 2018 >=== last message repeated 2 times. === > 41.41% done, estimate finish Fri May 25 20:44:27 2018 > 41.41% done, estimate finish Fri May 25 20:44:26 2018 > 41.42% done, estimate finish Fri May 25 20:44:26 2018 > 41.42% done, estimate finish Fri May 25 20:44:28 2018 > 41.43% done, estimate finish Fri May 25 20:44:27 2018 > 41.43% done, estimate finish Fri May 25 20:44:26 2018 >=== last message repeated 2 times. === > 41.44% done, estimate finish Fri May 25 20:44:25 2018 >=== last message repeated 2 times. === > 41.45% done, estimate finish Fri May 25 20:44:26 2018 >=== last message repeated 2 times. === > 41.45% done, estimate finish Fri May 25 20:44:25 2018 > 41.46% done, estimate finish Fri May 25 20:44:25 2018 > 41.46% done, estimate finish Fri May 25 20:44:24 2018 > 41.47% done, estimate finish Fri May 25 20:44:23 2018 > 41.47% done, estimate finish Fri May 25 20:44:25 2018 > 41.47% done, estimate finish Fri May 25 20:44:24 2018 > 41.48% done, estimate finish Fri May 25 20:44:24 2018 > 41.48% done, estimate finish Fri May 25 20:44:23 2018 > 41.49% done, estimate finish Fri May 25 20:44:23 2018 > 41.49% done, estimate finish Fri May 25 20:44:22 2018 > 41.49% done, estimate finish Fri May 25 20:44:24 2018 > 41.50% done, estimate finish Fri May 25 20:44:23 2018 >=== last message repeated 2 times. === > 41.51% done, estimate finish Fri May 25 20:44:22 2018 > 41.51% done, estimate finish Fri May 25 20:44:21 2018 > 41.52% done, estimate finish Fri May 25 20:44:21 2018 > 41.52% done, estimate finish Fri May 25 20:44:20 2018 > 41.52% done, estimate finish Fri May 25 20:44:22 2018 > 41.53% done, estimate finish Fri May 25 20:44:21 2018 >=== last message repeated 2 times. === > 41.54% done, estimate finish Fri May 25 20:44:20 2018 > 41.54% done, estimate finish Fri May 25 20:44:19 2018 >=== last message repeated 2 times. === > 41.55% done, estimate finish Fri May 25 20:44:21 2018 > 41.55% done, estimate finish Fri May 25 20:44:20 2018 > 41.56% done, estimate finish Fri May 25 20:44:19 2018 >=== last message repeated 2 times. === > 41.56% done, estimate finish Fri May 25 20:44:18 2018 > 41.57% done, estimate finish Fri May 25 20:44:18 2018 > 41.57% done, estimate finish Fri May 25 20:44:17 2018 > 41.58% done, estimate finish Fri May 25 20:44:19 2018 > 41.58% done, estimate finish Fri May 25 20:44:18 2018 >=== last message repeated 2 times. === > 41.59% done, estimate finish Fri May 25 20:44:17 2018 > 41.59% done, estimate finish Fri May 25 20:44:16 2018 > 41.60% done, estimate finish Fri May 25 20:44:16 2018 > 41.60% done, estimate finish Fri May 25 20:44:17 2018 > 41.61% done, estimate finish Fri May 25 20:44:17 2018 > 41.61% done, estimate finish Fri May 25 20:44:16 2018 >=== last message repeated 2 times. === > 41.62% done, estimate finish Fri May 25 20:44:15 2018 > 41.62% done, estimate finish Fri May 25 20:44:14 2018 > 41.63% done, estimate finish Fri May 25 20:44:16 2018 >=== last message repeated 2 times. === > 41.63% done, estimate finish Fri May 25 20:44:15 2018 > 41.64% done, estimate finish Fri May 25 20:44:14 2018 >=== last message repeated 2 times. === > 41.65% done, estimate finish Fri May 25 20:44:13 2018 > 41.65% done, estimate finish Fri May 25 20:44:15 2018 > 41.65% done, estimate finish Fri May 25 20:44:14 2018 > 41.66% done, estimate finish Fri May 25 20:44:14 2018 > 41.66% done, estimate finish Fri May 25 20:44:13 2018 > 41.67% done, estimate finish Fri May 25 20:44:12 2018 >=== last message repeated 2 times. === > 41.67% done, estimate finish Fri May 25 20:44:14 2018 > 41.68% done, estimate finish Fri May 25 20:44:13 2018 > 41.68% done, estimate finish Fri May 25 20:44:12 2018 > 41.69% done, estimate finish Fri May 25 20:44:12 2018 > 41.69% done, estimate finish Fri May 25 20:44:11 2018 > 41.70% done, estimate finish Fri May 25 20:44:11 2018 > 41.70% done, estimate finish Fri May 25 20:44:12 2018 >=== last message repeated 2 times. === > 41.71% done, estimate finish Fri May 25 20:44:11 2018 >=== last message repeated 2 times. === > 41.72% done, estimate finish Fri May 25 20:44:10 2018 > 41.72% done, estimate finish Fri May 25 20:44:09 2018 > 41.72% done, estimate finish Fri May 25 20:44:11 2018 > 41.73% done, estimate finish Fri May 25 20:44:13 2018 > 41.73% done, estimate finish Fri May 25 20:44:12 2018 > 41.74% done, estimate finish Fri May 25 20:44:12 2018 > 41.74% done, estimate finish Fri May 25 20:44:11 2018 > 41.74% done, estimate finish Fri May 25 20:44:10 2018 > 41.75% done, estimate finish Fri May 25 20:44:10 2018 > 41.75% done, estimate finish Fri May 25 20:44:09 2018 > 41.76% done, estimate finish Fri May 25 20:44:09 2018 > 41.76% done, estimate finish Fri May 25 20:44:08 2018 > 41.76% done, estimate finish Fri May 25 20:44:07 2018 > 41.77% done, estimate finish Fri May 25 20:44:07 2018 > 41.77% done, estimate finish Fri May 25 20:44:09 2018 > 41.78% done, estimate finish Fri May 25 20:44:08 2018 > 41.78% done, estimate finish Fri May 25 20:44:07 2018 > 41.79% done, estimate finish Fri May 25 20:44:07 2018 > 41.79% done, estimate finish Fri May 25 20:44:06 2018 >=== last message repeated 2 times. === > 41.80% done, estimate finish Fri May 25 20:44:07 2018 >=== last message repeated 2 times. === > 41.81% done, estimate finish Fri May 25 20:44:06 2018 >=== last message repeated 2 times. === > 41.81% done, estimate finish Fri May 25 20:44:05 2018 > 41.82% done, estimate finish Fri May 25 20:44:04 2018 > 41.82% done, estimate finish Fri May 25 20:44:06 2018 > 41.83% done, estimate finish Fri May 25 20:44:05 2018 >=== last message repeated 2 times. === > 41.83% done, estimate finish Fri May 25 20:44:04 2018 > 41.84% done, estimate finish Fri May 25 20:44:04 2018 > 41.84% done, estimate finish Fri May 25 20:44:03 2018 > 41.85% done, estimate finish Fri May 25 20:44:05 2018 > 41.85% done, estimate finish Fri May 25 20:44:04 2018 > 41.86% done, estimate finish Fri May 25 20:44:04 2018 > 41.86% done, estimate finish Fri May 25 20:44:03 2018 > 41.86% done, estimate finish Fri May 25 20:44:02 2018 > 41.87% done, estimate finish Fri May 25 20:44:02 2018 > 41.87% done, estimate finish Fri May 25 20:44:01 2018 > 41.88% done, estimate finish Fri May 25 20:44:03 2018 > 41.88% done, estimate finish Fri May 25 20:44:02 2018 >=== last message repeated 2 times. === > 41.89% done, estimate finish Fri May 25 20:44:01 2018 >=== last message repeated 2 times. === > 41.90% done, estimate finish Fri May 25 20:44:00 2018 > 41.90% done, estimate finish Fri May 25 20:44:02 2018 > 41.90% done, estimate finish Fri May 25 20:44:01 2018 > 41.91% done, estimate finish Fri May 25 20:44:01 2018 > 41.91% done, estimate finish Fri May 25 20:44:00 2018 > 41.92% done, estimate finish Fri May 25 20:43:59 2018 >=== last message repeated 2 times. === > 41.92% done, estimate finish Fri May 25 20:44:00 2018 > 41.93% done, estimate finish Fri May 25 20:44:00 2018 > 41.93% done, estimate finish Fri May 25 20:43:59 2018 > 41.94% done, estimate finish Fri May 25 20:43:59 2018 > 41.94% done, estimate finish Fri May 25 20:43:58 2018 > 41.95% done, estimate finish Fri May 25 20:43:57 2018 > 41.95% done, estimate finish Fri May 25 20:43:59 2018 >=== last message repeated 2 times. === > 41.96% done, estimate finish Fri May 25 20:43:58 2018 > 41.96% done, estimate finish Fri May 25 20:43:57 2018 > 41.97% done, estimate finish Fri May 25 20:43:57 2018 > 41.97% done, estimate finish Fri May 25 20:43:56 2018 > 41.97% done, estimate finish Fri May 25 20:43:58 2018 > 41.98% done, estimate finish Fri May 25 20:43:57 2018 >=== last message repeated 2 times. === > 41.99% done, estimate finish Fri May 25 20:43:56 2018 >=== last message repeated 2 times. === > 41.99% done, estimate finish Fri May 25 20:43:55 2018 > 42.00% done, estimate finish Fri May 25 20:43:57 2018 > 42.00% done, estimate finish Fri May 25 20:43:56 2018 > 42.01% done, estimate finish Fri May 25 20:43:56 2018 > 42.01% done, estimate finish Fri May 25 20:43:55 2018 > 42.01% done, estimate finish Fri May 25 20:43:54 2018 > 42.02% done, estimate finish Fri May 25 20:43:54 2018 > 42.02% done, estimate finish Fri May 25 20:43:55 2018 > 42.03% done, estimate finish Fri May 25 20:43:55 2018 > 42.03% done, estimate finish Fri May 25 20:43:54 2018 > 42.04% done, estimate finish Fri May 25 20:43:54 2018 > 42.04% done, estimate finish Fri May 25 20:43:53 2018 > 42.04% done, estimate finish Fri May 25 20:43:52 2018 > 42.05% done, estimate finish Fri May 25 20:43:52 2018 > 42.05% done, estimate finish Fri May 25 20:43:54 2018 > 42.06% done, estimate finish Fri May 25 20:43:53 2018 > 42.06% done, estimate finish Fri May 25 20:43:52 2018 >=== last message repeated 2 times. === > 42.07% done, estimate finish Fri May 25 20:43:51 2018 >=== last message repeated 2 times. === > 42.08% done, estimate finish Fri May 25 20:43:52 2018 >=== last message repeated 2 times. === > 42.08% done, estimate finish Fri May 25 20:43:51 2018 > 42.09% done, estimate finish Fri May 25 20:43:51 2018 > 42.09% done, estimate finish Fri May 25 20:43:50 2018 > 42.10% done, estimate finish Fri May 25 20:43:49 2018 > 42.10% done, estimate finish Fri May 25 20:43:51 2018 >=== last message repeated 2 times. === > 42.11% done, estimate finish Fri May 25 20:43:50 2018 > 42.11% done, estimate finish Fri May 25 20:43:49 2018 > 42.12% done, estimate finish Fri May 25 20:43:49 2018 > 42.12% done, estimate finish Fri May 25 20:43:48 2018 > 42.13% done, estimate finish Fri May 25 20:43:50 2018 > 42.13% done, estimate finish Fri May 25 20:43:49 2018 >=== last message repeated 2 times. === > 42.14% done, estimate finish Fri May 25 20:43:48 2018 >=== last message repeated 2 times. === > 42.15% done, estimate finish Fri May 25 20:43:47 2018 > 42.15% done, estimate finish Fri May 25 20:43:49 2018 > 42.15% done, estimate finish Fri May 25 20:43:48 2018 > 42.16% done, estimate finish Fri May 25 20:43:47 2018 >=== last message repeated 2 times. === > 42.17% done, estimate finish Fri May 25 20:43:46 2018 >=== last message repeated 2 times. === > 42.17% done, estimate finish Fri May 25 20:43:45 2018 > 42.18% done, estimate finish Fri May 25 20:43:47 2018 > 42.18% done, estimate finish Fri May 25 20:43:46 2018 > 42.19% done, estimate finish Fri May 25 20:43:46 2018 > 42.19% done, estimate finish Fri May 25 20:43:45 2018 > 42.20% done, estimate finish Fri May 25 20:43:44 2018 >=== last message repeated 2 times. === > 42.20% done, estimate finish Fri May 25 20:43:46 2018 > 42.21% done, estimate finish Fri May 25 20:43:45 2018 > 42.21% done, estimate finish Fri May 25 20:43:44 2018 > 42.22% done, estimate finish Fri May 25 20:43:44 2018 > 42.22% done, estimate finish Fri May 25 20:43:43 2018 >=== last message repeated 2 times. === > 42.23% done, estimate finish Fri May 25 20:43:44 2018 >=== last message repeated 2 times. === > 42.24% done, estimate finish Fri May 25 20:43:43 2018 >=== last message repeated 2 times. === > 42.24% done, estimate finish Fri May 25 20:43:42 2018 > 42.25% done, estimate finish Fri May 25 20:43:41 2018 > 42.25% done, estimate finish Fri May 25 20:43:43 2018 > 42.26% done, estimate finish Fri May 25 20:43:43 2018 > 42.26% done, estimate finish Fri May 25 20:43:42 2018 > 42.26% done, estimate finish Fri May 25 20:43:41 2018 > 42.27% done, estimate finish Fri May 25 20:43:41 2018 > 42.27% done, estimate finish Fri May 25 20:43:40 2018 > 42.28% done, estimate finish Fri May 25 20:43:40 2018 > 42.28% done, estimate finish Fri May 25 20:43:41 2018 > 42.29% done, estimate finish Fri May 25 20:43:41 2018 > 42.29% done, estimate finish Fri May 25 20:43:40 2018 >=== last message repeated 2 times. === > 42.30% done, estimate finish Fri May 25 20:43:39 2018 > 42.30% done, estimate finish Fri May 25 20:43:38 2018 > 42.31% done, estimate finish Fri May 25 20:43:40 2018 > 42.31% done, estimate finish Fri May 25 20:43:39 2018 >=== last message repeated 2 times. === > 42.32% done, estimate finish Fri May 25 20:43:38 2018 >=== last message repeated 2 times. === > 42.33% done, estimate finish Fri May 25 20:43:37 2018 > 42.33% done, estimate finish Fri May 25 20:43:39 2018 > 42.33% done, estimate finish Fri May 25 20:43:38 2018 > 42.34% done, estimate finish Fri May 25 20:43:38 2018 > 42.34% done, estimate finish Fri May 25 20:43:37 2018 > 42.35% done, estimate finish Fri May 25 20:43:36 2018 >=== last message repeated 2 times. === > 42.35% done, estimate finish Fri May 25 20:43:38 2018 > 42.36% done, estimate finish Fri May 25 20:43:37 2018 > 42.36% done, estimate finish Fri May 25 20:43:36 2018 > 42.37% done, estimate finish Fri May 25 20:43:36 2018 > 42.37% done, estimate finish Fri May 25 20:43:35 2018 > 42.38% done, estimate finish Fri May 25 20:43:35 2018 > 42.38% done, estimate finish Fri May 25 20:43:36 2018 >=== last message repeated 2 times. === > 42.39% done, estimate finish Fri May 25 20:43:35 2018 >=== last message repeated 2 times. === > 42.40% done, estimate finish Fri May 25 20:43:34 2018 > 42.40% done, estimate finish Fri May 25 20:43:33 2018 > 42.40% done, estimate finish Fri May 25 20:43:35 2018 > 42.41% done, estimate finish Fri May 25 20:43:35 2018 > 42.41% done, estimate finish Fri May 25 20:43:34 2018 > 42.42% done, estimate finish Fri May 25 20:43:33 2018 >=== last message repeated 2 times. === > 42.42% done, estimate finish Fri May 25 20:43:32 2018 > 42.43% done, estimate finish Fri May 25 20:43:32 2018 > 42.43% done, estimate finish Fri May 25 20:43:33 2018 > 42.44% done, estimate finish Fri May 25 20:43:33 2018 > 42.44% done, estimate finish Fri May 25 20:43:32 2018 >=== last message repeated 2 times. === > 42.45% done, estimate finish Fri May 25 20:43:31 2018 > 42.45% done, estimate finish Fri May 25 20:43:30 2018 > 42.46% done, estimate finish Fri May 25 20:43:32 2018 >=== last message repeated 2 times. === > 42.47% done, estimate finish Fri May 25 20:43:31 2018 > 42.47% done, estimate finish Fri May 25 20:43:30 2018 >=== last message repeated 2 times. === > 42.48% done, estimate finish Fri May 25 20:43:29 2018 > 42.48% done, estimate finish Fri May 25 20:43:31 2018 > 42.49% done, estimate finish Fri May 25 20:43:30 2018 >=== last message repeated 2 times. === > 42.49% done, estimate finish Fri May 25 20:43:29 2018 > 42.50% done, estimate finish Fri May 25 20:43:29 2018 > 42.50% done, estimate finish Fri May 25 20:43:28 2018 > 42.51% done, estimate finish Fri May 25 20:43:30 2018 > 42.51% done, estimate finish Fri May 25 20:43:29 2018 >=== last message repeated 2 times. === > 42.52% done, estimate finish Fri May 25 20:43:28 2018 > 42.52% done, estimate finish Fri May 25 20:43:27 2018 > 42.53% done, estimate finish Fri May 25 20:43:27 2018 > 42.53% done, estimate finish Fri May 25 20:43:28 2018 > 42.54% done, estimate finish Fri May 25 20:43:28 2018 > 42.54% done, estimate finish Fri May 25 20:43:27 2018 >=== last message repeated 2 times. === > 42.55% done, estimate finish Fri May 25 20:43:26 2018 >=== last message repeated 2 times. === > 42.56% done, estimate finish Fri May 25 20:43:27 2018 >=== last message repeated 2 times. === > 42.56% done, estimate finish Fri May 25 20:43:26 2018 > 42.57% done, estimate finish Fri May 25 20:43:25 2018 >=== last message repeated 2 times. === > 42.58% done, estimate finish Fri May 25 20:43:24 2018 >=== last message repeated 2 times. === > 42.58% done, estimate finish Fri May 25 20:43:25 2018 > 42.59% done, estimate finish Fri May 25 20:43:25 2018 > 42.59% done, estimate finish Fri May 25 20:43:24 2018 > 42.60% done, estimate finish Fri May 25 20:43:24 2018 > 42.60% done, estimate finish Fri May 25 20:43:23 2018 >=== last message repeated 2 times. === > 42.61% done, estimate finish Fri May 25 20:43:24 2018 >=== last message repeated 2 times. === > 42.62% done, estimate finish Fri May 25 20:43:23 2018 > 42.62% done, estimate finish Fri May 25 20:43:22 2018 > 42.63% done, estimate finish Fri May 25 20:43:22 2018 > 42.63% done, estimate finish Fri May 25 20:43:21 2018 > 42.63% done, estimate finish Fri May 25 20:43:23 2018 > 42.64% done, estimate finish Fri May 25 20:43:22 2018 >=== last message repeated 2 times. === > 42.65% done, estimate finish Fri May 25 20:43:21 2018 >=== last message repeated 2 times. === > 42.65% done, estimate finish Fri May 25 20:43:20 2018 > 42.66% done, estimate finish Fri May 25 20:43:22 2018 > 42.66% done, estimate finish Fri May 25 20:43:21 2018 > 42.67% done, estimate finish Fri May 25 20:43:21 2018 > 42.67% done, estimate finish Fri May 25 20:43:20 2018 > 42.67% done, estimate finish Fri May 25 20:43:19 2018 > 42.68% done, estimate finish Fri May 25 20:43:19 2018 > 42.68% done, estimate finish Fri May 25 20:43:18 2018 > 42.69% done, estimate finish Fri May 25 20:43:20 2018 > 42.69% done, estimate finish Fri May 25 20:43:19 2018 >=== last message repeated 2 times. === > 42.70% done, estimate finish Fri May 25 20:43:18 2018 >=== last message repeated 2 times. === > 42.71% done, estimate finish Fri May 25 20:43:17 2018 > 42.71% done, estimate finish Fri May 25 20:43:19 2018 > 42.72% done, estimate finish Fri May 25 20:43:18 2018 >=== last message repeated 2 times. === > 42.72% done, estimate finish Fri May 25 20:43:17 2018 > 42.73% done, estimate finish Fri May 25 20:43:16 2018 >=== last message repeated 2 times. === > 42.74% done, estimate finish Fri May 25 20:43:18 2018 > 42.74% done, estimate finish Fri May 25 20:43:17 2018 > 42.74% done, estimate finish Fri May 25 20:43:16 2018 > 42.75% done, estimate finish Fri May 25 20:43:16 2018 > 42.75% done, estimate finish Fri May 25 20:43:15 2018 > 42.76% done, estimate finish Fri May 25 20:43:15 2018 > 42.76% done, estimate finish Fri May 25 20:43:16 2018 >=== last message repeated 2 times. === > 42.77% done, estimate finish Fri May 25 20:43:15 2018 >=== last message repeated 2 times. === > 42.78% done, estimate finish Fri May 25 20:43:14 2018 > 42.78% done, estimate finish Fri May 25 20:43:13 2018 > 42.78% done, estimate finish Fri May 25 20:43:15 2018 > 42.79% done, estimate finish Fri May 25 20:43:15 2018 > 42.79% done, estimate finish Fri May 25 20:43:14 2018 > 42.80% done, estimate finish Fri May 25 20:43:13 2018 >=== last message repeated 2 times. === > 42.81% done, estimate finish Fri May 25 20:43:12 2018 >=== last message repeated 2 times. === > 42.81% done, estimate finish Fri May 25 20:43:13 2018 > 42.82% done, estimate finish Fri May 25 20:43:13 2018 > 42.82% done, estimate finish Fri May 25 20:43:12 2018 > 42.83% done, estimate finish Fri May 25 20:43:12 2018 > 42.83% done, estimate finish Fri May 25 20:43:11 2018 > 42.83% done, estimate finish Fri May 25 20:43:10 2018 > 42.84% done, estimate finish Fri May 25 20:43:12 2018 >=== last message repeated 2 times. === > 42.85% done, estimate finish Fri May 25 20:43:11 2018 > 42.85% done, estimate finish Fri May 25 20:43:10 2018 >=== last message repeated 2 times. === > 42.86% done, estimate finish Fri May 25 20:43:09 2018 > 42.86% done, estimate finish Fri May 25 20:43:11 2018 > 42.87% done, estimate finish Fri May 25 20:43:10 2018 >=== last message repeated 2 times. === > 42.87% done, estimate finish Fri May 25 20:43:09 2018 > 42.88% done, estimate finish Fri May 25 20:43:09 2018 > 42.88% done, estimate finish Fri May 25 20:43:08 2018 > 42.89% done, estimate finish Fri May 25 20:43:08 2018 > 42.89% done, estimate finish Fri May 25 20:43:09 2018 > 42.90% done, estimate finish Fri May 25 20:43:09 2018 > 42.90% done, estimate finish Fri May 25 20:43:08 2018 >=== last message repeated 2 times. === > 42.91% done, estimate finish Fri May 25 20:43:07 2018 > 42.91% done, estimate finish Fri May 25 20:43:06 2018 > 42.92% done, estimate finish Fri May 25 20:43:08 2018 > 42.92% done, estimate finish Fri May 25 20:43:07 2018 >=== last message repeated 2 times. === > 42.93% done, estimate finish Fri May 25 20:43:06 2018 >=== last message repeated 2 times. === > 42.94% done, estimate finish Fri May 25 20:43:05 2018 >=== last message repeated 2 times. === > 42.94% done, estimate finish Fri May 25 20:43:06 2018 > 42.95% done, estimate finish Fri May 25 20:43:06 2018 > 42.95% done, estimate finish Fri May 25 20:43:05 2018 > 42.96% done, estimate finish Fri May 25 20:43:05 2018 > 42.96% done, estimate finish Fri May 25 20:43:04 2018 > 42.97% done, estimate finish Fri May 25 20:43:03 2018 >=== last message repeated 2 times. === > 42.97% done, estimate finish Fri May 25 20:43:05 2018 > 42.98% done, estimate finish Fri May 25 20:43:04 2018 > 42.98% done, estimate finish Fri May 25 20:43:03 2018 > 42.99% done, estimate finish Fri May 25 20:43:03 2018 > 42.99% done, estimate finish Fri May 25 20:43:02 2018 >=== last message repeated 2 times. === > 43.00% done, estimate finish Fri May 25 20:43:03 2018 >=== last message repeated 2 times. === > 43.01% done, estimate finish Fri May 25 20:43:02 2018 >=== last message repeated 2 times. === > 43.01% done, estimate finish Fri May 25 20:43:01 2018 > 43.02% done, estimate finish Fri May 25 20:43:00 2018 > 43.02% done, estimate finish Fri May 25 20:43:02 2018 > 43.03% done, estimate finish Fri May 25 20:43:02 2018 > 43.03% done, estimate finish Fri May 25 20:43:01 2018 > 43.03% done, estimate finish Fri May 25 20:43:00 2018 > 43.04% done, estimate finish Fri May 25 20:43:00 2018 > 43.04% done, estimate finish Fri May 25 20:42:59 2018 > 43.05% done, estimate finish Fri May 25 20:42:59 2018 > 43.05% done, estimate finish Fri May 25 20:43:00 2018 > 43.06% done, estimate finish Fri May 25 20:43:00 2018 > 43.06% done, estimate finish Fri May 25 20:42:59 2018 >=== last message repeated 2 times. === > 43.07% done, estimate finish Fri May 25 20:42:58 2018 > 43.07% done, estimate finish Fri May 25 20:42:57 2018 > 43.08% done, estimate finish Fri May 25 20:42:57 2018 > 43.08% done, estimate finish Fri May 25 20:42:59 2018 > 43.08% done, estimate finish Fri May 25 20:42:58 2018 > 43.09% done, estimate finish Fri May 25 20:42:57 2018 >=== last message repeated 2 times. === > 43.10% done, estimate finish Fri May 25 20:42:56 2018 >=== last message repeated 2 times. === > 43.10% done, estimate finish Fri May 25 20:42:57 2018 > 43.11% done, estimate finish Fri May 25 20:42:57 2018 > 43.11% done, estimate finish Fri May 25 20:42:56 2018 > 43.12% done, estimate finish Fri May 25 20:42:56 2018 > 43.12% done, estimate finish Fri May 25 20:42:55 2018 > 43.12% done, estimate finish Fri May 25 20:42:54 2018 > 43.13% done, estimate finish Fri May 25 20:42:56 2018 >=== last message repeated 2 times. === > 43.14% done, estimate finish Fri May 25 20:42:55 2018 > 43.14% done, estimate finish Fri May 25 20:42:54 2018 > 43.15% done, estimate finish Fri May 25 20:42:54 2018 > 43.15% done, estimate finish Fri May 25 20:42:53 2018 >=== last message repeated 2 times. === > 43.16% done, estimate finish Fri May 25 20:42:54 2018 >=== last message repeated 2 times. === > 43.17% done, estimate finish Fri May 25 20:42:53 2018 >=== last message repeated 2 times. === > 43.17% done, estimate finish Fri May 25 20:42:52 2018 > 43.18% done, estimate finish Fri May 25 20:42:52 2018 > 43.18% done, estimate finish Fri May 25 20:42:53 2018 > 43.19% done, estimate finish Fri May 25 20:42:53 2018 > 43.19% done, estimate finish Fri May 25 20:42:52 2018 >=== last message repeated 2 times. === > 43.20% done, estimate finish Fri May 25 20:42:51 2018 > 43.20% done, estimate finish Fri May 25 20:42:50 2018 > 43.21% done, estimate finish Fri May 25 20:42:50 2018 > 43.21% done, estimate finish Fri May 25 20:42:52 2018 > 43.21% done, estimate finish Fri May 25 20:42:51 2018 > 43.22% done, estimate finish Fri May 25 20:42:50 2018 >=== last message repeated 2 times. === > 43.23% done, estimate finish Fri May 25 20:42:49 2018 >=== last message repeated 2 times. === > 43.24% done, estimate finish Fri May 25 20:42:48 2018 > 43.24% done, estimate finish Fri May 25 20:42:50 2018 > 43.24% done, estimate finish Fri May 25 20:42:49 2018 > 43.25% done, estimate finish Fri May 25 20:42:49 2018 > 43.25% done, estimate finish Fri May 25 20:42:48 2018 > 43.26% done, estimate finish Fri May 25 20:42:47 2018 >=== last message repeated 2 times. === > 43.26% done, estimate finish Fri May 25 20:42:49 2018 > 43.27% done, estimate finish Fri May 25 20:42:48 2018 > 43.27% done, estimate finish Fri May 25 20:42:47 2018 > 43.28% done, estimate finish Fri May 25 20:42:47 2018 > 43.28% done, estimate finish Fri May 25 20:42:46 2018 >=== last message repeated 2 times. === > 43.29% done, estimate finish Fri May 25 20:42:47 2018 >=== last message repeated 2 times. === > 43.30% done, estimate finish Fri May 25 20:42:46 2018 >=== last message repeated 2 times. === > 43.31% done, estimate finish Fri May 25 20:42:45 2018 >=== last message repeated 2 times. === > 43.31% done, estimate finish Fri May 25 20:42:44 2018 > 43.32% done, estimate finish Fri May 25 20:42:46 2018 > 43.32% done, estimate finish Fri May 25 20:42:45 2018 > 43.33% done, estimate finish Fri May 25 20:42:45 2018 > 43.33% done, estimate finish Fri May 25 20:42:44 2018 > 43.33% done, estimate finish Fri May 25 20:42:43 2018 > 43.34% done, estimate finish Fri May 25 20:42:43 2018 > 43.34% done, estimate finish Fri May 25 20:42:45 2018 > 43.35% done, estimate finish Fri May 25 20:42:44 2018 > 43.35% done, estimate finish Fri May 25 20:42:43 2018 >=== last message repeated 2 times. === > 43.36% done, estimate finish Fri May 25 20:42:42 2018 >=== last message repeated 2 times. === > 43.37% done, estimate finish Fri May 25 20:42:41 2018 > 43.37% done, estimate finish Fri May 25 20:42:43 2018 > 43.37% done, estimate finish Fri May 25 20:42:42 2018 > 43.38% done, estimate finish Fri May 25 20:42:42 2018 > 43.38% done, estimate finish Fri May 25 20:42:41 2018 > 43.39% done, estimate finish Fri May 25 20:42:40 2018 >=== last message repeated 2 times. === > 43.40% done, estimate finish Fri May 25 20:42:42 2018 > 43.40% done, estimate finish Fri May 25 20:42:41 2018 > 43.40% done, estimate finish Fri May 25 20:42:40 2018 > 43.41% done, estimate finish Fri May 25 20:42:40 2018 > 43.41% done, estimate finish Fri May 25 20:42:39 2018 > 43.42% done, estimate finish Fri May 25 20:42:39 2018 > 43.42% done, estimate finish Fri May 25 20:42:38 2018 > 43.42% done, estimate finish Fri May 25 20:42:40 2018 > 43.43% done, estimate finish Fri May 25 20:42:39 2018 >=== last message repeated 2 times. === > 43.44% done, estimate finish Fri May 25 20:42:38 2018 >=== last message repeated 2 times. === > 43.44% done, estimate finish Fri May 25 20:42:37 2018 > 43.45% done, estimate finish Fri May 25 20:42:39 2018 > 43.45% done, estimate finish Fri May 25 20:42:38 2018 > 43.46% done, estimate finish Fri May 25 20:42:38 2018 > 43.46% done, estimate finish Fri May 25 20:42:37 2018 > 43.46% done, estimate finish Fri May 25 20:42:36 2018 > 43.47% done, estimate finish Fri May 25 20:42:36 2018 > 43.47% done, estimate finish Fri May 25 20:42:35 2018 > 43.48% done, estimate finish Fri May 25 20:42:37 2018 > 43.48% done, estimate finish Fri May 25 20:42:36 2018 > 43.49% done, estimate finish Fri May 25 20:42:36 2018 > 43.49% done, estimate finish Fri May 25 20:42:35 2018 >=== last message repeated 2 times. === > 43.50% done, estimate finish Fri May 25 20:42:34 2018 > 43.50% done, estimate finish Fri May 25 20:42:36 2018 > 43.51% done, estimate finish Fri May 25 20:42:35 2018 >=== last message repeated 2 times. === > 43.51% done, estimate finish Fri May 25 20:42:34 2018 > 43.52% done, estimate finish Fri May 25 20:42:34 2018 > 43.52% done, estimate finish Fri May 25 20:42:33 2018 > 43.53% done, estimate finish Fri May 25 20:42:32 2018 > 43.53% done, estimate finish Fri May 25 20:42:34 2018 >=== last message repeated 2 times. === > 43.54% done, estimate finish Fri May 25 20:42:33 2018 > 43.54% done, estimate finish Fri May 25 20:42:32 2018 > 43.55% done, estimate finish Fri May 25 20:42:32 2018 > 43.55% done, estimate finish Fri May 25 20:42:31 2018 > 43.55% done, estimate finish Fri May 25 20:42:33 2018 > 43.56% done, estimate finish Fri May 25 20:42:32 2018 >=== last message repeated 2 times. === > 43.57% done, estimate finish Fri May 25 20:42:31 2018 >=== last message repeated 2 times. === > 43.58% done, estimate finish Fri May 25 20:42:30 2018 > 43.58% done, estimate finish Fri May 25 20:42:29 2018 > 43.58% done, estimate finish Fri May 25 20:42:31 2018 > 43.59% done, estimate finish Fri May 25 20:42:31 2018 > 43.59% done, estimate finish Fri May 25 20:42:30 2018 > 43.60% done, estimate finish Fri May 25 20:42:29 2018 >=== last message repeated 2 times. === > 43.60% done, estimate finish Fri May 25 20:42:28 2018 > 43.61% done, estimate finish Fri May 25 20:42:30 2018 > 43.61% done, estimate finish Fri May 25 20:42:29 2018 > 43.62% done, estimate finish Fri May 25 20:42:29 2018 > 43.62% done, estimate finish Fri May 25 20:42:28 2018 >=== last message repeated 2 times. === > 43.63% done, estimate finish Fri May 25 20:42:27 2018 >=== last message repeated 2 times. === > 43.64% done, estimate finish Fri May 25 20:42:28 2018 >=== last message repeated 2 times. === > 43.65% done, estimate finish Fri May 25 20:42:27 2018 >=== last message repeated 2 times. === > 43.65% done, estimate finish Fri May 25 20:42:26 2018 > 43.66% done, estimate finish Fri May 25 20:42:25 2018 > 43.66% done, estimate finish Fri May 25 20:42:27 2018 > 43.67% done, estimate finish Fri May 25 20:42:27 2018 > 43.67% done, estimate finish Fri May 25 20:42:26 2018 > 43.67% done, estimate finish Fri May 25 20:42:25 2018 > 43.68% done, estimate finish Fri May 25 20:42:25 2018 > 43.68% done, estimate finish Fri May 25 20:42:24 2018 > 43.69% done, estimate finish Fri May 25 20:42:26 2018 > 43.69% done, estimate finish Fri May 25 20:42:25 2018 >=== last message repeated 2 times. === > 43.70% done, estimate finish Fri May 25 20:42:24 2018 >=== last message repeated 2 times. === > 43.71% done, estimate finish Fri May 25 20:42:23 2018 >=== last message repeated 2 times. === > 43.71% done, estimate finish Fri May 25 20:42:24 2018 > 43.72% done, estimate finish Fri May 25 20:42:24 2018 > 43.72% done, estimate finish Fri May 25 20:42:23 2018 > 43.73% done, estimate finish Fri May 25 20:42:23 2018 > 43.73% done, estimate finish Fri May 25 20:42:22 2018 > 43.74% done, estimate finish Fri May 25 20:42:21 2018 >=== last message repeated 2 times. === > 43.74% done, estimate finish Fri May 25 20:42:23 2018 > 43.75% done, estimate finish Fri May 25 20:42:22 2018 > 43.75% done, estimate finish Fri May 25 20:42:21 2018 > 43.76% done, estimate finish Fri May 25 20:42:21 2018 > 43.76% done, estimate finish Fri May 25 20:42:20 2018 >=== last message repeated 2 times. === > 43.77% done, estimate finish Fri May 25 20:42:21 2018 >=== last message repeated 2 times. === > 43.78% done, estimate finish Fri May 25 20:42:20 2018 >=== last message repeated 2 times. === > 43.78% done, estimate finish Fri May 25 20:42:19 2018 > 43.79% done, estimate finish Fri May 25 20:42:19 2018 > 43.79% done, estimate finish Fri May 25 20:42:20 2018 > 43.80% done, estimate finish Fri May 25 20:42:20 2018 > 43.80% done, estimate finish Fri May 25 20:42:19 2018 >=== last message repeated 2 times. === > 43.81% done, estimate finish Fri May 25 20:42:18 2018 > 43.81% done, estimate finish Fri May 25 20:42:17 2018 > 43.82% done, estimate finish Fri May 25 20:42:17 2018 > 43.82% done, estimate finish Fri May 25 20:42:19 2018 > 43.83% done, estimate finish Fri May 25 20:42:18 2018 > 43.83% done, estimate finish Fri May 25 20:42:17 2018 >=== last message repeated 2 times. === > 43.84% done, estimate finish Fri May 25 20:42:16 2018 >=== last message repeated 2 times. === > 43.85% done, estimate finish Fri May 25 20:42:15 2018 > 43.85% done, estimate finish Fri May 25 20:42:17 2018 > 43.85% done, estimate finish Fri May 25 20:42:16 2018 > 43.86% done, estimate finish Fri May 25 20:42:16 2018 > 43.86% done, estimate finish Fri May 25 20:42:15 2018 > 43.87% done, estimate finish Fri May 25 20:42:15 2018 > 43.87% done, estimate finish Fri May 25 20:42:14 2018 > 43.87% done, estimate finish Fri May 25 20:42:16 2018 > 43.88% done, estimate finish Fri May 25 20:42:15 2018 >=== last message repeated 2 times. === > 43.89% done, estimate finish Fri May 25 20:42:14 2018 > 43.89% done, estimate finish Fri May 25 20:42:13 2018 >=== last message repeated 2 times. === > 43.90% done, estimate finish Fri May 25 20:42:15 2018 > 43.90% done, estimate finish Fri May 25 20:42:14 2018 > 43.91% done, estimate finish Fri May 25 20:42:13 2018 >=== last message repeated 2 times. === > 43.92% done, estimate finish Fri May 25 20:42:12 2018 >=== last message repeated 2 times. === > 43.92% done, estimate finish Fri May 25 20:42:11 2018 > 43.93% done, estimate finish Fri May 25 20:42:13 2018 > 43.93% done, estimate finish Fri May 25 20:42:12 2018 > 43.94% done, estimate finish Fri May 25 20:42:12 2018 > 43.94% done, estimate finish Fri May 25 20:42:11 2018 >=== last message repeated 2 times. === > 43.95% done, estimate finish Fri May 25 20:42:10 2018 > 43.95% done, estimate finish Fri May 25 20:42:12 2018 > 43.96% done, estimate finish Fri May 25 20:42:11 2018 >=== last message repeated 2 times. === > 43.96% done, estimate finish Fri May 25 20:42:10 2018 > 43.97% done, estimate finish Fri May 25 20:42:10 2018 > 43.97% done, estimate finish Fri May 25 20:42:09 2018 > 43.98% done, estimate finish Fri May 25 20:42:08 2018 > 43.98% done, estimate finish Fri May 25 20:42:10 2018 > 43.98% done, estimate finish Fri May 25 20:42:09 2018 > 43.99% done, estimate finish Fri May 25 20:42:09 2018 > 43.99% done, estimate finish Fri May 25 20:42:08 2018 > 44.00% done, estimate finish Fri May 25 20:42:08 2018 > 44.00% done, estimate finish Fri May 25 20:42:07 2018 > 44.01% done, estimate finish Fri May 25 20:42:09 2018 > 44.01% done, estimate finish Fri May 25 20:42:08 2018 >=== last message repeated 2 times. === > 44.02% done, estimate finish Fri May 25 20:42:07 2018 >=== last message repeated 2 times. === > 44.03% done, estimate finish Fri May 25 20:42:06 2018 > 44.03% done, estimate finish Fri May 25 20:42:08 2018 > 44.03% done, estimate finish Fri May 25 20:42:07 2018 > 44.04% done, estimate finish Fri May 25 20:42:07 2018 > 44.04% done, estimate finish Fri May 25 20:42:06 2018 > 44.05% done, estimate finish Fri May 25 20:42:06 2018 > 44.05% done, estimate finish Fri May 25 20:42:05 2018 > 44.05% done, estimate finish Fri May 25 20:42:04 2018 > 44.06% done, estimate finish Fri May 25 20:42:06 2018 >=== last message repeated 2 times. === > 44.07% done, estimate finish Fri May 25 20:42:05 2018 > 44.07% done, estimate finish Fri May 25 20:42:04 2018 >=== last message repeated 2 times. === > 44.08% done, estimate finish Fri May 25 20:42:03 2018 >=== last message repeated 2 times. === > 44.09% done, estimate finish Fri May 25 20:42:04 2018 >=== last message repeated 2 times. === > 44.10% done, estimate finish Fri May 25 20:42:03 2018 >=== last message repeated 2 times. === > 44.10% done, estimate finish Fri May 25 20:42:02 2018 > 44.11% done, estimate finish Fri May 25 20:42:02 2018 > 44.11% done, estimate finish Fri May 25 20:42:03 2018 > 44.12% done, estimate finish Fri May 25 20:42:03 2018 > 44.12% done, estimate finish Fri May 25 20:42:02 2018 >=== last message repeated 2 times. === > 44.13% done, estimate finish Fri May 25 20:42:01 2018 > 44.13% done, estimate finish Fri May 25 20:42:00 2018 > 44.14% done, estimate finish Fri May 25 20:42:02 2018 >=== last message repeated 2 times. === > 44.14% done, estimate finish Fri May 25 20:42:01 2018 > 44.15% done, estimate finish Fri May 25 20:42:00 2018 >=== last message repeated 2 times. === > 44.16% done, estimate finish Fri May 25 20:41:59 2018 >=== last message repeated 2 times. === > 44.17% done, estimate finish Fri May 25 20:42:00 2018 >=== last message repeated 2 times. === > 44.17% done, estimate finish Fri May 25 20:41:59 2018 > 44.18% done, estimate finish Fri May 25 20:41:59 2018 > 44.18% done, estimate finish Fri May 25 20:41:58 2018 > 44.19% done, estimate finish Fri May 25 20:41:58 2018 > 44.19% done, estimate finish Fri May 25 20:41:57 2018 > 44.19% done, estimate finish Fri May 25 20:41:59 2018 > 44.20% done, estimate finish Fri May 25 20:41:58 2018 >=== last message repeated 2 times. === > 44.21% done, estimate finish Fri May 25 20:41:57 2018 >=== last message repeated 2 times. === > 44.21% done, estimate finish Fri May 25 20:41:56 2018 > 44.22% done, estimate finish Fri May 25 20:41:58 2018 > 44.22% done, estimate finish Fri May 25 20:41:57 2018 > 44.23% done, estimate finish Fri May 25 20:41:57 2018 > 44.23% done, estimate finish Fri May 25 20:41:56 2018 > 44.23% done, estimate finish Fri May 25 20:41:55 2018 > 44.24% done, estimate finish Fri May 25 20:41:55 2018 > 44.24% done, estimate finish Fri May 25 20:41:57 2018 > 44.25% done, estimate finish Fri May 25 20:41:56 2018 > 44.25% done, estimate finish Fri May 25 20:41:55 2018 > 44.26% done, estimate finish Fri May 25 20:41:55 2018 > 44.26% done, estimate finish Fri May 25 20:41:54 2018 >=== last message repeated 2 times. === > 44.27% done, estimate finish Fri May 25 20:41:53 2018 > 44.27% done, estimate finish Fri May 25 20:41:55 2018 > 44.28% done, estimate finish Fri May 25 20:41:54 2018 >=== last message repeated 2 times. === > 44.28% done, estimate finish Fri May 25 20:41:53 2018 > 44.29% done, estimate finish Fri May 25 20:41:53 2018 > 44.29% done, estimate finish Fri May 25 20:41:52 2018 > 44.30% done, estimate finish Fri May 25 20:41:54 2018 > 44.30% done, estimate finish Fri May 25 20:41:53 2018 >=== last message repeated 2 times. === > 44.31% done, estimate finish Fri May 25 20:41:52 2018 >=== last message repeated 2 times. === > 44.32% done, estimate finish Fri May 25 20:41:51 2018 > 44.32% done, estimate finish Fri May 25 20:41:50 2018 > 44.32% done, estimate finish Fri May 25 20:41:52 2018 > 44.33% done, estimate finish Fri May 25 20:41:52 2018 > 44.33% done, estimate finish Fri May 25 20:41:51 2018 > 44.34% done, estimate finish Fri May 25 20:41:50 2018 >=== last message repeated 2 times. === > 44.35% done, estimate finish Fri May 25 20:41:49 2018 > 44.35% done, estimate finish Fri May 25 20:41:51 2018 > 44.35% done, estimate finish Fri May 25 20:41:50 2018 > 44.36% done, estimate finish Fri May 25 20:41:50 2018 > 44.36% done, estimate finish Fri May 25 20:41:49 2018 > 44.37% done, estimate finish Fri May 25 20:41:49 2018 > 44.37% done, estimate finish Fri May 25 20:41:48 2018 >=== last message repeated 2 times. === > 44.38% done, estimate finish Fri May 25 20:41:49 2018 >=== last message repeated 2 times. === > 44.39% done, estimate finish Fri May 25 20:41:48 2018 >=== last message repeated 2 times. === > 44.39% done, estimate finish Fri May 25 20:41:47 2018 > 44.40% done, estimate finish Fri May 25 20:41:47 2018 > 44.40% done, estimate finish Fri May 25 20:41:48 2018 > 44.41% done, estimate finish Fri May 25 20:41:48 2018 > 44.41% done, estimate finish Fri May 25 20:41:47 2018 >=== last message repeated 2 times. === > 44.42% done, estimate finish Fri May 25 20:41:46 2018 > 44.42% done, estimate finish Fri May 25 20:41:45 2018 > 44.43% done, estimate finish Fri May 25 20:41:45 2018 > 44.43% done, estimate finish Fri May 25 20:41:47 2018 > 44.44% done, estimate finish Fri May 25 20:41:46 2018 > 44.44% done, estimate finish Fri May 25 20:41:45 2018 >=== last message repeated 2 times. === > 44.45% done, estimate finish Fri May 25 20:41:44 2018 >=== last message repeated 2 times. === > 44.46% done, estimate finish Fri May 25 20:41:45 2018 >=== last message repeated 2 times. === > 44.46% done, estimate finish Fri May 25 20:41:44 2018 > 44.47% done, estimate finish Fri May 25 20:41:44 2018 > 44.47% done, estimate finish Fri May 25 20:41:43 2018 > 44.48% done, estimate finish Fri May 25 20:41:43 2018 > 44.48% done, estimate finish Fri May 25 20:41:44 2018 >=== last message repeated 2 times. === > 44.49% done, estimate finish Fri May 25 20:41:43 2018 >=== last message repeated 2 times. === > 44.50% done, estimate finish Fri May 25 20:41:42 2018 >=== last message repeated 2 times. === > 44.51% done, estimate finish Fri May 25 20:41:41 2018 > 44.51% done, estimate finish Fri May 25 20:41:43 2018 > 44.51% done, estimate finish Fri May 25 20:41:42 2018 > 44.52% done, estimate finish Fri May 25 20:41:42 2018 > 44.52% done, estimate finish Fri May 25 20:41:41 2018 > 44.53% done, estimate finish Fri May 25 20:41:40 2018 >=== last message repeated 2 times. === > 44.53% done, estimate finish Fri May 25 20:41:39 2018 > 44.54% done, estimate finish Fri May 25 20:41:41 2018 > 44.54% done, estimate finish Fri May 25 20:41:40 2018 > 44.55% done, estimate finish Fri May 25 20:41:40 2018 > 44.55% done, estimate finish Fri May 25 20:41:39 2018 >=== last message repeated 2 times. === > 44.56% done, estimate finish Fri May 25 20:41:38 2018 > 44.56% done, estimate finish Fri May 25 20:41:40 2018 > 44.57% done, estimate finish Fri May 25 20:41:39 2018 >=== last message repeated 2 times. === > 44.57% done, estimate finish Fri May 25 20:41:38 2018 > 44.58% done, estimate finish Fri May 25 20:41:38 2018 > 44.58% done, estimate finish Fri May 25 20:41:37 2018 > 44.59% done, estimate finish Fri May 25 20:41:39 2018 > 44.59% done, estimate finish Fri May 25 20:41:38 2018 > 44.60% done, estimate finish Fri May 25 20:41:38 2018 > 44.60% done, estimate finish Fri May 25 20:41:37 2018 >=== last message repeated 2 times. === > 44.61% done, estimate finish Fri May 25 20:41:36 2018 > 44.61% done, estimate finish Fri May 25 20:41:35 2018 > 44.62% done, estimate finish Fri May 25 20:41:37 2018 >=== last message repeated 2 times. === > 44.62% done, estimate finish Fri May 25 20:41:36 2018 > 44.63% done, estimate finish Fri May 25 20:41:35 2018 >=== last message repeated 2 times. === > 44.64% done, estimate finish Fri May 25 20:41:34 2018 > 44.64% done, estimate finish Fri May 25 20:41:36 2018 >=== last message repeated 2 times. === > 44.65% done, estimate finish Fri May 25 20:41:35 2018 > 44.65% done, estimate finish Fri May 25 20:41:34 2018 > 44.66% done, estimate finish Fri May 25 20:41:34 2018 > 44.66% done, estimate finish Fri May 25 20:41:33 2018 >=== last message repeated 2 times. === > 44.67% done, estimate finish Fri May 25 20:41:34 2018 >=== last message repeated 2 times. === > 44.68% done, estimate finish Fri May 25 20:41:33 2018 >=== last message repeated 2 times. === > 44.69% done, estimate finish Fri May 25 20:41:32 2018 >=== last message repeated 2 times. === > 44.69% done, estimate finish Fri May 25 20:41:33 2018 > 44.70% done, estimate finish Fri May 25 20:41:33 2018 > 44.70% done, estimate finish Fri May 25 20:41:32 2018 > 44.71% done, estimate finish Fri May 25 20:41:32 2018 > 44.71% done, estimate finish Fri May 25 20:41:31 2018 >=== last message repeated 2 times. === > 44.72% done, estimate finish Fri May 25 20:41:30 2018 > 44.72% done, estimate finish Fri May 25 20:41:32 2018 > 44.73% done, estimate finish Fri May 25 20:41:31 2018 >=== last message repeated 2 times. === > 44.73% done, estimate finish Fri May 25 20:41:30 2018 > 44.74% done, estimate finish Fri May 25 20:41:29 2018 >=== last message repeated 2 times. === > 44.75% done, estimate finish Fri May 25 20:41:31 2018 > 44.75% done, estimate finish Fri May 25 20:41:30 2018 > 44.75% done, estimate finish Fri May 25 20:41:29 2018 > 44.76% done, estimate finish Fri May 25 20:41:29 2018 > 44.76% done, estimate finish Fri May 25 20:41:28 2018 > 44.77% done, estimate finish Fri May 25 20:41:28 2018 > 44.77% done, estimate finish Fri May 25 20:41:29 2018 > 44.78% done, estimate finish Fri May 25 20:41:29 2018 > 44.78% done, estimate finish Fri May 25 20:41:28 2018 >=== last message repeated 2 times. === > 44.79% done, estimate finish Fri May 25 20:41:27 2018 > 44.79% done, estimate finish Fri May 25 20:41:29 2018 > 44.80% done, estimate finish Fri May 25 20:41:28 2018 >=== last message repeated 2 times. === > 44.80% done, estimate finish Fri May 25 20:41:27 2018 > 44.81% done, estimate finish Fri May 25 20:41:27 2018 > 44.81% done, estimate finish Fri May 25 20:41:26 2018 > 44.82% done, estimate finish Fri May 25 20:41:26 2018 > 44.82% done, estimate finish Fri May 25 20:41:27 2018 >=== last message repeated 2 times. === > 44.83% done, estimate finish Fri May 25 20:41:26 2018 >=== last message repeated 2 times. === > 44.84% done, estimate finish Fri May 25 20:41:25 2018 >=== last message repeated 2 times. === > 44.84% done, estimate finish Fri May 25 20:41:26 2018 > 44.85% done, estimate finish Fri May 25 20:41:26 2018 > 44.85% done, estimate finish Fri May 25 20:41:25 2018 > 44.86% done, estimate finish Fri May 25 20:41:25 2018 > 44.86% done, estimate finish Fri May 25 20:41:24 2018 > 44.87% done, estimate finish Fri May 25 20:41:23 2018 >=== last message repeated 2 times. === > 44.87% done, estimate finish Fri May 25 20:41:25 2018 > 44.88% done, estimate finish Fri May 25 20:41:24 2018 > 44.88% done, estimate finish Fri May 25 20:41:23 2018 > 44.89% done, estimate finish Fri May 25 20:41:23 2018 > 44.89% done, estimate finish Fri May 25 20:41:22 2018 >=== last message repeated 2 times. === > 44.90% done, estimate finish Fri May 25 20:41:23 2018 >=== last message repeated 2 times. === > 44.91% done, estimate finish Fri May 25 20:41:22 2018 >=== last message repeated 2 times. === > 44.91% done, estimate finish Fri May 25 20:41:21 2018 > 44.92% done, estimate finish Fri May 25 20:41:21 2018 > 44.92% done, estimate finish Fri May 25 20:41:22 2018 > 44.93% done, estimate finish Fri May 25 20:41:22 2018 > 44.93% done, estimate finish Fri May 25 20:41:21 2018 > 44.94% done, estimate finish Fri May 25 20:41:21 2018 > 44.94% done, estimate finish Fri May 25 20:41:20 2018 >=== last message repeated 2 times. === > 44.95% done, estimate finish Fri May 25 20:41:19 2018 > 44.95% done, estimate finish Fri May 25 20:41:21 2018 > 44.96% done, estimate finish Fri May 25 20:41:20 2018 >=== last message repeated 2 times. === > 44.96% done, estimate finish Fri May 25 20:41:19 2018 > 44.97% done, estimate finish Fri May 25 20:41:19 2018 > 44.97% done, estimate finish Fri May 25 20:41:18 2018 > 44.98% done, estimate finish Fri May 25 20:41:20 2018 > 44.98% done, estimate finish Fri May 25 20:41:19 2018 >=== last message repeated 2 times. === > 44.99% done, estimate finish Fri May 25 20:41:18 2018 >=== last message repeated 2 times. === > 45.00% done, estimate finish Fri May 25 20:41:17 2018 > 45.00% done, estimate finish Fri May 25 20:41:16 2018 > 45.00% done, estimate finish Fri May 25 20:41:18 2018 > 45.01% done, estimate finish Fri May 25 20:41:18 2018 > 45.01% done, estimate finish Fri May 25 20:41:17 2018 > 45.02% done, estimate finish Fri May 25 20:41:16 2018 >=== last message repeated 2 times. === > 45.03% done, estimate finish Fri May 25 20:41:15 2018 > 45.03% done, estimate finish Fri May 25 20:41:17 2018 > 45.03% done, estimate finish Fri May 25 20:41:16 2018 > 45.04% done, estimate finish Fri May 25 20:41:16 2018 > 45.04% done, estimate finish Fri May 25 20:41:15 2018 > 45.05% done, estimate finish Fri May 25 20:41:15 2018 > 45.05% done, estimate finish Fri May 25 20:41:14 2018 > 45.05% done, estimate finish Fri May 25 20:41:16 2018 > 45.06% done, estimate finish Fri May 25 20:41:15 2018 >=== last message repeated 2 times. === > 45.07% done, estimate finish Fri May 25 20:41:14 2018 >=== last message repeated 2 times. === > 45.07% done, estimate finish Fri May 25 20:41:13 2018 > 45.08% done, estimate finish Fri May 25 20:41:13 2018 > 45.08% done, estimate finish Fri May 25 20:41:14 2018 > 45.09% done, estimate finish Fri May 25 20:41:14 2018 > 45.09% done, estimate finish Fri May 25 20:41:13 2018 >=== last message repeated 2 times. === > 45.10% done, estimate finish Fri May 25 20:41:12 2018 >=== last message repeated 2 times. === > 45.11% done, estimate finish Fri May 25 20:41:13 2018 >=== last message repeated 2 times. === > 45.12% done, estimate finish Fri May 25 20:41:12 2018 >=== last message repeated 2 times. === > 45.12% done, estimate finish Fri May 25 20:41:11 2018 > 45.13% done, estimate finish Fri May 25 20:41:10 2018 >=== last message repeated 2 times. === > 45.14% done, estimate finish Fri May 25 20:41:12 2018 > 45.14% done, estimate finish Fri May 25 20:41:11 2018 >=== last message repeated 2 times. === > 45.15% done, estimate finish Fri May 25 20:41:10 2018 > 45.15% done, estimate finish Fri May 25 20:41:09 2018 > 45.16% done, estimate finish Fri May 25 20:41:09 2018 > 45.16% done, estimate finish Fri May 25 20:41:11 2018 > 45.16% done, estimate finish Fri May 25 20:41:10 2018 > 45.17% done, estimate finish Fri May 25 20:41:09 2018 >=== last message repeated 2 times. === > 45.18% done, estimate finish Fri May 25 20:41:08 2018 >=== last message repeated 2 times. === > 45.18% done, estimate finish Fri May 25 20:41:07 2018 > 45.19% done, estimate finish Fri May 25 20:41:09 2018 > 45.19% done, estimate finish Fri May 25 20:41:08 2018 > 45.20% done, estimate finish Fri May 25 20:41:08 2018 > 45.20% done, estimate finish Fri May 25 20:41:07 2018 > 45.21% done, estimate finish Fri May 25 20:41:07 2018 > 45.21% done, estimate finish Fri May 25 20:41:06 2018 > 45.21% done, estimate finish Fri May 25 20:41:08 2018 > 45.22% done, estimate finish Fri May 25 20:41:07 2018 >=== last message repeated 2 times. === > 45.23% done, estimate finish Fri May 25 20:41:06 2018 >=== last message repeated 2 times. === > 45.23% done, estimate finish Fri May 25 20:41:05 2018 > 45.24% done, estimate finish Fri May 25 20:41:05 2018 > 45.24% done, estimate finish Fri May 25 20:41:06 2018 > 45.25% done, estimate finish Fri May 25 20:41:06 2018 > 45.25% done, estimate finish Fri May 25 20:41:05 2018 >=== last message repeated 2 times. === > 45.26% done, estimate finish Fri May 25 20:41:04 2018 >=== last message repeated 2 times. === > 45.27% done, estimate finish Fri May 25 20:41:05 2018 >=== last message repeated 2 times. === > 45.28% done, estimate finish Fri May 25 20:41:04 2018 >=== last message repeated 2 times. === > 45.28% done, estimate finish Fri May 25 20:41:03 2018 > 45.29% done, estimate finish Fri May 25 20:41:02 2018 > 45.29% done, estimate finish Fri May 25 20:41:04 2018 > 45.30% done, estimate finish Fri May 25 20:41:04 2018 > 45.30% done, estimate finish Fri May 25 20:41:03 2018 > 45.30% done, estimate finish Fri May 25 20:41:02 2018 > 45.31% done, estimate finish Fri May 25 20:41:02 2018 > 45.31% done, estimate finish Fri May 25 20:41:01 2018 > 45.32% done, estimate finish Fri May 25 20:41:01 2018 > 45.32% done, estimate finish Fri May 25 20:41:03 2018 > 45.32% done, estimate finish Fri May 25 20:41:02 2018 > 45.33% done, estimate finish Fri May 25 20:41:01 2018 >=== last message repeated 2 times. === > 45.34% done, estimate finish Fri May 25 20:41:00 2018 >=== last message repeated 2 times. === > 45.34% done, estimate finish Fri May 25 20:41:01 2018 > 45.35% done, estimate finish Fri May 25 20:41:01 2018 > 45.35% done, estimate finish Fri May 25 20:41:00 2018 > 45.36% done, estimate finish Fri May 25 20:41:00 2018 > 45.36% done, estimate finish Fri May 25 20:40:59 2018 > 45.37% done, estimate finish Fri May 25 20:40:59 2018 > 45.37% done, estimate finish Fri May 25 20:40:58 2018 > 45.37% done, estimate finish Fri May 25 20:41:00 2018 > 45.38% done, estimate finish Fri May 25 20:40:59 2018 >=== last message repeated 2 times. === > 45.39% done, estimate finish Fri May 25 20:40:58 2018 >=== last message repeated 2 times. === > 45.39% done, estimate finish Fri May 25 20:40:57 2018 > 45.40% done, estimate finish Fri May 25 20:40:59 2018 > 45.40% done, estimate finish Fri May 25 20:40:58 2018 > 45.41% done, estimate finish Fri May 25 20:40:58 2018 > 45.41% done, estimate finish Fri May 25 20:40:57 2018 >=== last message repeated 2 times. === > 45.42% done, estimate finish Fri May 25 20:40:56 2018 >=== last message repeated 2 times. === > 45.43% done, estimate finish Fri May 25 20:40:57 2018 >=== last message repeated 2 times. === > 45.43% done, estimate finish Fri May 25 20:40:56 2018 > 45.44% done, estimate finish Fri May 25 20:40:56 2018 > 45.44% done, estimate finish Fri May 25 20:40:55 2018 > 45.45% done, estimate finish Fri May 25 20:40:54 2018 > 45.45% done, estimate finish Fri May 25 20:40:56 2018 > 45.46% done, estimate finish Fri May 25 20:40:56 2018 > 45.46% done, estimate finish Fri May 25 20:40:55 2018 >=== last message repeated 2 times. === > 45.47% done, estimate finish Fri May 25 20:40:54 2018 > 45.47% done, estimate finish Fri May 25 20:40:53 2018 > 45.48% done, estimate finish Fri May 25 20:40:55 2018 >=== last message repeated 2 times. === > 45.48% done, estimate finish Fri May 25 20:40:54 2018 > 45.49% done, estimate finish Fri May 25 20:40:53 2018 >=== last message repeated 2 times. === > 45.50% done, estimate finish Fri May 25 20:40:52 2018 >=== last message repeated 2 times. === > 45.50% done, estimate finish Fri May 25 20:40:53 2018 > 45.51% done, estimate finish Fri May 25 20:40:53 2018 > 45.51% done, estimate finish Fri May 25 20:40:52 2018 > 45.52% done, estimate finish Fri May 25 20:40:52 2018 > 45.52% done, estimate finish Fri May 25 20:40:51 2018 >=== last message repeated 2 times. === > 45.53% done, estimate finish Fri May 25 20:40:52 2018 >=== last message repeated 2 times. === > 45.54% done, estimate finish Fri May 25 20:40:51 2018 >=== last message repeated 2 times. === > 45.55% done, estimate finish Fri May 25 20:40:50 2018 >=== last message repeated 2 times. === > 45.55% done, estimate finish Fri May 25 20:40:51 2018 > 45.56% done, estimate finish Fri May 25 20:40:51 2018 > 45.56% done, estimate finish Fri May 25 20:40:50 2018 > 45.57% done, estimate finish Fri May 25 20:40:50 2018 > 45.57% done, estimate finish Fri May 25 20:40:49 2018 >=== last message repeated 2 times. === > 45.58% done, estimate finish Fri May 25 20:40:48 2018 > 45.58% done, estimate finish Fri May 25 20:40:50 2018 > 45.59% done, estimate finish Fri May 25 20:40:49 2018 >=== last message repeated 2 times. === > 45.59% done, estimate finish Fri May 25 20:40:48 2018 > 45.60% done, estimate finish Fri May 25 20:40:48 2018 > 45.60% done, estimate finish Fri May 25 20:40:47 2018 > 45.61% done, estimate finish Fri May 25 20:40:49 2018 > 45.61% done, estimate finish Fri May 25 20:40:48 2018 >=== last message repeated 2 times. === > 45.62% done, estimate finish Fri May 25 20:40:47 2018 >=== last message repeated 2 times. === > 45.63% done, estimate finish Fri May 25 20:40:46 2018 >=== last message repeated 2 times. === > 45.64% done, estimate finish Fri May 25 20:40:47 2018 >=== last message repeated 2 times. === > 45.64% done, estimate finish Fri May 25 20:40:46 2018 > 45.65% done, estimate finish Fri May 25 20:40:46 2018 > 45.65% done, estimate finish Fri May 25 20:40:45 2018 > 45.66% done, estimate finish Fri May 25 20:40:44 2018 > 45.66% done, estimate finish Fri May 25 20:40:46 2018 >=== last message repeated 2 times. === > 45.67% done, estimate finish Fri May 25 20:40:45 2018 >=== last message repeated 2 times. === > 45.68% done, estimate finish Fri May 25 20:40:44 2018 > 45.68% done, estimate finish Fri May 25 20:40:43 2018 >=== last message repeated 2 times. === > 45.69% done, estimate finish Fri May 25 20:40:45 2018 > 45.69% done, estimate finish Fri May 25 20:40:44 2018 > 45.70% done, estimate finish Fri May 25 20:40:43 2018 >=== last message repeated 2 times. === > 45.71% done, estimate finish Fri May 25 20:40:42 2018 >=== last message repeated 2 times. === > 45.71% done, estimate finish Fri May 25 20:40:44 2018 > 45.72% done, estimate finish Fri May 25 20:40:43 2018 > 45.72% done, estimate finish Fri May 25 20:40:42 2018 > 45.73% done, estimate finish Fri May 25 20:40:42 2018 > 45.73% done, estimate finish Fri May 25 20:40:41 2018 >=== last message repeated 2 times. === > 45.74% done, estimate finish Fri May 25 20:40:42 2018 >=== last message repeated 2 times. === > 45.75% done, estimate finish Fri May 25 20:40:41 2018 >=== last message repeated 2 times. === > 45.75% done, estimate finish Fri May 25 20:40:40 2018 > 45.76% done, estimate finish Fri May 25 20:40:40 2018 > 45.76% done, estimate finish Fri May 25 20:40:39 2018 > 45.77% done, estimate finish Fri May 25 20:40:41 2018 > 45.77% done, estimate finish Fri May 25 20:40:40 2018 >=== last message repeated 2 times. === > 45.78% done, estimate finish Fri May 25 20:40:39 2018 >=== last message repeated 2 times. === > 45.79% done, estimate finish Fri May 25 20:40:38 2018 > 45.79% done, estimate finish Fri May 25 20:40:40 2018 > 45.80% done, estimate finish Fri May 25 20:40:39 2018 >=== last message repeated 2 times. === > 45.80% done, estimate finish Fri May 25 20:40:38 2018 > 45.81% done, estimate finish Fri May 25 20:40:38 2018 > 45.81% done, estimate finish Fri May 25 20:40:37 2018 > 45.82% done, estimate finish Fri May 25 20:40:39 2018 > 45.82% done, estimate finish Fri May 25 20:40:38 2018 >=== last message repeated 2 times. === > 45.83% done, estimate finish Fri May 25 20:40:37 2018 >=== last message repeated 2 times. === > 45.84% done, estimate finish Fri May 25 20:40:36 2018 >=== last message repeated 2 times. === > 45.84% done, estimate finish Fri May 25 20:40:37 2018 > 45.85% done, estimate finish Fri May 25 20:40:37 2018 > 45.85% done, estimate finish Fri May 25 20:40:36 2018 > 45.86% done, estimate finish Fri May 25 20:40:36 2018 > 45.86% done, estimate finish Fri May 25 20:40:35 2018 >=== last message repeated 2 times. === > 45.87% done, estimate finish Fri May 25 20:40:34 2018 > 45.87% done, estimate finish Fri May 25 20:40:36 2018 > 45.88% done, estimate finish Fri May 25 20:40:35 2018 >=== last message repeated 2 times. === > 45.89% done, estimate finish Fri May 25 20:40:34 2018 >=== last message repeated 2 times. === > 45.89% done, estimate finish Fri May 25 20:40:33 2018 > 45.90% done, estimate finish Fri May 25 20:40:35 2018 > 45.90% done, estimate finish Fri May 25 20:40:34 2018 > 45.91% done, estimate finish Fri May 25 20:40:34 2018 > 45.91% done, estimate finish Fri May 25 20:40:33 2018 > 45.91% done, estimate finish Fri May 25 20:40:32 2018 > 45.92% done, estimate finish Fri May 25 20:40:32 2018 > 45.92% done, estimate finish Fri May 25 20:40:34 2018 > 45.93% done, estimate finish Fri May 25 20:40:33 2018 >=== last message repeated 2 times. === > 45.93% done, estimate finish Fri May 25 20:40:32 2018 > 45.94% done, estimate finish Fri May 25 20:40:31 2018 >=== last message repeated 2 times. === > 45.95% done, estimate finish Fri May 25 20:40:30 2018 > 45.95% done, estimate finish Fri May 25 20:40:32 2018 > 45.95% done, estimate finish Fri May 25 20:40:31 2018 > 45.96% done, estimate finish Fri May 25 20:40:31 2018 > 45.96% done, estimate finish Fri May 25 20:40:30 2018 > 45.97% done, estimate finish Fri May 25 20:40:30 2018 > 45.97% done, estimate finish Fri May 25 20:40:29 2018 > 45.98% done, estimate finish Fri May 25 20:40:31 2018 > 45.98% done, estimate finish Fri May 25 20:40:30 2018 >=== last message repeated 2 times. === > 45.99% done, estimate finish Fri May 25 20:40:29 2018 >=== last message repeated 2 times. === > 46.00% done, estimate finish Fri May 25 20:40:28 2018 > 46.00% done, estimate finish Fri May 25 20:40:30 2018 > 46.00% done, estimate finish Fri May 25 20:40:29 2018 > 46.01% done, estimate finish Fri May 25 20:40:29 2018 > 46.01% done, estimate finish Fri May 25 20:40:28 2018 > 46.02% done, estimate finish Fri May 25 20:40:28 2018 > 46.02% done, estimate finish Fri May 25 20:40:27 2018 >=== last message repeated 2 times. === > 46.03% done, estimate finish Fri May 25 20:40:28 2018 >=== last message repeated 2 times. === > 46.04% done, estimate finish Fri May 25 20:40:27 2018 >=== last message repeated 2 times. === > 46.05% done, estimate finish Fri May 25 20:40:26 2018 >=== last message repeated 2 times. === > 46.05% done, estimate finish Fri May 25 20:40:27 2018 > 46.06% done, estimate finish Fri May 25 20:40:27 2018 > 46.06% done, estimate finish Fri May 25 20:40:26 2018 > 46.07% done, estimate finish Fri May 25 20:40:26 2018 > 46.07% done, estimate finish Fri May 25 20:40:25 2018 >=== last message repeated 2 times. === > 46.08% done, estimate finish Fri May 25 20:40:24 2018 > 46.08% done, estimate finish Fri May 25 20:40:26 2018 > 46.09% done, estimate finish Fri May 25 20:40:25 2018 >=== last message repeated 2 times. === > 46.09% done, estimate finish Fri May 25 20:40:24 2018 > 46.10% done, estimate finish Fri May 25 20:40:24 2018 > 46.10% done, estimate finish Fri May 25 20:40:23 2018 > 46.11% done, estimate finish Fri May 25 20:40:25 2018 > 46.11% done, estimate finish Fri May 25 20:40:24 2018 >=== last message repeated 2 times. === > 46.12% done, estimate finish Fri May 25 20:40:23 2018 >=== last message repeated 2 times. === > 46.13% done, estimate finish Fri May 25 20:40:22 2018 >=== last message repeated 2 times. === > 46.14% done, estimate finish Fri May 25 20:40:23 2018 >=== last message repeated 2 times. === > 46.14% done, estimate finish Fri May 25 20:40:22 2018 > 46.15% done, estimate finish Fri May 25 20:40:22 2018 > 46.15% done, estimate finish Fri May 25 20:40:21 2018 > 46.16% done, estimate finish Fri May 25 20:40:21 2018 > 46.16% done, estimate finish Fri May 25 20:40:22 2018 >=== last message repeated 2 times. === > 46.17% done, estimate finish Fri May 25 20:40:21 2018 >=== last message repeated 2 times. === > 46.18% done, estimate finish Fri May 25 20:40:20 2018 >=== last message repeated 2 times. === > 46.18% done, estimate finish Fri May 25 20:40:21 2018 > 46.19% done, estimate finish Fri May 25 20:40:21 2018 > 46.19% done, estimate finish Fri May 25 20:40:20 2018 > 46.20% done, estimate finish Fri May 25 20:40:20 2018 > 46.20% done, estimate finish Fri May 25 20:40:19 2018 >=== last message repeated 2 times. === > 46.21% done, estimate finish Fri May 25 20:40:18 2018 > 46.21% done, estimate finish Fri May 25 20:40:20 2018 > 46.22% done, estimate finish Fri May 25 20:40:19 2018 >=== last message repeated 2 times. === > 46.23% done, estimate finish Fri May 25 20:40:18 2018 >=== last message repeated 2 times. === > 46.23% done, estimate finish Fri May 25 20:40:17 2018 > 46.24% done, estimate finish Fri May 25 20:40:19 2018 > 46.24% done, estimate finish Fri May 25 20:40:18 2018 > 46.25% done, estimate finish Fri May 25 20:40:18 2018 > 46.25% done, estimate finish Fri May 25 20:40:17 2018 >=== last message repeated 2 times. === > 46.26% done, estimate finish Fri May 25 20:40:16 2018 > 46.26% done, estimate finish Fri May 25 20:40:18 2018 > 46.27% done, estimate finish Fri May 25 20:40:17 2018 >=== last message repeated 2 times. === > 46.27% done, estimate finish Fri May 25 20:40:16 2018 > 46.28% done, estimate finish Fri May 25 20:40:16 2018 > 46.28% done, estimate finish Fri May 25 20:40:15 2018 > 46.29% done, estimate finish Fri May 25 20:40:14 2018 > 46.29% done, estimate finish Fri May 25 20:40:16 2018 >=== last message repeated 2 times. === > 46.30% done, estimate finish Fri May 25 20:40:15 2018 >=== last message repeated 2 times. === > 46.31% done, estimate finish Fri May 25 20:40:14 2018 > 46.31% done, estimate finish Fri May 25 20:40:13 2018 > 46.32% done, estimate finish Fri May 25 20:40:15 2018 >=== last message repeated 2 times. === > 46.32% done, estimate finish Fri May 25 20:40:14 2018 > 46.33% done, estimate finish Fri May 25 20:40:13 2018 >=== last message repeated 2 times. === > 46.34% done, estimate finish Fri May 25 20:40:12 2018 >=== last message repeated 2 times. === > 46.34% done, estimate finish Fri May 25 20:40:14 2018 > 46.35% done, estimate finish Fri May 25 20:40:13 2018 > 46.35% done, estimate finish Fri May 25 20:40:12 2018 > 46.36% done, estimate finish Fri May 25 20:40:12 2018 > 46.36% done, estimate finish Fri May 25 20:40:11 2018 >=== last message repeated 2 times. === > 46.37% done, estimate finish Fri May 25 20:40:13 2018 > 46.37% done, estimate finish Fri May 25 20:40:12 2018 > 46.38% done, estimate finish Fri May 25 20:40:11 2018 >=== last message repeated 2 times. === > 46.38% done, estimate finish Fri May 25 20:40:10 2018 > 46.39% done, estimate finish Fri May 25 20:40:10 2018 > 46.39% done, estimate finish Fri May 25 20:40:09 2018 > 46.40% done, estimate finish Fri May 25 20:40:11 2018 > 46.40% done, estimate finish Fri May 25 20:40:10 2018 > 46.41% done, estimate finish Fri May 25 20:40:10 2018 > 46.41% done, estimate finish Fri May 25 20:40:09 2018 >=== last message repeated 2 times. === > 46.42% done, estimate finish Fri May 25 20:40:08 2018 > 46.42% done, estimate finish Fri May 25 20:40:10 2018 > 46.43% done, estimate finish Fri May 25 20:40:09 2018 >=== last message repeated 2 times. === > 46.43% done, estimate finish Fri May 25 20:40:08 2018 > 46.44% done, estimate finish Fri May 25 20:40:08 2018 > 46.44% done, estimate finish Fri May 25 20:40:07 2018 > 46.45% done, estimate finish Fri May 25 20:40:09 2018 > 46.45% done, estimate finish Fri May 25 20:40:08 2018 >=== last message repeated 2 times. === > 46.46% done, estimate finish Fri May 25 20:40:07 2018 >=== last message repeated 2 times. === > 46.47% done, estimate finish Fri May 25 20:40:06 2018 >=== last message repeated 2 times. === > 46.48% done, estimate finish Fri May 25 20:40:07 2018 >=== last message repeated 2 times. === > 46.48% done, estimate finish Fri May 25 20:40:06 2018 > 46.49% done, estimate finish Fri May 25 20:40:06 2018 > 46.49% done, estimate finish Fri May 25 20:40:05 2018 > 46.50% done, estimate finish Fri May 25 20:40:05 2018 > 46.50% done, estimate finish Fri May 25 20:40:06 2018 >=== last message repeated 2 times. === > 46.51% done, estimate finish Fri May 25 20:40:05 2018 >=== last message repeated 2 times. === > 46.52% done, estimate finish Fri May 25 20:40:04 2018 >=== last message repeated 2 times. === > 46.52% done, estimate finish Fri May 25 20:40:03 2018 > 46.53% done, estimate finish Fri May 25 20:40:05 2018 > 46.53% done, estimate finish Fri May 25 20:40:04 2018 > 46.54% done, estimate finish Fri May 25 20:40:04 2018 > 46.54% done, estimate finish Fri May 25 20:40:03 2018 >=== last message repeated 2 times. === > 46.55% done, estimate finish Fri May 25 20:40:02 2018 > 46.55% done, estimate finish Fri May 25 20:40:04 2018 > 46.56% done, estimate finish Fri May 25 20:40:03 2018 >=== last message repeated 2 times. === > 46.57% done, estimate finish Fri May 25 20:40:02 2018 >=== last message repeated 2 times. === > 46.57% done, estimate finish Fri May 25 20:40:01 2018 > 46.58% done, estimate finish Fri May 25 20:40:03 2018 > 46.58% done, estimate finish Fri May 25 20:40:02 2018 > 46.59% done, estimate finish Fri May 25 20:40:02 2018 > 46.59% done, estimate finish Fri May 25 20:40:01 2018 >=== last message repeated 2 times. === > 46.60% done, estimate finish Fri May 25 20:40:00 2018 >=== last message repeated 2 times. === > 46.61% done, estimate finish Fri May 25 20:40:01 2018 >=== last message repeated 2 times. === > 46.61% done, estimate finish Fri May 25 20:40:00 2018 > 46.62% done, estimate finish Fri May 25 20:40:00 2018 > 46.62% done, estimate finish Fri May 25 20:39:59 2018 > 46.63% done, estimate finish Fri May 25 20:39:59 2018 > 46.63% done, estimate finish Fri May 25 20:40:00 2018 >=== last message repeated 2 times. === > 46.64% done, estimate finish Fri May 25 20:39:59 2018 >=== last message repeated 2 times. === > 46.65% done, estimate finish Fri May 25 20:39:58 2018 >=== last message repeated 2 times. === > 46.66% done, estimate finish Fri May 25 20:39:59 2018 >=== last message repeated 2 times. === > 46.66% done, estimate finish Fri May 25 20:39:58 2018 > 46.67% done, estimate finish Fri May 25 20:39:58 2018 > 46.67% done, estimate finish Fri May 25 20:39:57 2018 > 46.68% done, estimate finish Fri May 25 20:39:57 2018 > 46.68% done, estimate finish Fri May 25 20:39:56 2018 > 46.68% done, estimate finish Fri May 25 20:39:58 2018 > 46.69% done, estimate finish Fri May 25 20:39:57 2018 >=== last message repeated 2 times. === > 46.70% done, estimate finish Fri May 25 20:39:56 2018 >=== last message repeated 2 times. === > 46.70% done, estimate finish Fri May 25 20:39:55 2018 > 46.71% done, estimate finish Fri May 25 20:39:57 2018 > 46.71% done, estimate finish Fri May 25 20:39:56 2018 > 46.72% done, estimate finish Fri May 25 20:39:56 2018 > 46.72% done, estimate finish Fri May 25 20:39:55 2018 >=== last message repeated 2 times. === > 46.73% done, estimate finish Fri May 25 20:39:54 2018 > 46.73% done, estimate finish Fri May 25 20:39:56 2018 > 46.74% done, estimate finish Fri May 25 20:39:55 2018 >=== last message repeated 2 times. === > 46.75% done, estimate finish Fri May 25 20:39:54 2018 >=== last message repeated 2 times. === > 46.75% done, estimate finish Fri May 25 20:39:53 2018 > 46.76% done, estimate finish Fri May 25 20:39:53 2018 > 46.76% done, estimate finish Fri May 25 20:39:54 2018 > 46.77% done, estimate finish Fri May 25 20:39:54 2018 > 46.77% done, estimate finish Fri May 25 20:39:53 2018 >=== last message repeated 2 times. === > 46.78% done, estimate finish Fri May 25 20:39:52 2018 >=== last message repeated 2 times. === > 46.79% done, estimate finish Fri May 25 20:39:51 2018 > 46.79% done, estimate finish Fri May 25 20:39:53 2018 > 46.79% done, estimate finish Fri May 25 20:39:52 2018 > 46.80% done, estimate finish Fri May 25 20:39:52 2018 > 46.80% done, estimate finish Fri May 25 20:39:51 2018 > 46.81% done, estimate finish Fri May 25 20:39:51 2018 > 46.81% done, estimate finish Fri May 25 20:39:52 2018 > 46.82% done, estimate finish Fri May 25 20:39:52 2018 > 46.82% done, estimate finish Fri May 25 20:39:51 2018 >=== last message repeated 2 times. === > 46.83% done, estimate finish Fri May 25 20:39:50 2018 >=== last message repeated 2 times. === > 46.84% done, estimate finish Fri May 25 20:39:49 2018 > 46.84% done, estimate finish Fri May 25 20:39:51 2018 > 46.84% done, estimate finish Fri May 25 20:39:50 2018 > 46.85% done, estimate finish Fri May 25 20:39:50 2018 > 46.85% done, estimate finish Fri May 25 20:39:49 2018 > 46.86% done, estimate finish Fri May 25 20:39:49 2018 > 46.86% done, estimate finish Fri May 25 20:39:48 2018 >=== last message repeated 2 times. === > 46.87% done, estimate finish Fri May 25 20:39:49 2018 >=== last message repeated 2 times. === > 46.88% done, estimate finish Fri May 25 20:39:48 2018 >=== last message repeated 2 times. === > 46.88% done, estimate finish Fri May 25 20:39:47 2018 > 46.89% done, estimate finish Fri May 25 20:39:47 2018 > 46.89% done, estimate finish Fri May 25 20:39:48 2018 > 46.90% done, estimate finish Fri May 25 20:39:48 2018 > 46.90% done, estimate finish Fri May 25 20:39:47 2018 > 46.91% done, estimate finish Fri May 25 20:39:47 2018 > 46.91% done, estimate finish Fri May 25 20:39:46 2018 >=== last message repeated 2 times. === > 46.92% done, estimate finish Fri May 25 20:39:47 2018 >=== last message repeated 2 times. === > 46.93% done, estimate finish Fri May 25 20:39:46 2018 >=== last message repeated 2 times. === > 46.93% done, estimate finish Fri May 25 20:39:45 2018 > 46.94% done, estimate finish Fri May 25 20:39:45 2018 > 46.94% done, estimate finish Fri May 25 20:39:44 2018 > 46.95% done, estimate finish Fri May 25 20:39:46 2018 > 46.95% done, estimate finish Fri May 25 20:39:45 2018 >=== last message repeated 2 times. === > 46.96% done, estimate finish Fri May 25 20:39:44 2018 >=== last message repeated 2 times. === > 46.97% done, estimate finish Fri May 25 20:39:43 2018 > 46.97% done, estimate finish Fri May 25 20:39:45 2018 > 46.97% done, estimate finish Fri May 25 20:39:44 2018 > 46.98% done, estimate finish Fri May 25 20:39:44 2018 > 46.98% done, estimate finish Fri May 25 20:39:43 2018 > 46.99% done, estimate finish Fri May 25 20:39:43 2018 > 46.99% done, estimate finish Fri May 25 20:39:42 2018 > 47.00% done, estimate finish Fri May 25 20:39:44 2018 > 47.00% done, estimate finish Fri May 25 20:39:43 2018 >=== last message repeated 2 times. === > 47.01% done, estimate finish Fri May 25 20:39:42 2018 >=== last message repeated 2 times. === > 47.02% done, estimate finish Fri May 25 20:39:41 2018 >=== last message repeated 2 times. === > 47.02% done, estimate finish Fri May 25 20:39:42 2018 > 47.03% done, estimate finish Fri May 25 20:39:42 2018 > 47.03% done, estimate finish Fri May 25 20:39:41 2018 > 47.04% done, estimate finish Fri May 25 20:39:41 2018 > 47.04% done, estimate finish Fri May 25 20:39:40 2018 >=== last message repeated 2 times. === > 47.05% done, estimate finish Fri May 25 20:39:41 2018 >=== last message repeated 2 times. === > 47.06% done, estimate finish Fri May 25 20:39:40 2018 >=== last message repeated 2 times. === > 47.06% done, estimate finish Fri May 25 20:39:39 2018 > 47.07% done, estimate finish Fri May 25 20:39:39 2018 > 47.07% done, estimate finish Fri May 25 20:39:38 2018 > 47.08% done, estimate finish Fri May 25 20:39:40 2018 > 47.08% done, estimate finish Fri May 25 20:39:39 2018 > 47.09% done, estimate finish Fri May 25 20:39:39 2018 > 47.09% done, estimate finish Fri May 25 20:39:38 2018 >=== last message repeated 2 times. === > 47.10% done, estimate finish Fri May 25 20:39:37 2018 > 47.10% done, estimate finish Fri May 25 20:39:39 2018 > 47.11% done, estimate finish Fri May 25 20:39:38 2018 >=== last message repeated 2 times. === > 47.11% done, estimate finish Fri May 25 20:39:37 2018 > 47.12% done, estimate finish Fri May 25 20:39:37 2018 > 47.12% done, estimate finish Fri May 25 20:39:36 2018 > 47.13% done, estimate finish Fri May 25 20:39:38 2018 > 47.13% done, estimate finish Fri May 25 20:39:37 2018 >=== last message repeated 2 times. === > 47.14% done, estimate finish Fri May 25 20:39:36 2018 >=== last message repeated 2 times. === > 47.15% done, estimate finish Fri May 25 20:39:35 2018 >=== last message repeated 2 times. === > 47.16% done, estimate finish Fri May 25 20:39:36 2018 >=== last message repeated 2 times. === > 47.16% done, estimate finish Fri May 25 20:39:35 2018 > 47.17% done, estimate finish Fri May 25 20:39:35 2018 > 47.17% done, estimate finish Fri May 25 20:39:34 2018 > 47.18% done, estimate finish Fri May 25 20:39:34 2018 > 47.18% done, estimate finish Fri May 25 20:39:36 2018 > 47.18% done, estimate finish Fri May 25 20:39:35 2018 > 47.19% done, estimate finish Fri May 25 20:39:34 2018 >=== last message repeated 2 times. === > 47.20% done, estimate finish Fri May 25 20:39:33 2018 >=== last message repeated 2 times. === > 47.20% done, estimate finish Fri May 25 20:39:35 2018 > 47.21% done, estimate finish Fri May 25 20:39:34 2018 > 47.21% done, estimate finish Fri May 25 20:39:33 2018 > 47.22% done, estimate finish Fri May 25 20:39:33 2018 > 47.22% done, estimate finish Fri May 25 20:39:32 2018 >=== last message repeated 2 times. === > 47.23% done, estimate finish Fri May 25 20:39:31 2018 > 47.23% done, estimate finish Fri May 25 20:39:33 2018 > 47.24% done, estimate finish Fri May 25 20:39:33 2018 > 47.24% done, estimate finish Fri May 25 20:39:32 2018 > 47.25% done, estimate finish Fri May 25 20:39:31 2018 >=== last message repeated 2 times. === > 47.25% done, estimate finish Fri May 25 20:39:30 2018 > 47.26% done, estimate finish Fri May 25 20:39:32 2018 >=== last message repeated 2 times. === > 47.27% done, estimate finish Fri May 25 20:39:31 2018 >=== last message repeated 2 times. === > 47.27% done, estimate finish Fri May 25 20:39:30 2018 > 47.28% done, estimate finish Fri May 25 20:39:29 2018 > 47.28% done, estimate finish Fri May 25 20:39:31 2018 > 47.29% done, estimate finish Fri May 25 20:39:31 2018 > 47.29% done, estimate finish Fri May 25 20:39:30 2018 >=== last message repeated 2 times. === > 47.30% done, estimate finish Fri May 25 20:39:29 2018 >=== last message repeated 2 times. === > 47.31% done, estimate finish Fri May 25 20:39:28 2018 > 47.31% done, estimate finish Fri May 25 20:39:30 2018 > 47.31% done, estimate finish Fri May 25 20:39:29 2018 > 47.32% done, estimate finish Fri May 25 20:39:29 2018 > 47.32% done, estimate finish Fri May 25 20:39:28 2018 > 47.33% done, estimate finish Fri May 25 20:39:28 2018 > 47.33% done, estimate finish Fri May 25 20:39:27 2018 > 47.34% done, estimate finish Fri May 25 20:39:29 2018 > 47.34% done, estimate finish Fri May 25 20:39:28 2018 >=== last message repeated 2 times. === > 47.35% done, estimate finish Fri May 25 20:39:27 2018 >=== last message repeated 2 times. === > 47.36% done, estimate finish Fri May 25 20:39:26 2018 > 47.36% done, estimate finish Fri May 25 20:39:28 2018 > 47.36% done, estimate finish Fri May 25 20:39:27 2018 > 47.37% done, estimate finish Fri May 25 20:39:27 2018 > 47.37% done, estimate finish Fri May 25 20:39:26 2018 > 47.38% done, estimate finish Fri May 25 20:39:26 2018 > 47.38% done, estimate finish Fri May 25 20:39:25 2018 >=== last message repeated 2 times. === > 47.39% done, estimate finish Fri May 25 20:39:26 2018 >=== last message repeated 2 times. === > 47.40% done, estimate finish Fri May 25 20:39:25 2018 >=== last message repeated 2 times. === > 47.40% done, estimate finish Fri May 25 20:39:24 2018 > 47.41% done, estimate finish Fri May 25 20:39:24 2018 > 47.41% done, estimate finish Fri May 25 20:39:25 2018 > 47.42% done, estimate finish Fri May 25 20:39:25 2018 > 47.42% done, estimate finish Fri May 25 20:39:24 2018 > 47.43% done, estimate finish Fri May 25 20:39:24 2018 > 47.43% done, estimate finish Fri May 25 20:39:23 2018 >=== last message repeated 2 times. === > 47.44% done, estimate finish Fri May 25 20:39:22 2018 > 47.44% done, estimate finish Fri May 25 20:39:24 2018 > 47.45% done, estimate finish Fri May 25 20:39:23 2018 >=== last message repeated 2 times. === > 47.45% done, estimate finish Fri May 25 20:39:22 2018 > 47.46% done, estimate finish Fri May 25 20:39:22 2018 > 47.46% done, estimate finish Fri May 25 20:39:21 2018 > 47.47% done, estimate finish Fri May 25 20:39:23 2018 > 47.47% done, estimate finish Fri May 25 20:39:22 2018 >=== last message repeated 2 times. === > 47.48% done, estimate finish Fri May 25 20:39:21 2018 >=== last message repeated 2 times. === > 47.49% done, estimate finish Fri May 25 20:39:20 2018 > 47.49% done, estimate finish Fri May 25 20:39:22 2018 > 47.49% done, estimate finish Fri May 25 20:39:21 2018 > 47.50% done, estimate finish Fri May 25 20:39:21 2018 > 47.50% done, estimate finish Fri May 25 20:39:20 2018 > 47.51% done, estimate finish Fri May 25 20:39:20 2018 > 47.51% done, estimate finish Fri May 25 20:39:19 2018 > 47.52% done, estimate finish Fri May 25 20:39:19 2018 > 47.52% done, estimate finish Fri May 25 20:39:20 2018 >=== last message repeated 2 times. === > 47.53% done, estimate finish Fri May 25 20:39:19 2018 >=== last message repeated 2 times. === > 47.54% done, estimate finish Fri May 25 20:39:18 2018 >=== last message repeated 2 times. === > 47.54% done, estimate finish Fri May 25 20:39:19 2018 > 47.55% done, estimate finish Fri May 25 20:39:19 2018 > 47.55% done, estimate finish Fri May 25 20:39:18 2018 > 47.56% done, estimate finish Fri May 25 20:39:18 2018 > 47.56% done, estimate finish Fri May 25 20:39:17 2018 >=== last message repeated 2 times. === > 47.57% done, estimate finish Fri May 25 20:39:18 2018 >=== last message repeated 2 times. === > 47.58% done, estimate finish Fri May 25 20:39:17 2018 >=== last message repeated 2 times. === > 47.59% done, estimate finish Fri May 25 20:39:16 2018 >=== last message repeated 2 times. === > 47.59% done, estimate finish Fri May 25 20:39:15 2018 > 47.60% done, estimate finish Fri May 25 20:39:17 2018 > 47.60% done, estimate finish Fri May 25 20:39:16 2018 > 47.61% done, estimate finish Fri May 25 20:39:16 2018 > 47.61% done, estimate finish Fri May 25 20:39:15 2018 >=== last message repeated 2 times. === > 47.62% done, estimate finish Fri May 25 20:39:14 2018 > 47.62% done, estimate finish Fri May 25 20:39:16 2018 > 47.63% done, estimate finish Fri May 25 20:39:16 2018 > 47.63% done, estimate finish Fri May 25 20:39:15 2018 >=== last message repeated 2 times. === > 47.64% done, estimate finish Fri May 25 20:39:14 2018 > 47.64% done, estimate finish Fri May 25 20:39:13 2018 > 47.65% done, estimate finish Fri May 25 20:39:15 2018 >=== last message repeated 2 times. === > 47.65% done, estimate finish Fri May 25 20:39:14 2018 > 47.66% done, estimate finish Fri May 25 20:39:14 2018 > 47.66% done, estimate finish Fri May 25 20:39:13 2018 > 47.67% done, estimate finish Fri May 25 20:39:13 2018 > 47.67% done, estimate finish Fri May 25 20:39:12 2018 > 47.68% done, estimate finish Fri May 25 20:39:14 2018 > 47.68% done, estimate finish Fri May 25 20:39:13 2018 >=== last message repeated 2 times. === > 47.69% done, estimate finish Fri May 25 20:39:12 2018 >=== last message repeated 2 times. === > 47.70% done, estimate finish Fri May 25 20:39:11 2018 > 47.70% done, estimate finish Fri May 25 20:39:13 2018 > 47.70% done, estimate finish Fri May 25 20:39:12 2018 > 47.71% done, estimate finish Fri May 25 20:39:12 2018 > 47.71% done, estimate finish Fri May 25 20:39:11 2018 > 47.72% done, estimate finish Fri May 25 20:39:11 2018 > 47.72% done, estimate finish Fri May 25 20:39:10 2018 > 47.72% done, estimate finish Fri May 25 20:39:12 2018 > 47.73% done, estimate finish Fri May 25 20:39:11 2018 >=== last message repeated 2 times. === > 47.74% done, estimate finish Fri May 25 20:39:10 2018 >=== last message repeated 2 times. === > 47.74% done, estimate finish Fri May 25 20:39:09 2018 > 47.75% done, estimate finish Fri May 25 20:39:09 2018 > 47.75% done, estimate finish Fri May 25 20:39:10 2018 > 47.76% done, estimate finish Fri May 25 20:39:10 2018 > 47.76% done, estimate finish Fri May 25 20:39:09 2018 > 47.77% done, estimate finish Fri May 25 20:39:09 2018 > 47.77% done, estimate finish Fri May 25 20:39:08 2018 >=== last message repeated 2 times. === > 47.78% done, estimate finish Fri May 25 20:39:09 2018 >=== last message repeated 2 times. === > 47.79% done, estimate finish Fri May 25 20:39:08 2018 >=== last message repeated 2 times. === > 47.79% done, estimate finish Fri May 25 20:39:07 2018 > 47.80% done, estimate finish Fri May 25 20:39:07 2018 > 47.80% done, estimate finish Fri May 25 20:39:06 2018 > 47.81% done, estimate finish Fri May 25 20:39:08 2018 > 47.81% done, estimate finish Fri May 25 20:39:07 2018 >=== last message repeated 2 times. === > 47.82% done, estimate finish Fri May 25 20:39:06 2018 >=== last message repeated 2 times. === > 47.83% done, estimate finish Fri May 25 20:39:05 2018 > 47.83% done, estimate finish Fri May 25 20:39:07 2018 > 47.83% done, estimate finish Fri May 25 20:39:06 2018 > 47.84% done, estimate finish Fri May 25 20:39:06 2018 > 47.84% done, estimate finish Fri May 25 20:39:05 2018 > 47.85% done, estimate finish Fri May 25 20:39:05 2018 > 47.85% done, estimate finish Fri May 25 20:39:04 2018 > 47.86% done, estimate finish Fri May 25 20:39:06 2018 > 47.86% done, estimate finish Fri May 25 20:39:05 2018 >=== last message repeated 2 times. === > 47.87% done, estimate finish Fri May 25 20:39:04 2018 >=== last message repeated 2 times. === > 47.88% done, estimate finish Fri May 25 20:39:03 2018 >=== last message repeated 2 times. === > 47.88% done, estimate finish Fri May 25 20:39:05 2018 > 47.89% done, estimate finish Fri May 25 20:39:04 2018 >=== last message repeated 2 times. === > 47.90% done, estimate finish Fri May 25 20:39:03 2018 > 47.90% done, estimate finish Fri May 25 20:39:05 2018 > 47.90% done, estimate finish Fri May 25 20:39:04 2018 > 47.91% done, estimate finish Fri May 25 20:39:04 2018 > 47.91% done, estimate finish Fri May 25 20:39:03 2018 > 47.92% done, estimate finish Fri May 25 20:39:03 2018 > 47.92% done, estimate finish Fri May 25 20:39:02 2018 > 47.93% done, estimate finish Fri May 25 20:39:02 2018 > 47.93% done, estimate finish Fri May 25 20:39:03 2018 >=== last message repeated 2 times. === > 47.94% done, estimate finish Fri May 25 20:39:02 2018 >=== last message repeated 2 times. === > 47.95% done, estimate finish Fri May 25 20:39:01 2018 >=== last message repeated 2 times. === > 47.95% done, estimate finish Fri May 25 20:39:02 2018 > 47.96% done, estimate finish Fri May 25 20:39:02 2018 > 47.96% done, estimate finish Fri May 25 20:39:01 2018 > 47.97% done, estimate finish Fri May 25 20:39:01 2018 > 47.97% done, estimate finish Fri May 25 20:39:00 2018 >=== last message repeated 2 times. === > 47.98% done, estimate finish Fri May 25 20:39:01 2018 >=== last message repeated 2 times. === > 47.99% done, estimate finish Fri May 25 20:39:00 2018 >=== last message repeated 2 times. === > 47.99% done, estimate finish Fri May 25 20:38:59 2018 > 48.00% done, estimate finish Fri May 25 20:38:59 2018 > 48.00% done, estimate finish Fri May 25 20:38:58 2018 > 48.01% done, estimate finish Fri May 25 20:39:00 2018 > 48.01% done, estimate finish Fri May 25 20:38:59 2018 > 48.02% done, estimate finish Fri May 25 20:38:59 2018 > 48.02% done, estimate finish Fri May 25 20:38:58 2018 >=== last message repeated 2 times. === > 48.03% done, estimate finish Fri May 25 20:38:57 2018 > 48.03% done, estimate finish Fri May 25 20:38:59 2018 > 48.04% done, estimate finish Fri May 25 20:38:58 2018 >=== last message repeated 2 times. === > 48.04% done, estimate finish Fri May 25 20:38:57 2018 > 48.05% done, estimate finish Fri May 25 20:38:57 2018 > 48.05% done, estimate finish Fri May 25 20:38:56 2018 > 48.06% done, estimate finish Fri May 25 20:38:58 2018 > 48.06% done, estimate finish Fri May 25 20:38:57 2018 >=== last message repeated 2 times. === > 48.07% done, estimate finish Fri May 25 20:38:56 2018 >=== last message repeated 2 times. === > 48.08% done, estimate finish Fri May 25 20:38:55 2018 >=== last message repeated 2 times. === > 48.08% done, estimate finish Fri May 25 20:38:56 2018 > 48.09% done, estimate finish Fri May 25 20:38:56 2018 > 48.09% done, estimate finish Fri May 25 20:38:55 2018 > 48.10% done, estimate finish Fri May 25 20:38:55 2018 > 48.10% done, estimate finish Fri May 25 20:38:54 2018 > 48.11% done, estimate finish Fri May 25 20:38:54 2018 > 48.11% done, estimate finish Fri May 25 20:38:56 2018 > 48.11% done, estimate finish Fri May 25 20:38:55 2018 > 48.12% done, estimate finish Fri May 25 20:38:55 2018 > 48.12% done, estimate finish Fri May 25 20:38:54 2018 > 48.13% done, estimate finish Fri May 25 20:38:54 2018 > 48.13% done, estimate finish Fri May 25 20:38:53 2018 > 48.13% done, estimate finish Fri May 25 20:38:55 2018 > 48.14% done, estimate finish Fri May 25 20:38:54 2018 >=== last message repeated 