Login
[x]
Log in using an account from:
Fedora Account System
Red Hat Associate
Red Hat Customer
Or login using a Red Hat Bugzilla account
Forgot Password
Login:
Hide Forgot
Create an Account
Red Hat Bugzilla – Attachment 707399 Details for
Bug 919675
"appendable error medium" after burning blu ray
[?]
New
Simple Search
Advanced Search
My Links
Browse
Requests
Reports
Current State
Search
Tabular reports
Graphical reports
Duplicates
Other Reports
User Changes
Plotly Reports
Bug Status
Bug Severity
Non-Defaults
|
Product Dashboard
Help
Page Help!
Bug Writing Guidelines
What's new
Browser Support Policy
5.0.4.rh83 Release notes
FAQ
Guides index
User guide
Web Services
Contact
Legal
This site requires JavaScript to be enabled to function correctly, please enable it.
k3b output
debug_2.txt (text/plain), 1.20 MB, created by
Arjan
on 2013-03-09 12:39:24 UTC
(
hide
)
Description:
k3b output
Filename:
MIME Type:
Creator:
Arjan
Created:
2013-03-09 12:39:24 UTC
Size:
1.20 MB
patch
obsolete
>Burned media >----------------------- >BD-R Sequential (SRM) > >Devices >----------------------- >PIONEER BD-RW BDR-208D 1.10 (/dev/sr1, CD-R, CD-RW, CD-ROM, DVD-ROM, DVD-R, DVD-RW, DVD-R DL, BD-ROM, BD-R, BD-RE, DVD+R, DVD+RW, DVD+R DL) [DVD-ROM, DVD-R Sequential, DVD-R Dual Layer Sequential, DVD-R Dual Layer Jump, DVD-RW Restricted Overwrite, DVD-RW Sequential, DVD+RW, DVD+R, DVD+R Dual Layer, CD-ROM, CD-R, CD-RW, BD-ROM, BD-R Sequential (SRM), BD-R Random (RRM), BD-RE] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R16, RAW/R96P, RAW/R96R, Restricted Overwrite, Layer Jump, Random Recording, Sequential Recording, Sequential Recording + POW] [%7] >PLEXTOR DVDR PX-L890SA 1.03 (/dev/sr0, CD-R, CD-RW, CD-ROM, DVD-ROM, DVD-R, DVD-RW, DVD-R DL, DVD+R, DVD+RW, DVD+R DL) [DVD-ROM, DVD-R Sequential, DVD-R Dual Layer Sequential, DVD-R Dual Layer Jump, DVD-RAM, DVD-RW Restricted Overwrite, DVD-RW Sequential, DVD+RW, DVD+R, DVD+R Dual Layer, CD-ROM, CD-R, CD-RW] [SAO, TAO, RAW, SAO/R96P, SAO/R96R, RAW/R16, RAW/R96P, RAW/R96R, Restricted Overwrite, Layer Jump] [%7] > >K3b::IsoImager >----------------------- >mkisofs print size result: 11856074 (24281239552 bytes) > >System >----------------------- >K3b Version: 2.0.2 >KDE Version: 4.9.5 >QT Version: 4.8.4 >Kernel: 3.8.1-201.fc18.x86_64 > >Used versions >----------------------- >mkisofs: 1.1.11 >growisofs: 7.1 > >growisofs >----------------------- >Executing 'builtin_dd if=/dev/fd/0 of=/dev/sr1 obs=32k seek=0' >/dev/sr1: pre-formatting blank BD-R for 24.8GB... >/dev/sr1: "Current Write Speed" is 4.1x4390KBps. > 10944512/24281239552 ( 0.0%) @0.6x, remaining 184:47 RBU 100.0% UBU 1.9% > 32178176/24281239552 ( 0.1%) @1.4x, remaining 100:28 RBU 100.0% UBU 44.2% > 54099968/24281239552 ( 