2 times. === > 48.15% done, estimate finish Fri May 25 20:38:53 2018 >=== last message repeated 2 times. === > 48.15% done, estimate finish Fri May 25 20:38:52 2018 > 48.16% done, estimate finish Fri May 25 20:38:52 2018 > 48.16% done, estimate finish Fri May 25 20:38:53 2018 > 48.17% done, estimate finish Fri May 25 20:38:53 2018 > 48.17% done, estimate finish Fri May 25 20:38:52 2018 >=== last message repeated 2 times. === > 48.18% done, estimate finish Fri May 25 20:38:51 2018 >=== last message repeated 2 times. === > 48.19% done, estimate finish Fri May 25 20:38:52 2018 >=== last message repeated 2 times. === > 48.20% done, estimate finish Fri May 25 20:38:51 2018 >=== last message repeated 2 times. === > 48.20% done, estimate finish Fri May 25 20:38:50 2018 > 48.21% done, estimate finish Fri May 25 20:38:50 2018 > 48.21% done, estimate finish Fri May 25 20:38:51 2018 > 48.22% done, estimate finish Fri May 25 20:38:51 2018 > 48.22% done, estimate finish Fri May 25 20:38:50 2018 >=== last message repeated 2 times. === > 48.23% done, estimate finish Fri May 25 20:38:49 2018 >=== last message repeated 2 times. === > 48.24% done, estimate finish Fri May 25 20:38:48 2018 > 48.24% done, estimate finish Fri May 25 20:38:50 2018 > 48.24% done, estimate finish Fri May 25 20:38:49 2018 > 48.25% done, estimate finish Fri May 25 20:38:49 2018 > 48.25% done, estimate finish Fri May 25 20:38:48 2018 > 48.26% done, estimate finish Fri May 25 20:38:48 2018 > 48.26% done, estimate finish Fri May 25 20:38:47 2018 > 48.27% done, estimate finish Fri May 25 20:38:49 2018 > 48.27% done, estimate finish Fri May 25 20:38:48 2018 >=== last message repeated 2 times. === > 48.28% done, estimate finish Fri May 25 20:38:47 2018 >=== last message repeated 2 times. === > 48.29% done, estimate finish Fri May 25 20:38:46 2018 >=== last message repeated 2 times. === > 48.29% done, estimate finish Fri May 25 20:38:48 2018 > 48.30% done, estimate finish Fri May 25 20:38:47 2018 >=== last message repeated 2 times. === > 48.31% done, estimate finish Fri May 25 20:38:46 2018 >=== last message repeated 2 times. === > 48.31% done, estimate finish Fri May 25 20:38:45 2018 > 48.32% done, estimate finish Fri May 25 20:38:47 2018 > 48.32% done, estimate finish Fri May 25 20:38:46 2018 > 48.33% done, estimate finish Fri May 25 20:38:46 2018 > 48.33% done, estimate finish Fri May 25 20:38:45 2018 >=== last message repeated 2 times. === > 48.34% done, estimate finish Fri May 25 20:38:44 2018 > 48.34% done, estimate finish Fri May 25 20:38:46 2018 > 48.35% done, estimate finish Fri May 25 20:38:45 2018 >=== last message repeated 2 times. === > 48.36% done, estimate finish Fri May 25 20:38:44 2018 >=== last message repeated 2 times. === > 48.36% done, estimate finish Fri May 25 20:38:43 2018 > 48.37% done, estimate finish Fri May 25 20:38:43 2018 > 48.37% done, estimate finish Fri May 25 20:38:44 2018 > 48.38% done, estimate finish Fri May 25 20:38:44 2018 > 48.38% done, estimate finish Fri May 25 20:38:43 2018 >=== last message repeated 2 times. === > 48.39% done, estimate finish Fri May 25 20:38:42 2018 > 48.39% done, estimate finish Fri May 25 20:38:44 2018 > 48.40% done, estimate finish Fri May 25 20:38:43 2018 >=== last message repeated 2 times. === > 48.40% done, estimate finish Fri May 25 20:38:42 2018 > 48.41% done, estimate finish Fri May 25 20:38:42 2018 > 48.41% done, estimate finish Fri May 25 20:38:41 2018 > 48.42% done, estimate finish Fri May 25 20:38:41 2018 > 48.42% done, estimate finish Fri May 25 20:38:42 2018 >=== last message repeated 2 times. === > 48.43% done, estimate finish Fri May 25 20:38:41 2018 >=== last message repeated 2 times. === > 48.44% done, estimate finish Fri May 25 20:38:40 2018 >=== last message repeated 2 times. === > 48.45% done, estimate finish Fri May 25 20:38:41 2018 >=== last message repeated 2 times. === > 48.45% done, estimate finish Fri May 25 20:38:40 2018 > 48.46% done, estimate finish Fri May 25 20:38:40 2018 >=== last message repeated 2 times. === > 48.47% done, estimate finish Fri May 25 20:38:39 2018 >=== last message repeated 2 times. === > 48.47% done, estimate finish Fri May 25 20:38:40 2018 > 48.48% done, estimate finish Fri May 25 20:38:40 2018 > 48.48% done, estimate finish Fri May 25 20:38:39 2018 > 48.49% done, estimate finish Fri May 25 20:38:39 2018 > 48.49% done, estimate finish Fri May 25 20:38:38 2018 >=== last message repeated 2 times. === > 48.50% done, estimate finish Fri May 25 20:38:39 2018 >=== last message repeated 2 times. === > 48.51% done, estimate finish Fri May 25 20:38:38 2018 >=== last message repeated 2 times. === > 48.51% done, estimate finish Fri May 25 20:38:37 2018 > 48.52% done, estimate finish Fri May 25 20:38:37 2018 > 48.52% done, estimate finish Fri May 25 20:38:38 2018 > 48.53% done, estimate finish Fri May 25 20:38:38 2018 > 48.53% done, estimate finish Fri May 25 20:38:37 2018 > 48.54% done, estimate finish Fri May 25 20:38:37 2018 > 48.54% done, estimate finish Fri May 25 20:38:36 2018 >=== last message repeated 2 times. === > 48.55% done, estimate finish Fri May 25 20:38:35 2018 > 48.55% done, estimate finish Fri May 25 20:38:37 2018 > 48.56% done, estimate finish Fri May 25 20:38:36 2018 >=== last message repeated 2 times. === > 48.56% done, estimate finish Fri May 25 20:38:35 2018 > 48.57% done, estimate finish Fri May 25 20:38:35 2018 > 48.57% done, estimate finish Fri May 25 20:38:34 2018 > 48.58% done, estimate finish Fri May 25 20:38:36 2018 > 48.58% done, estimate finish Fri May 25 20:38:35 2018 >=== last message repeated 2 times. === > 48.59% done, estimate finish Fri May 25 20:38:34 2018 >=== last message repeated 2 times. === > 48.60% done, estimate finish Fri May 25 20:38:33 2018 > 48.60% done, estimate finish Fri May 25 20:38:35 2018 > 48.60% done, estimate finish Fri May 25 20:38:34 2018 > 48.61% done, estimate finish Fri May 25 20:38:34 2018 >=== last message repeated 2 times. === > 48.62% done, estimate finish Fri May 25 20:38:33 2018 >=== last message repeated 2 times. === > 48.63% done, estimate finish Fri May 25 20:38:32 2018 > 48.63% done, estimate finish Fri May 25 20:38:34 2018 > 48.63% done, estimate finish Fri May 25 20:38:33 2018 > 48.64% done, estimate finish Fri May 25 20:38:33 2018 > 48.64% done, estimate finish Fri May 25 20:38:32 2018 > 48.65% done, estimate finish Fri May 25 20:38:32 2018 > 48.65% done, estimate finish Fri May 25 20:38:31 2018 > 48.65% done, estimate finish Fri May 25 20:38:33 2018 > 48.66% done, estimate finish Fri May 25 20:38:32 2018 >=== last message repeated 2 times. === > 48.67% done, estimate finish Fri May 25 20:38:31 2018 >=== last message repeated 2 times. === > 48.67% done, estimate finish Fri May 25 20:38:30 2018 > 48.68% done, estimate finish Fri May 25 20:38:30 2018 > 48.68% done, estimate finish Fri May 25 20:38:31 2018 > 48.69% done, estimate finish Fri May 25 20:38:31 2018 > 48.69% done, estimate finish Fri May 25 20:38:30 2018 > 48.70% done, estimate finish Fri May 25 20:38:30 2018 > 48.70% done, estimate finish Fri May 25 20:38:29 2018 >=== last message repeated 2 times. === > 48.71% done, estimate finish Fri May 25 20:38:30 2018 >=== last message repeated 2 times. === > 48.72% done, estimate finish Fri May 25 20:38:29 2018 >=== last message repeated 2 times. === > 48.72% done, estimate finish Fri May 25 20:38:28 2018 > 48.73% done, estimate finish Fri May 25 20:38:28 2018 > 48.73% done, estimate finish Fri May 25 20:38:27 2018 > 48.74% done, estimate finish Fri May 25 20:38:29 2018 > 48.74% done, estimate finish Fri May 25 20:38:28 2018 >=== last message repeated 2 times. === > 48.75% done, estimate finish Fri May 25 20:38:27 2018 >=== last message repeated 2 times. === > 48.76% done, estimate finish Fri May 25 20:38:26 2018 > 48.76% done, estimate finish Fri May 25 20:38:28 2018 >=== last message repeated 2 times. === > 48.77% done, estimate finish Fri May 25 20:38:27 2018 >=== last message repeated 2 times. === > 48.78% done, estimate finish Fri May 25 20:38:26 2018 >=== last message repeated 2 times. === > 48.79% done, estimate finish Fri May 25 20:38:25 2018 > 48.79% done, estimate finish Fri May 25 20:38:27 2018 > 48.79% done, estimate finish Fri May 25 20:38:26 2018 > 48.80% done, estimate finish Fri May 25 20:38:26 2018 > 48.80% done, estimate finish Fri May 25 20:38:25 2018 > 48.81% done, estimate finish Fri May 25 20:38:25 2018 > 48.81% done, estimate finish Fri May 25 20:38:24 2018 >=== last message repeated 2 times. === > 48.82% done, estimate finish Fri May 25 20:38:25 2018 >=== last message repeated 2 times. === > 48.83% done, estimate finish Fri May 25 20:38:24 2018 >=== last message repeated 2 times. === > 48.83% done, estimate finish Fri May 25 20:38:23 2018 > 48.84% done, estimate finish Fri May 25 20:38:23 2018 > 48.84% done, estimate finish Fri May 25 20:38:24 2018 > 48.85% done, estimate finish Fri May 25 20:38:24 2018 > 48.85% done, estimate finish Fri May 25 20:38:23 2018 >=== last message repeated 2 times. === > 48.86% done, estimate finish Fri May 25 20:38:22 2018 >=== last message repeated 2 times. === > 48.87% done, estimate finish Fri May 25 20:38:21 2018 > 48.87% done, estimate finish Fri May 25 20:38:23 2018 > 48.88% done, estimate finish Fri May 25 20:38:22 2018 >=== last message repeated 2 times. === > 48.88% done, estimate finish Fri May 25 20:38:21 2018 > 48.89% done, estimate finish Fri May 25 20:38:21 2018 > 48.89% done, estimate finish Fri May 25 20:38:20 2018 > 48.90% done, estimate finish Fri May 25 20:38:20 2018 > 48.90% done, estimate finish Fri May 25 20:38:22 2018 > 48.90% done, estimate finish Fri May 25 20:38:21 2018 > 48.91% done, estimate finish Fri May 25 20:38:21 2018 > 48.91% done, estimate finish Fri May 25 20:38:20 2018 > 48.92% done, estimate finish Fri May 25 20:38:20 2018 > 48.92% done, estimate finish Fri May 25 20:38:19 2018 > 48.92% done, estimate finish Fri May 25 20:38:21 2018 > 48.93% done, estimate finish Fri May 25 20:38:20 2018 >=== last message repeated 2 times. === > 48.94% done, estimate finish Fri May 25 20:38:19 2018 >=== last message repeated 2 times. === > 48.94% done, estimate finish Fri May 25 20:38:18 2018 > 48.95% done, estimate finish Fri May 25 20:38:18 2018 > 48.95% done, estimate finish Fri May 25 20:38:19 2018 > 48.96% done, estimate finish Fri May 25 20:38:19 2018 > 48.96% done, estimate finish Fri May 25 20:38:18 2018 > 48.97% done, estimate finish Fri May 25 20:38:18 2018 > 48.97% done, estimate finish Fri May 25 20:38:17 2018 >=== last message repeated 2 times. === > 48.98% done, estimate finish Fri May 25 20:38:18 2018 >=== last message repeated 2 times. === > 48.99% done, estimate finish Fri May 25 20:38:17 2018 >=== last message repeated 2 times. === > 48.99% done, estimate finish Fri May 25 20:38:16 2018 > 49.00% done, estimate finish Fri May 25 20:38:16 2018 > 49.00% done, estimate finish Fri May 25 20:38:15 2018 > 49.01% done, estimate finish Fri May 25 20:38:17 2018 > 49.01% done, estimate finish Fri May 25 20:38:16 2018 >=== last message repeated 2 times. === > 49.02% done, estimate finish Fri May 25 20:38:15 2018 >=== last message repeated 2 times. === > 49.03% done, estimate finish Fri May 25 20:38:15 2018 > 49.03% done, estimate finish Fri May 25 20:38:14 2018 > 49.04% done, estimate finish Fri May 25 20:38:16 2018 > 49.04% done, estimate finish Fri May 25 20:38:15 2018 >=== last message repeated 2 times. === > 49.05% done, estimate finish Fri May 25 20:38:14 2018 >=== last message repeated 2 times. === > 49.06% done, estimate finish Fri May 25 20:38:13 2018 > 49.06% done, estimate finish Fri May 25 20:38:15 2018 > 49.06% done, estimate finish Fri May 25 20:38:14 2018 > 49.07% done, estimate finish Fri May 25 20:38:14 2018 > 49.07% done, estimate finish Fri May 25 20:38:13 2018 > 49.08% done, estimate finish Fri May 25 20:38:13 2018 > 49.08% done, estimate finish Fri May 25 20:38:12 2018 >=== last message repeated 2 times. === > 49.09% done, estimate finish Fri May 25 20:38:13 2018 >=== last message repeated 2 times. === > 49.10% done, estimate finish Fri May 25 20:38:12 2018 >=== last message repeated 2 times. === > 49.10% done, estimate finish Fri May 25 20:38:11 2018 > 49.11% done, estimate finish Fri May 25 20:38:11 2018 > 49.11% done, estimate finish Fri May 25 20:38:12 2018 > 49.12% done, estimate finish Fri May 25 20:38:12 2018 > 49.12% done, estimate finish Fri May 25 20:38:11 2018 > 49.13% done, estimate finish Fri May 25 20:38:11 2018 > 49.13% done, estimate finish Fri May 25 20:38:10 2018 >=== last message repeated 2 times. === > 49.14% done, estimate finish Fri May 25 20:38:09 2018 > 49.14% done, estimate finish Fri May 25 20:38:11 2018 > 49.15% done, estimate finish Fri May 25 20:38:11 2018 > 49.15% done, estimate finish Fri May 25 20:38:10 2018 >=== last message repeated 2 times. === > 49.16% done, estimate finish Fri May 25 20:38:09 2018 >=== last message repeated 2 times. === > 49.17% done, estimate finish Fri May 25 20:38:08 2018 > 49.17% done, estimate finish Fri May 25 20:38:10 2018 > 49.17% done, estimate finish Fri May 25 20:38:09 2018 > 49.18% done, estimate finish Fri May 25 20:38:09 2018 > 49.18% done, estimate finish Fri May 25 20:38:08 2018 > 49.19% done, estimate finish Fri May 25 20:38:08 2018 > 49.19% done, estimate finish Fri May 25 20:38:07 2018 > 49.19% done, estimate finish Fri May 25 20:38:09 2018 > 49.20% done, estimate finish Fri May 25 20:38:08 2018 >=== last message repeated 2 times. === > 49.21% done, estimate finish Fri May 25 20:38:07 2018 >=== last message repeated 2 times. === > 49.22% done, estimate finish Fri May 25 20:38:06 2018 >=== last message repeated 2 times. === > 49.22% done, estimate finish Fri May 25 20:38:07 2018 > 49.23% done, estimate finish Fri May 25 20:38:07 2018 > 49.23% done, estimate finish Fri May 25 20:38:06 2018 > 49.24% done, estimate finish Fri May 25 20:38:06 2018 > 49.24% done, estimate finish Fri May 25 20:38:05 2018 >=== last message repeated 2 times. === > 49.25% done, estimate finish Fri May 25 20:38:04 2018 > 49.25% done, estimate finish Fri May 25 20:38:06 2018 > 49.26% done, estimate finish Fri May 25 20:38:06 2018 > 49.26% done, estimate finish Fri May 25 20:38:05 2018 >=== last message repeated 2 times. === > 49.27% done, estimate finish Fri May 25 20:38:04 2018 >=== last message repeated 2 times. === > 49.28% done, estimate finish Fri May 25 20:38:05 2018 >=== last message repeated 2 times. === > 49.28% done, estimate finish Fri May 25 20:38:04 2018 > 49.29% done, estimate finish Fri May 25 20:38:04 2018 > 49.29% done, estimate finish Fri May 25 20:38:03 2018 > 49.30% done, estimate finish Fri May 25 20:38:03 2018 > 49.30% done, estimate finish Fri May 25 20:38:02 2018 > 49.31% done, estimate finish Fri May 25 20:38:04 2018 > 49.31% done, estimate finish Fri May 25 20:38:03 2018 >=== last message repeated 2 times. === > 49.32% done, estimate finish Fri May 25 20:38:02 2018 >=== last message repeated 2 times. === > 49.33% done, estimate finish Fri May 25 20:38:01 2018 > 49.33% done, estimate finish Fri May 25 20:38:03 2018 > 49.33% done, estimate finish Fri May 25 20:38:02 2018 > 49.34% done, estimate finish Fri May 25 20:38:02 2018 > 49.34% done, estimate finish Fri May 25 20:38:01 2018 > 49.35% done, estimate finish Fri May 25 20:38:01 2018 > 49.35% done, estimate finish Fri May 25 20:38:00 2018 >=== last message repeated 2 times. === > 49.36% done, estimate finish Fri May 25 20:38:01 2018 >=== last message repeated 2 times. === > 49.37% done, estimate finish Fri May 25 20:38:01 2018 > 49.37% done, estimate finish Fri May 25 20:38:00 2018 >=== last message repeated 2 times. === > 49.38% done, estimate finish Fri May 25 20:37:59 2018 >=== last message repeated 2 times. === > 49.39% done, estimate finish Fri May 25 20:38:00 2018 >=== last message repeated 2 times. === > 49.40% done, estimate finish Fri May 25 20:37:59 2018 >=== last message repeated 2 times. === > 49.40% done, estimate finish Fri May 25 20:37:58 2018 > 49.41% done, estimate finish Fri May 25 20:37:58 2018 > 49.41% done, estimate finish Fri May 25 20:37:59 2018 > 49.42% done, estimate finish Fri May 25 20:37:59 2018 > 49.42% done, estimate finish Fri May 25 20:37:58 2018 >=== last message repeated 2 times. === > 49.43% done, estimate finish Fri May 25 20:37:57 2018 >=== last message repeated 2 times. === > 49.44% done, estimate finish Fri May 25 20:37:56 2018 > 49.44% done, estimate finish Fri May 25 20:37:58 2018 > 49.44% done, estimate finish Fri May 25 20:37:57 2018 > 49.45% done, estimate finish Fri May 25 20:37:57 2018 > 49.45% done, estimate finish Fri May 25 20:37:56 2018 > 49.46% done, estimate finish Fri May 25 20:37:56 2018 > 49.46% done, estimate finish Fri May 25 20:37:55 2018 > 49.47% done, estimate finish Fri May 25 20:37:57 2018 > 49.47% done, estimate finish Fri May 25 20:37:56 2018 >=== last message repeated 2 times. === > 49.48% done, estimate finish Fri May 25 20:37:56 2018 > 49.48% done, estimate finish Fri May 25 20:37:55 2018 > 49.49% done, estimate finish Fri May 25 20:37:55 2018 > 49.49% done, estimate finish Fri May 25 20:37:54 2018 > 49.49% done, estimate finish Fri May 25 20:37:56 2018 > 49.50% done, estimate finish Fri May 25 20:37:55 2018 >=== last message repeated 2 times. === > 49.51% done, estimate finish Fri May 25 20:37:54 2018 >=== last message repeated 2 times. === > 49.51% done, estimate finish Fri May 25 20:37:53 2018 > 49.52% done, estimate finish Fri May 25 20:37:53 2018 > 49.52% done, estimate finish Fri May 25 20:37:54 2018 > 49.53% done, estimate finish Fri May 25 20:37:54 2018 > 49.53% done, estimate finish Fri May 25 20:37:53 2018 >=== last message repeated 2 times. === > 49.54% done, estimate finish Fri May 25 20:37:52 2018 >=== last message repeated 2 times. === > 49.55% done, estimate finish Fri May 25 20:37:53 2018 >=== last message repeated 2 times. === > 49.56% done, estimate finish Fri May 25 20:37:52 2018 >=== last message repeated 2 times. === > 49.56% done, estimate finish Fri May 25 20:37:51 2018 > 49.57% done, estimate finish Fri May 25 20:37:51 2018 > 49.57% done, estimate finish Fri May 25 20:37:50 2018 > 49.58% done, estimate finish Fri May 25 20:37:52 2018 >=== last message repeated 2 times. === > 49.58% done, estimate finish Fri May 25 20:37:51 2018 > 49.59% done, estimate finish Fri May 25 20:37:51 2018 > 49.59% done, estimate finish Fri May 25 20:37:50 2018 > 49.60% done, estimate finish Fri May 25 20:37:50 2018 > 49.60% done, estimate finish Fri May 25 20:37:49 2018 > 49.60% done, estimate finish Fri May 25 20:37:51 2018 > 49.61% done, estimate finish Fri May 25 20:37:50 2018 >=== last message repeated 2 times. === > 49.62% done, estimate finish Fri May 25 20:37:49 2018 >=== last message repeated 2 times. === > 49.62% done, estimate finish Fri May 25 20:37:48 2018 > 49.63% done, estimate finish Fri May 25 20:37:50 2018 > 49.63% done, estimate finish Fri May 25 20:37:49 2018 > 49.64% done, estimate finish Fri May 25 20:37:49 2018 > 49.64% done, estimate finish Fri May 25 20:37:48 2018 > 49.65% done, estimate finish Fri May 25 20:37:48 2018 > 49.65% done, estimate finish Fri May 25 20:37:47 2018 >=== last message repeated 2 times. === > 49.66% done, estimate finish Fri May 25 20:37:48 2018 >=== last message repeated 2 times. === > 49.67% done, estimate finish Fri May 25 20:37:47 2018 >=== last message repeated 3 times. === > 49.68% done, estimate finish Fri May 25 20:37:46 2018 > 49.68% done, estimate finish Fri May 25 20:37:48 2018 > 49.69% done, estimate finish Fri May 25 20:37:47 2018 >=== last message repeated 2 times. === > 49.69% done, estimate finish Fri May 25 20:37:46 2018 > 49.70% done, estimate finish Fri May 25 20:37:46 2018 > 49.70% done, estimate finish Fri May 25 20:37:45 2018 > 49.71% done, estimate finish Fri May 25 20:37:45 2018 > 49.71% done, estimate finish Fri May 25 20:37:46 2018 >=== last message repeated 2 times. === > 49.72% done, estimate finish Fri May 25 20:37:45 2018 >=== last message repeated 2 times. === > 49.73% done, estimate finish Fri May 25 20:37:44 2018 >=== last message repeated 2 times. === > 49.74% done, estimate finish Fri May 25 20:37:43 2018 > 49.74% done, estimate finish Fri May 25 20:37:45 2018 > 49.74% done, estimate finish Fri May 25 20:37:44 2018 > 49.75% done, estimate finish Fri May 25 20:37:44 2018 > 49.75% done, estimate finish Fri May 25 20:37:43 2018 > 49.76% done, estimate finish Fri May 25 20:37:43 2018 > 49.76% done, estimate finish Fri May 25 20:37:42 2018 > 49.76% done, estimate finish Fri May 25 20:37:44 2018 > 49.77% done, estimate finish Fri May 25 20:37:44 2018 > 49.77% done, estimate finish Fri May 25 20:37:43 2018 > 49.78% done, estimate finish Fri May 25 20:37:43 2018 > 49.78% done, estimate finish Fri May 25 20:37:42 2018 >=== last message repeated 2 times. === > 49.79% done, estimate finish Fri May 25 20:37:41 2018 > 49.79% done, estimate finish Fri May 25 20:37:43 2018 > 49.80% done, estimate finish Fri May 25 20:37:42 2018 >=== last message repeated 2 times. === > 49.81% done, estimate finish Fri May 25 20:37:41 2018 >=== last message repeated 2 times. === > 49.81% done, estimate finish Fri May 25 20:37:40 2018 > 49.82% done, estimate finish Fri May 25 20:37:40 2018 > 49.82% done, estimate finish Fri May 25 20:37:41 2018 > 49.83% done, estimate finish Fri May 25 20:37:41 2018 > 49.83% done, estimate finish Fri May 25 20:37:40 2018 >=== last message repeated 2 times. === > 49.84% done, estimate finish Fri May 25 20:37:39 2018 >=== last message repeated 2 times. === > 49.85% done, estimate finish Fri May 25 20:37:40 2018 >=== last message repeated 2 times. === > 49.85% done, estimate finish Fri May 25 20:37:39 2018 > 49.86% done, estimate finish Fri May 25 20:37:39 2018 >=== last message repeated 2 times. === > 49.87% done, estimate finish Fri May 25 20:37:38 2018 > 49.87% done, estimate finish Fri May 25 20:37:40 2018 > 49.87% done, estimate finish Fri May 25 20:37:39 2018 > 49.88% done, estimate finish Fri May 25 20:37:39 2018 > 49.88% done, estimate finish Fri May 25 20:37:38 2018 > 49.89% done, estimate finish Fri May 25 20:37:38 2018 > 49.89% done, estimate finish Fri May 25 20:37:37 2018 > 49.90% done, estimate finish Fri May 25 20:37:37 2018 > 49.90% done, estimate finish Fri May 25 20:37:38 2018 >=== last message repeated 2 times. === > 49.91% done, estimate finish Fri May 25 20:37:37 2018 >=== last message repeated 2 times. === > 49.92% done, estimate finish Fri May 25 20:37:36 2018 >=== last message repeated 2 times. === > 49.92% done, estimate finish Fri May 25 20:37:35 2018 > 49.93% done, estimate finish Fri May 25 20:37:37 2018 > 49.93% done, estimate finish Fri May 25 20:37:36 2018 > 49.94% done, estimate finish Fri May 25 20:37:36 2018 > 49.94% done, estimate finish Fri May 25 20:37:35 2018 >=== last message repeated 2 times. === > 49.95% done, estimate finish Fri May 25 20:37:35 2018 > 49.95% done, estimate finish Fri May 25 20:37:36 2018 > 49.96% done, estimate finish Fri May 25 20:37:36 2018 > 49.96% done, estimate finish Fri May 25 20:37:35 2018 >=== last message repeated 2 times. === > 49.97% done, estimate finish Fri May 25 20:37:34 2018 >=== last message repeated 2 times. === > 49.98% done, estimate finish Fri May 25 20:37:33 2018 > 49.98% done, estimate finish Fri May 25 20:37:35 2018 > 49.99% done, estimate finish Fri May 25 20:37:34 2018 >=== last message repeated 2 times. === > 49.99% done, estimate finish Fri May 25 20:37:33 2018 > 50.00% done, estimate finish Fri May 25 20:37:33 2018 > 50.00% done, estimate finish Fri May 25 20:37:32 2018 > 50.01% done, estimate finish Fri May 25 20:37:34 2018 > 50.01% done, estimate finish Fri May 25 20:37:33 2018 >=== last message repeated 2 times. === > 50.02% done, estimate finish Fri May 25 20:37:32 2018 >=== last message repeated 2 times. === > 50.03% done, estimate finish Fri May 25 20:37:31 2018 >=== last message repeated 2 times. === > 50.03% done, estimate finish Fri May 25 20:37:33 2018 > 50.04% done, estimate finish Fri May 25 20:37:32 2018 >=== last message repeated 2 times. === > 50.05% done, estimate finish Fri May 25 20:37:31 2018 >=== last message repeated 2 times. === > 50.05% done, estimate finish Fri May 25 20:37:30 2018 > 50.06% done, estimate finish Fri May 25 20:37:30 2018 > 50.06% done, estimate finish Fri May 25 20:37:31 2018 > 50.07% done, estimate finish Fri May 25 20:37:31 2018 > 50.07% done, estimate finish Fri May 25 20:37:30 2018 > 50.08% done, estimate finish Fri May 25 20:37:30 2018 > 50.08% done, estimate finish Fri May 25 20:37:29 2018 >=== last message repeated 2 times. === > 50.09% done, estimate finish Fri May 25 20:37:30 2018 >=== last message repeated 2 times. === > 50.10% done, estimate finish Fri May 25 20:37:29 2018 >=== last message repeated 2 times. === > 50.10% done, estimate finish Fri May 25 20:37:28 2018 > 50.11% done, estimate finish Fri May 25 20:37:28 2018 > 50.11% done, estimate finish Fri May 25 20:37:27 2018 > 50.12% done, estimate finish Fri May 25 20:37:29 2018 >=== last message repeated 2 times. === > 50.12% done, estimate finish Fri May 25 20:37:28 2018 > 50.13% done, estimate finish Fri May 25 20:37:28 2018 > 50.13% done, estimate finish Fri May 25 20:37:27 2018 > 50.14% done, estimate finish Fri May 25 20:37:27 2018 > 50.14% done, estimate finish Fri May 25 20:37:28 2018 > 50.15% done, estimate finish Fri May 25 20:37:28 2018 > 50.15% done, estimate finish Fri May 25 20:37:27 2018 >=== last message repeated 2 times. === > 50.16% done, estimate finish Fri May 25 20:37:26 2018 >=== last message repeated 2 times. === > 50.17% done, estimate finish Fri May 25 20:37:25 2018 > 50.17% done, estimate finish Fri May 25 20:37:27 2018 > 50.17% done, estimate finish Fri May 25 20:37:26 2018 > 50.18% done, estimate finish Fri May 25 20:37:26 2018 > 50.18% done, estimate finish Fri May 25 20:37:25 2018 > 50.19% done, estimate finish Fri May 25 20:37:25 2018 > 50.19% done, estimate finish Fri May 25 20:37:24 2018 >=== last message repeated 2 times. === > 50.20% done, estimate finish Fri May 25 20:37:25 2018 >=== last message repeated 2 times. === > 50.21% done, estimate finish Fri May 25 20:37:25 2018 > 50.21% done, estimate finish Fri May 25 20:37:24 2018 >=== last message repeated 2 times. === > 50.22% done, estimate finish Fri May 25 20:37:23 2018 > 50.22% done, estimate finish Fri May 25 20:37:25 2018 > 50.23% done, estimate finish Fri May 25 20:37:24 2018 >=== last message repeated 2 times. === > 50.24% done, estimate finish Fri May 25 20:37:23 2018 >=== last message repeated 2 times. === > 50.24% done, estimate finish Fri May 25 20:37:22 2018 > 50.25% done, estimate finish Fri May 25 20:37:22 2018 > 50.25% done, estimate finish Fri May 25 20:37:23 2018 > 50.26% done, estimate finish Fri May 25 20:37:23 2018 > 50.26% done, estimate finish Fri May 25 20:37:22 2018 >=== last message repeated 2 times. === > 50.27% done, estimate finish Fri May 25 20:37:21 2018 >=== last message repeated 2 times. === > 50.28% done, estimate finish Fri May 25 20:37:20 2018 > 50.28% done, estimate finish Fri May 25 20:37:22 2018 >=== last message repeated 2 times. === > 50.29% done, estimate finish Fri May 25 20:37:21 2018 >=== last message repeated 2 times. === > 50.30% done, estimate finish Fri May 25 20:37:20 2018 >=== last message repeated 2 times. === > 50.30% done, estimate finish Fri May 25 20:37:21 2018 > 50.31% done, estimate finish Fri May 25 20:37:21 2018 > 50.31% done, estimate finish Fri May 25 20:37:20 2018 > 50.32% done, estimate finish Fri May 25 20:37:20 2018 > 50.32% done, estimate finish Fri May 25 20:37:19 2018 > 50.33% done, estimate finish Fri May 25 20:37:19 2018 > 50.33% done, estimate finish Fri May 25 20:37:20 2018 >=== last message repeated 2 times. === > 50.34% done, estimate finish Fri May 25 20:37:19 2018 >=== last message repeated 2 times. === > 50.35% done, estimate finish Fri May 25 20:37:18 2018 >=== last message repeated 2 times. === > 50.35% done, estimate finish Fri May 25 20:37:17 2018 > 50.36% done, estimate finish Fri May 25 20:37:19 2018 > 50.36% done, estimate finish Fri May 25 20:37:18 2018 > 50.37% done, estimate finish Fri May 25 20:37:18 2018 >=== last message repeated 2 times. === > 50.37% done, estimate finish Fri May 25 20:37:17 2018 > 50.38% done, estimate finish Fri May 25 20:37:17 2018 > 50.38% done, estimate finish Fri May 25 20:37:16 2018 > 50.39% done, estimate finish Fri May 25 20:37:18 2018 > 50.39% done, estimate finish Fri May 25 20:37:17 2018 >=== last message repeated 2 times. === > 50.40% done, estimate finish Fri May 25 20:37:16 2018 >=== last message repeated 2 times. === > 50.41% done, estimate finish Fri May 25 20:37:15 2018 > 50.41% done, estimate finish Fri May 25 20:37:17 2018 > 50.42% done, estimate finish Fri May 25 20:37:16 2018 >=== last message repeated 2 times. === > 50.42% done, estimate finish Fri May 25 20:37:15 2018 > 50.43% done, estimate finish Fri May 25 20:37:15 2018 > 50.43% done, estimate finish Fri May 25 20:37:14 2018 > 50.44% done, estimate finish Fri May 25 20:37:14 2018 > 50.44% done, estimate finish Fri May 25 20:37:15 2018 >=== last message repeated 2 times. === > 50.45% done, estimate finish Fri May 25 20:37:15 2018 > 50.45% done, estimate finish Fri May 25 20:37:14 2018 > 50.46% done, estimate finish Fri May 25 20:37:14 2018 > 50.46% done, estimate finish Fri May 25 20:37:13 2018 > 50.46% done, estimate finish Fri May 25 20:37:15 2018 > 50.47% done, estimate finish Fri May 25 20:37:14 2018 >=== last message repeated 2 times. === > 50.48% done, estimate finish Fri May 25 20:37:13 2018 >=== last message repeated 2 times. === > 50.48% done, estimate finish Fri May 25 20:37:12 2018 > 50.49% done, estimate finish Fri May 25 20:37:12 2018 > 50.49% done, estimate finish Fri May 25 20:37:13 2018 > 50.50% done, estimate finish Fri May 25 20:37:13 2018 > 50.50% done, estimate finish Fri May 25 20:37:12 2018 > 50.51% done, estimate finish Fri May 25 20:37:12 2018 > 50.51% done, estimate finish Fri May 25 20:37:11 2018 >=== last message repeated 2 times. === > 50.52% done, estimate finish Fri May 25 20:37:11 2018 > 50.52% done, estimate finish Fri May 25 20:37:12 2018 > 50.53% done, estimate finish Fri May 25 20:37:12 2018 > 50.53% done, estimate finish Fri May 25 20:37:11 2018 >=== last message repeated 2 times. === > 50.54% done, estimate finish Fri May 25 20:37:10 2018 >=== last message repeated 2 times. === > 50.55% done, estimate finish Fri May 25 20:37:11 2018 >=== last message repeated 2 times. === > 50.55% done, estimate finish Fri May 25 20:37:10 2018 > 50.56% done, estimate finish Fri May 25 20:37:10 2018 > 50.56% done, estimate finish Fri May 25 20:37:09 2018 > 50.57% done, estimate finish Fri May 25 20:37:09 2018 > 50.57% done, estimate finish Fri May 25 20:37:08 2018 > 50.58% done, estimate finish Fri May 25 20:37:10 2018 > 50.58% done, estimate finish Fri May 25 20:37:09 2018 >=== last message repeated 2 times. === > 50.59% done, estimate finish Fri May 25 20:37:08 2018 >=== last message repeated 2 times. === > 50.60% done, estimate finish Fri May 25 20:37:08 2018 > 50.60% done, estimate finish Fri May 25 20:37:09 2018 >=== last message repeated 2 times. === > 50.61% done, estimate finish Fri May 25 20:37:08 2018 >=== last message repeated 2 times. === > 50.62% done, estimate finish Fri May 25 20:37:07 2018 >=== last message repeated 2 times. === > 50.62% done, estimate finish Fri May 25 20:37:06 2018 > 50.63% done, estimate finish Fri May 25 20:37:08 2018 > 50.63% done, estimate finish Fri May 25 20:37:07 2018 > 50.64% done, estimate finish Fri May 25 20:37:07 2018 > 50.64% done, estimate finish Fri May 25 20:37:06 2018 >=== last message repeated 2 times. === > 50.65% done, estimate finish Fri May 25 20:37:05 2018 >=== last message repeated 2 times. === > 50.66% done, estimate finish Fri May 25 20:37:06 2018 >=== last message repeated 2 times. === > 50.67% done, estimate finish Fri May 25 20:37:05 2018 >=== last message repeated 3 times. === > 50.68% done, estimate finish Fri May 25 20:37:04 2018 > 50.68% done, estimate finish Fri May 25 20:37:06 2018 > 50.69% done, estimate finish Fri May 25 20:37:05 2018 >=== last message repeated 2 times. === > 50.69% done, estimate finish Fri May 25 20:37:04 2018 > 50.70% done, estimate finish Fri May 25 20:37:04 2018 > 50.70% done, estimate finish Fri May 25 20:37:03 2018 > 50.71% done, estimate finish Fri May 25 20:37:05 2018 > 50.71% done, estimate finish Fri May 25 20:37:04 2018 >=== last message repeated 2 times. === > 50.72% done, estimate finish Fri May 25 20:37:03 2018 >=== last message repeated 2 times. === > 50.73% done, estimate finish Fri May 25 20:37:02 2018 >=== last message repeated 2 times. === > 50.73% done, estimate finish Fri May 25 20:37:03 2018 > 50.74% done, estimate finish Fri May 25 20:37:03 2018 >=== last message repeated 2 times. === > 50.75% done, estimate finish Fri May 25 20:37:02 2018 >=== last message repeated 2 times. === > 50.76% done, estimate finish Fri May 25 20:37:01 2018 >=== last message repeated 2 times. === > 50.76% done, estimate finish Fri May 25 20:37:02 2018 > 50.77% done, estimate finish Fri May 25 20:37:02 2018 > 50.77% done, estimate finish Fri May 25 20:37:01 2018 > 50.78% done, estimate finish Fri May 25 20:37:01 2018 > 50.78% done, estimate finish Fri May 25 20:37:00 2018 >=== last message repeated 2 times. === > 50.79% done, estimate finish Fri May 25 20:37:01 2018 >=== last message repeated 2 times. === > 50.80% done, estimate finish Fri May 25 20:37:00 2018 >=== last message repeated 2 times. === > 50.80% done, estimate finish Fri May 25 20:36:59 2018 > 50.81% done, estimate finish Fri May 25 20:36:59 2018 >=== last message repeated 2 times. === > 50.82% done, estimate finish Fri May 25 20:37:00 2018 >=== last message repeated 2 times. === > 50.82% done, estimate finish Fri May 25 20:36:59 2018 > 50.83% done, estimate finish Fri May 25 20:36:59 2018 > 50.83% done, estimate finish Fri May 25 20:36:58 2018 > 50.84% done, estimate finish Fri May 25 20:36:58 2018 > 50.84% done, estimate finish Fri May 25 20:36:57 2018 > 50.85% done, estimate finish Fri May 25 20:36:59 2018 > 50.85% done, estimate finish Fri May 25 20:36:58 2018 >=== last message repeated 2 times. === > 50.86% done, estimate finish Fri May 25 20:36:57 2018 >=== last message repeated 2 times. === > 50.87% done, estimate finish Fri May 25 20:36:56 2018 > 50.87% done, estimate finish Fri May 25 20:36:58 2018 > 50.87% done, estimate finish Fri May 25 20:36:57 2018 > 50.88% done, estimate finish Fri May 25 20:36:57 2018 >=== last message repeated 2 times. === > 50.89% done, estimate finish Fri May 25 20:36:56 2018 >=== last message repeated 2 times. === > 50.89% done, estimate finish Fri May 25 20:36:55 2018 > 50.90% done, estimate finish Fri May 25 20:36:57 2018 > 50.90% done, estimate finish Fri May 25 20:36:56 2018 > 50.91% done, estimate finish Fri May 25 20:36:56 2018 > 50.91% done, estimate finish Fri May 25 20:36:55 2018 > 50.92% done, estimate finish Fri May 25 20:36:55 2018 > 50.92% done, estimate finish Fri May 25 20:36:54 2018 > 50.92% done, estimate finish Fri May 25 20:36:56 2018 > 50.93% done, estimate finish Fri May 25 20:36:55 2018 >=== last message repeated 2 times. === > 50.94% done, estimate finish Fri May 25 20:36:54 2018 >=== last message repeated 2 times. === > 50.94% done, estimate finish Fri May 25 20:36:53 2018 > 50.95% done, estimate finish Fri May 25 20:36:55 2018 >=== last message repeated 2 times. === > 50.96% done, estimate finish Fri May 25 20:36:54 2018 >=== last message repeated 2 times. === > 50.96% done, estimate finish Fri May 25 20:36:53 2018 > 50.97% done, estimate finish Fri May 25 20:36:53 2018 > 50.97% done, estimate finish Fri May 25 20:36:52 2018 > 50.98% done, estimate finish Fri May 25 20:36:54 2018 > 50.98% done, estimate finish Fri May 25 20:36:53 2018 >=== last message repeated 2 times. === > 50.99% done, estimate finish Fri May 25 20:36:52 2018 >=== last message repeated 2 times. === > 51.00% done, estimate finish Fri May 25 20:36:51 2018 > 51.00% done, estimate finish Fri May 25 20:36:53 2018 > 51.01% done, estimate finish Fri May 25 20:36:52 2018 >=== last message repeated 2 times. === > 51.01% done, estimate finish Fri May 25 20:36:51 2018 > 51.02% done, estimate finish Fri May 25 20:36:51 2018 >=== last message repeated 2 times. === > 51.03% done, estimate finish Fri May 25 20:36:50 2018 > 51.03% done, estimate finish Fri May 25 20:36:52 2018 > 51.03% done, estimate finish Fri May 25 20:36:51 2018 > 51.04% done, estimate finish Fri May 25 20:36:51 2018 > 51.04% done, estimate finish Fri May 25 20:36:50 2018 > 51.05% done, estimate finish Fri May 25 20:36:50 2018 > 51.05% done, estimate finish Fri May 25 20:36:49 2018 > 51.05% done, estimate finish Fri May 25 20:36:51 2018 > 51.06% done, estimate finish Fri May 25 20:36:50 2018 >=== last message repeated 2 times. === > 51.07% done, estimate finish Fri May 25 20:36:49 2018 >=== last message repeated 2 times. === > 51.07% done, estimate finish Fri May 25 20:36:48 2018 > 51.08% done, estimate finish Fri May 25 20:36:48 2018 > 51.08% done, estimate finish Fri May 25 20:36:49 2018 > 51.09% done, estimate finish Fri May 25 20:36:49 2018 >=== last message repeated 2 times. === > 51.10% done, estimate finish Fri May 25 20:36:48 2018 > 51.10% done, estimate finish Fri May 25 20:36:50 2018 > 51.10% done, estimate finish Fri May 25 20:36:49 2018 > 51.11% done, estimate finish Fri May 25 20:36:49 2018 > 51.11% done, estimate finish Fri May 25 20:36:48 2018 > 51.12% done, estimate finish Fri May 25 20:36:48 2018 > 51.12% done, estimate finish Fri May 25 20:36:47 2018 >=== last message repeated 2 times. === > 51.13% done, estimate finish Fri May 25 20:36:46 2018 > 51.13% done, estimate finish Fri May 25 20:36:48 2018 > 51.14% done, estimate finish Fri May 25 20:36:47 2018 >=== last message repeated 2 times. === > 51.14% done, estimate finish Fri May 25 20:36:46 2018 > 51.15% done, estimate finish Fri May 25 20:36:46 2018 >=== last message repeated 2 times. === > 51.16% done, estimate finish Fri May 25 20:36:45 2018 > 51.16% done, estimate finish Fri May 25 20:36:47 2018 > 51.16% done, estimate finish Fri May 25 20:36:46 2018 > 51.17% done, estimate finish Fri May 25 20:36:46 2018 > 51.17% done, estimate finish Fri May 25 20:36:45 2018 > 51.18% done, estimate finish Fri May 25 20:36:45 2018 > 51.18% done, estimate finish Fri May 25 20:36:44 2018 > 51.19% done, estimate finish Fri May 25 20:36:46 2018 > 51.19% done, estimate finish Fri May 25 20:36:45 2018 >=== last message repeated 2 times. === > 51.20% done, estimate finish Fri May 25 20:36:44 2018 >=== last message repeated 2 times. === > 51.21% done, estimate finish Fri May 25 20:36:43 2018 > 51.21% done, estimate finish Fri May 25 20:36:45 2018 > 51.21% done, estimate finish Fri May 25 20:36:44 2018 > 51.22% done, estimate finish Fri May 25 20:36:44 2018 >=== last message repeated 2 times. === > 51.23% done, estimate finish Fri May 25 20:36:43 2018 >=== last message repeated 2 times. === > 51.23% done, estimate finish Fri May 25 20:36:42 2018 > 51.24% done, estimate finish Fri May 25 20:36:44 2018 > 51.24% done, estimate finish Fri May 25 20:36:43 2018 > 51.25% done, estimate finish Fri May 25 20:36:43 2018 > 51.25% done, estimate finish Fri May 25 20:36:42 2018 >=== last message repeated 2 times. === > 51.26% done, estimate finish Fri May 25 20:36:41 2018 >=== last message repeated 2 times. === > 51.27% done, estimate finish Fri May 25 20:36:42 2018 >=== last message repeated 2 times. === > 51.28% done, estimate finish Fri May 25 20:36:41 2018 >=== last message repeated 3 times. === > 51.29% done, estimate finish Fri May 25 20:36:40 2018 > 51.29% done, estimate finish Fri May 25 20:36:42 2018 > 51.30% done, estimate finish Fri May 25 20:36:41 2018 >=== last message repeated 2 times. === > 51.30% done, estimate finish Fri May 25 20:36:40 2018 > 51.31% done, estimate finish Fri May 25 20:36:40 2018 > 51.31% done, estimate finish Fri May 25 20:36:39 2018 > 51.32% done, estimate finish Fri May 25 20:36:39 2018 > 51.32% done, estimate finish Fri May 25 20:36:40 2018 >=== last message repeated 2 times. === > 51.33% done, estimate finish Fri May 25 20:36:39 2018 >=== last message repeated 2 times. === > 51.34% done, estimate finish Fri May 25 20:36:38 2018 >=== last message repeated 2 times. === > 51.35% done, estimate finish Fri May 25 20:36:39 2018 >=== last message repeated 3 times. === > 51.36% done, estimate finish Fri May 25 20:36:38 2018 >=== last message repeated 2 times. === > 51.37% done, estimate finish Fri May 25 20:36:37 2018 > 51.37% done, estimate finish Fri May 25 20:36:39 2018 > 51.37% done, estimate finish Fri May 25 20:36:38 2018 > 51.38% done, estimate finish Fri May 25 20:36:38 2018 > 51.38% done, estimate finish Fri May 25 20:36:37 2018 > 51.39% done, estimate finish Fri May 25 20:36:37 2018 > 51.39% done, estimate finish Fri May 25 20:36:36 2018 >=== last message repeated 2 times. === > 51.40% done, estimate finish Fri May 25 20:36:37 2018 >=== last message repeated 2 times. === > 51.41% done, estimate finish Fri May 25 20:36:36 2018 >=== last message repeated 3 times. === > 51.42% done, estimate finish Fri May 25 20:36:35 2018 >=== last message repeated 2 times. === > 51.43% done, estimate finish Fri May 25 20:36:36 2018 >=== last message repeated 2 times. === > 51.44% done, estimate finish Fri May 25 20:36:35 2018 >=== last message repeated 2 times. === > 51.44% done, estimate finish Fri May 25 20:36:34 2018 > 51.45% done, estimate finish Fri May 25 20:36:34 2018 > 51.45% done, estimate finish Fri May 25 20:36:35 2018 > 51.46% done, estimate finish Fri May 25 20:36:35 2018 > 51.46% done, estimate finish Fri May 25 20:36:34 2018 >=== last message repeated 2 times. === > 51.47% done, estimate finish Fri May 25 20:36:33 2018 >=== last message repeated 2 times. === > 51.48% done, estimate finish Fri May 25 20:36:33 2018 > 51.48% done, estimate finish Fri May 25 20:36:34 2018 >=== last message repeated 2 times. === > 51.49% done, estimate finish Fri May 25 20:36:33 2018 >=== last message repeated 2 times. === > 51.50% done, estimate finish Fri May 25 20:36:32 2018 >=== last message repeated 2 times. === > 51.50% done, estimate finish Fri May 25 20:36:31 2018 > 51.51% done, estimate finish Fri May 25 20:36:33 2018 > 51.51% done, estimate finish Fri May 25 20:36:32 2018 > 51.52% done, estimate finish Fri May 25 20:36:32 2018 > 51.52% done, estimate finish Fri May 25 20:36:31 2018 > 51.53% done, estimate finish Fri May 25 20:36:31 2018 >=== last message repeated 2 times. === > 51.53% done, estimate finish Fri May 25 20:36:32 2018 > 51.54% done, estimate finish Fri May 25 20:36:32 2018 > 51.54% done, estimate finish Fri May 25 20:36:31 2018 > 51.55% done, estimate finish Fri May 25 20:36:31 2018 > 51.55% done, estimate finish Fri May 25 20:36:30 2018 >=== last message repeated 2 times. === > 51.56% done, estimate finish Fri May 25 20:36:31 2018 >=== last message repeated 2 times. === > 51.57% done, estimate finish Fri May 25 20:36:30 2018 >=== last message repeated 2 times. === > 51.57% done, estimate finish Fri May 25 20:36:29 2018 > 51.58% done, estimate finish Fri May 25 20:36:29 2018 > 51.58% done, estimate finish Fri May 25 20:36:28 2018 > 51.59% done, estimate finish Fri May 25 20:36:30 2018 > 51.59% done, estimate finish Fri May 25 20:36:29 2018 >=== last message repeated 2 times. === > 51.60% done, estimate finish Fri May 25 20:36:29 2018 > 51.60% done, estimate finish Fri May 25 20:36:28 2018 > 51.61% done, estimate finish Fri May 25 20:36:28 2018 > 51.61% done, estimate finish Fri May 25 20:36:27 2018 > 51.62% done, estimate finish Fri May 25 20:36:29 2018 > 51.62% done, estimate finish Fri May 25 20:36:28 2018 >=== last message repeated 2 times. === > 51.63% done, estimate finish Fri May 25 20:36:27 2018 >=== last message repeated 2 times. === > 51.64% done, estimate finish Fri May 25 20:36:26 2018 > 51.64% done, estimate finish Fri May 25 20:36:28 2018 > 51.64% done, estimate finish Fri May 25 20:36:27 2018 > 51.65% done, estimate finish Fri May 25 20:36:27 2018 > 51.65% done, estimate finish Fri May 25 20:36:26 2018 > 51.66% done, estimate finish Fri May 25 20:36:26 2018 >=== last message repeated 2 times. === > 51.66% done, estimate finish Fri May 25 20:36:25 2018 > 51.67% done, estimate finish Fri May 25 20:36:27 2018 > 51.67% done, estimate finish Fri May 25 20:36:26 2018 > 51.68% done, estimate finish Fri May 25 20:36:26 2018 > 51.68% done, estimate finish Fri May 25 20:36:25 2018 > 51.69% done, estimate finish Fri May 25 20:36:25 2018 > 51.69% done, estimate finish Fri May 25 20:36:24 2018 > 51.69% done, estimate finish Fri May 25 20:36:26 2018 > 51.70% done, estimate finish Fri May 25 20:36:25 2018 >=== last message repeated 2 times. === > 51.71% done, estimate finish Fri May 25 20:36:24 2018 >=== last message repeated 3 times. === > 51.72% done, estimate finish Fri May 25 20:36:23 2018 > 51.72% done, estimate finish Fri May 25 20:36:25 2018 > 51.73% done, estimate finish Fri May 25 20:36:24 2018 >=== last message repeated 2 times. === > 51.73% done, estimate finish Fri May 25 20:36:23 2018 > 51.74% done, estimate finish Fri May 25 20:36:23 2018 > 51.74% done, estimate finish Fri May 25 20:36:22 2018 > 51.75% done, estimate finish Fri May 25 20:36:24 2018 > 51.75% done, estimate finish Fri May 25 20:36:23 2018 >=== last message repeated 2 times. === > 51.76% done, estimate finish Fri May 25 20:36:22 2018 >=== last message repeated 2 times. === > 51.77% done, estimate finish Fri May 25 20:36:21 2018 >=== last message repeated 2 times. === > 51.78% done, estimate finish Fri May 25 20:36:23 2018 > 51.78% done, estimate finish Fri May 25 20:36:22 2018 >=== last message repeated 2 times. === > 51.79% done, estimate finish Fri May 25 20:36:21 2018 >=== last message repeated 2 times. === > 51.80% done, estimate finish Fri May 25 20:36:20 2018 > 51.80% done, estimate finish Fri May 25 20:36:22 2018 > 51.80% done, estimate finish Fri May 25 20:36:21 2018 > 51.81% done, estimate finish Fri May 25 20:36:21 2018 > 51.81% done, estimate finish Fri May 25 20:36:20 2018 > 51.82% done, estimate finish Fri May 25 20:36:20 2018 > 51.82% done, estimate finish Fri May 25 20:36:19 2018 >=== last message repeated 2 times. === > 51.83% done, estimate finish Fri May 25 20:36:20 2018 >=== last message repeated 2 times. === > 51.84% done, estimate finish Fri May 25 20:36:20 2018 > 51.84% done, estimate finish Fri May 25 20:36:19 2018 >=== last message repeated 2 times. === > 51.85% done, estimate finish Fri May 25 20:36:18 2018 >=== last message repeated 2 times. === > 51.86% done, estimate finish Fri May 25 20:36:19 2018 >=== last message repeated 2 times. === > 51.87% done, estimate finish Fri May 25 20:36:18 2018 >=== last message repeated 2 times. === > 51.87% done, estimate finish Fri May 25 20:36:17 2018 > 51.88% done, estimate finish Fri May 25 20:36:17 2018 > 51.88% done, estimate finish Fri May 25 20:36:18 2018 > 51.89% done, estimate finish Fri May 25 20:36:18 2018 >=== last message repeated 2 times. === > 51.89% done, estimate finish Fri May 25 20:36:17 2018 > 51.90% done, estimate finish Fri May 25 20:36:17 2018 > 51.90% done, estimate finish Fri May 25 20:36:16 2018 > 51.91% done, estimate finish Fri May 25 20:36:18 2018 > 51.91% done, estimate finish Fri May 25 20:36:17 2018 >=== last message repeated 2 times. === > 51.92% done, estimate finish Fri May 25 20:36:16 2018 >=== last message repeated 2 times. === > 51.93% done, estimate finish Fri May 25 20:36:15 2018 >=== last message repeated 2 times. === > 51.93% done, estimate finish Fri May 25 20:36:16 2018 > 51.94% done, estimate finish Fri May 25 20:36:16 2018 > 51.94% done, estimate finish Fri May 25 20:36:15 2018 > 51.95% done, estimate finish Fri May 25 20:36:15 2018 >=== last message repeated 2 times. === > 51.96% done, estimate finish Fri May 25 20:36:14 2018 >=== last message repeated 2 times. === > 51.96% done, estimate finish Fri May 25 20:36:15 2018 > 51.97% done, estimate finish Fri May 25 20:36:15 2018 > 51.97% done, estimate finish Fri May 25 20:36:14 2018 > 51.98% done, estimate finish Fri May 25 20:36:14 2018 > 51.98% done, estimate finish Fri May 25 20:36:13 2018 >=== last message repeated 2 times. === > 51.99% done, estimate finish Fri May 25 20:36:14 2018 >=== last message repeated 2 times. === > 52.00% done, estimate finish Fri May 25 20:36:13 2018 >=== last message repeated 3 times. === > 52.01% done, estimate finish Fri May 25 20:36:12 2018 >=== last message repeated 2 times. === > 52.02% done, estimate finish Fri May 25 20:36:13 2018 >=== last message repeated 2 times. === > 52.03% done, estimate finish Fri May 25 20:36:12 2018 >=== last message repeated 2 times. === > 52.03% done, estimate finish Fri May 25 20:36:11 2018 > 52.04% done, estimate finish Fri May 25 20:36:11 2018 > 52.04% done, estimate finish Fri May 25 20:36:12 2018 > 52.05% done, estimate finish Fri May 25 20:36:12 2018 > 52.05% done, estimate finish Fri May 25 20:36:11 2018 >=== last message repeated 2 times. === > 52.06% done, estimate finish Fri May 25 20:36:11 2018 > 52.06% done, estimate finish Fri May 25 20:36:10 2018 > 52.07% done, estimate finish Fri May 25 20:36:10 2018 > 52.07% done, estimate finish Fri May 25 20:36:11 2018 >=== last message repeated 2 times. === > 52.08% done, estimate finish Fri May 25 20:36:10 2018 >=== last message repeated 2 times. === > 52.09% done, estimate finish Fri May 25 20:36:09 2018 >=== last message repeated 2 times. === > 52.09% done, estimate finish Fri May 25 20:36:10 2018 > 52.10% done, estimate finish Fri May 25 20:36:10 2018 > 52.10% done, estimate finish Fri May 25 20:36:09 2018 > 52.11% done, estimate finish Fri May 25 20:36:09 2018 > 52.11% done, estimate finish Fri May 25 20:36:08 2018 > 52.12% done, estimate finish Fri May 25 20:36:08 2018 >=== last message repeated 2 times. === > 52.12% done, estimate finish Fri May 25 20:36:09 2018 > 52.13% done, estimate finish Fri May 25 20:36:09 2018 > 52.13% done, estimate finish Fri May 25 20:36:08 2018 > 52.14% done, estimate finish Fri May 25 20:36:08 2018 > 52.14% done, estimate finish Fri May 25 20:36:07 2018 >=== last message repeated 2 times. === > 52.15% done, estimate finish Fri May 25 20:36:08 2018 >=== last message repeated 2 times. === > 52.16% done, estimate finish Fri May 25 20:36:07 2018 >=== last message repeated 2 times. === > 52.16% done, estimate finish Fri May 25 20:36:06 2018 > 52.17% done, estimate finish Fri May 25 20:36:06 2018 >=== last message repeated 2 times. === > 52.18% done, estimate finish Fri May 25 20:36:07 2018 >=== last message repeated 2 times. === > 52.18% done, estimate finish Fri May 25 20:36:06 2018 > 52.19% done, estimate finish Fri May 25 20:36:06 2018 > 52.19% done, estimate finish Fri May 25 20:36:05 2018 > 52.20% done, estimate finish Fri May 25 20:36:05 2018 > 52.20% done, estimate finish Fri May 25 20:36:04 2018 > 52.21% done, estimate finish Fri May 25 20:36:06 2018 > 52.21% done, estimate finish Fri May 25 20:36:05 2018 >=== last message repeated 2 times. === > 52.22% done, estimate finish Fri May 25 20:36:04 2018 >=== last message repeated 2 times. === > 52.23% done, estimate finish Fri May 25 20:36:04 2018 > 52.23% done, estimate finish Fri May 25 20:36:05 2018 >=== last message repeated 2 times. === > 52.24% done, estimate finish Fri May 25 20:36:04 2018 >=== last message repeated 2 times. === > 52.25% done, estimate finish Fri May 25 20:36:03 2018 >=== last message repeated 2 times. === > 52.25% done, estimate finish Fri May 25 20:36:04 2018 > 52.26% done, estimate finish Fri May 25 20:36:04 2018 > 52.26% done, estimate finish Fri May 25 20:36:03 2018 > 52.27% done, estimate finish Fri May 25 20:36:03 2018 > 52.27% done, estimate finish Fri May 25 20:36:02 2018 >=== last message repeated 2 times. === > 52.28% done, estimate finish Fri May 25 20:36:02 2018 > 52.28% done, estimate finish Fri May 25 20:36:03 2018 > 52.29% done, estimate finish Fri May 25 20:36:03 2018 > 52.29% done, estimate finish Fri May 25 20:36:02 2018 > 52.30% done, estimate finish Fri May 25 20:36:02 2018 > 52.30% done, estimate finish Fri May 25 20:36:01 2018 >=== last message repeated 2 times. === > 52.31% done, estimate finish Fri May 25 20:36:00 2018 > 52.31% done, estimate finish Fri May 25 20:36:02 2018 > 52.32% done, estimate finish Fri May 25 20:36:01 2018 >=== last message repeated 2 times. === > 52.32% done, estimate finish Fri May 25 20:36:00 2018 > 52.33% done, estimate finish Fri May 25 20:36:00 2018 >=== last message repeated 2 times. === > 52.34% done, estimate finish Fri May 25 20:36:01 2018 >=== last message repeated 2 times. === > 52.34% done, estimate finish Fri May 25 20:36:00 2018 > 52.35% done, estimate finish Fri May 25 20:36:00 2018 > 52.35% done, estimate finish Fri May 25 20:35:59 2018 > 52.36% done, estimate finish Fri May 25 20:35:59 2018 > 52.36% done, estimate finish Fri May 25 20:36:00 2018 >=== last message repeated 2 times. === > 52.37% done, estimate finish Fri May 25 20:35:59 2018 >=== last message repeated 2 times. === > 52.38% done, estimate finish Fri May 25 20:35:58 2018 >=== last message repeated 2 times. === > 52.39% done, estimate finish Fri May 25 20:35:58 2018 > 52.39% done, estimate finish Fri May 25 20:35:59 2018 >=== last message repeated 2 times. === > 52.40% done, estimate finish Fri May 25 20:35:58 2018 >=== last message repeated 2 times. === > 52.41% done, estimate finish Fri May 25 20:35:57 2018 >=== last message repeated 2 times. === > 52.41% done, estimate finish Fri May 25 20:35:56 2018 > 52.42% done, estimate finish Fri May 25 20:35:58 2018 > 52.42% done, estimate finish Fri May 25 20:35:57 2018 > 52.43% done, estimate finish Fri May 25 20:35:57 2018 > 52.43% done, estimate finish Fri May 25 20:35:56 2018 >=== last message repeated 2 times. === > 52.44% done, estimate finish Fri May 25 20:35:56 2018 > 52.44% done, estimate finish Fri May 25 20:35:57 2018 > 52.45% done, estimate finish Fri May 25 20:35:57 2018 > 52.45% done, estimate finish Fri May 25 20:35:56 2018 > 52.46% done, estimate finish Fri May 25 20:35:56 2018 > 52.46% done, estimate finish Fri May 25 20:35:55 2018 >=== last message repeated 2 times. === > 52.47% done, estimate finish Fri May 25 20:35:56 2018 >=== last message repeated 2 times. === > 52.48% done, estimate finish Fri May 25 20:35:55 2018 >=== last message repeated 2 times. === > 52.48% done, estimate finish Fri May 25 20:35:54 2018 > 52.49% done, estimate finish Fri May 25 20:35:54 2018 >=== last message repeated 2 times. === > 52.50% done, estimate finish Fri May 25 20:35:55 2018 >=== last message repeated 2 times. === > 52.50% done, estimate finish Fri May 25 20:35:54 2018 > 52.51% done, estimate finish Fri May 25 20:35:54 2018 > 52.51% done, estimate finish Fri May 25 20:35:53 2018 > 52.52% done, estimate finish Fri May 25 20:35:53 2018 > 52.52% done, estimate finish Fri May 25 20:35:52 2018 > 52.52% done, estimate finish Fri May 25 20:35:54 2018 > 52.53% done, estimate finish Fri May 25 20:35:53 2018 >=== last message repeated 2 times. === > 52.54% done, estimate finish Fri May 25 20:35:52 2018 >=== last message repeated 2 times. === > 52.55% done, estimate finish Fri May 25 20:35:52 2018 > 52.55% done, estimate finish Fri May 25 20:35:53 2018 >=== last message repeated 2 times. === > 52.56% done, estimate finish Fri May 25 20:35:52 2018 >=== last message repeated 2 times. === > 52.57% done, estimate finish Fri May 25 20:35:51 2018 >=== last message repeated 2 times. === > 52.57% done, estimate finish Fri May 25 20:35:50 2018 > 52.58% done, estimate finish Fri May 25 20:35:52 2018 > 52.58% done, estimate finish Fri May 25 20:35:51 2018 > 52.59% done, estimate finish Fri May 25 20:35:51 2018 > 52.59% done, estimate finish Fri May 25 20:35:50 2018 >=== last message repeated 2 times. === > 52.60% done, estimate finish Fri May 25 20:35:50 2018 > 52.60% done, estimate finish Fri May 25 20:35:49 2018 > 52.61% done, estimate finish Fri May 25 20:35:51 2018 > 52.61% done, estimate finish Fri May 25 20:35:50 2018 >=== last message repeated 2 times. === > 52.62% done, estimate finish Fri May 25 20:35:49 2018 >=== last message repeated 2 times. === > 52.63% done, estimate finish Fri May 25 20:35:48 2018 > 52.63% done, estimate finish Fri May 25 20:35:50 2018 > 52.64% done, estimate finish Fri May 25 20:35:49 2018 >=== last message repeated 3 times. === > 52.65% done, estimate finish Fri May 25 20:35:48 2018 >=== last message repeated 2 times. === > 52.66% done, estimate finish Fri May 25 20:35:49 2018 >=== last message repeated 2 times. === > 52.66% done, estimate finish Fri May 25 20:35:48 2018 > 52.67% done, estimate finish Fri May 25 20:35:48 2018 > 52.67% done, estimate finish Fri May 25 20:35:47 2018 > 52.68% done, estimate finish Fri May 25 20:35:47 2018 > 52.68% done, estimate finish Fri May 25 20:35:46 2018 > 52.68% done, estimate finish Fri May 25 20:35:48 2018 > 52.69% done, estimate finish Fri May 25 20:35:47 2018 >=== last message repeated 2 times. === > 52.70% done, estimate finish Fri May 25 20:35:47 2018 > 52.70% done, estimate finish Fri May 25 20:35:46 2018 >=== last message repeated 2 times. === > 52.71% done, estimate finish Fri May 25 20:35:45 2018 > 52.71% done, estimate finish Fri May 25 20:35:47 2018 > 52.72% done, estimate finish Fri May 25 20:35:46 2018 >=== last message repeated 2 times. === > 52.73% done, estimate finish Fri May 25 20:35:45 2018 >=== last message repeated 2 times. === > 52.73% done, estimate finish Fri May 25 20:35:44 2018 > 52.74% done, estimate finish Fri May 25 20:35:46 2018 > 52.74% done, estimate finish Fri May 25 20:35:45 2018 > 52.75% done, estimate finish Fri May 25 20:35:45 2018 >=== last message repeated 2 times. === > 52.75% done, estimate finish Fri May 25 20:35:44 2018 > 52.76% done, estimate finish Fri May 25 20:35:44 2018 > 52.76% done, estimate finish Fri May 25 20:35:45 2018 > 52.77% done, estimate finish Fri May 25 20:35:45 2018 > 52.77% done, estimate finish Fri May 25 20:35:44 2018 >=== last message repeated 2 times. === > 52.78% done, estimate finish Fri May 25 20:35:43 2018 >=== last message repeated 2 times. === > 52.79% done, estimate finish Fri May 25 20:35:42 2018 > 52.79% done, estimate finish Fri May 25 20:35:44 2018 > 52.80% done, estimate finish Fri May 25 20:35:43 2018 >=== last message repeated 3 times. === > 52.81% done, estimate finish Fri May 25 20:35:42 2018 >=== last message repeated 2 times. === > 52.82% done, estimate finish Fri May 25 20:35:41 2018 > 52.82% done, estimate finish Fri May 25 20:35:43 2018 > 52.82% done, estimate finish Fri May 25 20:35:42 2018 > 52.83% done, estimate finish Fri May 25 20:35:42 2018 > 52.83% done, estimate finish Fri May 25 20:35:41 2018 > 52.84% done, estimate finish Fri May 25 20:35:41 2018 >=== last message repeated 2 times. === > 52.84% done, estimate finish Fri May 25 20:35:42 2018 > 52.85% done, estimate finish Fri May 25 20:35:42 2018 > 52.85% done, estimate finish Fri May 25 20:35:41 2018 > 52.86% done, estimate finish Fri May 25 20:35:41 2018 > 52.86% done, estimate finish Fri May 25 20:35:40 2018 >=== last message repeated 2 times. === > 52.87% done, estimate finish Fri May 25 20:35:41 2018 >=== last message repeated 2 times. === > 52.88% done, estimate finish Fri May 25 20:35:40 2018 >=== last message repeated 2 times. === > 52.89% done, estimate finish Fri May 25 20:35:39 2018 >=== last message repeated 3 times. === > 52.90% done, estimate finish Fri May 25 20:35:40 2018 >=== last message repeated 2 times. === > 52.91% done, estimate finish Fri May 25 20:35:39 2018 >=== last message repeated 2 times. === > 52.91% done, estimate finish Fri May 25 20:35:38 2018 > 52.92% done, estimate finish Fri May 25 20:35:38 2018 > 52.92% done, estimate finish Fri May 25 20:35:37 2018 > 52.93% done, estimate finish Fri May 25 20:35:39 2018 > 52.93% done, estimate finish Fri May 25 20:35:38 2018 >=== last message repeated 2 times. === > 52.94% done, estimate finish Fri May 25 20:35:37 2018 >=== last message repeated 2 times. === > 52.95% done, estimate finish Fri May 25 20:35:37 2018 > 52.95% done, estimate finish Fri May 25 20:35:38 2018 >=== last message repeated 2 times. === > 52.96% done, estimate finish Fri May 25 20:35:37 2018 >=== last message repeated 2 times. === > 52.97% done, estimate finish Fri May 25 20:35:36 2018 >=== last message repeated 2 times. === > 52.98% done, estimate finish Fri May 25 20:35:37 2018 >=== last message repeated 2 times. === > 52.98% done, estimate finish Fri May 25 20:35:36 2018 > 52.99% done, estimate finish Fri May 25 20:35:36 2018 >=== last message repeated 2 times. === > 53.00% done, estimate finish Fri May 25 20:35:35 2018 >=== last message repeated 2 times. === > 53.00% done, estimate finish Fri May 25 20:35:36 2018 > 53.01% done, estimate finish Fri May 25 20:35:36 2018 > 53.01% done, estimate finish Fri May 25 20:35:35 2018 > 53.02% done, estimate finish Fri May 25 20:35:35 2018 > 53.02% done, estimate finish Fri May 25 20:35:34 2018 >=== last message repeated 2 times. === > 53.03% done, estimate finish Fri May 25 20:35:33 2018 > 53.03% done, estimate finish Fri May 25 20:35:35 2018 > 53.04% done, estimate finish Fri May 25 20:35:34 2018 >=== last message repeated 3 times. === > 53.05% done, estimate finish Fri May 25 20:35:33 2018 >=== last message repeated 2 times. === > 53.06% done, estimate finish Fri May 25 20:35:34 2018 >=== last message repeated 2 times. === > 53.07% done, estimate finish Fri May 25 20:35:33 2018 >=== last message repeated 2 times. === > 53.07% done, estimate finish Fri May 25 20:35:32 2018 > 53.08% done, estimate finish Fri May 25 20:35:32 2018 > 53.08% done, estimate finish Fri May 25 20:35:31 2018 > 53.09% done, estimate finish Fri May 25 20:35:33 2018 > 53.09% done, estimate finish Fri May 25 20:35:32 2018 >=== last message repeated 2 times. === > 53.10% done, estimate finish Fri May 25 20:35:32 2018 > 53.10% done, estimate finish Fri May 25 20:35:31 2018 > 53.11% done, estimate finish Fri May 25 20:35:31 2018 > 53.11% done, estimate finish Fri May 25 20:35:32 2018 >=== last message repeated 2 times. === > 53.12% done, estimate finish Fri May 25 20:35:31 2018 >=== last message repeated 2 times. === > 53.13% done, estimate finish Fri May 25 20:35:30 2018 >=== last message repeated 3 times. === > 53.14% done, estimate finish Fri May 25 20:35:31 2018 >=== last message repeated 2 times. === > 53.15% done, estimate finish Fri May 25 20:35:30 2018 >=== last message repeated 2 times. === > 53.16% done, estimate finish Fri May 25 20:35:29 2018 >=== last message repeated 2 times. === > 53.16% done, estimate finish Fri May 25 20:35:30 2018 > 53.17% done, estimate finish Fri May 25 20:35:30 2018 > 53.17% done, estimate finish Fri May 25 20:35:29 2018 > 53.18% done, estimate finish Fri May 25 20:35:29 2018 > 53.18% done, estimate finish Fri May 25 20:35:28 2018 >=== last message repeated 2 times. === > 53.19% done, estimate finish Fri May 25 20:35:28 2018 > 53.19% done, estimate finish Fri May 25 20:35:29 2018 > 53.20% done, estimate finish Fri May 25 20:35:29 2018 > 53.20% done, estimate finish Fri May 25 20:35:28 2018 >=== last message repeated 2 times. === > 53.21% done, estimate finish Fri May 25 20:35:27 2018 >=== last message repeated 2 times. === > 53.22% done, estimate finish Fri May 25 20:35:28 2018 >=== last message repeated 2 times. === > 53.23% done, estimate finish Fri May 25 20:35:27 2018 >=== last message repeated 3 times. === > 53.24% done, estimate finish Fri May 25 20:35:26 2018 > 53.24% done, estimate finish Fri May 25 20:35:28 2018 > 53.25% done, estimate finish Fri May 25 20:35:27 2018 >=== last message repeated 2 times. === > 53.25% done, estimate finish Fri May 25 20:35:26 2018 > 53.26% done, estimate finish Fri May 25 20:35:26 2018 > 53.26% done, estimate finish Fri May 25 20:35:25 2018 > 53.27% done, estimate finish Fri May 25 20:35:25 2018 > 53.27% done, estimate finish Fri May 25 20:35:26 2018 >=== last message repeated 2 times. === > 53.28% done, estimate finish Fri May 25 20:35:25 2018 >=== last message repeated 2 times. === > 53.29% done, estimate finish Fri May 25 20:35:25 2018 > 53.29% done, estimate finish Fri May 25 20:35:24 2018 >=== last message repeated 2 times. === > 53.30% done, estimate finish Fri May 25 20:35:25 2018 >=== last message repeated 2 times. === > 53.31% done, estimate finish Fri May 25 20:35:24 2018 >=== last message repeated 2 times. === > 53.32% done, estimate finish Fri May 25 20:35:23 2018 >=== last message repeated 2 times. === > 53.32% done, estimate finish Fri May 25 20:35:24 2018 > 53.33% done, estimate finish Fri May 25 20:35:24 2018 >=== last message repeated 2 times. === > 53.34% done, estimate finish Fri May 25 20:35:23 2018 >=== last message repeated 2 times. === > 53.34% done, estimate finish Fri May 25 20:35:22 2018 > 53.35% done, estimate finish Fri May 25 20:35:24 2018 > 53.35% done, estimate finish Fri May 25 20:35:23 2018 > 53.36% done, estimate finish Fri May 25 20:35:23 2018 > 53.36% done, estimate finish Fri May 25 20:35:22 2018 >=== last message repeated 2 times. === > 53.37% done, estimate finish Fri May 25 20:35:22 2018 > 53.37% done, estimate finish Fri May 25 20:35:21 2018 > 53.38% done, estimate finish Fri May 25 20:35:23 2018 > 53.38% done, estimate finish Fri May 25 20:35:22 2018 >=== last message repeated 2 times. === > 53.39% done, estimate finish Fri May 25 20:35:21 2018 >=== last message repeated 2 times. === > 53.40% done, estimate finish Fri May 25 20:35:20 2018 >=== last message repeated 2 times. === > 53.41% done, estimate finish Fri May 25 20:35:21 2018 >=== last message repeated 2 times. === > 53.41% done, estimate finish Fri May 25 20:35:20 2018 > 53.42% done, estimate finish Fri May 25 20:35:20 2018 >=== last message repeated 2 times. === > 53.43% done, estimate finish Fri May 25 20:35:19 2018 > 53.43% done, estimate finish Fri May 25 20:35:21 2018 > 53.43% done, estimate finish Fri May 25 20:35:20 2018 > 53.44% done, estimate finish Fri May 25 20:35:20 2018 > 53.44% done, estimate finish Fri May 25 20:35:19 2018 > 53.45% done, estimate finish Fri May 25 20:35:19 2018 > 53.45% done, estimate finish Fri May 25 20:35:18 2018 > 53.45% done, estimate finish Fri May 25 20:35:20 2018 > 53.46% done, estimate finish Fri May 25 20:35:19 2018 >=== last message repeated 2 times. === > 53.47% done, estimate finish Fri May 25 20:35:19 2018 > 53.47% done, estimate finish Fri May 25 20:35:18 2018 >=== last message repeated 2 times. === > 53.48% done, estimate finish Fri May 25 20:35:17 2018 > 53.48% done, estimate finish Fri May 25 20:35:19 2018 > 53.49% done, estimate finish Fri May 25 20:35:18 2018 >=== last message repeated 2 times. === > 53.50% done, estimate finish Fri May 25 20:35:17 2018 >=== last message repeated 2 times. === > 53.50% done, estimate finish Fri May 25 20:35:16 2018 > 53.51% done, estimate finish Fri May 25 20:35:16 2018 > 53.51% done, estimate finish Fri May 25 20:35:18 2018 > 53.52% done, estimate finish Fri May 25 20:35:17 2018 >=== last message repeated 2 times. === > 53.52% done, estimate finish Fri May 25 20:35:16 2018 > 53.53% done, estimate finish Fri May 25 20:35:16 2018 > 53.53% done, estimate finish Fri May 25 20:35:15 2018 > 53.54% done, estimate finish Fri May 25 20:35:17 2018 > 53.54% done, estimate finish Fri May 25 20:35:16 2018 >=== last message repeated 2 times. === > 53.55% done, estimate finish Fri May 25 20:35:15 2018 >=== last message repeated 2 times. === > 53.56% done, estimate finish Fri May 25 20:35:15 2018 > 53.56% done, estimate finish Fri May 25 20:35:16 2018 > 53.57% done, estimate finish Fri May 25 20:35:16 2018 > 53.57% done, estimate finish Fri May 25 20:35:15 2018 >=== last message repeated 2 times. === > 53.58% done, estimate finish Fri May 25 20:35:14 2018 >=== last message repeated 2 times. === > 53.59% done, estimate finish Fri May 25 20:35:13 2018 > 53.59% done, estimate finish Fri May 25 20:35:15 2018 > 53.59% done, estimate finish Fri May 25 20:35:14 2018 > 53.60% done, estimate finish Fri May 25 20:35:14 2018 >=== last message repeated 2 times. === > 53.61% done, estimate finish Fri May 25 20:35:13 2018 >=== last message repeated 2 times. === > 53.61% done, estimate finish Fri May 25 20:35:12 2018 > 53.62% done, estimate finish Fri May 25 20:35:14 2018 > 53.62% done, estimate finish Fri May 25 20:35:13 2018 > 53.63% done, estimate finish Fri May 25 20:35:13 2018 > 53.63% done, estimate finish Fri May 25 20:35:12 2018 >=== last message repeated 2 times. === > 53.64% done, estimate finish Fri May 25 20:35:12 2018 > 53.64% done, estimate finish Fri May 25 20:35:13 2018 > 53.65% done, estimate finish Fri May 25 20:35:12 2018 >=== last message repeated 2 times. === > 53.66% done, estimate finish Fri May 25 20:35:12 2018 > 53.66% done, estimate finish Fri May 25 20:35:11 2018 >=== last message repeated 2 times. === > 53.67% done, estimate finish Fri May 25 20:35:12 2018 >=== last message repeated 2 times. === > 53.68% done, estimate finish Fri May 25 20:35:11 2018 >=== last message repeated 2 times. === > 53.68% done, estimate finish Fri May 25 20:35:10 2018 > 53.69% done, estimate finish Fri May 25 20:35:10 2018 >=== last message repeated 2 times. === > 53.70% done, estimate finish Fri May 25 20:35:11 2018 >=== last message repeated 2 times. === > 53.70% done, estimate finish Fri May 25 20:35:10 2018 > 53.71% done, estimate finish Fri May 25 20:35:10 2018 > 53.71% done, estimate finish Fri May 25 20:35:09 2018 > 53.72% done, estimate finish Fri May 25 20:35:09 2018 > 53.72% done, estimate finish Fri May 25 20:35:10 2018 >=== last message repeated 2 times. === > 53.73% done, estimate finish Fri May 25 20:35:09 2018 >=== last message repeated 2 times. === > 53.74% done, estimate finish Fri May 25 20:35:09 2018 > 53.74% done, estimate finish Fri May 25 20:35:08 2018 > 53.75% done, estimate finish Fri May 25 20:35:08 2018 > 53.75% done, estimate finish Fri May 25 20:35:09 2018 >=== last message repeated 2 times. === > 53.76% done, estimate finish Fri May 25 20:35:08 2018 >=== last message repeated 2 times. === > 53.77% done, estimate finish Fri May 25 20:35:07 2018 >=== last message repeated 2 times. === > 53.77% done, estimate finish Fri May 25 20:35:08 2018 > 53.78% done, estimate finish Fri May 25 20:35:08 2018 >=== last message repeated 2 times. === > 53.79% done, estimate finish Fri May 25 20:35:07 2018 >=== last message repeated 2 times. === > 53.79% done, estimate finish Fri May 25 20:35:06 2018 > 53.80% done, estimate finish Fri May 25 20:35:06 2018 > 53.80% done, estimate finish Fri May 25 20:35:07 2018 > 53.81% done, estimate finish Fri May 25 20:35:07 2018 > 53.81% done, estimate finish Fri May 25 20:35:06 2018 >=== last message repeated 2 times. === > 53.82% done, estimate finish Fri May 25 20:35:06 2018 > 53.82% done, estimate finish Fri May 25 20:35:05 2018 > 53.83% done, estimate finish Fri May 25 20:35:06 2018 >=== last message repeated 2 times. === > 53.84% done, estimate finish Fri May 25 20:35:06 2018 > 53.84% done, estimate finish Fri May 25 20:35:05 2018 >=== last message repeated 2 times. === > 53.85% done, estimate finish Fri May 25 20:35:04 2018 >=== last message repeated 2 times. === > 53.86% done, estimate finish Fri May 25 20:35:05 2018 >=== last message repeated 2 times. === > 53.86% done, estimate finish Fri May 25 20:35:04 2018 > 53.87% done, estimate finish Fri May 25 20:35:04 2018 >=== last message repeated 2 times. === > 53.88% done, estimate finish Fri May 25 20:35:03 2018 > 53.88% done, estimate finish Fri May 25 20:35:05 2018 > 53.88% done, estimate finish Fri May 25 20:35:04 2018 > 53.89% done, estimate finish Fri May 25 20:35:04 2018 > 53.89% done, estimate finish Fri May 25 20:35:03 2018 > 53.90% done, estimate finish Fri May 25 20:35:03 2018 > 53.90% done, estimate finish Fri May 25 20:35:02 2018 >=== last message repeated 2 times. === > 53.91% done, estimate finish Fri May 25 20:35:03 2018 >=== last message repeated 2 times. === > 53.92% done, estimate finish Fri May 25 20:35:03 2018 > 53.92% done, estimate finish Fri May 25 20:35:02 2018 > 53.93% done, estimate finish Fri May 25 20:35:02 2018 > 53.93% done, estimate finish Fri May 25 20:35:01 2018 > 53.93% done, estimate finish Fri May 25 20:35:03 2018 > 53.94% done, estimate finish Fri May 25 20:35:02 2018 >=== last message repeated 2 times. === > 53.95% done, estimate finish Fri May 25 20:35:01 2018 >=== last message repeated 3 times. === > 53.96% done, estimate finish Fri May 25 20:35:00 2018 > 53.96% done, estimate finish Fri May 25 20:35:02 2018 > 53.97% done, estimate finish Fri May 25 20:35:01 2018 >=== last message repeated 2 times. === > 53.97% done, estimate finish Fri May 25 20:35:00 2018 > 53.98% done, estimate finish Fri May 25 20:35:00 2018 > 53.98% done, estimate finish Fri May 25 20:34:59 2018 > 53.99% done, estimate finish Fri May 25 20:35:01 2018 > 53.99% done, estimate finish Fri May 25 20:35:00 2018 > 54.00% done, estimate finish Fri May 25 20:35:00 2018 >=== last message repeated 2 times. === > 54.00% done, estimate finish Fri May 25 20:34:59 2018 > 54.01% done, estimate finish Fri May 25 20:34:59 2018 > 54.01% done, estimate finish Fri May 25 20:34:58 2018 > 54.02% done, estimate finish Fri May 25 20:35:00 2018 > 54.02% done, estimate finish Fri May 25 20:34:59 2018 >=== last message repeated 2 times. === > 54.03% done, estimate finish Fri May 25 20:34:58 2018 >=== last message repeated 2 times. === > 54.04% done, estimate finish Fri May 25 20:34:58 2018 > 54.04% done, estimate finish Fri May 25 20:34:59 2018 >=== last message repeated 2 times. === > 54.05% done, estimate finish Fri May 25 20:34:58 2018 >=== last message repeated 2 times. === > 54.06% done, estimate finish Fri May 25 20:34:57 2018 >=== last message repeated 2 times. === > 54.06% done, estimate finish Fri May 25 20:34:58 2018 > 54.07% done, estimate finish Fri May 25 20:34:58 2018 > 54.07% done, estimate finish Fri May 25 20:34:57 2018 > 54.08% done, estimate finish Fri May 25 20:34:57 2018 >=== last message repeated 2 times. === > 54.09% done, estimate finish Fri May 25 20:34:56 2018 >=== last message repeated 2 times. === > 54.09% done, estimate finish Fri May 25 20:34:57 2018 > 54.10% done, estimate finish Fri May 25 20:34:57 2018 > 54.10% done, estimate finish Fri May 25 20:34:56 2018 > 54.11% done, estimate finish Fri May 25 20:34:56 2018 > 54.11% done, estimate finish Fri May 25 20:34:55 2018 >=== last message repeated 2 times. === > 54.12% done, estimate finish Fri May 25 20:34:56 2018 >=== last message repeated 2 times. === > 54.13% done, estimate finish Fri May 25 20:34:56 2018 > 54.13% done, estimate finish Fri May 25 20:34:55 2018 >=== last message repeated 2 times. === > 54.14% done, estimate finish Fri May 25 20:34:54 2018 >=== last message repeated 2 times. === > 54.15% done, estimate finish Fri May 25 20:34:55 2018 >=== last message repeated 2 times. === > 54.15% done, estimate finish Fri May 25 20:34:54 2018 > 54.16% done, estimate finish Fri May 25 20:34:54 2018 >=== last message repeated 2 times. === > 54.17% done, estimate finish Fri May 25 20:34:53 2018 > 54.17% done, estimate finish Fri May 25 20:34:54 2018 > 54.18% done, estimate finish Fri May 25 20:34:54 2018 >=== last message repeated 2 times. === > 54.18% done, estimate finish Fri May 25 20:34:53 2018 > 54.19% done, estimate finish Fri May 25 20:34:53 2018 > 54.19% done, estimate finish Fri May 25 20:34:52 2018 > 54.20% done, estimate finish Fri May 25 20:34:54 2018 > 54.20% done, estimate finish Fri May 25 20:34:53 2018 >=== last message repeated 2 times. === > 54.21% done, estimate finish Fri May 25 20:34:52 2018 >=== last message repeated 2 times. === > 54.22% done, estimate finish Fri May 25 20:34:52 2018 > 54.22% done, estimate finish Fri May 25 20:34:51 2018 > 54.22% done, estimate finish Fri May 25 20:34:53 2018 > 54.23% done, estimate finish Fri May 25 20:34:52 2018 >=== last message repeated 2 times. === > 54.24% done, estimate finish Fri May 25 20:34:51 2018 >=== last message repeated 2 times. === > 54.24% done, estimate finish Fri May 25 20:34:50 2018 > 54.25% done, estimate finish Fri May 25 20:34:50 2018 > 54.25% done, estimate finish Fri May 25 20:34:51 2018 > 54.26% done, estimate finish Fri May 25 20:34:51 2018 >=== last message repeated 2 times. === > 54.27% done, estimate finish Fri May 25 20:34:50 2018 >=== last message repeated 2 times. === > 54.27% done, estimate finish Fri May 25 20:34:49 2018 > 54.28% done, estimate finish Fri May 25 20:34:51 2018 > 54.28% done, estimate finish Fri May 25 20:34:50 2018 > 54.29% done, estimate finish Fri May 25 20:34:50 2018 > 54.29% done, estimate finish Fri May 25 20:34:49 2018 >=== last message repeated 2 times. === > 54.30% done, estimate finish Fri May 25 20:34:49 2018 > 54.30% done, estimate finish Fri May 25 20:34:50 2018 > 54.31% done, estimate finish Fri May 25 20:34:50 2018 > 54.31% done, estimate finish Fri May 25 20:34:49 2018 >=== last message repeated 2 times. === > 54.32% done, estimate finish Fri May 25 20:34:48 2018 >=== last message repeated 2 times. === > 54.33% done, estimate finish Fri May 25 20:34:47 2018 > 54.33% done, estimate finish Fri May 25 20:34:49 2018 > 54.34% done, estimate finish Fri May 25 20:34:48 2018 >=== last message repeated 3 times. === > 54.35% done, estimate finish Fri May 25 20:34:47 2018 >=== last message repeated 2 times. === > 54.36% done, estimate finish Fri May 25 20:34:46 2018 > 54.36% done, estimate finish Fri May 25 20:34:48 2018 > 54.36% done, estimate finish Fri May 25 20:34:47 2018 > 54.37% done, estimate finish Fri May 25 20:34:49 2018 > 54.37% done, estimate finish Fri May 25 20:34:48 2018 > 54.38% done, estimate finish Fri May 25 20:34:48 2018 > 54.38% done, estimate finish Fri May 25 20:34:47 2018 >=== last message repeated 2 times. === > 54.39% done, estimate finish Fri May 25 20:34:47 2018 > 54.39% done, estimate finish Fri May 25 20:34:46 2018 > 54.40% done, estimate finish Fri May 25 20:34:46 2018 > 54.40% done, estimate finish Fri May 25 20:34:45 2018 > 54.40% done, estimate finish Fri May 25 20:34:47 2018 > 54.41% done, estimate finish Fri May 25 20:34:46 2018 >=== last message repeated 2 times. === > 54.42% done, estimate finish Fri May 25 20:34:45 2018 >=== last message repeated 2 times. === > 54.43% done, estimate finish Fri May 25 20:34:45 2018 > 54.43% done, estimate finish Fri May 25 20:34:44 2018 > 54.43% done, estimate finish Fri May 25 20:34:46 2018 > 54.44% done, estimate finish Fri May 25 20:34:45 2018 >=== last message repeated 2 times. === > 54.45% done, estimate finish Fri May 25 20:34:44 2018 >=== last message repeated 2 times. === > 54.45% done, estimate finish Fri May 25 20:34:43 2018 > 54.46% done, estimate finish Fri May 25 20:34:45 2018 > 54.46% done, estimate finish Fri May 25 20:34:44 2018 > 54.47% done, estimate finish Fri May 25 20:34:44 2018 >=== last message repeated 2 times. === > 54.47% done, estimate finish Fri May 25 20:34:43 2018 > 54.48% done, estimate finish Fri May 25 20:34:43 2018 > 54.48% done, estimate finish Fri May 25 20:34:44 2018 > 54.49% done, estimate finish Fri May 25 20:34:44 2018 > 54.49% done, estimate finish Fri May 25 20:34:43 2018 >=== last message repeated 2 times. === > 54.50% done, estimate finish Fri May 25 20:34:42 2018 >=== last message repeated 2 times. === > 54.51% done, estimate finish Fri May 25 20:34:42 2018 > 54.51% done, estimate finish Fri May 25 20:34:43 2018 > 54.52% done, estimate finish Fri May 25 20:34:43 2018 > 54.52% done, estimate finish Fri May 25 20:34:42 2018 >=== last message repeated 2 times. === > 54.53% done, estimate finish Fri May 25 20:34:41 2018 >=== last message repeated 2 times. === > 54.54% done, estimate finish Fri May 25 20:34:42 2018 >=== last message repeated 3 times. === > 54.55% done, estimate finish Fri May 25 20:34:41 2018 >=== last message repeated 2 times. === > 54.56% done, estimate finish Fri May 25 20:34:40 2018 >=== last message repeated 2 times. === > 54.56% done, estimate finish Fri May 25 20:34:41 2018 > 54.57% done, estimate finish Fri May 25 20:34:41 2018 > 54.57% done, estimate finish Fri May 25 20:34:40 2018 > 54.58% done, estimate finish Fri May 25 20:34:40 2018 >=== last message repeated 2 times. === > 54.58% done, estimate finish Fri May 25 20:34:39 2018 > 54.59% done, estimate finish Fri May 25 20:34:41 2018 > 54.59% done, estimate finish Fri May 25 20:34:40 2018 > 54.60% done, estimate finish Fri May 25 20:34:40 2018 > 54.60% done, estimate finish Fri May 25 20:34:39 2018 > 54.61% done, estimate finish Fri May 25 20:34:39 2018 > 54.61% done, estimate finish Fri May 25 20:34:38 2018 >=== last message repeated 2 times. === > 54.62% done, estimate finish Fri May 25 20:34:39 2018 >=== last message repeated 2 times. === > 54.63% done, estimate finish Fri May 25 20:34:39 2018 > 54.63% done, estimate finish Fri May 25 20:34:38 2018 >=== last message repeated 2 times. === > 54.64% done, estimate finish Fri May 25 20:34:37 2018 > 54.64% done, estimate finish Fri May 25 20:34:39 2018 > 54.65% done, estimate finish Fri May 25 20:34:38 2018 >=== last message repeated 2 times. === > 54.65% done, estimate finish Fri May 25 20:34:37 2018 > 54.66% done, estimate finish Fri May 25 20:34:37 2018 >=== last message repeated 2 times. === > 54.67% done, estimate finish Fri May 25 20:34:36 2018 > 54.67% done, estimate finish Fri May 25 20:34:38 2018 > 54.67% done, estimate finish Fri May 25 20:34:37 2018 > 54.68% done, estimate finish Fri May 25 20:34:37 2018 > 54.68% done, estimate finish Fri May 25 20:34:36 2018 > 54.69% done, estimate finish Fri May 25 20:34:36 2018 > 54.69% done, estimate finish Fri May 25 20:34:35 2018 > 54.70% done, estimate finish Fri May 25 20:34:37 2018 > 54.70% done, estimate finish Fri May 25 20:34:36 2018 >=== last message repeated 2 times. === > 54.71% done, estimate finish Fri May 25 20:34:36 2018 > 54.71% done, estimate finish Fri May 25 20:34:35 2018 > 54.72% done, estimate finish Fri May 25 20:34:35 2018 > 54.72% done, estimate finish Fri May 25 20:34:34 2018 > 54.72% done, estimate finish Fri May 25 20:34:36 2018 > 54.73% done, estimate finish Fri May 25 20:34:35 2018 >=== last message repeated 2 times. === > 54.74% done, estimate finish Fri May 25 20:34:34 2018 >=== last message repeated 3 times. === > 54.75% done, estimate finish Fri May 25 20:34:35 2018 >=== last message repeated 2 times. === > 54.76% done, estimate finish Fri May 25 20:34:34 2018 >=== last message repeated 2 times. === > 54.77% done, estimate finish Fri May 25 20:34:33 2018 >=== last message repeated 2 times. === > 54.77% done, estimate finish Fri May 25 20:34:34 2018 > 54.78% done, estimate finish Fri May 25 20:34:34 2018 > 54.78% done, estimate finish Fri May 25 20:34:33 2018 > 54.79% done, estimate finish Fri May 25 20:34:33 2018 >=== last message repeated 2 times. === > 54.79% done, estimate finish Fri May 25 20:34:32 2018 > 54.80% done, estimate finish Fri May 25 20:34:32 2018 > 54.80% done, estimate finish Fri May 25 20:34:33 2018 > 54.81% done, estimate finish Fri May 25 20:34:33 2018 > 54.81% done, estimate finish Fri May 25 20:34:32 2018 >=== last message repeated 2 times. === > 54.82% done, estimate finish Fri May 25 20:34:31 2018 >=== last message repeated 2 times. === > 54.83% done, estimate finish Fri May 25 20:34:31 2018 > 54.83% done, estimate finish Fri May 25 20:34:32 2018 >=== last message repeated 2 times. === > 54.84% done, estimate finish Fri May 25 20:34:31 2018 >=== last message repeated 2 times. === > 54.85% done, estimate finish Fri May 25 20:34:30 2018 >=== last message repeated 2 times. === > 54.86% done, estimate finish Fri May 25 20:34:31 2018 >=== last message repeated 2 times. === > 54.86% done, estimate finish Fri May 25 20:34:30 2018 > 54.87% done, estimate finish Fri May 25 20:34:30 2018 >=== last message repeated 2 times. === > 54.88% done, estimate finish Fri May 25 20:34:29 2018 > 54.88% done, estimate finish Fri May 25 20:34:31 2018 > 54.88% done, estimate finish Fri May 25 20:34:30 2018 > 54.89% done, estimate finish Fri May 25 20:34:30 2018 > 54.89% done, estimate finish Fri May 25 20:34:29 2018 > 54.90% done, estimate finish Fri May 25 20:34:29 2018 >=== last message repeated 2 times. === > 54.90% done, estimate finish Fri May 25 20:34:28 2018 > 54.91% done, estimate finish Fri May 25 20:34:30 2018 > 54.91% done, estimate finish Fri May 25 20:34:29 2018 > 54.92% done, estimate finish Fri May 25 20:34:29 2018 > 54.92% done, estimate finish Fri May 25 20:34:28 2018 >=== last message repeated 2 times. === > 54.93% done, estimate finish Fri May 25 20:34:27 2018 > 54.93% done, estimate finish Fri May 25 20:34:29 2018 > 54.94% done, estimate finish Fri May 25 20:34:28 2018 >=== last message repeated 2 times. === > 54.95% done, estimate finish Fri May 25 20:34:28 2018 > 54.95% done, estimate finish Fri May 25 20:34:27 2018 >=== last message repeated 2 times. === > 54.96% done, estimate finish Fri May 25 20:34:26 2018 > 54.96% done, estimate finish Fri May 25 20:34:28 2018 > 54.97% done, estimate finish Fri May 25 20:34:27 2018 >=== last message repeated 2 times. === > 54.97% done, estimate finish Fri May 25 20:34:26 2018 > 54.98% done, estimate finish Fri May 25 20:34:26 2018 >=== last message repeated 2 times. === > 54.99% done, estimate finish Fri May 25 20:34:27 2018 >=== last message repeated 2 times. === > 54.99% done, estimate finish Fri May 25 20:34:26 2018 > 55.00% done, estimate finish Fri May 25 20:34:26 2018 > 55.00% done, estimate finish Fri May 25 20:34:25 2018 > 55.01% done, estimate finish Fri May 25 20:34:25 2018 > 55.01% done, estimate finish Fri May 25 20:34:26 2018 >=== last message repeated 2 times. === > 55.02% done, estimate finish Fri May 25 20:34:25 2018 >=== last message repeated 2 times. === > 55.03% done, estimate finish Fri May 25 20:34:25 2018 > 55.03% done, estimate finish Fri May 25 20:34:24 2018 > 55.04% done, estimate finish Fri May 25 20:34:24 2018 > 55.04% done, estimate finish Fri May 25 20:34:25 2018 >=== last message repeated 2 times. === > 55.05% done, estimate finish Fri May 25 20:34:24 2018 >=== last message repeated 2 times. === > 55.06% done, estimate finish Fri May 25 20:34:24 2018 > 55.06% done, estimate finish Fri May 25 20:34:23 2018 >=== last message repeated 2 times. === > 55.07% done, estimate finish Fri May 25 20:34:24 2018 >=== last message repeated 2 times. === > 55.08% done, estimate finish Fri May 25 20:34:23 2018 >=== last message repeated 2 times. === > 55.08% done, estimate finish Fri May 25 20:34:22 2018 > 55.09% done, estimate finish Fri May 25 20:34:22 2018 > 55.09% done, estimate finish Fri May 25 20:34:23 2018 > 55.10% done, estimate finish Fri May 25 20:34:23 2018 >=== last message repeated 2 times. === > 55.11% done, estimate finish Fri May 25 20:34:22 2018 >=== last message repeated 2 times. === > 55.11% done, estimate finish Fri May 25 20:34:21 2018 > 55.12% done, estimate finish Fri May 25 20:34:23 2018 > 55.12% done, estimate finish Fri May 25 20:34:22 2018 > 55.13% done, estimate finish Fri May 25 20:34:22 2018 > 55.13% done, estimate finish Fri May 25 20:34:21 2018 >=== last message repeated 2 times. === > 55.14% done, estimate finish Fri May 25 20:34:21 2018 > 55.14% done, estimate finish Fri May 25 20:34:20 2018 > 55.15% done, estimate finish Fri May 25 20:34:22 2018 > 55.15% done, estimate finish Fri May 25 20:34:21 2018 >=== last message repeated 2 times. === > 55.16% done, estimate finish Fri May 25 20:34:20 2018 >=== last message repeated 2 times. === > 55.17% done, estimate finish Fri May 25 20:34:19 2018 > 55.17% done, estimate finish Fri May 25 20:34:21 2018 > 55.17% done, estimate finish Fri May 25 20:34:20 2018 > 55.18% done, estimate finish Fri May 25 20:34:20 2018 >=== last message repeated 2 times. === > 55.19% done, estimate finish Fri May 25 20:34:19 2018 >=== last message repeated 2 times. === > 55.20% done, estimate finish Fri May 25 20:34:18 2018 > 55.20% done, estimate finish Fri May 25 20:34:20 2018 > 55.20% done, estimate finish Fri May 25 20:34:19 2018 > 55.21% done, estimate finish Fri May 25 20:34:19 2018 >=== last message repeated 2 times. === > 55.22% done, estimate finish Fri May 25 20:34:18 2018 >=== last message repeated 2 times. === > 55.22% done, estimate finish Fri May 25 20:34:19 2018 > 55.23% done, estimate finish Fri May 25 20:34:19 2018 > 55.23% done, estimate finish Fri May 25 20:34:18 2018 > 55.24% done, estimate finish Fri May 25 20:34:18 2018 > 55.24% done, estimate finish Fri May 25 20:34:17 2018 >=== last message repeated 2 times. === > 55.25% done, estimate finish Fri May 25 20:34:17 2018 > 55.25% done, estimate finish Fri May 25 20:34:18 2018 > 55.26% done, estimate finish Fri May 25 20:34:18 2018 > 55.26% done, estimate finish Fri May 25 20:34:17 2018 >=== last message repeated 2 times. === > 55.27% done, estimate finish Fri May 25 20:34:16 2018 >=== last message repeated 2 times. === > 55.28% done, estimate finish Fri May 25 20:34:17 2018 >=== last message repeated 2 times. === > 55.29% done, estimate finish Fri May 25 20:34:16 2018 >=== last message repeated 3 times. === > 55.30% done, estimate finish Fri May 25 20:34:15 2018 > 55.30% done, estimate finish Fri May 25 20:34:17 2018 > 55.31% done, estimate finish Fri May 25 20:34:16 2018 >=== last message repeated 2 times. === > 55.31% done, estimate finish Fri May 25 20:34:15 2018 > 55.32% done, estimate finish Fri May 25 20:34:15 2018 >=== last message repeated 2 times. === > 55.33% done, estimate finish Fri May 25 20:34:14 2018 > 55.33% done, estimate finish Fri May 25 20:34:15 2018 >=== last message repeated 2 times. === > 55.34% done, estimate finish Fri May 25 20:34:15 2018 > 55.34% done, estimate finish Fri May 25 20:34:14 2018 > 55.35% done, estimate finish Fri May 25 20:34:14 2018 > 55.35% done, estimate finish Fri May 25 20:34:13 2018 >=== last message repeated 2 times. === > 55.36% done, estimate finish Fri May 25 20:34:14 2018 >=== last message repeated 2 times. === > 55.37% done, estimate finish Fri May 25 20:34:14 2018 > 55.37% done, estimate finish Fri May 25 20:34:13 2018 > 55.38% done, estimate finish Fri May 25 20:34:13 2018 > 55.38% done, estimate finish Fri May 25 20:34:12 2018 > 55.38% done, estimate finish Fri May 25 20:34:14 2018 > 55.39% done, estimate finish Fri May 25 20:34:13 2018 >=== last message repeated 2 times. === > 55.40% done, estimate finish Fri May 25 20:34:12 2018 >=== last message repeated 3 times. === > 55.41% done, estimate finish Fri May 25 20:34:13 2018 >=== last message repeated 2 times. === > 55.42% done, estimate finish Fri May 25 20:34:12 2018 >=== last message repeated 2 times. === > 55.42% done, estimate finish Fri May 25 20:34:11 2018 > 55.43% done, estimate finish Fri May 25 20:34:11 2018 > 55.43% done, estimate finish Fri May 25 20:34:12 2018 > 55.44% done, estimate finish Fri May 25 20:34:12 2018 > 55.44% done, estimate finish Fri May 25 20:34:11 2018 >=== last message repeated 2 times. === > 55.45% done, estimate finish Fri May 25 20:34:11 2018 > 55.45% done, estimate finish Fri May 25 20:34:10 2018 > 55.46% done, estimate finish Fri May 25 20:34:10 2018 > 55.46% done, estimate finish Fri May 25 20:34:11 2018 > 55.47% done, estimate finish Fri May 25 20:34:11 2018 > 55.47% done, estimate finish Fri May 25 20:34:10 2018 >=== last message repeated 2 times. === > 55.48% done, estimate finish Fri May 25 20:34:10 2018 > 55.48% done, estimate finish Fri May 25 20:34:09 2018 > 55.49% done, estimate finish Fri May 25 20:34:09 2018 > 55.49% done, estimate finish Fri May 25 20:34:10 2018 >=== last message repeated 2 times. === > 55.50% done, estimate finish Fri May 25 20:34:09 2018 >=== last message repeated 2 times. === > 55.51% done, estimate finish Fri May 25 20:34:08 2018 >=== last message repeated 2 times. === > 55.51% done, estimate finish Fri May 25 20:34:09 2018 > 55.52% done, estimate finish Fri May 25 20:34:09 2018 >=== last message repeated 2 times. === > 55.53% done, estimate finish Fri May 25 20:34:08 2018 >=== last message repeated 2 times. === > 55.54% done, estimate finish Fri May 25 20:34:07 2018 > 55.54% done, estimate finish Fri May 25 20:34:09 2018 > 55.54% done, estimate finish Fri May 25 20:34:08 2018 > 55.55% done, estimate finish Fri May 25 20:34:08 2018 >=== last message repeated 2 times. === > 55.56% done, estimate finish Fri May 25 20:34:07 2018 >=== last message repeated 2 times. === > 55.56% done, estimate finish Fri May 25 20:34:06 2018 > 55.57% done, estimate finish Fri May 25 20:34:08 2018 > 55.57% done, estimate finish Fri May 25 20:34:07 2018 > 55.58% done, estimate finish Fri May 25 20:34:07 2018 > 55.58% done, estimate finish Fri May 25 20:34:06 2018 >=== last message repeated 2 times. === > 55.59% done, estimate finish Fri May 25 20:34:06 2018 > 55.59% done, estimate finish Fri May 25 20:34:07 2018 > 55.60% done, estimate finish Fri May 25 20:34:07 2018 > 55.60% done, estimate finish Fri May 25 20:34:06 2018 >=== last message repeated 2 times. === > 55.61% done, estimate finish Fri May 25 20:34:05 2018 >=== last message repeated 2 times. === > 55.62% done, estimate finish Fri May 25 20:34:04 2018 > 55.62% done, estimate finish Fri May 25 20:34:06 2018 > 55.63% done, estimate finish Fri May 25 20:34:05 2018 >=== last message repeated 3 times. === > 55.64% done, estimate finish Fri May 25 20:34:04 2018 >=== last message repeated 2 times. === > 55.65% done, estimate finish Fri May 25 20:34:05 2018 >=== last message repeated 2 times. === > 55.65% done, estimate finish Fri May 25 20:34:04 2018 > 55.66% done, estimate finish Fri May 25 20:34:04 2018 >=== last message repeated 2 times. === > 55.67% done, estimate finish Fri May 25 20:34:03 2018 >=== last message repeated 2 times. === > 55.67% done, estimate finish Fri May 25 20:34:04 2018 > 55.68% done, estimate finish Fri May 25 20:34:04 2018 > 55.68% done, estimate finish Fri May 25 20:34:03 2018 > 55.69% done, estimate finish Fri May 25 20:34:03 2018 > 55.69% done, estimate finish Fri May 25 20:34:02 2018 >=== last message repeated 2 times. === > 55.70% done, estimate finish Fri May 25 20:34:03 2018 >=== last message repeated 2 times. === > 55.71% done, estimate finish Fri May 25 20:34:03 2018 > 55.71% done, estimate finish Fri May 25 20:34:02 2018 > 55.72% done, estimate finish Fri May 25 20:34:02 2018 > 55.72% done, estimate finish Fri May 25 20:34:01 2018 > 55.72% done, estimate finish Fri May 25 20:34:03 2018 > 55.73% done, estimate finish Fri May 25 20:34:02 2018 >=== last message repeated 2 times. === > 55.74% done, estimate finish Fri May 25 20:34:02 2018 > 55.74% done, estimate finish Fri May 25 20:34:01 2018 >=== last message repeated 2 times. === > 55.75% done, estimate finish Fri May 25 20:34:00 2018 > 55.75% done, estimate finish Fri May 25 20:34:02 2018 > 55.76% done, estimate finish Fri May 25 20:34:01 2018 >=== last message repeated 2 times. === > 55.76% done, estimate finish Fri May 25 20:34:00 2018 > 55.77% done, estimate finish Fri May 25 20:34:00 2018 >=== last message repeated 2 times. === > 55.78% done, estimate finish Fri May 25 20:33:59 2018 > 55.78% done, estimate finish Fri May 25 20:34:01 2018 > 55.78% done, estimate finish Fri May 25 20:34:00 2018 > 55.79% done, estimate finish Fri May 25 20:34:00 2018 > 55.79% done, estimate finish Fri May 25 20:33:59 2018 > 55.80% done, estimate finish Fri May 25 20:33:59 2018 >=== last message repeated 2 times. === > 55.81% done, estimate finish Fri May 25 20:34:00 2018 > 55.81% done, estimate finish Fri May 25 20:33:59 2018 >=== last message repeated 2 times. === > 55.82% done, estimate finish Fri May 25 20:33:59 2018 > 55.82% done, estimate finish Fri May 25 20:33:58 2018 > 55.83% done, estimate finish Fri May 25 20:33:58 2018 > 55.83% done, estimate finish Fri May 25 20:33:59 2018 >=== last message repeated 2 times. === > 55.84% done, estimate finish Fri May 25 20:33:58 2018 >=== last message repeated 2 times. === > 55.85% done, estimate finish Fri May 25 20:33:58 2018 > 55.85% done, estimate finish Fri May 25 20:33:57 2018 > 55.85% done, estimate finish Fri May 25 20:33:59 2018 > 55.86% done, estimate finish Fri May 25 20:33:58 2018 >=== last message repeated 2 times. === > 55.87% done, estimate finish Fri May 25 20:33:57 2018 >=== last message repeated 2 times. === > 55.88% done, estimate finish Fri May 25 20:33:56 2018 >=== last message repeated 2 times. === > 55.88% done, estimate finish Fri May 25 20:33:57 2018 > 55.89% done, estimate finish Fri May 25 20:33:57 2018 >=== last message repeated 2 times. === > 55.90% done, estimate finish Fri May 25 20:33:56 2018 >=== last message repeated 2 times. === > 55.90% done, estimate finish Fri May 25 20:33:55 2018 > 55.91% done, estimate finish Fri May 25 20:33:55 2018 > 55.91% done, estimate finish Fri May 25 20:33:56 2018 > 55.92% done, estimate finish Fri May 25 20:33:56 2018 >=== last message repeated 2 times. === > 55.92% done, estimate finish Fri May 25 20:33:55 2018 > 55.93% done, estimate finish Fri May 25 20:33:55 2018 > 55.93% done, estimate finish Fri May 25 20:33:54 2018 > 55.94% done, estimate finish Fri May 25 20:33:56 2018 > 55.94% done, estimate finish Fri May 25 20:33:55 2018 >=== last message repeated 2 times. === > 55.95% done, estimate finish Fri May 25 20:33:54 2018 >=== last message repeated 2 times. === > 55.96% done, estimate finish Fri May 25 20:33:54 2018 > 55.96% done, estimate finish Fri May 25 20:33:55 2018 > 55.97% done, estimate finish Fri May 25 20:33:55 2018 > 55.97% done, estimate finish Fri May 25 20:33:54 2018 >=== last message repeated 2 times. === > 55.98% done, estimate finish Fri May 25 20:33:53 2018 >=== last message repeated 2 times. === > 55.99% done, estimate finish Fri May 25 20:33:53 2018 > 55.99% done, estimate finish Fri May 25 20:33:54 2018 >=== last message repeated 2 times. === > 56.00% done, estimate finish Fri May 25 20:33:53 2018 >=== last message repeated 2 times. === > 56.01% done, estimate finish Fri May 25 20:33:52 2018 >=== last message repeated 2 times. === > 56.01% done, estimate finish Fri May 25 20:33:53 2018 > 56.02% done, estimate finish Fri May 25 20:33:53 2018 > 56.02% done, estimate finish Fri May 25 20:33:52 2018 > 56.03% done, estimate finish Fri May 25 20:33:52 2018 >=== last message repeated 2 times. === > 56.03% done, estimate finish Fri May 25 20:33:51 2018 > 56.04% done, estimate finish Fri May 25 20:33:51 2018 > 56.04% done, estimate finish Fri May 25 20:33:52 2018 > 56.05% done, estimate finish Fri May 25 20:33:52 2018 > 56.05% done, estimate finish Fri May 25 20:33:51 2018 > 56.06% done, estimate finish Fri May 25 20:33:51 2018 >=== last message repeated 2 times. === > 56.06% done, estimate finish Fri May 25 20:33:50 2018 > 56.07% done, estimate finish Fri May 25 20:33:52 2018 > 56.07% done, estimate finish Fri May 25 20:33:51 2018 > 56.08% done, estimate finish Fri May 25 20:33:51 2018 > 56.08% done, estimate finish Fri May 25 20:33:50 2018 >=== last message repeated 2 times. === > 56.09% done, estimate finish Fri May 25 20:33:49 2018 >=== last message repeated 2 times. === > 56.10% done, estimate finish Fri May 25 20:33:50 2018 >=== last message repeated 3 times. === > 56.11% done, estimate finish Fri May 25 20:33:49 2018 >=== last message repeated 2 times. === > 56.12% done, estimate finish Fri May 25 20:33:48 2018 > 56.12% done, estimate finish Fri May 25 20:33:50 2018 > 56.12% done, estimate finish Fri May 25 20:33:49 2018 > 56.13% done, estimate finish Fri May 25 20:33:49 2018 >=== last message repeated 2 times. === > 56.14% done, estimate finish Fri May 25 20:33:48 2018 >=== last message repeated 2 times. === > 56.15% done, estimate finish Fri May 25 20:33:49 2018 >=== last message repeated 2 times. === > 56.15% done, estimate finish Fri May 25 20:33:48 2018 > 56.16% done, estimate finish Fri May 25 20:33:48 2018 > 56.16% done, estimate finish Fri May 25 20:33:47 2018 > 56.17% done, estimate finish Fri May 25 20:33:47 2018 >=== last message repeated 2 times. === > 56.17% done, estimate finish Fri May 25 20:33:48 2018 > 56.18% done, estimate finish Fri May 25 20:33:48 2018 > 56.18% done, estimate finish Fri May 25 20:33:47 2018 > 56.19% done, estimate finish Fri May 25 20:33:47 2018 > 56.19% done, estimate finish Fri May 25 20:33:46 2018 >=== last message repeated 2 times. === > 56.20% done, estimate finish Fri May 25 20:33:47 2018 >=== last message repeated 2 times. === > 56.21% done, estimate finish Fri May 25 20:33:47 2018 > 56.21% done, estimate finish Fri May 25 20:33:46 2018 >=== last message repeated 2 times. === > 56.22% done, estimate finish Fri May 25 20:33:45 2018 >=== last message repeated 2 times. === > 56.23% done, estimate finish Fri May 25 20:33:46 2018 >=== last message repeated 2 times. === > 56.24% done, estimate finish Fri May 25 20:33:45 2018 >=== last message repeated 3 times. === > 56.25% done, estimate finish Fri May 25 20:33:44 2018 > 56.25% done, estimate finish Fri May 25 20:33:46 2018 > 56.26% done, estimate finish Fri May 25 20:33:45 2018 >=== last message repeated 2 times. === > 56.26% done, estimate finish Fri May 25 20:33:44 2018 > 56.27% done, estimate finish Fri May 25 20:33:44 2018 >=== last message repeated 2 times. === > 56.28% done, estimate finish Fri May 25 20:33:45 2018 >=== last message repeated 2 times. === > 56.28% done, estimate finish Fri May 25 20:33:44 2018 > 56.29% done, estimate finish Fri May 25 20:33:44 2018 > 56.29% done, estimate finish Fri May 25 20:33:43 2018 > 56.30% done, estimate finish Fri May 25 20:33:43 2018 >=== last message repeated 2 times. === > 56.31% done, estimate finish Fri May 25 20:33:44 2018 >=== last message repeated 2 times. === > 56.31% done, estimate finish Fri May 25 20:33:43 2018 > 56.32% done, estimate finish Fri May 25 20:33:43 2018 > 56.32% done, estimate finish Fri May 25 20:33:42 2018 > 56.33% done, estimate finish Fri May 25 20:33:42 2018 > 56.33% done, estimate finish Fri May 25 20:33:43 2018 >=== last message repeated 2 times. === > 56.34% done, estimate finish Fri May 25 20:33:42 2018 >=== last message repeated 2 times. === > 56.35% done, estimate finish Fri May 25 20:33:42 2018 > 56.35% done, estimate finish Fri May 25 20:33:41 2018 >=== last message repeated 2 times. === > 56.36% done, estimate finish Fri May 25 20:33:42 2018 >=== last message repeated 2 times. === > 56.37% done, estimate finish Fri May 25 20:33:41 2018 >=== last message repeated 3 times. === > 56.38% done, estimate finish Fri May 25 20:33:40 2018 > 56.38% done, estimate finish Fri May 25 20:33:42 2018 > 56.39% done, estimate finish Fri May 25 20:33:41 2018 >=== last message repeated 2 times. === > 56.40% done, estimate finish Fri May 25 20:33:40 2018 >=== last message repeated 2 times. === > 56.40% done, estimate finish Fri May 25 20:33:39 2018 > 56.41% done, estimate finish Fri May 25 20:33:39 2018 > 56.41% done, estimate finish Fri May 25 20:33:40 2018 > 56.42% done, estimate finish Fri May 25 20:33:40 2018 >=== last message repeated 2 times. === > 56.42% done, estimate finish Fri May 25 20:33:39 2018 > 56.43% done, estimate finish Fri May 25 20:33:39 2018 > 56.43% done, estimate finish Fri May 25 20:33:38 2018 > 56.44% done, estimate finish Fri May 25 20:33:40 2018 > 56.44% done, estimate finish Fri May 25 20:33:39 2018 >=== last message repeated 2 times. === > 56.45% done, estimate finish Fri May 25 20:33:39 2018 > 56.45% done, estimate finish Fri May 25 20:33:38 2018 > 56.46% done, estimate finish Fri May 25 20:33:38 2018 > 56.46% done, estimate finish Fri May 25 20:33:39 2018 >=== last message repeated 2 times. === > 56.47% done, estimate finish Fri May 25 20:33:38 2018 >=== last message repeated 2 times. === > 56.48% done, estimate finish Fri May 25 20:33:38 2018 > 56.48% done, estimate finish Fri May 25 20:33:37 2018 > 56.49% done, estimate finish Fri May 25 20:33:37 2018 > 56.49% done, estimate finish Fri May 25 20:33:38 2018 >=== last message repeated 2 times. === > 56.50% done, estimate finish Fri May 25 20:33:37 2018 >=== last message repeated 2 times. === > 56.51% done, estimate finish Fri May 25 20:33:36 2018 >=== last message repeated 2 times. === > 56.51% done, estimate finish Fri May 25 20:33:37 2018 > 56.52% done, estimate finish Fri May 25 20:33:37 2018 >=== last message repeated 2 times. === > 56.53% done, estimate finish Fri May 25 20:33:36 2018 >=== last message repeated 2 times. === > 56.53% done, estimate finish Fri May 25 20:33:35 2018 > 56.54% done, estimate finish Fri May 25 20:33:35 2018 > 56.54% done, estimate finish Fri May 25 20:33:36 2018 > 56.55% done, estimate finish Fri May 25 20:33:36 2018 >=== last message repeated 2 times. === > 56.55% done, estimate finish Fri May 25 20:33:35 2018 > 56.56% done, estimate finish Fri May 25 20:33:35 2018 > 56.56% done, estimate finish Fri May 25 20:33:34 2018 > 56.57% done, estimate finish Fri May 25 20:33:36 2018 > 56.57% done, estimate finish Fri May 25 20:33:35 2018 > 56.58% done, estimate finish Fri May 25 20:33:35 2018 > 56.58% done, estimate finish Fri May 25 20:33:34 2018 >=== last message repeated 2 times. === > 56.59% done, estimate finish Fri May 25 20:33:34 2018 > 56.59% done, estimate finish Fri May 25 20:33:33 2018 > 56.60% done, estimate finish Fri May 25 20:33:35 2018 > 56.60% done, estimate finish Fri May 25 20:33:34 2018 >=== last message repeated 2 times. === > 56.61% done, estimate finish Fri May 25 20:33:33 2018 >=== last message repeated 2 times. === > 56.62% done, estimate finish Fri May 25 20:33:33 2018 > 56.62% done, estimate finish Fri May 25 20:33:34 2018 >=== last message repeated 2 times. === > 56.63% done, estimate finish Fri May 25 20:33:33 2018 >=== last message repeated 2 times. === > 56.64% done, estimate finish Fri May 25 20:33:32 2018 >=== last message repeated 2 times. === > 56.65% done, estimate finish Fri May 25 20:33:33 2018 >=== last message repeated 3 times. === > 56.66% done, estimate finish Fri May 25 20:33:32 2018 >=== last message repeated 2 times. === > 56.67% done, estimate finish Fri May 25 20:33:31 2018 > 56.67% done, estimate finish Fri May 25 20:33:33 2018 > 56.67% done, estimate finish Fri May 25 20:33:32 2018 > 56.68% done, estimate finish Fri May 25 20:33:32 2018 > 56.68% done, estimate finish Fri May 25 20:33:31 2018 > 56.69% done, estimate finish Fri May 25 20:33:31 2018 >=== last message repeated 2 times. === > 56.69% done, estimate finish Fri May 25 20:33:30 2018 > 56.70% done, estimate finish Fri May 25 20:33:32 2018 > 56.70% done, estimate finish Fri May 25 20:33:31 2018 > 56.71% done, estimate finish Fri May 25 20:33:31 2018 > 56.71% done, estimate finish Fri May 25 20:33:30 2018 >=== last message repeated 2 times. === > 56.72% done, estimate finish Fri May 25 20:33:30 2018 > 56.72% done, estimate finish Fri May 25 20:33:29 2018 > 56.73% done, estimate finish Fri May 25 20:33:31 2018 > 56.73% done, estimate finish Fri May 25 20:33:30 2018 > 56.74% done, estimate finish Fri May 25 20:33:30 2018 > 56.74% done, estimate finish Fri May 25 20:33:29 2018 >=== last message repeated 2 times. === > 56.75% done, estimate finish Fri May 25 20:33:29 2018 > 56.75% done, estimate finish Fri May 25 20:33:30 2018 > 56.76% done, estimate finish Fri May 25 20:33:30 2018 > 56.76% done, estimate finish Fri May 25 20:33:29 2018 >=== last message repeated 2 times. === > 56.77% done, estimate finish Fri May 25 20:33:28 2018 >=== last message repeated 2 times. === > 56.78% done, estimate finish Fri May 25 20:33:29 2018 >=== last message repeated 2 times. === > 56.78% done, estimate finish Fri May 25 20:33:28 2018 > 56.79% done, estimate finish Fri May 25 20:33:28 2018 >=== last message repeated 2 times. === > 56.80% done, estimate finish Fri May 25 20:33:27 2018 >=== last message repeated 2 times. === > 56.80% done, estimate finish Fri May 25 20:33:28 2018 > 56.81% done, estimate finish Fri May 25 20:33:28 2018 > 56.81% done, estimate finish Fri May 25 20:33:27 2018 > 56.82% done, estimate finish Fri May 25 20:33:27 2018 >=== last message repeated 2 times. === > 56.83% done, estimate finish Fri May 25 20:33:26 2018 > 56.83% done, estimate finish Fri May 25 20:33:28 2018 > 56.83% done, estimate finish Fri May 25 20:33:27 2018 > 56.84% done, estimate finish Fri May 25 20:33:27 2018 > 56.84% done, estimate finish Fri May 25 20:33:26 2018 > 56.85% done, estimate finish Fri May 25 20:33:26 2018 >=== last message repeated 2 times. === > 56.85% done, estimate finish Fri May 25 20:33:27 2018 > 56.86% done, estimate finish Fri May 25 20:33:27 2018 > 56.86% done, estimate finish Fri May 25 20:33:26 2018 > 56.87% done, estimate finish Fri May 25 20:33:26 2018 > 56.87% done, estimate finish Fri May 25 20:33:25 2018 >=== last message repeated 2 times. === > 56.88% done, estimate finish Fri May 25 20:33:25 2018 > 56.88% done, estimate finish Fri May 25 20:33:26 2018 > 56.89% done, estimate finish Fri May 25 20:33:25 2018 >=== last message repeated 3 times. === > 56.90% done, estimate finish Fri May 25 20:33:24 2018 >=== last message repeated 2 times. === > 56.91% done, estimate finish Fri May 25 20:33:23 2018 > 56.91% done, estimate finish Fri May 25 20:33:25 2018 > 56.92% done, estimate finish Fri May 25 20:33:24 2018 >=== last message repeated 3 times. === > 56.93% done, estimate finish Fri May 25 20:33:23 2018 >=== last message repeated 2 times. === > 56.94% done, estimate finish Fri May 25 20:33:24 2018 >=== last message repeated 2 times. === > 56.94% done, estimate finish Fri May 25 20:33:23 2018 > 56.95% done, estimate finish Fri May 25 20:33:23 2018 >=== last message repeated 2 times. === > 56.96% done, estimate finish Fri May 25 20:33:22 2018 > 56.96% done, estimate finish Fri May 25 20:33:24 2018 > 56.96% done, estimate finish Fri May 25 20:33:23 2018 > 56.97% done, estimate finish Fri May 25 20:33:23 2018 > 56.97% done, estimate finish Fri May 25 20:33:22 2018 > 56.98% done, estimate finish Fri May 25 20:33:22 2018 >=== last message repeated 2 times. === > 56.99% done, estimate finish Fri May 25 20:33:23 2018 > 56.99% done, estimate finish Fri May 25 20:33:22 2018 >=== last message repeated 2 times. === > 57.00% done, estimate finish Fri May 25 20:33:22 2018 > 57.00% done, estimate finish Fri May 25 20:33:21 2018 > 57.01% done, estimate finish Fri May 25 20:33:21 2018 > 57.01% done, estimate finish Fri May 25 20:33:20 2018 > 57.01% done, estimate finish Fri May 25 20:33:22 2018 > 57.02% done, estimate finish Fri May 25 20:33:21 2018 >=== last message repeated 2 times. === > 57.03% done, estimate finish Fri May 25 20:33:21 2018 > 57.03% done, estimate finish Fri May 25 20:33:20 2018 >=== last message repeated 2 times. === > 57.04% done, estimate finish Fri May 25 20:33:21 2018 >=== last message repeated 2 times. === > 57.05% done, estimate finish Fri May 25 20:33:20 2018 >=== last message repeated 3 times. === > 57.06% done, estimate finish Fri May 25 20:33:19 2018 > 57.06% done, estimate finish Fri May 25 20:33:21 2018 > 57.07% done, estimate finish Fri May 25 20:33:20 2018 >=== last message repeated 2 times. === > 57.08% done, estimate finish Fri May 25 20:33:19 2018 >=== last message repeated 3 times. === > 57.09% done, estimate finish Fri May 25 20:33:20 2018 >=== last message repeated 2 times. === > 57.10% done, estimate finish Fri May 25 20:33:19 2018 >=== last message repeated 2 times. === > 57.10% done, estimate finish Fri May 25 20:33:18 2018 > 57.11% done, estimate finish Fri May 25 20:33:18 2018 >=== last message repeated 2 times. === > 57.12% done, estimate finish Fri May 25 20:33:19 2018 > 57.12% done, estimate finish Fri May 25 20:33:18 2018 >=== last message repeated 2 times. === > 57.13% done, estimate finish Fri May 25 20:33:18 2018 > 57.13% done, estimate finish Fri May 25 20:33:17 2018 > 57.14% done, estimate finish Fri May 25 20:33:17 2018 > 57.14% done, estimate finish Fri May 25 20:33:16 2018 > 57.14% done, estimate finish Fri May 25 20:33:18 2018 > 57.15% done, estimate finish Fri May 25 20:33:17 2018 >=== last message repeated 2 times. === > 57.16% done, estimate finish Fri May 25 20:33:17 2018 > 57.16% done, estimate finish Fri May 25 20:33:16 2018 > 57.17% done, estimate finish Fri May 25 20:33:16 2018 > 57.17% done, estimate finish Fri May 25 20:33:17 2018 >=== last message repeated 2 times. === > 57.18% done, estimate finish Fri May 25 20:33:16 2018 >=== last message repeated 2 times. === > 57.19% done, estimate finish Fri May 25 20:33:16 2018 > 57.19% done, estimate finish Fri May 25 20:33:15 2018 > 57.19% done, estimate finish Fri May 25 20:33:17 2018 > 57.20% done, estimate finish Fri May 25 20:33:16 2018 >=== last message repeated 2 times. === > 57.21% done, estimate finish Fri May 25 20:33:15 2018 >=== last message repeated 3 times. === > 57.22% done, estimate finish Fri May 25 20:33:14 2018 > 57.22% done, estimate finish Fri May 25 20:33:15 2018 > 57.23% done, estimate finish Fri May 25 20:33:15 2018 >=== last message repeated 2 times. === > 57.23% done, estimate finish Fri May 25 20:33:14 2018 > 57.24% done, estimate finish Fri May 25 20:33:14 2018 >=== last message repeated 2 times. === > 57.25% done, estimate finish Fri May 25 20:33:15 2018 > 57.25% done, estimate finish Fri May 25 20:33:14 2018 > 57.26% done, estimate finish Fri May 25 20:33:14 2018 >=== last message repeated 2 times. === > 57.26% done, estimate finish Fri May 25 20:33:13 2018 > 57.27% done, estimate finish Fri May 25 20:33:13 2018 > 57.27% done, estimate finish Fri May 25 20:33:14 2018 > 57.28% done, estimate finish Fri May 25 20:33:14 2018 > 57.28% done, estimate finish Fri May 25 20:33:13 2018 >=== last message repeated 2 times. === > 57.29% done, estimate finish Fri May 25 20:33:13 2018 > 57.29% done, estimate finish Fri May 25 20:33:12 2018 > 57.30% done, estimate finish Fri May 25 20:33:12 2018 > 57.30% done, estimate finish Fri May 25 20:33:13 2018 >=== last message repeated 2 times. === > 57.31% done, estimate finish Fri May 25 20:33:12 2018 >=== last message repeated 2 times. === > 57.32% done, estimate finish Fri May 25 20:33:12 2018 > 57.32% done, estimate finish Fri May 25 20:33:11 2018 > 57.32% done, estimate finish Fri May 25 20:33:13 2018 > 57.33% done, estimate finish Fri May 25 20:33:12 2018 >=== last message repeated 2 times. === > 57.34% done, estimate finish Fri May 25 20:33:11 2018 >=== last message repeated 2 times. === > 57.35% done, estimate finish Fri May 25 20:33:11 2018 > 57.35% done, estimate finish Fri May 25 20:33:10 2018 > 57.35% done, estimate finish Fri May 25 20:33:12 2018 > 57.36% done, estimate finish Fri May 25 20:33:11 2018 >=== last message repeated 2 times. === > 57.37% done, estimate finish Fri May 25 20:33:10 2018 >=== last message repeated 3 times. === > 57.38% done, estimate finish Fri May 25 20:33:11 2018 > 57.38% done, estimate finish Fri May 25 20:33:10 2018 > 57.39% done, estimate finish Fri May 25 20:33:10 2018 >=== last message repeated 2 times. === > 57.39% done, estimate finish Fri May 25 20:33:09 2018 > 57.40% done, estimate finish Fri May 25 20:33:09 2018 > 57.40% done, estimate finish Fri May 25 20:33:08 2018 > 57.41% done, estimate finish Fri May 25 20:33:10 2018 > 57.41% done, estimate finish Fri May 25 20:33:09 2018 > 57.42% done, estimate finish Fri May 25 20:33:09 2018 >=== last message repeated 2 times. === > 57.42% done, estimate finish Fri May 25 20:33:08 2018 > 57.43% done, estimate finish Fri May 25 20:33:08 2018 > 57.43% done, estimate finish Fri May 25 20:33:09 2018 > 57.44% done, estimate finish Fri May 25 20:33:09 2018 > 57.44% done, estimate finish Fri May 25 20:33:08 2018 >=== last message repeated 2 times. === > 57.45% done, estimate finish Fri May 25 20:33:08 2018 > 57.45% done, estimate finish Fri May 25 20:33:07 2018 > 57.46% done, estimate finish Fri May 25 20:33:09 2018 > 57.46% done, estimate finish Fri May 25 20:33:08 2018 >=== last message repeated 2 times. === > 57.47% done, estimate finish Fri May 25 20:33:07 2018 >=== last message repeated 2 times. === > 57.48% done, estimate finish Fri May 25 20:33:07 2018 > 57.48% done, estimate finish Fri May 25 20:33:08 2018 >=== last message repeated 2 times. === > 57.49% done, estimate finish Fri May 25 20:33:07 2018 >=== last message repeated 2 times. === > 57.50% done, estimate finish Fri May 25 20:33:06 2018 >=== last message repeated 2 times. === > 57.51% done, estimate finish Fri May 25 20:33:06 2018 > 57.51% done, estimate finish Fri May 25 20:33:07 2018 >=== last message repeated 2 times. === > 57.52% done, estimate finish Fri May 25 20:33:06 2018 >=== last message repeated 2 times. === > 57.53% done, estimate finish Fri May 25 20:33:05 2018 >=== last message repeated 3 times. === > 57.54% done, estimate finish Fri May 25 20:33:06 2018 > 57.54% done, estimate finish Fri May 25 20:33:05 2018 > 57.55% done, estimate finish Fri May 25 20:33:05 2018 >=== last message repeated 2 times. === > 57.55% done, estimate finish Fri May 25 20:33:04 2018 > 57.56% done, estimate finish Fri May 25 20:33:04 2018 > 57.56% done, estimate finish Fri May 25 20:33:05 2018 > 57.57% done, estimate finish Fri May 25 20:33:05 2018 > 57.57% done, estimate finish Fri May 25 20:33:04 2018 >=== last message repeated 2 times. === > 57.58% done, estimate finish Fri May 25 20:33:04 2018 > 57.58% done, estimate finish Fri May 25 20:33:03 2018 > 57.59% done, estimate finish Fri May 25 20:33:05 2018 > 57.59% done, estimate finish Fri May 25 20:33:04 2018 > 57.60% done, estimate finish Fri May 25 20:33:04 2018 > 57.60% done, estimate finish Fri May 25 20:33:03 2018 >=== last message repeated 2 times. === > 57.61% done, estimate finish Fri May 25 20:33:03 2018 > 57.61% done, estimate finish Fri May 25 20:33:02 2018 > 57.62% done, estimate finish Fri May 25 20:33:04 2018 > 57.62% done, estimate finish Fri May 25 20:33:03 2018 >=== last message repeated 2 times. === > 57.63% done, estimate finish Fri May 25 20:33:02 2018 >=== last message repeated 2 times. === > 57.64% done, estimate finish Fri May 25 20:33:02 2018 > 57.64% done, estimate finish Fri May 25 20:33:03 2018 >=== last message repeated 2 times. === > 57.65% done, estimate finish Fri May 25 20:33:02 2018 >=== last message repeated 2 times. === > 57.66% done, estimate finish Fri May 25 20:33:01 2018 >=== last message repeated 2 times. === > 57.66% done, estimate finish Fri May 25 20:33:02 2018 > 57.67% done, estimate finish Fri May 25 20:33:02 2018 >=== last message repeated 2 times. === > 57.68% done, estimate finish Fri May 25 20:33:01 2018 >=== last message repeated 2 times. === > 57.69% done, estimate finish Fri May 25 20:33:00 2018 > 57.69% done, estimate finish Fri May 25 20:33:02 2018 > 57.69% done, estimate finish Fri May 25 20:33:01 2018 > 57.70% done, estimate finish Fri May 25 20:33:01 2018 >=== last message repeated 2 times. === > 57.71% done, estimate finish Fri May 25 20:33:02 2018 > 57.71% done, estimate finish Fri May 25 20:33:01 2018 >=== last message repeated 2 times. === > 57.72% done, estimate finish Fri May 25 20:33:01 2018 > 57.72% done, estimate finish Fri May 25 20:33:00 2018 > 57.73% done, estimate finish Fri May 25 20:33:00 2018 >=== last message repeated 2 times. === > 57.73% done, estimate finish Fri May 25 20:32:59 2018 > 57.74% done, estimate finish Fri May 25 20:33:00 2018 >=== last message repeated 2 times. === > 57.75% done, estimate finish Fri May 25 20:33:00 2018 > 57.75% done, estimate finish Fri May 25 20:32:59 2018 > 57.76% done, estimate finish Fri May 25 20:32:59 2018 > 57.76% done, estimate finish Fri May 25 20:32:58 2018 > 57.76% done, estimate finish Fri May 25 20:33:00 2018 > 57.77% done, estimate finish Fri May 25 20:32:59 2018 >=== last message repeated 2 times. === > 57.78% done, estimate finish Fri May 25 20:32:59 2018 > 57.78% done, estimate finish Fri May 25 20:32:58 2018 >=== last message repeated 2 times. === > 57.79% done, estimate finish Fri May 25 20:32:57 2018 > 57.79% done, estimate finish Fri May 25 20:32:59 2018 > 57.80% done, estimate finish Fri May 25 20:32:58 2018 >=== last message repeated 3 times. === > 57.81% done, estimate finish Fri May 25 20:32:57 2018 >=== last message repeated 2 times. === > 57.82% done, estimate finish Fri May 25 20:32:58 2018 >=== last message repeated 2 times. === > 57.82% done, estimate finish Fri May 25 20:32:57 2018 > 57.83% done, estimate finish Fri May 25 20:32:57 2018 >=== last message repeated 2 times. === > 57.84% done, estimate finish Fri May 25 20:32:56 2018 >=== last message repeated 2 times. === > 57.85% done, estimate finish Fri May 25 20:32:57 2018 >=== last message repeated 2 times. === > 57.85% done, estimate finish Fri May 25 20:32:56 2018 > 57.86% done, estimate finish Fri May 25 20:32:56 2018 >=== last message repeated 2 times. === > 57.87% done, estimate finish Fri May 25 20:32:55 2018 > 57.87% done, estimate finish Fri May 25 20:32:57 2018 > 57.87% done, estimate finish Fri May 25 20:32:56 2018 > 57.88% done, estimate finish Fri May 25 20:32:56 2018 > 57.88% done, estimate finish Fri May 25 20:32:55 2018 > 57.89% done, estimate finish Fri May 25 20:32:55 2018 >=== last message repeated 2 times. === > 57.89% done, estimate finish Fri May 25 20:32:54 2018 > 57.90% done, estimate finish Fri May 25 20:32:56 2018 > 57.90% done, estimate finish Fri May 25 20:32:55 2018 > 57.91% done, estimate finish Fri May 25 20:32:55 2018 > 57.91% done, estimate finish Fri May 25 20:32:54 2018 >=== last message repeated 2 times. === > 57.92% done, estimate finish Fri May 25 20:32:54 2018 > 57.92% done, estimate finish Fri May 25 20:32:55 2018 > 57.93% done, estimate finish Fri May 25 20:32:55 2018 > 57.93% done, estimate finish Fri May 25 20:32:54 2018 > 57.94% done, estimate finish Fri May 25 20:32:54 2018 > 57.94% done, estimate finish Fri May 25 20:32:53 2018 >=== last message repeated 2 times. === > 57.95% done, estimate finish Fri May 25 20:32:54 2018 >=== last message repeated 2 times. === > 57.96% done, estimate finish Fri May 25 20:32:53 2018 >=== last message repeated 3 times. === > 57.97% done, estimate finish Fri May 25 20:32:52 2018 > 57.97% done, estimate finish Fri May 25 20:32:54 2018 > 57.98% done, estimate finish Fri May 25 20:32:53 2018 >=== last message repeated 2 times. === > 57.98% done, estimate finish Fri May 25 20:32:52 2018 > 57.99% done, estimate finish Fri May 25 20:32:52 2018 >=== last message repeated 2 times. === > 58.00% done, estimate finish Fri May 25 20:32:51 2018 > 58.00% done, estimate finish Fri May 25 20:32:53 2018 > 58.00% done, estimate finish Fri May 25 20:32:52 2018 > 58.01% done, estimate finish Fri May 25 20:32:52 2018 > 58.01% done, estimate finish Fri May 25 20:32:51 2018 > 58.02% done, estimate finish Fri May 25 20:32:51 2018 >=== last message repeated 2 times. === > 58.03% done, estimate finish Fri May 25 20:32:52 2018 >=== last message repeated 2 times. === > 58.03% done, estimate finish Fri May 25 20:32:51 2018 > 58.04% done, estimate finish Fri May 25 20:32:51 2018 > 58.04% done, estimate finish Fri May 25 20:32:50 2018 > 58.05% done, estimate finish Fri May 25 20:32:50 2018 > 58.05% done, estimate finish Fri May 25 20:32:51 2018 >=== last message repeated 2 times. === > 58.06% done, estimate finish Fri May 25 20:32:51 2018 > 58.06% done, estimate finish Fri May 25 20:32:50 2018 > 58.07% done, estimate finish Fri May 25 20:32:50 2018 > 58.07% done, estimate finish Fri May 25 20:32:49 2018 >=== last message repeated 2 times. === > 58.08% done, estimate finish Fri May 25 20:32:50 2018 >=== last message repeated 2 times. === > 58.09% done, estimate finish Fri May 25 20:32:50 2018 > 58.09% done, estimate finish Fri May 25 20:32:49 2018 >=== last message repeated 2 times. === > 58.10% done, estimate finish Fri May 25 20:32:48 2018 > 58.10% done, estimate finish Fri May 25 20:32:50 2018 > 58.11% done, estimate finish Fri May 25 20:32:49 2018 >=== last message repeated 2 times. === > 58.12% done, estimate finish Fri May 25 20:32:49 2018 > 58.12% done, estimate finish Fri May 25 20:32:48 2018 >=== last message repeated 2 times. === > 58.13% done, estimate finish Fri May 25 20:32:47 2018 > 58.13% done, estimate finish Fri May 25 20:32:49 2018 > 58.14% done, estimate finish Fri May 25 20:32:48 2018 >=== last message repeated 3 times. === > 58.15% done, estimate finish Fri May 25 20:32:47 2018 >=== last message repeated 2 times. === > 58.16% done, estimate finish Fri May 25 20:32:48 2018 >=== last message repeated 2 times. === > 58.16% done, estimate finish Fri May 25 20:32:47 2018 > 58.17% done, estimate finish Fri May 25 20:32:47 2018 >=== last message repeated 2 times. === > 58.18% done, estimate finish Fri May 25 20:32:46 2018 > 58.18% done, estimate finish Fri May 25 20:32:48 2018 > 58.19% done, estimate finish Fri May 25 20:32:47 2018 >=== last message repeated 2 times. === > 58.19% done, estimate finish Fri May 25 20:32:46 2018 > 58.20% done, estimate finish Fri May 25 20:32:46 2018 >=== last message repeated 2 times. === > 58.21% done, estimate finish Fri May 25 20:32:45 2018 > 58.21% done, estimate finish Fri May 25 20:32:47 2018 > 58.21% done, estimate finish Fri May 25 20:32:46 2018 > 58.22% done, estimate finish Fri May 25 20:32:46 2018 > 58.22% done, estimate finish Fri May 25 20:32:45 2018 > 58.23% done, estimate finish Fri May 25 20:32:45 2018 >=== last message repeated 2 times. === > 58.23% done, estimate finish Fri May 25 20:32:46 2018 > 58.24% done, estimate finish Fri May 25 20:32:46 2018 > 58.24% done, estimate finish Fri May 25 20:32:45 2018 > 58.25% done, estimate finish Fri May 25 20:32:45 2018 > 58.25% done, estimate finish Fri May 25 20:32:44 2018 >=== last message repeated 2 times. === > 58.26% done, estimate finish Fri May 25 20:32:45 2018 >=== last message repeated 2 times. === > 58.27% done, estimate finish Fri May 25 20:32:44 2018 >=== last message repeated 2 times. === > 58.28% done, estimate finish Fri May 25 20:32:44 2018 > 58.28% done, estimate finish Fri May 25 20:32:43 2018 >=== last message repeated 2 times. === > 58.29% done, estimate finish Fri May 25 20:32:44 2018 >=== last message repeated 2 times. === > 58.30% done, estimate finish Fri May 25 20:32:44 2018 > 58.30% done, estimate finish Fri May 25 20:32:43 2018 >=== last message repeated 2 times. === > 58.31% done, estimate finish Fri May 25 20:32:42 2018 > 58.31% done, estimate finish Fri May 25 20:32:44 2018 > 58.32% done, estimate finish Fri May 25 20:32:43 2018 >=== last message repeated 2 times. === > 58.32% done, estimate finish Fri May 25 20:32:42 2018 > 58.33% done, estimate finish Fri May 25 20:32:42 2018 >=== last message repeated 2 times. === > 58.34% done, estimate finish Fri May 25 20:32:41 2018 > 58.34% done, estimate finish Fri May 25 20:32:43 2018 > 58.34% done, estimate finish Fri May 25 20:32:42 2018 > 58.35% done, estimate finish Fri May 25 20:32:42 2018 > 58.35% done, estimate finish Fri May 25 20:32:41 2018 > 58.36% done, estimate finish Fri May 25 20:32:41 2018 >=== last message repeated 2 times. === > 58.37% done, estimate finish Fri May 25 20:32:42 2018 >=== last message repeated 2 times. === > 58.37% done, estimate finish Fri May 25 20:32:41 2018 > 58.38% done, estimate finish Fri May 25 20:32:41 2018 > 58.38% done, estimate finish Fri May 25 20:32:40 2018 > 58.39% done, estimate finish Fri May 25 20:32:40 2018 >=== last message repeated 2 times. === > 58.39% done, estimate finish Fri May 25 20:32:41 2018 > 58.40% done, estimate finish Fri May 25 20:32:41 2018 > 58.40% done, estimate finish Fri May 25 20:32:40 2018 > 58.41% done, estimate finish Fri May 25 20:32:40 2018 >=== last message repeated 2 times. === > 58.41% done, estimate finish Fri May 25 20:32:39 2018 > 58.42% done, estimate finish Fri May 25 20:32:40 2018 >=== last message repeated 2 times. === > 58.43% done, estimate finish Fri May 25 20:32:40 2018 > 58.43% done, estimate finish Fri May 25 20:32:39 2018 >=== last message repeated 2 times. === > 58.44% done, estimate finish Fri May 25 20:32:38 2018 > 58.44% done, estimate finish Fri May 25 20:32:40 2018 > 58.45% done, estimate finish Fri May 25 20:32:39 2018 >=== last message repeated 2 times. === > 58.46% done, estimate finish Fri May 25 20:32:39 2018 > 58.46% done, estimate finish Fri May 25 20:32:38 2018 >=== last message repeated 2 times. === > 58.47% done, estimate finish Fri May 25 20:32:39 2018 >=== last message repeated 2 times. === > 58.48% done, estimate finish Fri May 25 20:32:38 2018 >=== last message repeated 3 times. === > 58.49% done, estimate finish Fri May 25 20:32:37 2018 >=== last message repeated 2 times. === > 58.50% done, estimate finish Fri May 25 20:32:38 2018 >=== last message repeated 2 times. === > 58.50% done, estimate finish Fri May 25 20:32:37 2018 > 58.51% done, estimate finish Fri May 25 20:32:37 2018 >=== last message repeated 2 times. === > 58.52% done, estimate finish Fri May 25 20:32:36 2018 > 58.52% done, estimate finish Fri May 25 20:32:38 2018 > 58.52% done, estimate finish Fri May 25 20:32:37 2018 > 58.53% done, estimate finish Fri May 25 20:32:37 2018 > 58.53% done, estimate finish Fri May 25 20:32:36 2018 > 58.54% done, estimate finish Fri May 25 20:32:36 2018 >=== last message repeated 2 times. === > 58.55% done, estimate finish Fri May 25 20:32:37 2018 >=== last message repeated 2 times. === > 58.55% done, estimate finish Fri May 25 20:32:36 2018 > 58.56% done, estimate finish Fri May 25 20:32:36 2018 > 58.56% done, estimate finish Fri May 25 20:32:35 2018 > 58.57% done, estimate finish Fri May 25 20:32:35 2018 >=== last message repeated 2 times. === > 58.57% done, estimate finish Fri May 25 20:32:36 2018 > 58.58% done, estimate finish Fri May 25 20:32:36 2018 > 58.58% done, estimate finish Fri May 25 20:32:35 2018 > 58.59% done, estimate finish Fri May 25 20:32:35 2018 > 58.59% done, estimate finish Fri May 25 20:32:34 2018 >=== last message repeated 2 times. === > 58.60% done, estimate finish Fri May 25 20:32:35 2018 >=== last message repeated 2 times. === > 58.61% done, estimate finish Fri May 25 20:32:35 2018 > 58.61% done, estimate finish Fri May 25 20:32:34 2018 > 58.62% done, estimate finish Fri May 25 20:32:34 2018 > 58.62% done, estimate finish Fri May 25 20:32:33 2018 >=== last message repeated 2 times. === > 58.63% done, estimate finish Fri May 25 20:32:34 2018 >=== last message repeated 2 times. === > 58.64% done, estimate finish Fri May 25 20:32:34 2018 > 58.64% done, estimate finish Fri May 25 20:32:33 2018 >=== last message repeated 2 times. === > 58.65% done, estimate finish Fri May 25 20:32:32 2018 > 58.65% done, estimate finish Fri May 25 20:32:34 2018 > 58.66% done, estimate finish Fri May 25 20:32:33 2018 >=== last message repeated 3 times. === > 58.67% done, estimate finish Fri May 25 20:32:32 2018 >=== last message repeated 2 times. === > 58.68% done, estimate finish Fri May 25 20:32:33 2018 >=== last message repeated 2 times. === > 58.68% done, estimate finish Fri May 25 20:32:32 2018 > 58.69% done, estimate finish Fri May 25 20:32:32 2018 >=== last message repeated 2 times. === > 58.70% done, estimate finish Fri May 25 20:32:31 2018 >=== last message repeated 2 times. === > 58.71% done, estimate finish Fri May 25 20:32:32 2018 >=== last message repeated 2 times. === > 58.71% done, estimate finish Fri May 25 20:32:31 2018 > 58.72% done, estimate finish Fri May 25 20:32:31 2018 >=== last message repeated 2 times. === > 58.73% done, estimate finish Fri May 25 20:32:30 2018 > 58.73% done, estimate finish Fri May 25 20:32:32 2018 > 58.73% done, estimate finish Fri May 25 20:32:31 2018 > 58.74% done, estimate finish Fri May 25 20:32:31 2018 > 58.74% done, estimate finish Fri May 25 20:32:30 2018 > 58.75% done, estimate finish Fri May 25 20:32:30 2018 >=== last message repeated 2 times. === > 58.75% done, estimate finish Fri May 25 20:32:31 2018 > 58.76% done, estimate finish Fri May 25 20:32:31 2018 > 58.76% done, estimate finish Fri May 25 20:32:30 2018 > 58.77% done, estimate finish Fri May 25 20:32:30 2018 > 58.77% done, estimate finish Fri May 25 20:32:29 2018 >=== last message repeated 2 times. === > 58.78% done, estimate finish Fri May 25 20:32:29 2018 > 58.78% done, estimate finish Fri May 25 20:32:30 2018 > 58.79% done, estimate finish Fri May 25 20:32:30 2018 > 58.79% done, estimate finish Fri May 25 20:32:29 2018 > 58.80% done, estimate finish Fri May 25 20:32:29 2018 > 58.80% done, estimate finish Fri May 25 20:32:28 2018 >=== last message repeated 2 times. === > 58.81% done, estimate finish Fri May 25 20:32:29 2018 >=== last message repeated 2 times. === > 58.82% done, estimate finish Fri May 25 20:32:29 2018 > 58.82% done, estimate finish Fri May 25 20:32:28 2018 >=== last message repeated 2 times. === > 58.83% done, estimate finish Fri May 25 20:32:27 2018 > 58.83% done, estimate finish Fri May 25 20:32:29 2018 > 58.84% done, estimate finish Fri May 25 20:32:28 2018 >=== last message repeated 3 times. === > 58.85% done, estimate finish Fri May 25 20:32:27 2018 >=== last message repeated 2 times. === > 58.86% done, estimate finish Fri May 25 20:32:26 2018 > 58.86% done, estimate finish Fri May 25 20:32:28 2018 > 58.86% done, estimate finish Fri May 25 20:32:27 2018 > 58.87% done, estimate finish Fri May 25 20:32:27 2018 >=== last message repeated 2 times. === > 58.88% done, estimate finish Fri May 25 20:32:26 2018 >=== last message repeated 2 times. === > 58.89% done, estimate finish Fri May 25 20:32:27 2018 >=== last message repeated 2 times. === > 58.89% done, estimate finish Fri May 25 20:32:26 2018 > 58.90% done, estimate finish Fri May 25 20:32:26 2018 >=== last message repeated 2 times. === > 58.91% done, estimate finish Fri May 25 20:32:25 2018 >=== last message repeated 2 times. === > 58.91% done, estimate finish Fri May 25 20:32:26 2018 > 58.92% done, estimate finish Fri May 25 20:32:26 2018 > 58.92% done, estimate finish Fri May 25 20:32:25 2018 > 58.93% done, estimate finish Fri May 25 20:32:25 2018 >=== last message repeated 2 times. === > 58.93% done, estimate finish Fri May 25 20:32:24 2018 > 58.94% done, estimate finish Fri May 25 20:32:26 2018 > 58.94% done, estimate finish Fri May 25 20:32:25 2018 > 58.95% done, estimate finish Fri May 25 20:32:25 2018 > 58.95% done, estimate finish Fri May 25 20:32:24 2018 > 58.96% done, estimate finish Fri May 25 20:32:24 2018 >=== last message repeated 2 times. === > 58.96% done, estimate finish Fri May 25 20:32:25 2018 > 58.97% done, estimate finish Fri May 25 20:32:25 2018 > 58.97% done, estimate finish Fri May 25 20:32:24 2018 > 58.98% done, estimate finish Fri May 25 20:32:24 2018 > 58.98% done, estimate finish Fri May 25 20:32:23 2018 >=== last message repeated 2 times. === > 58.99% done, estimate finish Fri May 25 20:32:23 2018 > 58.99% done, estimate finish Fri May 25 20:32:24 2018 > 59.00% done, estimate finish Fri May 25 20:32:24 2018 > 59.00% done, estimate finish Fri May 25 20:32:23 2018 >=== last message repeated 2 times. === > 59.01% done, estimate finish Fri May 25 20:32:23 2018 > 59.01% done, estimate finish Fri May 25 20:32:22 2018 > 59.02% done, estimate finish Fri May 25 20:32:23 2018 >=== last message repeated 3 times. === > 59.03% done, estimate finish Fri May 25 20:32:22 2018 >=== last message repeated 2 times. === > 59.04% done, estimate finish Fri May 25 20:32:22 2018 > 59.04% done, estimate finish Fri May 25 20:32:23 2018 > 59.05% done, estimate finish Fri May 25 20:32:22 2018 >=== last message repeated 3 times. === > 59.06% done, estimate finish Fri May 25 20:32:21 2018 >=== last message repeated 2 times. === > 59.07% done, estimate finish Fri May 25 20:32:22 2018 >=== last message repeated 2 times. === > 59.07% done, estimate finish Fri May 25 20:32:21 2018 > 59.08% done, estimate finish Fri May 25 20:32:21 2018 >=== last message repeated 2 times. === > 59.09% done, estimate finish Fri May 25 20:32:20 2018 >=== last message repeated 2 times. === > 59.09% done, estimate finish Fri May 25 20:32:21 2018 > 59.10% done, estimate finish Fri May 25 20:32:21 2018 > 59.10% done, estimate finish Fri May 25 20:32:20 2018 > 59.11% done, estimate finish Fri May 25 20:32:20 2018 >=== last message repeated 2 times. === > 59.11% done, estimate finish Fri May 25 20:32:19 2018 > 59.12% done, estimate finish Fri May 25 20:32:21 2018 > 59.12% done, estimate finish Fri May 25 20:32:20 2018 > 59.13% done, estimate finish Fri May 25 20:32:20 2018 >=== last message repeated 2 times. === > 59.14% done, estimate finish Fri May 25 20:32:19 2018 >=== last message repeated 2 times. === > 59.14% done, estimate finish Fri May 25 20:32:18 2018 > 59.15% done, estimate finish Fri May 25 20:32:20 2018 > 59.15% done, estimate finish Fri May 25 20:32:19 2018 > 59.16% done, estimate finish Fri May 25 20:32:19 2018 >=== last message repeated 2 times. === > 59.16% done, estimate finish Fri May 25 20:32:18 2018 > 59.17% done, estimate finish Fri May 25 20:32:18 2018 > 59.17% done, estimate finish Fri May 25 20:32:19 2018 > 59.18% done, estimate finish Fri May 25 20:32:19 2018 > 59.18% done, estimate finish Fri May 25 20:32:18 2018 >=== last message repeated 2 times. === > 59.19% done, estimate finish Fri May 25 20:32:18 2018 > 59.19% done, estimate finish Fri May 25 20:32:17 2018 > 59.20% done, estimate finish Fri May 25 20:32:17 2018 > 59.20% done, estimate finish Fri May 25 20:32:18 2018 >=== last message repeated 2 times. === > 59.21% done, estimate finish Fri May 25 20:32:17 2018 >=== last message repeated 2 times. === > 59.22% done, estimate finish Fri May 25 20:32:17 2018 > 59.22% done, estimate finish Fri May 25 20:32:16 2018 > 59.23% done, estimate finish Fri May 25 20:32:18 2018 > 59.23% done, estimate finish Fri May 25 20:32:17 2018 >=== last message repeated 2 times. === > 59.24% done, estimate finish Fri May 25 20:32:16 2018 >=== last message repeated 2 times. === > 59.25% done, estimate finish Fri May 25 20:32:16 2018 > 59.25% done, estimate finish Fri May 25 20:32:17 2018 >=== last message repeated 2 times. === > 59.26% done, estimate finish Fri May 25 20:32:16 2018 >=== last message repeated 2 times. === > 59.27% done, estimate finish Fri May 25 20:32:15 2018 >=== last message repeated 2 times. === > 59.27% done, estimate finish Fri May 25 20:32:16 2018 > 59.28% done, estimate finish Fri May 25 20:32:16 2018 >=== last message repeated 2 times. === > 59.29% done, estimate finish Fri May 25 20:32:15 2018 >=== last message repeated 2 times. === > 59.30% done, estimate finish Fri May 25 20:32:14 2018 >=== last message repeated 2 times. === > 59.30% done, estimate finish Fri May 25 20:32:15 2018 > 59.31% done, estimate finish Fri May 25 20:32:15 2018 >=== last message repeated 2 times. === > 59.32% done, estimate finish Fri May 25 20:32:14 2018 >=== last message repeated 2 times. === > 59.32% done, estimate finish Fri May 25 20:32:13 2018 > 59.33% done, estimate finish Fri May 25 20:32:15 2018 > 59.33% done, estimate finish Fri May 25 20:32:14 2018 > 59.34% done, estimate finish Fri May 25 20:32:14 2018 >=== last message repeated 2 times. === > 59.34% done, estimate finish Fri May 25 20:32:13 2018 > 59.35% done, estimate finish Fri May 25 20:32:13 2018 > 59.35% done, estimate finish Fri May 25 20:32:14 2018 > 59.36% done, estimate finish Fri May 25 20:32:14 2018 > 59.36% done, estimate finish Fri May 25 20:32:13 2018 >=== last message repeated 2 times. === > 59.37% done, estimate finish Fri May 25 20:32:13 2018 > 59.37% done, estimate finish Fri May 25 20:32:12 2018 > 59.38% done, estimate finish Fri May 25 20:32:12 2018 > 59.38% done, estimate finish Fri May 25 20:32:13 2018 > 59.39% done, estimate finish Fri May 25 20:32:13 2018 > 59.39% done, estimate finish Fri May 25 20:32:12 2018 >=== last message repeated 2 times. === > 59.40% done, estimate finish Fri May 25 20:32:12 2018 > 59.40% done, estimate finish Fri May 25 20:32:11 2018 > 59.41% done, estimate finish Fri May 25 20:32:13 2018 > 59.41% done, estimate finish Fri May 25 20:32:12 2018 >=== last message repeated 2 times. === > 59.42% done, estimate finish Fri May 25 20:32:11 2018 >=== last message repeated 2 times. === > 59.43% done, estimate finish Fri May 25 20:32:11 2018 > 59.43% done, estimate finish Fri May 25 20:32:12 2018 >=== last message repeated 2 times. === > 59.44% done, estimate finish Fri May 25 20:32:11 2018 >=== last message repeated 2 times. === > 59.45% done, estimate finish Fri May 25 20:32:11 2018 > 59.45% done, estimate finish Fri May 25 20:32:10 2018 >=== last message repeated 2 times. === > 59.46% done, estimate finish Fri May 25 20:32:11 2018 >=== last message repeated 2 times. === > 59.47% done, estimate finish Fri May 25 20:32:10 2018 >=== last message repeated 2 times. === > 59.48% done, estimate finish Fri May 25 20:32:10 2018 > 59.48% done, estimate finish Fri May 25 20:32:09 2018 > 59.48% done, estimate finish Fri May 25 20:32:10 2018 > 59.49% done, estimate finish Fri May 25 20:32:10 2018 >=== last message repeated 2 times. === > 59.50% done, estimate finish Fri May 25 20:32:09 2018 >=== last message repeated 3 times. === > 59.51% done, estimate finish Fri May 25 20:32:08 2018 > 59.51% done, estimate finish Fri May 25 20:32:10 2018 > 59.52% done, estimate finish Fri May 25 20:32:09 2018 >=== last message repeated 2 times. === > 59.52% done, estimate finish Fri May 25 20:32:08 2018 > 59.53% done, estimate finish Fri May 25 20:32:08 2018 >=== last message repeated 2 times. === > 59.54% done, estimate finish Fri May 25 20:32:09 2018 >=== last message repeated 2 times. === > 59.54% done, estimate finish Fri May 25 20:32:08 2018 > 59.55% done, estimate finish Fri May 25 20:32:08 2018 > 59.55% done, estimate finish Fri May 25 20:32:07 2018 > 59.56% done, estimate finish Fri May 25 20:32:07 2018 > 59.56% done, estimate finish Fri May 25 20:32:08 2018 > 59.57% done, estimate finish Fri May 25 20:32:08 2018 >=== last message repeated 2 times. === > 59.57% done, estimate finish Fri May 25 20:32:07 2018 > 59.58% done, estimate finish Fri May 25 20:32:07 2018 > 59.58% done, estimate finish Fri May 25 20:32:06 2018 > 59.59% done, estimate finish Fri May 25 20:32:06 2018 > 59.59% done, estimate finish Fri May 25 20:32:07 2018 >=== last message repeated 2 times. === > 59.60% done, estimate finish Fri May 25 20:32:07 2018 > 59.60% done, estimate finish Fri May 25 20:32:06 2018 > 59.61% done, estimate finish Fri May 25 20:32:06 2018 > 59.61% done, estimate finish Fri May 25 20:32:05 2018 > 59.61% done, estimate finish Fri May 25 20:32:07 2018 > 59.62% done, estimate finish Fri May 25 20:32:06 2018 >=== last message repeated 2 times. === > 59.63% done, estimate finish Fri May 25 20:32:06 2018 > 59.63% done, estimate finish Fri May 25 20:32:05 2018 > 59.64% done, estimate finish Fri May 25 20:32:05 2018 > 59.64% done, estimate finish Fri May 25 20:32:06 2018 >=== last message repeated 2 times. === > 59.65% done, estimate finish Fri May 25 20:32:05 2018 >=== last message repeated 2 times. === > 59.66% done, estimate finish Fri May 25 20:32:05 2018 > 59.66% done, estimate finish Fri May 25 20:32:04 2018 > 59.66% done, estimate finish Fri May 25 20:32:06 2018 > 59.67% done, estimate finish Fri May 25 20:32:05 2018 >=== last message repeated 2 times. === > 59.68% done, estimate finish Fri May 25 20:32:04 2018 >=== last message repeated 3 times. === > 59.69% done, estimate finish Fri May 25 20:32:03 2018 > 59.69% done, estimate finish Fri May 25 20:32:05 2018 > 59.70% done, estimate finish Fri May 25 20:32:04 2018 >=== last message repeated 3 times. === > 59.71% done, estimate finish Fri May 25 20:32:03 2018 >=== last message repeated 2 times. === > 59.72% done, estimate finish Fri May 25 20:32:04 2018 >=== last message repeated 2 times. === > 59.73% done, estimate finish Fri May 25 20:32:03 2018 >=== last message repeated 3 times. === > 59.74% done, estimate finish Fri May 25 20:32:02 2018 > 59.74% done, estimate finish Fri May 25 20:32:03 2018 > 59.75% done, estimate finish Fri May 25 20:32:03 2018 >=== last message repeated 2 times. === > 59.75% done, estimate finish Fri May 25 20:32:02 2018 > 59.76% done, estimate finish Fri May 25 20:32:02 2018 >=== last message repeated 2 times. === > 59.77% done, estimate finish Fri May 25 20:32:01 2018 > 59.77% done, estimate finish Fri May 25 20:32:03 2018 > 59.77% done, estimate finish Fri May 25 20:32:02 2018 > 59.78% done, estimate finish Fri May 25 20:32:02 2018 > 59.78% done, estimate finish Fri May 25 20:32:01 2018 > 59.79% done, estimate finish Fri May 25 20:32:01 2018 >=== last message repeated 2 times. === > 59.79% done, estimate finish Fri May 25 20:32:02 2018 > 59.80% done, estimate finish Fri May 25 20:32:02 2018 > 59.80% done, estimate finish Fri May 25 20:32:01 2018 > 59.81% done, estimate finish Fri May 25 20:32:01 2018 > 59.81% done, estimate finish Fri May 25 20:32:00 2018 > 59.82% done, estimate finish Fri May 25 20:32:00 2018 > 59.82% done, estimate finish Fri May 25 20:32:01 2018 >=== last message repeated 2 times. === > 59.83% done, estimate finish Fri May 25 20:32:01 2018 > 59.83% done, estimate finish Fri May 25 20:32:00 2018 > 59.84% done, estimate finish Fri May 25 20:32:00 2018 > 59.84% done, estimate finish Fri May 25 20:31:59 2018 >=== last message repeated 2 times. === > 59.85% done, estimate finish Fri May 25 20:32:00 2018 >=== last message repeated 2 times. === > 59.86% done, estimate finish Fri May 25 20:32:00 2018 > 59.86% done, estimate finish Fri May 25 20:31:59 2018 >=== last message repeated 2 times. === > 59.87% done, estimate finish Fri May 25 20:31:59 2018 > 59.87% done, estimate finish Fri May 25 20:32:00 2018 > 59.88% done, estimate finish Fri May 25 20:31:59 2018 >=== last message repeated 3 times. === > 59.89% done, estimate finish Fri May 25 20:31:58 2018 >=== last message repeated 2 times. === > 59.90% done, estimate finish Fri May 25 20:31:59 2018 >=== last message repeated 2 times. === > 59.91% done, estimate finish Fri May 25 20:31:58 2018 >=== last message repeated 3 times. === > 59.92% done, estimate finish Fri May 25 20:31:57 2018 >=== last message repeated 2 times. === > 59.93% done, estimate finish Fri May 25 20:31:58 2018 >=== last message repeated 3 times. === > 59.94% done, estimate finish Fri May 25 20:31:57 2018 >=== last message repeated 2 times. === > 59.95% done, estimate finish Fri May 25 20:31:56 2018 > 59.95% done, estimate finish Fri May 25 20:31:58 2018 > 59.95% done, estimate finish Fri May 25 20:31:57 2018 > 59.96% done, estimate finish Fri May 25 20:31:57 2018 >=== last message repeated 2 times. === > 59.97% done, estimate finish Fri May 25 20:31:56 2018 >=== last message repeated 2 times. === > 59.97% done, estimate finish Fri May 25 20:31:55 2018 > 59.98% done, estimate finish Fri May 25 20:31:57 2018 > 59.98% done, estimate finish Fri May 25 20:31:56 2018 > 59.99% done, estimate finish Fri May 25 20:31:56 2018 >=== last message repeated 2 times. === > 60.00% done, estimate finish Fri May 25 20:31:55 2018 >=== last message repeated 2 times. === > 60.00% done, estimate finish Fri May 25 20:31:56 2018 > 60.01% done, estimate finish Fri May 25 20:31:56 2018 > 60.01% done, estimate finish Fri May 25 20:31:55 2018 > 60.02% done, estimate finish Fri May 25 20:31:55 2018 >=== last message repeated 2 times. === > 60.02% done, estimate finish Fri May 25 20:31:54 2018 > 60.03% done, estimate finish Fri May 25 20:31:56 2018 > 60.03% done, estimate finish Fri May 25 20:31:55 2018 > 60.04% done, estimate finish Fri May 25 20:31:55 2018 > 60.04% done, estimate finish Fri May 25 20:31:54 2018 >=== last message repeated 2 times. === > 60.05% done, estimate finish Fri May 25 20:31:54 2018 > 60.05% done, estimate finish Fri May 25 20:31:55 2018 > 60.06% done, estimate finish Fri May 25 20:31:55 2018 > 60.06% done, estimate finish Fri May 25 20:31:54 2018 > 60.07% done, estimate finish Fri May 25 20:31:54 2018 >=== last message repeated 2 times. === > 60.07% done, estimate finish Fri May 25 20:31:53 2018 > 60.08% done, estimate finish Fri May 25 20:31:54 2018 >=== last message repeated 2 times. === > 60.09% done, estimate finish Fri May 25 20:31:54 2018 > 60.09% done, estimate finish Fri May 25 20:31:53 2018 >=== last message repeated 2 times. === > 60.10% done, estimate finish Fri May 25 20:31:53 2018 > 60.10% done, estimate finish Fri May 25 20:31:52 2018 > 60.11% done, estimate finish Fri May 25 20:31:53 2018 >=== last message repeated 3 times. === > 60.12% done, estimate finish Fri May 25 20:31:52 2018 >=== last message repeated 2 times. === > 60.13% done, estimate finish Fri May 25 20:31:52 2018 > 60.13% done, estimate finish Fri May 25 20:31:53 2018 >=== last message repeated 2 times. === > 60.14% done, estimate finish Fri May 25 20:31:52 2018 >=== last message repeated 2 times. === > 60.15% done, estimate finish Fri May 25 20:31:51 2018 >=== last message repeated 2 times. === > 60.16% done, estimate finish Fri May 25 20:31:51 2018 > 60.16% done, estimate finish Fri May 25 20:31:52 2018 >=== last message repeated 2 times. === > 60.17% done, estimate finish Fri May 25 20:31:51 2018 >=== last message repeated 2 times. === > 60.18% done, estimate finish Fri May 25 20:31:50 2018 >=== last message repeated 2 times. === > 60.18% done, estimate finish Fri May 25 20:31:51 2018 > 60.19% done, estimate finish Fri May 25 20:31:51 2018 >=== last message repeated 2 times. === > 60.20% done, estimate finish Fri May 25 20:31:50 2018 >=== last message repeated 3 times. === > 60.21% done, estimate finish Fri May 25 20:31:51 2018 > 60.21% done, estimate finish Fri May 25 20:31:50 2018 > 60.22% done, estimate finish Fri May 25 20:31:50 2018 >=== last message repeated 2 times. === > 60.22% done, estimate finish Fri May 25 20:31:49 2018 > 60.23% done, estimate finish Fri May 25 20:31:49 2018 > 60.23% done, estimate finish Fri May 25 20:31:50 2018 > 60.24% done, estimate finish Fri May 25 20:31:50 2018 > 60.24% done, estimate finish Fri May 25 20:31:49 2018 > 60.25% done, estimate finish Fri May 25 20:31:49 2018 >=== last message repeated 2 times. === > 60.25% done, estimate finish Fri May 25 20:31:48 2018 > 60.26% done, estimate finish Fri May 25 20:31:48 2018 > 60.26% done, estimate finish Fri May 25 20:31:49 2018 > 60.27% done, estimate finish Fri May 25 20:31:49 2018 >=== last message repeated 2 times. === > 60.27% done, estimate finish Fri May 25 20:31:48 2018 > 60.28% done, estimate finish Fri May 25 20:31:48 2018 > 60.28% done, estimate finish Fri May 25 20:31:47 2018 > 60.29% done, estimate finish Fri May 25 20:31:49 2018 > 60.29% done, estimate finish Fri May 25 20:31:48 2018 >=== last message repeated 2 times. === > 60.30% done, estimate finish Fri May 25 20:31:48 2018 > 60.30% done, estimate finish Fri May 25 20:31:47 2018 > 60.31% done, estimate finish Fri May 25 20:31:47 2018 > 60.31% done, estimate finish Fri May 25 20:31:48 2018 >=== last message repeated 2 times. === > 60.32% done, estimate finish Fri May 25 20:31:47 2018 >=== last message repeated 2 times. === > 60.33% done, estimate finish Fri May 25 20:31:47 2018 > 60.33% done, estimate finish Fri May 25 20:31:46 2018 > 60.34% done, estimate finish Fri May 25 20:31:48 2018 > 60.34% done, estimate finish Fri May 25 20:31:47 2018 >=== last message repeated 2 times. === > 60.35% done, estimate finish Fri May 25 20:31:46 2018 >=== last message repeated 2 times. === > 60.36% done, estimate finish Fri May 25 20:31:46 2018 > 60.36% done, estimate finish Fri May 25 20:31:45 2018 > 60.36% done, estimate finish Fri May 25 20:31:47 2018 > 60.37% done, estimate finish Fri May 25 20:31:46 2018 >=== last message repeated 2 times. === > 60.38% done, estimate finish Fri May 25 20:31:46 2018 > 60.38% done, estimate finish Fri May 25 20:31:45 2018 >=== last message repeated 2 times. === > 60.39% done, estimate finish Fri May 25 20:31:46 2018 >=== last message repeated 2 times. === > 60.40% done, estimate finish Fri May 25 20:31:45 2018 >=== last message repeated 2 times. === > 60.41% done, estimate finish Fri May 25 20:31:45 2018 > 60.41% done, estimate finish Fri May 25 20:31:44 2018 > 60.41% done, estimate finish Fri May 25 20:31:46 2018 > 60.42% done, estimate finish Fri May 25 20:31:45 2018 >=== last message repeated 2 times. === > 60.43% done, estimate finish Fri May 25 20:31:44 2018 >=== last message repeated 3 times. === > 60.44% done, estimate finish Fri May 25 20:31:43 2018 > 60.44% done, estimate finish Fri May 25 20:31:45 2018 > 60.45% done, estimate finish Fri May 25 20:31:44 2018 >=== last message repeated 2 times. === > 60.45% done, estimate finish Fri May 25 20:31:43 2018 > 60.46% done, estimate finish Fri May 25 20:31:43 2018 >=== last message repeated 2 times. === > 60.47% done, estimate finish Fri May 25 20:31:44 2018 >=== last message repeated 2 times. === > 60.47% done, estimate finish Fri May 25 20:31:43 2018 > 60.48% done, estimate finish Fri May 25 20:31:43 2018 >=== last message repeated 2 times. === > 60.49% done, estimate finish Fri May 25 20:31:42 2018 > 60.49% done, estimate finish Fri May 25 20:31:43 2018 > 60.50% done, estimate finish Fri May 25 20:31:43 2018 >=== last message repeated 2 times. === > 60.50% done, estimate finish Fri May 25 20:31:42 2018 > 60.51% done, estimate finish Fri May 25 20:31:42 2018 >=== last message repeated 2 times. === > 60.52% done, estimate finish Fri May 25 20:31:41 2018 > 60.52% done, estimate finish Fri May 25 20:31:42 2018 >=== last message repeated 2 times. === > 60.53% done, estimate finish Fri May 25 20:31:42 2018 > 60.53% done, estimate finish Fri May 25 20:31:41 2018 > 60.54% done, estimate finish Fri May 25 20:31:41 2018 >=== last message repeated 2 times. === > 60.54% done, estimate finish Fri May 25 20:31:42 2018 > 60.55% done, estimate finish Fri May 25 20:31:42 2018 > 60.55% done, estimate finish Fri May 25 20:31:41 2018 > 60.56% done, estimate finish Fri May 25 20:31:41 2018 > 60.56% done, estimate finish Fri May 25 20:31:40 2018 >=== last message repeated 2 times. === > 60.57% done, estimate finish Fri May 25 20:31:41 2018 >=== last message repeated 2 times. === > 60.58% done, estimate finish Fri May 25 20:31:41 2018 > 60.58% done, estimate finish Fri May 25 20:31:40 2018 > 60.59% done, estimate finish Fri May 25 20:31:40 2018 >=== last message repeated 2 times. === > 60.59% done, estimate finish Fri May 25 20:31:39 2018 > 60.60% done, estimate finish Fri May 25 20:31:40 2018 >=== last message repeated 2 times. === > 60.61% done, estimate finish Fri May 25 20:31:40 2018 > 60.61% done, estimate finish Fri May 25 20:31:39 2018 >=== last message repeated 2 times. === > 60.62% done, estimate finish Fri May 25 20:31:39 2018 > 60.62% done, estimate finish Fri May 25 20:31:40 2018 > 60.63% done, estimate finish Fri May 25 20:31:39 2018 >=== last message repeated 3 times. === > 60.64% done, estimate finish Fri May 25 20:31:38 2018 >=== last message repeated 2 times. === > 60.65% done, estimate finish Fri May 25 20:31:39 2018 >=== last message repeated 3 times. === > 60.66% done, estimate finish Fri May 25 20:31:38 2018 >=== last message repeated 2 times. === > 60.67% done, estimate finish Fri May 25 20:31:37 2018 >=== last message repeated 2 times. === > 60.68% done, estimate finish Fri May 25 20:31:38 2018 >=== last message repeated 3 times. === > 60.69% done, estimate finish Fri May 25 20:31:37 2018 >=== last message repeated 2 times. === > 60.70% done, estimate finish Fri May 25 20:31:37 2018 > 60.70% done, estimate finish Fri May 25 20:31:38 2018 > 60.70% done, estimate finish Fri May 25 20:31:37 2018 > 60.71% done, estimate finish Fri May 25 20:31:37 2018 >=== last message repeated 2 times. === > 60.72% done, estimate finish Fri May 25 20:31:36 2018 >=== last message repeated 2 times. === > 60.72% done, estimate finish Fri May 25 20:31:37 2018 > 60.73% done, estimate finish Fri May 25 20:31:37 2018 > 60.73% done, estimate finish Fri May 25 20:31:36 2018 > 60.74% done, estimate finish Fri May 25 20:31:36 2018 >=== last message repeated 2 times. === > 60.74% done, estimate finish Fri May 25 20:31:35 2018 > 60.75% done, estimate finish Fri May 25 20:31:35 2018 > 60.75% done, estimate finish Fri May 25 20:31:36 2018 > 60.76% done, estimate finish Fri May 25 20:31:36 2018 >=== last message repeated 2 times. === > 60.77% done, estimate finish Fri May 25 20:31:35 2018 >=== last message repeated 2 times. === > 60.77% done, estimate finish Fri May 25 20:31:34 2018 > 60.78% done, estimate finish Fri May 25 20:31:36 2018 > 60.78% done, estimate finish Fri May 25 20:31:35 2018 > 60.79% done, estimate finish Fri May 25 20:31:35 2018 >=== last message repeated 2 times. === > 60.79% done, estimate finish Fri May 25 20:31:34 2018 > 60.80% done, estimate finish Fri May 25 20:31:34 2018 > 60.80% done, estimate finish Fri May 25 20:31:35 2018 > 60.81% done, estimate finish Fri May 25 20:31:35 2018 > 60.81% done, estimate finish Fri May 25 20:31:34 2018 >=== last message repeated 2 times. === > 60.82% done, estimate finish Fri May 25 20:31:34 2018 > 60.82% done, estimate finish Fri May 25 20:31:33 2018 > 60.83% done, estimate finish Fri May 25 20:31:33 2018 > 60.83% done, estimate finish Fri May 25 20:31:34 2018 > 60.84% done, estimate finish Fri May 25 20:31:34 2018 >=== last message repeated 2 times. === > 60.84% done, estimate finish Fri May 25 20:31:33 2018 > 60.85% done, estimate finish Fri May 25 20:31:33 2018 > 60.85% done, estimate finish Fri May 25 20:31:32 2018 > 60.86% done, estimate finish Fri May 25 20:31:34 2018 > 60.86% done, estimate finish Fri May 25 20:31:33 2018 >=== last message repeated 2 times. === > 60.87% done, estimate finish Fri May 25 20:31:33 2018 > 60.87% done, estimate finish Fri May 25 20:31:32 2018 > 60.88% done, estimate finish Fri May 25 20:31:32 2018 > 60.88% done, estimate finish Fri May 25 20:31:33 2018 >=== last message repeated 2 times. === > 60.89% done, estimate finish Fri May 25 20:31:32 2018 >=== last message repeated 2 times. === > 60.90% done, estimate finish Fri May 25 20:31:32 2018 > 60.90% done, estimate finish Fri May 25 20:31:31 2018 > 60.90% done, estimate finish Fri May 25 20:31:33 2018 > 60.91% done, estimate finish Fri May 25 20:31:32 2018 >=== last message repeated 2 times. === > 60.92% done, estimate finish Fri May 25 20:31:31 2018 >=== last message repeated 2 times. === > 60.93% done, estimate finish Fri May 25 20:31:31 2018 > 60.93% done, estimate finish Fri May 25 20:31:30 2018 > 60.93% done, estimate finish Fri May 25 20:31:32 2018 > 60.94% done, estimate finish Fri May 25 20:31:31 2018 >=== last message repeated 2 times. === > 60.95% done, estimate finish Fri May 25 20:31:31 2018 > 60.95% done, estimate finish Fri May 25 20:31:30 2018 >=== last message repeated 2 times. === > 60.96% done, estimate finish Fri May 25 20:31:31 2018 >=== last message repeated 2 times. === > 60.97% done, estimate finish Fri May 25 20:31:30 2018 >=== last message repeated 3 times. === > 60.98% done, estimate finish Fri May 25 20:31:29 2018 > 60.98% done, estimate finish Fri May 25 20:31:31 2018 > 60.99% done, estimate finish Fri May 25 20:31:30 2018 >=== last message repeated 2 times. === > 60.99% done, estimate finish Fri May 25 20:31:29 2018 > 61.00% done, estimate finish Fri May 25 20:31:29 2018 >=== last message repeated 2 times. === > 61.01% done, estimate finish Fri May 25 20:31:30 2018 >=== last message repeated 2 times. === > 61.02% done, estimate finish Fri May 25 20:31:29 2018 >=== last message repeated 3 times. === > 61.03% done, estimate finish Fri May 25 20:31:28 2018 >=== last message repeated 2 times. === > 61.04% done, estimate finish Fri May 25 20:31:29 2018 >=== last message repeated 2 times. === > 61.04% done, estimate finish Fri May 25 20:31:28 2018 > 61.05% done, estimate finish Fri May 25 20:31:28 2018 >=== last message repeated 2 times. === > 61.06% done, estimate finish Fri May 25 20:31:27 2018 > 61.06% done, estimate finish Fri May 25 20:31:28 2018 >=== last message repeated 2 times. === > 61.07% done, estimate finish Fri May 25 20:31:28 2018 > 61.07% done, estimate finish Fri May 25 20:31:27 2018 > 61.08% done, estimate finish Fri May 25 20:31:27 2018 >=== last message repeated 2 times. === > 61.08% done, estimate finish Fri May 25 20:31:28 2018 > 61.09% done, estimate finish Fri May 25 20:31:28 2018 > 61.09% done, estimate finish Fri May 25 20:31:27 2018 > 61.10% done, estimate finish Fri May 25 20:31:27 2018 > 61.10% done, estimate finish Fri May 25 20:31:26 2018 > 61.11% done, estimate finish Fri May 25 20:31:26 2018 > 61.11% done, estimate finish Fri May 25 20:31:27 2018 >=== last message repeated 2 times. === > 61.12% done, estimate finish Fri May 25 20:31:27 2018 > 61.12% done, estimate finish Fri May 25 20:31:26 2018 > 61.13% done, estimate finish Fri May 25 20:31:26 2018 >=== last message repeated 2 times. === > 61.13% done, estimate finish Fri May 25 20:31:27 2018 > 61.14% done, estimate finish Fri May 25 20:31:26 2018 >=== last message repeated 2 times. === > 61.15% done, estimate finish Fri May 25 20:31:26 2018 > 61.15% done, estimate finish Fri May 25 20:31:25 2018 >=== last message repeated 2 times. === > 61.16% done, estimate finish Fri May 25 20:31:26 2018 >=== last message repeated 2 times. === > 61.17% done, estimate finish Fri May 25 20:31:26 2018 > 61.17% done, estimate finish Fri May 25 20:31:25 2018 > 61.18% done, estimate finish Fri May 25 20:31:25 2018 > 61.18% done, estimate finish Fri May 25 20:31:24 2018 > 61.18% done, estimate finish Fri May 25 20:31:26 2018 > 61.19% done, estimate finish Fri May 25 20:31:25 2018 >=== last message repeated 2 times. === > 61.20% done, estimate finish Fri May 25 20:31:25 2018 > 61.20% done, estimate finish Fri May 25 20:31:24 2018 >=== last message repeated 2 times. === > 61.21% done, estimate finish Fri May 25 20:31:24 2018 > 61.21% done, estimate finish Fri May 25 20:31:25 2018 > 61.22% done, estimate finish Fri May 25 20:31:24 2018 >=== last message repeated 3 times. === > 61.23% done, estimate finish Fri May 25 20:31:23 2018 >=== last message repeated 2 times. === > 61.24% done, estimate finish Fri May 25 20:31:24 2018 >=== last message repeated 3 times. === > 61.25% done, estimate finish Fri May 25 20:31:23 2018 >=== last message repeated 2 times. === > 61.26% done, estimate finish Fri May 25 20:31:22 2018 > 61.26% done, estimate finish Fri May 25 20:31:24 2018 > 61.27% done, estimate finish Fri May 25 20:31:23 2018 >=== last message repeated 3 times. === > 61.28% done, estimate finish Fri May 25 20:31:22 2018 >=== last message repeated 2 times. === > 61.29% done, estimate finish Fri May 25 20:31:22 2018 > 61.29% done, estimate finish Fri May 25 20:31:23 2018 > 61.29% done, estimate finish Fri May 25 20:31:22 2018 > 61.30% done, estimate finish Fri May 25 20:31:22 2018 >=== last message repeated 2 times. === > 61.31% done, estimate finish Fri May 25 20:31:21 2018 >=== last message repeated 2 times. === > 61.31% done, estimate finish Fri May 25 20:31:22 2018 > 61.32% done, estimate finish Fri May 25 20:31:22 2018 > 61.32% done, estimate finish Fri May 25 20:31:21 2018 > 61.33% done, estimate finish Fri May 25 20:31:21 2018 >=== last message repeated 2 times. === > 61.33% done, estimate finish Fri May 25 20:31:20 2018 > 61.34% done, estimate finish Fri May 25 20:31:22 2018 > 61.34% done, estimate finish Fri May 25 20:31:21 2018 > 61.35% done, estimate finish Fri May 25 20:31:21 2018 >=== last message repeated 2 times. === > 61.36% done, estimate finish Fri May 25 20:31:20 2018 >=== last message repeated 2 times. === > 61.36% done, estimate finish Fri May 25 20:31:21 2018 > 61.37% done, estimate finish Fri May 25 20:31:21 2018 > 61.37% done, estimate finish Fri May 25 20:31:20 2018 > 61.38% done, estimate finish Fri May 25 20:31:20 2018 >=== last message repeated 2 times. === > 61.38% done, estimate finish Fri May 25 20:31:19 2018 > 61.39% done, estimate finish Fri May 25 20:31:19 2018 > 61.39% done, estimate finish Fri May 25 20:31:20 2018 > 61.40% done, estimate finish Fri May 25 20:31:20 2018 > 61.40% done, estimate finish Fri May 25 20:31:19 2018 >=== last message repeated 2 times. === > 61.41% done, estimate finish Fri May 25 20:31:19 2018 > 61.41% done, estimate finish Fri May 25 20:31:18 2018 > 61.42% done, estimate finish Fri May 25 20:31:20 2018 > 61.42% done, estimate finish Fri May 25 20:31:19 2018 >=== last message repeated 2 times. === > 61.43% done, estimate finish Fri May 25 20:31:19 2018 > 61.43% done, estimate finish Fri May 25 20:31:18 2018 > 61.44% done, estimate finish Fri May 25 20:31:18 2018 > 61.44% done, estimate finish Fri May 25 20:31:19 2018 > 61.45% done, estimate finish Fri May 25 20:31:19 2018 > 61.45% done, estimate finish Fri May 25 20:31:18 2018 >=== last message repeated 2 times. === > 61.46% done, estimate finish Fri May 25 20:31:18 2018 > 61.46% done, estimate finish Fri May 25 20:31:17 2018 > 61.47% done, estimate finish Fri May 25 20:31:19 2018 > 61.47% done, estimate finish Fri May 25 20:31:18 2018 >=== last message repeated 2 times. === > 61.48% done, estimate finish Fri May 25 20:31:17 2018 >=== last message repeated 2 times. === > 61.49% done, estimate finish Fri May 25 20:31:17 2018 > 61.49% done, estimate finish Fri May 25 20:31:16 2018 > 61.49% done, estimate finish Fri May 25 20:31:18 2018 > 61.50% done, estimate finish Fri May 25 20:31:17 2018 >=== last message repeated 2 times. === > 61.51% done, estimate finish Fri May 25 20:31:17 2018 > 61.51% done, estimate finish Fri May 25 20:31:16 2018 >=== last message repeated 2 times. === > 61.52% done, estimate finish Fri May 25 20:31:17 2018 >=== last message repeated 2 times. === > 61.53% done, estimate finish Fri May 25 20:31:16 2018 >=== last message repeated 2 times. === > 61.54% done, estimate finish Fri May 25 20:31:16 2018 > 61.54% done, estimate finish Fri May 25 20:31:15 2018 > 61.54% done, estimate finish Fri May 25 20:31:17 2018 > 61.55% done, estimate finish Fri May 25 20:31:16 2018 >=== last message repeated 2 times. === > 61.56% done, estimate finish Fri May 25 20:31:15 2018 >=== last message repeated 3 times. === > 61.57% done, estimate finish Fri May 25 20:31:16 2018 >=== last message repeated 2 times. === > 61.58% done, estimate finish Fri May 25 20:31:15 2018 >=== last message repeated 3 times. === > 61.59% done, estimate finish Fri May 25 20:31:14 2018 >=== last message repeated 2 times. === > 61.60% done, estimate finish Fri May 25 20:31:15 2018 >=== last message repeated 2 times. === > 61.61% done, estimate finish Fri May 25 20:31:14 2018 >=== last message repeated 3 times. === > 61.62% done, estimate finish Fri May 25 20:31:13 2018 > 61.62% done, estimate finish Fri May 25 20:31:15 2018 > 61.63% done, estimate finish Fri May 25 20:31:14 2018 >=== last message repeated 2 times. === > 61.63% done, estimate finish Fri May 25 20:31:13 2018 > 61.64% done, estimate finish Fri May 25 20:31:13 2018 >=== last message repeated 2 times. === > 61.65% done, estimate finish Fri May 25 20:31:14 2018 >=== last message repeated 2 times. === > 61.65% done, estimate finish Fri May 25 20:31:13 2018 > 61.66% done, estimate finish Fri May 25 20:31:13 2018 >=== last message repeated 2 times. === > 61.67% done, estimate finish Fri May 25 20:31:12 2018 >=== last message repeated 2 times. === > 61.67% done, estimate finish Fri May 25 20:31:13 2018 > 61.68% done, estimate finish Fri May 25 20:31:13 2018 > 61.68% done, estimate finish Fri May 25 20:31:12 2018 > 61.69% done, estimate finish Fri May 25 20:31:12 2018 >=== last message repeated 2 times. === > 61.70% done, estimate finish Fri May 25 20:31:11 2018 > 61.70% done, estimate finish Fri May 25 20:31:13 2018 > 61.70% done, estimate finish Fri May 25 20:31:12 2018 > 61.71% done, estimate finish Fri May 25 20:31:12 2018 > 61.71% done, estimate finish Fri May 25 20:31:11 2018 > 61.72% done, estimate finish Fri May 25 20:31:11 2018 >=== last message repeated 2 times. === > 61.72% done, estimate finish Fri May 25 20:31:12 2018 > 61.73% done, estimate finish Fri May 25 20:31:12 2018 > 61.73% done, estimate finish Fri May 25 20:31:11 2018 > 61.74% done, estimate finish Fri May 25 20:31:11 2018 >=== last message repeated 2 times. === > 61.74% done, estimate finish Fri May 25 20:31:10 2018 > 61.75% done, estimate finish Fri May 25 20:31:11 2018 >=== last message repeated 2 times. === > 61.76% done, estimate finish Fri May 25 20:31:11 2018 > 61.76% done, estimate finish Fri May 25 20:31:10 2018 >=== last message repeated 2 times. === > 61.77% done, estimate finish Fri May 25 20:31:10 2018 > 61.77% done, estimate finish Fri May 25 20:31:09 2018 > 61.78% done, estimate finish Fri May 25 20:31:11 2018 > 61.78% done, estimate finish Fri May 25 20:31:10 2018 > 61.79% done, estimate finish Fri May 25 20:31:10 2018 > 61.79% done, estimate finish Fri May 25 20:31:09 2018 >=== last message repeated 2 times. === > 61.80% done, estimate finish Fri May 25 20:31:09 2018 > 61.80% done, estimate finish Fri May 25 20:31:10 2018 > 61.81% done, estimate finish Fri May 25 20:31:10 2018 > 61.81% done, estimate finish Fri May 25 20:31:09 2018 >=== last message repeated 2 times. === > 61.82% done, estimate finish Fri May 25 20:31:09 2018 > 61.82% done, estimate finish Fri May 25 20:31:08 2018 > 61.83% done, estimate finish Fri May 25 20:31:09 2018 >=== last message repeated 3 times. === > 61.84% done, estimate finish Fri May 25 20:31:08 2018 >=== last message repeated 2 times. === > 61.85% done, estimate finish Fri May 25 20:31:08 2018 > 61.85% done, estimate finish Fri May 25 20:31:07 2018 > 61.85% done, estimate finish Fri May 25 20:31:09 2018 > 61.86% done, estimate finish Fri May 25 20:31:08 2018 >=== last message repeated 2 times. === > 61.87% done, estimate finish Fri May 25 20:31:07 2018 >=== last message repeated 2 times. === > 61.88% done, estimate finish Fri May 25 20:31:07 2018 > 61.88% done, estimate finish Fri May 25 20:31:08 2018 >=== last message repeated 2 times. === > 61.89% done, estimate finish Fri May 25 20:31:07 2018 >=== last message repeated 2 times. === > 61.90% done, estimate finish Fri May 25 20:31:07 2018 > 61.90% done, estimate finish Fri May 25 20:31:06 2018 > 61.90% done, estimate finish Fri May 25 20:31:07 2018 > 61.91% done, estimate finish Fri May 25 20:31:07 2018 >=== last message repeated 2 times. === > 61.92% done, estimate finish Fri May 25 20:31:06 2018 >=== last message repeated 3 times. === > 61.93% done, estimate finish Fri May 25 20:31:07 2018 >=== last message repeated 2 times. === > 61.94% done, estimate finish Fri May 25 20:31:06 2018 >=== last message repeated 2 times. === > 61.95% done, estimate finish Fri May 25 20:31:06 2018 > 61.95% done, estimate finish Fri May 25 20:31:05 2018 >=== last message repeated 2 times. === > 61.96% done, estimate finish Fri May 25 20:31:06 2018 >=== last message repeated 2 times. === > 61.97% done, estimate finish Fri May 25 20:31:05 2018 >=== last message repeated 3 times. === > 61.98% done, estimate finish Fri May 25 20:31:04 2018 > 61.98% done, estimate finish Fri May 25 20:31:06 2018 > 61.99% done, estimate finish Fri May 25 20:31:05 2018 >=== last message repeated 2 times. === > 61.99% done, estimate finish Fri May 25 20:31:04 2018 > 62.00% done, estimate finish Fri May 25 20:31:04 2018 >=== last message repeated 2 times. === > 62.01% done, estimate finish Fri May 25 20:31:05 2018 >=== last message repeated 2 times. === > 62.01% done, estimate finish Fri May 25 20:31:04 2018 > 62.02% done, estimate finish Fri May 25 20:31:04 2018 >=== last message repeated 2 times. === > 62.03% done, estimate finish Fri May 25 20:31:03 2018 > 62.03% done, estimate finish Fri May 25 20:31:04 2018 > 62.04% done, estimate finish Fri May 25 20:31:04 2018 >=== last message repeated 2 times. === > 62.04% done, estimate finish Fri May 25 20:31:03 2018 > 62.05% done, estimate finish Fri May 25 20:31:03 2018 >=== last message repeated 2 times. === > 62.06% done, estimate finish Fri May 25 20:31:02 2018 > 62.06% done, estimate finish Fri May 25 20:31:04 2018 > 62.06% done, estimate finish Fri May 25 20:31:03 2018 > 62.07% done, estimate finish Fri May 25 20:31:03 2018 > 62.07% done, estimate finish Fri May 25 20:31:02 2018 > 62.08% done, estimate finish Fri May 25 20:31:02 2018 >=== last message repeated 2 times. === > 62.08% done, estimate finish Fri May 25 20:31:03 2018 > 62.09% done, estimate finish Fri May 25 20:31:03 2018 > 62.09% done, estimate finish Fri May 25 20:31:02 2018 > 62.10% done, estimate finish Fri May 25 20:31:02 2018 >=== last message repeated 2 times. === > 62.10% done, estimate finish Fri May 25 20:31:01 2018 > 62.11% done, estimate finish Fri May 25 20:31:02 2018 >=== last message repeated 2 times. === > 