0.2%) @1.5x, remaining 82:06 RBU 100.0% UBU 13.5% > 75956224/24281239552 ( 0.3%) @1.5x, remaining 79:40 RBU 100.0% UBU 100.0% > 97812480/24281239552 ( 0.4%) @1.5x, remaining 74:10 RBU 100.0% UBU 48.1% > 119734272/24281239552 ( 0.5%) @1.5x, remaining 70:37 RBU 100.0% UBU 100.0% > 142344192/24281239552 ( 0.6%) @1.5x, remaining 70:39 RBU 100.0% UBU 100.0% > 163577856/24281239552 ( 0.7%) @1.4x, remaining 68:48 RBU 100.0% UBU 100.0% > 184811520/24281239552 ( 0.8%) @1.4x, remaining 67:21 RBU 100.0% UBU 100.0% > 206241792/24281239552 ( 0.8%) @1.4x, remaining 68:05 RBU 100.0% UBU 44.2% > 228130816/24281239552 ( 0.9%) @1.5x, remaining 66:46 RBU 100.0% UBU 51.9% > 249757696/24281239552 ( 1.0%) @1.4x, remaining 65:44 RBU 100.0% UBU 100.0% > 272367616/24281239552 ( 1.1%) @1.5x, remaining 66:06 RBU 100.0% UBU 100.0% > 293732352/24281239552 ( 1.2%) @1.4x, remaining 65:19 RBU 100.0% UBU 100.0% > 314834944/24281239552 ( 1.3%) @1.4x, remaining 64:42 RBU 100.0% UBU 100.0% > 336822272/24281239552 ( 1.4%) @1.5x, remaining 65:09 RBU 100.0% UBU 100.0% > 358252544/24281239552 ( 1.5%) @1.4x, remaining 64:33 RBU 100.0% UBU 17.3% > 379650048/24281239552 ( 1.6%) @1.4x, remaining 64:00 RBU 100.0% UBU 100.0% > 402063360/24281239552 ( 1.7%) @1.5x, remaining 64:20 RBU 100.0% UBU 100.0% > 423297024/24281239552 ( 1.7%) @1.4x, remaining 63:52 RBU 100.0% UBU 100.0% > 445612032/24281239552 ( 1.8%) @1.5x, remaining 63:17 RBU 100.0% UBU 100.0% > 465698816/24281239552 ( 1.9%) @1.3x, remaining 63:55 RBU 100.0% UBU 98.1% > 486866944/24281239552 ( 2.0%) @1.4x, remaining 63:32 RBU 100.0% UBU 36.5% > 508624896/24281239552 ( 2.1%) @1.5x, remaining 63:05 RBU 100.0% UBU 100.0% > 530579456/24281239552 ( 2.2%) @1.5x, remaining 63:24 RBU 100.0% UBU 100.0% > 550305792/24281239552 ( 2.3%) @1.3x, remaining 63:14 RBU 100.0% UBU 51.9% > 571310080/24281239552 ( 2.4%) @1.4x, remaining 62:56 RBU 100.0% UBU 75.0% > 591953920/24281239552 ( 2.4%) @1.4x, remaining 63:21 RBU 100.0% UBU 100.0% > 612564992/24281239552 ( 2.5%) @1.4x, remaining 63:06 RBU 100.0% UBU 51.9% > 633667584/24281239552 ( 2.6%) @1.4x, remaining 62:49 RBU 100.0% UBU 100.0% > 654835712/24281239552 ( 2.7%) @1.4x, remaining 63:08 RBU 100.0% UBU 75.0% > 675938304/24281239552 ( 2.8%) @1.4x, remaining 62:51 RBU 100.0% UBU 100.0% > 697499648/24281239552 ( 2.9%) @1.4x, remaining 62:33 RBU 100.0% UBU 100.0% > 719585280/24281239552 ( 3.0%) @1.5x, remaining 62:45 RBU 100.0% UBU 100.0% > 741539840/24281239552 ( 3.1%) @1.5x, remaining 62:25 RBU 100.0% UBU 100.0% > 763232256/24281239552 ( 3.1%) @1.4x, remaining 62:08 RBU 100.0% UBU 100.0% > 784859136/24281239552 ( 3.2%) @1.4x, remaining 62:22 RBU 100.0% UBU 100.0% > 807010304/24281239552 ( 3.3%) @1.5x, remaining 62:03 RBU 100.0% UBU 100.0% > 829620224/24281239552 ( 3.4%) @1.5x, remaining 61:43 RBU 100.0% UBU 100.0% > 851312640/24281239552 ( 3.5%) @1.4x, remaining 61:55 RBU 100.0% UBU 100.0% > 873201664/24281239552 ( 3.6%) @1.5x, remaining 61:39 RBU 100.0% UBU 100.0% > 895746048/24281239552 ( 3.7%) @1.5x, remaining 61:21 RBU 100.0% UBU 100.0% > 917504000/24281239552 ( 3.8%) @1.5x, remaining 61:32 RBU 100.0% UBU 100.0% > 939196416/24281239552 ( 3.9%) @1.4x, remaining 61:18 RBU 100.0% UBU 100.0% > 960692224/24281239552 ( 4.0%) @1.4x, remaining 61:05 RBU 100.0% UBU 100.0% > 983302144/24281239552 ( 4.0%) @1.5x, remaining 61:12 RBU 100.0% UBU 100.0% > 1004634112/24281239552 ( 4.1%) @1.4x, remaining 61:00 RBU 100.0% UBU 100.0% > 1026162688/24281239552 ( 4.2%) @1.4x, remaining 60:48 RBU 100.0% UBU 59.6% > 1047691264/24281239552 ( 4.3%) @1.4x, remaining 60:59 RBU 99.9% UBU 28.8% > 1069481984/24281239552 ( 4.4%) @1.5x, remaining 60:46 RBU 100.0% UBU 100.0% > 1090781184/24281239552 ( 4.5%) @1.4x, remaining 60:35 RBU 100.0% UBU 86.5% > 1110507520/24281239552 ( 4.6%) @1.3x, remaining 60:51 RBU 100.0% UBU 5.8% > 1131708416/24281239552 ( 4.7%) @1.4x, remaining 60:41 RBU 100.0% UBU 100.0% > 1152974848/24281239552 ( 4.7%) @1.4x, remaining 60:30 RBU 100.0% UBU 48.1% > 1174765568/24281239552 ( 4.8%) @1.5x, remaining 60:38 RBU 100.0% UBU 100.0% > 1196621824/24281239552 ( 4.9%) @1.5x, remaining 60:26 RBU 100.0% UBU 100.0% > 1218084864/24281239552 ( 5.0%) @1.4x, remaining 60:16 RBU 100.0% UBU 100.0% > 1240334336/24281239552 ( 5.1%) @1.5x, remaining 60:22 RBU 100.0% UBU 100.0% > 1261436928/24281239552 ( 5.2%) @1.4x, remaining 60:13 RBU 100.0% UBU 100.0% > 1283653632/24281239552 ( 5.3%) @1.5x, remaining 60:01 RBU 100.0% UBU 100.0% > 1305083904/24281239552 ( 5.4%) @1.4x, remaining 60:09 RBU 100.0% UBU 100.0% > 1326252032/24281239552 ( 5.5%) @1.4x, remaining 60:00 RBU 100.0% UBU 36.5% > 1346240512/24281239552 ( 5.5%) @1.3x, remaining 59:54 RBU 100.0% UBU 94.2% > 1368719360/24281239552 ( 5.6%) @1.5x, remaining 59:59 RBU 100.0% UBU 100.0% > 1389821952/24281239552 ( 5.7%) @1.4x, remaining 59:50 RBU 100.0% UBU 100.0% > 1410990080/24281239552 ( 5.8%) @1.4x, remaining 59:42 RBU 100.0% UBU 78.8% > 1432027136/24281239552 ( 5.9%) @1.4x, remaining 59:50 RBU 100.0% UBU 100.0% > 1453260800/24281239552 ( 6.0%) @1.4x, remaining 59:41 RBU 100.0% UBU 100.0% > 1475117056/24281239552 ( 6.1%) @1.5x, remaining 59:31 RBU 100.0% UBU 100.0% > 1495597056/24281239552 ( 6.2%) @1.4x, remaining 59:40 RBU 100.0% UBU 100.0% > 1516765184/24281239552 ( 6.2%) @1.4x, remaining 59:32 RBU 100.0% UBU 36.5% > 1538129920/24281239552 ( 6.3%) @1.4x, remaining 59:23 RBU 100.0% UBU 100.0% > 1559101440/24281239552 ( 6.4%) @1.4x, remaining 59:30 RBU 100.0% UBU 100.0% > 1581252608/24281239552 ( 6.5%) @1.5x, remaining 59:20 RBU 99.9% UBU 