62.12% done, estimate finish Fri May 25 20:31:02 2018 > 62.12% done, estimate finish Fri May 25 20:31:01 2018 > 62.13% done, estimate finish Fri May 25 20:31:01 2018 >=== last message repeated 2 times. === > 62.13% done, estimate finish Fri May 25 20:31:02 2018 > 62.14% done, estimate finish Fri May 25 20:31:02 2018 > 62.14% done, estimate finish Fri May 25 20:31:01 2018 > 62.15% done, estimate finish Fri May 25 20:31:01 2018 > 62.15% done, estimate finish Fri May 25 20:31:00 2018 >=== last message repeated 2 times. === > 62.16% done, estimate finish Fri May 25 20:31:00 2018 > 62.16% done, estimate finish Fri May 25 20:31:01 2018 > 62.17% done, estimate finish Fri May 25 20:31:01 2018 > 62.17% done, estimate finish Fri May 25 20:31:00 2018 >=== last message repeated 2 times. === > 62.18% done, estimate finish Fri May 25 20:31:00 2018 > 62.18% done, estimate finish Fri May 25 20:30:59 2018 > 62.19% done, estimate finish Fri May 25 20:31:00 2018 >=== last message repeated 3 times. === > 62.20% done, estimate finish Fri May 25 20:30:59 2018 >=== last message repeated 2 times. === > 62.21% done, estimate finish Fri May 25 20:30:59 2018 > 62.21% done, estimate finish Fri May 25 20:31:00 2018 > 62.22% done, estimate finish Fri May 25 20:31:00 2018 > 62.22% done, estimate finish Fri May 25 20:30:59 2018 >=== last message repeated 2 times. === > 62.23% done, estimate finish Fri May 25 20:30:59 2018 > 62.23% done, estimate finish Fri May 25 20:30:58 2018 > 62.24% done, estimate finish Fri May 25 20:30:58 2018 > 62.24% done, estimate finish Fri May 25 20:30:59 2018 >=== last message repeated 2 times. === > 62.25% done, estimate finish Fri May 25 20:30:58 2018 >=== last message repeated 2 times. === > 62.26% done, estimate finish Fri May 25 20:30:58 2018 > 62.26% done, estimate finish Fri May 25 20:30:57 2018 > 62.26% done, estimate finish Fri May 25 20:30:59 2018 > 62.27% done, estimate finish Fri May 25 20:30:58 2018 >=== last message repeated 2 times. === > 62.28% done, estimate finish Fri May 25 20:30:57 2018 >=== last message repeated 3 times. === > 62.29% done, estimate finish Fri May 25 20:30:58 2018 >=== last message repeated 2 times. === > 62.30% done, estimate finish Fri May 25 20:30:57 2018 >=== last message repeated 2 times. === > 62.31% done, estimate finish Fri May 25 20:30:57 2018 > 62.31% done, estimate finish Fri May 25 20:30:56 2018 > 62.31% done, estimate finish Fri May 25 20:30:57 2018 > 62.32% done, estimate finish Fri May 25 20:30:57 2018 >=== last message repeated 2 times. === > 62.33% done, estimate finish Fri May 25 20:30:56 2018 >=== last message repeated 3 times. === > 62.34% done, estimate finish Fri May 25 20:30:55 2018 > 62.34% done, estimate finish Fri May 25 20:30:57 2018 > 62.35% done, estimate finish Fri May 25 20:30:56 2018 >=== last message repeated 3 times. === > 62.36% done, estimate finish Fri May 25 20:30:55 2018 >=== last message repeated 2 times. === > 62.37% done, estimate finish Fri May 25 20:30:56 2018 >=== last message repeated 2 times. === > 62.38% done, estimate finish Fri May 25 20:30:55 2018 >=== last message repeated 3 times. === > 62.39% done, estimate finish Fri May 25 20:30:54 2018 > 62.39% done, estimate finish Fri May 25 20:30:56 2018 > 62.40% done, estimate finish Fri May 25 20:30:55 2018 >=== last message repeated 2 times. === > 62.40% done, estimate finish Fri May 25 20:30:54 2018 > 62.41% done, estimate finish Fri May 25 20:30:54 2018 >=== last message repeated 2 times. === > 62.42% done, estimate finish Fri May 25 20:30:55 2018 >=== last message repeated 2 times. === > 62.42% done, estimate finish Fri May 25 20:30:54 2018 > 62.43% done, estimate finish Fri May 25 20:30:54 2018 >=== last message repeated 2 times. === > 62.44% done, estimate finish Fri May 25 20:30:53 2018 >=== last message repeated 2 times. === > 62.44% done, estimate finish Fri May 25 20:30:54 2018 > 62.45% done, estimate finish Fri May 25 20:30:54 2018 > 62.45% done, estimate finish Fri May 25 20:30:53 2018 > 62.46% done, estimate finish Fri May 25 20:30:53 2018 >=== last message repeated 2 times. === > 62.47% done, estimate finish Fri May 25 20:30:52 2018 > 62.47% done, estimate finish Fri May 25 20:30:54 2018 > 62.47% done, estimate finish Fri May 25 20:30:53 2018 > 62.48% done, estimate finish Fri May 25 20:30:53 2018 > 62.48% done, estimate finish Fri May 25 20:30:52 2018 > 62.49% done, estimate finish Fri May 25 20:30:52 2018 >=== last message repeated 2 times. === > 62.49% done, estimate finish Fri May 25 20:30:53 2018 > 62.50% done, estimate finish Fri May 25 20:30:53 2018 > 62.50% done, estimate finish Fri May 25 20:30:52 2018 > 62.51% done, estimate finish Fri May 25 20:30:52 2018 >=== last message repeated 2 times. === > 62.51% done, estimate finish Fri May 25 20:30:51 2018 > 62.52% done, estimate finish Fri May 25 20:30:51 2018 > 62.52% done, estimate finish Fri May 25 20:30:52 2018 > 62.53% done, estimate finish Fri May 25 20:30:52 2018 > 62.53% done, estimate finish Fri May 25 20:30:51 2018 >=== last message repeated 2 times. === > 62.54% done, estimate finish Fri May 25 20:30:51 2018 > 62.54% done, estimate finish Fri May 25 20:30:50 2018 > 62.55% done, estimate finish Fri May 25 20:30:52 2018 > 62.55% done, estimate finish Fri May 25 20:30:51 2018 > 62.56% done, estimate finish Fri May 25 20:30:51 2018 >=== last message repeated 2 times. === > 62.56% done, estimate finish Fri May 25 20:30:50 2018 > 62.57% done, estimate finish Fri May 25 20:30:50 2018 > 62.57% done, estimate finish Fri May 25 20:30:51 2018 > 62.58% done, estimate finish Fri May 25 20:30:51 2018 > 62.58% done, estimate finish Fri May 25 20:30:50 2018 >=== last message repeated 2 times. === > 62.59% done, estimate finish Fri May 25 20:30:50 2018 > 62.59% done, estimate finish Fri May 25 20:30:49 2018 > 62.60% done, estimate finish Fri May 25 20:30:51 2018 > 62.60% done, estimate finish Fri May 25 20:30:50 2018 >=== last message repeated 2 times. === > 62.61% done, estimate finish Fri May 25 20:30:49 2018 >=== last message repeated 2 times. === > 62.62% done, estimate finish Fri May 25 20:30:49 2018 > 62.62% done, estimate finish Fri May 25 20:30:48 2018 > 62.62% done, estimate finish Fri May 25 20:30:50 2018 > 62.63% done, estimate finish Fri May 25 20:30:49 2018 >=== last message repeated 2 times. === > 62.64% done, estimate finish Fri May 25 20:30:49 2018 > 62.64% done, estimate finish Fri May 25 20:30:48 2018 > 62.65% done, estimate finish Fri May 25 20:30:48 2018 > 62.65% done, estimate finish Fri May 25 20:30:49 2018 >=== last message repeated 2 times. === > 62.66% done, estimate finish Fri May 25 20:30:48 2018 >=== last message repeated 2 times. === > 62.67% done, estimate finish Fri May 25 20:30:48 2018 > 62.67% done, estimate finish Fri May 25 20:30:47 2018 > 62.67% done, estimate finish Fri May 25 20:30:49 2018 > 62.68% done, estimate finish Fri May 25 20:30:48 2018 >=== last message repeated 2 times. === > 62.69% done, estimate finish Fri May 25 20:30:48 2018 > 62.69% done, estimate finish Fri May 25 20:30:47 2018 >=== last message repeated 2 times. === > 62.70% done, estimate finish Fri May 25 20:30:48 2018 >=== last message repeated 2 times. === > 62.71% done, estimate finish Fri May 25 20:30:47 2018 >=== last message repeated 2 times. === > 62.72% done, estimate finish Fri May 25 20:30:47 2018 > 62.72% done, estimate finish Fri May 25 20:30:46 2018 >=== last message repeated 2 times. === > 62.73% done, estimate finish Fri May 25 20:30:47 2018 >=== last message repeated 2 times. === > 62.74% done, estimate finish Fri May 25 20:30:47 2018 > 62.74% done, estimate finish Fri May 25 20:30:46 2018 >=== last message repeated 2 times. === > 62.75% done, estimate finish Fri May 25 20:30:45 2018 > 62.75% done, estimate finish Fri May 25 20:30:47 2018 > 62.76% done, estimate finish Fri May 25 20:30:46 2018 >=== last message repeated 3 times. === > 62.77% done, estimate finish Fri May 25 20:30:45 2018 >=== last message repeated 2 times. === > 62.78% done, estimate finish Fri May 25 20:30:46 2018 >=== last message repeated 2 times. === > 62.78% done, estimate finish Fri May 25 20:30:45 2018 > 62.79% done, estimate finish Fri May 25 20:30:45 2018 >=== last message repeated 2 times. === > 62.80% done, estimate finish Fri May 25 20:30:44 2018 >=== last message repeated 2 times. === > 62.81% done, estimate finish Fri May 25 20:30:45 2018 >=== last message repeated 3 times. === > 62.82% done, estimate finish Fri May 25 20:30:44 2018 >=== last message repeated 2 times. === > 62.83% done, estimate finish Fri May 25 20:30:44 2018 > 62.83% done, estimate finish Fri May 25 20:30:45 2018 > 62.83% done, estimate finish Fri May 25 20:30:44 2018 > 62.84% done, estimate finish Fri May 25 20:30:44 2018 >=== last message repeated 2 times. === > 62.85% done, estimate finish Fri May 25 20:30:43 2018 >=== last message repeated 2 times. === > 62.85% done, estimate finish Fri May 25 20:30:44 2018 > 62.86% done, estimate finish Fri May 25 20:30:44 2018 >=== last message repeated 2 times. === > 62.87% done, estimate finish Fri May 25 20:30:43 2018 >=== last message repeated 2 times. === > 62.87% done, estimate finish Fri May 25 20:30:42 2018 > 62.88% done, estimate finish Fri May 25 20:30:44 2018 > 62.88% done, estimate finish Fri May 25 20:30:43 2018 > 62.89% done, estimate finish Fri May 25 20:30:43 2018 >=== last message repeated 2 times. === > 62.90% done, estimate finish Fri May 25 20:30:42 2018 >=== last message repeated 3 times. === > 62.91% done, estimate finish Fri May 25 20:30:43 2018 > 62.91% done, estimate finish Fri May 25 20:30:42 2018 > 62.92% done, estimate finish Fri May 25 20:30:42 2018 >=== last message repeated 2 times. === > 62.92% done, estimate finish Fri May 25 20:30:41 2018 > 62.93% done, estimate finish Fri May 25 20:30:41 2018 > 62.93% done, estimate finish Fri May 25 20:30:42 2018 > 62.94% done, estimate finish Fri May 25 20:30:42 2018 >=== last message repeated 2 times. === > 62.94% done, estimate finish Fri May 25 20:30:41 2018 > 62.95% done, estimate finish Fri May 25 20:30:41 2018 >=== last message repeated 2 times. === > 62.96% done, estimate finish Fri May 25 20:30:42 2018 > 62.96% done, estimate finish Fri May 25 20:30:41 2018 >=== last message repeated 2 times. === > 62.97% done, estimate finish Fri May 25 20:30:41 2018 > 62.97% done, estimate finish Fri May 25 20:30:40 2018 > 62.98% done, estimate finish Fri May 25 20:30:40 2018 > 62.98% done, estimate finish Fri May 25 20:30:41 2018 > 62.99% done, estimate finish Fri May 25 20:30:41 2018 >=== last message repeated 2 times. === > 62.99% done, estimate finish Fri May 25 20:30:40 2018 > 63.00% done, estimate finish Fri May 25 20:30:40 2018 >=== last message repeated 2 times. === > 63.01% done, estimate finish Fri May 25 20:30:39 2018 > 63.01% done, estimate finish Fri May 25 20:30:40 2018 >=== last message repeated 2 times. === > 63.02% done, estimate finish Fri May 25 20:30:40 2018 > 63.02% done, estimate finish Fri May 25 20:30:39 2018 > 63.03% done, estimate finish Fri May 25 20:30:39 2018 >=== last message repeated 2 times. === > 63.03% done, estimate finish Fri May 25 20:30:40 2018 > 63.04% done, estimate finish Fri May 25 20:30:40 2018 > 63.04% done, estimate finish Fri May 25 20:30:39 2018 > 63.05% done, estimate finish Fri May 25 20:30:39 2018 > 63.05% done, estimate finish Fri May 25 20:30:38 2018 > 63.06% done, estimate finish Fri May 25 20:30:38 2018 > 63.06% done, estimate finish Fri May 25 20:30:39 2018 >=== last message repeated 2 times. === > 63.07% done, estimate finish Fri May 25 20:30:39 2018 > 63.07% done, estimate finish Fri May 25 20:30:38 2018 > 63.08% done, estimate finish Fri May 25 20:30:38 2018 >=== last message repeated 2 times. === > 63.08% done, estimate finish Fri May 25 20:30:39 2018 > 63.09% done, estimate finish Fri May 25 20:30:38 2018 >=== last message repeated 2 times. === > 63.10% done, estimate finish Fri May 25 20:30:38 2018 > 63.10% done, estimate finish Fri May 25 20:30:37 2018 >=== last message repeated 2 times. === > 63.11% done, estimate finish Fri May 25 20:30:37 2018 > 63.11% done, estimate finish Fri May 25 20:30:38 2018 > 63.12% done, estimate finish Fri May 25 20:30:38 2018 > 63.12% done, estimate finish Fri May 25 20:30:37 2018 >=== last message repeated 2 times. === > 63.13% done, estimate finish Fri May 25 20:30:37 2018 > 63.13% done, estimate finish Fri May 25 20:30:36 2018 > 63.14% done, estimate finish Fri May 25 20:30:37 2018 >=== last message repeated 2 times. === > 63.15% done, estimate finish Fri May 25 20:30:37 2018 > 63.15% done, estimate finish Fri May 25 20:30:36 2018 >=== last message repeated 2 times. === > 63.16% done, estimate finish Fri May 25 20:30:36 2018 > 63.16% done, estimate finish Fri May 25 20:30:35 2018 > 63.17% done, estimate finish Fri May 25 20:30:37 2018 > 63.17% done, estimate finish Fri May 25 20:30:36 2018 >=== last message repeated 2 times. === > 63.18% done, estimate finish Fri May 25 20:30:36 2018 > 63.18% done, estimate finish Fri May 25 20:30:35 2018 > 63.19% done, estimate finish Fri May 25 20:30:35 2018 > 63.19% done, estimate finish Fri May 25 20:30:36 2018 >=== last message repeated 2 times. === > 63.20% done, estimate finish Fri May 25 20:30:35 2018 >=== last message repeated 2 times. === > 63.21% done, estimate finish Fri May 25 20:30:35 2018 > 63.21% done, estimate finish Fri May 25 20:30:34 2018 > 63.21% done, estimate finish Fri May 25 20:30:36 2018 > 63.22% done, estimate finish Fri May 25 20:30:35 2018 >=== last message repeated 2 times. === > 63.23% done, estimate finish Fri May 25 20:30:35 2018 > 63.23% done, estimate finish Fri May 25 20:30:34 2018 > 63.24% done, estimate finish Fri May 25 20:30:34 2018 > 63.24% done, estimate finish Fri May 25 20:30:33 2018 > 63.24% done, estimate finish Fri May 25 20:30:35 2018 > 63.25% done, estimate finish Fri May 25 20:30:34 2018 >=== last message repeated 2 times. === > 63.26% done, estimate finish Fri May 25 20:30:34 2018 > 63.26% done, estimate finish Fri May 25 20:30:33 2018 >=== last message repeated 2 times. === > 63.27% done, estimate finish Fri May 25 20:30:34 2018 >=== last message repeated 2 times. === > 63.28% done, estimate finish Fri May 25 20:30:33 2018 >=== last message repeated 3 times. === > 63.29% done, estimate finish Fri May 25 20:30:32 2018 > 63.29% done, estimate finish Fri May 25 20:30:34 2018 > 63.30% done, estimate finish Fri May 25 20:30:33 2018 >=== last message repeated 3 times. === > 63.31% done, estimate finish Fri May 25 20:30:32 2018 >=== last message repeated 2 times. === > 63.32% done, estimate finish Fri May 25 20:30:32 2018 > 63.32% done, estimate finish Fri May 25 20:30:33 2018 > 63.33% done, estimate finish Fri May 25 20:30:32 2018 >=== last message repeated 3 times. === > 63.34% done, estimate finish Fri May 25 20:30:31 2018 >=== last message repeated 2 times. === > 63.35% done, estimate finish Fri May 25 20:30:32 2018 >=== last message repeated 3 times. === > 63.36% done, estimate finish Fri May 25 20:30:31 2018 >=== last message repeated 2 times. === > 63.37% done, estimate finish Fri May 25 20:30:31 2018 > 63.37% done, estimate finish Fri May 25 20:30:32 2018 > 63.37% done, estimate finish Fri May 25 20:30:31 2018 > 63.38% done, estimate finish Fri May 25 20:30:31 2018 >=== last message repeated 2 times. === > 63.39% done, estimate finish Fri May 25 20:30:30 2018 >=== last message repeated 3 times. === > 63.40% done, estimate finish Fri May 25 20:30:31 2018 >=== last message repeated 2 times. === > 63.41% done, estimate finish Fri May 25 20:30:30 2018 >=== last message repeated 2 times. === > 63.42% done, estimate finish Fri May 25 20:30:30 2018 > 63.42% done, estimate finish Fri May 25 20:30:29 2018 > 63.42% done, estimate finish Fri May 25 20:30:30 2018 > 63.43% done, estimate finish Fri May 25 20:30:30 2018 >=== last message repeated 2 times. === > 63.44% done, estimate finish Fri May 25 20:30:29 2018 >=== last message repeated 3 times. === > 63.45% done, estimate finish Fri May 25 20:30:30 2018 >=== last message repeated 2 times. === > 63.46% done, estimate finish Fri May 25 20:30:29 2018 >=== last message repeated 2 times. === > 63.46% done, estimate finish Fri May 25 20:30:28 2018 > 63.47% done, estimate finish Fri May 25 20:30:28 2018 >=== last message repeated 2 times. === > 63.48% done, estimate finish Fri May 25 20:30:29 2018 >=== last message repeated 2 times. === > 63.48% done, estimate finish Fri May 25 20:30:28 2018 > 63.49% done, estimate finish Fri May 25 20:30:28 2018 >=== last message repeated 2 times. === > 63.50% done, estimate finish Fri May 25 20:30:27 2018 > 63.50% done, estimate finish Fri May 25 20:30:29 2018 > 63.51% done, estimate finish Fri May 25 20:30:28 2018 >=== last message repeated 2 times. === > 63.51% done, estimate finish Fri May 25 20:30:27 2018 > 63.52% done, estimate finish Fri May 25 20:30:27 2018 >=== last message repeated 2 times. === > 63.53% done, estimate finish Fri May 25 20:30:26 2018 > 63.53% done, estimate finish Fri May 25 20:30:28 2018 > 63.53% done, estimate finish Fri May 25 20:30:27 2018 > 63.54% done, estimate finish Fri May 25 20:30:27 2018 >=== last message repeated 2 times. === > 63.55% done, estimate finish Fri May 25 20:30:26 2018 >=== last message repeated 2 times. === > 63.55% done, estimate finish Fri May 25 20:30:27 2018 > 63.56% done, estimate finish Fri May 25 20:30:27 2018 > 63.56% done, estimate finish Fri May 25 20:30:26 2018 > 63.57% done, estimate finish Fri May 25 20:30:26 2018 >=== last message repeated 2 times. === > 63.58% done, estimate finish Fri May 25 20:30:25 2018 > 63.58% done, estimate finish Fri May 25 20:30:27 2018 > 63.58% done, estimate finish Fri May 25 20:30:26 2018 > 63.59% done, estimate finish Fri May 25 20:30:26 2018 >=== last message repeated 2 times. === > 63.60% done, estimate finish Fri May 25 20:30:25 2018 >=== last message repeated 3 times. === > 63.61% done, estimate finish Fri May 25 20:30:26 2018 > 63.61% done, estimate finish Fri May 25 20:30:25 2018 > 63.62% done, estimate finish Fri May 25 20:30:25 2018 >=== last message repeated 2 times. === > 63.62% done, estimate finish Fri May 25 20:30:24 2018 > 63.63% done, estimate finish Fri May 25 20:30:24 2018 > 63.63% done, estimate finish Fri May 25 20:30:25 2018 > 63.64% done, estimate finish Fri May 25 20:30:25 2018 >=== last message repeated 2 times. === > 63.64% done, estimate finish Fri May 25 20:30:24 2018 > 63.65% done, estimate finish Fri May 25 20:30:24 2018 >=== last message repeated 2 times. === > 63.66% done, estimate finish Fri May 25 20:30:25 2018 > 63.66% done, estimate finish Fri May 25 20:30:24 2018 > 63.67% done, estimate finish Fri May 25 20:30:24 2018 >=== last message repeated 2 times. === > 63.67% done, estimate finish Fri May 25 20:30:23 2018 > 63.68% done, estimate finish Fri May 25 20:30:23 2018 > 63.68% done, estimate finish Fri May 25 20:30:24 2018 > 63.69% done, estimate finish Fri May 25 20:30:24 2018 >=== last message repeated 2 times. === > 63.69% done, estimate finish Fri May 25 20:30:23 2018 > 63.70% done, estimate finish Fri May 25 20:30:23 2018 >=== last message repeated 2 times. === > 63.71% done, estimate finish Fri May 25 20:30:22 2018 > 63.71% done, estimate finish Fri May 25 20:30:23 2018 >=== last message repeated 2 times. === > 63.72% done, estimate finish Fri May 25 20:30:23 2018 > 63.72% done, estimate finish Fri May 25 20:30:22 2018 > 63.73% done, estimate finish Fri May 25 20:30:22 2018 >=== last message repeated 2 times. === > 63.73% done, estimate finish Fri May 25 20:30:23 2018 > 63.74% done, estimate finish Fri May 25 20:30:23 2018 > 63.74% done, estimate finish Fri May 25 20:30:22 2018 > 63.75% done, estimate finish Fri May 25 20:30:22 2018 > 63.75% done, estimate finish Fri May 25 20:30:21 2018 > 63.76% done, estimate finish Fri May 25 20:30:21 2018 > 63.76% done, estimate finish Fri May 25 20:30:22 2018 >=== last message repeated 2 times. === > 63.77% done, estimate finish Fri May 25 20:30:22 2018 > 63.77% done, estimate finish Fri May 25 20:30:21 2018 > 63.78% done, estimate finish Fri May 25 20:30:21 2018 >=== last message repeated 2 times. === > 63.78% done, estimate finish Fri May 25 20:30:20 2018 > 63.79% done, estimate finish Fri May 25 20:30:22 2018 > 63.79% done, estimate finish Fri May 25 20:30:21 2018 > 63.80% done, estimate finish Fri May 25 20:30:21 2018 > 63.80% done, estimate finish Fri May 25 20:30:20 2018 >=== last message repeated 2 times. === > 63.81% done, estimate finish Fri May 25 20:30:20 2018 > 63.81% done, estimate finish Fri May 25 20:30:21 2018 > 63.82% done, estimate finish Fri May 25 20:30:21 2018 > 63.82% done, estimate finish Fri May 25 20:30:20 2018 >=== last message repeated 2 times. === > 63.83% done, estimate finish Fri May 25 20:30:20 2018 > 63.83% done, estimate finish Fri May 25 20:30:19 2018 > 63.84% done, estimate finish Fri May 25 20:30:19 2018 > 63.84% done, estimate finish Fri May 25 20:30:20 2018 > 63.85% done, estimate finish Fri May 25 20:30:20 2018 > 63.85% done, estimate finish Fri May 25 20:30:19 2018 >=== last message repeated 2 times. === > 63.86% done, estimate finish Fri May 25 20:30:19 2018 > 63.86% done, estimate finish Fri May 25 20:30:18 2018 > 63.87% done, estimate finish Fri May 25 20:30:20 2018 > 63.87% done, estimate finish Fri May 25 20:30:19 2018 >=== last message repeated 2 times. === > 63.88% done, estimate finish Fri May 25 20:30:19 2018 > 63.88% done, estimate finish Fri May 25 20:30:18 2018 > 63.89% done, estimate finish Fri May 25 20:30:18 2018 > 63.89% done, estimate finish Fri May 25 20:30:19 2018 >=== last message repeated 2 times. === > 63.90% done, estimate finish Fri May 25 20:30:18 2018 >=== last message repeated 2 times. === > 63.91% done, estimate finish Fri May 25 20:30:18 2018 > 63.91% done, estimate finish Fri May 25 20:30:17 2018 > 63.92% done, estimate finish Fri May 25 20:30:17 2018 > 63.92% done, estimate finish Fri May 25 20:30:18 2018 >=== last message repeated 2 times. === > 63.93% done, estimate finish Fri May 25 20:30:18 2018 > 63.93% done, estimate finish Fri May 25 20:30:17 2018 > 63.94% done, estimate finish Fri May 25 20:30:17 2018 >=== last message repeated 2 times. === > 63.94% done, estimate finish Fri May 25 20:30:18 2018 > 63.95% done, estimate finish Fri May 25 20:30:17 2018 >=== last message repeated 2 times. === > 63.96% done, estimate finish Fri May 25 20:30:17 2018 > 63.96% done, estimate finish Fri May 25 20:30:16 2018 >=== last message repeated 2 times. === > 63.97% done, estimate finish Fri May 25 20:30:17 2018 >=== last message repeated 2 times. === > 63.98% done, estimate finish Fri May 25 20:30:17 2018 > 63.98% done, estimate finish Fri May 25 20:30:16 2018 >=== last message repeated 2 times. === > 63.99% done, estimate finish Fri May 25 20:30:16 2018 > 63.99% done, estimate finish Fri May 25 20:30:15 2018 > 64.00% done, estimate finish Fri May 25 20:30:16 2018 >=== last message repeated 2 times. === > 64.01% done, estimate finish Fri May 25 20:30:16 2018 > 64.01% done, estimate finish Fri May 25 20:30:15 2018 >=== last message repeated 2 times. === > 64.02% done, estimate finish Fri May 25 20:30:15 2018 > 64.02% done, estimate finish Fri May 25 20:30:16 2018 > 64.03% done, estimate finish Fri May 25 20:30:16 2018 > 64.03% done, estimate finish Fri May 25 20:30:15 2018 >=== last message repeated 2 times. === > 64.04% done, estimate finish Fri May 25 20:30:15 2018 > 64.04% done, estimate finish Fri May 25 20:30:14 2018 > 64.05% done, estimate finish Fri May 25 20:30:15 2018 >=== last message repeated 3 times. === > 64.06% done, estimate finish Fri May 25 20:30:14 2018 >=== last message repeated 2 times. === > 64.07% done, estimate finish Fri May 25 20:30:14 2018 > 64.07% done, estimate finish Fri May 25 20:30:13 2018 > 64.07% done, estimate finish Fri May 25 20:30:15 2018 > 64.08% done, estimate finish Fri May 25 20:30:14 2018 >=== last message repeated 2 times. === > 64.09% done, estimate finish Fri May 25 20:30:14 2018 > 64.09% done, estimate finish Fri May 25 20:30:13 2018 > 64.10% done, estimate finish Fri May 25 20:30:13 2018 > 64.10% done, estimate finish Fri May 25 20:30:14 2018 >=== last message repeated 2 times. === > 64.11% done, estimate finish Fri May 25 20:30:13 2018 >=== last message repeated 2 times. === > 64.12% done, estimate finish Fri May 25 20:30:13 2018 > 64.12% done, estimate finish Fri May 25 20:30:12 2018 >=== last message repeated 2 times. === > 64.13% done, estimate finish Fri May 25 20:30:13 2018 >=== last message repeated 2 times. === > 64.14% done, estimate finish Fri May 25 20:30:13 2018 > 64.14% done, estimate finish Fri May 25 20:30:12 2018 >=== last message repeated 2 times. === > 64.15% done, estimate finish Fri May 25 20:30:12 2018 > 64.15% done, estimate finish Fri May 25 20:30:13 2018 > 64.16% done, estimate finish Fri May 25 20:30:12 2018 >=== last message repeated 3 times. === > 64.17% done, estimate finish Fri May 25 20:30:11 2018 >=== last message repeated 2 times. === > 64.18% done, estimate finish Fri May 25 20:30:12 2018 >=== last message repeated 2 times. === > 64.19% done, estimate finish Fri May 25 20:30:12 2018 > 64.19% done, estimate finish Fri May 25 20:30:11 2018 >=== last message repeated 2 times. === > 64.20% done, estimate finish Fri May 25 20:30:11 2018 > 64.20% done, estimate finish Fri May 25 20:30:10 2018 > 64.21% done, estimate finish Fri May 25 20:30:11 2018 >=== last message repeated 3 times. === > 64.22% done, estimate finish Fri May 25 20:30:10 2018 >=== last message repeated 2 times. === > 64.23% done, estimate finish Fri May 25 20:30:10 2018 > 64.23% done, estimate finish Fri May 25 20:30:11 2018 >=== last message repeated 2 times. === > 64.24% done, estimate finish Fri May 25 20:30:10 2018 >=== last message repeated 2 times. === > 64.25% done, estimate finish Fri May 25 20:30:10 2018 > 64.25% done, estimate finish Fri May 25 20:30:09 2018 > 64.25% done, estimate finish Fri May 25 20:30:10 2018 > 64.26% done, estimate finish Fri May 25 20:30:10 2018 >=== last message repeated 2 times. === > 64.27% done, estimate finish Fri May 25 20:30:09 2018 >=== last message repeated 2 times. === > 64.28% done, estimate finish Fri May 25 20:30:09 2018 > 64.28% done, estimate finish Fri May 25 20:30:10 2018 >=== last message repeated 2 times. === > 64.29% done, estimate finish Fri May 25 20:30:09 2018 >=== last message repeated 2 times. === > 64.30% done, estimate finish Fri May 25 20:30:09 2018 > 64.30% done, estimate finish Fri May 25 20:30:08 2018 >=== last message repeated 2 times. === > 64.31% done, estimate finish Fri May 25 20:30:09 2018 >=== last message repeated 2 times. === > 64.32% done, estimate finish Fri May 25 20:30:08 2018 >=== last message repeated 3 times. === > 64.33% done, estimate finish Fri May 25 20:30:07 2018 > 64.33% done, estimate finish Fri May 25 20:30:09 2018 > 64.34% done, estimate finish Fri May 25 20:30:08 2018 >=== last message repeated 2 times. === > 64.35% done, estimate finish Fri May 25 20:30:08 2018 > 64.35% done, estimate finish Fri May 25 20:30:07 2018 >=== last message repeated 2 times. === > 64.36% done, estimate finish Fri May 25 20:30:08 2018 >=== last message repeated 2 times. === > 64.37% done, estimate finish Fri May 25 20:30:07 2018 >=== last message repeated 3 times. === > 64.38% done, estimate finish Fri May 25 20:30:06 2018 >=== last message repeated 2 times. === > 64.39% done, estimate finish Fri May 25 20:30:07 2018 >=== last message repeated 3 times. === > 64.40% done, estimate finish Fri May 25 20:30:06 2018 >=== last message repeated 2 times. === > 64.41% done, estimate finish Fri May 25 20:30:06 2018 > 64.41% done, estimate finish Fri May 25 20:30:07 2018 > 64.41% done, estimate finish Fri May 25 20:30:06 2018 > 64.42% done, estimate finish Fri May 25 20:30:06 2018 >=== last message repeated 2 times. === > 64.43% done, estimate finish Fri May 25 20:30:05 2018 >=== last message repeated 2 times. === > 64.44% done, estimate finish Fri May 25 20:30:05 2018 > 64.44% done, estimate finish Fri May 25 20:30:06 2018 >=== last message repeated 2 times. === > 64.45% done, estimate finish Fri May 25 20:30:05 2018 >=== last message repeated 2 times. === > 64.46% done, estimate finish Fri May 25 20:30:05 2018 > 64.46% done, estimate finish Fri May 25 20:30:04 2018 > 64.46% done, estimate finish Fri May 25 20:30:05 2018 > 64.47% done, estimate finish Fri May 25 20:30:05 2018 >=== last message repeated 2 times. === > 64.48% done, estimate finish Fri May 25 20:30:04 2018 >=== last message repeated 3 times. === > 64.49% done, estimate finish Fri May 25 20:30:05 2018 >=== last message repeated 2 times. === > 64.50% done, estimate finish Fri May 25 20:30:04 2018 >=== last message repeated 3 times. === > 64.51% done, estimate finish Fri May 25 20:30:03 2018 >=== last message repeated 2 times. === > 64.52% done, estimate finish Fri May 25 20:30:04 2018 >=== last message repeated 2 times. === > 64.53% done, estimate finish Fri May 25 20:30:03 2018 >=== last message repeated 3 times. === > 64.54% done, estimate finish Fri May 25 20:30:02 2018 > 64.54% done, estimate finish Fri May 25 20:30:04 2018 > 64.55% done, estimate finish Fri May 25 20:30:03 2018 >=== last message repeated 3 times. === > 64.56% done, estimate finish Fri May 25 20:30:02 2018 >=== last message repeated 2 times. === > 64.57% done, estimate finish Fri May 25 20:30:03 2018 >=== last message repeated 2 times. === > 64.57% done, estimate finish Fri May 25 20:30:02 2018 > 64.58% done, estimate finish Fri May 25 20:30:02 2018 >=== last message repeated 2 times. === > 64.59% done, estimate finish Fri May 25 20:30:01 2018 > 64.59% done, estimate finish Fri May 25 20:30:03 2018 > 64.59% done, estimate finish Fri May 25 20:30:02 2018 > 64.60% done, estimate finish Fri May 25 20:30:02 2018 > 64.60% done, estimate finish Fri May 25 20:30:03 2018 > 64.61% done, estimate finish Fri May 25 20:30:03 2018 > 64.61% done, estimate finish Fri May 25 20:30:02 2018 > 64.62% done, estimate finish Fri May 25 20:30:02 2018 >=== last message repeated 2 times. === > 64.62% done, estimate finish Fri May 25 20:30:01 2018 > 64.63% done, estimate finish Fri May 25 20:30:01 2018 >=== last message repeated 2 times. === > 64.64% done, estimate finish Fri May 25 20:30:00 2018 > 64.64% done, estimate finish Fri May 25 20:30:02 2018 > 64.64% done, estimate finish Fri May 25 20:30:01 2018 > 64.65% done, estimate finish Fri May 25 20:30:01 2018 >=== last message repeated 2 times. === > 64.66% done, estimate finish Fri May 25 20:30:00 2018 >=== last message repeated 2 times. === > 64.66% done, estimate finish Fri May 25 20:30:01 2018 > 64.67% done, estimate finish Fri May 25 20:30:01 2018 > 64.67% done, estimate finish Fri May 25 20:30:00 2018 > 64.68% done, estimate finish Fri May 25 20:30:00 2018 >=== last message repeated 2 times. === > 64.69% done, estimate finish Fri May 25 20:29:59 2018 > 64.69% done, estimate finish Fri May 25 20:30:01 2018 > 64.69% done, estimate finish Fri May 25 20:30:00 2018 > 64.70% done, estimate finish Fri May 25 20:30:00 2018 >=== last message repeated 2 times. === > 64.71% done, estimate finish Fri May 25 20:29:59 2018 >=== last message repeated 3 times. === > 64.72% done, estimate finish Fri May 25 20:30:00 2018 > 64.72% done, estimate finish Fri May 25 20:29:59 2018 > 64.73% done, estimate finish Fri May 25 20:29:59 2018 >=== last message repeated 2 times. === > 64.73% done, estimate finish Fri May 25 20:29:58 2018 > 64.74% done, estimate finish Fri May 25 20:30:00 2018 > 64.74% done, estimate finish Fri May 25 20:29:59 2018 > 64.75% done, estimate finish Fri May 25 20:29:59 2018 >=== last message repeated 2 times. === > 64.75% done, estimate finish Fri May 25 20:29:58 2018 > 64.76% done, estimate finish Fri May 25 20:29:58 2018 >=== last message repeated 2 times. === > 64.77% done, estimate finish Fri May 25 20:29:59 2018 > 64.77% done, estimate finish Fri May 25 20:29:58 2018 > 64.78% done, estimate finish Fri May 25 20:29:58 2018 >=== last message repeated 2 times. === > 64.78% done, estimate finish Fri May 25 20:29:57 2018 > 64.79% done, estimate finish Fri May 25 20:29:57 2018 > 64.79% done, estimate finish Fri May 25 20:29:58 2018 > 64.80% done, estimate finish Fri May 25 20:29:58 2018 >=== last message repeated 2 times. === > 64.80% done, estimate finish Fri May 25 20:29:57 2018 > 64.81% done, estimate finish Fri May 25 20:29:57 2018 >=== last message repeated 2 times. === > 64.82% done, estimate finish Fri May 25 20:29:56 2018 > 64.82% done, estimate finish Fri May 25 20:29:57 2018 >=== last message repeated 2 times. === > 64.83% done, estimate finish Fri May 25 20:29:57 2018 > 64.83% done, estimate finish Fri May 25 20:29:56 2018 > 64.84% done, estimate finish Fri May 25 20:29:56 2018 >=== last message repeated 2 times. === > 64.84% done, estimate finish Fri May 25 20:29:57 2018 > 64.85% done, estimate finish Fri May 25 20:29:57 2018 > 64.85% done, estimate finish Fri May 25 20:29:56 2018 > 64.86% done, estimate finish Fri May 25 20:29:56 2018 >=== last message repeated 2 times. === > 64.87% done, estimate finish Fri May 25 20:29:55 2018 >=== last message repeated 2 times. === > 64.87% done, estimate finish Fri May 25 20:29:56 2018 > 64.88% done, estimate finish Fri May 25 20:29:56 2018 > 64.88% done, estimate finish Fri May 25 20:29:55 2018 > 64.89% done, estimate finish Fri May 25 20:29:55 2018 >=== last message repeated 2 times. === > 64.89% done, estimate finish Fri May 25 20:29:54 2018 > 64.90% done, estimate finish Fri May 25 20:29:56 2018 > 64.90% done, estimate finish Fri May 25 20:29:55 2018 > 64.91% done, estimate finish Fri May 25 20:29:55 2018 >=== last message repeated 2 times. === > 64.91% done, estimate finish Fri May 25 20:29:54 2018 > 64.92% done, estimate finish Fri May 25 20:29:54 2018 > 64.92% done, estimate finish Fri May 25 20:29:55 2018 > 64.93% done, estimate finish Fri May 25 20:29:55 2018 >=== last message repeated 2 times. === > 64.93% done, estimate finish Fri May 25 20:29:54 2018 > 64.94% done, estimate finish Fri May 25 20:29:54 2018 > 64.94% done, estimate finish Fri May 25 20:29:53 2018 > 64.95% done, estimate finish Fri May 25 20:29:53 2018 > 64.95% done, estimate finish Fri May 25 20:29:54 2018 > 64.96% done, estimate finish Fri May 25 20:29:54 2018 >=== last message repeated 2 times. === > 64.96% done, estimate finish Fri May 25 20:29:53 2018 > 64.97% done, estimate finish Fri May 25 20:29:53 2018 >=== last message repeated 2 times. === > 64.98% done, estimate finish Fri May 25 20:29:54 2018 >=== last message repeated 2 times. === > 64.98% done, estimate finish Fri May 25 20:29:53 2018 > 64.99% done, estimate finish Fri May 25 20:29:53 2018 >=== last message repeated 2 times. === > 65.00% done, estimate finish Fri May 25 20:29:52 2018 > 65.00% done, estimate finish Fri May 25 20:29:53 2018 >=== last message repeated 2 times. === > 65.01% done, estimate finish Fri May 25 20:29:53 2018 > 65.01% done, estimate finish Fri May 25 20:29:52 2018 > 65.02% done, estimate finish Fri May 25 20:29:52 2018 >=== last message repeated 2 times. === > 65.03% done, estimate finish Fri May 25 20:29:53 2018 >=== last message repeated 2 times. === > 65.03% done, estimate finish Fri May 25 20:29:52 2018 > 65.04% done, estimate finish Fri May 25 20:29:52 2018 >=== last message repeated 2 times. === > 65.05% done, estimate finish Fri May 25 20:29:51 2018 >=== last message repeated 2 times. === > 65.05% done, estimate finish Fri May 25 20:29:52 2018 > 65.06% done, estimate finish Fri May 25 20:29:52 2018 > 65.06% done, estimate finish Fri May 25 20:29:51 2018 > 65.07% done, estimate finish Fri May 25 20:29:51 2018 >=== last message repeated 2 times. === > 65.07% done, estimate finish Fri May 25 20:29:50 2018 > 65.08% done, estimate finish Fri May 25 20:29:52 2018 > 65.08% done, estimate finish Fri May 25 20:29:51 2018 > 65.09% done, estimate finish Fri May 25 20:29:51 2018 >=== last message repeated 2 times. === > 65.09% done, estimate finish Fri May 25 20:29:50 2018 > 65.10% done, estimate finish Fri May 25 20:29:50 2018 > 65.10% done, estimate finish Fri May 25 20:29:51 2018 > 65.11% done, estimate finish Fri May 25 20:29:51 2018 > 65.11% done, estimate finish Fri May 25 20:29:50 2018 > 65.12% done, estimate finish Fri May 25 20:29:50 2018 >=== last message repeated 2 times. === > 65.12% done, estimate finish Fri May 25 20:29:49 2018 > 65.13% done, estimate finish Fri May 25 20:29:51 2018 > 65.13% done, estimate finish Fri May 25 20:29:50 2018 > 65.14% done, estimate finish Fri May 25 20:29:50 2018 >=== last message repeated 2 times. === > 65.14% done, estimate finish Fri May 25 20:29:49 2018 > 65.15% done, estimate finish Fri May 25 20:29:49 2018 >=== last message repeated 2 times. === > 65.16% done, estimate finish Fri May 25 20:29:50 2018 > 65.16% done, estimate finish Fri May 25 20:29:49 2018 >=== last message repeated 2 times. === > 65.17% done, estimate finish Fri May 25 20:29:49 2018 > 65.17% done, estimate finish Fri May 25 20:29:48 2018 > 65.18% done, estimate finish Fri May 25 20:29:48 2018 >=== last message repeated 2 times. === > 65.18% done, estimate finish Fri May 25 20:29:49 2018 > 65.19% done, estimate finish Fri May 25 20:29:49 2018 > 65.19% done, estimate finish Fri May 25 20:29:48 2018 > 65.20% done, estimate finish Fri May 25 20:29:48 2018 >=== last message repeated 2 times. === > 65.21% done, estimate finish Fri May 25 20:29:47 2018 > 65.21% done, estimate finish Fri May 25 20:29:48 2018 >=== last message repeated 2 times. === > 65.22% done, estimate finish Fri May 25 20:29:48 2018 > 65.22% done, estimate finish Fri May 25 20:29:47 2018 > 65.23% done, estimate finish Fri May 25 20:29:47 2018 >=== last message repeated 2 times. === > 65.23% done, estimate finish Fri May 25 20:29:48 2018 > 65.24% done, estimate finish Fri May 25 20:29:48 2018 > 65.24% done, estimate finish Fri May 25 20:29:47 2018 > 65.25% done, estimate finish Fri May 25 20:29:47 2018 >=== last message repeated 2 times. === > 65.25% done, estimate finish Fri May 25 20:29:46 2018 > 65.26% done, estimate finish Fri May 25 20:29:48 2018 > 65.26% done, estimate finish Fri May 25 20:29:47 2018 > 65.27% done, estimate finish Fri May 25 20:29:47 2018 >=== last message repeated 2 times. === > 65.27% done, estimate finish Fri May 25 20:29:46 2018 > 65.28% done, estimate finish Fri May 25 20:29:46 2018 >=== last message repeated 2 times. === > 65.29% done, estimate finish Fri May 25 20:29:47 2018 > 65.29% done, estimate finish Fri May 25 20:29:46 2018 > 65.30% done, estimate finish Fri May 25 20:29:46 2018 >=== last message repeated 2 times. === > 65.30% done, estimate finish Fri May 25 20:29:45 2018 > 65.31% done, estimate finish Fri May 25 20:29:45 2018 > 65.31% done, estimate finish Fri May 25 20:29:46 2018 > 65.32% done, estimate finish Fri May 25 20:29:46 2018 >=== last message repeated 2 times. === > 65.32% done, estimate finish Fri May 25 20:29:45 2018 > 65.33% done, estimate finish Fri May 25 20:29:45 2018 >=== last message repeated 2 times. === > 65.34% done, estimate finish Fri May 25 20:29:46 2018 > 65.34% done, estimate finish Fri May 25 20:29:45 2018 >=== last message repeated 2 times. === > 65.35% done, estimate finish Fri May 25 20:29:45 2018 > 65.35% done, estimate finish Fri May 25 20:29:44 2018 > 65.36% done, estimate finish Fri May 25 20:29:44 2018 > 65.36% done, estimate finish Fri May 25 20:29:45 2018 >=== last message repeated 2 times. === > 65.37% done, estimate finish Fri May 25 20:29:45 2018 > 65.37% done, estimate finish Fri May 25 20:29:44 2018 > 65.38% done, estimate finish Fri May 25 20:29:44 2018 >=== last message repeated 2 times. === > 65.39% done, estimate finish Fri May 25 20:29:43 2018 > 65.39% done, estimate finish Fri May 25 20:29:44 2018 >=== last message repeated 2 times. === > 65.40% done, estimate finish Fri May 25 20:29:44 2018 > 65.40% done, estimate finish Fri May 25 20:29:43 2018 > 65.41% done, estimate finish Fri May 25 20:29:43 2018 >=== last message repeated 2 times. === > 65.41% done, estimate finish Fri May 25 20:29:44 2018 > 65.42% done, estimate finish Fri May 25 20:29:44 2018 > 65.42% done, estimate finish Fri May 25 20:29:43 2018 > 65.43% done, estimate finish Fri May 25 20:29:43 2018 >=== last message repeated 2 times. === > 65.43% done, estimate finish Fri May 25 20:29:42 2018 > 65.44% done, estimate finish Fri May 25 20:29:42 2018 > 65.44% done, estimate finish Fri May 25 20:29:43 2018 > 65.45% done, estimate finish Fri May 25 20:29:43 2018 > 65.45% done, estimate finish Fri May 25 20:29:42 2018 > 65.46% done, estimate finish Fri May 25 20:29:42 2018 >=== last message repeated 2 times. === > 65.46% done, estimate finish Fri May 25 20:29:41 2018 > 65.47% done, estimate finish Fri May 25 20:29:43 2018 > 65.47% done, estimate finish Fri May 25 20:29:42 2018 > 65.48% done, estimate finish Fri May 25 20:29:42 2018 >=== last message repeated 2 times. === > 65.48% done, estimate finish Fri May 25 20:29:41 2018 > 65.49% done, estimate finish Fri May 25 20:29:41 2018 > 65.49% done, estimate finish Fri May 25 20:29:42 2018 > 65.50% done, estimate finish Fri May 25 20:29:42 2018 >=== last message repeated 2 times. === > 65.50% done, estimate finish Fri May 25 20:29:41 2018 > 65.51% done, estimate finish Fri May 25 20:29:41 2018 >=== last message repeated 2 times. === > 65.52% done, estimate finish Fri May 25 20:29:42 2018 > 65.52% done, estimate finish Fri May 25 20:29:41 2018 >=== last message repeated 2 times. === > 65.53% done, estimate finish Fri May 25 20:29:41 2018 > 65.53% done, estimate finish Fri May 25 20:29:40 2018 > 65.54% done, estimate finish Fri May 25 20:29:40 2018 >=== last message repeated 2 times. === > 65.55% done, estimate finish Fri May 25 20:29:41 2018 >=== last message repeated 2 times. === > 65.55% done, estimate finish Fri May 25 20:29:40 2018 > 65.56% done, estimate finish Fri May 25 20:29:40 2018 >=== last message repeated 2 times. === > 65.57% done, estimate finish Fri May 25 20:29:39 2018 > 65.57% done, estimate finish Fri May 25 20:29:40 2018 >=== last message repeated 2 times. === > 65.58% done, estimate finish Fri May 25 20:29:40 2018 > 65.58% done, estimate finish Fri May 25 20:29:39 2018 > 65.59% done, estimate finish Fri May 25 20:29:39 2018 >=== last message repeated 2 times. === > 65.59% done, estimate finish Fri May 25 20:29:40 2018 > 65.60% done, estimate finish Fri May 25 20:29:40 2018 > 65.60% done, estimate finish Fri May 25 20:29:39 2018 > 65.61% done, estimate finish Fri May 25 20:29:39 2018 >=== last message repeated 2 times. === > 65.61% done, estimate finish Fri May 25 20:29:38 2018 > 65.62% done, estimate finish Fri May 25 20:29:39 2018 >=== last message repeated 2 times. === > 65.63% done, estimate finish Fri May 25 20:29:39 2018 > 65.63% done, estimate finish Fri May 25 20:29:38 2018 > 65.64% done, estimate finish Fri May 25 20:29:38 2018 >=== last message repeated 2 times. === > 65.64% done, estimate finish Fri May 25 20:29:37 2018 > 65.65% done, estimate finish Fri May 25 20:29:39 2018 > 65.65% done, estimate finish Fri May 25 20:29:38 2018 > 65.66% done, estimate finish Fri May 25 20:29:38 2018 >=== last message repeated 2 times. === > 65.66% done, estimate finish Fri May 25 20:29:37 2018 > 65.67% done, estimate finish Fri May 25 20:29:37 2018 > 65.67% done, estimate finish Fri May 25 20:29:38 2018 > 65.68% done, estimate finish Fri May 25 20:29:38 2018 >=== last message repeated 2 times. === > 65.68% done, estimate finish Fri May 25 20:29:37 2018 > 65.69% done, estimate finish Fri May 25 20:29:37 2018 >=== last message repeated 2 times. === > 65.70% done, estimate finish Fri May 25 20:29:38 2018 > 65.70% done, estimate finish Fri May 25 20:29:37 2018 >=== last message repeated 2 times. === > 65.71% done, estimate finish Fri May 25 20:29:37 2018 > 65.71% done, estimate finish Fri May 25 20:29:36 2018 > 65.72% done, estimate finish Fri May 25 20:29:36 2018 >=== last message repeated 2 times. === > 65.73% done, estimate finish Fri May 25 20:29:37 2018 >=== last message repeated 2 times. === > 65.73% done, estimate finish Fri May 25 20:29:36 2018 > 65.74% done, estimate finish Fri May 25 20:29:36 2018 >=== last message repeated 2 times. === > 65.75% done, estimate finish Fri May 25 20:29:35 2018 > 65.75% done, estimate finish Fri May 25 20:29:36 2018 >=== last message repeated 2 times. === > 65.76% done, estimate finish Fri May 25 20:29:36 2018 > 65.76% done, estimate finish Fri May 25 20:29:35 2018 > 65.77% done, estimate finish Fri May 25 20:29:35 2018 >=== last message repeated 2 times. === > 65.77% done, estimate finish Fri May 25 20:29:36 2018 > 65.78% done, estimate finish Fri May 25 20:29:36 2018 > 65.78% done, estimate finish Fri May 25 20:29:35 2018 > 65.79% done, estimate finish Fri May 25 20:29:35 2018 >=== last message repeated 2 times. === > 65.80% done, estimate finish Fri May 25 20:29:34 2018 >=== last message repeated 2 times. === > 65.80% done, estimate finish Fri May 25 20:29:35 2018 > 65.81% done, estimate finish Fri May 25 20:29:35 2018 > 65.81% done, estimate finish Fri May 25 20:29:34 2018 > 65.82% done, estimate finish Fri May 25 20:29:34 2018 >=== last message repeated 2 times. === > 65.82% done, estimate finish Fri May 25 20:29:33 2018 > 65.83% done, estimate finish Fri May 25 20:29:35 2018 > 65.83% done, estimate finish Fri May 25 20:29:34 2018 > 65.84% done, estimate finish Fri May 25 20:29:34 2018 >=== last message repeated 2 times. === > 65.84% done, estimate finish Fri May 25 20:29:33 2018 > 65.85% done, estimate finish Fri May 25 20:29:33 2018 > 65.85% done, estimate finish Fri May 25 20:29:34 2018 > 65.86% done, estimate finish Fri May 25 20:29:34 2018 >=== last message repeated 2 times. === > 65.86% done, estimate finish Fri May 25 20:29:33 2018 > 65.87% done, estimate finish Fri May 25 20:29:33 2018 >=== last message repeated 2 times. === > 65.88% done, estimate finish Fri May 25 20:29:34 2018 > 65.88% done, estimate finish Fri May 25 20:29:33 2018 > 65.89% done, estimate finish Fri May 25 20:29:33 2018 >=== last message repeated 2 times. === > 65.89% done, estimate finish Fri May 25 20:29:32 2018 > 65.90% done, estimate finish Fri May 25 20:29:32 2018 >=== last message repeated 2 times. === > 65.91% done, estimate finish Fri May 25 20:29:33 2018 >=== last message repeated 2 times. === > 65.91% done, estimate finish Fri May 25 20:29:32 2018 > 65.92% done, estimate finish Fri May 25 20:29:32 2018 >=== last message repeated 2 times. === > 65.93% done, estimate finish Fri May 25 20:29:31 2018 > 65.93% done, estimate finish Fri May 25 20:29:32 2018 >=== last message repeated 2 times. === > 65.94% done, estimate finish Fri May 25 20:29:32 2018 > 65.94% done, estimate finish Fri May 25 20:29:31 2018 > 65.95% done, estimate finish Fri May 25 20:29:31 2018 >=== last message repeated 2 times. === > 65.95% done, estimate finish Fri May 25 20:29:32 2018 > 65.96% done, estimate finish Fri May 25 20:29:32 2018 > 65.96% done, estimate finish Fri May 25 20:29:31 2018 > 65.97% done, estimate finish Fri May 25 20:29:31 2018 >=== last message repeated 2 times. === > 65.98% done, estimate finish Fri May 25 20:29:30 2018 >=== last message repeated 2 times. === > 65.98% done, estimate finish Fri May 25 20:29:31 2018 > 65.99% done, estimate finish Fri May 25 20:29:31 2018 >=== last message repeated 2 times. === > 66.00% done, estimate finish Fri May 25 20:29:30 2018 >=== last message repeated 3 times. === > 66.01% done, estimate finish Fri May 25 20:29:31 2018 > 66.01% done, estimate finish Fri May 25 20:29:30 2018 > 66.02% done, estimate finish Fri May 25 20:29:30 2018 >=== last message repeated 2 times. === > 66.02% done, estimate finish Fri May 25 20:29:29 2018 > 66.03% done, estimate finish Fri May 25 20:29:29 2018 > 66.03% done, estimate finish Fri May 25 20:29:30 2018 > 66.04% done, estimate finish Fri May 25 20:29:30 2018 >=== last message repeated 2 times. === > 66.04% done, estimate finish Fri May 25 20:29:29 2018 > 66.05% done, estimate finish Fri May 25 20:29:29 2018 >=== last message repeated 2 times. === > 66.06% done, estimate finish Fri May 25 20:29:30 2018 > 66.06% done, estimate finish Fri May 25 20:29:29 2018 > 66.07% done, estimate finish Fri May 25 20:29:29 2018 >=== last message repeated 2 times. === > 66.07% done, estimate finish Fri May 25 20:29:28 2018 > 66.08% done, estimate finish Fri May 25 20:29:28 2018 > 66.08% done, estimate finish Fri May 25 20:29:29 2018 > 66.09% done, estimate finish Fri May 25 20:29:29 2018 >=== last message repeated 2 times. === > 66.09% done, estimate finish Fri May 25 20:29:28 2018 > 66.10% done, estimate finish Fri May 25 20:29:28 2018 >=== last message repeated 2 times. === > 66.11% done, estimate finish Fri May 25 20:29:27 2018 > 66.11% done, estimate finish Fri May 25 20:29:28 2018 >=== last message repeated 2 times. === > 66.12% done, estimate finish Fri May 25 20:29:28 2018 > 66.12% done, estimate finish Fri May 25 20:29:27 2018 > 66.13% done, estimate finish Fri May 25 20:29:27 2018 >=== last message repeated 2 times. === > 66.13% done, estimate finish Fri May 25 20:29:28 2018 > 66.14% done, estimate finish Fri May 25 20:29:28 2018 > 66.14% done, estimate finish Fri May 25 20:29:27 2018 > 66.15% done, estimate finish Fri May 25 20:29:27 2018 >=== last message repeated 2 times. === > 66.16% done, estimate finish Fri May 25 20:29:26 2018 > 66.16% done, estimate finish Fri May 25 20:29:28 2018 > 66.16% done, estimate finish Fri May 25 20:29:27 2018 > 66.17% done, estimate finish Fri May 25 20:29:27 2018 >=== last message repeated 2 times. === > 66.18% done, estimate finish Fri May 25 20:29:26 2018 >=== last message repeated 3 times. === > 66.19% done, estimate finish Fri May 25 20:29:27 2018 > 66.19% done, estimate finish Fri May 25 20:29:26 2018 > 66.20% done, estimate finish Fri May 25 20:29:26 2018 >=== last message repeated 2 times. === > 66.20% done, estimate finish Fri May 25 20:29:25 2018 > 66.21% done, estimate finish Fri May 25 20:29:25 2018 > 66.21% done, estimate finish Fri May 25 20:29:26 2018 > 66.22% done, estimate finish Fri May 25 20:29:26 2018 >=== last message repeated 2 times. === > 66.23% done, estimate finish Fri May 25 20:29:25 2018 >=== last message repeated 3 times. === > 66.24% done, estimate finish Fri May 25 20:29:26 2018 > 66.24% done, estimate finish Fri May 25 20:29:25 2018 > 66.25% done, estimate finish Fri May 25 20:29:25 2018 >=== last message repeated 2 times. === > 66.25% done, estimate finish Fri May 25 20:29:24 2018 > 66.26% done, estimate finish Fri May 25 20:29:24 2018 >=== last message repeated 2 times. === > 66.27% done, estimate finish Fri May 25 20:29:25 2018 >=== last message repeated 2 times. === > 66.27% done, estimate finish Fri May 25 20:29:24 2018 > 66.28% done, estimate finish Fri May 25 20:29:24 2018 >=== last message repeated 2 times. === > 66.29% done, estimate finish Fri May 25 20:29:23 2018 > 66.29% done, estimate finish Fri May 25 20:29:25 2018 > 66.29% done, estimate finish Fri May 25 20:29:24 2018 > 66.30% done, estimate finish Fri May 25 20:29:24 2018 >=== last message repeated 2 times. === > 66.31% done, estimate finish Fri May 25 20:29:23 2018 >=== last message repeated 2 times. === > 66.32% done, estimate finish Fri May 25 20:29:24 2018 >=== last message repeated 2 times. === > 66.32% done, estimate finish Fri May 25 20:29:23 2018 > 66.33% done, estimate finish Fri May 25 20:29:23 2018 >=== last message repeated 2 times. === > 66.34% done, estimate finish Fri May 25 20:29:22 2018 > 66.34% done, estimate finish Fri May 25 20:29:24 2018 > 66.34% done, estimate finish Fri May 25 20:29:23 2018 > 66.35% done, estimate finish Fri May 25 20:29:23 2018 >=== last message repeated 2 times. === > 66.36% done, estimate finish Fri May 25 20:29:22 2018 >=== last message repeated 3 times. === > 66.37% done, estimate finish Fri May 25 20:29:23 2018 > 66.37% done, estimate finish Fri May 25 20:29:22 2018 > 66.38% done, estimate finish Fri May 25 20:29:22 2018 >=== last message repeated 3 times. === > 66.39% done, estimate finish Fri May 25 20:29:21 2018 > 66.39% done, estimate finish Fri May 25 20:29:22 2018 > 66.40% done, estimate finish Fri May 25 20:29:22 2018 >=== last message repeated 2 times. === > 66.41% done, estimate finish Fri May 25 20:29:21 2018 >=== last message repeated 3 times. === > 66.42% done, estimate finish Fri May 25 20:29:22 2018 >=== last message repeated 2 times. === > 66.43% done, estimate finish Fri May 25 20:29:21 2018 >=== last message repeated 3 times. === > 66.44% done, estimate finish Fri May 25 20:29:20 2018 >=== last message repeated 2 times. === > 66.45% done, estimate finish Fri May 25 20:29:21 2018 >=== last message repeated 2 times. === > 66.45% done, estimate finish Fri May 25 20:29:20 2018 > 66.46% done, estimate finish Fri May 25 20:29:20 2018 >=== last message repeated 2 times. === > 66.47% done, estimate finish Fri May 25 20:29:19 2018 > 66.47% done, estimate finish Fri May 25 20:29:21 2018 > 66.47% done, estimate finish Fri May 25 20:29:20 2018 > 66.48% done, estimate finish Fri May 25 20:29:20 2018 >=== last message repeated 2 times. === > 66.49% done, estimate finish Fri May 25 20:29:19 2018 >=== last message repeated 2 times. === > 66.50% done, estimate finish Fri May 25 20:29:20 2018 >=== last message repeated 3 times. === > 66.51% done, estimate finish Fri May 25 20:29:19 2018 >=== last message repeated 2 times. === > 66.52% done, estimate finish Fri May 25 20:29:19 2018 > 66.52% done, estimate finish Fri May 25 20:29:18 2018 > 66.52% done, estimate finish Fri May 25 20:29:19 2018 > 66.53% done, estimate finish Fri May 25 20:29:19 2018 >=== last message repeated 2 times. === > 66.54% done, estimate finish Fri May 25 20:29:18 2018 >=== last message repeated 3 times. === > 66.55% done, estimate finish Fri May 25 20:29:19 2018 >=== last message repeated 2 times. === > 66.56% done, estimate finish Fri May 25 20:29:18 2018 >=== last message repeated 2 times. === > 66.57% done, estimate finish Fri May 25 20:29:18 2018 > 66.57% done, estimate finish Fri May 25 20:29:17 2018 > 66.57% done, estimate finish Fri May 25 20:29:18 2018 > 66.58% done, estimate finish Fri May 25 20:29:18 2018 >=== last message repeated 2 times. === > 66.59% done, estimate finish Fri May 25 20:29:17 2018 >=== last message repeated 3 times. === > 66.60% done, estimate finish Fri May 25 20:29:18 2018 >=== last message repeated 2 times. === > 66.61% done, estimate finish Fri May 25 20:29:17 2018 >=== last message repeated 3 times. === > 66.62% done, estimate finish Fri May 25 20:29:16 2018 > 66.62% done, estimate finish Fri May 25 20:29:18 2018 > 66.63% done, estimate finish Fri May 25 20:29:17 2018 >=== last message repeated 3 times. === > 66.64% done, estimate finish Fri May 25 20:29:16 2018 >=== last message repeated 2 times. === > 66.65% done, estimate finish Fri May 25 20:29:16 2018 > 66.65% done, estimate finish Fri May 25 20:29:17 2018 > 66.66% done, estimate finish Fri May 25 20:29:16 2018 >=== last message repeated 3 times. === > 66.67% done, estimate finish Fri May 25 20:29:15 2018 >=== last message repeated 2 times. === > 66.68% done, estimate finish Fri May 25 20:29:16 2018 >=== last message repeated 3 times. === > 66.69% done, estimate finish Fri May 25 20:29:15 2018 >=== last message repeated 2 times. === > 66.70% done, estimate finish Fri May 25 20:29:15 2018 > 66.70% done, estimate finish Fri May 25 20:29:16 2018 > 66.70% done, estimate finish Fri May 25 20:29:15 2018 > 66.71% done, estimate finish Fri May 25 20:29:15 2018 >=== last message repeated 2 times. === > 66.72% done, estimate finish Fri May 25 20:29:15 2018 > 66.72% done, estimate finish Fri May 25 20:29:14 2018 >=== last message repeated 2 times. === > 66.73% done, estimate finish Fri May 25 20:29:15 2018 >=== last message repeated 2 times. === > 66.74% done, estimate finish Fri May 25 20:29:14 2018 >=== last message repeated 2 times. === > 66.75% done, estimate finish Fri May 25 20:29:14 2018 > 66.75% done, estimate finish Fri May 25 20:29:13 2018 > 66.75% done, estimate finish Fri May 25 20:29:15 2018 > 66.76% done, estimate finish Fri May 25 20:29:14 2018 >=== last message repeated 2 times. === > 66.77% done, estimate finish Fri May 25 20:29:14 2018 > 66.77% done, estimate finish Fri May 25 20:29:13 2018 >=== last message repeated 2 times. === > 66.78% done, estimate finish Fri May 25 20:29:14 2018 >=== last message repeated 2 times. === > 66.79% done, estimate finish Fri May 25 20:29:13 2018 >=== last message repeated 3 times. === > 66.80% done, estimate finish Fri May 25 20:29:12 2018 >=== last message repeated 2 times. === > 66.81% done, estimate finish Fri May 25 20:29:13 2018 >=== last message repeated 3 times. === > 66.82% done, estimate finish Fri May 25 20:29:12 2018 >=== last message repeated 2 times. === > 66.83% done, estimate finish Fri May 25 20:29:12 2018 > 66.83% done, estimate finish Fri May 25 20:29:13 2018 > 66.84% done, estimate finish Fri May 25 20:29:13 2018 > 66.84% done, estimate finish Fri May 25 20:29:12 2018 >=== last message repeated 2 times. === > 66.85% done, estimate finish Fri May 25 20:29:12 2018 > 66.85% done, estimate finish Fri May 25 20:29:11 2018 > 66.86% done, estimate finish Fri May 25 20:29:12 2018 >=== last message repeated 3 times. === > 66.87% done, estimate finish Fri May 25 20:29:11 2018 >=== last message repeated 2 times. === > 66.88% done, estimate finish Fri May 25 20:29:11 2018 > 66.88% done, estimate finish Fri May 25 20:29:12 2018 >=== last message repeated 2 times. === > 66.89% done, estimate finish Fri May 25 20:29:11 2018 >=== last message repeated 2 times. === > 66.90% done, estimate finish Fri May 25 20:29:11 2018 > 66.90% done, estimate finish Fri May 25 20:29:10 2018 > 66.91% done, estimate finish Fri May 25 20:29:11 2018 >=== last message repeated 3 times. === > 66.92% done, estimate finish Fri May 25 20:29:11 2018 > 66.92% done, estimate finish Fri May 25 20:29:10 2018 > 66.93% done, estimate finish Fri May 25 20:29:10 2018 >=== last message repeated 2 times. === > 66.93% done, estimate finish Fri May 25 20:29:11 2018 > 66.94% done, estimate finish Fri May 25 20:29:10 2018 >=== last message repeated 2 times. === > 66.95% done, estimate finish Fri May 25 20:29:10 2018 > 66.95% done, estimate finish Fri May 25 20:29:09 2018 >=== last message repeated 2 times. === > 66.96% done, estimate finish Fri May 25 20:29:10 2018 >=== last message repeated 2 times. === > 66.97% done, estimate finish Fri May 25 20:29:10 2018 > 66.97% done, estimate finish Fri May 25 20:29:09 2018 >=== last message repeated 2 times. === > 66.98% done, estimate finish Fri May 25 20:29:09 2018 > 66.98% done, estimate finish Fri May 25 20:29:08 2018 > 66.99% done, estimate finish Fri May 25 20:29:09 2018 >=== last message repeated 2 times. === > 67.00% done, estimate finish Fri May 25 20:29:09 2018 > 67.00% done, estimate finish Fri May 25 20:29:08 2018 >=== last message repeated 2 times. === > 67.01% done, estimate finish Fri May 25 20:29:08 2018 > 67.01% done, estimate finish Fri May 25 20:29:09 2018 > 67.02% done, estimate finish Fri May 25 20:29:09 2018 > 67.02% done, estimate finish Fri May 25 20:29:08 2018 >=== last message repeated 2 times. === > 67.03% done, estimate finish Fri May 25 20:29:08 2018 > 67.03% done, estimate finish Fri May 25 20:29:07 2018 > 67.04% done, estimate finish Fri May 25 20:29:09 2018 > 67.04% done, estimate finish Fri May 25 20:29:08 2018 >=== last message repeated 2 times. === > 67.05% done, estimate finish Fri May 25 20:29:08 2018 > 67.05% done, estimate finish Fri May 25 20:29:07 2018 > 67.06% done, estimate finish Fri May 25 20:29:07 2018 > 67.06% done, estimate finish Fri May 25 20:29:08 2018 >=== last message repeated 2 times. === > 67.07% done, estimate finish Fri May 25 20:29:07 2018 >=== last message repeated 2 times. === > 67.08% done, estimate finish Fri May 25 20:29:07 2018 > 67.08% done, estimate finish Fri May 25 20:29:06 2018 > 67.09% done, estimate finish Fri May 25 20:29:08 2018 > 67.09% done, estimate finish Fri May 25 20:29:07 2018 >=== last message repeated 2 times. === > 67.10% done, estimate finish Fri May 25 20:29:07 2018 > 67.10% done, estimate finish Fri May 25 20:29:06 2018 > 67.11% done, estimate finish Fri May 25 20:29:06 2018 >=== last message repeated 2 times. === > 67.11% done, estimate finish Fri May 25 20:29:07 2018 > 67.12% done, estimate finish Fri May 25 20:29:07 2018 > 67.12% done, estimate finish Fri May 25 20:29:06 2018 > 67.13% done, estimate finish Fri May 25 20:29:06 2018 >=== last message repeated 2 times. === > 67.13% done, estimate finish Fri May 25 20:29:05 2018 > 67.14% done, estimate finish Fri May 25 20:29:06 2018 >=== last message repeated 2 times. === > 67.15% done, estimate finish Fri May 25 20:29:06 2018 > 67.15% done, estimate finish Fri May 25 20:29:05 2018 >=== last message repeated 2 times. === > 67.16% done, estimate finish Fri May 25 20:29:05 2018 > 67.16% done, estimate finish Fri May 25 20:29:06 2018 > 67.17% done, estimate finish Fri May 25 20:29:06 2018 > 67.17% done, estimate finish Fri May 25 20:29:05 2018 > 67.18% done, estimate finish Fri May 25 20:29:05 2018 >=== last message repeated 2 times. === > 67.18% done, estimate finish Fri May 25 20:29:04 2018 > 67.19% done, estimate finish Fri May 25 20:29:04 2018 > 67.19% done, estimate finish Fri May 25 20:29:05 2018 > 67.20% done, estimate finish Fri May 25 20:29:05 2018 >=== last message repeated 2 times. === > 67.20% done, estimate finish Fri May 25 20:29:04 2018 > 67.21% done, estimate finish Fri May 25 20:29:04 2018 >=== last message repeated 2 times. === > 67.22% done, estimate finish Fri May 25 20:29:05 2018 > 67.22% done, estimate finish Fri May 25 20:29:04 2018 >=== last message repeated 2 times. === > 67.23% done, estimate finish Fri May 25 20:29:04 2018 > 67.23% done, estimate finish Fri May 25 20:29:03 2018 > 67.24% done, estimate finish Fri May 25 20:29:03 2018 > 67.24% done, estimate finish Fri May 25 20:29:04 2018 > 67.25% done, estimate finish Fri May 25 20:29:04 2018 >=== last message repeated 2 times. === > 67.25% done, estimate finish Fri May 25 20:29:03 2018 > 67.26% done, estimate finish Fri May 25 20:29:03 2018 >=== last message repeated 2 times. === > 67.27% done, estimate finish Fri May 25 20:29:04 2018 >=== last message repeated 2 times. === > 67.27% done, estimate finish Fri May 25 20:29:03 2018 > 67.28% done, estimate finish Fri May 25 20:29:03 2018 >=== last message repeated 2 times. === > 67.29% done, estimate finish Fri May 25 20:29:02 2018 >=== last message repeated 2 times. === > 67.29% done, estimate finish Fri May 25 20:29:03 2018 > 67.30% done, estimate finish Fri May 25 20:29:03 2018 > 67.30% done, estimate finish Fri May 25 20:29:02 2018 > 67.31% done, estimate finish Fri May 25 20:29:02 2018 >=== last message repeated 2 times. === > 67.31% done, estimate finish Fri May 25 20:29:01 2018 > 67.32% done, estimate finish Fri May 25 20:29:03 2018 > 67.32% done, estimate finish Fri May 25 20:29:02 2018 > 67.33% done, estimate finish Fri May 25 20:29:02 2018 >=== last message repeated 2 times. === > 67.34% done, estimate finish Fri May 25 20:29:01 2018 >=== last message repeated 2 times. === > 67.34% done, estimate finish Fri May 25 20:29:02 2018 > 67.35% done, estimate finish Fri May 25 20:29:02 2018 >=== last message repeated 2 times. === > 67.36% done, estimate finish Fri May 25 20:29:01 2018 >=== last message repeated 3 times. === > 67.37% done, estimate finish Fri May 25 20:29:02 2018 > 67.37% done, estimate finish Fri May 25 20:29:01 2018 > 67.38% done, estimate finish Fri May 25 20:29:01 2018 >=== last message repeated 2 times. === > 67.38% done, estimate finish Fri May 25 20:29:00 2018 > 67.39% done, estimate finish Fri May 25 20:29:00 2018 > 67.39% done, estimate finish Fri May 25 20:29:01 2018 > 67.40% done, estimate finish Fri May 25 20:29:01 2018 >=== last message repeated 2 times. === > 67.40% done, estimate finish Fri May 25 20:29:00 2018 > 67.41% done, estimate finish Fri May 25 20:29:00 2018 >=== last message repeated 2 times. === > 67.42% done, estimate finish Fri May 25 20:28:59 2018 > 67.42% done, estimate finish Fri May 25 20:29:00 2018 > 67.43% done, estimate finish Fri May 25 20:29:00 2018 >=== last message repeated 3 times. === > 67.44% done, estimate finish Fri May 25 20:28:59 2018 >=== last message repeated 2 times. === > 67.45% done, estimate finish Fri May 25 20:29:00 2018 >=== last message repeated 2 times. === > 67.45% done, estimate finish Fri May 25 20:28:59 2018 > 67.46% done, estimate finish Fri May 25 20:28:59 2018 >=== last message repeated 2 times. === > 67.47% done, estimate finish Fri May 25 20:28:58 2018 >=== last message repeated 2 times. === > 67.47% done, estimate finish Fri May 25 20:28:59 2018 > 67.48% done, estimate finish Fri May 25 20:28:59 2018 >=== last message repeated 2 times. === > 67.49% done, estimate finish Fri May 25 20:28:58 2018 >=== last message repeated 3 times. === > 67.50% done, estimate finish Fri May 25 20:28:59 2018 > 67.50% done, estimate finish Fri May 25 20:28:58 2018 > 67.51% done, estimate finish Fri May 25 20:28:58 2018 >=== last message repeated 2 times. === > 67.52% done, estimate finish Fri May 25 20:28:58 2018 > 67.52% done, estimate finish Fri May 25 20:28:57 2018 > 67.52% done, estimate finish Fri May 25 20:28:58 2018 > 67.53% done, estimate finish Fri May 25 20:28:58 2018 >=== last message repeated 2 times. === > 67.54% done, estimate finish Fri May 25 20:28:57 2018 >=== last message repeated 3 times. === > 67.55% done, estimate finish Fri May 25 20:28:58 2018 >=== last message repeated 2 times. === > 67.56% done, estimate finish Fri May 25 20:28:57 2018 >=== last message repeated 3 times. === > 67.57% done, estimate finish Fri May 25 20:28:56 2018 > 67.57% done, estimate finish Fri May 25 20:28:57 2018 > 67.58% done, estimate finish Fri May 25 20:28:57 2018 >=== last message repeated 2 times. === > 67.58% done, estimate finish Fri May 25 20:28:56 2018 > 67.59% done, estimate finish Fri May 25 20:28:56 2018 >=== last message repeated 2 times. === > 67.60% done, estimate finish Fri May 25 20:28:56 2018 > 67.60% done, estimate finish Fri May 25 20:28:57 2018 > 67.61% done, estimate finish Fri May 25 20:28:56 2018 >=== last message repeated 3 times. === > 67.62% done, estimate finish Fri May 25 20:28:55 2018 >=== last message repeated 2 times. === > 67.63% done, estimate finish Fri May 25 20:28:56 2018 >=== last message repeated 3 times. === > 67.64% done, estimate finish Fri May 25 20:28:55 2018 >=== last message repeated 2 times. === > 67.65% done, estimate finish Fri May 25 20:28:55 2018 > 67.65% done, estimate finish Fri May 25 20:28:56 2018 > 67.65% done, estimate finish Fri May 25 20:28:55 2018 > 67.66% done, estimate finish Fri May 25 20:28:55 2018 >=== last message repeated 2 times. === > 67.67% done, estimate finish Fri May 25 20:28:55 2018 > 67.67% done, estimate finish Fri May 25 20:28:54 2018 > 67.68% done, estimate finish Fri May 25 20:28:54 2018 > 67.68% done, estimate finish Fri May 25 20:28:55 2018 >=== last message repeated 2 times. === > 67.69% done, estimate finish Fri May 25 20:28:54 2018 >=== last message repeated 2 times. === > 67.70% done, estimate finish Fri May 25 20:28:54 2018 > 67.70% done, estimate finish Fri May 25 20:28:53 2018 > 67.70% done, estimate finish Fri May 25 20:28:55 2018 > 67.71% done, estimate finish Fri May 25 20:28:54 2018 >=== last message repeated 2 times. === > 67.72% done, estimate finish Fri May 25 20:28:54 2018 > 67.72% done, estimate finish Fri May 25 20:28:53 2018 >=== last message repeated 2 times. === > 67.73% done, estimate finish Fri May 25 20:28:54 2018 >=== last message repeated 2 times. === > 67.74% done, estimate finish Fri May 25 20:28:54 2018 > 67.74% done, estimate finish Fri May 25 20:28:53 2018 >=== last message repeated 2 times. === > 67.75% done, estimate finish Fri May 25 20:28:53 2018 > 67.75% done, estimate finish Fri May 25 20:28:54 2018 > 67.76% done, estimate finish Fri May 25 20:28:53 2018 >=== last message repeated 2 times. === > 67.77% done, estimate finish Fri May 25 20:28:53 2018 > 67.77% done, estimate finish Fri May 25 20:28:52 2018 >=== last message repeated 2 times. === > 67.78% done, estimate finish Fri May 25 20:28:52 2018 > 67.78% done, estimate finish Fri May 25 20:28:53 2018 > 67.79% done, estimate finish Fri May 25 20:28:53 2018 > 67.79% done, estimate finish Fri May 25 20:28:52 2018 >=== last message repeated 2 times. === > 67.80% done, estimate finish Fri May 25 20:28:52 2018 > 67.80% done, estimate finish Fri May 25 20:28:51 2018 > 67.81% done, estimate finish Fri May 25 20:28:52 2018 >=== last message repeated 3 times. === > 67.82% done, estimate finish Fri May 25 20:28:52 2018 > 67.82% done, estimate finish Fri May 25 20:28:51 2018 > 67.83% done, estimate finish Fri May 25 20:28:51 2018 > 67.83% done, estimate finish Fri May 25 20:28:52 2018 >=== last message repeated 2 times. === > 67.84% done, estimate finish Fri May 25 20:28:51 2018 >=== last message repeated 2 times. === > 67.85% done, estimate finish Fri May 25 20:28:51 2018 > 67.85% done, estimate finish Fri May 25 20:28:50 2018 > 67.86% done, estimate finish Fri May 25 20:28:52 2018 > 67.86% done, estimate finish Fri May 25 20:28:51 2018 >=== last message repeated 2 times. === > 67.87% done, estimate finish Fri May 25 20:28:51 2018 > 67.87% done, estimate finish Fri May 25 20:28:50 2018 > 67.88% done, estimate finish Fri May 25 20:28:50 2018 > 67.88% done, estimate finish Fri May 25 20:28:51 2018 >=== last message repeated 2 times. === > 67.89% done, estimate finish Fri May 25 20:28:51 2018 > 67.89% done, estimate finish Fri May 25 20:28:50 2018 > 67.90% done, estimate finish Fri May 25 20:28:50 2018 >=== last message repeated 2 times. === > 67.90% done, estimate finish Fri May 25 20:28:49 2018 > 67.91% done, estimate finish Fri May 25 20:28:50 2018 >=== last message repeated 2 times. === > 67.92% done, estimate finish Fri May 25 20:28:50 2018 > 67.92% done, estimate finish Fri May 25 20:28:49 2018 >=== last message repeated 2 times. === > 67.93% done, estimate finish Fri May 25 20:28:49 2018 > 67.93% done, estimate finish Fri May 25 20:28:50 2018 > 67.94% done, estimate finish Fri May 25 20:28:50 2018 > 67.94% done, estimate finish Fri May 25 20:28:49 2018 > 67.95% done, estimate finish Fri May 25 20:28:49 2018 >=== last message repeated 2 times. === > 67.95% done, estimate finish Fri May 25 20:28:48 2018 > 67.96% done, estimate finish Fri May 25 20:28:50 2018 > 67.96% done, estimate finish Fri May 25 20:28:49 2018 > 67.97% done, estimate finish Fri May 25 20:28:49 2018 >=== last message repeated 2 times. === > 67.97% done, estimate finish Fri May 25 20:28:48 2018 > 67.98% done, estimate finish Fri May 25 20:28:48 2018 >=== last message repeated 2 times. === > 67.99% done, estimate finish Fri May 25 20:28:49 2018 > 67.99% done, estimate finish Fri May 25 20:28:48 2018 >=== last message repeated 2 times. === > 68.00% done, estimate finish Fri May 25 20:28:48 2018 > 68.00% done, estimate finish Fri May 25 20:28:47 2018 > 68.01% done, estimate finish Fri May 25 20:28:47 2018 > 68.01% done, estimate finish Fri May 25 20:28:48 2018 > 68.02% done, estimate finish Fri May 25 20:28:48 2018 >=== last message repeated 2 times. === > 68.02% done, estimate finish Fri May 25 20:28:47 2018 > 68.03% done, estimate finish Fri May 25 20:28:47 2018 >=== last message repeated 2 times. === > 68.04% done, estimate finish Fri May 25 20:28:48 2018 >=== last message repeated 2 times. === > 68.04% done, estimate finish Fri May 25 20:28:47 2018 > 68.05% done, estimate finish Fri May 25 20:28:47 2018 >=== last message repeated 2 times. === > 68.06% done, estimate finish Fri May 25 20:28:46 2018 > 68.06% done, estimate finish Fri May 25 20:28:47 2018 >=== last message repeated 2 times. === > 68.07% done, estimate finish Fri May 25 20:28:47 2018 > 68.07% done, estimate finish Fri May 25 20:28:46 2018 > 68.08% done, estimate finish Fri May 25 20:28:46 2018 >=== last message repeated 2 times. === > 68.08% done, estimate finish Fri May 25 20:28:47 2018 > 68.09% done, estimate finish Fri May 25 20:28:47 2018 > 68.09% done, estimate finish Fri May 25 20:28:46 2018 > 68.10% done, estimate finish Fri May 25 20:28:46 2018 >=== last message repeated 2 times. === > 68.11% done, estimate finish Fri May 25 20:28:45 2018 >=== last message repeated 2 times. === > 68.11% done, estimate finish Fri May 25 20:28:46 2018 > 68.12% done, estimate finish Fri May 25 20:28:46 2018 >=== last message repeated 2 times. === > 68.13% done, estimate finish Fri May 25 20:28:45 2018 >=== last message repeated 3 times. === > 68.14% done, estimate finish Fri May 25 20:28:46 2018 > 68.14% done, estimate finish Fri May 25 20:28:45 2018 > 68.15% done, estimate finish Fri May 25 20:28:45 2018 >=== last message repeated 3 times. === > 68.16% done, estimate finish Fri May 25 20:28:46 2018 > 68.16% done, estimate finish Fri May 25 20:28:45 2018 > 68.17% done, estimate finish Fri May 25 20:28:45 2018 >=== last message repeated 2 times. === > 68.17% done, estimate finish Fri May 25 20:28:44 2018 > 68.18% done, estimate finish Fri May 25 20:28:44 2018 > 68.18% done, estimate finish Fri May 25 20:28:45 2018 > 68.19% done, estimate finish Fri May 25 20:28:45 2018 >=== last message repeated 2 times. === > 68.20% done, estimate finish Fri May 25 20:28:44 2018 >=== last message repeated 3 times. === > 68.21% done, estimate finish Fri May 25 20:28:45 2018 > 68.21% done, estimate finish Fri May 25 20:28:44 2018 > 68.22% done, estimate finish Fri May 25 20:28:44 2018 >=== last message repeated 3 times. === > 68.23% done, estimate finish Fri May 25 20:28:43 2018 > 68.23% done, estimate finish Fri May 25 20:28:44 2018 > 68.24% done, estimate finish Fri May 25 20:28:44 2018 >=== last message repeated 2 times. === > 68.24% done, estimate finish Fri May 25 20:28:43 2018 > 68.25% done, estimate finish Fri May 25 20:28:43 2018 >=== last message repeated 2 times. === > 68.26% done, estimate finish Fri May 25 20:28:42 2018 > 68.26% done, estimate finish Fri May 25 20:28:44 2018 > 68.26% done, estimate finish Fri May 25 20:28:43 2018 > 68.27% done, estimate finish Fri May 25 20:28:43 2018 >=== last message repeated 2 times. === > 68.28% done, estimate finish Fri May 25 20:28:42 2018 >=== last message repeated 2 times. === > 68.29% done, estimate finish Fri May 25 20:28:43 2018 >=== last message repeated 3 times. === > 68.30% done, estimate finish Fri May 25 20:28:42 2018 >=== last message repeated 2 times. === > 68.31% done, estimate finish Fri May 25 20:28:42 2018 > 68.31% done, estimate finish Fri May 25 20:28:43 2018 > 68.31% done, estimate finish Fri May 25 20:28:42 2018 > 68.32% done, estimate finish Fri May 25 20:28:42 2018 >=== last message repeated 2 times. === > 68.33% done, estimate finish Fri May 25 20:28:41 2018 >=== last message repeated 3 times. === > 68.34% done, estimate finish Fri May 25 20:28:42 2018 >=== last message repeated 2 times. === > 68.35% done, estimate finish Fri May 25 20:28:41 2018 >=== last message repeated 3 times. === > 68.36% done, estimate finish Fri May 25 20:28:40 2018 > 68.36% done, estimate finish Fri May 25 20:28:42 2018 > 68.37% done, estimate finish Fri May 25 20:28:41 2018 >=== last message repeated 2 times. === > 68.38% done, estimate finish Fri May 25 20:28:41 2018 > 68.38% done, estimate finish Fri May 25 20:28:40 2018 >=== last message repeated 2 times. === > 68.39% done, estimate finish Fri May 25 20:28:41 2018 >=== last message repeated 2 times. === > 68.40% done, estimate finish Fri May 25 20:28:40 2018 >=== last message repeated 3 times. === > 68.41% done, estimate finish Fri May 25 20:28:39 2018 > 68.41% done, estimate finish Fri May 25 20:28:41 2018 > 68.42% done, estimate finish Fri May 25 20:28:40 2018 >=== last message repeated 3 times. === > 68.43% done, estimate finish Fri May 25 20:28:39 2018 >=== last message repeated 2 times. === > 68.44% done, estimate finish Fri May 25 20:28:40 2018 >=== last message repeated 2 times. === > 68.45% done, estimate finish Fri May 25 20:28:40 2018 > 68.45% done, estimate finish Fri May 25 20:28:39 2018 >=== last message repeated 2 times. === > 68.46% done, estimate finish Fri May 25 20:28:39 2018 > 68.46% done, estimate finish Fri May 25 20:28:38 2018 > 68.47% done, estimate finish Fri May 25 20:28:39 2018 >=== last message repeated 3 times. === > 68.48% done, estimate finish Fri May 25 20:28:39 2018 > 68.48% done, estimate finish Fri May 25 20:28:38 2018 > 68.49% done, estimate finish Fri May 25 20:28:38 2018 > 68.49% done, estimate finish Fri May 25 20:28:39 2018 >=== last message repeated 2 times. === > 68.50% done, estimate finish Fri May 25 20:28:38 2018 >=== last message repeated 2 times. === > 68.51% done, estimate finish Fri May 25 20:28:38 2018 > 68.51% done, estimate finish Fri May 25 20:28:37 2018 > 68.51% done, estimate finish Fri May 25 20:28:39 2018 > 68.52% done, estimate finish Fri May 25 20:28:38 2018 >=== last message repeated 2 times. === > 68.53% done, estimate finish Fri May 25 20:28:38 2018 > 68.53% done, estimate finish Fri May 25 20:28:37 2018 > 68.54% done, estimate finish Fri May 25 20:28:37 2018 >=== last message repeated 2 times. === > 68.54% done, estimate finish Fri May 25 20:28:38 2018 > 68.55% done, estimate finish Fri May 25 20:28:38 2018 > 68.55% done, estimate finish Fri May 25 20:28:37 2018 > 68.56% done, estimate finish Fri May 25 20:28:37 2018 >=== last message repeated 2 times. === > 68.56% done, estimate finish Fri May 25 20:28:36 2018 > 68.57% done, estimate finish Fri May 25 20:28:37 2018 >=== last message repeated 2 times. === > 68.58% done, estimate finish Fri May 25 20:28:37 2018 > 68.58% done, estimate finish Fri May 25 20:28:36 2018 >=== last message repeated 2 times. === > 68.59% done, estimate finish Fri May 25 20:28:36 2018 > 68.59% done, estimate finish Fri May 25 20:28:37 2018 > 68.60% done, estimate finish Fri May 25 20:28:37 2018 > 68.60% done, estimate finish Fri May 25 20:28:36 2018 >=== last message repeated 2 times. === > 68.61% done, estimate finish Fri May 25 20:28:36 2018 > 68.61% done, estimate finish Fri May 25 20:28:35 2018 > 68.62% done, estimate finish Fri May 25 20:28:37 2018 > 68.62% done, estimate finish Fri May 25 20:28:36 2018 > 68.63% done, estimate finish Fri May 25 20:28:36 2018 >=== last message repeated 2 times. === > 68.63% done, estimate finish Fri May 25 20:28:35 2018 > 68.64% done, estimate finish Fri May 25 20:28:35 2018 > 68.64% done, estimate finish Fri May 25 20:28:36 2018 > 68.65% done, estimate finish Fri May 25 20:28:36 2018 > 68.65% done, estimate finish Fri May 25 20:28:35 2018 >=== last message repeated 2 times. === > 68.66% done, estimate finish Fri May 25 20:28:35 2018 >=== last message repeated 2 times. === > 68.67% done, estimate finish Fri May 25 20:28:34 2018 > 68.67% done, estimate finish Fri May 25 20:28:35 2018 >=== last message repeated 2 times. === > 68.68% done, estimate finish Fri May 25 20:28:35 2018 > 68.68% done, estimate finish Fri May 25 20:28:34 2018 > 68.69% done, estimate finish Fri May 25 20:28:34 2018 >=== last message repeated 2 times. === > 68.69% done, estimate finish Fri May 25 20:28:35 2018 > 68.70% done, estimate finish Fri May 25 20:28:35 2018 > 68.70% done, estimate finish Fri May 25 20:28:34 2018 > 68.71% done, estimate finish Fri May 25 20:28:34 2018 >=== last message repeated 2 times. === > 68.72% done, estimate finish Fri May 25 20:28:33 2018 > 68.72% done, estimate finish Fri May 25 20:28:34 2018 >=== last message repeated 2 times. === > 68.73% done, estimate finish Fri May 25 20:28:34 2018 >=== last message repeated 2 times. === > 68.74% done, estimate finish Fri May 25 20:28:33 2018 >=== last message repeated 2 times. === > 68.74% done, estimate finish Fri May 25 20:28:34 2018 > 68.75% done, estimate finish Fri May 25 20:28:34 2018 > 68.75% done, estimate finish Fri May 25 20:28:33 2018 > 68.76% done, estimate finish Fri May 25 20:28:33 2018 >=== last message repeated 2 times. === > 68.76% done, estimate finish Fri May 25 20:28:32 2018 > 68.77% done, estimate finish Fri May 25 20:28:32 2018 > 68.77% done, estimate finish Fri May 25 20:28:33 2018 > 68.78% done, estimate finish Fri May 25 20:28:33 2018 >=== last message repeated 2 times. === > 68.79% done, estimate finish Fri May 25 20:28:32 2018 >=== last message repeated 3 times. === > 68.80% done, estimate finish Fri May 25 20:28:33 2018 >=== last message repeated 2 times. === > 68.81% done, estimate finish Fri May 25 20:28:32 2018 >=== last message repeated 3 times. === > 68.82% done, estimate finish Fri May 25 20:28:31 2018 > 68.82% done, estimate finish Fri May 25 20:28:32 2018 > 68.83% done, estimate finish Fri May 25 20:28:32 2018 >=== last message repeated 2 times. === > 68.83% done, estimate finish Fri May 25 20:28:31 2018 > 68.84% done, estimate finish Fri May 25 20:28:31 2018 >=== last message repeated 2 times. === > 68.85% done, estimate finish Fri May 25 20:28:32 2018 >=== last message repeated 2 times. === > 68.85% done, estimate finish Fri May 25 20:28:31 2018 > 68.86% done, estimate finish Fri May 25 20:28:31 2018 >=== last message repeated 2 times. === > 68.87% done, estimate finish Fri May 25 20:28:30 2018 > 68.87% done, estimate finish Fri May 25 20:28:32 2018 > 68.88% done, estimate finish Fri May 25 20:28:31 2018 >=== last message repeated 3 times. === > 68.89% done, estimate finish Fri May 25 20:28:30 2018 >=== last message repeated 2 times. === > 68.90% done, estimate finish Fri May 25 20:28:30 2018 > 68.90% done, estimate finish Fri May 25 20:28:31 2018 >=== last message repeated 2 times. === > 68.91% done, estimate finish Fri May 25 20:28:30 2018 >=== last message repeated 2 times. === > 68.92% done, estimate finish Fri May 25 20:28:30 2018 > 68.92% done, estimate finish Fri May 25 20:28:29 2018 > 68.92% done, estimate finish Fri May 25 20:28:30 2018 > 68.93% done, estimate finish Fri May 25 20:28:30 2018 >=== last message repeated 2 times. === > 68.94% done, estimate finish Fri May 25 20:28:29 2018 >=== last message repeated 3 times. === > 68.95% done, estimate finish Fri May 25 20:28:30 2018 >=== last message repeated 2 times. === > 68.96% done, estimate finish Fri May 25 20:28:29 2018 >=== last message repeated 2 times. === > 68.97% done, estimate finish Fri May 25 20:28:29 2018 > 68.97% done, estimate finish Fri May 25 20:28:28 2018 >=== last message repeated 2 times. === > 68.98% done, estimate finish Fri May 25 20:28:29 2018 >=== last message repeated 2 times. === > 68.99% done, estimate finish Fri May 25 20:28:29 2018 > 68.99% done, estimate finish Fri May 25 20:28:28 2018 >=== last message repeated 2 times. === > 69.00% done, estimate finish Fri May 25 20:28:28 2018 > 69.00% done, estimate finish Fri May 25 20:28:29 2018 > 69.01% done, estimate finish Fri May 25 20:28:28 2018 >=== last message repeated 3 times. === > 69.02% done, estimate finish Fri May 25 20:28:28 2018 > 69.02% done, estimate finish Fri May 25 20:28:27 2018 > 69.03% done, estimate finish Fri May 25 20:28:28 2018 >=== last message repeated 3 times. === > 69.04% done, estimate finish Fri May 25 20:28:27 2018 >=== last message repeated 2 times. === > 69.05% done, estimate finish Fri May 25 20:28:27 2018 > 69.05% done, estimate finish Fri May 25 20:28:28 2018 > 69.06% done, estimate finish Fri May 25 20:28:28 2018 > 69.06% done, estimate finish Fri May 25 20:28:27 2018 >=== last message repeated 2 times. === > 69.07% done, estimate finish Fri May 25 20:28:27 2018 > 69.07% done, estimate finish Fri May 25 20:28:26 2018 > 69.08% done, estimate finish Fri May 25 20:28:28 2018 > 69.08% done, estimate finish Fri May 25 20:28:27 2018 >=== last message repeated 2 times. === > 69.09% done, estimate finish Fri May 25 20:28:27 2018 > 69.09% done, estimate finish Fri May 25 20:28:26 2018 > 69.10% done, estimate finish Fri May 25 20:28:26 2018 > 69.10% done, estimate finish Fri May 25 20:28:27 2018 >=== last message repeated 2 times. === > 69.11% done, estimate finish Fri May 25 20:28:26 2018 >=== last message repeated 2 times. === > 69.12% done, estimate finish Fri May 25 20:28:26 2018 >=== last message repeated 2 times. === > 69.12% done, estimate finish Fri May 25 20:28:25 2018 > 69.13% done, estimate finish Fri May 25 20:28:26 2018 >=== last message repeated 2 times. === > 69.14% done, estimate finish Fri May 25 20:28:26 2018 > 69.14% done, estimate finish Fri May 25 20:28:25 2018 > 69.15% done, estimate finish Fri May 25 20:28:25 2018 >=== last message repeated 2 times. === > 69.15% done, estimate finish Fri May 25 20:28:26 2018 > 69.16% done, estimate finish Fri May 25 20:28:26 2018 > 69.16% done, estimate finish Fri May 25 20:28:25 2018 > 69.17% done, estimate finish Fri May 25 20:28:25 2018 >=== last message repeated 2 times. === > 69.17% done, estimate finish Fri May 25 20:28:24 2018 > 69.18% done, estimate finish Fri May 25 20:28:25 2018 >=== last message repeated 2 times. === > 69.19% done, estimate finish Fri May 25 20:28:25 2018 >=== last message repeated 2 times. === > 69.19% done, estimate finish Fri May 25 20:28:24 2018 > 69.20% done, estimate finish Fri May 25 20:28:24 2018 > 69.20% done, estimate finish Fri May 25 20:28:25 2018 > 69.21% done, estimate finish Fri May 25 20:28:25 2018 > 69.21% done, estimate finish Fri May 25 20:28:24 2018 > 69.22% done, estimate finish Fri May 25 20:28:24 2018 >=== last message repeated 3 times. === > 69.23% done, estimate finish Fri May 25 20:28:25 2018 > 69.23% done, estimate finish Fri May 25 20:28:24 2018 > 69.24% done, estimate finish Fri May 25 20:28:24 2018 >=== last message repeated 2 times. === > 69.24% done, estimate finish Fri May 25 20:28:23 2018 > 69.25% done, estimate finish Fri May 25 20:28:23 2018 > 69.25% done, estimate finish Fri May 25 20:28:24 2018 > 69.26% done, estimate finish Fri May 25 20:28:24 2018 >=== last message repeated 2 times. === > 69.26% done, estimate finish Fri May 25 20:28:23 2018 > 69.27% done, estimate finish Fri May 25 20:28:23 2018 >=== last message repeated 2 times. === > 69.28% done, estimate finish Fri May 25 20:28:24 2018 > 69.28% done, estimate finish Fri May 25 20:28:23 2018 >=== last message repeated 2 times. === > 69.29% done, estimate finish Fri May 25 20:28:23 2018 >=== last message repeated 2 times. === > 69.30% done, estimate finish Fri May 25 20:28:22 2018 >=== last message repeated 2 times. === > 69.31% done, estimate finish Fri May 25 20:28:23 2018 >=== last message repeated 2 times. === > 69.31% done, estimate finish Fri May 25 20:28:22 2018 > 69.32% done, estimate finish Fri May 25 20:28:22 2018 >=== last message repeated 2 times. === > 69.33% done, estimate finish Fri May 25 20:28:23 2018 >=== last message repeated 2 times. === > 69.33% done, estimate finish Fri May 25 20:28:22 2018 > 69.34% done, estimate finish Fri May 25 20:28:22 2018 >=== last message repeated 2 times. === > 69.35% done, estimate finish Fri May 25 20:28:21 2018 >=== last message repeated 3 times. === > 69.36% done, estimate finish Fri May 25 20:28:22 2018 >=== last message repeated 2 times. === > 69.37% done, estimate finish Fri May 25 20:28:21 2018 >=== last message repeated 3 times. === > 69.38% done, estimate finish Fri May 25 20:28:20 2018 > 69.38% done, estimate finish Fri May 25 20:28:21 2018 > 69.39% done, estimate finish Fri May 25 20:28:21 2018 >=== last message repeated 2 times. === > 69.40% done, estimate finish Fri May 25 20:28:21 2018 > 69.40% done, estimate finish Fri May 25 20:28:20 2018 >=== last message repeated 2 times. === > 69.41% done, estimate finish Fri May 25 20:28:21 2018 >=== last message repeated 2 times. === > 69.42% done, estimate finish Fri May 25 20:28:20 2018 >=== last message repeated 3 times. === > 69.43% done, estimate finish Fri May 25 20:28:20 2018 > 69.43% done, estimate finish Fri May 25 20:28:21 2018 > 69.44% done, estimate finish Fri May 25 20:28:20 2018 >=== last message repeated 3 times. === > 69.45% done, estimate finish Fri May 25 20:28:19 2018 >=== last message repeated 2 times. === > 69.46% done, estimate finish Fri May 25 20:28:20 2018 >=== last message repeated 3 times. === > 69.47% done, estimate finish Fri May 25 20:28:19 2018 >=== last message repeated 2 times. === > 69.48% done, estimate finish Fri May 25 20:28:19 2018 > 69.48% done, estimate finish Fri May 25 20:28:20 2018 > 69.49% done, estimate finish Fri May 25 20:28:19 2018 >=== last message repeated 3 times. === > 69.50% done, estimate finish Fri May 25 20:28:19 2018 > 69.50% done, estimate finish Fri May 25 20:28:18 2018 > 69.51% done, estimate finish Fri May 25 20:28:18 2018 > 69.51% done, estimate finish Fri May 25 20:28:19 2018 >=== last message repeated 2 times. === > 69.52% done, estimate finish Fri May 25 20:28:18 2018 >=== last message repeated 2 times. === > 69.53% done, estimate finish Fri May 25 20:28:18 2018 >=== last message repeated 2 times. === > 69.53% done, estimate finish Fri May 25 20:28:19 2018 > 69.54% done, estimate finish Fri May 25 20:28:18 2018 >=== last message repeated 2 times. === > 69.55% done, estimate finish Fri May 25 20:28:18 2018 > 69.55% done, estimate finish Fri May 25 20:28:17 2018 > 69.56% done, estimate finish Fri May 25 20:28:17 2018 > 69.56% done, estimate finish Fri May 25 20:28:18 2018 >=== last message repeated 2 times. === > 69.57% done, estimate finish Fri May 25 20:28:18 2018 > 69.57% done, estimate finish Fri May 25 20:28:17 2018 > 69.58% done, estimate finish Fri May 25 20:28:17 2018 >=== last message repeated 2 times. === > 69.58% done, estimate finish Fri May 25 20:28:18 2018 > 69.59% done, estimate finish Fri May 25 20:28:17 2018 >=== last message repeated 2 times. === > 69.60% done, estimate finish Fri May 25 20:28:17 2018 >=== last message repeated 2 times. === > 69.60% done, estimate finish Fri May 25 20:28:16 2018 > 69.61% done, estimate finish Fri May 25 20:28:16 2018 > 69.61% done, estimate finish Fri May 25 20:28:17 2018 > 69.62% done, estimate finish Fri May 25 20:28:17 2018 > 69.62% done, estimate finish Fri May 25 20:28:16 2018 >=== last message repeated 2 times. === > 69.63% done, estimate finish Fri May 25 20:28:16 2018 >=== last message repeated 2 times. === > 69.64% done, estimate finish Fri May 25 20:28:17 2018 > 69.64% done, estimate finish Fri May 25 20:28:16 2018 > 69.65% done, estimate finish Fri May 25 20:28:16 2018 >=== last message repeated 2 times. === > 69.65% done, estimate finish Fri May 25 20:28:15 2018 > 69.66% done, estimate finish Fri May 25 20:28:15 2018 > 69.66% done, estimate finish Fri May 25 20:28:16 2018 > 69.67% done, estimate finish Fri May 25 20:28:16 2018 >=== last message repeated 2 times. === > 69.67% done, estimate finish Fri May 25 20:28:15 2018 > 69.68% done, estimate finish Fri May 25 20:28:15 2018 >=== last message repeated 2 times. === > 69.69% done, estimate finish Fri May 25 20:28:14 2018 > 69.69% done, estimate finish Fri May 25 20:28:15 2018 >=== last message repeated 2 times. === > 69.70% done, estimate finish Fri May 25 20:28:15 2018 >=== last message repeated 2 times. === > 69.71% done, estimate finish Fri May 25 20:28:14 2018 >=== last message repeated 2 times. === > 69.71% done, estimate finish Fri May 25 20:28:15 2018 > 69.72% done, estimate finish Fri May 25 20:28:15 2018 > 69.72% done, estimate finish Fri May 25 20:28:14 2018 > 69.73% done, estimate finish Fri May 25 20:28:14 2018 >=== last message repeated 2 times. === > 69.74% done, estimate finish Fri May 25 20:28:14 2018 > 69.74% done, estimate finish Fri May 25 20:28:13 2018 > 69.74% done, estimate finish Fri May 25 20:28:14 2018 > 69.75% done, estimate finish Fri May 25 20:28:14 2018 >=== last message repeated 2 times. === > 69.76% done, estimate finish Fri May 25 20:28:13 2018 >=== last message repeated 3 times. === > 69.77% done, estimate finish Fri May 25 20:28:12 2018 > 69.77% done, estimate finish Fri May 25 20:28:14 2018 > 69.78% done, estimate finish Fri May 25 20:28:13 2018 >=== last message repeated 3 times. === > 69.79% done, estimate finish Fri May 25 20:28:12 2018 >=== last message repeated 2 times. === > 69.80% done, estimate finish Fri May 25 20:28:13 2018 >=== last message repeated 3 times. === > 69.81% done, estimate finish Fri May 25 20:28:12 2018 >=== last message repeated 2 times. === > 69.82% done, estimate finish Fri May 25 20:28:12 2018 > 69.82% done, estimate finish Fri May 25 20:28:11 2018 > 69.83% done, estimate finish Fri May 25 20:28:12 2018 >=== last message repeated 3 times. === > 69.84% done, estimate finish Fri May 25 20:28:12 2018 > 69.84% done, estimate finish Fri May 25 20:28:11 2018 > 69.85% done, estimate finish Fri May 25 20:28:11 2018 > 69.85% done, estimate finish Fri May 25 20:28:12 2018 >=== last message repeated 2 times. === > 69.86% done, estimate finish Fri May 25 20:28:11 2018 >=== last message repeated 2 times. === > 69.87% done, estimate finish Fri May 25 20:28:11 2018 >=== last message repeated 2 times. === > 69.87% done, estimate finish Fri May 25 20:28:12 2018 > 69.88% done, estimate finish Fri May 25 20:28:11 2018 >=== last message repeated 2 times. === > 69.89% done, estimate finish Fri May 25 20:28:11 2018 > 69.89% done, estimate finish Fri May 25 20:28:10 2018 >=== last message repeated 2 times. === > 69.90% done, estimate finish Fri May 25 20:28:10 2018 > 69.90% done, estimate finish Fri May 25 20:28:11 2018 > 69.91% done, estimate finish Fri May 25 20:28:11 2018 > 69.91% done, estimate finish Fri May 25 20:28:10 2018 > 69.92% done, estimate finish Fri May 25 20:28:10 2018 >=== last message repeated 2 times. === > 69.92% done, estimate finish Fri May 25 20:28:09 2018 > 69.93% done, estimate finish Fri May 25 20:28:09 2018 > 69.93% done, estimate finish Fri May 25 20:28:10 2018 > 69.94% done, estimate finish Fri May 25 20:28:10 2018 >=== last message repeated 2 times. === > 69.94% done, estimate finish Fri May 25 20:28:09 2018 > 69.95% done, estimate finish Fri May 25 20:28:09 2018 >=== last message repeated 2 times. === > 69.96% done, estimate finish Fri May 25 20:28:10 2018 > 69.96% done, estimate finish Fri May 25 20:28:09 2018 >=== last message repeated 2 times. === > 69.97% done, estimate finish Fri May 25 20:28:09 2018 >=== last message repeated 2 times. === > 69.98% done, estimate finish Fri May 25 20:28:08 2018 >=== last message repeated 2 times. === > 69.99% done, estimate finish Fri May 25 20:28:09 2018 >=== last message repeated 2 times. === > 69.99% done, estimate finish Fri May 25 20:28:08 2018 > 70.00% done, estimate finish Fri May 25 20:28:08 2018 >=== last message repeated 2 times. === > 70.01% done, estimate finish Fri May 25 20:28:08 2018 > 70.01% done, estimate finish Fri May 25 20:28:09 2018 > 70.01% done, estimate finish Fri May 25 20:28:08 2018 > 70.02% done, estimate finish Fri May 25 20:28:08 2018 >=== last message repeated 2 times. === > 70.03% done, estimate finish Fri May 25 20:28:07 2018 >=== last message repeated 3 times. === > 70.04% done, estimate finish Fri May 25 20:28:08 2018 >=== last message repeated 2 times. === > 70.05% done, estimate finish Fri May 25 20:28:07 2018 >=== last message repeated 3 times. === > 70.06% done, estimate finish Fri May 25 20:28:06 2018 > 70.06% done, estimate finish Fri May 25 20:28:07 2018 > 70.07% done, estimate finish Fri May 25 20:28:07 2018 >=== last message repeated 2 times. === > 70.08% done, estimate finish Fri May 25 20:28:07 2018 > 70.08% done, estimate finish Fri May 25 20:28:06 2018 >=== last message repeated 2 times. === > 70.09% done, estimate finish Fri May 25 20:28:06 2018 > 70.09% done, estimate finish Fri May 25 20:28:07 2018 > 70.10% done, estimate finish Fri May 25 20:28:06 2018 >=== last message repeated 3 times. === > 70.11% done, estimate finish Fri May 25 20:28:06 2018 > 70.11% done, estimate finish Fri May 25 20:28:05 2018 > 70.12% done, estimate finish Fri May 25 20:28:06 2018 >=== last message repeated 3 times. === > 70.13% done, estimate finish Fri May 25 20:28:05 2018 >=== last message repeated 2 times. === > 70.14% done, estimate finish Fri May 25 20:28:05 2018 >=== last message repeated 2 times. === > 70.14% done, estimate finish Fri May 25 20:28:06 2018 > 70.15% done, estimate finish Fri May 25 20:28:05 2018 >=== last message repeated 2 times. === > 70.16% done, estimate finish Fri May 25 20:28:05 2018 > 70.16% done, estimate finish Fri May 25 20:28:04 2018 > 70.17% done, estimate finish Fri May 25 20:28:04 2018 >=== last message repeated 2 times. === > 70.17% done, estimate finish Fri May 25 20:28:05 2018 > 70.18% done, estimate finish Fri May 25 20:28:05 2018 > 70.18% done, estimate finish Fri May 25 20:28:04 2018 > 70.19% done, estimate finish Fri May 25 20:28:04 2018 >=== last message repeated 2 times. === > 70.19% done, estimate finish Fri May 25 20:28:03 2018 > 70.20% done, estimate finish Fri May 25 20:28:05 2018 > 70.20% done, estimate finish Fri May 25 20:28:04 2018 > 70.21% done, estimate finish Fri May 25 20:28:04 2018 >=== last message repeated 2 times. === > 70.21% done, estimate finish Fri May 25 20:28:03 2018 > 70.22% done, estimate finish Fri May 25 20:28:03 2018 > 70.22% done, estimate finish Fri May 25 20:28:04 2018 > 70.23% done, estimate finish Fri May 25 20:28:04 2018 > 70.23% done, estimate finish Fri May 25 20:28:03 2018 >=== last message repeated 2 times. === > 70.24% done, estimate finish Fri May 25 20:28:03 2018 >=== last message repeated 2 times. === > 70.25% done, estimate finish Fri May 25 20:28:02 2018 > 70.25% done, estimate finish Fri May 25 20:28:03 2018 > 70.26% done, estimate finish Fri May 25 20:28:03 2018 >=== last message repeated 2 times. === > 70.26% done, estimate finish Fri May 25 20:28:02 2018 > 70.27% done, estimate finish Fri May 25 20:28:02 2018 >=== last message repeated 2 times. === > 70.28% done, estimate finish Fri May 25 20:28:02 2018 > 70.28% done, estimate finish Fri May 25 20:28:03 2018 > 70.28% done, estimate finish Fri May 25 20:28:02 2018 > 70.29% done, estimate finish Fri May 25 20:28:02 2018 >=== last message repeated 2 times. === > 70.30% done, estimate finish Fri May 25 20:28:01 2018 >=== last message repeated 2 times. === > 70.30% done, estimate finish Fri May 25 20:28:02 2018 > 70.31% done, estimate finish Fri May 25 20:28:02 2018 >=== last message repeated 2 times. === > 70.32% done, estimate finish Fri May 25 20:28:01 2018 >=== last message repeated 2 times. === > 70.33% done, estimate finish Fri May 25 20:28:01 2018 > 70.33% done, estimate finish Fri May 25 20:28:00 2018 > 70.33% done, estimate finish Fri May 25 20:28:02 2018 > 70.34% done, estimate finish Fri May 25 20:28:01 2018 >=== last message repeated 2 times. === > 70.35% done, estimate finish Fri May 25 20:28:01 2018 > 70.35% done, estimate finish Fri May 25 20:28:00 2018 >=== last message repeated 2 times. === > 70.36% done, estimate finish Fri May 25 20:28:01 2018 >=== last message repeated 2 times. === > 70.37% done, estimate finish Fri May 25 20:28:01 2018 > 70.37% done, estimate finish Fri May 25 20:28:00 2018 >=== last message repeated 2 times. === > 70.38% done, estimate finish Fri May 25 20:28:00 2018 > 70.38% done, estimate finish Fri May 25 20:27:59 2018 > 70.39% done, estimate finish Fri May 25 20:28:00 2018 >=== last message repeated 3 times. === > 70.40% done, estimate finish Fri May 25 20:27:59 2018 >=== last message repeated 2 times. === > 70.41% done, estimate finish Fri May 25 20:27:59 2018 > 70.41% done, estimate finish Fri May 25 20:28:00 2018 > 70.42% done, estimate finish Fri May 25 20:28:00 2018 > 70.42% done, estimate finish Fri May 25 20:27:59 2018 >=== last message repeated 2 times. === > 70.43% done, estimate finish Fri May 25 20:27:59 2018 > 70.43% done, estimate finish Fri May 25 20:27:58 2018 > 70.44% done, estimate finish Fri May 25 20:27:58 2018 > 70.44% done, estimate finish Fri May 25 20:27:59 2018 >=== last message repeated 2 times. === > 70.45% done, estimate finish Fri May 25 20:27:59 2018 > 70.45% done, estimate finish Fri May 25 20:27:58 2018 > 70.46% done, estimate finish Fri May 25 20:27:58 2018 >=== last message repeated 2 times. === > 70.46% done, estimate finish Fri May 25 20:27:59 2018 > 70.47% done, estimate finish Fri May 25 20:27:59 2018 > 70.47% done, estimate finish Fri May 25 20:27:58 2018 > 70.48% done, estimate finish Fri May 25 20:27:58 2018 >=== last message repeated 2 times. === > 70.48% done, estimate finish Fri May 25 20:27:57 2018 > 70.49% done, estimate finish Fri May 25 20:27:57 2018 > 70.49% done, estimate finish Fri May 25 20:27:58 2018 > 70.50% done, estimate finish Fri May 25 20:27:58 2018 >=== last message repeated 2 times. === > 70.51% done, estimate finish Fri May 25 20:27:57 2018 >=== last message repeated 3 times. === > 70.52% done, estimate finish Fri May 25 20:27:58 2018 > 70.52% done, estimate finish Fri May 25 20:27:57 2018 > 70.53% done, estimate finish Fri May 25 20:27:57 2018 >=== last message repeated 3 times. === > 70.54% done, estimate finish Fri May 25 20:27:56 2018 >=== last message repeated 2 times. === > 70.55% done, estimate finish Fri May 25 20:27:57 2018 >=== last message repeated 2 times. === > 70.55% done, estimate finish Fri May 25 20:27:56 2018 > 70.56% done, estimate finish Fri May 25 20:27:56 2018 >=== last message repeated 2 times. === > 70.57% done, estimate finish Fri May 25 20:27:56 2018 > 70.57% done, estimate finish Fri May 25 20:27:57 2018 > 70.57% done, estimate finish Fri May 25 20:27:56 2018 > 70.58% done, estimate finish Fri May 25 20:27:56 2018 >=== last message repeated 2 times. === > 70.59% done, estimate finish Fri May 25 20:27:55 2018 >=== last message repeated 2 times. === > 70.60% done, estimate finish Fri May 25 20:27:55 2018 > 70.60% done, estimate finish Fri May 25 20:27:56 2018 >=== last message repeated 2 times. === > 70.61% done, estimate finish Fri May 25 20:27:55 2018 >=== last message repeated 2 times. === > 70.62% done, estimate finish Fri May 25 20:27:55 2018 > 70.62% done, estimate finish Fri May 25 20:27:54 2018 > 70.62% done, estimate finish Fri May 25 20:27:56 2018 > 70.63% done, estimate finish Fri May 25 20:27:55 2018 >=== last message repeated 2 times. === > 70.64% done, estimate finish Fri May 25 20:27:55 2018 > 70.64% done, estimate finish Fri May 25 20:27:54 2018 >=== last message repeated 2 times. === > 70.65% done, estimate finish Fri May 25 20:27:54 2018 > 70.65% done, estimate finish Fri May 25 20:27:55 2018 > 70.66% done, estimate finish Fri May 25 20:27:54 2018 >=== last message repeated 3 times. === > 70.67% done, estimate finish Fri May 25 20:27:54 2018 > 70.67% done, estimate finish Fri May 25 20:27:53 2018 > 70.68% done, estimate finish Fri May 25 20:27:53 2018 > 70.68% done, estimate finish Fri May 25 20:27:54 2018 > 70.69% done, estimate finish Fri May 25 20:27:54 2018 > 70.69% done, estimate finish Fri May 25 20:27:53 2018 >=== last message repeated 2 times. === > 70.70% done, estimate finish Fri May 25 20:27:53 2018 >=== last message repeated 2 times. === > 70.71% done, estimate finish Fri May 25 20:27:54 2018 > 70.71% done, estimate finish Fri May 25 20:27:53 2018 >=== last message repeated 2 times. === > 70.72% done, estimate finish Fri May 25 20:27:53 2018 > 70.72% done, estimate finish Fri May 25 20:27:52 2018 > 70.73% done, estimate finish Fri May 25 20:27:52 2018 > 70.73% done, estimate finish Fri May 25 20:27:53 2018 >=== last message repeated 2 times. === > 70.74% done, estimate finish Fri May 25 20:27:53 2018 > 70.74% done, estimate finish Fri May 25 20:27:52 2018 > 70.75% done, estimate finish Fri May 25 20:27:52 2018 >=== last message repeated 2 times. === > 70.76% done, estimate finish Fri May 25 20:27:51 2018 > 70.76% done, estimate finish Fri May 25 20:27:53 2018 > 70.76% done, estimate finish Fri May 25 20:27:52 2018 > 70.77% done, estimate finish Fri May 25 20:27:52 2018 >=== last message repeated 2 times. === > 70.78% done, estimate finish Fri May 25 20:27:51 2018 >=== last message repeated 3 times. === > 70.79% done, estimate finish Fri May 25 20:27:52 2018 >=== last message repeated 2 times. === > 70.80% done, estimate finish Fri May 25 20:27:51 2018 >=== last message repeated 3 times. === > 70.81% done, estimate finish Fri May 25 20:27:50 2018 > 70.81% done, estimate finish Fri May 25 20:27:51 2018 > 70.82% done, estimate finish Fri May 25 20:27:51 2018 >=== last message repeated 3 times. === > 70.83% done, estimate finish Fri May 25 20:27:50 2018 >=== last message repeated 2 times. === > 70.84% done, estimate finish Fri May 25 20:27:50 2018 > 70.84% done, estimate finish Fri May 25 20:27:51 2018 > 70.85% done, estimate finish Fri May 25 20:27:50 2018 >=== last message repeated 3 times. === > 70.86% done, estimate finish Fri May 25 20:27:50 2018 > 70.86% done, estimate finish Fri May 25 20:27:49 2018 > 70.87% done, estimate finish Fri May 25 20:27:50 2018 >=== last message repeated 3 times. === > 70.88% done, estimate finish Fri May 25 20:27:49 2018 >=== last message repeated 2 times. === > 70.89% done, estimate finish Fri May 25 20:27:49 2018 > 70.89% done, estimate finish Fri May 25 20:27:50 2018 >=== last message repeated 2 times. === > 70.90% done, estimate finish Fri May 25 20:27:49 2018 >=== last message repeated 2 times. === > 70.91% done, estimate finish Fri May 25 20:27:49 2018 > 70.91% done, estimate finish Fri May 25 20:27:48 2018 >=== last message repeated 2 times. === > 70.92% done, estimate finish Fri May 25 20:27:49 2018 >=== last message repeated 2 times. === > 70.93% done, estimate finish Fri May 25 20:27:49 2018 > 70.93% done, estimate finish Fri May 25 20:27:48 2018 > 70.94% done, estimate finish Fri May 25 20:27:48 2018 >=== last message repeated 2 times. === > 70.94% done, estimate finish Fri May 25 20:27:47 2018 > 70.95% done, estimate finish Fri May 25 20:27:49 2018 > 70.95% done, estimate finish Fri May 25 20:27:48 2018 > 70.96% done, estimate finish Fri May 25 20:27:48 2018 >=== last message repeated 2 times. === > 70.96% done, estimate finish Fri May 25 20:27:47 2018 > 70.97% done, estimate finish Fri May 25 20:27:47 2018 > 70.97% done, estimate finish Fri May 25 20:27:48 2018 > 70.98% done, estimate finish Fri May 25 20:27:48 2018 >=== last message repeated 2 times. === > 70.98% done, estimate finish Fri May 25 20:27:47 2018 > 70.99% done, estimate finish Fri May 25 20:27:47 2018 >=== last message repeated 2 times. === > 71.00% done, estimate finish Fri May 25 20:27:46 2018 > 71.00% done, estimate finish Fri May 25 20:27:47 2018 >=== last message repeated 2 times. === > 71.01% done, estimate finish Fri May 25 20:27:47 2018 >=== last message repeated 2 times. === > 71.02% done, estimate finish Fri May 25 20:27:46 2018 >=== last message repeated 2 times. === > 71.03% done, estimate finish Fri May 25 20:27:47 2018 >=== last message repeated 2 times. === > 71.03% done, estimate finish Fri May 25 20:27:46 2018 > 71.04% done, estimate finish Fri May 25 20:27:46 2018 >=== last message repeated 2 times. === > 71.05% done, estimate finish Fri May 25 20:27:46 2018 > 71.05% done, estimate finish Fri May 25 20:27:47 2018 > 71.05% done, estimate finish Fri May 25 20:27:46 2018 > 71.06% done, estimate finish Fri May 25 20:27:46 2018 >=== last message repeated 2 times. === > 71.07% done, estimate finish Fri May 25 20:27:45 2018 >=== last message repeated 3 times. === > 71.08% done, estimate finish Fri May 25 20:27:46 2018 >=== last message repeated 2 times. === > 71.09% done, estimate finish Fri May 25 20:27:45 2018 >=== last message repeated 2 times. === > 71.10% done, estimate finish Fri May 25 20:27:45 2018 > 71.10% done, estimate finish Fri May 25 20:27:44 2018 >=== last message repeated 2 times. === > 71.11% done, estimate finish Fri May 25 20:27:45 2018 >=== last message repeated 2 times. === > 71.12% done, estimate finish Fri May 25 20:27:45 2018 > 71.12% done, estimate finish Fri May 25 20:27:44 2018 >=== last message repeated 2 times. === > 71.13% done, estimate finish Fri May 25 20:27:44 2018 > 71.13% done, estimate finish Fri May 25 20:27:45 2018 > 71.14% done, estimate finish Fri May 25 20:27:45 2018 > 71.14% done, estimate finish Fri May 25 20:27:44 2018 >=== last message repeated 2 times. === > 71.15% done, estimate finish Fri May 25 20:27:44 2018 > 71.15% done, estimate finish Fri May 25 20:27:43 2018 > 71.16% done, estimate finish Fri May 25 20:27:44 2018 >=== last message repeated 3 times. === > 71.17% done, estimate finish Fri May 25 20:27:44 2018 > 71.17% done, estimate finish Fri May 25 20:27:43 2018 > 71.18% done, estimate finish Fri May 25 20:27:43 2018 >=== last message repeated 2 times. === > 71.19% done, estimate finish Fri May 25 20:27:44 2018 > 71.19% done, estimate finish Fri May 25 20:27:43 2018 >=== last message repeated 2 times. === > 71.20% done, estimate finish Fri May 25 20:27:43 2018 >=== last message repeated 2 times. === > 71.21% done, estimate finish Fri May 25 20:27:42 2018 >=== last message repeated 2 times. === > 71.21% done, estimate finish Fri May 25 20:27:43 2018 > 71.22% done, estimate finish Fri May 25 20:27:43 2018 > 71.22% done, estimate finish Fri May 25 20:27:42 2018 > 71.23% done, estimate finish Fri May 25 20:27:42 2018 >=== last message repeated 3 times. === > 71.24% done, estimate finish Fri May 25 20:27:43 2018 > 71.24% done, estimate finish Fri May 25 20:27:42 2018 > 71.25% done, estimate finish Fri May 25 20:27:42 2018 >=== last message repeated 2 times. === > 71.25% done, estimate finish Fri May 25 20:27:41 2018 > 71.26% done, estimate finish Fri May 25 20:27:41 2018 >=== last message repeated 2 times. === > 71.27% done, estimate finish Fri May 25 20:27:42 2018 >=== last message repeated 2 times. === > 71.28% done, estimate finish Fri May 25 20:27:41 2018 >=== last message repeated 3 times. === > 71.29% done, estimate finish Fri May 25 20:27:40 2018 > 71.29% done, estimate finish Fri May 25 20:27:42 2018 > 71.30% done, estimate finish Fri May 25 20:27:41 2018 >=== last message repeated 3 times. === > 71.31% done, estimate finish Fri May 25 20:27:40 2018 >=== last message repeated 2 times. === > 71.32% done, estimate finish Fri May 25 20:27:41 2018 >=== last message repeated 3 times. === > 71.33% done, estimate finish Fri May 25 20:27:40 2018 >=== last message repeated 2 times. === > 71.34% done, estimate finish Fri May 25 20:27:40 2018 > 71.34% done, estimate finish Fri May 25 20:27:39 2018 > 71.34% done, estimate finish Fri May 25 20:27:40 2018 > 71.35% done, estimate finish Fri May 25 20:27:40 2018 >=== last message repeated 2 times. === > 71.36% done, estimate finish Fri May 25 20:27:40 2018 > 71.36% done, estimate finish Fri May 25 20:27:39 2018 > 71.37% done, estimate finish Fri May 25 20:27:39 2018 >=== last message repeated 2 times. === > 71.37% done, estimate finish Fri May 25 20:27:40 2018 > 71.38% done, estimate finish Fri May 25 20:27:39 2018 >=== last message repeated 2 times. === > 71.39% done, estimate finish Fri May 25 20:27:39 2018 >=== last message repeated 2 times. === > 71.39% done, estimate finish Fri May 25 20:27:38 2018 > 71.40% done, estimate finish Fri May 25 20:27:39 2018 >=== last message repeated 2 times. === > 71.41% done, estimate finish Fri May 25 20:27:39 2018 > 71.41% done, estimate finish Fri May 25 20:27:38 2018 >=== last message repeated 2 times. === > 71.42% done, estimate finish Fri May 25 20:27:38 2018 >=== last message repeated 2 times. === > 71.43% done, estimate finish Fri May 25 20:27:39 2018 > 71.43% done, estimate finish Fri May 25 20:27:38 2018 >=== last message repeated 2 times. === > 71.44% done, estimate finish Fri May 25 20:27:38 2018 > 71.44% done, estimate finish Fri May 25 20:27:37 2018 > 71.45% done, estimate finish Fri May 25 20:27:37 2018 > 71.45% done, estimate finish Fri May 25 20:27:38 2018 > 71.46% done, estimate finish Fri May 25 20:27:38 2018 >=== last message repeated 2 times. === > 71.46% done, estimate finish Fri May 25 20:27:37 2018 > 71.47% done, estimate finish Fri May 25 20:27:37 2018 >=== last message repeated 2 times. === > 71.48% done, estimate finish Fri May 25 20:27:38 2018 >=== last message repeated 2 times. === > 71.48% done, estimate finish Fri May 25 20:27:37 2018 > 71.49% done, estimate finish Fri May 25 20:27:37 2018 >=== last message repeated 2 times. === > 71.50% done, estimate finish Fri May 25 20:27:36 2018 >=== last message repeated 2 times. === > 71.50% done, estimate finish Fri May 25 20:27:37 2018 > 71.51% done, estimate finish Fri May 25 20:27:37 2018 >=== last message repeated 2 times. === > 71.52% done, estimate finish Fri May 25 20:27:36 2018 >=== last message repeated 2 times. === > 71.53% done, estimate finish Fri May 25 20:27:36 2018 > 71.53% done, estimate finish Fri May 25 20:27:35 2018 > 71.53% done, estimate finish Fri May 25 20:27:36 2018 > 71.54% done, estimate finish Fri May 25 20:27:36 2018 >=== last message repeated 2 times. === > 71.55% done, estimate finish Fri May 25 20:27:36 2018 > 71.55% done, estimate finish Fri May 25 20:27:35 2018 >=== last message repeated 2 times. === > 71.56% done, estimate finish Fri May 25 20:27:36 2018 >=== last message repeated 2 times. === > 71.57% done, estimate finish Fri May 25 20:27:35 2018 >=== last message repeated 3 times. === > 71.58% done, estimate finish Fri May 25 20:27:35 2018 > 71.58% done, estimate finish Fri May 25 20:27:34 2018 > 71.59% done, estimate finish Fri May 25 20:27:35 2018 >=== last message repeated 3 times. === > 71.60% done, estimate finish Fri May 25 20:27:34 2018 >=== last message repeated 2 times. === > 71.61% done, estimate finish Fri May 25 20:27:34 2018 > 71.61% done, estimate finish Fri May 25 20:27:35 2018 > 71.62% done, estimate finish Fri May 25 20:27:35 2018 > 71.62% done, estimate finish Fri May 25 20:27:34 2018 >=== last message repeated 2 times. === > 71.63% done, estimate finish Fri May 25 20:27:34 2018 > 71.63% done, estimate finish Fri May 25 20:27:33 2018 > 71.64% done, estimate finish Fri May 25 20:27:33 2018 > 71.64% done, estimate finish Fri May 25 20:27:34 2018 >=== last message repeated 2 times. === > 71.65% done, estimate finish Fri May 25 20:27:34 2018 > 71.65% done, estimate finish Fri May 25 20:27:33 2018 > 71.66% done, estimate finish Fri May 25 20:27:33 2018 >=== last message repeated 2 times. === > 71.66% done, estimate finish Fri May 25 20:27:34 2018 > 71.67% done, estimate finish Fri May 25 20:27:34 2018 > 71.67% done, estimate finish Fri May 25 20:27:33 2018 > 71.68% done, estimate finish Fri May 25 20:27:33 2018 >=== last message repeated 2 times. === > 71.68% done, estimate finish Fri May 25 20:27:32 2018 > 71.69% done, estimate finish Fri May 25 20:27:32 2018 > 71.69% done, estimate finish Fri May 25 20:27:33 2018 > 71.70% done, estimate finish Fri May 25 20:27:33 2018 >=== last message repeated 2 times. === > 71.71% done, estimate finish Fri May 25 20:27:32 2018 >=== last message repeated 3 times. === > 71.72% done, estimate finish Fri May 25 20:27:33 2018 > 71.72% done, estimate finish Fri May 25 20:27:32 2018 > 71.73% done, estimate finish Fri May 25 20:27:32 2018 >=== last message repeated 3 times. === > 71.74% done, estimate finish Fri May 25 20:27:31 2018 > 71.74% done, estimate finish Fri May 25 20:27:32 2018 > 71.75% done, estimate finish Fri May 25 20:27:32 2018 >=== last message repeated 3 times. === > 71.76% done, estimate finish Fri May 25 20:27:31 2018 >=== last message repeated 2 times. === > 71.77% done, estimate finish Fri May 25 20:27:31 2018 > 71.77% done, estimate finish Fri May 25 20:27:32 2018 > 71.77% done, estimate finish Fri May 25 20:27:31 2018 > 71.78% done, estimate finish Fri May 25 20:27:31 2018 >=== last message repeated 2 times. === > 71.79% done, estimate finish Fri May 25 20:27:31 2018 > 71.79% done, estimate finish Fri May 25 20:27:32 2018 > 71.80% done, estimate finish Fri May 25 20:27:31 2018 >=== last message repeated 3 times. === > 71.81% done, estimate finish Fri May 25 20:27:30 2018 >=== last message repeated 2 times. === > 71.82% done, estimate finish Fri May 25 20:27:30 2018 > 71.82% done, estimate finish Fri May 25 20:27:31 2018 >=== last message repeated 2 times. === > 71.83% done, estimate finish Fri May 25 20:27:30 2018 >=== last message repeated 2 times. === > 71.84% done, estimate finish Fri May 25 20:27:30 2018 > 71.84% done, estimate finish Fri May 25 20:27:29 2018 > 71.84% done, estimate finish Fri May 25 20:27:31 2018 > 71.85% done, estimate finish Fri May 25 20:27:30 2018 >=== last message repeated 2 times. === > 71.86% done, estimate finish Fri May 25 20:27:30 2018 > 71.86% done, estimate finish Fri May 25 20:27:29 2018 > 71.87% done, estimate finish Fri May 25 20:27:29 2018 > 71.87% done, estimate finish Fri May 25 20:27:30 2018 >=== last message repeated 2 times. === > 71.88% done, estimate finish Fri May 25 20:27:30 2018 > 71.88% done, estimate finish Fri May 25 20:27:29 2018 > 71.89% done, estimate finish Fri May 25 20:27:29 2018 >=== last message repeated 2 times. === > 71.89% done, estimate finish Fri May 25 20:27:28 2018 > 71.90% done, estimate finish Fri May 25 20:27:29 2018 >=== last message repeated 2 times. === > 71.91% done, estimate finish Fri May 25 20:27:29 2018 >=== last message repeated 2 times. === > 71.91% done, estimate finish Fri May 25 20:27:28 2018 > 71.92% done, estimate finish Fri May 25 20:27:28 2018 > 71.92% done, estimate finish Fri May 25 20:27:29 2018 > 71.93% done, estimate finish Fri May 25 20:27:29 2018 > 71.93% done, estimate finish Fri May 25 20:27:28 2018 >=== last message repeated 2 times. === > 71.94% done, estimate finish Fri May 25 20:27:28 2018 >=== last message repeated 2 times. === > 71.95% done, estimate finish Fri May 25 20:27:27 2018 > 71.95% done, estimate finish Fri May 25 20:27:28 2018 > 71.96% done, estimate finish Fri May 25 20:27:28 2018 >=== last message repeated 2 times. === > 71.96% done, estimate finish Fri May 25 20:27:27 2018 > 71.97% done, estimate finish Fri May 25 20:27:27 2018 >=== last message repeated 2 times. === > 71.98% done, estimate finish Fri May 25 20:27:27 2018 > 71.98% done, estimate finish Fri May 25 20:27:28 2018 > 71.98% done, estimate finish Fri May 25 20:27:27 2018 > 71.99% done, estimate finish Fri May 25 20:27:27 2018 >=== last message repeated 2 times. === > 72.00% done, estimate finish Fri May 25 20:27:27 2018 > 72.00% done, estimate finish Fri May 25 20:27:26 2018 > 72.00% done, estimate finish Fri May 25 20:27:27 2018 > 72.01% done, estimate finish Fri May 25 20:27:27 2018 >=== last message repeated 2 times. === > 72.02% done, estimate finish Fri May 25 20:27:26 2018 >=== last message repeated 3 times. === > 72.03% done, estimate finish Fri May 25 20:27:27 2018 >=== last message repeated 2 times. === > 72.04% done, estimate finish Fri May 25 20:27:26 2018 >=== last message repeated 2 times. === > 72.05% done, estimate finish Fri May 25 20:27:26 2018 > 72.05% done, estimate finish Fri May 25 20:27:25 2018 >=== last message repeated 2 times. === > 72.06% done, estimate finish Fri May 25 20:27:26 2018 >=== last message repeated 2 times. === > 72.07% done, estimate finish Fri May 25 20:27:26 2018 > 72.07% done, estimate finish Fri May 25 20:27:25 2018 >=== last message repeated 2 times. === > 72.08% done, estimate finish Fri May 25 20:27:25 2018 > 72.08% done, estimate finish Fri May 25 20:27:24 2018 > 72.09% done, estimate finish Fri May 25 20:27:26 2018 > 72.09% done, estimate finish Fri May 25 20:27:25 2018 >=== last message repeated 2 times. === > 72.10% done, estimate finish Fri May 25 20:27:25 2018 > 72.10% done, estimate finish Fri May 25 20:27:24 2018 > 72.11% done, estimate finish Fri May 25 20:27:25 2018 >=== last message repeated 3 times. === > 72.12% done, estimate finish Fri May 25 20:27:25 2018 > 72.12% done, estimate finish Fri May 25 20:27:24 2018 > 72.13% done, estimate finish Fri May 25 20:27:24 2018 >=== last message repeated 2 times. === > 72.14% done, estimate finish Fri May 25 20:27:25 2018 > 72.14% done, estimate finish Fri May 25 20:27:24 2018 >=== last message repeated 2 times. === > 72.15% done, estimate finish Fri May 25 20:27:24 2018 >=== last message repeated 2 times. === > 72.16% done, estimate finish Fri May 25 20:27:23 2018 >=== last message repeated 2 times. === > 72.16% done, estimate finish Fri May 25 20:27:24 2018 > 72.17% done, estimate finish Fri May 25 20:27:24 2018 > 72.17% done, estimate finish Fri May 25 20:27:23 2018 > 72.18% done, estimate finish Fri May 25 20:27:23 2018 >=== last message repeated 3 times. === > 72.19% done, estimate finish Fri May 25 20:27:24 2018 > 72.19% done, estimate finish Fri May 25 20:27:23 2018 > 72.20% done, estimate finish Fri May 25 20:27:23 2018 >=== last message repeated 2 times. === > 72.21% done, estimate finish Fri May 25 20:27:23 2018 > 72.21% done, estimate finish Fri May 25 20:27:22 2018 > 72.21% done, estimate finish Fri May 25 20:27:23 2018 > 72.22% done, estimate finish Fri May 25 20:27:23 2018 >=== last message repeated 2 times. === > 72.23% done, estimate finish Fri May 25 20:27:22 2018 >=== last message repeated 3 times. === > 72.24% done, estimate finish Fri May 25 20:27:22 2018 > 72.24% done, estimate finish Fri May 25 20:27:23 2018 > 72.25% done, estimate finish Fri May 25 20:27:22 2018 >=== last message repeated 3 times. === > 72.26% done, estimate finish Fri May 25 20:27:21 2018 >=== last message repeated 2 times. === > 72.27% done, estimate finish Fri May 25 20:27:22 2018 >=== last message repeated 3 times. === > 72.28% done, estimate finish Fri May 25 20:27:21 2018 >=== last message repeated 2 times. === > 72.29% done, estimate finish Fri May 25 20:27:21 2018 > 72.29% done, estimate finish Fri May 25 20:27:20 2018 > 72.30% done, estimate finish Fri May 25 20:27:22 2018 > 72.30% done, estimate finish Fri May 25 20:27:21 2018 >=== last message repeated 2 times. === > 72.31% done, estimate finish Fri May 25 20:27:21 2018 > 72.31% done, estimate finish Fri May 25 20:27:20 2018 > 72.32% done, estimate finish Fri May 25 20:27:20 2018 > 72.32% done, estimate finish Fri May 25 20:27:21 2018 >=== last message repeated 2 times. === > 72.33% done, estimate finish Fri May 25 20:27:21 2018 > 72.33% done, estimate finish Fri May 25 20:27:20 2018 > 72.34% done, estimate finish Fri May 25 20:27:20 2018 >=== last message repeated 2 times. === > 72.34% done, estimate finish Fri May 25 20:27:19 2018 > 72.35% done, estimate finish Fri May 25 20:27:20 2018 >=== last message repeated 2 times. === > 72.36% done, estimate finish Fri May 25 20:27:20 2018 >=== last message repeated 2 times. === > 72.36% done, estimate finish Fri May 25 20:27:19 2018 > 72.37% done, estimate finish Fri May 25 20:27:19 2018 > 72.37% done, estimate finish Fri May 25 20:27:20 2018 > 72.38% done, estimate finish Fri May 25 20:27:20 2018 >=== last message repeated 2 times. === > 72.39% done, estimate finish Fri May 25 20:27:19 2018 >=== last message repeated 3 times. === > 72.40% done, estimate finish Fri May 25 20:27:18 2018 > 72.40% done, estimate finish Fri May 25 20:27:19 2018 > 72.41% done, estimate finish Fri May 25 20:27:19 2018 >=== last message repeated 3 times. === > 72.42% done, estimate finish Fri May 25 20:27:18 2018 >=== last message repeated 2 times. === > 72.43% done, estimate finish Fri May 25 20:27:19 2018 >=== last message repeated 2 times. === > 72.43% done, estimate finish Fri May 25 20:27:18 2018 > 72.44% done, estimate finish Fri May 25 20:27:18 2018 >=== last message repeated 2 times. === > 72.45% done, estimate finish Fri May 25 20:27:18 2018 > 72.45% done, estimate finish Fri May 25 20:27:19 2018 > 72.45% done, estimate finish Fri May 25 20:27:18 2018 > 72.46% done, estimate finish Fri May 25 20:27:18 2018 >=== last message repeated 2 times. === > 72.47% done, estimate finish Fri May 25 20:27:17 2018 >=== last message repeated 2 times. === > 72.48% done, estimate finish Fri May 25 20:27:17 2018 > 72.48% done, estimate finish Fri May 25 20:27:18 2018 >=== last message repeated 2 times. === > 72.49% done, estimate finish Fri May 25 20:27:17 2018 >=== last message repeated 2 times. === > 72.50% done, estimate finish Fri May 25 20:27:17 2018 >=== last message repeated 2 times. === > 72.50% done, estimate finish Fri May 25 20:27:16 2018 > 72.51% done, estimate finish Fri May 25 20:27:17 2018 >=== last message repeated 2 times. === > 72.52% done, estimate finish Fri May 25 20:27:17 2018 > 72.52% done, estimate finish Fri May 25 20:27:16 2018 >=== last message repeated 2 times. === > 72.53% done, estimate finish Fri May 25 20:27:16 2018 > 72.53% done, estimate finish Fri May 25 20:27:17 2018 > 72.54% done, estimate finish Fri May 25 20:27:17 2018 > 72.54% done, estimate finish Fri May 25 20:27:16 2018 >=== last message repeated 2 times. === > 72.55% done, estimate finish Fri May 25 20:27:16 2018 > 72.55% done, estimate finish Fri May 25 20:27:15 2018 > 72.56% done, estimate finish Fri May 25 20:27:17 2018 > 72.56% done, estimate finish Fri May 25 20:27:16 2018 > 72.57% done, estimate finish Fri May 25 20:27:16 2018 >=== last message repeated 2 times. === > 72.57% done, estimate finish Fri May 25 20:27:15 2018 > 72.58% done, estimate finish Fri May 25 20:27:15 2018 >=== last message repeated 2 times. === > 72.59% done, estimate finish Fri May 25 20:27:16 2018 >=== last message repeated 2 times. === > 72.59% done, estimate finish Fri May 25 20:27:15 2018 > 72.60% done, estimate finish Fri May 25 20:27:15 2018 >=== last message repeated 2 times. === > 72.61% done, estimate finish Fri May 25 20:27:14 2018 >=== last message repeated 2 times. === > 72.61% done, estimate finish Fri May 25 20:27:15 2018 > 72.62% done, estimate finish Fri May 25 20:27:15 2018 >=== last message repeated 2 times. === > 72.63% done, estimate finish Fri May 25 20:27:14 2018 >=== last message repeated 2 times. === > 72.64% done, estimate finish Fri May 25 20:27:14 2018 > 72.64% done, estimate finish Fri May 25 20:27:15 2018 >=== last message repeated 2 times. === > 72.65% done, estimate finish Fri May 25 20:27:14 2018 >=== last message repeated 2 times. === > 72.66% done, estimate finish Fri May 25 20:27:14 2018 > 72.66% done, estimate finish Fri May 25 20:27:13 2018 >=== last message repeated 2 times. === > 72.67% done, estimate finish Fri May 25 20:27:14 2018 >=== last message repeated 2 times. === > 72.68% done, estimate finish Fri May 25 20:27:14 2018 > 72.68% done, estimate finish Fri May 25 20:27:13 2018 >=== last message repeated 2 times. === > 72.69% done, estimate finish Fri May 25 20:27:13 2018 > 72.69% done, estimate finish Fri May 25 20:27:14 2018 > 72.70% done, estimate finish Fri May 25 20:27:13 2018 >=== last message repeated 3 times. === > 72.71% done, estimate finish Fri May 25 20:27:13 2018 > 72.71% done, estimate finish Fri May 25 20:27:12 2018 > 72.72% done, estimate finish Fri May 25 20:27:13 2018 >=== last message repeated 2 times. === > 72.73% done, estimate finish Fri May 25 20:27:13 2018 > 72.73% done, estimate finish Fri May 25 20:27:12 2018 >=== last message repeated 2 times. === > 72.74% done, estimate finish Fri May 25 20:27:12 2018 >=== last message repeated 2 times. === > 72.75% done, estimate finish Fri May 25 20:27:13 2018 > 72.75% done, estimate finish Fri May 25 20:27:12 2018 >=== last message repeated 2 times. === > 72.76% done, estimate finish Fri May 25 20:27:12 2018 >=== last message repeated 2 times. === > 72.77% done, estimate finish Fri May 25 20:27:11 2018 >=== last message repeated 2 times. === > 72.77% done, estimate finish Fri May 25 20:27:12 2018 > 72.78% done, estimate finish Fri May 25 20:27:12 2018 > 72.78% done, estimate finish Fri May 25 20:27:11 2018 > 72.79% done, estimate finish Fri May 25 20:27:11 2018 >=== last message repeated 3 times. === > 72.80% done, estimate finish Fri May 25 20:27:12 2018 > 72.80% done, estimate finish Fri May 25 20:27:11 2018 > 72.81% done, estimate finish Fri May 25 20:27:11 2018 >=== last message repeated 2 times. === > 72.82% done, estimate finish Fri May 25 20:27:10 2018 >=== last message repeated 2 times. === > 72.82% done, estimate finish Fri May 25 20:27:11 2018 > 72.83% done, estimate finish Fri May 25 20:27:11 2018 >=== last message repeated 2 times. === > 72.84% done, estimate finish Fri May 25 20:27:10 2018 >=== last message repeated 3 times. === > 72.85% done, estimate finish Fri May 25 20:27:10 2018 > 72.85% done, estimate finish Fri May 25 20:27:11 2018 > 72.86% done, estimate finish Fri May 25 20:27:10 2018 >=== last message repeated 3 times. === > 72.87% done, estimate finish Fri May 25 20:27:09 2018 >=== last message repeated 2 times. === > 72.88% done, estimate finish Fri May 25 20:27:10 2018 >=== last message repeated 3 times. === > 72.89% done, estimate finish Fri May 25 20:27:09 2018 >=== last message repeated 2 times. === > 72.90% done, estimate finish Fri May 25 20:27:09 2018 > 72.90% done, estimate finish Fri May 25 20:27:08 2018 > 72.91% done, estimate finish Fri May 25 20:27:10 2018 > 72.91% done, estimate finish Fri May 25 20:27:09 2018 >=== last message repeated 2 times. === > 72.92% done, estimate finish Fri May 25 20:27:09 2018 > 72.92% done, estimate finish Fri May 25 20:27:08 2018 > 72.93% done, estimate finish Fri May 25 20:27:08 2018 > 72.93% done, estimate finish Fri May 25 20:27:09 2018 >=== last message repeated 2 times. === > 72.94% done, estimate finish Fri May 25 20:27:09 2018 > 72.94% done, estimate finish Fri May 25 20:27:08 2018 > 72.95% done, estimate finish Fri May 25 20:27:08 2018 >=== last message repeated 2 times. === > 72.95% done, estimate finish Fri May 25 20:27:07 2018 > 72.96% done, estimate finish Fri May 25 20:27:08 2018 >=== last message repeated 2 times. === > 72.97% done, estimate finish Fri May 25 20:27:08 2018 >=== last message repeated 2 times. === > 72.98% done, estimate finish Fri May 25 20:27:07 2018 >=== last message repeated 2 times. === > 72.98% done, estimate finish Fri May 25 20:27:08 2018 > 72.99% done, estimate finish Fri May 25 20:27:08 2018 >=== last message repeated 2 times. === > 73.00% done, estimate finish Fri May 25 20:27:07 2018 >=== last message repeated 3 times. === > 73.01% done, estimate finish Fri May 25 20:27:06 2018 > 73.01% done, estimate finish Fri May 25 20:27:07 2018 > 73.02% done, estimate finish Fri May 25 20:27:07 2018 >=== last message repeated 3 times. === > 73.03% done, estimate finish Fri May 25 20:27:06 2018 >=== last message repeated 2 times. === > 73.04% done, estimate finish Fri May 25 20:27:07 2018 >=== last message repeated 2 times. === > 73.04% done, estimate finish Fri May 25 20:27:06 2018 > 73.05% done, estimate finish Fri May 25 20:27:06 2018 >=== last message repeated 2 times. === > 73.06% done, estimate finish Fri May 25 20:27:06 2018 > 73.06% done, estimate finish Fri May 25 20:27:07 2018 > 73.07% done, estimate finish Fri May 25 20:27:06 2018 >=== last message repeated 3 times. === > 73.08% done, estimate finish Fri May 25 20:27:06 2018 > 73.08% done, estimate finish Fri May 25 20:27:05 2018 > 73.09% done, estimate finish Fri May 25 20:27:05 2018 > 73.09% done, estimate finish Fri May 25 20:27:06 2018 >=== last message repeated 2 times. === > 73.10% done, estimate finish Fri May 25 20:27:05 2018 >=== last message repeated 2 times. === > 73.11% done, estimate finish Fri May 25 20:27:05 2018 >=== last message repeated 2 times. === > 73.11% done, estimate finish Fri May 25 20:27:04 2018 > 73.12% done, estimate finish Fri May 25 20:27:05 2018 >=== last message repeated 2 times. === > 73.13% done, estimate finish Fri May 25 20:27:05 2018 > 73.13% done, estimate finish Fri May 25 20:27:04 2018 >=== last message repeated 2 times. === > 73.14% done, estimate finish Fri May 25 20:27:04 2018 > 73.14% done, estimate finish Fri May 25 20:27:05 2018 > 73.15% done, estimate finish Fri May 25 20:27:05 2018 > 73.15% done, estimate finish Fri May 25 20:27:04 2018 > 73.16% done, estimate finish Fri May 25 20:27:04 2018 >=== last message repeated 3 times. === > 73.17% done, estimate finish Fri May 25 20:27:05 2018 > 73.17% done, estimate finish Fri May 25 20:27:04 2018 > 73.18% done, estimate finish Fri May 25 20:27:04 2018 >=== last message repeated 2 times. === > 73.18% done, estimate finish Fri May 25 20:27:03 2018 > 73.19% done, estimate finish Fri May 25 20:27:03 2018 >=== last message repeated 2 times. === > 73.20% done, estimate finish Fri May 25 20:27:04 2018 >=== last message repeated 2 times. === > 73.20% done, estimate finish Fri May 25 20:27:03 2018 > 73.21% done, estimate finish Fri May 25 20:27:03 2018 >=== last message repeated 2 times. === > 73.22% done, estimate finish Fri May 25 20:27:02 2018 > 73.22% done, estimate finish Fri May 25 20:27:04 2018 > 73.22% done, estimate finish Fri May 25 20:27:03 2018 > 73.23% done, estimate finish Fri May 25 20:27:03 2018 >=== last message repeated 2 times. === > 73.24% done, estimate finish Fri May 25 20:27:02 2018 >=== last message repeated 2 times. === > 73.25% done, estimate finish Fri May 25 20:27:02 2018 > 73.25% done, estimate finish Fri May 25 20:27:03 2018 >=== last message repeated 2 times. === > 73.26% done, estimate finish Fri May 25 20:27:02 2018 >=== last message repeated 2 times. === > 73.27% done, estimate finish Fri May 25 20:27:02 2018 > 73.27% done, estimate finish Fri May 25 20:27:01 2018 > 73.27% done, estimate finish Fri May 25 20:27:03 2018 > 73.28% done, estimate finish Fri May 25 20:27:02 2018 >=== last message repeated 2 times. === > 73.29% done, estimate finish Fri May 25 20:27:02 2018 > 73.29% done, estimate finish Fri May 25 20:27:01 2018 >=== last message repeated 2 times. === > 73.30% done, estimate finish Fri May 25 20:27:01 2018 > 73.30% done, estimate finish Fri May 25 20:27:02 2018 > 73.31% done, estimate finish Fri May 25 20:27:02 2018 > 73.31% done, estimate finish Fri May 25 20:27:01 2018 >=== last message repeated 2 times. === > 73.32% done, estimate finish Fri May 25 20:27:01 2018 > 73.32% done, estimate finish Fri May 25 20:27:00 2018 > 73.33% done, estimate finish Fri May 25 20:27:01 2018 >=== last message repeated 2 times. === > 73.34% done, estimate finish Fri May 25 20:27:01 2018 >=== last message repeated 2 times. === > 73.34% done, estimate finish Fri May 25 20:27:00 2018 > 73.35% done, estimate finish Fri May 25 20:27:00 2018 >=== last message repeated 2 times. === > 73.36% done, estimate finish Fri May 25 20:27:01 2018 >=== last message repeated 2 times. === > 73.36% done, estimate finish Fri May 25 20:27:00 2018 > 73.37% done, estimate finish Fri May 25 20:27:00 2018 >=== last message repeated 2 times. === > 73.38% done, estimate finish Fri May 25 20:26:59 2018 > 73.38% done, estimate finish Fri May 25 20:27:00 2018 >=== last message repeated 2 times. === > 73.39% done, estimate finish Fri May 25 20:27:00 2018 >=== last message repeated 2 times. === > 73.40% done, estimate finish Fri May 25 20:26:59 2018 >=== last message repeated 2 times. === > 73.41% done, estimate finish Fri May 25 20:27:00 2018 >=== last message repeated 2 times. === > 73.41% done, estimate finish Fri May 25 20:26:59 2018 > 73.42% done, estimate finish Fri May 25 20:26:59 2018 >=== last message repeated 2 times. === > 73.43% done, estimate finish Fri May 25 20:26:59 2018 > 73.43% done, estimate finish Fri May 25 20:26:58 2018 > 73.43% done, estimate finish Fri May 25 20:26:59 2018 > 73.44% done, estimate finish Fri May 25 20:26:59 2018 >=== last message repeated 2 times. === > 73.45% done, estimate finish Fri May 25 20:26:59 2018 > 73.45% done, estimate finish Fri May 25 20:26:58 2018 >=== last message repeated 2 times. === > 73.46% done, estimate finish Fri May 25 20:26:58 2018 > 73.46% done, estimate finish Fri May 25 20:26:59 2018 > 73.47% done, estimate finish Fri May 25 20:26:58 2018 >=== last message repeated 3 times. === > 73.48% done, estimate finish Fri May 25 20:26:58 2018 > 73.48% done, estimate finish Fri May 25 20:26:57 2018 > 73.49% done, estimate finish Fri May 25 20:26:58 2018 >=== last message repeated 2 times. === > 73.50% done, estimate finish Fri May 25 20:26:58 2018 > 73.50% done, estimate finish Fri May 25 20:26:57 2018 >=== last message repeated 2 times. === > 73.51% done, estimate finish Fri May 25 20:26:57 2018 > 73.51% done, estimate finish Fri May 25 20:26:58 2018 > 73.52% done, estimate finish Fri May 25 20:26:58 2018 > 73.52% done, estimate finish Fri May 25 20:26:57 2018 >=== last message repeated 2 times. === > 73.53% done, estimate finish Fri May 25 20:26:57 2018 >=== last message repeated 2 times. === > 73.54% done, estimate finish Fri May 25 20:26:56 2018 > 73.54% done, estimate finish Fri May 25 20:26:57 2018 >=== last message repeated 2 times. === > 73.55% done, estimate finish Fri May 25 20:26:57 2018 > 73.55% done, estimate finish Fri May 25 20:26:56 2018 > 73.56% done, estimate finish Fri May 25 20:26:56 2018 >=== last message repeated 2 times. === > 73.56% done, estimate finish Fri May 25 20:26:57 2018 > 73.57% done, estimate finish Fri May 25 20:26:57 2018 > 73.57% done, estimate finish Fri May 25 20:26:56 2018 > 73.58% done, estimate finish Fri May 25 20:26:56 2018 >=== last message repeated 2 times. === > 73.59% done, estimate finish Fri May 25 20:26:56 2018 > 73.59% done, estimate finish Fri May 25 20:26:55 2018 > 73.59% done, estimate finish Fri May 25 20:26:56 2018 > 73.60% done, estimate finish Fri May 25 20:26:56 2018 >=== last message repeated 2 times. === > 73.61% done, estimate finish Fri May 25 20:26:55 2018 >=== last message repeated 3 times. === > 73.62% done, estimate finish Fri May 25 20:26:56 2018 >=== last message repeated 2 times. === > 73.63% done, estimate finish Fri May 25 20:26:55 2018 >=== last message repeated 3 times. === > 73.64% done, estimate finish Fri May 25 20:26:54 2018 >=== last message repeated 2 times. === > 73.65% done, estimate finish Fri May 25 20:26:55 2018 >=== last message repeated 3 times. === > 73.66% done, estimate finish Fri May 25 20:26:54 2018 >=== last message repeated 2 times. === > 73.67% done, estimate finish Fri May 25 20:26:54 2018 > 73.67% done, estimate finish Fri May 25 20:26:55 2018 > 73.68% done, estimate finish Fri May 25 20:26:55 2018 > 73.68% done, estimate finish Fri May 25 20:26:54 2018 >=== last message repeated 2 times. === > 73.69% done, estimate finish Fri May 25 20:26:54 2018 > 73.69% done, estimate finish Fri May 25 20:26:53 2018 > 73.70% done, estimate finish Fri May 25 20:26:55 2018 > 73.70% done, estimate finish Fri May 25 20:26:54 2018 >=== last message repeated 2 times. === > 73.71% done, estimate finish Fri May 25 20:26:54 2018 > 73.71% done, estimate finish Fri May 25 20:26:53 2018 > 73.72% done, estimate finish Fri May 25 20:26:53 2018 >=== last message repeated 2 times. === > 73.72% done, estimate finish Fri May 25 20:26:54 2018 > 73.73% done, estimate finish Fri May 25 20:26:54 2018 > 73.73% done, estimate finish Fri May 25 20:26:53 2018 > 73.74% done, estimate finish Fri May 25 20:26:53 2018 >=== last message repeated 2 times. === > 73.75% done, estimate finish Fri May 25 20:26:52 2018 > 73.75% done, estimate finish Fri May 25 20:26:54 2018 > 73.75% done, estimate finish Fri May 25 20:26:53 2018 > 73.76% done, estimate finish Fri May 25 20:26:53 2018 >=== last message repeated 2 times. === > 73.77% done, estimate finish Fri May 25 20:26:52 2018 >=== last message repeated 3 times. === > 73.78% done, estimate finish Fri May 25 20:26:53 2018 >=== last message repeated 2 times. === > 73.79% done, estimate finish Fri May 25 20:26:52 2018 >=== last message repeated 3 times. === > 73.80% done, estimate finish Fri May 25 20:26:51 2018 > 73.80% done, estimate finish Fri May 25 20:26:52 2018 > 73.81% done, estimate finish Fri May 25 20:26:52 2018 >=== last message repeated 3 times. === > 73.82% done, estimate finish Fri May 25 20:26:51 2018 >=== last message repeated 2 times. === > 73.83% done, estimate finish Fri May 25 20:26:51 2018 > 73.83% done, estimate finish Fri May 25 20:26:52 2018 > 73.84% done, estimate finish Fri May 25 20:26:52 2018 > 73.84% done, estimate finish Fri May 25 20:26:51 2018 >=== last message repeated 2 times. === > 73.85% done, estimate finish Fri May 25 20:26:51 2018 > 73.85% done, estimate finish Fri May 25 20:26:50 2018 > 73.86% done, estimate finish Fri May 25 20:26:51 2018 >=== last message repeated 3 times. === > 73.87% done, estimate finish Fri May 25 20:26:51 2018 > 73.87% done, estimate finish Fri May 25 20:26:50 2018 > 73.88% done, estimate finish Fri May 25 20:26:50 2018 >=== last message repeated 2 times. === > 73.88% done, estimate finish Fri May 25 20:26:51 2018 > 73.89% done, estimate finish Fri May 25 20:26:51 2018 > 73.89% done, estimate finish Fri May 25 20:26:50 2018 > 73.90% done, estimate finish Fri May 25 20:26:50 2018 >=== last message repeated 2 times. === > 73.90% done, estimate finish Fri May 25 20:26:49 2018 > 73.91% done, estimate finish Fri May 25 20:26:50 2018 >=== last message repeated 2 times. === > 73.92% done, estimate finish Fri May 25 20:26:50 2018 >=== last message repeated 2 times. === > 73.93% done, estimate finish Fri May 25 20:26:49 2018 >=== last message repeated 2 times. === > 73.93% done, estimate finish Fri May 25 20:26:50 2018 > 73.94% done, estimate finish Fri May 25 20:26:50 2018 > 73.94% done, estimate finish Fri May 25 20:26:49 2018 > 73.95% done, estimate finish Fri May 25 20:26:49 2018 >=== last message repeated 3 times. === > 73.96% done, estimate finish Fri May 25 20:26:48 2018 > 73.96% done, estimate finish Fri May 25 20:26:49 2018 > 73.97% done, estimate finish Fri May 25 20:26:49 2018 >=== last message repeated 3 times. === > 73.98% done, estimate finish Fri May 25 20:26:48 2018 >=== last message repeated 2 times. === > 73.99% done, estimate finish Fri May 25 20:26:48 2018 > 73.99% done, estimate finish Fri May 25 20:26:49 2018 > 73.99% done, estimate finish Fri May 25 20:26:48 2018 > 74.00% done, estimate finish Fri May 25 20:26:48 2018 >=== last message repeated 2 times. === > 74.01% done, estimate finish Fri May 25 20:26:48 2018 > 74.01% done, estimate finish Fri May 25 20:26:47 2018 > 74.02% done, estimate finish Fri May 25 20:26:48 2018 >=== last message repeated 3 times. === > 74.03% done, estimate finish Fri May 25 20:26:48 2018 > 74.03% done, estimate finish Fri May 25 20:26:47 2018 > 74.04% done, estimate finish Fri May 25 20:26:47 2018 > 74.04% done, estimate finish Fri May 25 20:26:48 2018 >=== last message repeated 2 times. === > 74.05% done, estimate finish Fri May 25 20:26:47 2018 >=== last message repeated 2 times. === > 74.06% done, estimate finish Fri May 25 20:26:47 2018 >=== last message repeated 2 times. === > 74.06% done, estimate finish Fri May 25 20:26:46 2018 > 74.07% done, estimate finish Fri May 25 20:26:47 2018 >=== last message repeated 2 times. === > 74.08% done, estimate finish Fri May 25 20:26:47 2018 >=== last message repeated 2 times. === > 74.08% done, estimate finish Fri May 25 20:26:46 2018 > 74.09% done, estimate finish Fri May 25 20:26:46 2018 > 74.09% done, estimate finish Fri May 25 20:26:47 2018 > 74.10% done, estimate finish Fri May 25 20:26:47 2018 > 74.10% done, estimate finish Fri May 25 20:26:46 2018 > 74.11% done, estimate finish Fri May 25 20:26:46 2018 >=== last message repeated 3 times. === > 74.12% done, estimate finish Fri May 25 20:26:47 2018 > 74.12% done, estimate finish Fri May 25 20:26:46 2018 > 74.13% done, estimate finish Fri May 25 20:26:46 2018 >=== last message repeated 3 times. === > 74.14% done, estimate finish Fri May 25 20:26:45 2018 >=== last message repeated 2 times. === > 74.15% done, estimate finish Fri May 25 20:26:46 2018 >=== last message repeated 2 times. === > 74.15% done, estimate finish Fri May 25 20:26:45 2018 > 74.16% done, estimate finish Fri May 25 20:26:45 2018 >=== last message repeated 2 times. === > 74.17% done, estimate finish Fri May 25 20:26:45 2018 > 74.17% done, estimate finish Fri May 25 20:26:44 2018 > 74.18% done, estimate finish Fri May 25 20:26:45 2018 >=== last message repeated 3 times. === > 74.19% done, estimate finish Fri May 25 20:26:44 2018 >=== last message repeated 2 times. === > 74.20% done, estimate finish Fri May 25 20:26:44 2018 > 74.20% done, estimate finish Fri May 25 20:26:45 2018 >=== last message repeated 2 times. === > 74.21% done, estimate finish Fri May 25 20:26:44 2018 >=== last message repeated 2 times. === > 74.22% done, estimate finish Fri May 25 20:26:44 2018 >=== last message repeated 2 times. === > 74.22% done, estimate finish Fri May 25 20:26:45 2018 > 74.23% done, estimate finish Fri May 25 20:26:44 2018 >=== last message repeated 2 times. === > 74.24% done, estimate finish Fri May 25 20:26:44 2018 > 74.24% done, estimate finish Fri May 25 20:26:43 2018 >=== last message repeated 2 times. === > 74.25% done, estimate finish Fri May 25 20:26:43 2018 > 74.25% done, estimate finish Fri May 25 20:26:44 2018 > 74.26% done, estimate finish Fri May 25 20:26:44 2018 > 74.26% done, estimate finish Fri May 25 20:26:43 2018 > 74.27% done, estimate finish Fri May 25 20:26:43 2018 >=== last message repeated 3 times. === > 74.28% done, estimate finish Fri May 25 20:26:44 2018 > 74.28% done, estimate finish Fri May 25 20:26:43 2018 > 74.29% done, estimate finish Fri May 25 20:26:43 2018 >=== last message repeated 2 times. === > 74.29% done, estimate finish Fri May 25 20:26:42 2018 > 74.30% done, estimate finish Fri May 25 20:26:42 2018 >=== last message repeated 2 times. === > 74.31% done, estimate finish Fri May 25 20:26:43 2018 >=== last message repeated 2 times. === > 74.31% done, estimate finish Fri May 25 20:26:42 2018 > 74.32% done, estimate finish Fri May 25 20:26:42 2018 >=== last message repeated 2 times. === > 74.33% done, estimate finish Fri May 25 20:26:42 2018 > 74.33% done, estimate finish Fri May 25 20:26:43 2018 > 74.33% done, estimate finish Fri May 25 20:26:42 2018 > 74.34% done, estimate finish Fri May 25 20:26:42 2018 >=== last message repeated 2 times. === > 74.35% done, estimate finish Fri May 25 20:26:41 2018 >=== last message repeated 2 times. === > 74.36% done, estimate finish Fri May 25 20:26:42 2018 >=== last message repeated 3 times. === > 74.37% done, estimate finish Fri May 25 20:26:41 2018 >=== last message repeated 2 times. === > 74.38% done, estimate finish Fri May 25 20:26:41 2018 >=== last message repeated 2 times. === > 74.38% done, estimate finish Fri May 25 20:26:42 2018 > 74.39% done, estimate finish Fri May 25 20:26:41 2018 >=== last message repeated 2 times. === > 74.40% done, estimate finish Fri May 25 20:26:41 2018 > 74.40% done, estimate finish Fri May 25 20:26:40 2018 >=== last message repeated 2 times. === > 74.41% done, estimate finish Fri May 25 20:26:41 2018 >=== last message repeated 2 times. === > 74.42% done, estimate finish Fri May 25 20:26:41 2018 > 74.42% done, estimate finish Fri May 25 20:26:40 2018 >=== last message repeated 2 times. === > 74.43% done, estimate finish Fri May 25 20:26:40 2018 >=== last message repeated 2 times. === > 74.44% done, estimate finish Fri May 25 20:26:41 2018 > 74.44% done, estimate finish Fri May 25 20:26:40 2018 > 74.45% done, estimate finish Fri May 25 20:26:40 2018 >=== last message repeated 2 times. === > 74.45% done, estimate finish Fri May 25 20:26:39 2018 > 74.46% done, estimate finish Fri May 25 20:26:39 2018 > 74.46% done, estimate finish Fri May 25 20:26:40 2018 > 74.47% done, estimate finish Fri May 25 20:26:40 2018 >=== last message repeated 2 times. === > 74.47% done, estimate finish Fri May 25 20:26:39 2018 > 74.48% done, estimate finish Fri May 25 20:26:39 2018 >=== last message repeated 2 times. === > 74.49% done, estimate finish Fri May 25 20:26:39 2018 > 74.49% done, estimate finish Fri May 25 20:26:40 2018 > 74.49% done, estimate finish Fri May 25 20:26:39 2018 > 74.50% done, estimate finish Fri May 25 20:26:39 2018 >=== last message repeated 2 times. === > 74.51% done, estimate finish Fri May 25 20:26:38 2018 >=== last message repeated 2 times. === > 74.52% done, estimate finish Fri May 25 20:26:39 2018 >=== last message repeated 3 times. === > 74.53% done, estimate finish Fri May 25 20:26:38 2018 >=== last message repeated 2 times. === > 74.54% done, estimate finish Fri May 25 20:26:38 2018 > 74.54% done, estimate finish Fri May 25 20:26:39 2018 >=== last message repeated 2 times. === > 74.55% done, estimate finish Fri May 25 20:26:38 2018 >=== last message repeated 2 times. === > 74.56% done, estimate finish Fri May 25 20:26:38 2018 > 74.56% done, estimate finish Fri May 25 20:26:37 2018 >=== last message repeated 2 times. === > 74.57% done, estimate finish Fri May 25 20:26:38 2018 >=== last message repeated 2 times. === > 74.58% done, estimate finish Fri May 25 20:26:38 2018 > 74.58% done, estimate finish Fri May 25 20:26:37 2018 >=== last message repeated 2 times. === > 74.59% done, estimate finish Fri May 25 20:26:37 2018 >=== last message repeated 2 times. === > 74.60% done, estimate finish Fri May 25 20:26:38 2018 > 74.60% done, estimate finish Fri May 25 20:26:37 2018 > 74.61% done, estimate finish Fri May 25 20:26:37 2018 >=== last message repeated 2 times. === > 74.61% done, estimate finish Fri May 25 20:26:36 2018 > 74.62% done, estimate finish Fri May 25 20:26:36 2018 > 74.62% done, estimate finish Fri May 25 20:26:37 2018 > 74.63% done, estimate finish Fri May 25 20:26:37 2018 >=== last message repeated 2 times. === > 74.63% done, estimate finish Fri May 25 20:26:36 2018 > 74.64% done, estimate finish Fri May 25 20:26:36 2018 >=== last message repeated 2 times. === > 74.65% done, estimate finish Fri May 25 20:26:37 2018 >=== last message repeated 2 times. === > 74.65% done, estimate finish Fri May 25 20:26:36 2018 > 74.66% done, estimate finish Fri May 25 20:26:36 2018 >=== last message repeated 2 times. === > 74.67% done, estimate finish Fri May 25 20:26:35 2018 >=== last message repeated 2 times. === > 74.67% done, estimate finish Fri May 25 20:26:36 2018 > 74.68% done, estimate finish Fri May 25 20:26:36 2018 >=== last message repeated 2 times. === > 74.69% done, estimate finish Fri May 25 20:26:35 2018 >=== last message repeated 2 times. === > 74.70% done, estimate finish Fri May 25 20:26:35 2018 > 74.70% done, estimate finish Fri May 25 20:26:36 2018 >=== last message repeated 2 times. === > 74.71% done, estimate finish Fri May 25 20:26:35 2018 >=== last message repeated 2 times. === > 74.72% done, estimate finish Fri May 25 20:26:35 2018 > 74.72% done, estimate finish Fri May 25 20:26:34 2018 > 74.72% done, estimate finish Fri May 25 20:26:35 2018 > 74.73% done, estimate finish Fri May 25 20:26:35 2018 >=== last message repeated 2 times. === > 74.74% done, estimate finish Fri May 25 20:26:35 2018 > 74.74% done, estimate finish Fri May 25 20:26:34 2018 >=== last message repeated 2 times. === > 74.75% done, estimate finish Fri May 25 20:26:34 2018 > 74.75% done, estimate finish Fri May 25 20:26:35 2018 > 74.76% done, estimate finish Fri May 25 20:26:35 2018 > 74.76% done, estimate finish Fri May 25 20:26:34 2018 >=== last message repeated 2 times. === > 74.77% done, estimate finish Fri May 25 20:26:34 2018 > 74.77% done, estimate finish Fri May 25 20:26:33 2018 > 74.78% done, estimate finish Fri May 25 20:26:33 2018 > 74.78% done, estimate finish Fri May 25 20:26:34 2018 > 74.79% done, estimate finish Fri May 25 20:26:34 2018 >=== last message repeated 2 times. === > 74.79% done, estimate finish Fri May 25 20:26:33 2018 > 74.80% done, estimate finish Fri May 25 20:26:33 2018 >=== last message repeated 2 times. === > 74.81% done, estimate finish Fri May 25 20:26:34 2018 >=== last message repeated 2 times. === > 74.81% done, estimate finish Fri May 25 20:26:33 2018 > 74.82% done, estimate finish Fri May 25 20:26:33 2018 >=== last message repeated 2 times. === > 74.83% done, estimate finish Fri May 25 20:26:32 2018 > 74.83% done, estimate finish Fri May 25 20:26:33 2018 >=== last message repeated 2 times. === > 74.84% done, estimate finish Fri May 25 20:26:33 2018 >=== last message repeated 2 times. === > 74.85% done, estimate finish Fri May 25 20:26:32 2018 >=== last message repeated 3 times. === > 74.86% done, estimate finish Fri May 25 20:26:33 2018 >=== last message repeated 2 times. === > 74.87% done, estimate finish Fri May 25 20:26:32 2018 >=== last message repeated 2 times. === > 74.88% done, estimate finish Fri May 25 20:26:32 2018 > 74.88% done, estimate finish Fri May 25 20:26:31 2018 > 74.88% done, estimate finish Fri May 25 20:26:32 2018 > 74.89% done, estimate finish Fri May 25 20:26:32 2018 >=== last message repeated 2 times. === > 74.90% done, estimate finish Fri May 25 20:26:32 2018 > 74.90% done, estimate finish Fri May 25 20:26:31 2018 >=== last message repeated 2 times. === > 74.91% done, estimate finish Fri May 25 20:26:32 2018 >=== last message repeated 2 times. === > 74.92% done, estimate finish Fri May 25 20:26:32 2018 > 74.92% done, estimate finish Fri May 25 20:26:31 2018 >=== last message repeated 2 times. === > 74.93% done, estimate finish Fri May 25 20:26:31 2018 > 74.93% done, estimate finish Fri May 25 20:26:30 2018 > 74.94% done, estimate finish Fri May 25 20:26:31 2018 >=== last message repeated 2 times. === > 74.95% done, estimate finish Fri May 25 20:26:31 2018 >=== last message repeated 2 times. === > 74.95% done, estimate finish Fri May 25 20:26:30 2018 > 74.96% done, estimate finish Fri May 25 20:26:30 2018 >=== last message repeated 2 times. === > 74.97% done, estimate finish Fri May 25 20:26:31 2018 >=== last message repeated 2 times. === > 74.97% done, estimate finish Fri May 25 20:26:30 2018 > 74.98% done, estimate finish Fri May 25 20:26:30 2018 >=== last message repeated 2 times. === > 74.99% done, estimate finish Fri May 25 20:26:29 2018 > 74.99% done, estimate finish Fri May 25 20:26:31 2018 > 74.99% done, estimate finish Fri May 25 20:26:30 2018 > 75.00% done, estimate finish Fri May 25 20:26:30 2018 >=== last message repeated 2 times. === > 75.01% done, estimate finish Fri May 25 20:26:29 2018 >=== last message repeated 2 times. === > 75.01% done, estimate finish Fri May 25 20:26:30 2018 > 75.02% done, estimate finish Fri May 25 20:26:30 2018 >=== last message repeated 2 times. === > 75.03% done, estimate finish Fri May 25 20:26:29 2018 >=== last message repeated 2 times. === > 75.04% done, estimate finish Fri May 25 20:26:29 2018 > 75.04% done, estimate finish Fri May 25 20:26:28 2018 > 75.04% done, estimate finish Fri May 25 20:26:30 2018 > 75.05% done, estimate finish Fri May 25 20:26:29 2018 >=== last message repeated 2 times. === > 75.06% done, estimate finish Fri May 25 20:26:29 2018 > 75.06% done, estimate finish Fri May 25 20:26:28 2018 >=== last message repeated 2 times. === > 75.07% done, estimate finish Fri May 25 20:26:29 2018 >=== last message repeated 2 times. === > 75.08% done, estimate finish Fri May 25 20:26:29 2018 > 75.08% done, estimate finish Fri May 25 20:26:28 2018 >=== last message repeated 2 times. === > 75.09% done, estimate finish Fri May 25 20:26:28 2018 > 75.09% done, estimate finish Fri May 25 20:26:29 2018 > 75.10% done, estimate finish Fri May 25 20:26:29 2018 > 75.10% done, estimate finish Fri May 25 20:26:28 2018 >=== last message repeated 2 times. === > 75.11% done, estimate finish Fri May 25 20:26:28 2018 > 75.11% done, estimate finish Fri May 25 20:26:27 2018 > 75.12% done, estimate finish Fri May 25 20:26:27 2018 > 75.12% done, estimate finish Fri May 25 20:26:28 2018 > 75.13% done, estimate finish Fri May 25 20:26:28 2018 >=== last message repeated 2 times. === > 75.13% done, estimate finish Fri May 25 20:26:27 2018 > 75.14% done, estimate finish Fri May 25 20:26:27 2018 >=== last message repeated 2 times. === > 75.15% done, estimate finish Fri May 25 20:26:28 2018 >=== last message repeated 2 times. === > 75.15% done, estimate finish Fri May 25 20:26:27 2018 > 75.16% done, estimate finish Fri May 25 20:26:27 2018 >=== last message repeated 2 times. === > 75.17% done, estimate finish Fri May 25 20:26:26 2018 > 75.17% done, estimate finish Fri May 25 20:26:27 2018 >=== last message repeated 2 times. === > 75.18% done, estimate finish Fri May 25 20:26:27 2018 >=== last message repeated 2 times. === > 75.19% done, estimate finish Fri May 25 20:26:26 2018 >=== last message repeated 3 times. === > 75.20% done, estimate finish Fri May 25 20:26:27 2018 >=== last message repeated 2 times. === > 75.21% done, estimate finish Fri May 25 20:26:26 2018 >=== last message repeated 2 times. === > 75.22% done, estimate finish Fri May 25 20:26:26 2018 > 75.22% done, estimate finish Fri May 25 20:26:25 2018 > 75.22% done, estimate finish Fri May 25 20:26:26 2018 > 75.23% done, estimate finish Fri May 25 20:26:26 2018 >=== last message repeated 2 times. === > 75.24% done, estimate finish Fri May 25 20:26:26 2018 > 75.24% done, estimate finish Fri May 25 20:26:25 2018 >=== last message repeated 2 times. === > 75.25% done, estimate finish Fri May 25 20:26:26 2018 >=== last message repeated 2 times. === > 75.26% done, estimate finish Fri May 25 20:26:26 2018 > 75.26% done, estimate finish Fri May 25 20:26:25 2018 >=== last message repeated 2 times. === > 75.27% done, estimate finish Fri May 25 20:26:25 2018 > 75.27% done, estimate finish Fri May 25 20:26:24 2018 > 75.28% done, estimate finish Fri May 25 20:26:25 2018 >=== last message repeated 2 times. === > 75.29% done, estimate finish Fri May 25 20:26:25 2018 >=== last message repeated 2 times. === > 75.29% done, estimate finish Fri May 25 20:26:24 2018 > 75.30% done, estimate finish Fri May 25 20:26:24 2018 > 75.30% done, estimate finish Fri May 25 20:26:25 2018 > 75.31% done, estimate finish Fri May 25 20:26:25 2018 >=== last message repeated 2 times. === > 75.31% done, estimate finish Fri May 25 20:26:24 2018 > 75.32% done, estimate finish Fri May 25 20:26:24 2018 >=== last message repeated 2 times. === > 75.33% done, estimate finish Fri May 25 20:26:23 2018 > 75.33% done, estimate finish Fri May 25 20:26:25 2018 > 75.33% done, estimate finish Fri May 25 20:26:24 2018 > 75.34% done, estimate finish Fri May 25 20:26:24 2018 >=== last message repeated 2 times. === > 75.35% done, estimate finish Fri May 25 20:26:23 2018 >=== last message repeated 2 times. === > 75.35% done, estimate finish Fri May 25 20:26:24 2018 > 75.36% done, estimate finish Fri May 25 20:26:24 2018 >=== last message repeated 2 times. === > 75.37% done, estimate finish Fri May 25 20:26:23 2018 >=== last message repeated 2 times. === > 75.38% done, estimate finish Fri May 25 20:26:23 2018 > 75.38% done, estimate finish Fri May 25 20:26:22 2018 > 75.38% done, estimate finish Fri May 25 20:26:24 2018 > 75.39% done, estimate finish Fri May 25 20:26:23 2018 >=== last message repeated 2 times. === > 75.40% done, estimate finish Fri May 25 20:26:23 2018 > 75.40% done, estimate finish Fri May 25 20:26:22 2018 >=== last message repeated 2 times. === > 75.41% done, estimate finish Fri May 25 20:26:23 2018 >=== last message repeated 2 times. === > 75.42% done, estimate finish Fri May 25 20:26:23 2018 > 75.42% done, estimate finish Fri May 25 20:26:22 2018 >=== last message repeated 2 times. === > 75.43% done, estimate finish Fri May 25 20:26:22 2018 > 75.43% done, estimate finish Fri May 25 20:26:23 2018 > 75.44% done, estimate finish Fri May 25 20:26:23 2018 > 75.44% done, estimate finish Fri May 25 20:26:22 2018 >=== last message repeated 2 times. === > 75.45% done, estimate finish Fri May 25 20:26:22 2018 > 75.45% done, estimate finish Fri May 25 20:26:21 2018 > 75.46% done, estimate finish Fri May 25 20:26:21 2018 > 75.46% done, estimate finish Fri May 25 20:26:22 2018 > 75.47% done, estimate finish Fri May 25 20:26:22 2018 >=== last message repeated 2 times. === > 75.47% done, estimate finish Fri May 25 20:26:21 2018 > 75.48% done, estimate finish Fri May 25 20:26:22 2018 >=== last message repeated 2 times. === > 75.49% done, estimate finish Fri May 25 20:26:22 2018 >=== last message repeated 2 times. === > 75.49% done, estimate finish Fri May 25 20:26:21 2018 > 75.50% done, estimate finish Fri May 25 20:26:21 2018 >=== last message repeated 2 times. === > 75.51% done, estimate finish Fri May 25 20:26:22 2018 > 75.51% done, estimate finish Fri May 25 20:26:21 2018 >=== last message repeated 2 times. === > 75.52% done, estimate finish Fri May 25 20:26:21 2018 >=== last message repeated 2 times. === > 75.53% done, estimate finish Fri May 25 20:26:20 2018 >=== last message repeated 2 times. === > 75.53% done, estimate finish Fri May 25 20:26:21 2018 > 75.54% done, estimate finish Fri May 25 20:26:21 2018 >=== last message repeated 2 times. === > 75.55% done, estimate finish Fri May 25 20:26:20 2018 >=== last message repeated 2 times. === > 75.56% done, estimate finish Fri May 25 20:26:20 2018 > 75.56% done, estimate finish Fri May 25 20:26:21 2018 >=== last message repeated 2 times. === > 75.57% done, estimate finish Fri May 25 20:26:20 2018 >=== last message repeated 2 times. === > 75.58% done, estimate finish Fri May 25 20:26:20 2018 > 75.58% done, estimate finish Fri May 25 20:26:19 2018 > 75.58% done, estimate finish Fri May 25 20:26:20 2018 > 75.59% done, estimate finish Fri May 25 20:26:20 2018 >=== last message repeated 2 times. === > 75.60% done, estimate finish Fri May 25 20:26:20 2018 > 75.60% done, estimate finish Fri May 25 20:26:19 2018 >=== last message repeated 2 times. === > 75.61% done, estimate finish Fri May 25 20:26:19 2018 > 75.61% done, estimate finish Fri May 25 20:26:20 2018 > 75.62% done, estimate finish Fri May 25 20:26:20 2018 > 75.62% done, estimate finish Fri May 25 20:26:19 2018 > 75.63% done, estimate finish Fri May 25 20:26:19 2018 >=== last message repeated 2 times. === > 75.63% done, estimate finish Fri May 25 20:26:18 2018 > 75.64% done, estimate finish Fri May 25 20:26:19 2018 >=== last message repeated 2 times. === > 75.65% done, estimate finish Fri May 25 20:26:19 2018 >=== last message repeated 2 times. === > 75.65% done, estimate finish Fri May 25 20:26:18 2018 > 75.66% done, estimate finish Fri May 25 20:26:18 2018 >=== last message repeated 2 times. === > 75.67% done, estimate finish Fri May 25 20:26:19 2018 >=== last message repeated 2 times. === > 75.67% done, estimate finish Fri May 25 20:26:18 2018 > 75.68% done, estimate finish Fri May 25 20:26:18 2018 >=== last message repeated 2 times. === > 75.69% done, estimate finish Fri May 25 20:26:17 2018 > 75.69% done, estimate finish Fri May 25 20:26:18 2018 >=== last message repeated 2 times. === > 75.70% done, estimate finish Fri May 25 20:26:18 2018 >=== last message repeated 2 times. === > 75.71% done, estimate finish Fri May 25 20:26:17 2018 >=== last message repeated 2 times. === > 75.72% done, estimate finish Fri May 25 20:26:18 2018 >=== last message repeated 3 times. === > 75.73% done, estimate finish Fri May 25 20:26:17 2018 >=== last message repeated 2 times. === > 75.74% done, estimate finish Fri May 25 20:26:17 2018 > 75.74% done, estimate finish Fri May 25 20:26:16 2018 > 75.74% done, estimate finish Fri May 25 20:26:18 2018 > 75.75% done, estimate finish Fri May 25 20:26:17 2018 >=== last message repeated 2 times. === > 75.76% done, estimate finish Fri May 25 20:26:17 2018 > 75.76% done, estimate finish Fri May 25 20:26:16 2018 >=== last message repeated 2 times. === > 75.77% done, estimate finish Fri May 25 20:26:17 2018 >=== last message repeated 2 times. === > 75.78% done, estimate finish Fri May 25 20:26:17 2018 > 75.78% done, estimate finish Fri May 25 20:26:16 2018 >=== last message repeated 2 times. === > 75.79% done, estimate finish Fri May 25 20:26:16 2018 >=== last message repeated 2 times. === > 75.80% done, estimate finish Fri May 25 20:26:17 2018 > 75.80% done, estimate finish Fri May 25 20:26:16 2018 > 75.81% done, estimate finish Fri May 25 20:26:16 2018 >=== last message repeated 2 times. === > 75.81% done, estimate finish Fri May 25 20:26:15 2018 > 75.82% done, estimate finish Fri May 25 20:26:15 2018 > 75.82% done, estimate finish Fri May 25 20:26:16 2018 > 75.83% done, estimate finish Fri May 25 20:26:16 2018 >=== last message repeated 2 times. === > 75.83% done, estimate finish Fri May 25 20:26:15 2018 > 75.84% done, estimate finish Fri May 25 20:26:15 2018 >=== last message repeated 2 times. === > 75.85% done, estimate finish Fri May 25 20:26:16 2018 >=== last message repeated 2 times. === > 75.85% done, estimate finish Fri May 25 20:26:15 2018 > 75.86% done, estimate finish Fri May 25 20:26:15 2018 >=== last message repeated 2 times. === > 75.87% done, estimate finish Fri May 25 20:26:14 2018 >=== last message repeated 2 times. === > 75.87% done, estimate finish Fri May 25 20:26:15 2018 > 75.88% done, estimate finish Fri May 25 20:26:15 2018 >=== last message repeated 2 times. === > 75.89% done, estimate finish Fri May 25 20:26:14 2018 >=== last message repeated 2 times. === > 75.90% done, estimate finish Fri May 25 20:26:14 2018 > 75.90% done, estimate finish Fri May 25 20:26:15 2018 >=== last message repeated 2 times. === > 75.91% done, estimate finish Fri May 25 20:26:14 2018 >=== last message repeated 2 times. === > 75.92% done, estimate finish Fri May 25 20:26:14 2018 > 75.92% done, estimate finish Fri May 25 20:26:13 2018 >=== last message repeated 2 times. === > 75.93% done, estimate finish Fri May 25 20:26:14 2018 >=== last message repeated 2 times. === > 75.94% done, estimate finish Fri May 25 20:26:14 2018 > 75.94% done, estimate finish Fri May 25 20:26:13 2018 >=== last message repeated 2 times. === > 75.95% done, estimate finish Fri May 25 20:26:13 2018 > 75.95% done, estimate finish Fri May 25 20:26:14 2018 > 75.96% done, estimate finish Fri May 25 20:26:14 2018 > 75.96% done, estimate finish Fri May 25 20:26:13 2018 >=== last message repeated 2 times. === > 75.97% done, estimate finish Fri May 25 20:26:13 2018 >=== last message repeated 2 times. === > 75.98% done, estimate finish Fri May 25 20:26:12 2018 > 75.98% done, estimate finish Fri May 25 20:26:13 2018 > 75.99% done, estimate finish Fri May 25 20:26:13 2018 >=== last message repeated 2 times. === > 75.99% done, estimate finish Fri May 25 20:26:12 2018 > 76.00% done, estimate finish Fri May 25 20:26:12 2018 >=== last message repeated 2 times. === > 76.01% done, estimate finish Fri May 25 20:26:13 2018 >=== last message repeated 2 times. === > 76.01% done, estimate finish Fri May 25 20:26:12 2018 > 76.02% done, estimate finish Fri May 25 20:26:12 2018 >=== last message repeated 2 times. === > 76.03% done, estimate finish Fri May 25 20:26:12 2018 > 76.03% done, estimate finish Fri May 25 20:26:13 2018 > 76.03% done, estimate finish Fri May 25 20:26:12 2018 > 76.04% done, estimate finish Fri May 25 20:26:12 2018 >=== last message repeated 2 times. === > 76.05% done, estimate finish Fri May 25 20:26:11 2018 >=== last message repeated 2 times. === > 76.06% done, estimate finish Fri May 25 20:26:11 2018 > 76.06% done, estimate finish Fri May 25 20:26:12 2018 >=== last message repeated 2 times. === > 76.07% done, estimate finish Fri May 25 20:26:11 2018 >=== last message repeated 2 times. === > 76.08% done, estimate finish Fri May 25 20:26:11 2018 >=== last message repeated 2 times. === > 76.08% done, estimate finish Fri May 25 20:26:12 2018 > 76.09% done, estimate finish Fri May 25 20:26:11 2018 >=== last message repeated 2 times. === > 76.10% done, estimate finish Fri May 25 20:26:11 2018 >=== last message repeated 2 times. === > 76.10% done, estimate finish Fri May 25 20:26:10 2018 > 76.11% done, estimate finish Fri May 25 20:26:11 2018 >=== last message repeated 2 times. === > 76.12% done, estimate finish Fri May 25 20:26:11 2018 > 76.12% done, estimate finish Fri May 25 20:26:10 2018 >=== last message repeated 2 times. === > 76.13% done, estimate finish Fri May 25 20:26:10 2018 >=== last message repeated 2 times. === > 76.14% done, estimate finish Fri May 25 20:26:11 2018 > 76.14% done, estimate finish Fri May 25 20:26:10 2018 > 76.15% done, estimate finish Fri May 25 20:26:10 2018 >=== last message repeated 3 times. === > 76.16% done, estimate finish Fri May 25 20:26:09 2018 > 76.16% done, estimate finish Fri May 25 20:26:10 2018 > 76.17% done, estimate finish Fri May 25 20:26:10 2018 >=== last message repeated 2 times. === > 76.17% done, estimate finish Fri May 25 20:26:09 2018 > 76.18% done, estimate finish Fri May 25 20:26:09 2018 >=== last message repeated 2 times. === > 76.19% done, estimate finish Fri May 25 20:26:09 2018 > 76.19% done, estimate finish Fri May 25 20:26:10 2018 > 76.19% done, estimate finish Fri May 25 20:26:09 2018 > 76.20% done, estimate finish Fri May 25 20:26:09 2018 >=== last message repeated 2 times. === > 76.21% done, estimate finish Fri May 25 20:26:09 2018 > 76.21% done, estimate finish Fri May 25 20:26:08 2018 > 76.21% done, estimate finish Fri May 25 20:26:09 2018 > 76.22% done, estimate finish Fri May 25 20:26:09 2018 >=== last message repeated 2 times. === > 76.23% done, estimate finish Fri May 25 20:26:09 2018 > 76.23% done, estimate finish Fri May 25 20:26:08 2018 > 76.24% done, estimate finish Fri May 25 20:26:08 2018 >=== last message repeated 2 times. === > 76.24% done, estimate finish Fri May 25 20:26:09 2018 > 76.25% done, estimate finish Fri May 25 20:26:08 2018 >=== last message repeated 2 times. === > 76.26% done, estimate finish Fri May 25 20:26:08 2018 >=== last message repeated 2 times. === > 76.26% done, estimate finish Fri May 25 20:26:07 2018 > 76.27% done, estimate finish Fri May 25 20:26:08 2018 >=== last message repeated 2 times. === > 76.28% done, estimate finish Fri May 25 20:26:08 2018 >=== last message repeated 2 times. === > 76.28% done, estimate finish Fri May 25 20:26:07 2018 > 76.29% done, estimate finish Fri May 25 20:26:07 2018 > 76.29% done, estimate finish Fri May 25 20:26:08 2018 > 76.30% done, estimate finish Fri May 25 20:26:08 2018 >=== last message repeated 2 times. === > 76.30% done, estimate finish Fri May 25 20:26:07 2018 > 76.31% done, estimate finish Fri May 25 20:26:07 2018 >=== last message repeated 2 times. === > 76.32% done, estimate finish Fri May 25 20:26:06 2018 > 76.32% done, estimate finish Fri May 25 20:26:07 2018 > 76.33% done, estimate finish Fri May 25 20:26:07 2018 >=== last message repeated 3 times. === > 76.34% done, estimate finish Fri May 25 20:26:06 2018 >=== last message repeated 2 times. === > 76.35% done, estimate finish Fri May 25 20:26:07 2018 >=== last message repeated 3 times. === > 76.36% done, estimate finish Fri May 25 20:26:06 2018 >=== last message repeated 2 times. === > 76.37% done, estimate finish Fri May 25 20:26:06 2018 > 76.37% done, estimate finish Fri May 25 20:26:07 2018 > 76.37% done, estimate finish Fri May 25 20:26:06 2018 > 76.38% done, estimate finish Fri May 25 20:26:06 2018 >=== last message repeated 2 times. === > 76.39% done, estimate finish Fri May 25 20:26:06 2018 > 76.39% done, estimate finish Fri May 25 20:26:05 2018 > 76.40% done, estimate finish Fri May 25 20:26:05 2018 > 76.40% done, estimate finish Fri May 25 20:26:06 2018 >=== last message repeated 2 times. === > 76.41% done, estimate finish Fri May 25 20:26:06 2018 > 76.41% done, estimate finish Fri May 25 20:26:05 2018 > 76.42% done, estimate finish Fri May 25 20:26:05 2018 >=== last message repeated 2 times. === > 76.42% done, estimate finish Fri May 25 20:26:06 2018 > 76.43% done, estimate finish Fri May 25 20:26:06 2018 > 76.43% done, estimate finish Fri May 25 20:26:05 2018 > 76.44% done, estimate finish Fri May 25 20:26:05 2018 >=== last message repeated 2 times. === > 76.44% done, estimate finish Fri May 25 20:26:04 2018 > 76.45% done, estimate finish Fri May 25 20:26:05 2018 >=== last message repeated 2 times. === > 76.46% done, estimate finish Fri May 25 20:26:05 2018 >=== last message repeated 2 times. === > 76.46% done, estimate finish Fri May 25 20:26:04 2018 > 76.47% done, estimate finish Fri May 25 20:26:04 2018 >=== last message repeated 2 times. === > 76.48% done, estimate finish Fri May 25 20:26:05 2018 >=== last message repeated 2 times. === > 76.49% done, estimate finish Fri May 25 20:26:04 2018 >=== last message repeated 3 times. === > 76.50% done, estimate finish Fri May 25 20:26:03 2018 >=== last message repeated 2 times. === > 76.51% done, estimate finish Fri May 25 20:26:04 2018 >=== last message repeated 3 times. === > 76.52% done, estimate finish Fri May 25 20:26:03 2018 >=== last message repeated 2 times. === > 76.53% done, estimate finish Fri May 25 20:26:03 2018 > 76.53% done, estimate finish Fri May 25 20:26:04 2018 >=== last message repeated 2 times. === > 76.54% done, estimate finish Fri May 25 20:26:03 2018 >=== last message repeated 2 times. === > 76.55% done, estimate finish Fri May 25 20:26:03 2018 >=== last message repeated 