100.0% > 1601896448/24281239552 ( 6.6%) @1.4x, remaining 59:13 RBU 100.0% UBU 100.0% > 1624047616/24281239552 ( 6.7%) @1.5x, remaining 59:17 RBU 100.0% UBU 100.0% > 1640824832/24281239552 ( 6.8%) @1.1x, remaining 59:19 RBU 100.0% UBU 5.8% > 1662124032/24281239552 ( 6.8%) @1.4x, remaining 59:11 RBU 100.0% UBU 100.0% > 1684733952/24281239552 ( 6.9%) @1.5x, remaining 59:14 RBU 100.0% UBU 100.0% > 1706819584/24281239552 ( 7.0%) @1.5x, remaining 59:04 RBU 100.0% UBU 100.0% > 1728446464/24281239552 ( 7.1%) @1.4x, remaining 58:56 RBU 100.0% UBU 100.0% > 1749680128/24281239552 ( 7.2%) @1.4x, remaining 59:01 RBU 100.0% UBU 86.5% > 1772224512/24281239552 ( 7.3%) @1.5x, remaining 58:50 RBU 100.0% UBU 100.0% > 1793916928/24281239552 ( 7.4%) @1.4x, remaining 58:42 RBU 100.0% UBU 100.0% > 1815937024/24281239552 ( 7.5%) @1.5x, remaining 58:45 RBU 100.0% UBU 100.0% > 1838284800/24281239552 ( 7.6%) @1.5x, remaining 58:36 RBU 100.0% UBU 100.0% > 1859977216/24281239552 ( 7.7%) @1.4x, remaining 58:27 RBU 99.9% UBU 100.0% > 1880817664/24281239552 ( 7.7%) @1.4x, remaining 58:33 RBU 100.0% UBU 48.1% > 1902051328/24281239552 ( 7.8%) @1.4x, remaining 58:26 RBU 100.0% UBU 100.0% > 1924464640/24281239552 ( 7.9%) @1.5x, remaining 58:16 RBU 100.0% UBU 100.0% > 1945632768/24281239552 ( 8.0%) @1.4x, remaining 58:21 RBU 100.0% UBU 13.5% > 1967095808/24281239552 ( 8.1%) @1.4x, remaining 58:13 RBU 100.0% UBU 100.0% > 1989279744/24281239552 ( 8.2%) @1.5x, remaining 58:05 RBU 100.0% UBU 100.0% > 2010644480/24281239552 ( 8.3%) @1.4x, remaining 58:09 RBU 100.0% UBU 100.0% > 2032992256/24281239552 ( 8.4%) @1.5x, remaining 58:00 RBU 100.0% UBU 100.0% > 2054094848/24281239552 ( 8.5%) @1.4x, remaining 58:04 RBU 100.0% UBU 100.0% > 2076639232/24281239552 ( 8.6%) @1.5x, remaining 57:55 RBU 100.0% UBU 100.0% > 2096562176/24281239552 ( 8.6%) @1.3x, remaining 57:50 RBU 100.0% UBU 13.5% > 2118549504/24281239552 ( 8.7%) @1.5x, remaining 57:53 RBU 100.0% UBU 100.0% > 2139422720/24281239552 ( 8.8%) @1.4x, remaining 57:47 RBU 100.0% UBU 100.0% > 2161377280/24281239552 ( 8.9%) @1.5x, remaining 57:39 RBU 100.0% UBU 100.0% > 2181169152/24281239552 ( 9.0%) @1.3x, remaining 57:45 RBU 100.0% UBU 59.6% > 2202206208/24281239552 ( 9.1%) @1.4x, remaining 57:38 RBU 100.0% UBU 100.0% > 2223898624/24281239552 ( 9.2%) @1.4x, remaining 57:31 RBU 100.0% UBU 100.0% > 2245918720/24281239552 ( 9.2%) @1.5x, remaining 57:33 RBU 100.0% UBU 100.0% > 2266890240/24281239552 ( 9.3%) @1.4x, remaining 57:27 RBU 100.0% UBU 63.5% > 2288189440/24281239552 ( 9.4%) @1.4x, remaining 57:20 RBU 100.0% UBU 100.0% > 2309423104/24281239552 ( 9.5%) @1.4x, remaining 57:24 RBU 100.0% UBU 78.8% > 2330460160/24281239552 ( 9.6%) @1.4x, remaining 57:17 RBU 100.0% UBU 100.0% > 2351726592/24281239552 ( 9.7%) @1.4x, remaining 57:11 RBU 100.0% UBU 100.0% > 2372730880/24281239552 ( 9.8%) @1.4x, remaining 57:14 RBU 100.0% UBU 90.4% > 2393964544/24281239552 ( 9.9%) @1.4x, remaining 57:08 RBU 100.0% UBU 94.2% > 2415067136/24281239552 ( 9.9%) @1.4x, remaining 57:02 RBU 100.0% UBU 100.0% > 2436300800/24281239552 (10.0%) @1.4x, remaining 57:05 RBU 100.0% UBU 100.0% > 2457403392/24281239552 (10.1%) @1.4x, remaining 56:59 RBU 100.0% UBU 100.0% > 2478505984/24281239552 (10.2%) @1.4x, remaining 56:53 RBU 100.0% UBU 100.0% > 2499674112/24281239552 (10.3%) @1.4x, remaining 56:55 RBU 100.0% UBU 44.2% > 2520776704/24281239552 (10.4%) @1.4x, remaining 56:49 RBU 100.0% UBU 67.3% > 2541879296/24281239552 (10.5%) @1.4x, remaining 56:43 RBU 100.0% UBU 100.0% > 2562981888/24281239552 (10.6%) @1.4x, remaining 56:46 RBU 100.0% UBU 100.0% > 2584313856/24281239552 (10.6%) @1.4x, remaining 56:40 RBU 100.0% UBU 100.0% > 2605613056/24281239552 (10.7%) @1.4x, remaining 56:34 RBU 100.0% UBU 100.0% > 2627665920/24281239552 (10.8%) @1.5x, remaining 56:35 RBU 100.0% UBU 100.0% > 2648735744/24281239552 (10.9%) @1.4x, remaining 56:29 RBU 100.0% UBU 100.0% > 2670002176/24281239552 (11.0%) @1.4x, remaining 56:23 RBU 100.0% UBU 100.0% > 2691104768/24281239552 (11.1%) @1.4x, remaining 56:25 RBU 100.0% UBU 100.0% > 2713714688/24281239552 (11.2%) @1.5x, remaining 56:17 RBU 100.0% UBU 100.0% > 2731016192/24281239552 (11.2%) @1.2x, remaining 56:17 RBU 100.0% UBU 25.0% > 2749038592/24281239552 (11.3%) @1.2x, remaining 56:23 RBU 100.0% UBU 63.5% > 2770370560/24281239552 (11.4%) @1.4x, remaining 56:17 RBU 100.0% UBU 100.0% > 2792751104/24281239552 (11.5%) @1.5x, remaining 56:10 RBU 100.0% UBU 100.0% > 2814443520/24281239552 (11.6%) @1.4x, remaining 56:11 RBU 100.0% UBU 100.0% > 2835578880/24281239552 (11.7%) @1.4x, remaining 56:05 RBU 100.0% UBU 100.0% > 2857140224/24281239552 (11.8%) @1.4x, remaining 55:59 RBU 100.0% UBU 90.4% > 2878865408/24281239552 (11.9%) @1.4x, remaining 56:00 RBU 100.0% UBU 100.0% > 2901114880/24281239552 (11.9%) @1.5x, remaining 55:53 RBU 100.0% UBU 100.0% > 2922512384/24281239552 (12.0%) @1.4x, remaining 55:47 RBU 100.0% UBU 100.0% > 2944991232/24281239552 (12.1%) @1.5x, remaining 55:47 RBU 100.0% UBU 100.0% > 2966093824/24281239552 (12.2%) @1.4x, remaining 55:41 RBU 100.0% UBU 100.0% > 2987327488/24281239552 (12.3%) @1.4x, remaining 55:35 RBU 100.0% UBU 100.0% > 3009806336/24281239552 (12.4%) @1.5x, remaining 55:35 RBU 100.0% UBU 100.0% > 3029729280/24281239552 (12.5%) @1.3x, remaining 55:31 RBU 100.0% UBU 100.0% > 3051945984/24281239552 (12.6%) @1.5x, remaining 55:24 RBU 100.0% UBU 100.0% > 3073441792/24281239552 (12.7%) @1.4x, remaining 55:25 RBU 100.0% UBU 100.0% > 3095134208/24281239552 (12.7%) @1.4x, remaining 55:19 