2 times. === > 76.55% done, estimate finish Fri May 25 20:26:04 2018 > 76.56% done, estimate finish Fri May 25 20:26:03 2018 >=== last message repeated 2 times. === > 76.57% done, estimate finish Fri May 25 20:26:03 2018 > 76.57% done, estimate finish Fri May 25 20:26:02 2018 > 76.58% done, estimate finish Fri May 25 20:26:02 2018 >=== last message repeated 2 times. === > 76.58% done, estimate finish Fri May 25 20:26:03 2018 > 76.59% done, estimate finish Fri May 25 20:26:03 2018 > 76.59% done, estimate finish Fri May 25 20:26:02 2018 > 76.60% done, estimate finish Fri May 25 20:26:02 2018 >=== last message repeated 3 times. === > 76.61% done, estimate finish Fri May 25 20:26:03 2018 > 76.61% done, estimate finish Fri May 25 20:26:02 2018 > 76.62% done, estimate finish Fri May 25 20:26:02 2018 >=== last message repeated 2 times. === > 76.62% done, estimate finish Fri May 25 20:26:01 2018 > 76.63% done, estimate finish Fri May 25 20:26:01 2018 > 76.63% done, estimate finish Fri May 25 20:26:02 2018 > 76.64% done, estimate finish Fri May 25 20:26:02 2018 >=== last message repeated 2 times. === > 76.64% done, estimate finish Fri May 25 20:26:01 2018 > 76.65% done, estimate finish Fri May 25 20:26:01 2018 >=== last message repeated 2 times. === > 76.66% done, estimate finish Fri May 25 20:26:01 2018 > 76.66% done, estimate finish Fri May 25 20:26:02 2018 > 76.67% done, estimate finish Fri May 25 20:26:01 2018 >=== last message repeated 3 times. === > 76.68% done, estimate finish Fri May 25 20:26:01 2018 > 76.68% done, estimate finish Fri May 25 20:26:00 2018 > 76.69% done, estimate finish Fri May 25 20:26:01 2018 >=== last message repeated 3 times. === > 76.70% done, estimate finish Fri May 25 20:26:00 2018 >=== last message repeated 2 times. === > 76.71% done, estimate finish Fri May 25 20:26:00 2018 > 76.71% done, estimate finish Fri May 25 20:26:01 2018 >=== last message repeated 2 times. === > 76.72% done, estimate finish Fri May 25 20:26:00 2018 >=== last message repeated 2 times. === > 76.73% done, estimate finish Fri May 25 20:26:00 2018 >=== last message repeated 2 times. === > 76.73% done, estimate finish Fri May 25 20:25:59 2018 > 76.74% done, estimate finish Fri May 25 20:26:00 2018 >=== last message repeated 2 times. === > 76.75% done, estimate finish Fri May 25 20:26:00 2018 >=== last message repeated 2 times. === > 76.76% done, estimate finish Fri May 25 20:25:59 2018 >=== last message repeated 2 times. === > 76.76% done, estimate finish Fri May 25 20:26:00 2018 > 76.77% done, estimate finish Fri May 25 20:26:00 2018 > 76.77% done, estimate finish Fri May 25 20:25:59 2018 > 76.78% done, estimate finish Fri May 25 20:25:59 2018 >=== last message repeated 3 times. === > 76.79% done, estimate finish Fri May 25 20:25:58 2018 > 76.79% done, estimate finish Fri May 25 20:25:59 2018 > 76.80% done, estimate finish Fri May 25 20:25:59 2018 >=== last message repeated 3 times. === > 76.81% done, estimate finish Fri May 25 20:25:58 2018 >=== last message repeated 2 times. === > 76.82% done, estimate finish Fri May 25 20:25:59 2018 >=== last message repeated 2 times. === > 76.83% done, estimate finish Fri May 25 20:25:59 2018 > 76.83% done, estimate finish Fri May 25 20:25:58 2018 >=== last message repeated 2 times. === > 76.84% done, estimate finish Fri May 25 20:25:58 2018 > 76.84% done, estimate finish Fri May 25 20:25:59 2018 > 76.85% done, estimate finish Fri May 25 20:25:58 2018 >=== last message repeated 3 times. === > 76.86% done, estimate finish Fri May 25 20:25:58 2018 > 76.86% done, estimate finish Fri May 25 20:25:57 2018 > 76.87% done, estimate finish Fri May 25 20:25:57 2018 > 76.87% done, estimate finish Fri May 25 20:25:58 2018 >=== last message repeated 2 times. === > 76.88% done, estimate finish Fri May 25 20:25:58 2018 > 76.88% done, estimate finish Fri May 25 20:25:57 2018 > 76.89% done, estimate finish Fri May 25 20:25:57 2018 >=== last message repeated 2 times. === > 76.89% done, estimate finish Fri May 25 20:25:58 2018 > 76.90% done, estimate finish Fri May 25 20:25:58 2018 > 76.90% done, estimate finish Fri May 25 20:25:57 2018 > 76.91% done, estimate finish Fri May 25 20:25:57 2018 >=== last message repeated 2 times. === > 76.92% done, estimate finish Fri May 25 20:25:56 2018 >=== last message repeated 2 times. === > 76.92% done, estimate finish Fri May 25 20:25:57 2018 > 76.93% done, estimate finish Fri May 25 20:25:57 2018 >=== last message repeated 2 times. === > 76.94% done, estimate finish Fri May 25 20:25:56 2018 >=== last message repeated 3 times. === > 76.95% done, estimate finish Fri May 25 20:25:57 2018 >=== last message repeated 2 times. === > 76.96% done, estimate finish Fri May 25 20:25:56 2018 >=== last message repeated 3 times. === > 76.97% done, estimate finish Fri May 25 20:25:55 2018 > 76.97% done, estimate finish Fri May 25 20:25:57 2018 > 76.98% done, estimate finish Fri May 25 20:25:56 2018 >=== last message repeated 3 times. === > 76.99% done, estimate finish Fri May 25 20:25:55 2018 >=== last message repeated 2 times. === > 77.00% done, estimate finish Fri May 25 20:25:55 2018 > 77.00% done, estimate finish Fri May 25 20:25:56 2018 > 77.01% done, estimate finish Fri May 25 20:25:56 2018 > 77.01% done, estimate finish Fri May 25 20:25:55 2018 >=== last message repeated 2 times. === > 77.02% done, estimate finish Fri May 25 20:25:55 2018 >=== last message repeated 2 times. === > 77.03% done, estimate finish Fri May 25 20:25:56 2018 > 77.03% done, estimate finish Fri May 25 20:25:55 2018 >=== last message repeated 2 times. === > 77.04% done, estimate finish Fri May 25 20:25:55 2018 > 77.04% done, estimate finish Fri May 25 20:25:54 2018 > 77.05% done, estimate finish Fri May 25 20:25:54 2018 >=== last message repeated 2 times. === > 77.05% done, estimate finish Fri May 25 20:25:55 2018 > 77.06% done, estimate finish Fri May 25 20:25:55 2018 > 77.06% done, estimate finish Fri May 25 20:25:54 2018 > 77.07% done, estimate finish Fri May 25 20:25:54 2018 >=== last message repeated 3 times. === > 77.08% done, estimate finish Fri May 25 20:25:55 2018 > 77.08% done, estimate finish Fri May 25 20:25:54 2018 > 77.09% done, estimate finish Fri May 25 20:25:54 2018 >=== last message repeated 2 times. === > 77.10% done, estimate finish Fri May 25 20:25:54 2018 > 77.10% done, estimate finish Fri May 25 20:25:53 2018 > 77.10% done, estimate finish Fri May 25 20:25:54 2018 > 77.11% done, estimate finish Fri May 25 20:25:54 2018 >=== last message repeated 2 times. === > 77.12% done, estimate finish Fri May 25 20:25:53 2018 >=== last message repeated 3 times. === > 77.13% done, estimate finish Fri May 25 20:25:53 2018 > 77.13% done, estimate finish Fri May 25 20:25:54 2018 > 77.14% done, estimate finish Fri May 25 20:25:53 2018 >=== last message repeated 3 times. === > 77.15% done, estimate finish Fri May 25 20:25:53 2018 > 77.15% done, estimate finish Fri May 25 20:25:52 2018 > 77.16% done, estimate finish Fri May 25 20:25:53 2018 >=== last message repeated 2 times. === > 77.17% done, estimate finish Fri May 25 20:25:53 2018 >=== last message repeated 2 times. === > 77.17% done, estimate finish Fri May 25 20:25:52 2018 > 77.18% done, estimate finish Fri May 25 20:25:52 2018 > 77.18% done, estimate finish Fri May 25 20:25:53 2018 > 77.19% done, estimate finish Fri May 25 20:25:53 2018 > 77.19% done, estimate finish Fri May 25 20:25:52 2018 >=== last message repeated 2 times. === > 77.20% done, estimate finish Fri May 25 20:25:52 2018 >=== last message repeated 2 times. === > 77.21% done, estimate finish Fri May 25 20:25:51 2018 > 77.21% done, estimate finish Fri May 25 20:25:52 2018 >=== last message repeated 2 times. === > 77.22% done, estimate finish Fri May 25 20:25:52 2018 >=== last message repeated 2 times. === > 77.23% done, estimate finish Fri May 25 20:25:51 2018 >=== last message repeated 2 times. === > 77.23% done, estimate finish Fri May 25 20:25:52 2018 > 77.24% done, estimate finish Fri May 25 20:25:52 2018 >=== last message repeated 2 times. === > 77.25% done, estimate finish Fri May 25 20:25:51 2018 >=== last message repeated 2 times. === > 77.26% done, estimate finish Fri May 25 20:25:51 2018 > 77.26% done, estimate finish Fri May 25 20:25:52 2018 > 77.26% done, estimate finish Fri May 25 20:25:51 2018 > 77.27% done, estimate finish Fri May 25 20:25:51 2018 >=== last message repeated 2 times. === > 77.28% done, estimate finish Fri May 25 20:25:51 2018 > 77.28% done, estimate finish Fri May 25 20:25:50 2018 >=== last message repeated 2 times. === > 77.29% done, estimate finish Fri May 25 20:25:51 2018 >=== last message repeated 2 times. === > 77.30% done, estimate finish Fri May 25 20:25:51 2018 > 77.30% done, estimate finish Fri May 25 20:25:50 2018 >=== last message repeated 2 times. === > 77.31% done, estimate finish Fri May 25 20:25:50 2018 > 77.31% done, estimate finish Fri May 25 20:25:51 2018 > 77.32% done, estimate finish Fri May 25 20:25:51 2018 > 77.32% done, estimate finish Fri May 25 20:25:50 2018 >=== last message repeated 2 times. === > 77.33% done, estimate finish Fri May 25 20:25:50 2018 > 77.33% done, estimate finish Fri May 25 20:25:49 2018 > 77.34% done, estimate finish Fri May 25 20:25:50 2018 >=== last message repeated 2 times. === > 77.35% done, estimate finish Fri May 25 20:25:50 2018 >=== last message repeated 2 times. === > 77.35% done, estimate finish Fri May 25 20:25:49 2018 > 77.36% done, estimate finish Fri May 25 20:25:49 2018 >=== last message repeated 2 times. === > 77.37% done, estimate finish Fri May 25 20:25:50 2018 >=== last message repeated 2 times. === > 77.37% done, estimate finish Fri May 25 20:25:49 2018 > 77.38% done, estimate finish Fri May 25 20:25:49 2018 >=== last message repeated 2 times. === > 77.39% done, estimate finish Fri May 25 20:25:49 2018 > 77.39% done, estimate finish Fri May 25 20:25:50 2018 > 77.39% done, estimate finish Fri May 25 20:25:49 2018 > 77.40% done, estimate finish Fri May 25 20:25:49 2018 >=== last message repeated 2 times. === > 77.41% done, estimate finish Fri May 25 20:25:48 2018 >=== last message repeated 3 times. === > 77.42% done, estimate finish Fri May 25 20:25:49 2018 >=== last message repeated 2 times. === > 77.43% done, estimate finish Fri May 25 20:25:48 2018 >=== last message repeated 2 times. === > 77.44% done, estimate finish Fri May 25 20:25:48 2018 >=== last message repeated 2 times. === > 77.44% done, estimate finish Fri May 25 20:25:49 2018 > 77.45% done, estimate finish Fri May 25 20:25:48 2018 >=== last message repeated 2 times. === > 77.46% done, estimate finish Fri May 25 20:25:48 2018 >=== last message repeated 2 times. === > 77.46% done, estimate finish Fri May 25 20:25:47 2018 > 77.47% done, estimate finish Fri May 25 20:25:48 2018 >=== last message repeated 2 times. === > 77.48% done, estimate finish Fri May 25 20:25:48 2018 > 77.48% done, estimate finish Fri May 25 20:25:47 2018 >=== last message repeated 2 times. === > 77.49% done, estimate finish Fri May 25 20:25:47 2018 >=== last message repeated 2 times. === > 77.50% done, estimate finish Fri May 25 20:25:48 2018 > 77.50% done, estimate finish Fri May 25 20:25:47 2018 >=== last message repeated 2 times. === > 77.51% done, estimate finish Fri May 25 20:25:47 2018 >=== last message repeated 2 times. === > 77.52% done, estimate finish Fri May 25 20:25:46 2018 > 77.52% done, estimate finish Fri May 25 20:25:47 2018 > 77.53% done, estimate finish Fri May 25 20:25:47 2018 >=== last message repeated 3 times. === > 77.54% done, estimate finish Fri May 25 20:25:46 2018 >=== last message repeated 2 times. === > 77.55% done, estimate finish Fri May 25 20:25:47 2018 >=== last message repeated 2 times. === > 77.55% done, estimate finish Fri May 25 20:25:46 2018 > 77.56% done, estimate finish Fri May 25 20:25:46 2018 >=== last message repeated 2 times. === > 77.57% done, estimate finish Fri May 25 20:25:46 2018 > 77.57% done, estimate finish Fri May 25 20:25:45 2018 > 77.57% done, estimate finish Fri May 25 20:25:46 2018 > 77.58% done, estimate finish Fri May 25 20:25:46 2018 >=== last message repeated 2 times. === > 77.59% done, estimate finish Fri May 25 20:25:46 2018 > 77.59% done, estimate finish Fri May 25 20:25:45 2018 > 77.60% done, estimate finish Fri May 25 20:25:45 2018 >=== last message repeated 2 times. === > 77.60% done, estimate finish Fri May 25 20:25:46 2018 > 77.61% done, estimate finish Fri May 25 20:25:46 2018 > 77.61% done, estimate finish Fri May 25 20:25:45 2018 > 77.62% done, estimate finish Fri May 25 20:25:45 2018 >=== last message repeated 2 times. === > 77.62% done, estimate finish Fri May 25 20:25:46 2018 > 77.63% done, estimate finish Fri May 25 20:25:45 2018 >=== last message repeated 2 times. === > 77.64% done, estimate finish Fri May 25 20:25:45 2018 >=== last message repeated 2 times. === > 77.64% done, estimate finish Fri May 25 20:25:44 2018 > 77.65% done, estimate finish Fri May 25 20:25:44 2018 > 77.65% done, estimate finish Fri May 25 20:25:45 2018 > 77.66% done, estimate finish Fri May 25 20:25:45 2018 >=== last message repeated 2 times. === > 77.66% done, estimate finish Fri May 25 20:25:44 2018 > 77.67% done, estimate finish Fri May 25 20:25:44 2018 >=== last message repeated 2 times. === > 77.68% done, estimate finish Fri May 25 20:25:44 2018 > 77.68% done, estimate finish Fri May 25 20:25:45 2018 > 77.69% done, estimate finish Fri May 25 20:25:44 2018 >=== last message repeated 3 times. === > 77.70% done, estimate finish Fri May 25 20:25:43 2018 >=== last message repeated 2 times. === > 77.71% done, estimate finish Fri May 25 20:25:44 2018 >=== last message repeated 3 times. === > 77.72% done, estimate finish Fri May 25 20:25:43 2018 >=== last message repeated 2 times. === > 77.73% done, estimate finish Fri May 25 20:25:43 2018 > 77.73% done, estimate finish Fri May 25 20:25:44 2018 >=== last message repeated 2 times. === > 77.74% done, estimate finish Fri May 25 20:25:43 2018 >=== last message repeated 2 times. === > 77.75% done, estimate finish Fri May 25 20:25:43 2018 >=== last message repeated 2 times. === > 77.75% done, estimate finish Fri May 25 20:25:42 2018 > 77.76% done, estimate finish Fri May 25 20:25:43 2018 >=== last message repeated 2 times. === > 77.77% done, estimate finish Fri May 25 20:25:43 2018 >=== last message repeated 2 times. === > 77.78% done, estimate finish Fri May 25 20:25:42 2018 >=== last message repeated 2 times. === > 77.78% done, estimate finish Fri May 25 20:25:43 2018 > 77.79% done, estimate finish Fri May 25 20:25:43 2018 > 77.79% done, estimate finish Fri May 25 20:25:42 2018 > 77.80% done, estimate finish Fri May 25 20:25:42 2018 >=== last message repeated 3 times. === > 77.81% done, estimate finish Fri May 25 20:25:41 2018 > 77.81% done, estimate finish Fri May 25 20:25:42 2018 > 77.82% done, estimate finish Fri May 25 20:25:42 2018 >=== last message repeated 3 times. === > 77.83% done, estimate finish Fri May 25 20:25:41 2018 >=== last message repeated 2 times. === > 77.84% done, estimate finish Fri May 25 20:25:42 2018 >=== last message repeated 3 times. === > 77.85% done, estimate finish Fri May 25 20:25:41 2018 >=== last message repeated 2 times. === > 77.86% done, estimate finish Fri May 25 20:25:41 2018 > 77.86% done, estimate finish Fri May 25 20:25:40 2018 > 77.87% done, estimate finish Fri May 25 20:25:41 2018 >=== last message repeated 3 times. === > 77.88% done, estimate finish Fri May 25 20:25:41 2018 > 77.88% done, estimate finish Fri May 25 20:25:40 2018 > 77.89% done, estimate finish Fri May 25 20:25:40 2018 > 77.89% done, estimate finish Fri May 25 20:25:41 2018 >=== last message repeated 2 times. === > 77.90% done, estimate finish Fri May 25 20:25:41 2018 > 77.90% done, estimate finish Fri May 25 20:25:40 2018 > 77.91% done, estimate finish Fri May 25 20:25:40 2018 >=== last message repeated 3 times. === > 77.92% done, estimate finish Fri May 25 20:25:41 2018 > 77.92% done, estimate finish Fri May 25 20:25:40 2018 > 77.93% done, estimate finish Fri May 25 20:25:40 2018 >=== last message repeated 2 times. === > 77.94% done, estimate finish Fri May 25 20:25:39 2018 >=== last message repeated 3 times. === > 77.95% done, estimate finish Fri May 25 20:25:40 2018 >=== last message repeated 2 times. === > 77.96% done, estimate finish Fri May 25 20:25:39 2018 >=== last message repeated 3 times. === > 77.97% done, estimate finish Fri May 25 20:25:39 2018 > 77.97% done, estimate finish Fri May 25 20:25:40 2018 > 77.98% done, estimate finish Fri May 25 20:25:39 2018 >=== last message repeated 3 times. === > 77.99% done, estimate finish Fri May 25 20:25:39 2018 > 77.99% done, estimate finish Fri May 25 20:25:38 2018 > 78.00% done, estimate finish Fri May 25 20:25:38 2018 > 78.00% done, estimate finish Fri May 25 20:25:39 2018 >=== last message repeated 2 times. === > 78.01% done, estimate finish Fri May 25 20:25:38 2018 >=== last message repeated 2 times. === > 78.02% done, estimate finish Fri May 25 20:25:38 2018 >=== last message repeated 2 times. === > 78.03% done, estimate finish Fri May 25 20:25:37 2018 > 78.03% done, estimate finish Fri May 25 20:25:38 2018 >=== last message repeated 2 times. === > 78.04% done, estimate finish Fri May 25 20:25:38 2018 >=== last message repeated 2 times. === > 78.05% done, estimate finish Fri May 25 20:25:37 2018 >=== last message repeated 3 times. === > 78.06% done, estimate finish Fri May 25 20:25:38 2018 >=== last message repeated 2 times. === > 78.07% done, estimate finish Fri May 25 20:25:37 2018 >=== last message repeated 3 times. === > 78.08% done, estimate finish Fri May 25 20:25:37 2018 > 78.08% done, estimate finish Fri May 25 20:25:38 2018 > 78.09% done, estimate finish Fri May 25 20:25:37 2018 >=== last message repeated 3 times. === > 78.10% done, estimate finish Fri May 25 20:25:36 2018 >=== last message repeated 2 times. === > 78.11% done, estimate finish Fri May 25 20:25:36 2018 > 78.11% done, estimate finish Fri May 25 20:25:37 2018 > 78.12% done, estimate finish Fri May 25 20:25:37 2018 > 78.12% done, estimate finish Fri May 25 20:25:36 2018 >=== last message repeated 2 times. === > 78.13% done, estimate finish Fri May 25 20:25:36 2018 >=== last message repeated 2 times. === > 78.14% done, estimate finish Fri May 25 20:25:37 2018 > 78.14% done, estimate finish Fri May 25 20:25:36 2018 >=== last message repeated 2 times. === > 78.15% done, estimate finish Fri May 25 20:25:36 2018 >=== last message repeated 2 times. === > 78.16% done, estimate finish Fri May 25 20:25:35 2018 >=== last message repeated 2 times. === > 78.16% done, estimate finish Fri May 25 20:25:36 2018 > 78.17% done, estimate finish Fri May 25 20:25:36 2018 > 78.17% done, estimate finish Fri May 25 20:25:35 2018 > 78.18% done, estimate finish Fri May 25 20:25:35 2018 >=== last message repeated 3 times. === > 78.19% done, estimate finish Fri May 25 20:25:36 2018 > 78.19% done, estimate finish Fri May 25 20:25:35 2018 > 78.20% done, estimate finish Fri May 25 20:25:35 2018 >=== last message repeated 2 times. === > 78.21% done, estimate finish Fri May 25 20:25:35 2018 > 78.21% done, estimate finish Fri May 25 20:25:34 2018 >=== last message repeated 2 times. === > 78.22% done, estimate finish Fri May 25 20:25:35 2018 >=== last message repeated 2 times. === > 78.23% done, estimate finish Fri May 25 20:25:35 2018 > 78.23% done, estimate finish Fri May 25 20:25:34 2018 >=== last message repeated 2 times. === > 78.24% done, estimate finish Fri May 25 20:25:34 2018 > 78.24% done, estimate finish Fri May 25 20:25:35 2018 > 78.25% done, estimate finish Fri May 25 20:25:35 2018 > 78.25% done, estimate finish Fri May 25 20:25:34 2018 >=== last message repeated 2 times. === > 78.26% done, estimate finish Fri May 25 20:25:34 2018 > 78.26% done, estimate finish Fri May 25 20:25:33 2018 > 78.27% done, estimate finish Fri May 25 20:25:33 2018 >=== last message repeated 2 times. === > 78.27% done, estimate finish Fri May 25 20:25:34 2018 > 78.28% done, estimate finish Fri May 25 20:25:34 2018 > 78.28% done, estimate finish Fri May 25 20:25:33 2018 > 78.29% done, estimate finish Fri May 25 20:25:33 2018 >=== last message repeated 2 times. === > 78.30% done, estimate finish Fri May 25 20:25:33 2018 > 78.30% done, estimate finish Fri May 25 20:25:34 2018 > 78.30% done, estimate finish Fri May 25 20:25:33 2018 > 78.31% done, estimate finish Fri May 25 20:25:33 2018 >=== last message repeated 2 times. === > 78.32% done, estimate finish Fri May 25 20:25:33 2018 > 78.32% done, estimate finish Fri May 25 20:25:32 2018 >=== last message repeated 2 times. === > 78.33% done, estimate finish Fri May 25 20:25:33 2018 >=== last message repeated 2 times. === > 78.34% done, estimate finish Fri May 25 20:25:32 2018 >=== last message repeated 3 times. === > 78.35% done, estimate finish Fri May 25 20:25:32 2018 > 78.35% done, estimate finish Fri May 25 20:25:33 2018 > 78.36% done, estimate finish Fri May 25 20:25:32 2018 >=== last message repeated 2 times. === > 78.37% done, estimate finish Fri May 25 20:25:32 2018 >=== last message repeated 2 times. === > 78.37% done, estimate finish Fri May 25 20:25:31 2018 > 78.38% done, estimate finish Fri May 25 20:25:31 2018 > 78.38% done, estimate finish Fri May 25 20:25:32 2018 > 78.39% done, estimate finish Fri May 25 20:25:32 2018 >=== last message repeated 2 times. === > 78.39% done, estimate finish Fri May 25 20:25:31 2018 > 78.40% done, estimate finish Fri May 25 20:25:31 2018 >=== last message repeated 2 times. === > 78.41% done, estimate finish Fri May 25 20:25:30 2018 > 78.41% done, estimate finish Fri May 25 20:25:32 2018 > 78.41% done, estimate finish Fri May 25 20:25:31 2018 > 78.42% done, estimate finish Fri May 25 20:25:31 2018 >=== last message repeated 2 times. === > 78.43% done, estimate finish Fri May 25 20:25:30 2018 >=== last message repeated 2 times. === > 78.43% done, estimate finish Fri May 25 20:25:31 2018 > 78.44% done, estimate finish Fri May 25 20:25:31 2018 >=== last message repeated 2 times. === > 78.45% done, estimate finish Fri May 25 20:25:30 2018 >=== last message repeated 2 times. === > 78.46% done, estimate finish Fri May 25 20:25:30 2018 >=== last message repeated 2 times. === > 78.46% done, estimate finish Fri May 25 20:25:31 2018 > 78.47% done, estimate finish Fri May 25 20:25:30 2018 >=== last message repeated 2 times. === > 78.48% done, estimate finish Fri May 25 20:25:30 2018 >=== last message repeated 2 times. === > 78.48% done, estimate finish Fri May 25 20:25:29 2018 > 78.49% done, estimate finish Fri May 25 20:25:30 2018 >=== last message repeated 2 times. === > 78.50% done, estimate finish Fri May 25 20:25:30 2018 > 78.50% done, estimate finish Fri May 25 20:25:29 2018 >=== last message repeated 2 times. === > 78.51% done, estimate finish Fri May 25 20:25:29 2018 >=== last message repeated 2 times. === > 78.52% done, estimate finish Fri May 25 20:25:30 2018 > 78.52% done, estimate finish Fri May 25 20:25:29 2018 >=== last message repeated 2 times. === > 78.53% done, estimate finish Fri May 25 20:25:29 2018 >=== last message repeated 2 times. === > 78.54% done, estimate finish Fri May 25 20:25:28 2018 >=== last message repeated 2 times. === > 78.55% done, estimate finish Fri May 25 20:25:29 2018 >=== last message repeated 3 times. === > 78.56% done, estimate finish Fri May 25 20:25:28 2018 >=== last message repeated 2 times. === > 78.57% done, estimate finish Fri May 25 20:25:28 2018 > 78.57% done, estimate finish Fri May 25 20:25:29 2018 >=== last message repeated 2 times. === > 78.58% done, estimate finish Fri May 25 20:25:28 2018 >=== last message repeated 2 times. === > 78.59% done, estimate finish Fri May 25 20:25:28 2018 > 78.59% done, estimate finish Fri May 25 20:25:27 2018 >=== last message repeated 2 times. === > 78.60% done, estimate finish Fri May 25 20:25:28 2018 >=== last message repeated 2 times. === > 78.61% done, estimate finish Fri May 25 20:25:28 2018 > 78.61% done, estimate finish Fri May 25 20:25:27 2018 >=== last message repeated 2 times. === > 78.62% done, estimate finish Fri May 25 20:25:27 2018 >=== last message repeated 2 times. === > 78.63% done, estimate finish Fri May 25 20:25:28 2018 > 78.63% done, estimate finish Fri May 25 20:25:27 2018 > 78.64% done, estimate finish Fri May 25 20:25:27 2018 >=== last message repeated 3 times. === > 78.65% done, estimate finish Fri May 25 20:25:26 2018 >=== last message repeated 2 times. === > 78.66% done, estimate finish Fri May 25 20:25:27 2018 >=== last message repeated 2 times. === > 78.66% done, estimate finish Fri May 25 20:25:26 2018 > 78.67% done, estimate finish Fri May 25 20:25:26 2018 >=== last message repeated 2 times. === > 78.68% done, estimate finish Fri May 25 20:25:26 2018 > 78.68% done, estimate finish Fri May 25 20:25:27 2018 > 78.68% done, estimate finish Fri May 25 20:25:26 2018 > 78.69% done, estimate finish Fri May 25 20:25:26 2018 >=== last message repeated 2 times. === > 78.70% done, estimate finish Fri May 25 20:25:26 2018 > 78.70% done, estimate finish Fri May 25 20:25:25 2018 > 78.71% done, estimate finish Fri May 25 20:25:25 2018 > 78.71% done, estimate finish Fri May 25 20:25:26 2018 >=== last message repeated 2 times. === > 78.72% done, estimate finish Fri May 25 20:25:26 2018 > 78.72% done, estimate finish Fri May 25 20:25:25 2018 > 78.73% done, estimate finish Fri May 25 20:25:25 2018 >=== last message repeated 2 times. === > 78.73% done, estimate finish Fri May 25 20:25:26 2018 > 78.74% done, estimate finish Fri May 25 20:25:26 2018 > 78.74% done, estimate finish Fri May 25 20:25:25 2018 > 78.75% done, estimate finish Fri May 25 20:25:25 2018 >=== last message repeated 2 times. === > 78.75% done, estimate finish Fri May 25 20:25:24 2018 > 78.76% done, estimate finish Fri May 25 20:25:24 2018 > 78.76% done, estimate finish Fri May 25 20:25:25 2018 > 78.77% done, estimate finish Fri May 25 20:25:25 2018 >=== last message repeated 2 times. === > 78.77% done, estimate finish Fri May 25 20:25:24 2018 > 78.78% done, estimate finish Fri May 25 20:25:24 2018 >=== last message repeated 2 times. === > 78.79% done, estimate finish Fri May 25 20:25:24 2018 > 78.79% done, estimate finish Fri May 25 20:25:25 2018 > 78.80% done, estimate finish Fri May 25 20:25:24 2018 >=== last message repeated 3 times. === > 78.81% done, estimate finish Fri May 25 20:25:24 2018 > 78.81% done, estimate finish Fri May 25 20:25:23 2018 > 78.82% done, estimate finish Fri May 25 20:25:24 2018 >=== last message repeated 3 times. === > 78.83% done, estimate finish Fri May 25 20:25:24 2018 > 78.83% done, estimate finish Fri May 25 20:25:23 2018 > 78.84% done, estimate finish Fri May 25 20:25:23 2018 >=== last message repeated 2 times. === > 78.84% done, estimate finish Fri May 25 20:25:24 2018 > 78.85% done, estimate finish Fri May 25 20:25:23 2018 >=== last message repeated 2 times. === > 78.86% done, estimate finish Fri May 25 20:25:23 2018 >=== last message repeated 2 times. === > 78.86% done, estimate finish Fri May 25 20:25:22 2018 > 78.87% done, estimate finish Fri May 25 20:25:23 2018 >=== last message repeated 2 times. === > 78.88% done, estimate finish Fri May 25 20:25:23 2018 >=== last message repeated 2 times. === > 78.89% done, estimate finish Fri May 25 20:25:22 2018 >=== last message repeated 3 times. === > 78.90% done, estimate finish Fri May 25 20:25:23 2018 >=== last message repeated 2 times. === > 78.91% done, estimate finish Fri May 25 20:25:22 2018 >=== last message repeated 3 times. === > 78.92% done, estimate finish Fri May 25 20:25:22 2018 > 78.92% done, estimate finish Fri May 25 20:25:23 2018 > 78.93% done, estimate finish Fri May 25 20:25:22 2018 >=== last message repeated 3 times. === > 78.94% done, estimate finish Fri May 25 20:25:21 2018 >=== last message repeated 2 times. === > 78.95% done, estimate finish Fri May 25 20:25:21 2018 > 78.95% done, estimate finish Fri May 25 20:25:22 2018 >=== last message repeated 2 times. === > 78.96% done, estimate finish Fri May 25 20:25:21 2018 >=== last message repeated 2 times. === > 78.97% done, estimate finish Fri May 25 20:25:21 2018 >=== last message repeated 2 times. === > 78.98% done, estimate finish Fri May 25 20:25:20 2018 > 78.98% done, estimate finish Fri May 25 20:25:21 2018 >=== last message repeated 2 times. === > 78.99% done, estimate finish Fri May 25 20:25:21 2018 >=== last message repeated 2 times. === > 79.00% done, estimate finish Fri May 25 20:25:20 2018 >=== last message repeated 2 times. === > 79.00% done, estimate finish Fri May 25 20:25:21 2018 > 79.01% done, estimate finish Fri May 25 20:25:21 2018 >=== last message repeated 2 times. === > 79.02% done, estimate finish Fri May 25 20:25:20 2018 >=== last message repeated 3 times. === > 79.03% done, estimate finish Fri May 25 20:25:19 2018 > 79.03% done, estimate finish Fri May 25 20:25:20 2018 > 79.04% done, estimate finish Fri May 25 20:25:20 2018 >=== last message repeated 2 times. === > 79.05% done, estimate finish Fri May 25 20:25:20 2018 > 79.05% done, estimate finish Fri May 25 20:25:19 2018 >=== last message repeated 2 times. === > 79.06% done, estimate finish Fri May 25 20:25:20 2018 >=== last message repeated 2 times. === > 79.07% done, estimate finish Fri May 25 20:25:20 2018 > 79.07% done, estimate finish Fri May 25 20:25:19 2018 >=== last message repeated 2 times. === > 79.08% done, estimate finish Fri May 25 20:25:19 2018 >=== last message repeated 2 times. === > 79.09% done, estimate finish Fri May 25 20:25:20 2018 > 79.09% done, estimate finish Fri May 25 20:25:19 2018 >=== last message repeated 2 times. === > 79.10% done, estimate finish Fri May 25 20:25:19 2018 >=== last message repeated 2 times. === > 79.11% done, estimate finish Fri May 25 20:25:18 2018 >=== last message repeated 2 times. === > 79.11% done, estimate finish Fri May 25 20:25:19 2018 > 79.12% done, estimate finish Fri May 25 20:25:19 2018 > 79.12% done, estimate finish Fri May 25 20:25:18 2018 > 79.13% done, estimate finish Fri May 25 20:25:18 2018 >=== last message repeated 2 times. === > 79.14% done, estimate finish Fri May 25 20:25:18 2018 > 79.14% done, estimate finish Fri May 25 20:25:19 2018 > 79.14% done, estimate finish Fri May 25 20:25:18 2018 > 79.15% done, estimate finish Fri May 25 20:25:18 2018 >=== last message repeated 2 times. === > 79.16% done, estimate finish Fri May 25 20:25:18 2018 > 79.16% done, estimate finish Fri May 25 20:25:17 2018 >=== last message repeated 2 times. === > 79.17% done, estimate finish Fri May 25 20:25:18 2018 >=== last message repeated 2 times. === > 79.18% done, estimate finish Fri May 25 20:25:18 2018 > 79.18% done, estimate finish Fri May 25 20:25:17 2018 >=== last message repeated 2 times. === > 79.19% done, estimate finish Fri May 25 20:25:17 2018 > 79.19% done, estimate finish Fri May 25 20:25:18 2018 > 79.20% done, estimate finish Fri May 25 20:25:18 2018 > 79.20% done, estimate finish Fri May 25 20:25:17 2018 >=== last message repeated 2 times. === > 79.21% done, estimate finish Fri May 25 20:25:17 2018 > 79.21% done, estimate finish Fri May 25 20:25:16 2018 > 79.22% done, estimate finish Fri May 25 20:25:16 2018 >=== last message repeated 2 times. === > 79.23% done, estimate finish Fri May 25 20:25:17 2018 >=== last message repeated 2 times. === > 79.23% done, estimate finish Fri May 25 20:25:16 2018 > 79.24% done, estimate finish Fri May 25 20:25:16 2018 > 79.24% done, estimate finish Fri May 25 20:25:17 2018 > 79.25% done, estimate finish Fri May 25 20:25:17 2018 > 79.25% done, estimate finish Fri May 25 20:25:18 2018 >=== last message repeated 2 times. === > 79.26% done, estimate finish Fri May 25 20:25:17 2018 >=== last message repeated 2 times. === > 79.27% done, estimate finish Fri May 25 20:25:17 2018 >=== last message repeated 2 times. === > 79.27% done, estimate finish Fri May 25 20:25:16 2018 > 79.28% done, estimate finish Fri May 25 20:25:16 2018 >=== last message repeated 2 times. === > 79.29% done, estimate finish Fri May 25 20:25:16 2018 > 79.29% done, estimate finish Fri May 25 20:25:15 2018 >=== last message repeated 2 times. === > 79.30% done, estimate finish Fri May 25 20:25:16 2018 >=== last message repeated 2 times. === > 79.31% done, estimate finish Fri May 25 20:25:15 2018 >=== last message repeated 2 times. === > 79.32% done, estimate finish Fri May 25 20:25:15 2018 >=== last message repeated 2 times. === > 79.32% done, estimate finish Fri May 25 20:25:16 2018 > 79.33% done, estimate finish Fri May 25 20:25:15 2018 >=== last message repeated 2 times. === > 79.34% done, estimate finish Fri May 25 20:25:15 2018 >=== last message repeated 2 times. === > 79.34% done, estimate finish Fri May 25 20:25:14 2018 > 79.35% done, estimate finish Fri May 25 20:25:14 2018 > 79.35% done, estimate finish Fri May 25 20:25:15 2018 > 79.36% done, estimate finish Fri May 25 20:25:15 2018 >=== last message repeated 2 times. === > 79.36% done, estimate finish Fri May 25 20:25:14 2018 > 79.37% done, estimate finish Fri May 25 20:25:14 2018 >=== last message repeated 2 times. === > 79.38% done, estimate finish Fri May 25 20:25:15 2018 >=== last message repeated 2 times. === > 79.38% done, estimate finish Fri May 25 20:25:14 2018 > 79.39% done, estimate finish Fri May 25 20:25:14 2018 >=== last message repeated 2 times. === > 79.40% done, estimate finish Fri May 25 20:25:14 2018 > 79.40% done, estimate finish Fri May 25 20:25:13 2018 > 79.41% done, estimate finish Fri May 25 20:25:14 2018 >=== last message repeated 3 times. === > 79.42% done, estimate finish Fri May 25 20:25:13 2018 >=== last message repeated 2 times. === > 79.43% done, estimate finish Fri May 25 20:25:13 2018 >=== last message repeated 2 times. === > 79.43% done, estimate finish Fri May 25 20:25:14 2018 > 79.44% done, estimate finish Fri May 25 20:25:13 2018 >=== last message repeated 2 times. === > 79.45% done, estimate finish Fri May 25 20:25:13 2018 >=== last message repeated 2 times. === > 79.45% done, estimate finish Fri May 25 20:25:12 2018 > 79.46% done, estimate finish Fri May 25 20:25:13 2018 >=== last message repeated 2 times. === > 79.47% done, estimate finish Fri May 25 20:25:13 2018 >=== last message repeated 2 times. === > 79.48% done, estimate finish Fri May 25 20:25:12 2018 >=== last message repeated 3 times. === > 79.49% done, estimate finish Fri May 25 20:25:13 2018 >=== last message repeated 2 times. === > 79.50% done, estimate finish Fri May 25 20:25:12 2018 >=== last message repeated 3 times. === > 79.51% done, estimate finish Fri May 25 20:25:11 2018 > 79.51% done, estimate finish Fri May 25 20:25:12 2018 > 79.52% done, estimate finish Fri May 25 20:25:12 2018 >=== last message repeated 3 times. === > 79.53% done, estimate finish Fri May 25 20:25:11 2018 >=== last message repeated 2 times. === > 79.54% done, estimate finish Fri May 25 20:25:11 2018 >=== last message repeated 2 times. === > 79.54% done, estimate finish Fri May 25 20:25:12 2018 > 79.55% done, estimate finish Fri May 25 20:25:11 2018 >=== last message repeated 2 times. === > 79.56% done, estimate finish Fri May 25 20:25:11 2018 >=== last message repeated 2 times. === > 79.57% done, estimate finish Fri May 25 20:25:10 2018 > 79.57% done, estimate finish Fri May 25 20:25:11 2018 >=== last message repeated 2 times. === > 79.58% done, estimate finish Fri May 25 20:25:11 2018 >=== last message repeated 2 times. === > 79.59% done, estimate finish Fri May 25 20:25:10 2018 >=== last message repeated 3 times. === > 79.60% done, estimate finish Fri May 25 20:25:11 2018 > 79.60% done, estimate finish Fri May 25 20:25:10 2018 > 79.61% done, estimate finish Fri May 25 20:25:10 2018 >=== last message repeated 3 times. === > 79.62% done, estimate finish Fri May 25 20:25:09 2018 > 79.62% done, estimate finish Fri May 25 20:25:10 2018 > 79.63% done, estimate finish Fri May 25 20:25:10 2018 >=== last message repeated 3 times. === > 79.64% done, estimate finish Fri May 25 20:25:09 2018 >=== last message repeated 2 times. === > 79.65% done, estimate finish Fri May 25 20:25:09 2018 > 79.65% done, estimate finish Fri May 25 20:25:10 2018 > 79.66% done, estimate finish Fri May 25 20:25:10 2018 > 79.66% done, estimate finish Fri May 25 20:25:09 2018 >=== last message repeated 2 times. === > 79.67% done, estimate finish Fri May 25 20:25:09 2018 >=== last message repeated 2 times. === > 79.68% done, estimate finish Fri May 25 20:25:08 2018 > 79.68% done, estimate finish Fri May 25 20:25:09 2018 >=== last message repeated 2 times. === > 79.69% done, estimate finish Fri May 25 20:25:09 2018 >=== last message repeated 2 times. === > 79.70% done, estimate finish Fri May 25 20:25:08 2018 >=== last message repeated 2 times. === > 79.70% done, estimate finish Fri May 25 20:25:09 2018 > 79.71% done, estimate finish Fri May 25 20:25:09 2018 > 79.71% done, estimate finish Fri May 25 20:25:08 2018 > 79.72% done, estimate finish Fri May 25 20:25:08 2018 >=== last message repeated 3 times. === > 79.73% done, estimate finish Fri May 25 20:25:07 2018 > 79.73% done, estimate finish Fri May 25 20:25:08 2018 > 79.74% done, estimate finish Fri May 25 20:25:08 2018 >=== last message repeated 2 times. === > 79.75% done, estimate finish Fri May 25 20:25:08 2018 > 79.75% done, estimate finish Fri May 25 20:25:07 2018 >=== last message repeated 2 times. === > 79.76% done, estimate finish Fri May 25 20:25:08 2018 >=== last message repeated 2 times. === > 79.77% done, estimate finish Fri May 25 20:25:08 2018 > 79.77% done, estimate finish Fri May 25 20:25:07 2018 >=== last message repeated 2 times. === > 79.78% done, estimate finish Fri May 25 20:25:07 2018 >=== last message repeated 2 times. === > 79.79% done, estimate finish Fri May 25 20:25:08 2018 > 79.79% done, estimate finish Fri May 25 20:25:07 2018 >=== last message repeated 2 times. === > 79.80% done, estimate finish Fri May 25 20:25:07 2018 >=== last message repeated 2 times. === > 79.81% done, estimate finish Fri May 25 20:25:06 2018 >=== last message repeated 2 times. === > 79.81% done, estimate finish Fri May 25 20:25:07 2018 > 79.82% done, estimate finish Fri May 25 20:25:07 2018 > 79.82% done, estimate finish Fri May 25 20:25:06 2018 > 79.83% done, estimate finish Fri May 25 20:25:06 2018 >=== last message repeated 2 times. === > 79.84% done, estimate finish Fri May 25 20:25:06 2018 > 79.84% done, estimate finish Fri May 25 20:25:07 2018 > 79.84% done, estimate finish Fri May 25 20:25:06 2018 > 79.85% done, estimate finish Fri May 25 20:25:06 2018 >=== last message repeated 2 times. === > 79.86% done, estimate finish Fri May 25 20:25:06 2018 > 79.86% done, estimate finish Fri May 25 20:25:05 2018 >=== last message repeated 2 times. === > 79.87% done, estimate finish Fri May 25 20:25:06 2018 >=== last message repeated 2 times. === > 79.88% done, estimate finish Fri May 25 20:25:06 2018 > 79.88% done, estimate finish Fri May 25 20:25:05 2018 >=== last message repeated 2 times. === > 79.89% done, estimate finish Fri May 25 20:25:05 2018 >=== last message repeated 2 times. === > 79.90% done, estimate finish Fri May 25 20:25:06 2018 > 79.90% done, estimate finish Fri May 25 20:25:05 2018 > 79.91% done, estimate finish Fri May 25 20:25:05 2018 >=== last message repeated 2 times. === > 79.91% done, estimate finish Fri May 25 20:25:04 2018 > 79.92% done, estimate finish Fri May 25 20:25:04 2018 > 79.92% done, estimate finish Fri May 25 20:25:05 2018 > 79.93% done, estimate finish Fri May 25 20:25:05 2018 >=== last message repeated 2 times. === > 79.93% done, estimate finish Fri May 25 20:25:04 2018 > 79.94% done, estimate finish Fri May 25 20:25:04 2018 >=== last message repeated 2 times. === > 79.95% done, estimate finish Fri May 25 20:25:04 2018 > 79.95% done, estimate finish Fri May 25 20:25:05 2018 > 79.95% done, estimate finish Fri May 25 20:25:04 2018 > 79.96% done, estimate finish Fri May 25 20:25:04 2018 >=== last message repeated 2 times. === > 79.97% done, estimate finish Fri May 25 20:25:04 2018 > 79.97% done, estimate finish Fri May 25 20:25:03 2018 > 79.97% done, estimate finish Fri May 25 20:25:04 2018 > 79.98% done, estimate finish Fri May 25 20:25:04 2018 >=== last message repeated 2 times. === > 79.99% done, estimate finish Fri May 25 20:25:04 2018 > 79.99% done, estimate finish Fri May 25 20:25:03 2018 > 80.00% done, estimate finish Fri May 25 20:25:03 2018 >=== last message repeated 2 times. === > 80.00% done, estimate finish Fri May 25 20:25:04 2018 > 80.01% done, estimate finish Fri May 25 20:25:04 2018 > 80.01% done, estimate finish Fri May 25 20:25:03 2018 > 80.02% done, estimate finish Fri May 25 20:25:03 2018 >=== last message repeated 2 times. === > 80.02% done, estimate finish Fri May 25 20:25:02 2018 > 80.03% done, estimate finish Fri May 25 20:25:02 2018 > 80.03% done, estimate finish Fri May 25 20:25:03 2018 > 80.04% done, estimate finish Fri May 25 20:25:03 2018 >=== last message repeated 2 times. === > 80.04% done, estimate finish Fri May 25 20:25:02 2018 > 80.05% done, estimate finish Fri May 25 20:25:02 2018 >=== last message repeated 2 times. === > 80.06% done, estimate finish Fri May 25 20:25:03 2018 >=== last message repeated 2 times. === > 80.06% done, estimate finish Fri May 25 20:25:02 2018 > 80.07% done, estimate finish Fri May 25 20:25:02 2018 >=== last message repeated 2 times. === > 80.08% done, estimate finish Fri May 25 20:25:02 2018 > 80.08% done, estimate finish Fri May 25 20:25:01 2018 > 80.09% done, estimate finish Fri May 25 20:25:02 2018 >=== last message repeated 3 times. === > 80.10% done, estimate finish Fri May 25 20:25:02 2018 > 80.10% done, estimate finish Fri May 25 20:25:01 2018 > 80.11% done, estimate finish Fri May 25 20:25:01 2018 > 80.11% done, estimate finish Fri May 25 20:25:02 2018 >=== last message repeated 2 times. === > 80.12% done, estimate finish Fri May 25 20:25:02 2018 > 80.12% done, estimate finish Fri May 25 20:25:01 2018 > 80.13% done, estimate finish Fri May 25 20:25:01 2018 >=== last message repeated 2 times. === > 80.13% done, estimate finish Fri May 25 20:25:00 2018 > 80.14% done, estimate finish Fri May 25 20:25:01 2018 >=== last message repeated 2 times. === > 80.15% done, estimate finish Fri May 25 20:25:01 2018 >=== last message repeated 2 times. === > 80.15% done, estimate finish Fri May 25 20:25:00 2018 > 80.16% done, estimate finish Fri May 25 20:25:00 2018 >=== last message repeated 2 times. === > 80.17% done, estimate finish Fri May 25 20:25:01 2018 >=== last message repeated 2 times. === > 80.18% done, estimate finish Fri May 25 20:25:00 2018 >=== last message repeated 3 times. === > 80.19% done, estimate finish Fri May 25 20:25:00 2018 > 80.19% done, estimate finish Fri May 25 20:25:01 2018 > 80.20% done, estimate finish Fri May 25 20:25:00 2018 >=== last message repeated 3 times. === > 80.21% done, estimate finish Fri May 25 20:25:00 2018 > 80.21% done, estimate finish Fri May 25 20:24:59 2018 > 80.22% done, estimate finish Fri May 25 20:24:59 2018 > 80.22% done, estimate finish Fri May 25 20:25:00 2018 >=== last message repeated 2 times. === > 80.23% done, estimate finish Fri May 25 20:25:00 2018 > 80.23% done, estimate finish Fri May 25 20:24:59 2018 > 80.24% done, estimate finish Fri May 25 20:24:59 2018 >=== last message repeated 2 times. === > 80.25% done, estimate finish Fri May 25 20:24:58 2018 > 80.25% done, estimate finish Fri May 25 20:24:59 2018 >=== last message repeated 2 times. === > 80.26% done, estimate finish Fri May 25 20:24:59 2018 >=== last message repeated 2 times. === > 80.27% done, estimate finish Fri May 25 20:24:58 2018 >=== last message repeated 2 times. === > 80.27% done, estimate finish Fri May 25 20:24:59 2018 > 80.28% done, estimate finish Fri May 25 20:24:59 2018 >=== last message repeated 2 times. === > 80.29% done, estimate finish Fri May 25 20:24:58 2018 >=== last message repeated 3 times. === > 80.30% done, estimate finish Fri May 25 20:24:58 2018 > 80.30% done, estimate finish Fri May 25 20:24:59 2018 > 80.31% done, estimate finish Fri May 25 20:24:58 2018 >=== last message repeated 3 times. === > 80.32% done, estimate finish Fri May 25 20:24:58 2018 > 80.32% done, estimate finish Fri May 25 20:24:57 2018 > 80.33% done, estimate finish Fri May 25 20:24:58 2018 >=== last message repeated 2 times. === > 80.34% done, estimate finish Fri May 25 20:24:58 2018 >=== last message repeated 2 times. === > 80.34% done, estimate finish Fri May 25 20:24:57 2018 > 80.35% done, estimate finish Fri May 25 20:24:57 2018 >=== last message repeated 2 times. === > 80.36% done, estimate finish Fri May 25 20:24:58 2018 > 80.36% done, estimate finish Fri May 25 20:24:57 2018 >=== last message repeated 2 times. === > 80.37% done, estimate finish Fri May 25 20:24:57 2018 >=== last message repeated 2 times. === > 80.38% done, estimate finish Fri May 25 20:24:56 2018 >=== last message repeated 2 times. === > 80.38% done, estimate finish Fri May 25 20:24:57 2018 > 80.39% done, estimate finish Fri May 25 20:24:57 2018 >=== last message repeated 2 times. === > 80.40% done, estimate finish Fri May 25 20:24:56 2018 >=== last message repeated 3 times. === > 80.41% done, estimate finish Fri May 25 20:24:57 2018 >=== last message repeated 2 times. === > 80.42% done, estimate finish Fri May 25 20:24:56 2018 >=== last message repeated 2 times. === > 80.43% done, estimate finish Fri May 25 20:24:56 2018 >=== last message repeated 2 times. === > 80.43% done, estimate finish Fri May 25 20:24:55 2018 > 80.44% done, estimate finish Fri May 25 20:24:56 2018 >=== last message repeated 2 times. === > 80.45% done, estimate finish Fri May 25 20:24:56 2018 >=== last message repeated 2 times. === > 80.45% done, estimate finish Fri May 25 20:24:55 2018 > 80.46% done, estimate finish Fri May 25 20:24:55 2018 > 80.46% done, estimate finish Fri May 25 20:24:56 2018 > 80.47% done, estimate finish Fri May 25 20:24:56 2018 >=== last message repeated 2 times. === > 80.47% done, estimate finish Fri May 25 20:24:55 2018 > 80.48% done, estimate finish Fri May 25 20:24:55 2018 >=== last message repeated 2 times. === > 80.49% done, estimate finish Fri May 25 20:24:54 2018 > 80.49% done, estimate finish Fri May 25 20:24:55 2018 >=== last message repeated 2 times. === > 80.50% done, estimate finish Fri May 25 20:24:55 2018 >=== last message repeated 2 times. === > 80.51% done, estimate finish Fri May 25 20:24:54 2018 >=== last message repeated 2 times. === > 80.52% done, estimate finish Fri May 25 20:24:54 2018 > 80.52% done, estimate finish Fri May 25 20:24:55 2018 >=== last message repeated 2 times. === > 80.53% done, estimate finish Fri May 25 20:24:54 2018 >=== last message repeated 2 times. === > 80.54% done, estimate finish Fri May 25 20:24:54 2018 >=== last message repeated 2 times. === > 80.54% done, estimate finish Fri May 25 20:24:55 2018 > 80.55% done, estimate finish Fri May 25 20:24:54 2018 >=== last message repeated 2 times. === > 80.56% done, estimate finish Fri May 25 20:24:54 2018 >=== last message repeated 2 times. === > 80.56% done, estimate finish Fri May 25 20:24:53 2018 > 80.57% done, estimate finish Fri May 25 20:24:53 2018 > 80.57% done, estimate finish Fri May 25 20:24:54 2018 > 80.58% done, estimate finish Fri May 25 20:24:54 2018 >=== last message repeated 2 times. === > 80.58% done, estimate finish Fri May 25 20:24:53 2018 > 80.59% done, estimate finish Fri May 25 20:24:53 2018 >=== last message repeated 2 times. === > 80.60% done, estimate finish Fri May 25 20:24:52 2018 > 80.60% done, estimate finish Fri May 25 20:24:53 2018 > 80.61% done, estimate finish Fri May 25 20:24:53 2018 >=== last message repeated 3 times. === > 80.62% done, estimate finish Fri May 25 20:24:52 2018 >=== last message repeated 2 times. === > 80.63% done, estimate finish Fri May 25 20:24:53 2018 >=== last message repeated 3 times. === > 80.64% done, estimate finish Fri May 25 20:24:52 2018 >=== last message repeated 2 times. === > 80.65% done, estimate finish Fri May 25 20:24:52 2018 >=== last message repeated 2 times. === > 80.65% done, estimate finish Fri May 25 20:24:53 2018 > 80.66% done, estimate finish Fri May 25 20:24:52 2018 >=== last message repeated 2 times. === > 80.67% done, estimate finish Fri May 25 20:24:52 2018 >=== last message repeated 2 times. === > 80.68% done, estimate finish Fri May 25 20:24:51 2018 > 80.68% done, estimate finish Fri May 25 20:24:52 2018 >=== last message repeated 2 times. === > 80.69% done, estimate finish Fri May 25 20:24:52 2018 >=== last message repeated 2 times. === > 80.70% done, estimate finish Fri May 25 20:24:51 2018 >=== last message repeated 3 times. === > 80.71% done, estimate finish Fri May 25 20:24:52 2018 >=== last message repeated 2 times. === > 80.72% done, estimate finish Fri May 25 20:24:51 2018 >=== last message repeated 3 times. === > 80.73% done, estimate finish Fri May 25 20:24:50 2018 >=== last message repeated 2 times. === > 80.74% done, estimate finish Fri May 25 20:24:51 2018 >=== last message repeated 3 times. === > 80.75% done, estimate finish Fri May 25 20:24:50 2018 >=== last message repeated 2 times. === > 80.76% done, estimate finish Fri May 25 20:24:50 2018 > 80.76% done, estimate finish Fri May 25 20:24:51 2018 > 80.77% done, estimate finish Fri May 25 20:24:51 2018 > 80.77% done, estimate finish Fri May 25 20:24:50 2018 >=== last message repeated 2 times. === > 80.78% done, estimate finish Fri May 25 20:24:50 2018 >=== last message repeated 2 times. === > 80.79% done, estimate finish Fri May 25 20:24:49 2018 > 80.79% done, estimate finish Fri May 25 20:24:50 2018 >=== last message repeated 2 times. === > 80.80% done, estimate finish Fri May 25 20:24:50 2018 >=== last message repeated 2 times. === > 80.81% done, estimate finish Fri May 25 20:24:49 2018 >=== last message repeated 3 times. === > 80.82% done, estimate finish Fri May 25 20:24:50 2018 >=== last message repeated 2 times. === > 80.83% done, estimate finish Fri May 25 20:24:49 2018 >=== last message repeated 3 times. === > 80.84% done, estimate finish Fri May 25 20:24:49 2018 > 80.84% done, estimate finish Fri May 25 20:24:50 2018 > 80.85% done, estimate finish Fri May 25 20:24:49 2018 >=== last message repeated 2 times. === > 80.86% done, estimate finish Fri May 25 20:24:49 2018 > 80.86% done, estimate finish Fri May 25 20:24:48 2018 >=== last message repeated 2 times. === > 80.87% done, estimate finish Fri May 25 20:24:48 2018 > 80.87% done, estimate finish Fri May 25 20:24:49 2018 > 80.88% done, estimate finish Fri May 25 20:24:49 2018 > 80.88% done, estimate finish Fri May 25 20:24:48 2018 >=== last message repeated 2 times. === > 80.89% done, estimate finish Fri May 25 20:24:48 2018 >=== last message repeated 2 times. === > 80.90% done, estimate finish Fri May 25 20:24:49 2018 > 80.90% done, estimate finish Fri May 25 20:24:48 2018 >=== last message repeated 2 times. === > 80.91% done, estimate finish Fri May 25 20:24:48 2018 >=== last message repeated 2 times. === > 80.92% done, estimate finish Fri May 25 20:24:47 2018 >=== last message repeated 2 times. === > 80.92% done, estimate finish Fri May 25 20:24:48 2018 > 80.93% done, estimate finish Fri May 25 20:24:48 2018 >=== last message repeated 2 times. === > 80.94% done, estimate finish Fri May 25 20:24:47 2018 >=== last message repeated 2 times. === > 80.95% done, estimate finish Fri May 25 20:24:47 2018 >=== last message repeated 2 times. === > 80.95% done, estimate finish Fri May 25 20:24:48 2018 > 80.96% done, estimate finish Fri May 25 20:24:47 2018 >=== last message repeated 2 times. === > 80.97% done, estimate finish Fri May 25 20:24:47 2018 >=== last message repeated 2 times. === > 80.97% done, estimate finish Fri May 25 20:24:46 2018 > 80.98% done, estimate finish Fri May 25 20:24:47 2018 >=== last message repeated 2 times. === > 80.99% done, estimate finish Fri May 25 20:24:47 2018 > 80.99% done, estimate finish Fri May 25 20:24:46 2018 >=== last message repeated 2 times. === > 81.00% done, estimate finish Fri May 25 20:24:46 2018 >=== last message repeated 2 times. === > 81.01% done, estimate finish Fri May 25 20:24:47 2018 > 81.01% done, estimate finish Fri May 25 20:24:46 2018 > 81.02% done, estimate finish Fri May 25 20:24:46 2018 >=== last message repeated 3 times. === > 81.03% done, estimate finish Fri May 25 20:24:45 2018 > 81.03% done, estimate finish Fri May 25 20:24:46 2018 > 81.04% done, estimate finish Fri May 25 20:24:46 2018 >=== last message repeated 3 times. === > 81.05% done, estimate finish Fri May 25 20:24:45 2018 >=== last message repeated 2 times. === > 81.06% done, estimate finish Fri May 25 20:24:45 2018 > 81.06% done, estimate finish Fri May 25 20:24:46 2018 >=== last message repeated 2 times. === > 81.07% done, estimate finish Fri May 25 20:24:45 2018 >=== last message repeated 2 times. === > 81.08% done, estimate finish Fri May 25 20:24:45 2018 >=== last message repeated 2 times. === > 81.08% done, estimate finish Fri May 25 20:24:44 2018 > 81.09% done, estimate finish Fri May 25 20:24:45 2018 >=== last message repeated 2 times. === > 81.10% done, estimate finish Fri May 25 20:24:45 2018 >=== last message repeated 2 times. === > 81.11% done, estimate finish Fri May 25 20:24:44 2018 >=== last message repeated 2 times. === > 81.11% done, estimate finish Fri May 25 20:24:45 2018 > 81.12% done, estimate finish Fri May 25 20:24:45 2018 > 81.12% done, estimate finish Fri May 25 20:24:44 2018 > 81.13% done, estimate finish Fri May 25 20:24:44 2018 >=== last message repeated 3 times. === > 81.14% done, estimate finish Fri May 25 20:24:43 2018 > 81.14% done, estimate finish Fri May 25 20:24:44 2018 > 81.15% done, estimate finish Fri May 25 20:24:44 2018 >=== last message repeated 3 times. === > 81.16% done, estimate finish Fri May 25 20:24:43 2018 >=== last message repeated 2 times. === > 81.17% done, estimate finish Fri May 25 20:24:44 2018 >=== last message repeated 3 times. === > 81.18% done, estimate finish Fri May 25 20:24:43 2018 >=== last message repeated 2 times. === > 81.19% done, estimate finish Fri May 25 20:24:43 2018 >=== last message repeated 2 times. === > 81.20% done, estimate finish Fri May 25 20:24:44 2018 > 81.20% done, estimate finish Fri May 25 20:24:43 2018 >=== last message repeated 2 times. === > 81.21% done, estimate finish Fri May 25 20:24:43 2018 >=== last message repeated 2 times. === > 81.22% done, estimate finish Fri May 25 20:24:42 2018 > 81.22% done, estimate finish Fri May 25 20:24:43 2018 >=== last message repeated 2 times. === > 81.23% done, estimate finish Fri May 25 20:24:43 2018 >=== last message repeated 2 times. === > 81.24% done, estimate finish Fri May 25 20:24:42 2018 >=== last message repeated 2 times. === > 81.24% done, estimate finish Fri May 25 20:24:43 2018 > 81.25% done, estimate finish Fri May 25 20:24:43 2018 > 81.25% done, estimate finish Fri May 25 20:24:42 2018 > 81.26% done, estimate finish Fri May 25 20:24:42 2018 >=== last message repeated 3 times. === > 81.27% done, estimate finish Fri May 25 20:24:41 2018 >=== last message repeated 2 times. === > 81.28% done, estimate finish Fri May 25 20:24:42 2018 >=== last message repeated 2 times. === > 81.29% done, estimate finish Fri May 25 20:24:42 2018 > 81.29% done, estimate finish Fri May 25 20:24:41 2018 >=== last message repeated 2 times. === > 81.30% done, estimate finish Fri May 25 20:24:41 2018 > 81.30% done, estimate finish Fri May 25 20:24:42 2018 > 81.31% done, estimate finish Fri May 25 20:24:42 2018 > 81.31% done, estimate finish Fri May 25 20:24:41 2018 >=== last message repeated 2 times. === > 81.32% done, estimate finish Fri May 25 20:24:41 2018 >=== last message repeated 2 times. === > 81.33% done, estimate finish Fri May 25 20:24:42 2018 > 81.33% done, estimate finish Fri May 25 20:24:41 2018 >=== last message repeated 2 times. === > 81.34% done, estimate finish Fri May 25 20:24:41 2018 >=== last message repeated 2 times. === > 81.35% done, estimate finish Fri May 25 20:24:40 2018 >=== last message repeated 2 times. === > 81.36% done, estimate finish Fri May 25 20:24:41 2018 >=== last message repeated 3 times. === > 81.37% done, estimate finish Fri May 25 20:24:40 2018 >=== last message repeated 2 times. === > 81.38% done, estimate finish Fri May 25 20:24:40 2018 > 81.38% done, estimate finish Fri May 25 20:24:41 2018 >=== last message repeated 2 times. === > 81.39% done, estimate finish Fri May 25 20:24:40 2018 >=== last message repeated 2 times. === > 81.40% done, estimate finish Fri May 25 20:24:40 2018 > 81.40% done, estimate finish Fri May 25 20:24:39 2018 >=== last message repeated 2 times. === > 81.41% done, estimate finish Fri May 25 20:24:40 2018 >=== last message repeated 2 times. === > 81.42% done, estimate finish Fri May 25 20:24:40 2018 > 81.42% done, estimate finish Fri May 25 20:24:39 2018 >=== last message repeated 2 times. === > 81.43% done, estimate finish Fri May 25 20:24:39 2018 >=== last message repeated 2 times. === > 81.44% done, estimate finish Fri May 25 20:24:40 2018 > 81.44% done, estimate finish Fri May 25 20:24:39 2018 > 81.45% done, estimate finish Fri May 25 20:24:39 2018 >=== last message repeated 3 times. === > 81.46% done, estimate finish Fri May 25 20:24:38 2018 > 81.46% done, estimate finish Fri May 25 20:24:39 2018 > 81.47% done, estimate finish Fri May 25 20:24:39 2018 >=== last message repeated 3 times. === > 81.48% done, estimate finish Fri May 25 20:24:38 2018 >=== last message repeated 2 times. === > 81.49% done, estimate finish Fri May 25 20:24:38 2018 > 81.49% done, estimate finish Fri May 25 20:24:39 2018 >=== last message repeated 2 times. === > 81.50% done, estimate finish Fri May 25 20:24:38 2018 >=== last message repeated 2 times. === > 81.51% done, estimate finish Fri May 25 20:24:38 2018 >=== last message repeated 2 times. === > 81.51% done, estimate finish Fri May 25 20:24:37 2018 > 81.52% done, estimate finish Fri May 25 20:24:38 2018 >=== last message repeated 2 times. === > 81.53% done, estimate finish Fri May 25 20:24:38 2018 >=== last message repeated 2 times. === > 81.54% done, estimate finish Fri May 25 20:24:37 2018 >=== last message repeated 2 times. === > 81.54% done, estimate finish Fri May 25 20:24:38 2018 > 81.55% done, estimate finish Fri May 25 20:24:38 2018 > 81.55% done, estimate finish Fri May 25 20:24:37 2018 > 81.56% done, estimate finish Fri May 25 20:24:37 2018 >=== last message repeated 3 times. === > 81.57% done, estimate finish Fri May 25 20:24:36 2018 > 81.57% done, estimate finish Fri May 25 20:24:37 2018 > 81.58% done, estimate finish Fri May 25 20:24:37 2018 >=== last message repeated 3 times. === > 81.59% done, estimate finish Fri May 25 20:24:36 2018 >=== last message repeated 2 times. === > 81.60% done, estimate finish Fri May 25 20:24:37 2018 >=== last message repeated 3 times. === > 81.61% done, estimate finish Fri May 25 20:24:36 2018 >=== last message repeated 2 times. === > 81.62% done, estimate finish Fri May 25 20:24:36 2018 >=== last message repeated 2 times. === > 81.63% done, estimate finish Fri May 25 20:24:37 2018 > 81.63% done, estimate finish Fri May 25 20:24:36 2018 >=== last message repeated 2 times. === > 81.64% done, estimate finish Fri May 25 20:24:36 2018 >=== last message repeated 2 times. === > 81.65% done, estimate finish Fri May 25 20:24:35 2018 >=== last message repeated 2 times. === > 81.65% done, estimate finish Fri May 25 20:24:36 2018 > 81.66% done, estimate finish Fri May 25 20:24:36 2018 >=== last message repeated 2 times. === > 81.67% done, estimate finish Fri May 25 20:24:35 2018 >=== last message repeated 3 times. === > 81.68% done, estimate finish Fri May 25 20:24:36 2018 >=== last message repeated 2 times. === > 81.69% done, estimate finish Fri May 25 20:24:35 2018 >=== last message repeated 3 times. === > 81.70% done, estimate finish Fri May 25 20:24:35 2018 > 81.70% done, estimate finish Fri May 25 20:24:34 2018 > 81.71% done, estimate finish Fri May 25 20:24:35 2018 >=== last message repeated 2 times. === > 81.72% done, estimate finish Fri May 25 20:24:35 2018 > 81.72% done, estimate finish Fri May 25 20:24:34 2018 >=== last message repeated 2 times. === > 81.73% done, estimate finish Fri May 25 20:24:34 2018 >=== last message repeated 2 times. === > 81.74% done, estimate finish Fri May 25 20:24:35 2018 > 81.74% done, estimate finish Fri May 25 20:24:34 2018 >=== last message repeated 2 times. === > 81.75% done, estimate finish Fri May 25 20:24:34 2018 >=== last message repeated 2 times. === > 81.76% done, estimate finish Fri May 25 20:24:33 2018 > 81.76% done, estimate finish Fri May 25 20:24:34 2018 >=== last message repeated 2 times. === > 81.77% done, estimate finish Fri May 25 20:24:34 2018 >=== last message repeated 2 times. === > 81.78% done, estimate finish Fri May 25 20:24:33 2018 >=== last message repeated 2 times. === > 81.79% done, estimate finish Fri May 25 20:24:33 2018 > 81.79% done, estimate finish Fri May 25 20:24:34 2018 >=== last message repeated 2 times. === > 81.80% done, estimate finish Fri May 25 20:24:33 2018 >=== last message repeated 2 times. === > 81.81% done, estimate finish Fri May 25 20:24:33 2018 >=== last message repeated 2 times. === > 81.81% done, estimate finish Fri May 25 20:24:34 2018 > 81.82% done, estimate finish Fri May 25 20:24:33 2018 >=== last message repeated 2 times. === > 81.83% done, estimate finish Fri May 25 20:24:33 2018 >=== last message repeated 2 times. === > 81.83% done, estimate finish Fri May 25 20:24:32 2018 > 81.84% done, estimate finish Fri May 25 20:24:33 2018 >=== last message repeated 2 times. === > 81.85% done, estimate finish Fri May 25 20:24:33 2018 >=== last message repeated 2 times. === > 81.85% done, estimate finish Fri May 25 20:24:32 2018 > 81.86% done, estimate finish Fri May 25 20:24:32 2018 >=== last message repeated 2 times. === > 81.87% done, estimate finish Fri May 25 20:24:33 2018 > 81.87% done, estimate finish Fri May 25 20:24:32 2018 > 81.88% done, estimate finish Fri May 25 20:24:32 2018 >=== last message repeated 3 times. === > 81.89% done, estimate finish Fri May 25 20:24:31 2018 >=== last message repeated 2 times. === > 81.90% done, estimate finish Fri May 25 20:24:32 2018 >=== last message repeated 3 times. === > 81.91% done, estimate finish Fri May 25 20:24:31 2018 >=== last message repeated 2 times. === > 81.92% done, estimate finish Fri May 25 20:24:31 2018 > 81.92% done, estimate finish Fri May 25 20:24:32 2018 >=== last message repeated 2 times. === > 81.93% done, estimate finish Fri May 25 20:24:31 2018 >=== last message repeated 2 times. === > 81.94% done, estimate finish Fri May 25 20:24:31 2018 >=== last message repeated 2 times. === > 81.94% done, estimate finish Fri May 25 20:24:30 2018 > 81.95% done, estimate finish Fri May 25 20:24:31 2018 >=== last message repeated 2 times. === > 81.96% done, estimate finish Fri May 25 20:24:31 2018 >=== last message repeated 2 times. === > 81.97% done, estimate finish Fri May 25 20:24:30 2018 >=== last message repeated 3 times. === > 81.98% done, estimate finish Fri May 25 20:24:31 2018 >=== last message repeated 2 times. === > 81.99% done, estimate finish Fri May 25 20:24:30 2018 >=== last message repeated 3 times. === > 82.00% done, estimate finish Fri May 25 20:24:30 2018 > 82.00% done, estimate finish Fri May 25 20:24:31 2018 > 82.01% done, estimate finish Fri May 25 20:24:30 2018 >=== last message repeated 3 times. === > 82.02% done, estimate finish Fri May 25 20:24:30 2018 > 82.02% done, estimate finish Fri May 25 20:24:29 2018 > 82.03% done, estimate finish Fri May 25 20:24:29 2018 > 82.03% done, estimate finish Fri May 25 20:24:30 2018 >=== last message repeated 2 times. === > 82.04% done, estimate finish Fri May 25 20:24:29 2018 >=== last message repeated 2 times. === > 82.05% done, estimate finish Fri May 25 20:24:29 2018 >=== last message repeated 2 times. === > 82.06% done, estimate finish Fri May 25 20:24:30 2018 > 82.06% done, estimate finish Fri May 25 20:24:29 2018 >=== last message repeated 2 times. === > 82.07% done, estimate finish Fri May 25 20:24:29 2018 >=== last message repeated 2 times. === > 82.08% done, estimate finish Fri May 25 20:24:28 2018 >=== last message repeated 2 times. === > 82.08% done, estimate finish Fri May 25 20:24:29 2018 > 82.09% done, estimate finish Fri May 25 20:24:29 2018 >=== last message repeated 2 times. === > 82.10% done, estimate finish Fri May 25 20:24:28 2018 >=== last message repeated 3 times. === > 82.11% done, estimate finish Fri May 25 20:24:28 2018 > 82.11% done, estimate finish Fri May 25 20:24:29 2018 > 82.12% done, estimate finish Fri May 25 20:24:28 2018 >=== last message repeated 2 times. === > 82.13% done, estimate finish Fri May 25 20:24:28 2018 >=== last message repeated 2 times. === > 82.13% done, estimate finish Fri May 25 20:24:27 2018 > 82.14% done, estimate finish Fri May 25 20:24:28 2018 >=== last message repeated 2 times. === > 82.15% done, estimate finish Fri May 25 20:24:28 2018 >=== last message repeated 2 times. === > 82.15% done, estimate finish Fri May 25 20:24:27 2018 > 82.16% done, estimate finish Fri May 25 20:24:27 2018 >=== last message repeated 2 times. === > 82.17% done, estimate finish Fri May 25 20:24:28 2018 >=== last message repeated 2 times. === > 82.17% done, estimate finish Fri May 25 20:24:27 2018 > 82.18% done, estimate finish Fri May 25 20:24:27 2018 >=== last message repeated 2 times. === > 82.19% done, estimate finish Fri May 25 20:24:27 2018 > 82.19% done, estimate finish Fri May 25 20:24:26 2018 > 82.19% done, estimate finish Fri May 25 20:24:27 2018 > 82.20% done, estimate finish Fri May 25 20:24:27 2018 >=== last message repeated 2 times. === > 82.21% done, estimate finish Fri May 25 20:24:26 2018 >=== last message repeated 2 times. === > 82.22% done, estimate finish Fri May 25 20:24:26 2018 > 82.22% done, estimate finish Fri May 25 20:24:27 2018 >=== last message repeated 2 times. === > 82.23% done, estimate finish Fri May 25 20:24:26 2018 >=== last message repeated 2 times. === > 82.24% done, estimate finish Fri May 25 20:24:26 2018 >=== last message repeated 2 times. === > 82.24% done, estimate finish Fri May 25 20:24:27 2018 > 82.25% done, estimate finish Fri May 25 20:24:26 2018 >=== last message repeated 2 times. === > 82.26% done, estimate finish Fri May 25 20:24:26 2018 >=== last message repeated 2 times. === > 82.26% done, estimate finish Fri May 25 20:24:25 2018 > 82.27% done, estimate finish Fri May 25 20:24:25 2018 > 82.27% done, estimate finish Fri May 25 20:24:26 2018 > 82.28% done, estimate finish Fri May 25 20:24:26 2018 >=== last message repeated 2 times. === > 82.28% done, estimate finish Fri May 25 20:24:25 2018 > 82.29% done, estimate finish Fri May 25 20:24:25 2018 >=== last message repeated 2 times. === > 82.30% done, estimate finish Fri May 25 20:24:26 2018 >=== last message repeated 2 times. === > 82.31% done, estimate finish Fri May 25 20:24:25 2018 >=== last message repeated 3 times. === > 82.32% done, estimate finish Fri May 25 20:24:25 2018 > 82.32% done, estimate finish Fri May 25 20:24:24 2018 > 82.33% done, estimate finish Fri May 25 20:24:25 2018 >=== last message repeated 3 times. === > 82.34% done, estimate finish Fri May 25 20:24:25 2018 > 82.34% done, estimate finish Fri May 25 20:24:24 2018 > 82.35% done, estimate finish Fri May 25 20:24:24 2018 >=== last message repeated 2 times. === > 82.35% done, estimate finish Fri May 25 20:24:25 2018 > 82.36% done, estimate finish Fri May 25 20:24:25 2018 > 82.36% done, estimate finish Fri May 25 20:24:24 2018 > 82.37% done, estimate finish Fri May 25 20:24:24 2018 >=== last message repeated 3 times. === > 82.38% done, estimate finish Fri May 25 20:24:24 2018 >=== last message repeated 2 times. === > 82.39% done, estimate finish Fri May 25 20:24:24 2018 >=== last message repeated 2 times. === > 82.40% done, estimate finish Fri May 25 20:24:23 2018 >=== last message repeated 3 times. === > 82.41% done, estimate finish Fri May 25 20:24:24 2018 >=== last message repeated 2 times. === > 82.42% done, estimate finish Fri May 25 20:24:23 2018 >=== last message repeated 3 times. === > 82.43% done, estimate finish Fri May 25 20:24:23 2018 > 82.43% done, estimate finish Fri May 25 20:24:22 2018 > 82.44% done, estimate finish Fri May 25 20:24:23 2018 >=== last message repeated 3 times. === > 82.45% done, estimate finish Fri May 25 20:24:23 2018 > 82.45% done, estimate finish Fri May 25 20:24:22 2018 > 82.46% done, estimate finish Fri May 25 20:24:22 2018 > 82.46% done, estimate finish Fri May 25 20:24:23 2018 >=== last message repeated 2 times. === > 82.47% done, estimate finish Fri May 25 20:24:23 2018 > 82.47% done, estimate finish Fri May 25 20:24:22 2018 > 82.48% done, estimate finish Fri May 25 20:24:22 2018 >=== last message repeated 2 times. === > 82.49% done, estimate finish Fri May 25 20:24:22 2018 > 82.49% done, estimate finish Fri May 25 20:24:23 2018 > 82.49% done, estimate finish Fri May 25 20:24:22 2018 > 82.50% done, estimate finish Fri May 25 20:24:22 2018 >=== last message repeated 2 times. === > 82.51% done, estimate finish Fri May 25 20:24:22 2018 > 82.51% done, estimate finish Fri May 25 20:24:21 2018 > 82.51% done, estimate finish Fri May 25 20:24:22 2018 > 82.52% done, estimate finish Fri May 25 20:24:22 2018 >=== last message repeated 2 times. === > 82.53% done, estimate finish Fri May 25 20:24:22 2018 > 82.53% done, estimate finish Fri May 25 20:24:21 2018 >=== last message repeated 2 times. === > 82.54% done, estimate finish Fri May 25 20:24:21 2018 > 82.54% done, estimate finish Fri May 25 20:24:22 2018 > 82.55% done, estimate finish Fri May 25 20:24:22 2018 > 82.55% done, estimate finish Fri May 25 20:24:21 2018 > 82.56% done, estimate finish Fri May 25 20:24:21 2018 >=== last message repeated 3 times. === > 82.57% done, estimate finish Fri May 25 20:24:21 2018 >=== last message repeated 2 times. === > 82.58% done, estimate finish Fri May 25 20:24:21 2018 >=== last message repeated 2 times. === > 82.58% done, estimate finish Fri May 25 20:24:20 2018 > 82.59% done, estimate finish Fri May 25 20:24:20 2018 >=== last message repeated 2 times. === > 82.60% done, estimate finish Fri May 25 20:24:21 2018 >=== last message repeated 2 times. === > 82.60% done, estimate finish Fri May 25 20:24:20 2018 > 82.61% done, estimate finish Fri May 25 20:24:20 2018 >=== last message repeated 2 times. === > 82.62% done, estimate finish Fri May 25 20:24:20 2018 > 82.62% done, estimate finish Fri May 25 20:24:21 2018 > 82.62% done, estimate finish Fri May 25 20:24:20 2018 > 82.63% done, estimate finish Fri May 25 20:24:20 2018 >=== last message repeated 2 times. === > 82.64% done, estimate finish Fri May 25 20:24:20 2018 > 82.64% done, estimate finish Fri May 25 20:24:19 2018 > 82.65% done, estimate finish Fri May 25 20:24:19 2018 > 82.65% done, estimate finish Fri May 25 20:24:20 2018 >=== last message repeated 2 times. === > 82.66% done, estimate finish Fri May 25 20:24:20 2018 > 82.66% done, estimate finish Fri May 25 20:24:19 2018 > 82.67% done, estimate finish Fri May 25 20:24:19 2018 >=== last message repeated 3 times. === > 82.68% done, estimate finish Fri May 25 20:24:20 2018 > 82.68% done, estimate finish Fri May 25 20:24:19 2018 > 82.69% done, estimate finish Fri May 25 20:24:19 2018 >=== last message repeated 3 times. === > 82.70% done, estimate finish Fri May 25 20:24:18 2018 > 82.70% done, estimate finish Fri May 25 20:24:19 2018 > 82.71% done, estimate finish Fri May 25 20:24:19 2018 >=== last message repeated 3 times. === > 82.72% done, estimate finish Fri May 25 20:24:18 2018 >=== last message repeated 2 times. === > 82.73% done, estimate finish Fri May 25 20:24:18 2018 > 82.73% done, estimate finish Fri May 25 20:24:19 2018 > 82.74% done, estimate finish Fri May 25 20:24:19 2018 > 82.74% done, estimate finish Fri May 25 20:24:18 2018 >=== last message repeated 2 times. === > 82.75% done, estimate finish Fri May 25 20:24:18 2018 >=== last message repeated 2 times. === > 82.76% done, estimate finish Fri May 25 20:24:19 2018 > 82.76% done, estimate finish Fri May 25 20:24:18 2018 >=== last message repeated 2 times. === > 82.77% done, estimate finish Fri May 25 20:24:18 2018 >=== last message repeated 2 times. === > 82.78% done, estimate finish Fri May 25 20:24:17 2018 >=== last message repeated 2 times. === > 82.78% done, estimate finish Fri May 25 20:24:18 2018 > 82.79% done, estimate finish Fri May 25 20:24:18 2018 > 82.79% done, estimate finish Fri May 25 20:24:17 2018 > 82.80% done, estimate finish Fri May 25 20:24:17 2018 >=== last message repeated 3 times. === > 82.81% done, estimate finish Fri May 25 20:24:18 2018 > 82.81% done, estimate finish Fri May 25 20:24:17 2018 > 82.82% done, estimate finish Fri May 25 20:24:17 2018 >=== last message repeated 2 times. === > 82.83% done, estimate finish Fri May 25 20:24:17 2018 > 82.83% done, estimate finish Fri May 25 20:24:16 2018 >=== last message repeated 2 times. === > 82.84% done, estimate finish Fri May 25 20:24:17 2018 >=== last message repeated 2 times. === > 82.85% done, estimate finish Fri May 25 20:24:17 2018 > 82.85% done, estimate finish Fri May 25 20:24:16 2018 >=== last message repeated 2 times. === > 82.86% done, estimate finish Fri May 25 20:24:16 2018 > 82.86% done, estimate finish Fri May 25 20:24:17 2018 > 82.87% done, estimate finish Fri May 25 20:24:17 2018 > 82.87% done, estimate finish Fri May 25 20:24:16 2018 >=== last message repeated 2 times. === > 82.88% done, estimate finish Fri May 25 20:24:16 2018 >=== last message repeated 2 times. === > 82.89% done, estimate finish Fri May 25 20:24:15 2018 > 82.89% done, estimate finish Fri May 25 20:24:16 2018 > 82.90% done, estimate finish Fri May 25 20:24:16 2018 >=== last message repeated 3 times. === > 82.91% done, estimate finish Fri May 25 20:24:15 2018 >=== last message repeated 2 times. === > 82.92% done, estimate finish Fri May 25 20:24:15 2018 > 82.92% done, estimate finish Fri May 25 20:24:16 2018 >=== last message repeated 2 times. === > 82.93% done, estimate finish Fri May 25 20:24:15 2018 >=== last message repeated 2 times. === > 82.94% done, estimate finish Fri May 25 20:24:15 2018 >=== last message repeated 2 times. === > 82.94% done, estimate finish Fri May 25 20:24:16 2018 > 82.95% done, estimate finish Fri May 25 20:24:15 2018 >=== last message repeated 2 times. === > 82.96% done, estimate finish Fri May 25 20:24:15 2018 >=== last message repeated 2 times. === > 82.96% done, estimate finish Fri May 25 20:24:14 2018 > 82.97% done, estimate finish Fri May 25 20:24:14 2018 > 82.97% done, estimate finish Fri May 25 20:24:15 2018 > 82.98% done, estimate finish Fri May 25 20:24:15 2018 >=== last message repeated 2 times. === > 82.99% done, estimate finish Fri May 25 20:24:14 2018 >=== last message repeated 3 times. === > 83.00% done, estimate finish Fri May 25 20:24:14 2018 >=== last message repeated 2 times. === > 83.01% done, estimate finish Fri May 25 20:24:14 2018 >=== last message repeated 3 times. === > 83.02% done, estimate finish Fri May 25 20:24:13 2018 >=== last message repeated 2 times. === > 83.03% done, estimate finish Fri May 25 20:24:14 2018 >=== last message repeated 3 times. === > 83.04% done, estimate finish Fri May 25 20:24:13 2018 >=== last message repeated 2 times. === > 83.05% done, estimate finish Fri May 25 20:24:13 2018 > 83.05% done, estimate finish Fri May 25 20:24:14 2018 >=== last message repeated 2 times. === > 83.06% done, estimate finish Fri May 25 20:24:13 2018 >=== last message repeated 2 times. === > 83.07% done, estimate finish Fri May 25 20:24:13 2018 >=== last message repeated 2 times. === > 83.08% done, estimate finish Fri May 25 20:24:12 2018 > 83.08% done, estimate finish Fri May 25 20:24:13 2018 >=== last message repeated 2 times. === > 83.09% done, estimate finish Fri May 25 20:24:14 2018 >=== last message repeated 2 times. === > 83.10% done, estimate finish Fri May 25 20:24:14 2018 > 83.10% done, estimate finish Fri May 25 20:24:13 2018 >=== last message repeated 2 times. === > 83.11% done, estimate finish Fri May 25 20:24:13 2018 >=== last message repeated 2 times. === > 83.12% done, estimate finish Fri May 25 20:24:12 2018 >=== last message repeated 3 times. === > 83.13% done, estimate finish Fri May 25 20:24:13 2018 >=== last message repeated 2 times. === > 83.14% done, estimate finish Fri May 25 20:24:12 2018 >=== last message repeated 3 times. === > 83.15% done, estimate finish Fri May 25 20:24:12 2018 > 83.15% done, estimate finish Fri May 25 20:24:13 2018 > 83.16% done, estimate finish Fri May 25 20:24:12 2018 >=== last message repeated 2 times. === > 83.17% done, estimate finish Fri May 25 20:24:12 2018 >=== last message repeated 2 times. === > 83.17% done, estimate finish Fri May 25 20:24:11 2018 > 83.18% done, estimate finish Fri May 25 20:24:11 2018 > 83.18% done, estimate finish Fri May 25 20:24:12 2018 > 83.19% done, estimate finish Fri May 25 20:24:12 2018 >=== last message repeated 2 times. === > 83.19% done, estimate finish Fri May 25 20:24:11 2018 > 83.20% done, estimate finish Fri May 25 20:24:11 2018 >=== last message repeated 2 times. === > 83.21% done, estimate finish Fri May 25 20:24:12 2018 > 83.21% done, estimate finish Fri May 25 20:24:11 2018 >=== last message repeated 2 times. === > 83.22% done, estimate finish Fri May 25 20:24:11 2018 >=== last message repeated 2 times. === > 83.23% done, estimate finish Fri May 25 20:24:11 2018 > 83.23% done, estimate finish Fri May 25 20:24:10 2018 > 83.24% done, estimate finish Fri May 25 20:24:11 2018 >=== last message repeated 3 times. === > 83.25% done, estimate finish Fri May 25 20:24:10 2018 >=== last message repeated 2 times. === > 83.26% done, estimate finish Fri May 25 20:24:10 2018 > 83.26% done, estimate finish Fri May 25 20:24:11 2018 >=== last message repeated 2 times. === > 83.27% done, estimate finish Fri May 25 20:24:10 2018 >=== last message repeated 2 times. === > 83.28% done, estimate finish Fri May 25 20:24:10 2018 >=== last message repeated 2 times. === > 83.28% done, estimate finish Fri May 25 20:24:09 2018 > 83.29% done, estimate finish Fri May 25 20:24:10 2018 >=== last message repeated 2 times. === > 83.30% done, estimate finish Fri May 25 20:24:10 2018 >=== last message repeated 2 times. === > 83.30% done, estimate finish Fri May 25 20:24:09 2018 > 83.31% done, estimate finish Fri May 25 20:24:09 2018 >=== last message repeated 2 times. === > 83.32% done, estimate finish Fri May 25 20:24:10 2018 >=== last message repeated 2 times. === > 83.33% done, estimate finish Fri May 25 20:24:09 2018 >=== last message repeated 3 times. === > 83.34% done, estimate finish Fri May 25 20:24:09 2018 > 83.34% done, estimate finish Fri May 25 20:24:10 2018 > 83.35% done, estimate finish Fri May 25 20:24:09 2018 >=== last message repeated 3 times. === > 83.36% done, estimate finish Fri May 25 20:24:09 2018 > 83.36% done, estimate finish Fri May 25 20:24:08 2018 > 83.37% done, estimate finish Fri May 25 20:24:09 2018 >=== last message repeated 3 times. === > 83.38% done, estimate finish Fri May 25 20:24:09 2018 > 83.38% done, estimate finish Fri May 25 20:24:08 2018 > 83.39% done, estimate finish Fri May 25 20:24:08 2018 >=== last message repeated 2 times. === > 83.39% done, estimate finish Fri May 25 20:24:09 2018 > 83.40% done, estimate finish Fri May 25 20:24:09 2018 > 83.40% done, estimate finish Fri May 25 20:24:08 2018 > 83.41% done, estimate finish Fri May 25 20:24:08 2018 >=== last message repeated 2 times. === > 83.42% done, estimate finish Fri May 25 20:24:08 2018 > 83.42% done, estimate finish Fri May 25 20:24:07 2018 > 83.42% done, estimate finish Fri May 25 20:24:08 2018 > 83.43% done, estimate finish Fri May 25 20:24:08 2018 >=== last message repeated 2 times. === > 83.44% done, estimate finish Fri May 25 20:24:08 2018 > 83.44% done, estimate finish Fri May 25 20:24:07 2018 >=== last message repeated 2 times. === > 83.45% done, estimate finish Fri May 25 20:24:08 2018 >=== last message repeated 2 times. === > 83.46% done, estimate finish Fri May 25 20:24:08 2018 > 83.46% done, estimate finish Fri May 25 20:24:07 2018 >=== last message repeated 2 times. === > 83.47% done, estimate finish Fri May 25 20:24:07 2018 >=== last message repeated 2 times. === > 83.48% done, estimate finish Fri May 25 20:24:07 2018 >=== last message repeated 3 times. === > 83.49% done, estimate finish Fri May 25 20:24:07 2018 > 83.49% done, estimate finish Fri May 25 20:24:06 2018 > 83.50% done, estimate finish Fri May 25 20:24:06 2018 > 83.50% done, estimate finish Fri May 25 20:24:07 2018 > 83.51% done, estimate finish Fri May 25 20:24:07 2018 >=== last message repeated 2 times. === > 83.51% done, estimate finish Fri May 25 20:24:06 2018 > 83.52% done, estimate finish Fri May 25 20:24:06 2018 >=== last message repeated 2 times. === > 83.53% done, estimate finish Fri May 25 20:24:06 2018 > 83.53% done, estimate finish Fri May 25 20:24:07 2018 > 83.53% done, estimate finish Fri May 25 20:24:06 2018 > 83.54% done, estimate finish Fri May 25 20:24:06 2018 >=== last message repeated 2 times. === > 83.55% done, estimate finish Fri May 25 20:24:06 2018 > 83.55% done, estimate finish Fri May 25 20:24:05 2018 >=== last message repeated 2 times. === > 83.56% done, estimate finish Fri May 25 20:24:06 2018 >=== last message repeated 2 times. === > 83.57% done, estimate finish Fri May 25 20:24:06 2018 > 83.57% done, estimate finish Fri May 25 20:24:05 2018 >=== last message repeated 2 times. === > 83.58% done, estimate finish Fri May 25 20:24:05 2018 > 83.58% done, estimate finish Fri May 25 20:24:06 2018 > 83.59% done, estimate finish Fri May 25 20:24:06 2018 > 83.59% done, estimate finish Fri May 25 20:24:05 2018 > 83.60% done, estimate finish Fri May 25 20:24:05 2018 >=== last message repeated 3 times. === > 83.61% done, estimate finish Fri May 25 20:24:06 2018 > 83.61% done, estimate finish Fri May 25 20:24:05 2018 > 83.62% done, estimate finish Fri May 25 20:24:05 2018 >=== last message repeated 3 times. === > 83.63% done, estimate finish Fri May 25 20:24:04 2018 >=== last message repeated 2 times. === > 83.64% done, estimate finish Fri May 25 20:24:05 2018 >=== last message repeated 3 times. === > 83.65% done, estimate finish Fri May 25 20:24:04 2018 >=== last message repeated 2 times. === > 83.66% done, estimate finish Fri May 25 20:24:04 2018 >=== last message repeated 2 times. === > 83.67% done, estimate finish Fri May 25 20:24:05 2018 > 83.67% done, estimate finish Fri May 25 20:24:04 2018 >=== last message repeated 2 times. === > 83.68% done, estimate finish Fri May 25 20:24:04 2018 >=== last message repeated 2 times. === > 83.69% done, estimate finish Fri May 25 20:24:03 2018 > 83.69% done, estimate finish Fri May 25 20:24:04 2018 >=== last message repeated 2 times. === > 83.70% done, estimate finish Fri May 25 20:24:04 2018 >=== last message repeated 2 times. === > 83.71% done, estimate finish Fri May 25 20:24:03 2018 >=== last message repeated 3 times. === > 83.72% done, estimate finish Fri May 25 20:24:04 2018 >=== last message repeated 2 times. === > 83.73% done, estimate finish Fri May 25 20:24:03 2018 >=== last message repeated 3 times. === > 83.74% done, estimate finish Fri May 25 20:24:03 2018 > 83.74% done, estimate finish Fri May 25 20:24:02 2018 > 83.75% done, estimate finish Fri May 25 20:24:03 2018 >=== last message repeated 2 times. === > 83.76% done, estimate finish Fri May 25 20:24:03 2018 >=== last message repeated 2 times. === > 83.76% done, estimate finish Fri May 25 20:24:02 2018 > 83.77% done, estimate finish Fri May 25 20:24:02 2018 > 83.77% done, estimate finish Fri May 25 20:24:03 2018 > 83.78% done, estimate finish Fri May 25 20:24:03 2018 > 83.78% done, estimate finish Fri May 25 20:24:02 2018 >=== last message repeated 2 times. === > 83.79% done, estimate finish Fri May 25 20:24:02 2018 >=== last message repeated 2 times. === > 83.80% done, estimate finish Fri May 25 20:24:03 2018 > 83.80% done, estimate finish Fri May 25 20:24:02 2018 >=== last message repeated 2 times. === > 83.81% done, estimate finish Fri May 25 20:24:02 2018 >=== last message repeated 2 times. === > 83.82% done, estimate finish Fri May 25 20:24:01 2018 >=== last message repeated 2 times. === > 83.82% done, estimate finish Fri May 25 20:24:02 2018 > 83.83% done, estimate finish Fri May 25 20:24:02 2018 >=== last message repeated 2 times. === > 83.84% done, estimate finish Fri May 25 20:24:01 2018 >=== last message repeated 2 times. === > 83.85% done, estimate finish Fri May 25 20:24:01 2018 > 83.85% done, estimate finish Fri May 25 20:24:02 2018 >=== last message repeated 2 times. === > 83.86% done, estimate finish Fri May 25 20:24:01 2018 >=== last message repeated 2 times. === > 83.87% done, estimate finish Fri May 25 20:24:01 2018 >=== last message repeated 2 times. === > 83.87% done, estimate finish Fri May 25 20:24:00 2018 > 83.88% done, estimate finish Fri May 25 20:24:01 2018 >=== last message repeated 2 times. === > 83.89% done, estimate finish Fri May 25 20:24:01 2018 >=== last message repeated 2 times. === > 83.89% done, estimate finish Fri May 25 20:24:00 2018 > 83.90% done, estimate finish Fri May 25 20:24:00 2018 >=== last message repeated 2 times. === > 83.91% done, estimate finish Fri May 25 20:24:01 2018 >=== last message repeated 2 times. === > 83.91% done, estimate finish Fri May 25 20:24:00 2018 > 83.92% done, estimate finish Fri May 25 20:24:00 2018 >=== last message repeated 2 times. === > 83.93% done, estimate finish Fri May 25 20:24:00 2018 > 83.93% done, estimate finish Fri May 25 20:24:01 2018 > 83.94% done, estimate finish Fri May 25 20:24:00 2018 >=== last message repeated 3 times. === > 83.95% done, estimate finish Fri May 25 20:24:00 2018 > 83.95% done, estimate finish Fri May 25 20:23:59 2018 > 83.96% done, estimate finish Fri May 25 20:24:00 2018 >=== last message repeated 3 times. === > 83.97% done, estimate finish Fri May 25 20:24:00 2018 > 83.97% done, estimate finish Fri May 25 20:23:59 2018 > 83.98% done, estimate finish Fri May 25 20:23:59 2018 >=== last message repeated 2 times. === > 83.98% done, estimate finish Fri May 25 20:24:00 2018 > 83.99% done, estimate finish Fri May 25 20:24:00 2018 > 83.99% done, estimate finish Fri May 25 20:23:59 2018 > 84.00% done, estimate finish Fri May 25 20:23:59 2018 >=== last message repeated 3 times. === > 84.01% done, estimate finish Fri May 25 20:23:58 2018 > 84.01% done, estimate finish Fri May 25 20:23:59 2018 > 84.02% done, estimate finish Fri May 25 20:23:59 2018 >=== last message repeated 2 times. === > 84.03% done, estimate finish Fri May 25 20:23:59 2018 > 84.03% done, estimate finish Fri May 25 20:23:58 2018 >=== last message repeated 2 times. === > 84.04% done, estimate finish Fri May 25 20:23:59 2018 >=== last message repeated 2 times. === > 84.05% done, estimate finish Fri May 25 20:23:59 2018 > 84.05% done, estimate finish Fri May 25 20:23:58 2018 >=== last message repeated 2 times. === > 84.06% done, estimate finish Fri May 25 20:23:58 2018 >=== last message repeated 2 times. === > 84.07% done, estimate finish Fri May 25 20:23:58 2018 >=== last message repeated 3 times. === > 84.08% done, estimate finish Fri May 25 20:23:58 2018 >=== last message repeated 2 times. === > 84.09% done, estimate finish Fri May 25 20:23:57 2018 >=== last message repeated 2 times. === > 84.10% done, estimate finish Fri May 25 20:23:58 2018 >=== last message repeated 2 times. === > 84.10% done, estimate finish Fri May 25 20:23:57 2018 > 84.11% done, estimate finish Fri May 25 20:23:57 2018 >=== last message repeated 2 times. === > 84.12% done, estimate finish Fri May 25 20:23:57 2018 > 84.12% done, estimate finish Fri May 25 20:23:58 2018 > 84.12% done, estimate finish Fri May 25 20:23:57 2018 > 84.13% done, estimate finish Fri May 25 20:23:57 2018 >=== last message repeated 2 times. === > 84.14% done, estimate finish Fri May 25 20:23:57 2018 > 84.14% done, estimate finish Fri May 25 20:23:56 2018 > 84.14% done, estimate finish Fri May 25 20:23:57 2018 > 84.15% done, estimate finish Fri May 25 20:23:57 2018 >=== last message repeated 2 times. === > 84.16% done, estimate finish Fri May 25 20:23:57 2018 > 84.16% done, estimate finish Fri May 25 20:23:56 2018 >=== last message repeated 2 times. === > 84.17% done, estimate finish Fri May 25 20:23:57 2018 >=== last message repeated 2 times. === > 84.18% done, estimate finish Fri May 25 20:23:57 2018 > 84.18% done, estimate finish Fri May 25 20:23:56 2018 > 84.19% done, estimate finish Fri May 25 20:23:56 2018 >=== last message repeated 3 times. === > 84.20% done, estimate finish Fri May 25 20:23:57 2018 > 84.20% done, estimate finish Fri May 25 20:23:56 2018 > 84.21% done, estimate finish Fri May 25 20:23:56 2018 >=== last message repeated 3 times. === > 84.22% done, estimate finish Fri May 25 20:23:55 2018 >=== last message repeated 2 times. === > 84.23% done, estimate finish Fri May 25 20:23:56 2018 >=== last message repeated 3 times. === > 84.24% done, estimate finish Fri May 25 20:23:55 2018 >=== last message repeated 2 times. === > 84.25% done, estimate finish Fri May 25 20:23:55 2018 > 84.25% done, estimate finish Fri May 25 20:23:56 2018 >=== last message repeated 2 times. === > 84.26% done, estimate finish Fri May 25 20:23:55 2018 >=== last message repeated 2 times. === > 84.27% done, estimate finish Fri May 25 20:23:55 2018 >=== last message repeated 2 times. === > 84.28% done, estimate finish Fri May 25 20:23:54 2018 > 84.28% done, estimate finish Fri May 25 20:23:55 2018 >=== last message repeated 2 times. === > 84.29% done, estimate finish Fri May 25 20:23:55 2018 >=== last message repeated 2 times. === > 84.30% done, estimate finish Fri May 25 20:23:54 2018 >=== last message repeated 3 times. === > 84.31% done, estimate finish Fri May 25 20:23:55 2018 >=== last message repeated 2 times. === > 84.32% done, estimate finish Fri May 25 20:23:54 2018 >=== last message repeated 3 times. === > 84.33% done, estimate finish Fri May 25 20:23:54 2018 > 84.33% done, estimate finish Fri May 25 20:23:55 2018 > 84.34% done, estimate finish Fri May 25 20:23:54 2018 >=== last message repeated 3 times. === > 84.35% done, estimate finish Fri May 25 20:23:54 2018 > 84.35% done, estimate finish Fri May 25 20:23:53 2018 > 84.36% done, estimate finish Fri May 25 20:23:54 2018 >=== last message repeated 2 times. === > 84.37% done, estimate finish Fri May 25 20:23:54 2018 >=== last message repeated 2 times. === > 84.37% done, estimate finish Fri May 25 20:23:53 2018 > 84.38% done, estimate finish Fri May 25 20:23:53 2018 >=== last message repeated 2 times. === > 84.39% done, estimate finish Fri May 25 20:23:54 2018 >=== last message repeated 2 times. === > 84.39% done, estimate finish Fri May 25 20:23:53 2018 > 84.40% done, estimate finish Fri May 25 20:23:53 2018 >=== last message repeated 2 times. === > 84.41% done, estimate finish Fri May 25 20:23:53 2018 > 84.41% done, estimate finish Fri May 25 20:23:52 2018 > 84.41% done, estimate finish Fri May 25 20:23:53 2018 > 84.42% done, estimate finish Fri May 25 20:23:53 2018 >=== last message repeated 2 times. === > 84.43% done, estimate finish Fri May 25 20:23:53 2018 > 84.43% done, estimate finish Fri May 25 20:23:52 2018 > 84.44% done, estimate finish Fri May 25 20:23:52 2018 > 84.44% done, estimate finish Fri May 25 20:23:53 2018 >=== last message repeated 2 times. === > 84.45% done, estimate finish Fri May 25 20:23:53 2018 > 84.45% done, estimate finish Fri May 25 20:23:52 2018 > 84.46% done, estimate finish Fri May 25 20:23:52 2018 >=== last message repeated 2 times. === > 84.46% done, estimate finish Fri May 25 20:23:53 2018 > 84.47% done, estimate finish Fri May 25 20:23:52 2018 >=== last message repeated 2 times. === > 84.48% done, estimate finish Fri May 25 20:23:52 2018 >=== last message repeated 3 times. === > 84.49% done, estimate finish Fri May 25 20:23:51 2018 > 84.49% done, estimate finish Fri May 25 20:23:52 2018 > 84.50% done, estimate finish Fri May 25 20:23:52 2018 >=== last message repeated 2 times. === > 84.50% done, estimate finish Fri May 25 20:23:51 2018 > 84.51% done, estimate finish Fri May 25 20:23:51 2018 >=== last message repeated 2 times. === > 84.52% done, estimate finish Fri May 25 20:23:51 2018 > 84.52% done, estimate finish Fri May 25 20:23:52 2018 > 84.53% done, estimate finish Fri May 25 20:23:51 2018 >=== last message repeated 3 times. === > 84.54% done, estimate finish Fri May 25 20:23:51 2018 > 84.54% done, estimate finish Fri May 25 20:23:50 2018 > 84.55% done, estimate finish Fri May 25 20:23:51 2018 >=== last message repeated 3 times. === > 84.56% done, estimate finish Fri May 25 20:23:51 2018 > 84.56% done, estimate finish Fri May 25 20:23:50 2018 > 84.57% done, estimate finish Fri May 25 20:23:50 2018 >=== last message repeated 2 times. === > 84.57% done, estimate finish Fri May 25 20:23:51 2018 > 84.58% done, estimate finish Fri May 25 20:23:51 2018 > 84.58% done, estimate finish Fri May 25 20:23:50 2018 > 84.59% done, estimate finish Fri May 25 20:23:50 2018 >=== last message repeated 3 times. === > 84.60% done, estimate finish Fri May 25 20:23:51 2018 > 84.60% done, estimate finish Fri May 25 20:23:50 2018 > 84.61% done, estimate finish Fri May 25 20:23:50 2018 >=== last message repeated 2 times. === > 84.62% done, estimate finish Fri May 25 20:23:50 2018 > 84.62% done, estimate finish Fri May 25 20:23:49 2018 >=== last message repeated 2 times. === > 84.63% done, estimate finish Fri May 25 20:23:50 2018 >=== last message repeated 2 times. === > 84.64% done, estimate finish Fri May 25 20:23:50 2018 > 84.64% done, estimate finish Fri May 25 20:23:49 2018 >=== last message repeated 2 times. === > 84.65% done, estimate finish Fri May 25 20:23:49 2018 > 84.65% done, estimate finish Fri May 25 20:23:50 2018 > 84.66% done, estimate finish Fri May 25 20:23:50 2018 > 84.66% done, estimate finish Fri May 25 20:23:49 2018 >=== last message repeated 2 times. === > 84.67% done, estimate finish Fri May 25 20:23:49 2018 >=== last message repeated 2 times. === > 84.68% done, estimate finish Fri May 25 20:23:48 2018 > 84.68% done, estimate finish Fri May 25 20:23:49 2018 >=== last message repeated 2 times. === > 84.69% done, estimate finish Fri May 25 20:23:49 2018 >=== last message repeated 2 times. === > 84.70% done, estimate finish Fri May 25 20:23:48 2018 >=== last message repeated 2 times. === > 84.71% done, estimate finish Fri May 25 20:23:49 2018 >=== last message repeated 3 times. === > 84.72% done, estimate finish Fri May 25 20:23:48 2018 >=== last message repeated 2 times. === > 84.73% done, estimate finish Fri May 25 20:23:48 2018 >=== last message repeated 2 times. === > 84.73% done, estimate finish Fri May 25 20:23:49 2018 > 84.74% done, estimate finish Fri May 25 20:23:48 2018 >=== last message repeated 2 times. === > 84.75% done, estimate finish Fri May 25 20:23:48 2018 >=== last message repeated 2 times. === > 84.75% done, estimate finish Fri May 25 20:23:47 2018 > 84.76% done, estimate finish Fri May 25 20:23:47 2018 > 84.76% done, estimate finish Fri May 25 20:23:48 2018 > 84.77% done, estimate finish Fri May 25 20:23:48 2018 >=== last message repeated 2 times. === > 84.77% done, estimate finish Fri May 25 20:23:47 2018 > 84.78% done, estimate finish Fri May 25 20:23:47 2018 >=== last message repeated 2 times. === > 84.79% done, estimate finish Fri May 25 20:23:48 2018 >=== last message repeated 2 times. === > 84.80% done, estimate finish Fri May 25 20:23:47 2018 >=== last message repeated 3 times. === > 84.81% done, estimate finish Fri May 25 20:23:47 2018 > 84.81% done, estimate finish Fri May 25 20:23:48 2018 > 84.82% done, estimate finish Fri May 25 20:23:47 2018 >=== last message repeated 3 times. === > 84.83% done, estimate finish Fri May 25 20:23:47 2018 > 84.83% done, estimate finish Fri May 25 20:23:46 2018 > 84.84% done, estimate finish Fri May 25 20:23:46 2018 > 84.84% done, estimate finish Fri May 25 20:23:47 2018 >=== last message repeated 2 times. === > 84.85% done, estimate finish Fri May 25 20:23:47 2018 > 84.85% done, estimate finish Fri May 25 20:23:46 2018 > 84.86% done, estimate finish Fri May 25 20:23:46 2018 >=== last message repeated 2 times. === > 84.87% done, estimate finish Fri May 25 20:23:46 2018 > 84.87% done, estimate finish Fri May 25 20:23:47 2018 > 84.87% done, estimate finish Fri May 25 20:23:46 2018 > 84.88% done, estimate finish Fri May 25 20:23:46 2018 >=== last message repeated 2 times. === > 84.89% done, estimate finish Fri May 25 20:23:46 2018 > 84.89% done, estimate finish Fri May 25 20:23:45 2018 > 84.89% done, estimate finish Fri May 25 20:23:46 2018 > 84.90% done, estimate finish Fri May 25 20:23:46 2018 >=== last message repeated 2 times. === > 84.91% done, estimate finish Fri May 25 20:23:46 2018 > 84.91% done, estimate finish Fri May 25 20:23:45 2018 >=== last message repeated 2 times. === > 84.92% done, estimate finish Fri May 25 20:23:46 2018 >=== last message repeated 2 times. === > 84.93% done, estimate finish Fri May 25 20:23:46 2018 > 84.93% done, estimate finish Fri May 25 20:23:45 2018 >=== last message repeated 2 times. === > 84.94% done, estimate finish Fri May 25 20:23:45 2018 >=== last message repeated 2 times. === > 84.95% done, estimate finish Fri May 25 20:23:45 2018 >=== last message repeated 2 times. === > 84.96% done, estimate finish Fri May 25 20:23:45 2018 >=== last message repeated 3 times. === > 84.97% done, estimate finish Fri May 25 20:23:44 2018 >=== last message repeated 2 times. === > 84.98% done, estimate finish Fri May 25 20:23:45 2018 >=== last message repeated 3 times. === > 84.99% done, estimate finish Fri May 25 20:23:44 2018 >=== last message repeated 2 times. === > 85.00% done, estimate finish Fri May 25 20:23:44 2018 > 85.00% done, estimate finish Fri May 25 20:23:45 2018 > 85.00% done, estimate finish Fri May 25 20:23:44 2018 > 85.01% done, estimate finish Fri May 25 20:23:44 2018 >=== last message repeated 2 times. === > 85.02% done, estimate finish Fri May 25 20:23:44 2018 >=== last message repeated 2 times. === > 85.02% done, estimate finish Fri May 25 20:23:43 2018 > 85.03% done, estimate finish Fri May 25 20:23:44 2018 >=== last message repeated 2 times. === > 85.04% done, estimate finish Fri May 25 20:23:44 2018 > 85.04% done, estimate finish Fri May 25 20:23:43 2018 > 85.05% done, estimate finish Fri May 25 20:23:43 2018 >=== last message repeated 2 times. === > 85.05% done, estimate finish Fri May 25 20:23:44 2018 > 85.06% done, estimate finish Fri May 25 20:23:44 2018 > 85.06% done, estimate finish Fri May 25 20:23:43 2018 > 85.07% done, estimate finish Fri May 25 20:23:43 2018 >=== last message repeated 3 times. === > 85.08% done, estimate finish Fri May 25 20:23:43 2018 >=== last message repeated 2 times. === > 85.09% done, estimate finish Fri May 25 20:23:43 2018 >=== last message repeated 3 times. === > 85.10% done, estimate finish Fri May 25 20:23:42 2018 >=== last message repeated 2 times. === > 85.11% done, estimate finish Fri May 25 20:23:43 2018 >=== last message repeated 3 times. === > 85.12% done, estimate finish Fri May 25 20:23:42 2018 >=== last message repeated 2 times. === > 85.13% done, estimate finish Fri May 25 20:23:42 2018 >=== last message repeated 2 times. === > 85.14% done, estimate finish Fri May 25 20:23:43 2018 > 85.14% done, estimate finish Fri May 25 20:23:42 2018 >=== last message repeated 2 times. === > 85.15% done, estimate finish Fri May 25 20:23:42 2018 >=== last message repeated 2 times. === > 85.16% done, estimate finish Fri May 25 20:23:41 2018 > 85.16% done, estimate finish Fri May 25 20:23:42 2018 >=== last message repeated 2 times. === > 85.17% done, estimate finish Fri May 25 20:23:42 2018 >=== last message repeated 2 times. === > 85.18% done, estimate finish Fri May 25 20:23:41 2018 >=== last message repeated 3 times. === > 85.19% done, estimate finish Fri May 25 20:23:42 2018 >=== last message repeated 2 times. === > 85.20% done, estimate finish Fri May 25 20:23:41 2018 >=== last message repeated 2 times. === > 85.21% done, estimate finish Fri May 25 20:23:41 2018 >=== last message repeated 2 times. === > 85.21% done, estimate finish Fri May 25 20:23:42 2018 > 85.22% done, estimate finish Fri May 25 20:23:41 2018 >=== last message repeated 2 times. === > 85.23% done, estimate finish Fri May 25 20:23:41 2018 >=== last message repeated 2 times. === > 85.23% done, estimate finish Fri May 25 20:23:40 2018 > 85.24% done, estimate finish Fri May 25 20:23:40 2018 > 85.24% done, estimate finish Fri May 25 20:23:41 2018 > 85.25% done, estimate finish Fri May 25 20:23:41 2018 >=== last message repeated 2 times. === > 85.25% done, estimate finish Fri May 25 20:23:40 2018 > 85.26% done, estimate finish Fri May 25 20:23:40 2018 >=== last message repeated 2 times. === > 85.27% done, estimate finish Fri May 25 20:23:41 2018 >=== last message repeated 2 times. === > 85.27% done, estimate finish Fri May 25 20:23:40 2018 > 85.28% done, estimate finish Fri May 25 20:23:40 2018 >=== last message repeated 2 times. === > 85.29% done, estimate finish Fri May 25 20:23:40 2018 > 85.29% done, estimate finish Fri May 25 20:23:41 2018 > 85.30% done, estimate finish Fri May 25 20:23:40 2018 >=== last message repeated 3 times. === > 85.31% done, estimate finish Fri May 25 20:23:40 2018 > 85.31% done, estimate finish Fri May 25 20:23:39 2018 > 85.32% done, estimate finish Fri May 25 20:23:39 2018 > 85.32% done, estimate finish Fri May 25 20:23:40 2018 >=== last message repeated 2 times. === > 85.33% done, estimate finish Fri May 25 20:23:40 2018 > 85.33% done, estimate finish Fri May 25 20:23:39 2018 > 85.34% done, estimate finish Fri May 25 20:23:39 2018 >=== last message repeated 3 times. === > 85.35% done, estimate finish Fri May 25 20:23:40 2018 > 85.35% done, estimate finish Fri May 25 20:23:39 2018 > 85.36% done, estimate finish Fri May 25 20:23:39 2018 >=== last message repeated 3 times. === > 85.37% done, estimate finish Fri May 25 20:23:38 2018 > 85.37% done, estimate finish Fri May 25 20:23:39 2018 > 85.38% done, estimate finish Fri May 25 20:23:39 2018 >=== last message repeated 2 times. === > 85.39% done, estimate finish Fri May 25 20:23:39 2018 > 85.39% done, estimate finish Fri May 25 20:23:38 2018 >=== last message repeated 2 times. === > 85.40% done, estimate finish Fri May 25 20:23:38 2018 > 85.40% done, estimate finish Fri May 25 20:23:39 2018 > 85.41% done, estimate finish Fri May 25 20:23:39 2018 > 85.41% done, estimate finish Fri May 25 20:23:38 2018 >=== last message repeated 2 times. === > 85.42% done, estimate finish Fri May 25 20:23:38 2018 >=== last message repeated 2 times. === > 85.43% done, estimate finish Fri May 25 20:23:37 2018 > 85.43% done, estimate finish Fri May 25 20:23:38 2018 >=== last message repeated 2 times. === > 85.44% done, estimate finish Fri May 25 20:23:38 2018 >=== last message repeated 2 times. === > 85.45% done, estimate finish Fri May 25 20:23:37 2018 >=== last message repeated 2 times. === > 85.45% done, estimate finish Fri May 25 20:23:38 2018 > 85.46% done, estimate finish Fri May 25 20:23:38 2018 >=== last message repeated 2 times. === > 85.47% done, estimate finish Fri May 25 20:23:37 2018 >=== last message repeated 2 times. === > 85.48% done, estimate finish Fri May 25 20:23:37 2018 > 85.48% done, estimate finish Fri May 25 20:23:38 2018 >=== last message repeated 2 times. === > 85.49% done, estimate finish Fri May 25 20:23:37 2018 >=== last message repeated 2 times. === > 85.50% done, estimate finish Fri May 25 20:23:37 2018 >=== last message repeated 2 times. === > 85.50% done, estimate finish Fri May 25 20:23:36 2018 > 85.51% done, estimate finish Fri May 25 20:23:37 2018 >=== last message repeated 2 times. === > 85.52% done, estimate finish Fri May 25 20:23:37 2018 >=== last message repeated 2 times. === > 85.52% done, estimate finish Fri May 25 20:23:36 2018 > 85.53% done, estimate finish Fri May 25 20:23:36 2018 >=== last message repeated 2 times. === > 85.54% done, estimate finish Fri May 25 20:23:37 2018 >=== last message repeated 2 times. === > 85.55% done, estimate finish Fri May 25 20:23:36 2018 >=== last message repeated 3 times. === > 85.56% done, estimate finish Fri May 25 20:23:36 2018 > 85.56% done, estimate finish Fri May 25 20:23:37 2018 > 85.57% done, estimate finish Fri May 25 20:23:36 2018 >=== last message repeated 3 times. === > 85.58% done, estimate finish Fri May 25 20:23:36 2018 > 85.58% done, estimate finish Fri May 25 20:23:35 2018 > 85.59% done, estimate finish Fri May 25 20:23:36 2018 >=== last message repeated 3 times. === > 85.60% done, estimate finish Fri May 25 20:23:36 2018 > 85.60% done, estimate finish Fri May 25 20:23:35 2018 > 85.61% done, estimate finish Fri May 25 20:23:35 2018 >=== last message repeated 2 times. === > 85.61% done, estimate finish Fri May 25 20:23:36 2018 > 85.62% done, estimate finish Fri May 25 20:23:36 2018 > 85.62% done, estimate finish Fri May 25 20:23:35 2018 > 85.63% done, estimate finish Fri May 25 20:23:35 2018 >=== last message repeated 2 times. === > 85.64% done, estimate finish Fri May 25 20:23:35 2018 > 85.64% done, estimate finish Fri May 25 20:23:34 2018 > 85.64% done, estimate finish Fri May 25 20:23:35 2018 > 85.65% done, estimate finish Fri May 25 20:23:35 2018 >=== last message repeated 2 times. === > 85.66% done, estimate finish Fri May 25 20:23:35 2018 > 85.66% done, estimate finish Fri May 25 20:23:34 2018 >=== last message repeated 2 times. === > 85.67% done, estimate finish Fri May 25 20:23:35 2018 >=== last message repeated 2 times. === > 85.68% done, estimate finish Fri May 25 20:23:35 2018 > 85.68% done, estimate finish Fri May 25 20:23:34 2018 >=== last message repeated 2 times. === > 85.69% done, estimate finish Fri May 25 20:23:34 2018 > 85.69% done, estimate finish Fri May 25 20:23:35 2018 > 85.70% done, estimate finish Fri May 25 20:23:35 2018 > 85.70% done, estimate finish Fri May 25 20:23:34 2018 >=== last message repeated 2 times. === > 85.71% done, estimate finish Fri May 25 20:23:34 2018 >=== last message repeated 2 times. === > 85.72% done, estimate finish Fri May 25 20:23:33 2018 > 85.72% done, estimate finish Fri May 25 20:23:34 2018 > 85.73% done, estimate finish Fri May 25 20:23:34 2018 >=== last message repeated 3 times. === > 85.74% done, estimate finish Fri May 25 20:23:33 2018 >=== last message repeated 2 times. === > 85.75% done, estimate finish Fri May 25 20:23:33 2018 > 85.75% done, estimate finish Fri May 25 20:23:34 2018 >=== last message repeated 2 times. === > 85.76% done, estimate finish Fri May 25 20:23:33 2018 >=== last message repeated 2 times. === > 85.77% done, estimate finish Fri May 25 20:23:33 2018 >=== last message repeated 2 times. === > 85.77% done, estimate finish Fri May 25 20:23:34 2018 > 85.78% done, estimate finish Fri May 25 20:23:33 2018 >=== last message repeated 2 times. === > 85.79% done, estimate finish Fri May 25 20:23:33 2018 >=== last message repeated 2 times. === > 85.79% done, estimate finish Fri May 25 20:23:32 2018 > 85.80% done, estimate finish Fri May 25 20:23:33 2018 >=== last message repeated 2 times. === > 85.81% done, estimate finish Fri May 25 20:23:33 2018 >=== last message repeated 2 times. === > 85.82% done, estimate finish Fri May 25 20:23:32 2018 >=== last message repeated 3 times. === > 85.83% done, estimate finish Fri May 25 20:23:33 2018 >=== last message repeated 2 times. === > 85.84% done, estimate finish Fri May 25 20:23:32 2018 >=== last message repeated 3 times. === > 85.85% done, estimate finish Fri May 25 20:23:32 2018 > 85.85% done, estimate finish Fri May 25 20:23:31 2018 > 85.86% done, estimate finish Fri May 25 20:23:32 2018 >=== last message repeated 3 times. === > 85.87% done, estimate finish Fri May 25 20:23:32 2018 > 85.87% done, estimate finish Fri May 25 20:23:31 2018 > 85.88% done, estimate finish Fri May 25 20:23:31 2018 > 85.88% done, estimate finish Fri May 25 20:23:32 2018 >=== last message repeated 2 times. === > 85.89% done, estimate finish Fri May 25 20:23:32 2018 > 85.89% done, estimate finish Fri May 25 20:23:31 2018 > 85.90% done, estimate finish Fri May 25 20:23:31 2018 >=== last message repeated 2 times. === > 85.91% done, estimate finish Fri May 25 20:23:31 2018 >=== last message repeated 3 times. === > 85.92% done, estimate finish Fri May 25 20:23:31 2018 >=== last message repeated 2 times. === > 85.93% done, estimate finish Fri May 25 20:23:31 2018 > 85.93% done, estimate finish Fri May 25 20:23:30 2018 > 85.93% done, estimate finish Fri May 25 20:23:31 2018 > 85.94% done, estimate finish Fri May 25 20:23:31 2018 >=== last message repeated 2 times. === > 85.95% done, estimate finish Fri May 25 20:23:31 2018 > 85.95% done, estimate finish Fri May 25 20:23:30 2018 >=== last message repeated 2 times. === > 85.96% done, estimate finish Fri May 25 20:23:30 2018 > 85.96% done, estimate finish Fri May 25 20:23:31 2018 > 85.97% done, estimate finish Fri May 25 20:23:31 2018 > 85.97% done, estimate finish Fri May 25 20:23:30 2018 > 85.98% done, estimate finish Fri May 25 20:23:30 2018 >=== last message repeated 3 times. === > 85.99% done, estimate finish Fri May 25 20:23:30 2018 >=== last message repeated 2 times. === > 86.00% done, estimate finish Fri May 25 20:23:30 2018 >=== last message repeated 3 times. === > 86.01% done, estimate finish Fri May 25 20:23:29 2018 >=== last message repeated 2 times. === > 86.02% done, estimate finish Fri May 25 20:23:30 2018 >=== last message repeated 3 times. === > 86.03% done, estimate finish Fri May 25 20:23:29 2018 >=== last message repeated 2 times. === > 86.04% done, estimate finish Fri May 25 20:23:29 2018 > 86.04% done, estimate finish Fri May 25 20:23:30 2018 > 86.04% done, estimate finish Fri May 25 20:23:29 2018 > 86.05% done, estimate finish Fri May 25 20:23:29 2018 >=== last message repeated 2 times. === > 86.06% done, estimate finish Fri May 25 20:23:29 2018 >=== last message repeated 2 times. === > 86.07% done, estimate finish Fri May 25 20:23:28 2018 > 86.07% done, estimate finish Fri May 25 20:23:29 2018 >=== last message repeated 2 times. === > 86.08% done, estimate finish Fri May 25 20:23:29 2018 >=== last message repeated 2 times. === > 86.09% done, estimate finish Fri May 25 20:23:28 2018 >=== last message repeated 2 times. === > 86.09% done, estimate finish Fri May 25 20:23:29 2018 > 86.10% done, estimate finish Fri May 25 20:23:29 2018 >=== last message repeated 2 times. === > 86.11% done, estimate finish Fri May 25 20:23:28 2018 >=== last message repeated 3 times. === > 86.12% done, estimate finish Fri May 25 20:23:28 2018 >=== last message repeated 2 times. === > 86.13% done, estimate finish Fri May 25 20:23:28 2018 >=== last message repeated 3 times. === > 86.14% done, estimate finish Fri May 25 20:23:28 2018 > 86.14% done, estimate finish Fri May 25 20:23:27 2018 > 86.15% done, estimate finish Fri May 25 20:23:28 2018 >=== last message repeated 2 times. === > 86.16% done, estimate finish Fri May 25 20:23:28 2018 >=== last message repeated 2 times. === > 86.16% done, estimate finish Fri May 25 20:23:27 2018 > 86.17% done, estimate finish Fri May 25 20:23:27 2018 >=== last message repeated 2 times. === > 86.18% done, estimate finish Fri May 25 20:23:28 2018 > 86.18% done, estimate finish Fri May 25 20:23:27 2018 >=== last message repeated 2 times. === > 86.19% done, estimate finish Fri May 25 20:23:27 2018 >=== last message repeated 2 times. === > 86.20% done, estimate finish Fri May 25 20:23:27 2018 >=== last message repeated 3 times. === > 86.21% done, estimate finish Fri May 25 20:23:27 2018 >=== last message repeated 2 times. === > 86.22% done, estimate finish Fri May 25 20:23:27 2018 > 86.22% done, estimate finish Fri May 25 20:23:26 2018 >=== last message repeated 2 times. === > 86.23% done, estimate finish Fri May 25 20:23:27 2018 >=== last message repeated 2 times. === > 86.24% done, estimate finish Fri May 25 20:23:27 2018 > 86.24% done, estimate finish Fri May 25 20:23:26 2018 > 86.25% done, estimate finish Fri May 25 20:23:26 2018 >=== last message repeated 2 times. === > 86.25% done, estimate finish Fri May 25 20:23:27 2018 > 86.26% done, estimate finish Fri May 25 20:23:26 2018 >=== last message repeated 2 times. === > 86.27% done, estimate finish Fri May 25 20:23:26 2018 >=== last message repeated 3 times. === > 86.28% done, estimate finish Fri May 25 20:23:25 2018 > 86.28% done, estimate finish Fri May 25 20:23:26 2018 > 86.29% done, estimate finish Fri May 25 20:23:26 2018 >=== last message repeated 3 times. === > 86.30% done, estimate finish Fri May 25 20:23:25 2018 >=== last message repeated 2 times. === > 86.31% done, estimate finish Fri May 25 20:23:26 2018 >=== last message repeated 2 times. === > 86.32% done, estimate finish Fri May 25 20:23:26 2018 > 86.32% done, estimate finish Fri May 25 20:23:25 2018 >=== last message repeated 2 times. === > 86.33% done, estimate finish Fri May 25 20:23:25 2018 >=== last message repeated 2 times. === > 86.34% done, estimate finish Fri May 25 20:23:25 2018 >=== last message repeated 3 times. === > 86.35% done, estimate finish Fri May 25 20:23:25 2018 >=== last message repeated 2 times. === > 86.36% done, estimate finish Fri May 25 20:23:24 2018 > 86.36% done, estimate finish Fri May 25 20:23:25 2018 >=== last message repeated 2 times. === > 86.37% done, estimate finish Fri May 25 20:23:25 2018 >=== last message repeated 2 times. === > 86.38% done, estimate finish Fri May 25 20:23:24 2018 >=== last message repeated 3 times. === > 86.39% done, estimate finish Fri May 25 20:23:25 2018 >=== last message repeated 2 times. === > 86.40% done, estimate finish Fri May 25 20:23:24 2018 >=== last message repeated 2 times. === > 86.41% done, estimate finish Fri May 25 20:23:24 2018 >=== last message repeated 3 times. === > 86.42% done, estimate finish Fri May 25 20:23:24 2018 >=== last message repeated 2 times. === > 86.43% done, estimate finish Fri May 25 20:23:24 2018 >=== last message repeated 2 times. === > 86.43% done, estimate finish Fri May 25 20:23:23 2018 > 86.44% done, estimate finish Fri May 25 20:23:23 2018 > 86.44% done, estimate finish Fri May 25 20:23:24 2018 > 86.45% done, estimate finish Fri May 25 20:23:24 2018 >=== last message repeated 2 times. === > 86.45% done, estimate finish Fri May 25 20:23:23 2018 > 86.46% done, estimate finish Fri May 25 20:23:23 2018 >=== last message repeated 2 times. === > 86.47% done, estimate finish Fri May 25 20:23:24 2018 >=== last message repeated 2 times. === > 86.47% done, estimate finish Fri May 25 20:23:23 2018 > 86.48% done, estimate finish Fri May 25 20:23:23 2018 >=== last message repeated 2 times. === > 86.49% done, estimate finish Fri May 25 20:23:23 2018 > 86.49% done, estimate finish Fri May 25 20:23:22 2018 > 86.50% done, estimate finish Fri May 25 20:23:23 2018 >=== last message repeated 3 times. === > 86.51% done, estimate finish Fri May 25 20:23:23 2018 > 86.51% done, estimate finish Fri May 25 20:23:22 2018 > 86.52% done, estimate finish Fri May 25 20:23:22 2018 > 86.52% done, estimate finish Fri May 25 20:23:23 2018 >=== last message repeated 2 times. === > 86.53% done, estimate finish Fri May 25 20:23:23 2018 > 86.53% done, estimate finish Fri May 25 20:23:22 2018 > 86.54% done, estimate finish Fri May 25 20:23:22 2018 >=== last message repeated 3 times. === > 86.55% done, estimate finish Fri May 25 20:23:22 2018 >=== last message repeated 2 times. === > 86.56% done, estimate finish Fri May 25 20:23:22 2018 >=== last message repeated 3 times. === > 86.57% done, estimate finish Fri May 25 20:23:21 2018 > 86.57% done, estimate finish Fri May 25 20:23:22 2018 > 86.58% done, estimate finish Fri May 25 20:23:22 2018 >=== last message repeated 2 times. === > 86.59% done, estimate finish Fri May 25 20:23:22 2018 > 86.59% done, estimate finish Fri May 25 20:23:21 2018 >=== last message repeated 2 times. === > 86.60% done, estimate finish Fri May 25 20:23:21 2018 > 86.60% done, estimate finish Fri May 25 20:23:22 2018 > 86.61% done, estimate finish Fri May 25 20:23:22 2018 > 86.61% done, estimate finish Fri May 25 20:23:21 2018 >=== last message repeated 2 times. === > 86.62% done, estimate finish Fri May 25 20:23:21 2018 >=== last message repeated 2 times. === > 86.63% done, estimate finish Fri May 25 20:23:21 2018 >=== last message repeated 3 times. === > 86.64% done, estimate finish Fri May 25 20:23:21 2018 >=== last message repeated 2 times. === > 86.65% done, estimate finish Fri May 25 20:23:20 2018 >=== last message repeated 2 times. === > 86.65% done, estimate finish Fri May 25 20:23:21 2018 > 86.66% done, estimate finish Fri May 25 20:23:21 2018 >=== last message repeated 2 times. === > 86.67% done, estimate finish Fri May 25 20:23:20 2018 >=== last message repeated 2 times. === > 86.68% done, estimate finish Fri May 25 20:23:20 2018 > 86.68% done, estimate finish Fri May 25 20:23:21 2018 >=== last message repeated 2 times. === > 86.69% done, estimate finish Fri May 25 20:23:20 2018 >=== last message repeated 2 times. === > 86.70% done, estimate finish Fri May 25 20:23:20 2018 >=== last message repeated 2 times. === > 86.70% done, estimate finish Fri May 25 20:23:19 2018 > 86.71% done, estimate finish Fri May 25 20:23:20 2018 >=== last message repeated 2 times. === > 86.72% done, estimate finish Fri May 25 20:23:20 2018 >=== last message repeated 2 times. === > 86.72% done, estimate finish Fri May 25 20:23:19 2018 > 86.73% done, estimate finish Fri May 25 20:23:19 2018 > 86.73% done, estimate finish Fri May 25 20:23:20 2018 > 86.74% done, estimate finish Fri May 25 20:23:20 2018 >=== last message repeated 2 times. === > 86.75% done, estimate finish Fri May 25 20:23:19 2018 >=== last message repeated 3 times. === > 86.76% done, estimate finish Fri May 25 20:23:19 2018 > 86.76% done, estimate finish Fri May 25 20:23:20 2018 > 86.77% done, estimate finish Fri May 25 20:23:19 2018 >=== last message repeated 3 times. === > 86.78% done, estimate finish Fri May 25 20:23:19 2018 > 86.78% done, estimate finish Fri May 25 20:23:18 2018 > 86.79% done, estimate finish Fri May 25 20:23:19 2018 >=== last message repeated 3 times. === > 86.80% done, estimate finish Fri May 25 20:23:19 2018 > 86.80% done, estimate finish Fri May 25 20:23:18 2018 > 86.81% done, estimate finish Fri May 25 20:23:18 2018 >=== last message repeated 2 times. === > 86.81% done, estimate finish Fri May 25 20:23:19 2018 > 86.82% done, estimate finish Fri May 25 20:23:19 2018 > 86.82% done, estimate finish Fri May 25 20:23:18 2018 > 86.83% done, estimate finish Fri May 25 20:23:18 2018 >=== last message repeated 2 times. === > 86.84% done, estimate finish Fri May 25 20:23:18 2018 > 86.84% done, estimate finish Fri May 25 20:23:19 2018 > 86.84% done, estimate finish Fri May 25 20:23:18 2018 > 86.85% done, estimate finish Fri May 25 20:23:18 2018 >=== last message repeated 2 times. === > 86.86% done, estimate finish Fri May 25 20:23:18 2018 > 86.86% done, estimate finish Fri May 25 20:23:17 2018 >=== last message repeated 2 times. === > 86.87% done, estimate finish Fri May 25 20:23:18 2018 >=== last message repeated 2 times. === > 86.88% done, estimate finish Fri May 25 20:23:18 2018 > 86.88% done, estimate finish Fri May 25 20:23:17 2018 >=== last message repeated 2 times. === > 86.89% done, estimate finish Fri May 25 20:23:17 2018 > 86.89% done, estimate finish Fri May 25 20:23:18 2018 > 86.90% done, estimate finish Fri May 25 20:23:18 2018 > 86.90% done, estimate finish Fri May 25 20:23:17 2018 >=== last message repeated 2 times. === > 86.91% done, estimate finish Fri May 25 20:23:17 2018 >=== last message repeated 2 times. === > 86.92% done, estimate finish Fri May 25 20:23:16 2018 > 86.92% done, estimate finish Fri May 25 20:23:17 2018 > 86.93% done, estimate finish Fri May 25 20:23:17 2018 >=== last message repeated 3 times. === > 86.94% done, estimate finish Fri May 25 20:23:16 2018 >=== last message repeated 2 times. === > 86.95% done, estimate finish Fri May 25 20:23:17 2018 >=== last message repeated 3 times. === > 86.96% done, estimate finish Fri May 25 20:23:16 2018 >=== last message repeated 2 times. === > 86.97% done, estimate finish Fri May 25 20:23:16 2018 >=== last message repeated 2 times. === > 86.97% done, estimate finish Fri May 25 20:23:17 2018 > 86.98% done, estimate finish Fri May 25 20:23:16 2018 >=== last message repeated 2 times. === > 86.99% done, estimate finish Fri May 25 20:23:16 2018 >=== last message repeated 2 times. === > 86.99% done, estimate finish Fri May 25 20:23:17 2018 > 87.00% done, estimate finish Fri May 25 20:23:16 2018 > 87.00% done, estimate finish Fri May 25 20:23:17 2018 > 87.01% done, estimate finish Fri May 25 20:23:17 2018 >=== last message repeated 2 times. === > 87.02% done, estimate finish Fri May 25 20:23:17 2018 > 87.02% done, estimate finish Fri May 25 20:23:16 2018 >=== last message repeated 2 times. === > 87.03% done, estimate finish Fri May 25 20:23:16 2018 >=== last message repeated 2 times. === > 87.04% done, estimate finish Fri May 25 20:23:15 2018 >=== last message repeated 2 times. === > 87.04% done, estimate finish Fri May 25 20:23:16 2018 > 87.05% done, estimate finish Fri May 25 20:23:16 2018 >=== last message repeated 2 times. === > 87.06% done, estimate finish Fri May 25 20:23:15 2018 >=== last message repeated 3 times. === > 87.07% done, estimate finish Fri May 25 20:23:15 2018 > 87.07% done, estimate finish Fri May 25 20:23:16 2018 > 87.08% done, estimate finish Fri May 25 20:23:15 2018 >=== last message repeated 2 times. === > 87.09% done, estimate finish Fri May 25 20:23:15 2018 >=== last message repeated 2 times. === > 87.09% done, estimate finish Fri May 25 20:23:14 2018 > 87.10% done, estimate finish Fri May 25 20:23:15 2018 >=== last message repeated 2 times. === > 87.11% done, estimate finish Fri May 25 20:23:15 2018 >=== last message repeated 2 times. === > 87.11% done, estimate finish Fri May 25 20:23:14 2018 > 87.12% done, estimate finish Fri May 25 20:23:14 2018 >=== last message repeated 2 times. === > 87.13% done, estimate finish Fri May 25 20:23:15 2018 >=== last message repeated 2 times. === > 87.13% done, estimate finish Fri May 25 20:23:14 2018 > 87.14% done, estimate finish Fri May 25 20:23:14 2018 >=== last message repeated 2 times. === > 87.15% done, estimate finish Fri May 25 20:23:14 2018 > 87.15% done, estimate finish Fri May 25 20:23:15 2018 > 87.15% done, estimate finish Fri May 25 20:23:14 2018 > 87.16% done, estimate finish Fri May 25 20:23:14 2018 >=== last message repeated 2 times. === > 87.17% done, estimate finish Fri May 25 20:23:14 2018 > 87.17% done, estimate finish Fri May 25 20:23:13 2018 > 87.18% done, estimate finish Fri May 25 20:23:13 2018 > 87.18% done, estimate finish Fri May 25 20:23:14 2018 >=== last message repeated 2 times. === > 87.19% done, estimate finish Fri May 25 20:23:14 2018 > 87.19% done, estimate finish Fri May 25 20:23:13 2018 > 87.20% done, estimate finish Fri May 25 20:23:13 2018 >=== last message repeated 2 times. === > 87.20% done, estimate finish Fri May 25 20:23:14 2018 > 87.21% done, estimate finish Fri May 25 20:23:14 2018 > 87.21% done, estimate finish Fri May 25 20:23:13 2018 > 87.22% done, estimate finish Fri May 25 20:23:13 2018 >=== last message repeated 3 times. === > 87.23% done, estimate finish Fri May 25 20:23:14 2018 > 87.23% done, estimate finish Fri May 25 20:23:13 2018 > 87.24% done, estimate finish Fri May 25 20:23:13 2018 >=== last message repeated 3 times. === > 87.25% done, estimate finish Fri May 25 20:23:12 2018 > 87.25% done, estimate finish Fri May 25 20:23:13 2018 > 87.26% done, estimate finish Fri May 25 20:23:13 2018 >=== last message repeated 2 times. === > 87.27% done, estimate finish Fri May 25 20:23:13 2018 > 87.27% done, estimate finish Fri May 25 20:23:12 2018 >=== last message repeated 2 times. === > 87.28% done, estimate finish Fri May 25 20:23:12 2018 > 87.28% done, estimate finish Fri May 25 20:23:13 2018 > 87.29% done, estimate finish Fri May 25 20:23:13 2018 > 87.29% done, estimate finish Fri May 25 20:23:12 2018 >=== last message repeated 2 times. === > 87.30% done, estimate finish Fri May 25 20:23:12 2018 >=== last message repeated 2 times. === > 87.31% done, estimate finish Fri May 25 20:23:11 2018 > 87.31% done, estimate finish Fri May 25 20:23:12 2018 >=== last message repeated 2 times. === > 87.32% done, estimate finish Fri May 25 20:23:12 2018 >=== last message repeated 2 times. === > 87.33% done, estimate finish Fri May 25 20:23:11 2018 >=== last message repeated 2 times. === > 87.33% done, estimate finish Fri May 25 20:23:12 2018 > 87.34% done, estimate finish Fri May 25 20:23:12 2018 >=== last message repeated 2 times. === > 87.35% done, estimate finish Fri May 25 20:23:11 2018 >=== last message repeated 2 times. === > 87.36% done, estimate finish Fri May 25 20:23:11 2018 > 87.36% done, estimate finish Fri May 25 20:23:12 2018 >=== last message repeated 2 times. === > 87.37% done, estimate finish Fri May 25 20:23:11 2018 >=== last message repeated 2 times. === > 87.38% done, estimate finish Fri May 25 20:23:11 2018 >=== last message repeated 2 times. === > 87.38% done, estimate finish Fri May 25 20:23:10 2018 > 87.39% done, estimate finish Fri May 25 20:23:11 2018 >=== last message repeated 2 times. === > 87.40% done, estimate finish Fri May 25 20:23:11 2018 >=== last message repeated 2 times. === > 87.40% done, estimate finish Fri May 25 20:23:10 2018 > 87.41% done, estimate finish Fri May 25 20:23:10 2018 >=== last message repeated 2 times. === > 87.42% done, estimate finish Fri May 25 20:23:11 2018 >=== last message repeated 2 times. === > 87.42% done, estimate finish Fri May 25 20:23:10 2018 > 87.43% done, estimate finish Fri May 25 20:23:10 2018 >=== last message repeated 2 times. === > 87.44% done, estimate finish Fri May 25 20:23:10 2018 > 87.44% done, estimate finish Fri May 25 20:23:11 2018 > 87.45% done, estimate finish Fri May 25 20:23:10 2018 >=== last message repeated 3 times. === > 87.46% done, estimate finish Fri May 25 20:23:10 2018 >=== last message repeated 2 times. === > 87.47% done, estimate finish Fri May 25 20:23:10 2018 >=== last message repeated 3 times. === > 87.48% done, estimate finish Fri May 25 20:23:10 2018 > 87.48% done, estimate finish Fri May 25 20:23:09 2018 > 87.49% done, estimate finish Fri May 25 20:23:09 2018 >=== last message repeated 2 times. === > 87.49% done, estimate finish Fri May 25 20:23:10 2018 > 87.50% done, estimate finish Fri May 25 20:23:10 2018 > 87.50% done, estimate finish Fri May 25 20:23:09 2018 > 87.51% done, estimate finish Fri May 25 20:23:09 2018 >=== last message repeated 2 times. === > 87.52% done, estimate finish Fri May 25 20:23:09 2018 >=== last message repeated 3 times. === > 87.53% done, estimate finish Fri May 25 20:23:09 2018 >=== last message repeated 2 times. === > 87.54% done, estimate finish Fri May 25 20:23:09 2018 >=== last message repeated 2 times. === > 87.54% done, estimate finish Fri May 25 20:23:08 2018 > 87.55% done, estimate finish Fri May 25 20:23:09 2018 >=== last message repeated 2 times. === > 87.56% done, estimate finish Fri May 25 20:23:09 2018 >=== last message repeated 2 times. === > 87.56% done, estimate finish Fri May 25 20:23:08 2018 > 87.57% done, estimate finish Fri May 25 20:23:08 2018 > 87.57% done, estimate finish Fri May 25 20:23:09 2018 > 87.58% done, estimate finish Fri May 25 20:23:09 2018 >=== last message repeated 2 times. === > 87.58% done, estimate finish Fri May 25 20:23:08 2018 > 87.59% done, estimate finish Fri May 25 20:23:08 2018 >=== last message repeated 2 times. === > 87.60% done, estimate finish Fri May 25 20:23:08 2018 >=== last message repeated 2 times. === > 87.61% done, estimate finish Fri May 25 20:23:08 2018 >=== last message repeated 3 times. === > 87.62% done, estimate finish Fri May 25 20:23:08 2018 > 87.62% done, estimate finish Fri May 25 20:23:07 2018 > 87.63% done, estimate finish Fri May 25 20:23:08 2018 >=== last message repeated 3 times. === > 87.64% done, estimate finish Fri May 25 20:23:08 2018 > 87.64% done, estimate finish Fri May 25 20:23:07 2018 > 87.65% done, estimate finish Fri May 25 20:23:07 2018 >=== last message repeated 2 times. === > 87.65% done, estimate finish Fri May 25 20:23:08 2018 > 87.66% done, estimate finish Fri May 25 20:23:08 2018 > 87.66% done, estimate finish Fri May 25 20:23:07 2018 > 87.67% done, estimate finish Fri May 25 20:23:07 2018 >=== last message repeated 3 times. === > 87.68% done, estimate finish Fri May 25 20:23:08 2018 > 87.68% done, estimate finish Fri May 25 20:23:07 2018 > 87.69% done, estimate finish Fri May 25 20:23:07 2018 >=== last message repeated 2 times. === > 87.70% done, estimate finish Fri May 25 20:23:07 2018 > 87.70% done, estimate finish Fri May 25 20:23:06 2018 > 87.70% done, estimate finish Fri May 25 20:23:07 2018 > 87.71% done, estimate finish Fri May 25 20:23:07 2018 >=== last message repeated 2 times. === > 87.72% done, estimate finish Fri May 25 20:23:07 2018 > 87.72% done, estimate finish Fri May 25 20:23:06 2018 >=== last message repeated 2 times. === > 87.73% done, estimate finish Fri May 25 20:23:06 2018 > 87.73% done, estimate finish Fri May 25 20:23:07 2018 > 87.74% done, estimate finish Fri May 25 20:23:07 2018 > 87.74% done, estimate finish Fri May 25 20:23:06 2018 >=== last message repeated 2 times. === > 87.75% done, estimate finish Fri May 25 20:23:06 2018 >=== last message repeated 2 times. === > 87.76% done, estimate finish Fri May 25 20:23:05 2018 > 87.76% done, estimate finish Fri May 25 20:23:06 2018 >=== last message repeated 2 times. === > 87.77% done, estimate finish Fri May 25 20:23:06 2018 >=== last message repeated 2 times. === > 87.78% done, estimate finish Fri May 25 20:23:05 2018 >=== last message repeated 2 times. === > 87.79% done, estimate finish Fri May 25 20:23:06 2018 >=== last message repeated 3 times. === > 87.80% done, estimate finish Fri May 25 20:23:05 2018 >=== last message repeated 2 times. === > 87.81% done, estimate finish Fri May 25 20:23:05 2018 > 87.81% done, estimate finish Fri May 25 20:23:06 2018 >=== last message repeated 2 times. === > 87.82% done, estimate finish Fri May 25 20:23:05 2018 >=== last message repeated 2 times. === > 87.83% done, estimate finish Fri May 25 20:23:05 2018 >=== last message repeated 2 times. === > 87.83% done, estimate finish Fri May 25 20:23:04 2018 > 87.84% done, estimate finish Fri May 25 20:23:05 2018 >=== last message repeated 2 times. === > 87.85% done, estimate finish Fri May 25 20:23:05 2018 >=== last message repeated 2 times. === > 87.86% done, estimate finish Fri May 25 20:23:04 2018 >=== last message repeated 3 times. === > 87.87% done, estimate finish Fri May 25 20:23:05 2018 >=== last message repeated 2 times. === > 87.88% done, estimate finish Fri May 25 20:23:04 2018 >=== last message repeated 3 times. === > 87.89% done, estimate finish Fri May 25 20:23:04 2018 > 87.89% done, estimate finish Fri May 25 20:23:05 2018 > 87.90% done, estimate finish Fri May 25 20:23:04 2018 >=== last message repeated 3 times. === > 87.91% done, estimate finish Fri May 25 20:23:04 2018 > 87.91% done, estimate finish Fri May 25 20:23:03 2018 > 87.92% done, estimate finish Fri May 25 20:23:04 2018 >=== last message repeated 3 times. === > 87.93% done, estimate finish Fri May 25 20:23:04 2018 > 87.93% done, estimate finish Fri May 25 20:23:03 2018 > 87.94% done, estimate finish Fri May 25 20:23:03 2018 >=== last message repeated 2 times. === > 87.95% done, estimate finish Fri May 25 20:23:04 2018 >=== last message repeated 2 times. === > 87.95% done, estimate finish Fri May 25 20:23:03 2018 > 87.96% done, estimate finish Fri May 25 20:23:03 2018 >=== last message repeated 2 times. === > 87.97% done, estimate finish Fri May 25 20:23:03 2018 > 87.97% done, estimate finish Fri May 25 20:23:04 2018 > 87.97% done, estimate finish Fri May 25 20:23:03 2018 > 87.98% done, estimate finish Fri May 25 20:23:03 2018 >=== last message repeated 2 times. === > 87.99% done, estimate finish Fri May 25 20:23:03 2018 >=== last message repeated 2 times. === > 87.99% done, estimate finish Fri May 25 20:23:02 2018 > 88.00% done, estimate finish Fri May 25 20:23:03 2018 >=== last message repeated 2 times. === > 88.01% done, estimate finish Fri May 25 20:23:03 2018 > 88.01% done, estimate finish Fri May 25 20:23:02 2018 >=== last message repeated 2 times. === > 88.02% done, estimate finish Fri May 25 20:23:02 2018 > 88.02% done, estimate finish Fri May 25 20:23:03 2018 > 88.03% done, estimate finish Fri May 25 20:23:03 2018 > 88.03% done, estimate finish Fri May 25 20:23:02 2018 > 88.04% done, estimate finish Fri May 25 20:23:02 2018 >=== last message repeated 3 times. === > 88.05% done, estimate finish Fri May 25 20:23:02 2018 >=== last message repeated 2 times. === > 88.06% done, estimate finish Fri May 25 20:23:02 2018 >=== last message repeated 3 times. === > 88.07% done, estimate finish Fri May 25 20:23:02 2018 > 88.07% done, estimate finish Fri May 25 20:23:01 2018 > 88.08% done, estimate finish Fri May 25 20:23:02 2018 >=== last message repeated 3 times. === > 88.09% done, estimate finish Fri May 25 20:23:02 2018 > 88.09% done, estimate finish Fri May 25 20:23:01 2018 > 88.10% done, estimate finish Fri May 25 20:23:01 2018 >=== last message repeated 2 times. === > 88.10% done, estimate finish Fri May 25 20:23:02 2018 > 88.11% done, estimate finish Fri May 25 20:23:02 2018 > 88.11% done, estimate finish Fri May 25 20:23:01 2018 > 88.12% done, estimate finish Fri May 25 20:23:01 2018 >=== last message repeated 2 times. === > 88.13% done, estimate finish Fri May 25 20:23:01 2018 >=== last message repeated 3 times. === > 88.14% done, estimate finish Fri May 25 20:23:01 2018 >=== last message repeated 2 times. === > 88.15% done, estimate finish Fri May 25 20:23:01 2018 > 88.15% done, estimate finish Fri May 25 20:23:00 2018 > 88.15% done, estimate finish Fri May 25 20:23:01 2018 > 88.16% done, estimate finish Fri May 25 20:23:01 2018 >=== last message repeated 2 times. === > 88.17% done, estimate finish Fri May 25 20:23:01 2018 > 88.17% done, estimate finish Fri May 25 20:23:00 2018 >=== last message repeated 2 times. === > 88.18% done, estimate finish Fri May 25 20:23:00 2018 > 88.18% done, estimate finish Fri May 25 20:23:01 2018 > 88.19% done, estimate finish Fri May 25 20:23:01 2018 > 88.19% done, estimate finish Fri May 25 20:23:00 2018 >=== last message repeated 2 times. === > 88.20% done, estimate finish Fri May 25 20:23:00 2018 >=== last message repeated 2 times. === > 88.21% done, estimate finish Fri May 25 20:22:59 2018 > 88.21% done, estimate finish Fri May 25 20:23:00 2018 > 88.22% done, estimate finish Fri May 25 20:23:00 2018 >=== last message repeated 3 times. === > 88.23% done, estimate finish Fri May 25 20:22:59 2018 >=== last message repeated 2 times. === > 88.24% done, estimate finish Fri May 25 20:23:00 2018 >=== last message repeated 3 times. === > 88.25% done, estimate finish Fri May 25 20:22:59 2018 >=== last message repeated 2 times. === > 88.26% done, estimate finish Fri May 25 20:22:59 2018 >=== last message repeated 2 times. === > 88.26% done, estimate finish Fri May 25 20:23:00 2018 > 88.27% done, estimate finish Fri May 25 20:22:59 2018 >=== last message repeated 2 times. === > 88.28% done, estimate finish Fri May 25 20:22:59 2018 >=== last message repeated 2 times. === > 88.29% done, estimate finish Fri May 25 20:22:58 2018 > 88.29% done, estimate finish Fri May 25 20:22:59 2018 >=== last message repeated 2 times. === > 88.30% done, estimate finish Fri May 25 20:22:59 2018 >=== last message repeated 2 times. === > 88.31% done, estimate finish Fri May 25 20:22:58 2018 >=== last message repeated 2 times. === > 88.31% done, estimate finish Fri May 25 20:22:59 2018 > 88.32% done, estimate finish Fri May 25 20:22:59 2018 >=== last message repeated 2 times. === > 88.33% done, estimate finish Fri May 25 20:22:58 2018 >=== last message repeated 3 times. === > 88.34% done, estimate finish Fri May 25 20:22:58 2018 > 88.34% done, estimate finish Fri May 25 20:22:59 2018 > 88.35% done, estimate finish Fri May 25 20:22:58 2018 >=== last message repeated 3 times. === > 88.36% done, estimate finish Fri May 25 20:22:58 2018 > 88.36% done, estimate finish Fri May 25 20:22:57 2018 > 88.37% done, estimate finish Fri May 25 20:22:58 2018 >=== last message repeated 2 times. === > 88.38% done, estimate finish Fri May 25 20:22:58 2018 >=== last message repeated 2 times. === > 88.38% done, estimate finish Fri May 25 20:22:57 2018 > 88.39% done, estimate finish Fri May 25 20:22:57 2018 >=== last message repeated 2 times. === > 88.40% done, estimate finish Fri May 25 20:22:58 2018 >=== last message repeated 2 times. === > 88.40% done, estimate finish Fri May 25 20:22:57 2018 > 88.41% done, estimate finish Fri May 25 20:22:57 2018 >=== last message repeated 2 times. === > 88.42% done, estimate finish Fri May 25 20:22:57 2018 > 88.42% done, estimate finish Fri May 25 20:22:58 2018 > 88.42% done, estimate finish Fri May 25 20:22:57 2018 > 88.43% done, estimate finish Fri May 25 20:22:57 2018 >=== last message repeated 2 times. === > 88.44% done, estimate finish Fri May 25 20:22:57 2018 >=== last message repeated 2 times. === > 88.44% done, estimate finish Fri May 25 20:22:56 2018 > 88.45% done, estimate finish Fri May 25 20:22:57 2018 >=== last message repeated 2 times. === > 88.46% done, estimate finish Fri May 25 20:22:57 2018 >=== last message repeated 2 times. === > 88.47% done, estimate finish Fri May 25 20:22:56 2018 >=== last message repeated 2 times. === > 88.47% done, estimate finish Fri May 25 20:22:57 2018 > 88.48% done, estimate finish Fri May 25 20:22:57 2018 >=== last message repeated 2 times. === > 88.49% done, estimate finish Fri May 25 20:22:56 2018 >=== last message repeated 3 times. === > 88.50% done, estimate finish Fri May 25 20:22:56 2018 >=== last message repeated 2 times. === > 88.51% done, estimate finish Fri May 25 20:22:56 2018 >=== last message repeated 3 times. === > 88.52% done, estimate finish Fri May 25 20:22:56 2018 > 88.52% done, estimate finish Fri May 25 20:22:55 2018 > 88.53% done, estimate finish Fri May 25 20:22:56 2018 >=== last message repeated 2 times. === > 88.54% done, estimate finish Fri May 25 20:22:56 2018 >=== last message repeated 2 times. === > 88.54% done, estimate finish Fri May 25 20:22:55 2018 > 88.55% done, estimate finish Fri May 25 20:22:55 2018 > 88.55% done, estimate finish Fri May 25 20:22:56 2018 > 88.56% done, estimate finish Fri May 25 20:22:56 2018 >=== last message repeated 2 times. === > 88.56% done, estimate finish Fri May 25 20:22:55 2018 > 88.57% done, estimate finish Fri May 25 20:22:55 2018 >=== last message repeated 2 times. === > 88.58% done, estimate finish Fri May 25 20:22:55 2018 > 88.58% done, estimate finish Fri May 25 20:22:56 2018 > 88.58% done, estimate finish Fri May 25 20:22:55 2018 > 88.59% done, estimate finish Fri May 25 20:22:55 2018 >=== last message repeated 2 times. === > 88.60% done, estimate finish Fri May 25 20:22:55 2018 > 88.60% done, estimate finish Fri May 25 20:22:54 2018 >=== last message repeated 2 times. === > 88.61% done, estimate finish Fri May 25 20:22:55 2018 >=== last message repeated 2 times. === > 88.62% done, estimate finish Fri May 25 20:22:55 2018 > 88.62% done, estimate finish Fri May 25 20:22:54 2018 > 88.63% done, estimate finish Fri May 25 20:22:54 2018 >=== last message repeated 2 times. === > 88.63% done, estimate finish Fri May 25 20:22:55 2018 > 88.64% done, estimate finish Fri May 25 20:22:55 2018 > 88.64% done, estimate finish Fri May 25 20:22:54 2018 > 88.65% done, estimate finish Fri May 25 20:22:54 2018 >=== last message repeated 3 times. === > 88.66% done, estimate finish Fri May 25 20:22:55 2018 > 88.66% done, estimate finish Fri May 25 20:22:54 2018 > 88.67% done, estimate finish Fri May 25 20:22:54 2018 >=== last message repeated 3 times. === > 88.68% done, estimate finish Fri May 25 20:22:53 2018 >=== last message repeated 2 times. === > 88.69% done, estimate finish Fri May 25 20:22:54 2018 >=== last message repeated 3 times. === > 88.70% done, estimate finish Fri May 25 20:22:53 2018 >=== last message repeated 2 times. === > 88.71% done, estimate finish Fri May 25 20:22:53 2018 > 88.71% done, estimate finish Fri May 25 20:22:54 2018 > 88.72% done, estimate finish Fri May 25 20:22:54 2018 > 88.72% done, estimate finish Fri May 25 20:22:53 2018 >=== last message repeated 2 times. === > 88.73% done, estimate finish Fri May 25 20:22:53 2018 >=== last message repeated 2 times. === > 88.74% done, estimate finish Fri May 25 20:22:53 2018 >=== last message repeated 3 times. === > 88.75% done, estimate finish Fri May 25 20:22:53 2018 >=== last message repeated 2 times. === > 88.76% done, estimate finish Fri May 25 20:22:52 2018 >=== last message repeated 2 times. === > 88.76% done, estimate finish Fri May 25 20:22:53 2018 > 88.77% done, estimate finish Fri May 25 20:22:53 2018 >=== last message repeated 2 times. === > 88.78% done, estimate finish Fri May 25 20:22:52 2018 >=== last message repeated 3 times. === > 88.79% done, estimate finish Fri May 25 20:22:52 2018 > 88.79% done, estimate finish Fri May 25 20:22:53 2018 > 88.80% done, estimate finish Fri May 25 20:22:52 2018 >=== last message repeated 2 times. === > 88.81% done, estimate finish Fri May 25 20:22:52 2018 >=== last message repeated 3 times. === > 88.82% done, estimate finish Fri May 25 20:22:52 2018 >=== last message repeated 2 times. === > 88.83% done, estimate finish Fri May 25 20:22:52 2018 >=== last message repeated 3 times. === > 88.84% done, estimate finish Fri May 25 20:22:51 2018 >=== last message repeated 2 times. === > 88.85% done, estimate finish Fri May 25 20:22:52 2018 >=== last message repeated 3 times. === > 88.86% done, estimate finish Fri May 25 20:22:51 2018 >=== last message repeated 2 times. === > 88.87% done, estimate finish Fri May 25 20:22:51 2018 > 88.87% done, estimate finish Fri May 25 20:22:52 2018 >=== last message repeated 2 times. === > 88.88% done, estimate finish Fri May 25 20:22:51 2018 >=== last message repeated 2 times. === > 88.89% done, estimate finish Fri May 25 20:22:51 2018 >=== last message repeated 2 times. === > 88.90% done, estimate finish Fri May 25 20:22:52 2018 > 88.90% done, estimate finish Fri May 25 20:22:51 2018 >=== last message repeated 2 times. === > 88.91% done, estimate finish Fri May 25 20:22:51 2018 >=== last message repeated 2 times. === > 88.92% done, estimate finish Fri May 25 20:22:50 2018 >=== last message repeated 2 times. === > 88.92% done, estimate finish Fri May 25 20:22:51 2018 > 88.93% done, estimate finish Fri May 25 20:22:51 2018 >=== last message repeated 2 times. === > 88.94% done, estimate finish Fri May 25 20:22:50 2018 >=== last message repeated 3 times. === > 88.95% done, estimate finish Fri May 25 20:22:51 2018 >=== last message repeated 2 times. === > 88.96% done, estimate finish Fri May 25 20:22:50 2018 >=== last message repeated 2 times. === > 88.97% done, estimate finish Fri May 25 20:22:50 2018 >=== last message repeated 2 times. === > 88.97% done, estimate finish Fri May 25 20:22:49 2018 > 88.98% done, estimate finish Fri May 25 20:22:50 2018 >=== last message repeated 2 times. === > 88.99% done, estimate finish Fri May 25 20:22:50 2018 >=== last message repeated 2 times. === > 88.99% done, estimate finish Fri May 25 20:22:49 2018 > 89.00% done, estimate finish Fri May 25 20:22:49 2018 > 89.00% done, estimate finish Fri May 25 20:22:50 2018 > 89.01% done, estimate finish Fri May 25 20:22:50 2018 >=== last message repeated 2 times. === > 89.01% done, estimate finish Fri May 25 20:22:49 2018 > 89.02% done, estimate finish Fri May 25 20:22:49 2018 >=== last message repeated 2 times. === > 89.03% done, estimate finish Fri May 25 20:22:49 2018 > 89.03% done, estimate finish Fri May 25 20:22:50 2018 > 89.03% done, estimate finish Fri May 25 20:22:49 2018 > 89.04% done, estimate finish Fri May 25 20:22:49 2018 >=== last message repeated 2 times. === > 89.05% done, estimate finish Fri May 25 20:22:49 2018 >=== last message repeated 2 times. === > 89.06% done, estimate finish Fri May 25 20:22:49 2018 >=== last message repeated 3 times. === > 89.07% done, estimate finish Fri May 25 20:22:49 2018 > 89.07% done, estimate finish Fri May 25 20:22:48 2018 > 89.08% done, estimate finish Fri May 25 20:22:48 2018 > 89.08% done, estimate finish Fri May 25 20:22:49 2018 >=== last message repeated 2 times. === > 89.09% done, estimate finish Fri May 25 20:22:49 2018 > 89.09% done, estimate finish Fri May 25 20:22:48 2018 > 89.10% done, estimate finish Fri May 25 20:22:48 2018 >=== last message repeated 3 times. === > 89.11% done, estimate finish Fri May 25 20:22:49 2018 > 89.11% done, estimate finish Fri May 25 20:22:48 2018 > 89.12% done, estimate finish Fri May 25 20:22:48 2018 >=== last message repeated 3 times. === > 89.13% done, estimate finish Fri May 25 20:22:48 2018 > 89.13% done, estimate finish Fri May 25 20:22:47 2018 > 89.14% done, estimate finish Fri May 25 20:22:48 2018 >=== last message repeated 2 times. === > 89.15% done, estimate finish Fri May 25 20:22:48 2018 >=== last message repeated 2 times. === > 89.15% done, estimate finish Fri May 25 20:22:47 2018 > 89.16% done, estimate finish Fri May 25 20:22:47 2018 > 89.16% done, estimate finish Fri May 25 20:22:48 2018 > 89.17% done, estimate finish Fri May 25 20:22:48 2018 >=== last message repeated 2 times. === > 89.17% done, estimate finish Fri May 25 20:22:47 2018 > 89.18% done, estimate finish Fri May 25 20:22:47 2018 >=== last message repeated 2 times. === > 89.19% done, estimate finish Fri May 25 20:22:48 2018 >=== last message repeated 2 times. === > 89.19% done, estimate finish Fri May 25 20:22:47 2018 > 89.20% done, estimate finish Fri May 25 20:22:47 2018 >=== last message repeated 2 times. === > 89.21% done, estimate finish Fri May 25 20:22:47 2018 > 89.21% done, estimate finish Fri May 25 20:22:46 2018 > 89.21% done, estimate finish Fri May 25 20:22:47 2018 > 89.22% done, estimate finish Fri May 25 20:22:47 2018 >=== last message repeated 2 times. === > 89.23% done, estimate finish Fri May 25 20:22:47 2018 > 89.23% done, estimate finish Fri May 25 20:22:46 2018 > 89.24% done, estimate finish Fri May 25 20:22:46 2018 > 89.24% done, estimate finish Fri May 25 20:22:47 2018 >=== last message repeated 2 times. === > 89.25% done, estimate finish Fri May 25 20:22:47 2018 > 89.25% done, estimate finish Fri May 25 20:22:46 2018 > 89.26% done, estimate finish Fri May 25 20:22:46 2018 >=== last message repeated 3 times. === > 89.27% done, estimate finish Fri May 25 20:22:47 2018 > 89.27% done, estimate finish Fri May 25 20:22:46 2018 > 89.28% done, estimate finish Fri May 25 20:22:46 2018 >=== last message repeated 3 times. === > 89.29% done, estimate finish Fri May 25 20:22:45 2018 > 89.29% done, estimate finish Fri May 25 20:22:46 2018 > 89.30% done, estimate finish Fri May 25 20:22:46 2018 >=== last message repeated 2 times. === > 89.31% done, estimate finish Fri May 25 20:22:46 2018 > 89.31% done, estimate finish Fri May 25 20:22:45 2018 >=== last message repeated 2 times. === > 89.32% done, estimate finish Fri May 25 20:22:45 2018 > 89.32% done, estimate finish Fri May 25 20:22:46 2018 > 89.33% done, estimate finish Fri May 25 20:22:46 2018 > 89.33% done, estimate finish Fri May 25 20:22:45 2018 >=== last message repeated 2 times. === > 89.34% done, estimate finish Fri May 25 20:22:45 2018 >=== last message repeated 2 times. === > 89.35% done, estimate finish Fri May 25 20:22:46 2018 > 89.35% done, estimate finish Fri May 25 20:22:45 2018 >=== last message repeated 2 times. === > 89.36% done, estimate finish Fri May 25 20:22:45 2018 >=== last message repeated 2 times. === > 89.37% done, estimate finish Fri May 25 20:22:45 2018 >=== last message repeated 3 times. === > 89.38% done, estimate finish Fri May 25 20:22:45 2018 >=== last message repeated 2 times. === > 89.39% done, estimate finish Fri May 25 20:22:45 2018 > 89.39% done, estimate finish Fri May 25 20:22:44 2018 > 89.40% done, estimate finish Fri May 25 20:22:44 2018 > 89.40% done, estimate finish Fri May 25 20:22:45 2018 >=== last message repeated 2 times. === > 89.41% done, estimate finish Fri May 25 20:22:45 2018 > 89.41% done, estimate finish Fri May 25 20:22:44 2018 > 89.42% done, estimate finish Fri May 25 20:22:44 2018 >=== last message repeated 3 times. === > 89.43% done, estimate finish Fri May 25 20:22:44 2018 >=== last message repeated 2 times. === > 89.44% done, estimate finish Fri May 25 20:22:44 2018 >=== last message repeated 3 times. === > 89.45% done, estimate finish Fri May 25 20:22:43 2018 > 89.45% done, estimate finish Fri May 25 20:22:44 2018 > 89.46% done, estimate finish Fri May 25 20:22:44 2018 >=== last message repeated 3 times. === > 89.47% done, estimate finish Fri May 25 20:22:43 2018 >=== last message repeated 2 times. === > 89.48% done, estimate finish Fri May 25 20:22:44 2018 >=== last message repeated 2 times. === > 89.49% done, estimate finish Fri May 25 20:22:44 2018 > 89.49% done, estimate finish Fri May 25 20:22:43 2018 >=== last message repeated 2 times. === > 89.50% done, estimate finish Fri May 25 20:22:43 2018 > 89.50% done, estimate finish Fri May 25 20:22:44 2018 > 89.51% done, estimate finish Fri May 25 20:22:44 2018 > 89.51% done, estimate finish Fri May 25 20:22:43 2018 >=== last message repeated 2 times. === > 89.52% done, estimate finish Fri May 25 20:22:43 2018 >=== last message repeated 2 times. === > 89.53% done, estimate finish Fri May 25 20:22:42 2018 > 89.53% done, estimate finish Fri May 25 20:22:43 2018 >=== last message repeated 2 times. === > 89.54% done, estimate finish Fri May 25 20:22:43 2018 >=== last message repeated 2 times. === > 89.55% done, estimate finish Fri May 25 20:22:42 2018 > 89.55% done, estimate finish Fri May 25 20:22:43 2018 >=== last message repeated 2 times. === > 89.56% done, estimate finish Fri May 25 20:22:43 2018 >=== last message repeated 2 times. === > 89.57% done, estimate finish Fri May 25 20:22:42 2018 >=== last message repeated 2 times. === > 89.58% done, estimate finish Fri May 25 20:22:43 2018 >=== last message repeated 3 times. === > 89.59% done, estimate finish Fri May 25 20:22:42 2018 >=== last message repeated 2 times. === > 89.60% done, estimate finish Fri May 25 20:22:42 2018 >=== last message repeated 2 times. === > 89.60% done, estimate finish Fri May 25 20:22:43 2018 > 89.61% done, estimate finish Fri May 25 20:22:42 2018 >=== last message repeated 2 times. === > 89.62% done, estimate finish Fri May 25 20:22:42 2018 >=== last message repeated 2 times. === > 89.62% done, estimate finish Fri May 25 20:22:41 2018 > 89.63% done, estimate finish Fri May 25 20:22:41 2018 > 89.63% done, estimate finish Fri May 25 20:22:42 2018 > 89.64% done, estimate finish Fri May 25 20:22:42 2018 >=== last message repeated 2 times. === > 89.64% done, estimate finish Fri May 25 20:22:41 2018 > 89.65% done, estimate finish Fri May 25 20:22:41 2018 >=== last message repeated 2 times. === > 89.66% done, estimate finish Fri May 25 20:22:42 2018 >=== last message repeated 2 times. === > 89.67% done, estimate finish Fri May 25 20:22:41 2018 >=== last message repeated 3 times. === > 89.68% done, estimate finish Fri May 25 20:22:41 2018 > 89.68% done, estimate finish Fri May 25 20:22:42 2018 > 89.69% done, estimate finish Fri May 25 20:22:41 2018 >=== last message repeated 3 times. === > 89.70% done, estimate finish Fri May 25 20:22:41 2018 >=== last message repeated 2 times. === > 89.71% done, estimate finish Fri May 25 20:22:40 2018 > 89.71% done, estimate finish Fri May 25 20:22:41 2018 >=== last message repeated 2 times. === > 89.72% done, estimate finish Fri May 25 20:22:41 2018 >=== last message repeated 2 times. === > 89.73% done, estimate finish Fri May 25 20:22:40 2018 >=== last message repeated 2 times. === > 89.74% done, estimate finish Fri May 25 20:22:41 2018 >=== last message repeated 3 times. === > 89.75% done, estimate finish Fri May 25 20:22:40 2018 >=== last message repeated 2 times. === > 89.76% done, estimate finish Fri May 25 20:22:40 2018 >=== last message repeated 2 times. === > 89.76% done, estimate finish Fri May 25 20:22:41 2018 > 89.77% done, estimate finish Fri May 25 20:22:40 2018 >=== last message repeated 2 times. === > 89.78% done, estimate finish Fri May 25 20:22:40 2018 >=== last message repeated 2 times. === > 89.78% done, estimate finish Fri May 25 20:22:39 2018 > 89.79% done, estimate finish Fri May 25 20:22:40 2018 >=== last message repeated 2 times. === > 89.80% done, estimate finish Fri May 25 20:22:40 2018 >=== last message repeated 2 times. === > 89.80% done, estimate finish Fri May 25 20:22:39 2018 > 89.81% done, estimate finish Fri May 25 20:22:39 2018 > 89.81% done, estimate finish Fri May 25 20:22:40 2018 > 89.82% done, estimate finish Fri May 25 20:22:40 2018 >=== last message repeated 2 times. === > 89.83% done, estimate finish Fri May 25 20:22:39 2018 >=== last message repeated 3 times. === > 89.84% done, estimate finish Fri May 25 20:22:39 2018 > 89.84% done, estimate finish Fri May 25 20:22:40 2018 > 89.85% done, estimate finish Fri May 25 20:22:39 2018 >=== last message repeated 3 times. === > 89.86% done, estimate finish Fri May 25 20:22:39 2018 > 89.86% done, estimate finish Fri May 25 20:22:38 2018 > 89.87% done, estimate finish Fri May 25 20:22:39 2018 >=== last message repeated 3 times. === > 89.88% done, estimate finish Fri May 25 20:22:39 2018 > 89.88% done, estimate finish Fri May 25 20:22:38 2018 > 89.89% done, estimate finish Fri May 25 20:22:38 2018 >=== last message repeated 2 times. === > 89.89% done, estimate finish Fri May 25 20:22:39 2018 > 89.90% done, estimate finish Fri May 25 20:22:39 2018 > 89.90% done, estimate finish Fri May 25 20:22:38 2018 > 89.91% done, estimate finish Fri May 25 20:22:38 2018 >=== last message repeated 2 times. === > 89.92% done, estimate finish Fri May 25 20:22:38 2018 > 89.92% done, estimate finish Fri May 25 20:22:39 2018 > 89.92% done, estimate finish Fri May 25 20:22:38 2018 > 89.93% done, estimate finish Fri May 25 20:22:38 2018 >=== last message repeated 2 times. === > 89.94% done, estimate finish Fri May 25 20:22:38 2018 >=== last message repeated 2 times. === > 89.94% done, estimate finish Fri May 25 20:22:37 2018 > 89.95% done, estimate finish Fri May 25 20:22:38 2018 >=== last message repeated 2 times. === > 89.96% done, estimate finish Fri May 25 20:22:38 2018 >=== last message repeated 2 times. === > 89.96% done, estimate finish Fri May 25 20:22:37 2018 > 89.97% done, estimate finish Fri May 25 20:22:37 2018 > 89.97% done, estimate finish Fri May 25 20:22:38 2018 > 89.98% done, estimate finish Fri May 25 20:22:38 2018 >=== last message repeated 2 times. === > 89.98% done, estimate finish Fri May 25 20:22:37 2018 > 89.99% done, estimate finish Fri May 25 20:22:37 2018 >=== last message repeated 2 times. === > 90.00% done, estimate finish Fri May 25 20:22:38 2018 >=== last message repeated 2 times. === > 90.01% done, estimate finish Fri May 25 20:22:37 2018 >=== last message repeated 3 times. === > 90.02% done, estimate finish Fri May 25 20:22:37 2018 > 90.02% done, estimate finish Fri May 25 20:22:36 2018 > 90.03% done, estimate finish Fri May 25 20:22:37 2018 >=== last message repeated 3 times. === > 90.04% done, estimate finish Fri May 25 20:22:37 2018 > 90.04% done, estimate finish Fri May 25 20:22:36 2018 > 90.05% done, estimate finish Fri May 25 20:22:36 2018 >=== last message repeated 2 times. === > 90.05% done, estimate finish Fri May 25 20:22:37 2018 > 90.06% done, estimate finish Fri May 25 20:22:37 2018 > 90.06% done, estimate finish Fri May 25 20:22:36 2018 > 90.07% done, estimate finish Fri May 25 20:22:36 2018 >=== last message repeated 3 times. === > 90.08% done, estimate finish Fri May 25 20:22:37 2018 > 90.08% done, estimate finish Fri May 25 20:22:36 2018 > 90.09% done, estimate finish Fri May 25 20:22:36 2018 >=== last message repeated 2 times. === > 90.10% done, estimate finish Fri May 25 20:22:36 2018 >=== last message repeated 3 times. === > 90.11% done, estimate finish Fri May 25 20:22:36 2018 >=== last message repeated 2 times. === > 90.12% done, estimate finish Fri May 25 20:22:36 2018 > 90.12% done, estimate finish Fri May 25 20:22:35 2018 >=== last message repeated 2 times. === > 90.13% done, estimate finish Fri May 25 20:22:35 2018 > 90.13% done, estimate finish Fri May 25 20:22:36 2018 > 90.14% done, estimate finish Fri May 25 20:22:36 2018 > 90.14% done, estimate finish Fri May 25 20:22:35 2018 >=== last message repeated 2 times. === > 90.15% done, estimate finish Fri May 25 20:22:35 2018 >=== last message repeated 2 times. === > 90.16% done, estimate finish Fri May 25 20:22:36 2018 > 90.16% done, estimate finish Fri May 25 20:22:35 2018 > 90.17% done, estimate finish Fri May 25 20:22:35 2018 >=== last message repeated 3 times. === > 90.18% done, estimate finish Fri May 25 20:22:35 2018 > 90.18% done, estimate finish Fri May 25 20:22:34 2018 > 90.19% done, estimate finish Fri May 25 20:22:35 2018 >=== last message repeated 3 times. === > 90.20% done, estimate finish Fri May 25 20:22:35 2018 > 90.20% done, estimate finish Fri May 25 20:22:34 2018 > 90.21% done, estimate finish Fri May 25 20:22:35 2018 >=== last message repeated 3 times. === > 90.22% done, estimate finish Fri May 25 20:22:35 2018 > 90.22% done, estimate finish Fri May 25 20:22:34 2018 > 90.23% done, estimate finish Fri May 25 20:22:34 2018 >=== last message repeated 2 times. === > 90.23% done, estimate finish Fri May 25 20:22:35 2018 > 90.24% done, estimate finish Fri May 25 20:22:35 2018 > 90.24% done, estimate finish Fri May 25 20:22:34 2018 > 90.25% done, estimate finish Fri May 25 20:22:34 2018 >=== last message repeated 2 times. === > 90.26% done, estimate finish Fri May 25 20:22:34 2018 > 90.26% done, estimate finish Fri May 25 20:22:35 2018 > 90.26% done, estimate finish Fri May 25 20:22:34 2018 > 90.27% done, estimate finish Fri May 25 20:22:34 2018 >=== last message repeated 2 times. === > 90.28% done, estimate finish Fri May 25 20:22:34 2018 > 90.28% done, estimate finish Fri May 25 20:22:33 2018 >=== last message repeated 2 times. === > 90.29% done, estimate finish Fri May 25 20:22:34 2018 >=== last message repeated 2 times. === > 90.30% done, estimate finish Fri May 25 20:22:34 2018 > 90.30% done, estimate finish Fri May 25 20:22:33 2018 >=== last message repeated 2 times. === > 90.31% done, estimate finish Fri May 25 20:22:33 2018 > 90.31% done, estimate finish Fri May 25 20:22:34 2018 > 90.32% done, estimate finish Fri May 25 20:22:34 2018 > 90.32% done, estimate finish Fri May 25 20:22:33 2018 >=== last message repeated 2 times. === > 90.33% done, estimate finish Fri May 25 20:22:33 2018 >=== last message repeated 2 times. === > 90.34% done, estimate finish Fri May 25 20:22:33 2018 >=== last message repeated 2 times. === > 90.35% done, estimate finish Fri May 25 20:22:33 2018 >=== last message repeated 3 times. === > 90.36% done, estimate finish Fri May 25 20:22:33 2018 > 90.36% done, estimate finish Fri May 25 20:22:32 2018 > 90.37% done, estimate finish Fri May 25 20:22:33 2018 >=== last message repeated 3 times. === > 90.38% done, estimate finish Fri May 25 20:22:33 2018 > 90.38% done, estimate finish Fri May 25 20:22:32 2018 > 90.39% done, estimate finish Fri May 25 20:22:32 2018 > 90.39% done, estimate finish Fri May 25 20:22:33 2018 >=== last message repeated 2 times. === > 90.40% done, estimate finish Fri May 25 20:22:33 2018 > 90.40% done, estimate finish Fri May 25 20:22:32 2018 > 90.41% done, estimate finish Fri May 25 20:22:32 2018 >=== last message repeated 3 times. === > 90.42% done, estimate finish Fri May 25 20:22:32 2018 >=== last message repeated 2 times. === > 90.43% done, estimate finish Fri May 25 20:22:32 2018 >=== last message repeated 2 times. === > 90.44% done, estimate finish Fri May 25 20:22:32 2018 > 90.44% done, estimate finish Fri May 25 20:22:31 2018 >=== last message repeated 2 times. === > 90.45% done, estimate finish Fri May 25 20:22:32 2018 >=== last message repeated 2 times. === > 90.46% done, estimate finish Fri May 25 20:22:32 2018 > 90.46% done, estimate finish Fri May 25 20:22:31 2018 >=== last message repeated 2 times. === > 90.47% done, estimate finish Fri May 25 20:22:31 2018 > 90.47% done, estimate finish Fri May 25 20:22:32 2018 > 90.48% done, estimate finish Fri May 25 20:22:32 2018 > 90.48% done, estimate finish Fri May 25 20:22:31 2018 >=== last message repeated 2 times. === > 90.49% done, estimate finish Fri May 25 20:22:31 2018 >=== last message repeated 2 times. === > 90.50% done, estimate finish Fri May 25 20:22:32 2018 > 90.50% done, estimate finish Fri May 25 20:22:31 2018 > 90.51% done, estimate finish Fri May 25 20:22:31 2018 >=== last message repeated 3 times. === > 90.52% done, estimate finish Fri May 25 20:22:30 2018 > 90.52% done, estimate finish Fri May 25 20:22:31 2018 > 90.53% done, estimate finish Fri May 25 20:22:31 2018 >=== last message repeated 3 times. === > 90.54% done, estimate finish Fri May 25 20:22:30 2018 >=== last message repeated 2 times. === > 90.55% done, estimate finish Fri May 25 20:22:30 2018 > 90.55% done, estimate finish Fri May 25 20:22:31 2018 >=== last message repeated 2 times. === > 90.56% done, estimate finish Fri May 25 20:22:30 2018 >=== last message repeated 2 times. === > 90.57% done, estimate finish Fri May 25 20:22:30 2018 >=== last message repeated 3 times. === > 90.58% done, estimate finish Fri May 25 20:22:30 2018 >=== last message repeated 2 times. === > 90.59% done, estimate finish Fri May 25 20:22:30 2018 >=== last message repeated 2 times. === > 90.60% done, estimate finish Fri May 25 20:22:30 2018 > 90.60% done, estimate finish Fri May 25 20:22:29 2018 > 90.60% done, estimate finish Fri May 25 20:22:30 2018 > 90.61% done, estimate finish Fri May 25 20:22:30 2018 >=== last message repeated 2 times. === > 90.62% done, estimate finish Fri May 25 20:22:30 2018 > 90.62% done, estimate finish Fri May 25 20:22:29 2018 >=== last message repeated 2 times. === > 90.63% done, estimate finish Fri May 25 20:22:30 2018 >=== last message repeated 2 times. === > 90.64% done, estimate finish Fri May 25 20:22:30 2018 > 90.64% done, estimate finish Fri May 25 20:22:29 2018 >=== last message repeated 2 times. === > 90.65% done, estimate finish Fri May 25 20:22:29 2018 >=== last message repeated 2 times. === > 90.66% done, estimate finish Fri May 25 20:22:30 2018 > 90.66% done, estimate finish Fri May 25 20:22:29 2018 >=== last message repeated 2 times. === > 90.67% done, estimate finish Fri May 25 20:22:29 2018 >=== last message repeated 2 times. === > 90.68% done, estimate finish Fri May 25 20:22:28 2018 > 90.68% done, estimate finish Fri May 25 20:22:29 2018 > 90.69% done, estimate finish Fri May 25 20:22:29 2018 >=== last message repeated 3 times. === > 90.70% done, estimate finish Fri May 25 20:22:28 2018 >=== last message repeated 2 times. === > 90.71% done, estimate finish Fri May 25 20:22:29 2018 >=== last message repeated 3 times. === > 90.72% done, estimate finish Fri May 25 20:22:28 2018 >=== last message repeated 2 times. === > 90.73% done, estimate finish Fri May 25 20:22:28 2018 >=== last message repeated 2 times. === > 90.73% done, estimate finish Fri May 25 20:22:29 2018 > 90.74% done, estimate finish Fri May 25 20:22:28 2018 >=== last message repeated 2 times. === > 90.75% done, estimate finish Fri May 25 20:22:28 2018 >=== last message repeated 3 times. === > 90.76% done, estimate finish Fri May 25 20:22:27 2018 > 90.76% done, estimate finish Fri May 25 20:22:28 2018 > 90.77% done, estimate finish Fri May 25 20:22:28 2018 >=== last message repeated 2 times. === > 90.78% done, estimate finish Fri May 25 20:22:28 2018 > 90.78% done, estimate finish Fri May 25 20:22:27 2018 >=== last message repeated 2 times. === > 90.79% done, estimate finish Fri May 25 20:22:28 2018 >=== last message repeated 2 times. === > 90.80% done, estimate finish Fri May 25 20:22:28 2018 > 90.80% done, estimate finish Fri May 25 20:22:27 2018 >=== last message repeated 2 times. === > 90.81% done, estimate finish Fri May 25 20:22:27 2018 > 90.81% done, estimate finish Fri May 25 20:22:28 2018 > 90.82% done, estimate finish Fri May 25 20:22:28 2018 > 90.82% done, estimate finish Fri May 25 20:22:27 2018 >=== last message repeated 2 times. === > 90.83% done, estimate finish Fri May 25 20:22:27 2018 >=== last message repeated 2 times. === > 90.84% done, estimate finish Fri May 25 20:22:28 2018 > 90.84% done, estimate finish Fri May 25 20:22:27 2018 >=== last message repeated 2 times. === > 90.85% done, estimate finish Fri May 25 20:22:27 2018 >=== last message repeated 2 times. === > 90.86% done, estimate finish Fri May 25 20:22:26 2018 >=== last message repeated 2 times. === > 90.87% done, estimate finish Fri May 25 20:22:27 2018 >=== last message repeated 3 times. === > 90.88% done, estimate finish Fri May 25 20:22:26 2018 >=== last message repeated 2 times. === > 90.89% done, estimate finish Fri May 25 20:22:26 2018 > 90.89% done, estimate finish Fri May 25 20:22:27 2018 >=== last message repeated 2 times. === > 90.90% done, estimate finish Fri May 25 20:22:26 2018 >=== last message repeated 2 times. === > 90.91% done, estimate finish Fri May 25 20:22:26 2018 >=== last message repeated 3 times. === > 90.92% done, estimate finish Fri May 25 20:22:26 2018 >=== last message repeated 2 times. === > 90.93% done, estimate finish Fri May 25 20:22:26 2018 >=== last message repeated 2 times. === > 90.94% done, estimate finish Fri May 25 20:22:25 2018 >=== last message repeated 2 times. === > 90.94% done, estimate finish Fri May 25 20:22:26 2018 > 90.95% done, estimate finish Fri May 25 20:22:26 2018 >=== last message repeated 2 times. === > 90.96% done, estimate finish Fri May 25 20:22:25 2018 >=== last message repeated 3 times. === > 90.97% done, estimate finish Fri May 25 20:22:25 2018 > 90.97% done, estimate finish Fri May 25 20:22:26 2018 > 90.98% done, estimate finish Fri May 25 20:22:25 2018 >=== last message repeated 2 times. === > 90.98% done, estimate finish Fri May 25 20:22:26 2018 > 90.99% done, estimate finish Fri May 25 20:22:26 2018 >=== last message repeated 2 times. === > 91.00% done, estimate finish Fri May 25 20:22:25 2018 >=== last message repeated 3 times. === > 91.01% done, estimate finish Fri May 25 20:22:25 2018 >=== last message repeated 2 times. === > 91.02% done, estimate finish Fri May 25 20:22:25 2018 >=== last message repeated 2 times. === > 91.03% done, estimate finish Fri May 25 20:22:25 2018 >=== last message repeated 3 times. === > 91.04% done, estimate finish Fri May 25 20:22:24 2018 > 91.04% done, estimate finish Fri May 25 20:22:25 2018 > 91.05% done, estimate finish Fri May 25 20:22:25 2018 >=== last message repeated 3 times. === > 91.06% done, estimate finish Fri May 25 20:22:24 2018 >=== last message repeated 2 times. === > 91.07% done, estimate finish Fri May 25 20:22:24 2018 > 91.07% done, estimate finish Fri May 25 20:22:25 2018 >=== last message repeated 2 times. === > 91.08% done, estimate finish Fri May 25 20:22:24 2018 >=== last message repeated 2 times. === > 91.09% done, estimate finish Fri May 25 20:22:24 2018 >=== last message repeated 2 times. === > 91.09% done, estimate finish Fri May 25 20:22:25 2018 > 91.10% done, estimate finish Fri May 25 20:22:24 2018 >=== last message repeated 2 times. === > 91.11% done, estimate finish Fri May 25 20:22:24 2018 >=== last message repeated 2 times. === > 91.12% done, estimate finish Fri May 25 20:22:23 2018 > 91.12% done, estimate finish Fri May 25 20:22:24 2018 >=== last message repeated 2 times. === > 91.13% done, estimate finish Fri May 25 20:22:24 2018 >=== last message repeated 2 times. === > 91.14% done, estimate finish Fri May 25 20:22:23 2018 >=== last message repeated 3 times. === > 91.15% done, estimate finish Fri May 25 20:22:24 2018 >=== last message repeated 2 times. === > 91.16% done, estimate finish Fri May 25 20:22:23 2018 >=== last message repeated 3 times. === > 91.17% done, estimate finish Fri May 25 20:22:23 2018 > 91.17% done, estimate finish Fri May 25 20:22:24 2018 > 91.18% done, estimate finish Fri May 25 20:22:23 2018 >=== last message repeated 3 times. === > 91.19% done, estimate finish Fri May 25 20:22:23 2018 >=== last message repeated 2 times. === > 91.20% done, estimate finish Fri May 25 20:22:22 2018 > 91.20% done, estimate finish Fri May 25 20:22:23 2018 > 91.21% done, estimate finish Fri May 25 20:22:23 2018 >=== last message repeated 3 times. === > 91.22% done, estimate finish Fri May 25 20:22:22 2018 >=== last message repeated 2 times. === > 91.23% done, estimate finish Fri May 25 20:22:23 2018 >=== last message repeated 3 times. === > 91.24% done, estimate finish Fri May 25 20:22:22 2018 >=== last message repeated 2 times. === > 91.25% done, estimate finish Fri May 25 20:22:22 2018 >=== last message repeated 2 times. === > 91.25% done, estimate finish Fri May 25 20:22:23 2018 > 91.26% done, estimate finish Fri May 25 20:22:22 2018 >=== last message repeated 2 times. === > 91.27% done, estimate finish Fri May 25 20:22:22 2018 >=== last message repeated 2 times. === > 91.28% done, estimate finish Fri May 25 20:22:21 2018 > 91.28% done, estimate finish Fri May 25 20:22:22 2018 >=== last message repeated 2 times. === > 91.29% done, estimate finish Fri May 25 20:22:22 2018 >=== last message repeated 2 times. === > 91.30% done, estimate finish Fri May 25 20:22:21 2018 >=== last message repeated 2 times. === > 91.30% done, estimate finish Fri May 25 20:22:22 2018 > 91.31% done, estimate finish Fri May 25 20:22:22 2018 >=== last message repeated 2 times. === > 91.32% done, estimate finish Fri May 25 20:22:21 2018 >=== last message repeated 3 times. === > 91.33% done, estimate finish Fri May 25 20:22:21 2018 > 91.33% done, estimate finish Fri May 25 20:22:22 2018 > 91.34% done, estimate finish Fri May 25 20:22:21 2018 >=== last message repeated 3 times. === > 91.35% done, estimate finish Fri May 25 20:22:21 2018 >=== last message repeated 2 times. === > 91.36% done, estimate finish Fri May 25 20:22:21 2018 >=== last message repeated 2 times. === > 91.37% done, estimate finish Fri May 25 20:22:21 2018 >=== last message repeated 3 times. === > 91.38% done, estimate finish Fri May 25 20:22:20 2018 >=== last message repeated 2 times. === > 91.39% done, estimate finish Fri May 25 20:22:21 2018 >=== last message repeated 3 times. === > 91.40% done, estimate finish Fri May 25 20:22:20 2018 >=== last message repeated 2 times. === > 91.41% done, estimate finish Fri May 25 20:22:20 2018 > 91.41% done, estimate finish Fri May 25 20:22:21 2018 >=== last message repeated 2 times. === > 91.42% done, estimate finish Fri May 25 20:22:20 2018 >=== last message repeated 2 times. === > 91.43% done, estimate finish Fri May 25 20:22:20 2018 >=== last message repeated 2 times. === > 91.43% done, estimate finish Fri May 25 20:22:19 2018 > 91.44% done, estimate finish Fri May 25 20:22:20 2018 >=== last message repeated 2 times. === > 91.45% done, estimate finish Fri May 25 20:22:20 2018 >=== last message repeated 2 times. === > 91.46% done, estimate finish Fri May 25 20:22:19 2018 >=== last message repeated 2 times. === > 91.46% done, estimate finish Fri May 25 20:22:20 2018 > 91.47% done, estimate finish Fri May 25 20:22:20 2018 >=== last message repeated 2 times. === > 91.48% done, estimate finish Fri May 25 20:22:19 2018 >=== last message repeated 3 times. === > 91.49% done, estimate finish Fri May 25 20:22:20 2018 >=== last message repeated 2 times. === > 91.50% done, estimate finish Fri May 25 20:22:19 2018 >=== last message repeated 3 times. === > 91.51% done, estimate finish Fri May 25 20:22:19 2018 > 91.51% done, estimate finish Fri May 25 20:22:20 2018 > 91.52% done, estimate finish Fri May 25 20:22:19 2018 >=== last message repeated 3 times. === > 91.53% done, estimate finish Fri May 25 20:22:19 2018 >=== last message repeated 2 times. === > 91.54% done, estimate finish Fri May 25 20:22:18 2018 > 91.54% done, estimate finish Fri May 25 20:22:19 2018 > 91.55% done, estimate finish Fri May 25 20:22:19 2018 >=== last message repeated 3 times. === > 91.56% done, estimate finish Fri May 25 20:22:18 2018 >=== last message repeated 2 times. === > 91.57% done, estimate finish Fri May 25 20:22:18 2018 > 91.57% done, estimate finish Fri May 25 20:22:19 2018 >=== last message repeated 2 times. === > 91.58% done, estimate finish Fri May 25 20:22:18 2018 >=== last message repeated 2 times. === > 91.59% done, estimate finish Fri May 25 20:22:18 2018 >=== last message repeated 2 times. === > 91.59% done, estimate finish Fri May 25 20:22:19 2018 > 91.60% done, estimate finish Fri May 25 20:22:18 2018 >=== last message repeated 2 times. === > 91.61% done, estimate finish Fri May 25 20:22:18 2018 >=== last message repeated 2 times. === > 91.62% done, estimate finish Fri May 25 20:22:17 2018 > 91.62% done, estimate finish Fri May 25 20:22:18 2018 >=== last message repeated 2 times. === > 91.63% done, estimate finish Fri May 25 20:22:18 2018 >=== last message repeated 2 times. === > 91.64% done, estimate finish Fri May 25 20:22:17 2018 >=== last message repeated 3 times. === > 91.65% done, estimate finish Fri May 25 20:22:18 2018 >=== last message repeated 2 times. === > 91.66% done, estimate finish Fri May 25 20:22:17 2018 >=== last message repeated 3 times. === > 91.67% done, estimate finish Fri May 25 20:22:17 2018 > 91.67% done, estimate finish Fri May 25 20:22:18 2018 > 91.68% done, estimate finish Fri May 25 20:22:17 2018 >=== last message repeated 3 times. === > 91.69% done, estimate finish Fri May 25 20:22:17 2018 >=== last message repeated 2 times. === > 91.70% done, estimate finish Fri May 25 20:22:17 2018 >=== last message repeated 2 times. === > 91.71% done, estimate finish Fri May 25 20:22:17 2018 >=== last message repeated 3 times. === > 91.72% done, estimate finish Fri May 25 20:22:16 2018 >=== last message repeated 2 times. === > 91.73% done, estimate finish Fri May 25 20:22:17 2018 >=== last message repeated 3 times. === > 91.74% done, estimate finish Fri May 25 20:22:16 2018 >=== last message repeated 2 times. === > 91.75% done, estimate finish Fri May 25 20:22:16 2018 > 91.75% done, estimate finish Fri May 25 20:22:17 2018 >=== last message repeated 2 times. === > 91.76% done, estimate finish Fri May 25 20:22:16 2018 >=== last message repeated 2 times. === > 91.77% done, estimate finish Fri May 25 20:22:16 2018 >=== last message repeated 2 times. === > 91.77% done, estimate finish Fri May 25 20:22:15 2018 > 91.78% done, estimate finish Fri May 25 20:22:16 2018 >=== last message repeated 2 times. === > 91.79% done, estimate finish Fri May 25 20:22:16 2018 >=== last message repeated 2 times. === > 91.80% done, estimate finish Fri May 25 20:22:15 2018 >=== last message repeated 2 times. === > 91.80% done, estimate finish Fri May 25 20:22:16 2018 > 91.81% done, estimate finish Fri May 25 20:22:16 2018 >=== last message repeated 2 times. === > 91.82% done, estimate finish Fri May 25 20:22:15 2018 >=== last message repeated 3 times. === > 91.83% done, estimate finish Fri May 25 20:22:16 2018 >=== last message repeated 2 times. === > 91.84% done, estimate finish Fri May 25 20:22:15 2018 >=== last message repeated 3 times. === > 91.85% done, estimate finish Fri May 25 20:22:15 2018 >=== last message repeated 2 times. === > 91.86% done, estimate finish Fri May 25 20:22:15 2018 >=== last message repeated 3 times. === > 91.87% done, estimate finish Fri May 25 20:22:15 2018 >=== last message repeated 2 times. === > 91.88% done, estimate finish Fri May 25 20:22:14 2018 > 91.88% done, estimate finish Fri May 25 20:22:15 2018 > 91.89% done, estimate finish Fri May 25 20:22:15 2018 >=== last message repeated 3 times. === > 91.90% done, estimate finish Fri May 25 20:22:14 2018 >=== last message repeated 2 times. === > 91.91% done, estimate finish Fri May 25 20:22:15 2018 >=== last message repeated 3 times. === > 91.92% done, estimate finish Fri May 25 20:22:14 2018 >=== last message repeated 2 times. === > 91.93% done, estimate finish Fri May 25 20:22:14 2018 >=== last message repeated 2 times. === > 91.93% done, estimate finish Fri May 25 20:22:15 2018 > 91.94% done, estimate finish Fri May 25 20:22:14 2018 >=== last message repeated 2 times. === > 91.95% done, estimate finish Fri May 25 20:22:14 2018 >=== last message repeated 2 times. === > 91.95% done, estimate finish Fri May 25 20:22:13 2018 > 91.96% done, estimate finish Fri May 25 20:22:13 2018 > 91.96% done, estimate finish Fri May 25 20:22:14 2018 > 91.97% done, estimate finish Fri May 25 20:22:14 2018 >=== last message repeated 2 times. === > 91.98% done, estimate finish Fri May 25 20:22:13 2018 >=== last message repeated 3 times. === > 91.99% done, estimate finish Fri May 25 20:22:14 2018 >=== last message repeated 2 times. === > 92.00% done, estimate finish Fri May 25 20:22:13 2018 >=== last message repeated 3 times. === > 92.01% done, estimate finish Fri May 25 20:22:13 2018 > 92.01% done, estimate finish Fri May 25 20:22:14 2018 > 92.02% done, estimate finish Fri May 25 20:22:13 2018 >=== last message repeated 3 times. === > 92.03% done, estimate finish Fri May 25 20:22:13 2018 >=== last message repeated 2 times. === > 92.04% done, estimate finish Fri May 25 20:22:13 2018 >=== last message repeated 2 times. === > 92.05% done, estimate finish Fri May 25 20:22:13 2018 >=== last message repeated 3 times. === > 92.06% done, estimate finish Fri May 25 20:22:12 2018 >=== last message repeated 2 times. === > 92.07% done, estimate finish Fri May 25 20:22:13 2018 >=== last message repeated 3 times. === > 92.08% done, estimate finish Fri May 25 20:22:12 2018 >=== last message repeated 2 times. === > 92.09% done, estimate finish Fri May 25 20:22:12 2018 > 92.09% done, estimate finish Fri May 25 20:22:13 2018 >=== last message repeated 2 times. === > 92.10% done, estimate finish Fri May 25 20:22:12 2018 >=== last message repeated 2 times. === > 92.11% done, estimate finish Fri May 25 20:22:12 2018 >=== last message repeated 2 times. === > 92.11% done, estimate finish Fri May 25 20:22:11 2018 > 92.12% done, estimate finish Fri May 25 20:22:12 2018 >=== last message repeated 2 times. === > 92.13% done, estimate finish Fri May 25 20:22:12 2018 >=== last message repeated 2 times. === > 92.14% done, estimate finish Fri May 25 20:22:11 2018 >=== last message repeated 2 times. === > 92.14% done, estimate finish Fri May 25 20:22:12 2018 > 92.15% done, estimate finish Fri May 25 20:22:12 2018 >=== last message repeated 2 times. === > 92.16% done, estimate finish Fri May 25 20:22:11 2018 >=== last message repeated 3 times. === > 92.17% done, estimate finish Fri May 25 20:22:11 2018 > 92.17% done, estimate finish Fri May 25 20:22:12 2018 > 92.18% done, estimate finish Fri May 25 20:22:11 2018 >=== last message repeated 3 times. === > 92.19% done, estimate finish Fri May 25 20:22:11 2018 >=== last message repeated 2 times. === > 92.20% done, estimate finish Fri May 25 20:22:11 2018 >=== last message repeated 3 times. === > 92.21% done, estimate finish Fri May 25 20:22:11 2018 >=== last message repeated 2 times. === > 92.22% done, estimate finish Fri May 25 20:22:10 2018 > 92.22% done, estimate finish Fri May 25 20:22:11 2018 > 92.23% done, estimate finish Fri May 25 20:22:11 2018 >=== last message repeated 3 times. === > 92.24% done, estimate finish Fri May 25 20:22:10 2018 >=== last message repeated 2 times. === > 92.25% done, estimate finish Fri May 25 20:22:10 2018 > 92.25% done, estimate finish Fri May 25 20:22:11 2018 >=== last message repeated 2 times. === > 92.26% done, estimate finish Fri May 25 20:22:10 2018 >=== last message repeated 2 times. === > 92.27% done, estimate finish Fri May 25 20:22:10 2018 >=== last message repeated 2 times. === > 92.27% done, estimate finish Fri May 25 20:22:11 2018 > 92.28% done, estimate finish Fri May 25 20:22:10 2018 >=== last message repeated 2 times. === > 92.29% done, estimate finish Fri May 25 20:22:10 2018 >=== last message repeated 3 times. === > 92.30% done, estimate finish Fri May 25 20:22:10 2018 >=== last message repeated 2 times. === > 92.31% done, estimate finish Fri May 25 20:22:10 2018 >=== last message repeated 2 times. === > 92.32% done, estimate finish Fri May 25 20:22:10 2018 > 92.32% done, estimate finish Fri May 25 20:22:09 2018 >=== last message repeated 2 times. === > 92.33% done, estimate finish Fri May 25 20:22:10 2018 >=== last message repeated 2 times. === > 92.34% done, estimate finish Fri May 25 20:22:10 2018 > 92.34% done, estimate finish Fri May 25 20:22:09 2018 >=== last message repeated 2 times. === > 92.35% done, estimate finish Fri May 25 20:22:09 2018 >=== last message repeated 2 times. === > 92.36% done, estimate finish Fri May 25 20:22:10 2018 > 92.36% done, estimate finish Fri May 25 20:22:09 2018 >=== last message repeated 2 times. === > 92.37% done, estimate finish Fri May 25 20:22:09 2018 >=== last message repeated 2 times. === > 92.38% done, estimate finish Fri May 25 20:22:08 2018 > 92.38% done, estimate finish Fri May 25 20:22:09 2018 >=== last message repeated 2 times. === > 92.39% done, estimate finish Fri May 25 20:22:09 2018 >=== last message repeated 2 times. === > 92.40% done, estimate finish Fri May 25 20:22:08 2018 >=== last message repeated 2 times. === > 92.41% done, estimate finish Fri May 25 20:22:09 2018 >=== last message repeated 3 times. === > 92.42% done, estimate finish Fri May 25 20:22:08 2018 >=== last message repeated 2 times. === > 92.43% done, estimate finish Fri May 25 20:22:08 2018 > 92.43% done, estimate finish Fri May 25 20:22:09 2018 >=== last message repeated 2 times. === > 92.44% done, estimate finish Fri May 25 20:22:08 2018 >=== last message repeated 2 times. === > 92.45% done, estimate finish Fri May 25 20:22:08 2018 >=== last message repeated 3 times. === > 92.46% done, estimate finish Fri May 25 20:22:08 2018 >=== last message repeated 2 times. === > 92.47% done, estimate finish Fri May 25 20:22:08 2018 >=== last message repeated 2 times. === > 92.48% done, estimate finish Fri May 25 20:22:08 2018 > 92.48% done, estimate finish Fri May 25 20:22:07 2018 > 92.48% done, estimate finish Fri May 25 20:22:08 2018 > 92.49% done, estimate finish Fri May 25 20:22:08 2018 >=== last message repeated 2 times. === > 92.50% done, estimate finish Fri May 25 20:22:08 2018 > 92.50% done, estimate finish Fri May 25 20:22:07 2018 >=== last message repeated 2 times. === > 92.51% done, estimate finish Fri May 25 20:22:07 2018 > 92.51% done, estimate finish Fri May 25 20:22:08 2018 > 92.52% done, estimate finish Fri May 25 20:22:08 2018 > 92.52% done, estimate finish Fri May 25 20:22:07 2018 >=== last message repeated 2 times. === > 92.53% done, estimate finish Fri May 25 20:22:07 2018 >=== last message repeated 2 times. === > 92.54% done, estimate finish Fri May 25 20:22:08 2018 > 92.54% done, estimate finish Fri May 25 20:22:07 2018 >=== last message repeated 2 times. === > 92.55% done, estimate finish Fri May 25 20:22:07 2018 >=== last message repeated 2 times. === > 92.56% done, estimate finish Fri May 25 20:22:06 2018 >=== last message repeated 2 times. === > 92.57% done, estimate finish Fri May 25 20:22:07 2018 >=== last message repeated 3 times. === > 92.58% done, estimate finish Fri May 25 20:22:06 2018 >=== last message repeated 2 times. === > 92.59% done, estimate finish Fri May 25 20:22:06 2018 > 92.59% done, estimate finish Fri May 25 20:22:07 2018 >=== last message repeated 2 times. === > 92.60% done, estimate finish Fri May 25 20:22:06 2018 >=== last message repeated 2 times. === > 92.61% done, estimate finish Fri May 25 20:22:06 2018 >=== last message repeated 2 times. === > 92.61% done, estimate finish Fri May 25 20:22:07 2018 > 92.62% done, estimate finish Fri May 25 20:22:06 2018 >=== last message repeated 2 times. === > 92.63% done, estimate finish Fri May 25 20:22:06 2018 >=== last message repeated 3 times. === > 92.64% done, estimate finish Fri May 25 20:22:06 2018 >=== last message repeated 2 times. === > 92.65% done, estimate finish Fri May 25 20:22:06 2018 >=== last message repeated 2 times. === > 92.66% done, estimate finish Fri May 25 20:22:06 2018 > 92.66% done, estimate finish Fri May 25 20:22:05 2018 >=== last message repeated 2 times. === > 92.67% done, estimate finish Fri May 25 20:22:06 2018 >=== last message repeated 2 times. === > 92.68% done, estimate finish Fri May 25 20:22:06 2018 > 92.68% done, estimate finish Fri May 25 20:22:05 2018 >=== last message repeated 2 times. === > 92.69% done, estimate finish Fri May 25 20:22:05 2018 > 92.69% done, estimate finish Fri May 25 20:22:06 2018 > 92.70% done, estimate finish Fri May 25 20:22:06 2018 > 92.70% done, estimate finish Fri May 25 20:22:05 2018 >=== last message repeated 2 times. === > 92.71% done, estimate finish Fri May 25 20:22:05 2018 >=== last message repeated 2 times. === > 92.72% done, estimate finish Fri May 25 20:22:05 2018 >=== last message repeated 3 times. === > 92.73% done, estimate finish Fri May 25 20:22:05 2018 >=== last message repeated 2 times. === > 92.74% done, estimate finish Fri May 25 20:22:05 2018 > 92.74% done, estimate finish Fri May 25 20:22:04 2018 > 92.75% done, estimate finish Fri May 25 20:22:05 2018 >=== last message repeated 3 times. === > 92.76% done, estimate finish Fri May 25 20:22:05 2018 > 92.76% done, estimate finish Fri May 25 20:22:04 2018 > 92.77% done, estimate finish Fri May 25 20:22:04 2018 >=== last message repeated 2 times. === > 92.77% done, estimate finish Fri May 25 20:22:05 2018 > 92.78% done, estimate finish Fri May 25 20:22:05 2018 > 92.78% done, estimate finish Fri May 25 20:22:04 2018 > 92.79% done, estimate finish Fri May 25 20:22:04 2018 >=== last message repeated 3 times. === > 92.80% done, estimate finish Fri May 25 20:22:04 2018 >=== last message repeated 2 times. === > 92.81% done, estimate finish Fri May 25 20:22:04 2018 >=== last message repeated 2 times. === > 92.82% done, estimate finish Fri May 25 20:22:04 2018 > 92.82% done, estimate finish Fri May 25 20:22:03 2018 > 92.82% done, estimate finish Fri May 25 20:22:04 2018 > 92.83% done, estimate finish Fri May 25 20:22:04 2018 >=== last message repeated 2 times. === > 92.84% done, estimate finish Fri May 25 20:22:04 2018 > 92.84% done, estimate finish Fri May 25 20:22:03 2018 >=== last message repeated 2 times. === > 92.85% done, estimate finish Fri May 25 20:22:04 2018 >=== last message repeated 2 times. === > 92.86% done, estimate finish Fri May 25 20:22:04 2018 > 92.86% done, estimate finish Fri May 25 20:22:03 2018 >=== last message repeated 2 times. === > 92.87% done, estimate finish Fri May 25 20:22:03 2018 >=== last message repeated 2 times. === > 92.88% done, estimate finish Fri May 25 20:22:04 2018 > 92.88% done, estimate finish Fri May 25 20:22:03 2018 >=== last message repeated 2 times. === > 92.89% done, estimate finish Fri May 25 20:22:03 2018 >=== last message repeated 2 times. === > 92.90% done, estimate finish Fri May 25 20:22:03 2018 >=== last message repeated 2 times. === > 92.91% done, estimate finish Fri May 25 20:22:03 2018 >=== last message repeated 3 times. === > 92.92% done, estimate finish Fri May 25 20:22:03 2018 > 92.92% done, estimate finish Fri May 25 20:22:02 2018 > 92.93% done, estimate finish Fri May 25 20:22:02 2018 > 92.93% done, estimate finish Fri May 25 20:22:03 2018 >=== last message repeated 2 times. === > 92.94% done, estimate finish Fri May 25 20:22:03 2018 > 92.94% done, estimate finish Fri May 25 20:22:02 2018 > 92.95% done, estimate finish Fri May 25 20:22:02 2018 >=== last message repeated 2 times. === > 92.95% done, estimate finish Fri May 25 20:22:03 2018 > 92.96% done, estimate finish Fri May 25 20:22:03 2018 > 92.96% done, estimate finish Fri May 25 20:22:02 2018 > 92.97% done, estimate finish Fri May 25 20:22:02 2018 >=== last message repeated 3 times. === > 92.98% done, estimate finish Fri May 25 20:22:01 2018 > 92.98% done, estimate finish Fri May 25 20:22:02 2018 > 92.99% done, estimate finish Fri May 25 20:22:02 2018 >=== last message repeated 2 times. === > 93.00% done, estimate finish Fri May 25 20:22:02 2018 > 93.00% done, estimate finish Fri May 25 20:22:01 2018 >=== last message repeated 2 times. === > 93.01% done, estimate finish Fri May 25 20:22:02 2018 >=== last message repeated 2 times. === > 93.02% done, estimate finish Fri May 25 20:22:02 2018 > 93.02% done, estimate finish Fri May 25 20:22:01 2018 >=== last message repeated 2 times. === > 93.03% done, estimate finish Fri May 25 20:22:01 2018 > 93.03% done, estimate finish Fri May 25 20:22:02 2018 > 93.04% done, estimate finish Fri May 25 20:22:02 2018 > 93.04% done, estimate finish Fri May 25 20:22:01 2018 >=== last message repeated 2 times. === > 93.05% done, estimate finish Fri May 25 20:22:01 2018 >=== last message repeated 2 times. === > 93.06% done, estimate finish Fri May 25 20:22:01 2018 >=== last message repeated 3 times. === > 93.07% done, estimate finish Fri May 25 20:22:01 2018 >=== last message repeated 2 times. === > 93.08% done, estimate finish Fri May 25 20:22:01 2018 > 93.08% done, estimate finish Fri May 25 20:22:00 2018 > 93.09% done, estimate finish Fri May 25 20:22:01 2018 >=== last message repeated 3 times. === > 93.10% done, estimate finish Fri May 25 20:22:01 2018 > 93.10% done, estimate finish Fri May 25 20:22:00 2018 > 93.11% done, estimate finish Fri May 25 20:22:00 2018 > 93.11% done, estimate finish Fri May 25 20:22:01 2018 >=== last message repeated 2 times. === > 93.12% done, estimate finish Fri May 25 20:22:01 2018 > 93.12% done, estimate finish Fri May 25 20:22:00 2018 > 93.13% done, estimate finish Fri May 25 20:22:00 2018 >=== last message repeated 2 times. === > 93.13% done, estimate finish Fri May 25 20:22:01 2018 > 93.14% done, estimate finish Fri May 25 20:22:01 2018 > 93.14% done, estimate finish Fri May 25 20:22:00 2018 > 93.15% done, estimate finish Fri May 25 20:22:00 2018 >=== last message repeated 2 times. === > 93.16% done, estimate finish Fri May 25 20:22:00 2018 >=== last message repeated 3 times. === > 93.17% done, estimate finish Fri May 25 20:22:00 2018 >=== last message repeated 2 times. === > 93.18% done, estimate finish Fri May 25 20:22:00 2018 >=== last message repeated 2 times. === > 93.18% done, estimate finish Fri May 25 20:21:59 2018 > 93.19% done, estimate finish Fri May 25 20:21:59 2018 > 93.19% done, estimate finish Fri May 25 20:22:00 2018 > 93.20% done, estimate finish Fri May 25 20:22:00 2018 >=== last message repeated 2 times. === > 93.20% done, estimate finish Fri May 25 20:21:59 2018 > 93.21% done, estimate finish Fri May 25 20:21:59 2018 >=== last message repeated 2 times. === > 93.22% done, estimate finish Fri May 25 20:22:00 2018 >=== last message repeated 2 times. === > 93.22% done, estimate finish Fri May 25 20:21:59 2018 > 93.23% done, estimate finish Fri May 25 20:21:59 2018 >=== last message repeated 2 times. === > 93.24% done, estimate finish Fri May 25 20:22:00 2018 >=== last message repeated 2 times. === > 93.25% done, estimate finish Fri May 25 20:21:59 2018 >=== last message repeated 3 times. === > 93.26% done, estimate finish Fri May 25 20:21:59 2018 > 93.26% done, estimate finish Fri May 25 20:21:58 2018 > 93.27% done, estimate finish Fri May 25 20:21:59 2018 >=== last message repeated 3 times. === > 93.28% done, estimate finish Fri May 25 20:21:59 2018 > 93.28% done, estimate finish Fri May 25 20:21:58 2018 > 93.29% done, estimate finish Fri May 25 20:21:58 2018 >=== last message repeated 2 times. === > 93.29% done, estimate finish Fri May 25 20:21:59 2018 > 93.30% done, estimate finish Fri May 25 20:21:59 2018 > 93.30% done, estimate finish Fri May 25 20:21:58 2018 > 93.31% done, estimate finish Fri May 25 20:21:58 2018 >=== last message repeated 3 times. === > 93.32% done, estimate finish Fri May 25 20:21:59 2018 > 93.32% done, estimate finish Fri May 25 20:21:58 2018 > 93.33% done, estimate finish Fri May 25 20:21:58 2018 >=== last message repeated 2 times. === > 93.34% done, estimate finish Fri May 25 20:21:58 2018 >=== last message repeated 3 times. === > 93.35% done, estimate finish Fri May 25 20:21:58 2018 >=== last message repeated 2 times. === > 93.36% done, estimate finish Fri May 25 20:21:58 2018 >=== last message repeated 2 times. === > 93.36% done, estimate finish Fri May 25 20:21:57 2018 > 93.37% done, estimate finish Fri May 25 20:21:57 2018 > 93.37% done, estimate finish Fri May 25 20:21:58 2018 > 93.38% done, estimate finish Fri May 25 20:21:58 2018 >=== last message repeated 2 times. === > 93.38% done, estimate finish Fri May 25 20:21:57 2018 > 93.39% done, estimate finish Fri May 25 20:21:57 2018 >=== last message repeated 2 times. === > 93.40% done, estimate finish Fri May 25 20:21:58 2018 >=== last message repeated 2 times. === > 93.40% done, estimate finish Fri May 25 20:21:57 2018 > 93.41% done, estimate finish Fri May 25 20:21:57 2018 >=== last message repeated 2 times. === > 93.42% done, estimate finish Fri May 25 20:21:57 2018 > 93.42% done, estimate finish Fri May 25 20:21:58 2018 > 93.43% done, estimate finish Fri May 25 20:21:57 2018 >=== last message repeated 3 times. === > 93.44% done, estimate finish Fri May 25 20:21:57 2018 >=== last message repeated 2 times. === > 93.45% done, estimate finish Fri May 25 20:21:56 2018 > 93.45% done, estimate finish Fri May 25 20:21:57 2018 >=== last message repeated 2 times. === > 93.46% done, estimate finish Fri May 25 20:21:57 2018 >=== last message repeated 2 times. === > 93.47% done, estimate finish Fri May 25 20:21:56 2018 >=== last message repeated 2 times. === > 93.47% done, estimate finish Fri May 25 20:21:57 2018 > 93.48% done, estimate finish Fri May 25 20:21:57 2018 >=== last message repeated 2 times. === > 93.49% done, estimate finish Fri May 25 20:21:56 2018 >=== last message repeated 3 times. === > 93.50% done, estimate finish Fri May 25 20:21:57 2018 >=== last message repeated 2 times. === > 93.51% done, estimate finish Fri May 25 20:21:56 2018 >=== last message repeated 2 times. === > 93.52% done, estimate finish Fri May 25 20:21:56 2018 >=== last message repeated 2 times. === > 93.52% done, estimate finish Fri May 25 20:21:55 2018 > 93.53% done, estimate finish Fri May 25 20:21:56 2018 >=== last message repeated 2 times. === > 93.54% done, estimate finish Fri May 25 20:21:56 2018 >=== last message repeated 2 times. === > 93.54% done, estimate finish Fri May 25 20:21:55 2018 > 93.55% done, estimate finish Fri May 25 20:21:55 2018 > 93.55% done, estimate finish Fri May 25 20:21:56 2018 > 93.56% done, estimate finish Fri May 25 20:21:56 2018 >=== last message repeated 2 times. === > 93.56% done, estimate finish Fri May 25 20:21:55 2018 > 93.57% done, estimate finish Fri May 25 20:21:55 2018 >=== last message repeated 2 times. === > 93.58% done, estimate finish Fri May 25 20:21:55 2018 > 93.58% done, estimate finish Fri May 25 20:21:56 2018 > 93.59% done, estimate finish Fri May 25 20:21:55 2018 >=== last message repeated 3 times. === > 93.60% done, estimate finish Fri May 25 20:21:55 2018 >=== last message repeated 2 times. === > 93.61% done, estimate finish Fri May 25 20:21:55 2018 >=== last message repeated 3 times. === > 93.62% done, estimate finish Fri May 25 20:21:55 2018 >=== last message repeated 2 times. === > 93.63% done, estimate finish Fri May 25 20:21:54 2018 > 93.63% done, estimate finish Fri May 25 20:21:55 2018 >=== last message repeated 2 times. === > 93.64% done, estimate finish Fri May 25 20:21:55 2018 >=== last message repeated 2 times. === > 93.65% done, estimate finish Fri May 25 20:21:54 2018 >=== last message repeated 3 times. === > 93.66% done, estimate finish Fri May 25 20:21:55 2018 >=== last message repeated 2 times. === > 93.67% done, estimate finish Fri May 25 20:21:54 2018 >=== last message repeated 2 times. === > 93.68% done, estimate finish Fri May 25 20:21:54 2018 >=== last message repeated 2 times. === > 93.68% done, estimate finish Fri May 25 20:21:55 2018 > 93.69% done, estimate finish Fri May 25 20:21:54 2018 >=== last message repeated 2 times. === > 93.70% done, estimate finish Fri May 25 20:21:54 2018 >=== last message repeated 3 times. === > 93.71% done, estimate finish Fri May 25 20:21:54 2018 >=== last message repeated 2 times. === > 93.72% done, estimate finish Fri May 25 20:21:54 2018 >=== last message repeated 3 times. === > 93.73% done, estimate finish Fri May 25 20:21:53 2018 > 93.73% done, estimate finish Fri May 25 20:21:54 2018 > 93.74% done, estimate finish Fri May 25 20:21:54 2018 >=== last message repeated 3 times. === > 93.75% done, estimate finish Fri May 25 20:21:53 2018 >=== last message repeated 2 times. === > 93.76% done, estimate finish Fri May 25 20:21:53 2018 > 93.76% done, estimate finish Fri May 25 20:21:54 2018 > 93.77% done, estimate finish Fri May 25 20:21:54 2018 > 93.77% done, estimate finish Fri May 25 20:21:53 2018 >=== last message repeated 2 times. === > 93.78% done, estimate finish Fri May 25 20:21:53 2018 >=== last message repeated 2 times. === > 93.79% done, estimate finish Fri May 25 20:21:53 2018 >=== last message repeated 3 times. === > 93.80% done, estimate finish Fri May 25 20:21:53 2018 >=== last message repeated 2 times. === > 93.81% done, estimate finish Fri May 25 20:21:53 2018 > 93.81% done, estimate finish Fri May 25 20:21:52 2018 > 93.81% done, estimate finish Fri May 25 20:21:53 2018 > 93.82% done, estimate finish Fri May 25 20:21:53 2018 >=== last message repeated 2 times. === > 93.83% done, estimate finish Fri May 25 20:21:53 2018 > 93.83% done, estimate finish Fri May 25 20:21:52 2018 >=== last message repeated 2 times. === > 93.84% done, estimate finish Fri May 25 20:21:53 2018 >=== last message repeated 2 times. === > 93.85% done, estimate finish Fri May 25 20:21:53 2018 > 93.85% done, estimate finish Fri May 25 20:21:52 2018 > 93.86% done, estimate finish Fri May 25 20:21:52 2018 >=== last message repeated 3 times. === > 93.87% done, estimate finish Fri May 25 20:21:53 2018 > 93.87% done, estimate finish Fri May 25 20:21:52 2018 > 93.88% done, estimate finish Fri May 25 20:21:52 2018 >=== last message repeated 3 times. === > 93.89% done, estimate finish Fri May 25 20:21:51 2018 > 93.89% done, estimate finish Fri May 25 20:21:52 2018 > 93.90% done, estimate finish Fri May 25 20:21:52 2018 >=== last message repeated 3 times. === > 93.91% done, estimate finish Fri May 25 20:21:51 2018 >=== last message repeated 2 times. === > 93.92% done, estimate finish Fri May 25 20:21:52 2018 >=== last message repeated 2 times. === > 93.93% done, estimate finish Fri May 25 20:21:52 2018 > 93.93% done, estimate finish Fri May 25 20:21:51 2018 >=== last message repeated 2 times. === > 93.94% done, estimate finish Fri May 25 20:21:51 2018 >=== last message repeated 2 times. === > 93.95% done, estimate finish Fri May 25 20:21:52 2018 > 93.95% done, estimate finish Fri May 25 20:21:51 2018 >=== last message repeated 2 times. === > 93.96% done, estimate finish Fri May 25 20:21:51 2018 >=== last message repeated 2 times. === > 93.97% done, estimate finish Fri May 25 20:21:51 2018 >=== last message repeated 3 times. === > 93.98% done, estimate finish Fri May 25 20:21:51 2018 >=== last message repeated 2 times. === > 93.99% done, estimate finish Fri May 25 20:21:51 2018 > 93.99% done, estimate finish Fri May 25 20:21:50 2018 > 93.99% done, estimate finish Fri May 25 20:21:51 2018 > 94.00% done, estimate finish Fri May 25 20:21:51 2018 >=== last message repeated 2 times. === > 94.01% done, estimate finish Fri May 25 20:21:51 2018 > 94.01% done, estimate finish Fri May 25 20:21:50 2018 > 94.02% done, estimate finish Fri May 25 20:21:50 2018 >=== last message repeated 2 times. === > 94.02% done, estimate finish Fri May 25 20:21:51 2018 > 94.03% done, estimate finish Fri May 25 20:21:51 2018 > 94.03% done, estimate finish Fri May 25 20:21:50 2018 > 94.04% done, estimate finish Fri May 25 20:21:50 2018 >=== last message repeated 3 times. === > 94.05% done, estimate finish Fri May 25 20:21:51 2018 > 94.05% done, estimate finish Fri May 25 20:21:50 2018 > 94.06% done, estimate finish Fri May 25 20:21:50 2018 >=== last message repeated 3 times. === > 94.07% done, estimate finish Fri May 25 20:21:50 2018 > 94.07% done, estimate finish Fri May 25 20:21:49 2018 > 94.08% done, estimate finish Fri May 25 20:21:50 2018 >=== last message repeated 3 times. === > 94.09% done, estimate finish Fri May 25 20:21:50 2018 > 94.09% done, estimate finish Fri May 25 20:21:49 2018 > 94.10% done, estimate finish Fri May 25 20:21:49 2018 > 94.10% done, estimate finish Fri May 25 20:21:50 2018 > 94.11% done, estimate finish Fri May 25 20:21:50 2018 >=== last message repeated 2 times. === > 94.11% done, estimate finish Fri May 25 20:21:49 2018 > 94.12% done, estimate finish Fri May 25 20:21:49 2018 >=== last message repeated 2 times. === > 94.13% done, estimate finish Fri May 25 20:21:50 2018 >=== last message repeated 2 times. === > 94.13% done, estimate finish Fri May 25 20:21:49 2018 > 94.14% done, estimate finish Fri May 25 20:21:49 2018 >=== last message repeated 2 times. === > 94.15% done, estimate finish Fri May 25 20:21:49 2018 > 94.15% done, estimate finish Fri May 25 20:21:48 2018 > 94.15% done, estimate finish Fri May 25 20:21:49 2018 > 94.16% done, estimate finish Fri May 25 20:21:49 2018 >=== last message repeated 2 times. === > 94.17% done, estimate finish Fri May 25 20:21:49 2018 >=== last message repeated 2 times. === > 94.17% done, estimate finish Fri May 25 20:21:48 2018 > 94.18% done, estimate finish Fri May 25 20:21:49 2018 >=== last message repeated 2 times. === > 94.19% done, estimate finish Fri May 25 20:21:49 2018 > 94.19% done, estimate finish Fri May 25 20:21:48 2018 > 94.20% done, estimate finish Fri May 25 20:21:48 2018 >=== last message repeated 2 times. === > 94.20% done, estimate finish Fri May 25 20:21:49 2018 > 94.21% done, estimate finish Fri May 25 20:21:49 2018 >=== last message repeated 2 times. === > 94.22% done, estimate finish Fri May 25 20:21:48 2018 >=== last message repeated 3 times. === > 94.23% done, estimate finish Fri May 25 20:21:49 2018 >=== last message repeated 2 times. === > 94.24% done, estimate finish Fri May 25 20:21:48 2018 >=== last message repeated 3 times. === > 94.25% done, estimate finish Fri May 25 20:21:48 2018 > 94.25% done, estimate finish Fri May 25 20:21:47 2018 > 94.26% done, estimate finish Fri May 25 20:21:48 2018 >=== last message repeated 3 times. === > 94.27% done, estimate finish Fri May 25 20:21:48 2018 > 94.27% done, estimate finish Fri May 25 20:21:47 2018 > 94.28% done, estimate finish Fri May 25 20:21:47 2018 > 94.28% done, estimate finish Fri May 25 20:21:48 2018 > 94.29% done, estimate finish Fri May 25 20:21:48 2018 >=== last message repeated 2 times. === > 94.29% done, estimate finish Fri May 25 20:21:47 2018 > 94.30% done, estimate finish Fri May 25 20:21:47 2018 >=== last message repeated 2 times. === > 94.31% done, estimate finish Fri May 25 20:21:47 2018 > 94.31% done, estimate finish Fri May 25 20:21:48 2018 > 94.31% done, estimate finish Fri May 25 20:21:47 2018 > 94.32% done, estimate finish Fri May 25 20:21:47 2018 >=== last message repeated 2 times. === > 94.33% done, estimate finish Fri May 25 20:21:47 2018 >=== last message repeated 3 times. === > 94.34% done, estimate finish Fri May 25 20:21:47 2018 >=== last message repeated 2 times. === > 94.35% done, estimate finish Fri May 25 20:21:47 2018 >=== last message repeated 2 times. === > 94.36% done, estimate finish Fri May 25 20:21:46 2018 >=== last message repeated 2 times. === > 94.36% done, estimate finish Fri May 25 20:21:47 2018 > 94.37% done, estimate finish Fri May 25 20:21:47 2018 >=== last message repeated 2 times. === > 94.38% done, estimate finish Fri May 25 20:21:46 2018 >=== last message repeated 3 times. === > 94.39% done, estimate finish Fri May 25 20:21:47 2018 >=== last message repeated 2 times. === > 94.40% done, estimate finish Fri May 25 20:21:46 2018 >=== last message repeated 3 times. === > 94.41% done, estimate finish Fri May 25 20:21:46 2018 > 94.41% done, estimate finish Fri May 25 20:21:47 2018 > 94.42% done, estimate finish Fri May 25 20:21:46 2018 >=== last message repeated 3 times. === > 94.43% done, estimate finish Fri May 25 20:21:46 2018 >=== last message repeated 2 times. === > 94.44% done, estimate finish Fri May 25 20:21:46 2018 >=== last message repeated 2 times. === > 94.45% done, estimate finish Fri May 25 20:21:46 2018 >=== last message repeated 3 times. === > 94.46% done, estimate finish Fri May 25 20:21:45 2018 >=== last message repeated 2 times. === > 94.47% done, estimate finish Fri May 25 20:21:46 2018 >=== last message repeated 3 times. === > 94.48% done, estimate finish Fri May 25 20:21:45 2018 >=== last message repeated 2 times. === > 94.49% done, estimate finish Fri May 25 20:21:45 2018 > 94.49% done, estimate finish Fri May 25 20:21:46 2018 >=== last message repeated 2 times. === > 94.50% done, estimate finish Fri May 25 20:21:45 2018 >=== last message repeated 2 times. === > 94.51% done, estimate finish Fri May 25 20:21:45 2018 >=== last message repeated 2 times. === > 94.51% done, estimate finish Fri May 25 20:21:46 2018 > 94.52% done, estimate finish Fri May 25 20:21:45 2018 >=== last message repeated 2 times. === > 94.53% done, estimate finish Fri May 25 20:21:45 2018 >=== last message repeated 2 times. === > 94.54% done, estimate finish Fri May 25 20:21:45 2018 > 94.54% done, estimate finish Fri May 25 20:21:44 2018 > 94.54% done, estimate finish Fri May 25 20:21:45 2018 > 94.55% done, estimate finish Fri May 25 20:21:45 2018 >=== last message repeated 2 times. === > 94.56% done, estimate finish Fri May 25 20:21:45 2018 > 94.56% done, estimate finish Fri May 25 20:21:44 2018 >=== last message repeated 2 times. === > 94.57% done, estimate finish Fri May 25 20:21:45 2018 >=== last message repeated 2 times. === > 94.58% done, estimate finish Fri May 25 20:21:45 2018 > 94.58% done, estimate finish Fri May 25 20:21:44 2018 >=== last message repeated 2 times. === > 94.59% done, estimate finish Fri May 25 20:21:44 2018 > 94.59% done, estimate finish Fri May 25 20:21:45 2018 > 94.60% done, estimate finish Fri May 25 20:21:45 2018 > 94.60% done, estimate finish Fri May 25 20:21:44 2018 >=== last message repeated 2 times. === > 94.61% done, estimate finish Fri May 25 20:21:44 2018 >=== last message repeated 2 times. === > 94.62% done, estimate finish Fri May 25 20:21:43 2018 > 94.62% done, estimate finish Fri May 25 20:21:44 2018 > 94.63% done, estimate finish Fri May 25 20:21:44 2018 >=== last message repeated 3 times. === > 94.64% done, estimate finish Fri May 25 20:21:43 2018 >=== last message repeated 2 times. === > 94.65% done, estimate finish Fri May 25 20:21:44 2018 >=== last message repeated 3 times. === > 94.66% done, estimate finish Fri May 25 20:21:43 2018 >=== last message repeated 2 times. === > 94.67% done, estimate finish Fri May 25 20:21:43 2018 >=== last message repeated 2 times. === > 94.67% done, estimate finish Fri May 25 20:21:44 2018 > 94.68% done, estimate finish Fri May 25 20:21:43 2018 >=== last message repeated 2 times. === > 94.69% done, estimate finish Fri May 25 20:21:43 2018 >=== last message repeated 2 times. === > 94.70% done, estimate finish Fri May 25 20:21:43 2018 >=== last message repeated 3 times. === > 94.71% done, estimate finish Fri May 25 20:21:43 2018 >=== last message repeated 2 times. === > 94.72% done, estimate finish Fri May 25 20:21:43 2018 > 94.72% done, estimate finish Fri May 25 20:21:42 2018 > 94.72% done, estimate finish Fri May 25 20:21:43 2018 > 94.73% done, estimate finish Fri May 25 20:21:43 2018 >=== last message repeated 2 times. === > 94.74% done, estimate finish Fri May 25 20:21:43 2018 > 94.74% done, estimate finish Fri May 25 20:21:42 2018 >=== last message repeated 2 times. === > 94.75% done, estimate finish Fri May 25 20:21:42 2018 > 94.75% done, estimate finish Fri May 25 20:21:43 2018 > 94.76% done, estimate finish Fri May 25 20:21:43 2018 > 94.76% done, estimate finish Fri May 25 20:21:42 2018 >=== last message repeated 2 times. === > 94.77% done, estimate finish Fri May 25 20:21:42 2018 >=== last message repeated 2 times. === > 94.78% done, estimate finish Fri May 25 20:21:43 2018 > 94.78% done, estimate finish Fri May 25 20:21:42 2018 > 94.79% done, estimate finish Fri May 25 20:21:42 2018 >=== last message repeated 3 times. === > 94.80% done, estimate finish Fri May 25 20:21:42 2018 >=== last message repeated 2 times. === > 94.81% done, estimate finish Fri May 25 20:21:42 2018 >=== last message repeated 3 times. === > 94.82% done, estimate finish Fri May 25 20:21:42 2018 > 94.82% done, estimate finish Fri May 25 20:21:41 2018 > 94.83% done, estimate finish Fri May 25 20:21:42 2018 >=== last message repeated 3 times. === > 94.84% done, estimate finish Fri May 25 20:21:42 2018 > 94.84% done, estimate finish Fri May 25 20:21:41 2018 > 94.85% done, estimate finish Fri May 25 20:21:41 2018 >=== last message repeated 2 times. === > 94.85% done, estimate finish Fri May 25 20:21:42 2018 > 94.86% done, estimate finish Fri May 25 20:21:42 2018 > 94.86% done, estimate finish Fri May 25 20:21:41 2018 > 94.87% done, estimate finish Fri May 25 20:21:41 2018 >=== last message repeated 2 times. === > 94.88% done, estimate finish Fri May 25 20:21:41 2018 > 94.88% done, estimate finish Fri May 25 20:21:42 2018 > 94.88% done, estimate finish Fri May 25 20:21:41 2018 > 94.89% done, estimate finish Fri May 25 20:21:41 2018 >=== last message repeated 2 times. === > 94.90% done, estimate finish Fri May 25 20:21:41 2018 >=== last message repeated 2 times. === > 94.90% done, estimate finish Fri May 25 20:21:40 2018 > 94.91% done, estimate finish Fri May 25 20:21:41 2018 >=== last message repeated 2 times. === > 94.92% done, estimate finish Fri May 25 20:21:41 2018 >=== last message repeated 2 times. === > 94.92% done, estimate finish Fri May 25 20:21:40 2018 > 94.93% done, estimate finish Fri May 25 20:21:40 2018 > 94.93% done, estimate finish Fri May 25 20:21:41 2018 > 94.94% done, estimate finish Fri May 25 20:21:41 2018 >=== last message repeated 2 times. === > 94.94% done, estimate finish Fri May 25 20:21:40 2018 > 94.95% done, estimate finish Fri May 25 20:21:40 2018 >=== last message repeated 2 times. === > 94.96% done, estimate finish Fri May 25 20:21:41 2018 >=== last message repeated 2 times. === > 94.97% done, estimate finish Fri May 25 20:21:40 2018 >=== last message repeated 3 times. === > 94.98% done, estimate finish Fri May 25 20:21:40 2018 >=== last message repeated 2 times. === > 94.99% done, estimate finish Fri May 25 20:21:40 2018 >=== last message repeated 3 times. === > 95.00% done, estimate finish Fri May 25 20:21:40 2018 >=== last message repeated 2 times. === > 95.01% done, estimate finish Fri May 25 20:21:39 2018 > 95.01% done, estimate finish Fri May 25 20:21:40 2018 >=== last message repeated 2 times. === > 95.02% done, estimate finish Fri May 25 20:21:40 2018 >=== last message repeated 2 times. === > 95.03% done, estimate finish Fri May 25 20:21:39 2018 >=== last message repeated 3 times. === > 95.04% done, estimate finish Fri May 25 20:21:40 2018 >=== last message repeated 2 times. === > 95.05% done, estimate finish Fri May 25 20:21:39 2018 >=== last message repeated 2 times. === > 95.06% done, estimate finish Fri May 25 20:21:40 2018 >=== last message repeated 3 times. === > 95.07% done, estimate finish Fri May 25 20:21:39 2018 >=== last message repeated 2 times. === > 95.08% done, estimate finish Fri May 25 20:21:39 2018 > 95.08% done, estimate finish Fri May 25 20:21:40 2018 >=== last message repeated 2 times. === > 95.09% done, estimate finish Fri May 25 20:21:39 2018 >=== last message repeated 2 times. === > 95.10% done, estimate finish Fri May 25 20:21:39 2018 >=== last message repeated 3 times. === > 95.11% done, estimate finish Fri May 25 20:21:39 2018 >=== last message repeated 2 times. === > 95.12% done, estimate finish Fri May 25 20:21:39 2018 >=== last message repeated 2 times. === > 95.13% done, estimate finish Fri May 25 20:21:39 2018 > 95.13% done, estimate finish Fri May 25 20:21:38 2018 > 95.13% done, estimate finish Fri May 25 20:21:39 2018 > 95.14% done, estimate finish Fri May 25 20:21:39 2018 >=== last message repeated 2 times. === > 95.15% done, estimate finish Fri May 25 20:21:39 2018 > 95.15% done, estimate finish Fri May 25 20:21:38 2018 >=== last message repeated 2 times. === > 95.16% done, estimate finish Fri May 25 20:21:39 2018 >=== last message repeated 2 times. === > 95.17% done, estimate finish Fri May 25 20:21:39 2018 > 95.17% done, estimate finish Fri May 25 20:21:38 2018 >=== last message repeated 2 times. === > 95.18% done, estimate finish Fri May 25 20:21:38 2018 >=== last message repeated 2 times. === > 95.19% done, estimate finish Fri May 25 20:21:39 2018 > 95.19% done, estimate finish Fri May 25 20:21:38 2018 >=== last message repeated 2 times. === > 95.20% done, estimate finish Fri May 25 20:21:38 2018 >=== last message repeated 2 times. === > 95.21% done, estimate finish Fri May 25 20:21:37 2018 > 95.21% done, estimate finish Fri May 25 20:21:38 2018 > 95.22% done, estimate finish Fri May 25 20:21:38 2018 >=== last message repeated 3 times. === > 95.23% done, estimate finish Fri May 25 20:21:37 2018 >=== last message repeated 2 times. === > 95.24% done, estimate finish Fri May 25 20:21:37 2018 > 95.24% done, estimate finish Fri May 25 20:21:38 2018 >=== last message repeated 2 times. === > 95.25% done, estimate finish Fri May 25 20:21:37 2018 >=== last message repeated 2 times. === > 95.26% done, estimate finish Fri May 25 20:21:37 2018 >=== last message repeated 2 times. === > 95.26% done, estimate finish Fri May 25 20:21:38 2018 > 95.27% done, estimate finish Fri May 25 20:21:38 2018 > 95.27% done, estimate finish Fri May 25 20:21:37 2018 > 95.28% done, estimate finish Fri May 25 20:21:37 2018 >=== last message repeated 3 times. === > 95.29% done, estimate finish Fri May 25 20:21:38 2018 > 95.29% done, estimate finish Fri May 25 20:21:37 2018 > 95.30% done, estimate finish Fri May 25 20:21:37 2018 >=== last message repeated 2 times. === > 95.31% done, estimate finish Fri May 25 20:21:37 2018 > 95.31% done, estimate finish Fri May 25 20:21:36 2018 >=== last message repeated 2 times. === > 95.32% done, estimate finish Fri May 25 20:21:37 2018 >=== last message repeated 2 times. === > 95.33% done, estimate finish Fri May 25 20:21:37 2018 > 95.33% done, estimate finish Fri May 25 20:21:36 2018 >=== last message repeated 2 times. === > 95.34% done, estimate finish Fri May 25 20:21:36 2018 > 95.34% done, estimate finish Fri May 25 20:21:37 2018 > 95.35% done, estimate finish Fri May 25 20:21:37 2018 > 95.35% done, estimate finish Fri May 25 20:21:36 2018 >=== last message repeated 2 times. === > 95.36% done, estimate finish Fri May 25 20:21:36 2018 >=== last message repeated 2 times. === > 95.37% done, estimate finish Fri May 25 20:21:37 2018 > 95.37% done, estimate finish Fri May 25 20:21:36 2018 >=== last message repeated 2 times. === > 95.38% done, estimate finish Fri May 25 20:21:36 2018 >=== last message repeated 2 times. === > 95.39% done, estimate finish Fri May 25 20:21:36 2018 >=== last message repeated 2 times. === > 95.40% done, estimate finish Fri May 25 20:21:36 2018 >=== last message repeated 3 times. === > 95.41% done, estimate finish Fri May 25 20:21:36 2018 > 95.41% done, estimate finish Fri May 25 20:21:35 2018 > 95.42% done, estimate finish Fri May 25 20:21:35 2018 > 95.42% done, estimate finish Fri May 25 20:21:36 2018 >=== last message repeated 2 times. === > 95.43% done, estimate finish Fri May 25 20:21:36 2018 > 95.43% done, estimate finish Fri May 25 20:21:35 2018 > 95.44% done, estimate finish Fri May 25 20:21:35 2018 >=== last message repeated 2 times. === > 95.44% done, estimate finish Fri May 25 20:21:36 2018 > 95.45% done, estimate finish Fri May 25 20:21:36 2018 > 95.45% done, estimate finish Fri May 25 20:21:35 2018 > 95.46% done, estimate finish Fri May 25 20:21:35 2018 >=== last message repeated 2 times. === > 95.47% done, estimate finish Fri May 25 20:21:35 2018 > 95.47% done, estimate finish Fri May 25 20:21:36 2018 > 95.47% done, estimate finish Fri May 25 20:21:35 2018 > 95.48% done, estimate finish Fri May 25 20:21:35 2018 >=== last message repeated 2 times. === > 95.49% done, estimate finish Fri May 25 20:21:35 2018 >=== last message repeated 2 times. === > 95.49% done, estimate finish Fri May 25 20:21:34 2018 > 95.50% done, estimate finish Fri May 25 20:21:35 2018 >=== last message repeated 2 times. === > 95.51% done, estimate finish Fri May 25 20:21:35 2018 >=== last message repeated 2 times. === > 95.51% done, estimate finish Fri May 25 20:21:34 2018 > 95.52% done, estimate finish Fri May 25 20:21:34 2018 > 95.52% done, estimate finish Fri May 25 20:21:35 2018 > 95.53% done, estimate finish Fri May 25 20:21:35 2018 >=== last message repeated 2 times. === > 95.53% done, estimate finish Fri May 25 20:21:34 2018 > 95.54% done, estimate finish Fri May 25 20:21:34 2018 >=== last message repeated 2 times. === > 95.55% done, estimate finish Fri May 25 20:21:35 2018 >=== last message repeated 2 times. === > 95.56% done, estimate finish Fri May 25 20:21:34 2018 >=== last message repeated 3 times. === > 95.57% done, estimate finish Fri May 25 20:21:34 2018 >=== last message repeated 2 times. === > 95.58% done, estimate finish Fri May 25 20:21:34 2018 >=== last message repeated 3 times. === > 95.59% done, estimate finish Fri May 25 20:21:34 2018 >=== last message repeated 2 times. === > 95.60% done, estimate finish Fri May 25 20:21:33 2018 > 95.60% done, estimate finish Fri May 25 20:21:34 2018 >=== last message repeated 2 times. === > 95.61% done, estimate finish Fri May 25 20:21:34 2018 >=== last message repeated 2 times. === > 95.62% done, estimate finish Fri May 25 20:21:33 2018 >=== last message repeated 3 times. === > 95.63% done, estimate finish Fri May 25 20:21:34 2018 >=== last message repeated 2 times. === > 95.64% done, estimate finish Fri May 25 20:21:33 2018 >=== last message repeated 2 times. === > 95.65% done, estimate finish Fri May 25 20:21:33 2018 >=== last message repeated 2 times. === > 95.65% done, estimate finish Fri May 25 20:21:34 2018 > 95.66% done, estimate finish Fri May 25 20:21:33 2018 >=== last message repeated 2 times. === > 95.67% done, estimate finish Fri May 25 20:21:33 2018 >=== last message repeated 3 times. === > 95.68% done, estimate finish Fri May 25 20:21:33 2018 >=== last message repeated 2 times. === > 95.69% done, estimate finish Fri May 25 20:21:33 2018 >=== last message repeated 3 times. === > 95.70% done, estimate finish Fri May 25 20:21:32 2018 >=== last message repeated 2 times. === > 95.71% done, estimate finish Fri May 25 20:21:33 2018 >=== last message repeated 3 times. === > 95.72% done, estimate finish Fri May 25 20:21:32 2018 >=== last message repeated 2 times. === > 95.73% done, estimate finish Fri May 25 20:21:32 2018 > 95.73% done, estimate finish Fri May 25 20:21:33 2018 > 95.74% done, estimate finish Fri May 25 20:21:33 2018 > 95.74% done, estimate finish Fri May 25 20:21:32 2018 >=== last message repeated 2 times. === > 95.75% done, estimate finish Fri May 25 20:21:32 2018 >=== last message repeated 2 times. === > 95.76% done, estimate finish Fri May 25 20:21:33 2018 > 95.76% done, estimate finish Fri May 25 20:21:32 2018 >=== last message repeated 2 times. === > 95.77% done, estimate finish Fri May 25 20:21:32 2018 >=== last message repeated 2 times. === > 95.78% done, estimate finish Fri May 25 20:21:32 2018 >=== last message repeated 3 times. === > 95.79% done, estimate finish Fri May 25 20:21:32 2018 >=== last message repeated 2 times. === > 95.80% done, estimate finish Fri May 25 20:21:32 2018 > 95.80% done, estimate finish Fri May 25 20:21:31 2018 > 95.81% done, estimate finish Fri May 25 20:21:31 2018 > 95.81% done, estimate finish Fri May 25 20:21:32 2018 >=== last message repeated 2 times. === > 95.82% done, estimate finish Fri May 25 20:21:32 2018 > 95.82% done, estimate finish Fri May 25 20:21:31 2018 > 95.83% done, estimate finish Fri May 25 20:21:31 2018 >=== last message repeated 2 times. === > 95.83% done, estimate finish Fri May 25 20:21:32 2018 > 95.84% done, estimate finish Fri May 25 20:21:32 2018 > 95.84% done, estimate finish Fri May 25 20:21:31 2018 > 95.85% done, estimate finish Fri May 25 20:21:31 2018 >=== last message repeated 3 times. === > 95.86% done, estimate finish Fri May 25 20:21:32 2018 > 95.86% done, estimate finish Fri May 25 20:21:31 2018 > 95.87% done, estimate finish Fri May 25 20:21:31 2018 >=== last message repeated 3 times. === > 95.88% done, estimate finish Fri May 25 20:21:31 2018 >=== last message repeated 2 times. === > 95.89% done, estimate finish Fri May 25 20:21:31 2018 >=== last message repeated 2 times. === > 95.90% done, estimate finish Fri May 25 20:21:31 2018 >=== last message repeated 2 times. === > 95.90% done, estimate finish Fri May 25 20:21:30 2018 > 95.91% done, estimate finish Fri May 25 20:21:30 2018 > 95.91% done, estimate finish Fri May 25 20:21:31 2018 > 95.92% done, estimate finish Fri May 25 20:21:31 2018 >=== last message repeated 2 times. === > 95.92% done, estimate finish Fri May 25 20:21:30 2018 > 95.93% done, estimate finish Fri May 25 20:21:30 2018 >=== last message repeated 2 times. === > 95.94% done, estimate finish Fri May 25 20:21:31 2018 >=== last message repeated 2 times. === > 95.94% done, estimate finish Fri May 25 20:21:30 2018 > 95.95% done, estimate finish Fri May 25 20:21:30 2018 >=== last message repeated 2 times. === > 95.96% done, estimate finish Fri May 25 20:21:30 2018 >=== last message repeated 3 times. === > 95.97% done, estimate finish Fri May 25 20:21:30 2018 >=== last message repeated 2 times. === > 95.98% done, estimate finish Fri May 25 20:21:30 2018 >=== last message repeated 2 times. === > 95.99% done, estimate finish Fri May 25 20:21:29 2018 > 95.99% done, estimate finish Fri May 25 20:21:30 2018 >=== last message repeated 2 times. === > 96.00% done, estimate finish Fri May 25 20:21:30 2018 >=== last message repeated 2 times. === > 96.01% done, estimate finish Fri May 25 20:21:29 2018 >=== last message repeated 3 times. === > 96.02% done, estimate finish Fri May 25 20:21:30 2018 >=== last message repeated 2 times. === > 96.03% done, estimate finish Fri May 25 20:21:29 2018 >=== last message repeated 3 times. === > 96.04% done, estimate finish Fri May 25 20:21:29 2018 > 96.04% done, estimate finish Fri May 25 20:21:30 2018 > 96.05% done, estimate finish Fri May 25 20:21:29 2018 >=== last message repeated 3 times. === > 96.06% done, estimate finish Fri May 25 20:21:29 2018 >=== last message repeated 2 times. === > 96.07% done, estimate finish Fri May 25 20:21:29 2018 >=== last message repeated 2 times. === > 96.08% done, estimate finish Fri May 25 20:21:29 2018 >=== last message repeated 3 times. === > 96.09% done, estimate finish Fri May 25 20:21:28 2018 >=== last message repeated 2 times. === > 96.10% done, estimate finish Fri May 25 20:21:29 2018 >=== last message repeated 3 times. === > 96.11% done, estimate finish Fri May 25 20:21:28 2018 >=== last message repeated 2 times. === > 96.12% done, estimate finish Fri May 25 20:21:28 2018 > 96.12% done, estimate finish Fri May 25 20:21:29 2018 >=== last message repeated 2 times. === > 96.13% done, estimate finish Fri May 25 20:21:28 2018 >=== last message repeated 2 times. === > 96.14% done, estimate finish Fri May 25 20:21:28 2018 >=== last message repeated 2 times. === > 96.14% done, estimate finish Fri May 25 20:21:29 2018 > 96.15% done, estimate finish Fri May 25 20:21:28 2018 >=== last message repeated 2 times. === > 96.16% done, estimate finish Fri May 25 20:21:28 2018 >=== last message repeated 2 times. === > 96.17% done, estimate finish Fri May 25 20:21:28 2018 >=== last message repeated 3 times. === > 96.18% done, estimate finish Fri May 25 20:21:28 2018 >=== last message repeated 2 times. === > 96.19% done, estimate finish Fri May 25 20:21:28 2018 > 96.19% done, estimate finish Fri May 25 20:21:27 2018 > 96.19% done, estimate finish Fri May 25 20:21:28 2018 > 96.20% done, estimate finish Fri May 25 20:21:28 2018 >=== last message repeated 2 times. === > 96.21% done, estimate finish Fri May 25 20:21:28 2018 > 96.21% done, estimate finish Fri May 25 20:21:27 2018 >=== last message repeated 2 times. === > 96.22% done, estimate finish Fri May 25 20:21:27 2018 > 96.22% done, estimate finish Fri May 25 20:21:28 2018 > 96.23% done, estimate finish Fri May 25 20:21:28 2018 > 96.23% done, estimate finish Fri May 25 20:21:27 2018 > 96.24% done, estimate finish Fri May 25 20:21:27 2018 >=== last message repeated 3 times. === > 96.25% done, estimate finish Fri May 25 20:21:28 2018 > 96.25% done, estimate finish Fri May 25 20:21:27 2018 > 96.26% done, estimate finish Fri May 25 20:21:27 2018 >=== last message repeated 3 times. === > 96.27% done, estimate finish Fri May 25 20:21:27 2018 >=== last message repeated 2 times. === > 96.28% done, estimate finish Fri May 25 20:21:27 2018 >=== last message repeated 3 times. === > 96.29% done, estimate finish Fri May 25 20:21:27 2018 > 96.29% done, estimate finish Fri May 25 20:21:26 2018 > 96.30% done, estimate finish Fri May 25 20:21:27 2018 >=== last message repeated 3 times. === > 96.31% done, estimate finish Fri May 25 20:21:27 2018 > 96.31% done, estimate finish Fri May 25 20:21:26 2018 > 96.32% done, estimate finish Fri May 25 20:21:26 2018 >=== last message repeated 2 times. === > 96.33% done, estimate finish Fri May 25 20:21:27 2018 >=== last message repeated 2 times. === > 96.33% done, estimate finish Fri May 25 20:21:26 2018 > 96.34% done, estimate finish Fri May 25 20:21:26 2018 >=== last message repeated 2 times. === > 96.35% done, estimate finish Fri May 25 20:21:26 2018 > 96.35% done, estimate finish Fri May 25 20:21:27 2018 > 96.35% done, estimate finish Fri May 25 20:21:26 2018 > 96.36% done, estimate finish Fri May 25 20:21:26 2018 >=== last message repeated 2 times. === > 96.37% done, estimate finish Fri May 25 20:21:26 2018 >=== last message repeated 3 times. === > 96.38% done, estimate finish Fri May 25 20:21:26 2018 >=== last message repeated 2 times. === > 96.39% done, estimate finish Fri May 25 20:21:26 2018 >=== last message repeated 2 times. === > 96.39% done, estimate finish Fri May 25 20:21:25 2018 > 96.40% done, estimate finish Fri May 25 20:21:26 2018 >=== last message repeated 2 times. === > 96.41% done, estimate finish Fri May 25 20:21:26 2018 >=== last message repeated 2 times. === > 96.42% done, estimate finish Fri May 25 20:21:25 2018 >=== last message repeated 2 times. === > 96.42% done, estimate finish Fri May 25 20:21:26 2018 > 96.43% done, estimate finish Fri May 25 20:21:26 2018 >=== last message repeated 2 times. === > 96.44% done, estimate finish Fri May 25 20:21:25 2018 >=== last message repeated 3 times. === > 96.45% done, estimate finish Fri May 25 20:21:25 2018 > 96.45% done, estimate finish Fri May 25 20:21:26 2018 > 96.46% done, estimate finish Fri May 25 20:21:25 2018 >=== last message repeated 3 times. === > 96.47% done, estimate finish Fri May 25 20:21:25 2018 >=== last message repeated 2 times. === > 96.48% done, estimate finish Fri May 25 20:21:25 2018 >=== last message repeated 3 times. === > 96.49% done, estimate finish Fri May 25 20:21:25 2018 >=== last message repeated 2 times. === > 96.50% done, estimate finish Fri May 25 20:21:24 2018 > 96.50% done, estimate finish Fri May 25 20:21:25 2018 > 96.51% done, estimate finish Fri May 25 20:21:25 2018 >=== last message repeated 3 times. === > 96.52% done, estimate finish Fri May 25 20:21:24 2018 >=== last message repeated 2 times. === > 96.53% done, estimate finish Fri May 25 20:21:24 2018 > 96.53% done, estimate finish Fri May 25 20:21:25 2018 >=== last message repeated 2 times. === > 96.54% done, estimate finish Fri May 25 20:21:24 2018 >=== last message repeated 2 times. === > 96.55% done, estimate finish Fri May 25 20:21:24 2018 >=== last message repeated 2 times. === > 96.55% done, estimate finish Fri May 25 20:21:25 2018 > 96.56% done, estimate finish Fri May 25 20:21:24 2018 >=== last message repeated 2 times. === > 96.57% done, estimate finish Fri May 25 20:21:24 2018 >=== last message repeated 2 times. === > 96.58% done, estimate finish Fri May 25 20:21:24 2018 >=== last message repeated 3 times. === > 96.59% done, estimate finish Fri May 25 20:21:24 2018 >=== last message repeated 2 times. === > 96.60% done, estimate finish Fri May 25 20:21:24 2018 > 96.60% done, estimate finish Fri May 25 20:21:23 2018 > 96.60% done, estimate finish Fri May 25 20:21:24 2018 > 96.61% done, estimate finish Fri May 25 20:21:24 2018 >=== last message repeated 2 times. === > 96.62% done, estimate finish Fri May 25 20:21:24 2018 > 96.62% done, estimate finish Fri May 25 20:21:23 2018 >=== last message repeated 2 times. === > 96.63% done, estimate finish Fri May 25 20:21:24 2018 >=== last message repeated 2 times. === > 96.64% done, estimate finish Fri May 25 20:21:24 2018 > 96.64% done, estimate finish Fri May 25 20:21:23 2018 >=== last message repeated 2 times. === > 96.65% done, estimate finish Fri May 25 20:21:23 2018 >=== last message repeated 2 times. === > 96.66% done, estimate finish Fri May 25 20:21:24 2018 > 96.66% done, estimate finish Fri May 25 20:21:23 2018 > 96.67% done, estimate finish Fri May 25 20:21:23 2018 >=== last message repeated 3 times. === > 96.68% done, estimate finish Fri May 25 20:21:23 2018 >=== last message repeated 2 times. === > 96.69% done, estimate finish Fri May 25 20:21:23 2018 >=== last message repeated 3 times. === > 96.70% done, estimate finish Fri May 25 20:21:23 2018 > 96.70% done, estimate finish Fri May 25 20:21:22 2018 > 96.71% done, estimate finish Fri May 25 20:21:23 2018 >=== last message repeated 3 times. === > 96.72% done, estimate finish Fri May 25 20:21:23 2018 > 96.72% done, estimate finish Fri May 25 20:21:22 2018 > 96.73% done, estimate finish Fri May 25 20:21:22 2018 >=== last message repeated 2 times. === > 96.73% done, estimate finish Fri May 25 20:21:23 2018 > 96.74% done, estimate finish Fri May 25 20:21:23 2018 > 96.74% done, estimate finish Fri May 25 20:21:22 2018 > 96.75% done, estimate finish Fri May 25 20:21:22 2018 >=== last message repeated 2 times. === > 96.76% done, estimate finish Fri May 25 20:21:22 2018 > 96.76% done, estimate finish Fri May 25 20:21:23 2018 > 96.76% done, estimate finish Fri May 25 20:21:22 2018 > 96.77% done, estimate finish Fri May 25 20:21:22 2018 >=== last message repeated 2 times. === > 96.78% done, estimate finish Fri May 25 20:21:22 2018 >=== last message repeated 3 times. === > 96.79% done, estimate finish Fri May 25 20:21:22 2018 >=== last message repeated 2 times. === > 96.80% done, estimate finish Fri May 25 20:21:22 2018 >=== last message repeated 2 times. === > 96.80% done, estimate finish Fri May 25 20:21:21 2018 > 96.81% done, estimate finish Fri May 25 20:21:22 2018 >=== last message repeated 2 times. === > 96.82% done, estimate finish Fri May 25 20:21:22 2018 >=== last message repeated 2 times. === > 96.82% done, estimate finish Fri May 25 20:21:21 2018 > 96.83% done, estimate finish Fri May 25 20:21:21 2018 > 96.83% done, estimate finish Fri May 25 20:21:22 2018 > 96.84% done, estimate finish Fri May 25 20:21:22 2018 >=== last message repeated 2 times. === > 96.85% done, estimate finish Fri May 25 20:21:21 2018 >=== last message repeated 3 times. === > 96.86% done, estimate finish Fri May 25 20:21:21 2018 > 96.86% done, estimate finish Fri May 25 20:21:22 2018 > 96.87% done, estimate finish Fri May 25 20:21:21 2018 >=== last message repeated 3 times. === > 96.88% done, estimate finish Fri May 25 20:21:21 2018 >=== last message repeated 2 times. === > 96.89% done, estimate finish Fri May 25 20:21:21 2018 >=== last message repeated 3 times. === > 96.90% done, estimate finish Fri May 25 20:21:21 2018 >=== last message repeated 2 times. === > 96.91% done, estimate finish Fri May 25 20:21:20 2018 > 96.91% done, estimate finish Fri May 25 20:21:21 2018 >=== last message repeated 2 times. === > 96.92% done, estimate finish Fri May 25 20:21:21 2018 >=== last message repeated 2 times. === > 96.93% done, estimate finish Fri May 25 20:21:20 2018 >=== last message repeated 2 times. === > 96.94% done, estimate finish Fri May 25 20:21:21 2018 >=== last message repeated 3 times. === > 96.95% done, estimate finish Fri May 25 20:21:20 2018 >=== last message repeated 2 times. === > 96.96% done, estimate finish Fri May 25 20:21:20 2018 > 96.96% done, estimate finish Fri May 25 20:21:21 2018 >=== last message repeated 2 times. === > 96.97% done, estimate finish Fri May 25 20:21:20 2018 >=== last message repeated 2 times. === > 96.98% done, estimate finish Fri May 25 20:21:20 2018 >=== last message repeated 3 times. === > 96.99% done, estimate finish Fri May 25 20:21:20 2018 >=== last message repeated 2 times. === > 97.00% done, estimate finish Fri May 25 20:21:20 2018 >=== last message repeated 2 times. === > 97.01% done, estimate finish Fri May 25 20:21:20 2018 > 97.01% done, estimate finish Fri May 25 20:21:19 2018 > 97.01% done, estimate finish Fri May 25 20:21:20 2018 > 97.02% done, estimate finish Fri May 25 20:21:20 2018 >=== last message repeated 2 times. === > 97.03% done, estimate finish Fri May 25 20:21:20 2018 > 97.03% done, estimate finish Fri May 25 20:21:19 2018 >=== last message repeated 2 times. === > 97.04% done, estimate finish Fri May 25 20:21:20 2018 >=== last message repeated 2 times. === > 97.05% done, estimate finish Fri May 25 20:21:20 2018 > 97.05% done, estimate finish Fri May 25 20:21:19 2018 >=== last message repeated 2 times. === > 97.06% done, estimate finish Fri May 25 20:21:19 2018 >=== last message repeated 2 times. === > 97.07% done, estimate finish Fri May 25 20:21:20 2018 > 97.07% done, estimate finish Fri May 25 20:21:19 2018 >=== last message repeated 2 times. === > 97.08% done, estimate finish Fri May 25 20:21:19 2018 >=== last message repeated 2 times. === > 97.09% done, estimate finish Fri May 25 20:21:19 2018 >=== last message repeated 2 times. === > 97.10% done, estimate finish Fri May 25 20:21:19 2018 >=== last message repeated 3 times. === > 97.11% done, estimate finish Fri May 25 20:21:19 2018 > 97.11% done, estimate finish Fri May 25 20:21:18 2018 > 97.12% done, estimate finish Fri May 25 20:21:19 2018 >=== last message repeated 3 times. === > 97.13% done, estimate finish Fri May 25 20:21:19 2018 > 97.13% done, estimate finish Fri May 25 20:21:18 2018 > 97.14% done, estimate finish Fri May 25 20:21:18 2018 > 97.14% done, estimate finish Fri May 25 20:21:19 2018 >=== last message repeated 2 times. === > 97.15% done, estimate finish Fri May 25 20:21:19 2018 > 97.15% done, estimate finish Fri May 25 20:21:18 2018 > 97.16% done, estimate finish Fri May 25 20:21:18 2018 >=== last message repeated 2 times. === > 97.16% done, estimate finish Fri May 25 20:21:19 2018 > 97.17% done, estimate finish Fri May 25 20:21:19 2018 > 97.17% done, estimate finish Fri May 25 20:21:18 2018 > 97.18% done, estimate finish Fri May 25 20:21:18 2018 >=== last message repeated 2 times. === > 97.19% done, estimate finish Fri May 25 20:21:18 2018 >=== last message repeated 3 times. === > 97.20% done, estimate finish Fri May 25 20:21:18 2018 >=== last message repeated 2 times. === > 97.21% done, estimate finish Fri May 25 20:21:18 2018 >=== last message repeated 2 times. === > 97.21% done, estimate finish Fri May 25 20:21:17 2018 > 97.22% done, estimate finish Fri May 25 20:21:18 2018 >=== last message repeated 2 times. === > 97.23% done, estimate finish Fri May 25 20:21:18 2018 >=== last message repeated 2 times. === > 97.23% done, estimate finish Fri May 25 20:21:17 2018 > 97.24% done, estimate finish Fri May 25 20:21:17 2018 > 97.24% done, estimate finish Fri May 25 20:21:18 2018 > 97.25% done, estimate finish Fri May 25 20:21:18 2018 >=== last message repeated 2 times. === > 97.25% done, estimate finish Fri May 25 20:21:17 2018 > 97.26% done, estimate finish Fri May 25 20:21:17 2018 >=== last message repeated 2 times. === > 97.27% done, estimate finish Fri May 25 20:21:18 2018 >=== last message repeated 2 times. === > 97.28% done, estimate finish Fri May 25 20:21:17 2018 >=== last message repeated 3 times. === > 97.29% done, estimate finish Fri May 25 20:21:17 2018 > 97.29% done, estimate finish Fri May 25 20:21:18 2018 > 97.30% done, estimate finish Fri May 25 20:21:17 2018 >=== last message repeated 3 times. === > 97.31% done, estimate finish Fri May 25 20:21:17 2018 >=== last message repeated 2 times. === > 97.32% done, estimate finish Fri May 25 20:21:16 2018 > 97.32% done, estimate finish Fri May 25 20:21:17 2018 >=== last message repeated 2 times. === > 97.33% done, estimate finish Fri May 25 20:21:17 2018 >=== last message repeated 2 times. === > 97.34% done, estimate finish Fri May 25 20:21:16 2018 >=== last message repeated 2 times. === > 97.35% done, estimate finish Fri May 25 20:21:17 2018 >=== last message repeated 3 times. === > 97.36% done, estimate finish Fri May 25 20:21:16 2018 >=== last message repeated 2 times. === > 97.37% done, estimate finish Fri May 25 20:21:16 2018 > 97.37% done, estimate finish Fri May 25 20:21:17 2018 >=== last message repeated 2 times. === > 97.38% done, estimate finish Fri May 25 20:21:16 2018 >=== last message repeated 2 times. === > 97.39% done, estimate finish Fri May 25 20:21:16 2018 >=== last message repeated 3 times. === > 97.40% done, estimate finish Fri May 25 20:21:16 2018 >=== last message repeated 2 times. === > 97.41% done, estimate finish Fri May 25 20:21:16 2018 >=== last message repeated 3 times. === > 97.42% done, estimate finish Fri May 25 20:21:15 2018 > 97.42% done, estimate finish Fri May 25 20:21:16 2018 > 97.43% done, estimate finish Fri May 25 20:21:16 2018 >=== last message repeated 2 times. === > 97.44% done, estimate finish Fri May 25 20:21:16 2018 > 97.44% done, estimate finish Fri May 25 20:21:15 2018 >=== last message repeated 2 times. === > 97.45% done, estimate finish Fri May 25 20:21:16 2018 >=== last message repeated 2 times. === > 97.46% done, estimate finish Fri May 25 20:21:16 2018 > 97.46% done, estimate finish Fri May 25 20:21:15 2018 >=== last message repeated 2 times. === > 97.47% done, estimate finish Fri May 25 20:21:15 2018 > 97.47% done, estimate finish Fri May 25 20:21:16 2018 > 97.48% done, estimate finish Fri May 25 20:21:16 2018 > 97.48% done, estimate finish Fri May 25 20:21:15 2018 >=== last message repeated 2 times. === > 97.49% done, estimate finish Fri May 25 20:21:15 2018 >=== last message repeated 2 times. === > 97.50% done, estimate finish Fri May 25 20:21:16 2018 > 97.50% done, estimate finish Fri May 25 20:21:15 2018 >=== last message repeated 2 times. === > 97.51% done, estimate finish Fri May 25 20:21:15 2018 >=== last message repeated 2 times. === > 97.52% done, estimate finish Fri May 25 20:21:15 2018 >=== last message repeated 2 times. === > 97.53% done, estimate finish Fri May 25 20:21:15 2018 >=== last message repeated 3 times. === > 97.54% done, estimate finish Fri May 25 20:21:15 2018 > 97.54% done, estimate finish Fri May 25 20:21:14 2018 > 97.55% done, estimate finish Fri May 25 20:21:14 2018 > 97.55% done, estimate finish Fri May 25 20:21:15 2018 >=== last message repeated 2 times. === > 97.56% done, estimate finish Fri May 25 20:21:15 2018 > 97.56% done, estimate finish Fri May 25 20:21:14 2018 > 97.57% done, estimate finish Fri May 25 20:21:14 2018 >=== last message repeated 2 times. === > 97.57% done, estimate finish Fri May 25 20:21:15 2018 > 97.58% done, estimate finish Fri May 25 20:21:15 2018 > 97.58% done, estimate finish Fri May 25 20:21:14 2018 > 97.59% done, estimate finish Fri May 25 20:21:14 2018 >=== last message repeated 3 times. === > 97.60% done, estimate finish Fri May 25 20:21:15 2018 > 97.60% done, estimate finish Fri May 25 20:21:14 2018 > 97.61% done, estimate finish Fri May 25 20:21:14 2018 >=== last message repeated 2 times. === > 97.62% done, estimate finish Fri May 25 20:21:14 2018 >=== last message repeated 3 times. === > 97.63% done, estimate finish Fri May 25 20:21:14 2018 >=== last message repeated 2 times. === > 97.64% done, estimate finish Fri May 25 20:21:14 2018 >=== last message repeated 2 times. === > 97.64% done, estimate finish Fri May 25 20:21:13 2018 > 97.65% done, estimate finish Fri May 25 20:21:14 2018 >=== last message repeated 2 times. === > 97.66% done, estimate finish Fri May 25 20:21:14 2018 >=== last message repeated 2 times. === > 97.66% done, estimate finish Fri May 25 20:21:13 2018 > 97.67% done, estimate finish Fri May 25 20:21:13 2018 >=== last message repeated 2 times. === > 97.68% done, estimate finish Fri May 25 20:21:14 2018 >=== last message repeated 2 times. === > 97.69% done, estimate finish Fri May 25 20:21:13 2018 >=== last message repeated 3 times. === > 97.70% done, estimate finish Fri May 25 20:21:13 2018 > 97.70% done, estimate finish Fri May 25 20:21:14 2018 > 97.71% done, estimate finish Fri May 25 20:21:13 2018 >=== last message repeated 3 times. === > 97.72% done, estimate finish Fri May 25 20:21:13 2018 >=== last message repeated 2 times. === > 97.73% done, estimate finish Fri May 25 20:21:13 2018 >=== last message repeated 3 times. === > 97.74% done, estimate finish Fri May 25 20:21:13 2018 >=== last message repeated 2 times. === > 97.75% done, estimate finish Fri May 25 20:21:12 2018 >=== last message repeated 2 times. === > 97.75% done, estimate finish Fri May 25 20:21:13 2018 > 97.76% done, estimate finish Fri May 25 20:21:13 2018 >=== last message repeated 2 times. === > 97.77% done, estimate finish Fri May 25 20:21:12 2018 >=== last message repeated 2 times. === > 97.78% done, estimate finish Fri May 25 20:21:12 2018 > 97.78% done, estimate finish Fri May 25 20:21:13 2018 >=== last message repeated 2 times. === > 97.79% done, estimate finish Fri May 25 20:21:13 2018 > 97.79% done, estimate finish Fri May 25 20:21:12 2018 > 97.80% done, estimate finish Fri May 25 20:21:12 2018 >=== last message repeated 2 times. === > 97.80% done, estimate finish Fri May 25 20:21:13 2018 > 97.81% done, estimate finish Fri May 25 20:21:13 2018 > 97.81% done, estimate finish Fri May 25 20:21:12 2018 > 97.82% done, estimate finish Fri May 25 20:21:12 2018 >=== last message repeated 3 times. === > 97.83% done, estimate finish Fri May 25 20:21:13 2018 > 97.83% done, estimate finish Fri May 25 20:21:12 2018 > 97.84% done, estimate finish Fri May 25 20:21:12 2018 >=== last message repeated 3 times. === > 97.85% done, estimate finish Fri May 25 20:21:12 2018 >=== last message repeated 2 times. === > 97.86% done, estimate finish Fri May 25 20:21:12 2018 >=== last message repeated 2 times. === > 97.87% done, estimate finish Fri May 25 20:21:12 2018 >=== last message repeated 2 times. === > 97.87% done, estimate finish Fri May 25 20:21:11 2018 > 97.88% done, estimate finish Fri May 25 20:21:11 2018 > 97.88% done, estimate finish Fri May 25 20:21:12 2018 > 97.89% done, estimate finish Fri May 25 20:21:12 2018 >=== last message repeated 2 times. === > 97.89% done, estimate finish Fri May 25 20:21:11 2018 > 97.90% done, estimate finish Fri May 25 20:21:11 2018 >=== last message repeated 2 times. === > 97.91% done, estimate finish Fri May 25 20:21:12 2018 >=== last message repeated 2 times. === > 97.91% done, estimate finish Fri May 25 20:21:11 2018 > 97.92% done, estimate finish Fri May 25 20:21:11 2018 >=== last message repeated 2 times. === > 97.93% done, estimate finish Fri May 25 20:21:11 2018 > 97.93% done, estimate finish Fri May 25 20:21:12 2018 > 97.93% done, estimate finish Fri May 25 20:21:11 2018 > 97.94% done, estimate finish Fri May 25 20:21:11 2018 >=== last message repeated 2 times. === > 97.95% done, estimate finish Fri May 25 20:21:11 2018 >=== last message repeated 2 times. === > 97.96% done, estimate finish Fri May 25 20:21:11 2018 >=== last message repeated 3 times. === > 97.97% done, estimate finish Fri May 25 20:21:11 2018 >=== last message repeated 2 times. === > 97.98% done, estimate finish Fri May 25 20:21:10 2018 > 97.98% done, estimate finish Fri May 25 20:21:11 2018 >=== last message repeated 2 times. === > 97.99% done, estimate finish Fri May 25 20:21:11 2018 >=== last message repeated 2 times. === > 98.00% done, estimate finish Fri May 25 20:21:10 2018 >=== last message repeated 3 times. === > 98.01% done, estimate finish Fri May 25 20:21:11 2018 >=== last message repeated 2 times. === > 98.02% done, estimate finish Fri May 25 20:21:10 2018 >=== last message repeated 3 times. === > 98.03% done, estimate finish Fri May 25 20:21:10 2018 > 98.03% done, estimate finish Fri May 25 20:21:11 2018 > 98.04% done, estimate finish Fri May 25 20:21:10 2018 >=== last message repeated 2 times. === > 98.05% done, estimate finish Fri May 25 20:21:10 2018 >=== last message repeated 3 times. === > 98.06% done, estimate finish Fri May 25 20:21:10 2018 >=== last message repeated 2 times. === > 98.07% done, estimate finish Fri May 25 20:21:10 2018 >=== last message repeated 3 times. === > 98.08% done, estimate finish Fri May 25 20:21:09 2018 > 98.08% done, estimate finish Fri May 25 20:21:10 2018 > 98.09% done, estimate finish Fri May 25 20:21:10 2018 >=== last message repeated 3 times. === > 98.10% done, estimate finish Fri May 25 20:21:09 2018 >=== last message repeated 2 times. === > 98.11% done, estimate finish Fri May 25 20:21:10 2018 >=== last message repeated 2 times. === > 98.12% done, estimate finish Fri May 25 20:21:10 2018 > 98.12% done, estimate finish Fri May 25 20:21:09 2018 >=== last message repeated 2 times. === > 98.13% done, estimate finish Fri May 25 20:21:09 2018 >=== last message repeated 2 times. === > 98.14% done, estimate finish Fri May 25 20:21:10 2018 > 98.14% done, estimate finish Fri May 25 20:21:09 2018 >=== last message repeated 2 times. === > 98.15% done, estimate finish Fri May 25 20:21:09 2018 >=== last message repeated 2 times. === > 98.16% done, estimate finish Fri May 25 20:21:09 2018 >=== last message repeated 3 times. === > 98.17% done, estimate finish Fri May 25 20:21:09 2018 >=== last message repeated 2 times. === > 98.18% done, estimate finish Fri May 25 20:21:09 2018 > 98.18% done, estimate finish Fri May 25 20:21:08 2018 > 98.18% done, estimate finish Fri May 25 20:21:09 2018 > 98.19% done, estimate finish Fri May 25 20:21:09 2018 >=== last message repeated 2 times. === > 98.20% done, estimate finish Fri May 25 20:21:09 2018 > 98.20% done, estimate finish Fri May 25 20:21:08 2018 > 98.21% done, estimate finish Fri May 25 20:21:08 2018 >=== last message repeated 2 times. === > 98.21% done, estimate finish Fri May 25 20:21:09 2018 > 98.22% done, estimate finish Fri May 25 20:21:09 2018 > 98.22% done, estimate finish Fri May 25 20:21:08 2018 > 98.23% done, estimate finish Fri May 25 20:21:08 2018 >=== last message repeated 3 times. === > 98.24% done, estimate finish Fri May 25 20:21:09 2018 > 98.24% done, estimate finish Fri May 25 20:21:08 2018 > 98.25% done, estimate finish Fri May 25 20:21:08 2018 >=== last message repeated 3 times. === > 98.26% done, estimate finish Fri May 25 20:21:08 2018 >=== last message repeated 2 times. === > 98.27% done, estimate finish Fri May 25 20:21:08 2018 >=== last message repeated 3 times. === > 98.28% done, estimate finish Fri May 25 20:21:08 2018 > 98.28% done, estimate finish Fri May 25 20:21:07 2018 > 98.29% done, estimate finish Fri May 25 20:21:08 2018 >=== last message repeated 2 times. === > 98.30% done, estimate finish Fri May 25 20:21:08 2018 >=== last message repeated 2 times. === > 98.30% done, estimate finish Fri May 25 20:21:07 2018 > 98.31% done, estimate finish Fri May 25 20:21:07 2018 > 98.31% done, estimate finish Fri May 25 20:21:08 2018 > 98.32% done, estimate finish Fri May 25 20:21:08 2018 >=== last message repeated 2 times. === > 98.32% done, estimate finish Fri May 25 20:21:07 2018 > 98.33% done, estimate finish Fri May 25 20:21:07 2018 >=== last message repeated 2 times. === > 98.34% done, estimate finish Fri May 25 20:21:07 2018 > 98.34% done, estimate finish Fri May 25 20:21:08 2018 > 98.34% done, estimate finish Fri May 25 20:21:07 2018 > 98.35% done, estimate finish Fri May 25 20:21:07 2018 >=== last message repeated 2 times. === > 98.36% done, estimate finish Fri May 25 20:21:07 2018 >=== last message repeated 3 times. === > 98.37% done, estimate finish Fri May 25 20:21:07 2018 >=== last message repeated 2 times. === > 98.38% done, estimate finish Fri May 25 20:21:07 2018 >=== last message repeated 2 times. === > 98.39% done, estimate finish Fri May 25 20:21:06 2018 > 98.39% done, estimate finish Fri May 25 20:21:07 2018 >=== last message repeated 2 times. === > 98.40% done, estimate finish Fri May 25 20:21:07 2018 >=== last message repeated 2 times. === > 98.41% done, estimate finish Fri May 25 20:21:06 2018 >=== last message repeated 2 times. === > 98.41% done, estimate finish Fri May 25 20:21:07 2018 > 98.42% done, estimate finish Fri May 25 20:21:07 2018 >=== last message repeated 2 times. === > 98.43% done, estimate finish Fri May 25 20:21:07 2018 > 98.43% done, estimate finish Fri May 25 20:21:06 2018 >=== last message repeated 2 times. === > 98.44% done, estimate finish Fri May 25 20:21:07 2018 >=== last message repeated 2 times. === > 98.45% done, estimate finish Fri May 25 20:21:07 2018 > 98.45% done, estimate finish Fri May 25 20:21:06 2018 > 98.46% done, estimate finish Fri May 25 20:21:06 2018 >=== last message repeated 3 times. === > 98.47% done, estimate finish Fri May 25 20:21:07 2018 > 98.47% done, estimate finish Fri May 25 20:21:06 2018 > 98.48% done, estimate finish Fri May 25 20:21:06 2018 >=== last message repeated 3 times. === > 98.49% done, estimate finish Fri May 25 20:21:06 2018 >=== last message repeated 2 times. === > 98.50% done, estimate finish Fri May 25 20:21:06 2018 >=== last message repeated 3 times. === > 98.51% done, estimate finish Fri May 25 20:21:06 2018 > 98.51% done, estimate finish Fri May 25 20:21:05 2018 > 98.52% done, estimate finish Fri May 25 20:21:06 2018 >=== last message repeated 3 times. === > 98.53% done, estimate finish Fri May 25 20:21:06 2018 > 98.53% done, estimate finish Fri May 25 20:21:05 2018 > 98.54% done, estimate finish Fri May 25 20:21:05 2018 > 98.54% done, estimate finish Fri May 25 20:21:06 2018 > 98.55% done, estimate finish Fri May 25 20:21:06 2018 >=== last message repeated 2 times. === > 98.55% done, estimate finish Fri May 25 20:21:05 2018 > 98.56% done, estimate finish Fri May 25 20:21:05 2018 >=== last message repeated 2 times. === > 98.57% done, estimate finish Fri May 25 20:21:06 2018 >=== last message repeated 2 times. === > 98.57% done, estimate finish Fri May 25 20:21:05 2018 > 98.58% done, estimate finish Fri May 25 20:21:05 2018 >=== last message repeated 2 times. === > 98.59% done, estimate finish Fri May 25 20:21:05 2018 >=== last message repeated 3 times. === > 98.60% done, estimate finish Fri May 25 20:21:05 2018 >=== last message repeated 2 times. === > 98.61% done, estimate finish Fri May 25 20:21:05 2018 >=== last message repeated 2 times. === > 98.61% done, estimate finish Fri May 25 20:21:04 2018 > 98.62% done, estimate finish Fri May 25 20:21:05 2018 >=== last message repeated 2 times. === > 98.63% done, estimate finish Fri May 25 20:21:05 2018 >=== last message repeated 2 times. === > 98.64% done, estimate finish Fri May 25 20:21:04 2018 >=== last message repeated 2 times. === > 98.64% done, estimate finish Fri May 25 20:21:05 2018 > 98.65% done, estimate finish Fri May 25 20:21:05 2018 >=== last message repeated 2 times. === > 98.66% done, estimate finish Fri May 25 20:21:04 2018 >=== last message repeated 3 times. === > 98.67% done, estimate finish Fri May 25 20:21:05 2018 >=== last message repeated 2 times. === > 98.68% done, estimate finish Fri May 25 20:21:04 2018 >=== last message repeated 3 times. === > 98.69% done, estimate finish Fri May 25 20:21:04 2018 > 98.69% done, estimate finish Fri May 25 20:21:05 2018 > 98.70% done, estimate finish Fri May 25 20:21:04 2018 >=== last message repeated 3 times. === > 98.71% done, estimate finish Fri May 25 20:21:04 2018 >=== last message repeated 2 times. === > 98.72% done, estimate finish Fri May 25 20:21:03 2018 > 98.72% done, estimate finish Fri May 25 20:21:04 2018 > 98.73% done, estimate finish Fri May 25 20:21:04 2018 >=== last message repeated 3 times. === > 98.74% done, estimate finish Fri May 25 20:21:03 2018 >=== last message repeated 2 times. === > 98.75% done, estimate finish Fri May 25 20:21:04 2018 >=== last message repeated 3 times. === > 98.76% done, estimate finish Fri May 25 20:21:03 2018 >=== last message repeated 2 times. === > 98.77% done, estimate finish Fri May 25 20:21:03 2018 > 98.77% done, estimate finish Fri May 25 20:21:04 2018 >=== last message repeated 2 times. === > 98.78% done, estimate finish Fri May 25 20:21:03 2018 >=== last message repeated 2 times. === > 98.79% done, estimate finish Fri May 25 20:21:03 2018 >=== last message repeated 2 times. === > 98.79% done, estimate finish Fri May 25 20:21:04 2018 > 98.80% done, estimate finish Fri May 25 20:21:03 2018 >=== last message repeated 2 times. === > 98.81% done, estimate finish Fri May 25 20:21:03 2018 >=== last message repeated 2 times. === > 98.82% done, estimate finish Fri May 25 20:21:03 2018 >=== last message repeated 3 times. === > 98.83% done, estimate finish Fri May 25 20:21:03 2018 >=== last message repeated 2 times. === > 98.84% done, estimate finish Fri May 25 20:21:03 2018 > 98.84% done, estimate finish Fri May 25 20:21:02 2018 >=== last message repeated 2 times. === > 98.85% done, estimate finish Fri May 25 20:21:03 2018 >=== last message repeated 2 times. === > 98.86% done, estimate finish Fri May 25 20:21:03 2018 > 98.86% done, estimate finish Fri May 25 20:21:02 2018 >=== last message repeated 2 times. === > 98.87% done, estimate finish Fri May 25 20:21:02 2018 > 98.87% done, estimate finish Fri May 25 20:21:03 2018 > 98.88% done, estimate finish Fri May 25 20:21:03 2018 >=== last message repeated 2 times. === > 98.89% done, estimate finish Fri May 25 20:21:02 2018 >=== last message repeated 3 times. === > 98.90% done, estimate finish Fri May 25 20:21:03 2018 >=== last message repeated 2 times. === > 98.91% done, estimate finish Fri May 25 20:21:02 2018 >=== last message repeated 3 times. === > 98.92% done, estimate finish Fri May 25 20:21:02 2018 > 98.92% done, estimate finish Fri May 25 20:21:03 2018 > 98.93% done, estimate finish Fri May 25 20:21:02 2018 >=== last message repeated 3 times. === > 98.94% done, estimate finish Fri May 25 20:21:02 2018 >=== last message repeated 2 times. === > 98.95% done, estimate finish Fri May 25 20:21:02 2018 >=== last message repeated 3 times. === > 98.96% done, estimate finish Fri May 25 20:21:02 2018 >=== last message repeated 2 times. === > 98.97% done, estimate finish Fri May 25 20:21:01 2018 >=== last message repeated 2 times. === > 98.98% done, estimate finish Fri May 25 20:21:02 2018 >=== last message repeated 3 times. === > 98.99% done, estimate finish Fri May 25 20:21:01 2018 >=== last message repeated 2 times. === > 99.00% done, estimate finish Fri May 25 20:21:01 2018 > 99.00% done, estimate finish Fri May 25 20:21:02 2018 >=== last message repeated 2 times. === > 99.01% done, estimate finish Fri May 25 20:21:01 2018 >=== last message repeated 2 times. === > 99.02% done, estimate finish Fri May 25 20:21:01 2018 >=== last message repeated 2 times. === > 99.02% done, estimate finish Fri May 25 20:21:02 2018 > 99.03% done, estimate finish Fri May 25 20:21:01 2018 >=== last message repeated 2 times. === > 99.04% done, estimate finish Fri May 25 20:21:01 2018 >=== last message repeated 3 times. === > 99.05% done, estimate finish Fri May 25 20:21:01 2018 >=== last message repeated 2 times. === > 99.06% done, estimate finish Fri May 25 20:21:01 2018 >=== last message repeated 2 times. === > 99.07% done, estimate finish Fri May 25 20:21:01 2018 > 99.07% done, estimate finish Fri May 25 20:21:00 2018 > 99.07% done, estimate finish Fri May 25 20:21:01 2018 > 99.08% done, estimate finish Fri May 25 20:21:01 2018 >=== last message repeated 2 times. === > 99.09% done, estimate finish Fri May 25 20:21:01 2018 > 99.09% done, estimate finish Fri May 25 20:21:00 2018 >=== last message repeated 2 times. === > 99.10% done, estimate finish Fri May 25 20:21:00 2018 > 99.10% done, estimate finish Fri May 25 20:21:01 2018 > 99.11% done, estimate finish Fri May 25 20:21:01 2018 > 99.11% done, estimate finish Fri May 25 20:21:00 2018 >=== last message repeated 2 times. === > 99.12% done, estimate finish Fri May 25 20:21:00 2018 >=== last message repeated 2 times. === > 99.13% done, estimate finish Fri May 25 20:21:01 2018 > 99.13% done, estimate finish Fri May 25 20:21:00 2018 >=== last message repeated 2 times. === > 99.14% done, estimate finish Fri May 25 20:21:00 2018 >=== last message repeated 2 times. === > 99.15% done, estimate finish Fri May 25 20:21:00 2018 >=== last message repeated 2 times. === > 99.16% done, estimate finish Fri May 25 20:21:00 2018 > >mkisofs calculate size command: >----------------------- >/usr/bin/genisoimage -gui -graft-points -print-size -quiet -volid K3b-Daten-Projekt -volset -appid K3B THE CD KREATOR (C) 1998-2017 SEBASTIAN TRUEG, MICHAL MALEK AND LESLIE ZHAI -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/k3b.jNbtHm -rational-rock -hide-list /tmp/k3b.nsVRvo -joliet -joliet-long -hide-joliet-list /tmp/k3b.XpqFph -no-cache-inodes -full-iso9660-filenames -iso-level 3 -path-list /tmp/k3b.asRksN > >mkisofs command: >----------------------- >/usr/bin/genisoimage -gui -graft-points -volid K3b-Daten-Projekt -volset -appid K3B THE CD KREATOR (C) 1998-2017 SEBASTIAN TRUEG, MICHAL MALEK AND LESLIE ZHAI -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/k3b.eNDxem -rational-rock -hide-list /tmp/k3b.alGCKH -joliet -joliet-long -hide-joliet-list /tmp/k3b.uBSXPe -no-cache-inodes -full-iso9660-filenames -iso-level 3 -path-list /tmp/k3b.unvEsP >
You cannot view the attachment while viewing its details because your browser does not support IFRAMEs.
View the attachment on a separate page
.
View Attachment As Raw
Actions:
View
Attachments on
bug 1531158
:
1377025
|
1377026
| 1441688