RBU 100.0% UBU 100.0% > 3117154304/24281239552 (12.8%) @1.5x, remaining 55:13 RBU 100.0% UBU 100.0% > 3138322432/24281239552 (12.9%) @1.4x, remaining 55:14 RBU 100.0% UBU 100.0% > 3160637440/24281239552 (13.0%) @1.5x, remaining 55:07 RBU 100.0% UBU 100.0% > 3181772800/24281239552 (13.1%) @1.4x, remaining 55:02 RBU 100.0% UBU 100.0% > 3203006464/24281239552 (13.2%) @1.4x, remaining 55:03 RBU 100.0% UBU 100.0% > 3224371200/24281239552 (13.3%) @1.4x, remaining 54:57 RBU 100.0% UBU 100.0% > 3245277184/24281239552 (13.4%) @1.4x, remaining 54:52 RBU 100.0% UBU 9.6% > 3266510848/24281239552 (13.5%) @1.4x, remaining 54:53 RBU 100.0% UBU 100.0% > 3286302720/24281239552 (13.5%) @1.3x, remaining 54:50 RBU 100.0% UBU 28.8% > 3303407616/24281239552 (13.6%) @1.1x, remaining 54:49 RBU 100.0% UBU 67.3% > 3324444672/24281239552 (13.7%) @1.4x, remaining 54:50 RBU 100.0% UBU 100.0% > 3345678336/24281239552 (13.8%) @1.4x, remaining 54:45 RBU 100.0% UBU 100.0% > 3367698432/24281239552 (13.9%) @1.5x, remaining 54:38 RBU 100.0% UBU 100.0% > 3388080128/24281239552 (14.0%) @1.4x, remaining 54:40 RBU 100.0% UBU 78.8% > 3410690048/24281239552 (14.0%) @1.5x, remaining 54:33 RBU 100.0% UBU 100.0% > 3431989248/24281239552 (14.1%) @1.4x, remaining 54:28 RBU 100.0% UBU 94.2% > 3436707840/24281239552 (14.2%) @0.3x, remaining 54:47 RBU 100.0% UBU 100.0% > 3459121152/24281239552 (14.2%) @1.5x, remaining 54:40 RBU 100.0% UBU 100.0% > 3481731072/24281239552 (14.3%) @1.5x, remaining 54:33 RBU 100.0% UBU 100.0% > 3503751168/24281239552 (14.4%) @1.5x, remaining 54:33 RBU 100.0% UBU 100.0% > 3525705728/24281239552 (14.5%) @1.5x, remaining 54:27 RBU 100.0% UBU 100.0% > 3548053504/24281239552 (14.6%) @1.5x, remaining 54:20 RBU 100.0% UBU 100.0% > 3570237440/24281239552 (14.7%) @1.5x, remaining 54:20 RBU 100.0% UBU 75.0% > 3587571712/24281239552 (14.8%) @1.2x, remaining 54:19 RBU 100.0% UBU 17.3% > 3587571712/24281239552 (14.8%) @0.0x, remaining 54:36 RBU 100.0% UBU 100.0% > 3601334272/24281239552 (14.8%) @0.9x, remaining 54:44 RBU 100.0% UBU 55.8% > 3623026688/24281239552 (14.9%) @1.4x, remaining 54:38 RBU 100.0% UBU 100.0% > 3645177856/24281239552 (15.0%) @1.5x, remaining 54:32 RBU 100.0% UBU 17.3% > 3666345984/24281239552 (15.1%) @1.4x, remaining 54:32 RBU 100.0% UBU 5.8% > 3688923136/24281239552 (15.2%) @1.5x, remaining 54:25 RBU 100.0% UBU 100.0% > 3710124032/24281239552 (15.3%) @1.4x, remaining 54:20 RBU 100.0% UBU 100.0% > 3731488768/24281239552 (15.4%) @1.4x, remaining 54:20 RBU 100.0% UBU 9.6% > 3753902080/24281239552 (15.5%) @1.5x, remaining 54:13 RBU 100.0% UBU 100.0% > 3775135744/24281239552 (15.5%) @1.4x, remaining 54:08 RBU 100.0% UBU 17.3% > 3796303872/24281239552 (15.6%) @1.4x, remaining 54:08 RBU 100.0% UBU 100.0% > 3818881024/24281239552 (15.7%) @1.5x, remaining 54:01 RBU 100.0% UBU 100.0% > 3840147456/24281239552 (15.8%) @1.4x, remaining 53:56 RBU 100.0% UBU 5.8% > 3861250048/24281239552 (15.9%) @1.4x, remaining 53:56 RBU 100.0% UBU 100.0% > 3883761664/24281239552 (16.0%) @1.5x, remaining 53:49 RBU 100.0% UBU 100.0% > 3904962560/24281239552 (16.1%) @1.4x, remaining 53:44 RBU 100.0% UBU 100.0% > 3926753280/24281239552 (16.2%) @1.5x, remaining 53:44 RBU 100.0% UBU 100.0% > 3948675072/24281239552 (16.3%) @1.5x, remaining 53:38 RBU 100.0% UBU 100.0% > 3971284992/24281239552 (16.4%) @1.5x, remaining 53:31 RBU 100.0% UBU 100.0% > 3992616960/24281239552 (16.4%) @1.4x, remaining 53:31 RBU 99.9% UBU 100.0% > 4014669824/24281239552 (16.5%) @1.5x, remaining 53:25 RBU 100.0% UBU 100.0% > 4036034560/24281239552 (16.6%) @1.4x, remaining 53:20 RBU 100.0% UBU 100.0% > 4057137152/24281239552 (16.7%) @1.4x, remaining 53:20 RBU 100.0% UBU 100.0% > 4078239744/24281239552 (16.8%) @1.4x, remaining 53:15 RBU 100.0% UBU 100.0% > 4100554752/24281239552 (16.9%) @1.5x, remaining 53:09 RBU 100.0% UBU 100.0% > 4121952256/24281239552 (17.0%) @1.4x, remaining 53:08 RBU 100.0% UBU 100.0% > 4141744128/24281239552 (17.1%) @1.3x, remaining 53:04 RBU 100.0% UBU 94.2% > 4163108864/24281239552 (17.1%) @1.4x, remaining 52:59 RBU 100.0% UBU 100.0% > 4185456640/24281239552 (17.2%) @1.5x, remaining 52:58 RBU 100.0% UBU 100.0% > 4206821376/24281239552 (17.3%) @1.4x, remaining 52:53 RBU 100.0% UBU 82.7% > 4229431296/24281239552 (17.4%) @1.5x, remaining 52:46 RBU 100.0% UBU 100.0% > 4251058176/24281239552 (17.5%) @1.4x, remaining 52:46 RBU 100.0% UBU 75.0% > 4274257920/24281239552 (17.6%) @1.5x, remaining 52:39 RBU 100.0% UBU 100.0% > 4297261056/24281239552 (17.7%) @1.5x, remaining 52:32 RBU 100.0% UBU 100.0% > 4319870976/24281239552 (17.8%) @1.5x, remaining 52:31 RBU 100.0% UBU 100.0% > 4342349824/24281239552 (17.9%) @1.5x, remaining 52:25 RBU 100.0% UBU 100.0% > 4365221888/24281239552 (18.0%) @1.5x, remaining 52:18 RBU 100.0% UBU 40.4% > 4386455552/24281239552 (18.1%) @1.4x, remaining 52:18 RBU 100.0% UBU 25.0% > 4409065472/24281239552 (18.2%) @1.5x, remaining 52:12 RBU 100.0% UBU 100.0% > 4431675392/24281239552 (18.3%) @1.5x, remaining 52:06 RBU 100.0% UBU 100.0% > 4454154240/24281239552 (18.3%) @1.5x, remaining 52:04 RBU 100.0% UBU 100.0% > 4476764160/24281239552 (18.4%) @1.5x, remaining 51:58 RBU 100.0% UBU 100.0% > 4499111936/24281239552 (18.5%) @1.5x, remaining 51:53 RBU 100.0% UBU 63.5% > 4520607744/24281239552 (18.6%) @1.4x, remaining 51:52 RBU 100.0% UBU 32.7% > 4543217664/24281239552 (18.7%) @1.5x, remaining 51:46 RBU 100.0% UBU 100.0% > 4565827584/24281239552 (18.8%) @1.5x, remaining 51:44 RBU 100.0% UBU 51.9% > 4586995712/24281239552 (18.9%) @1.4x, remaining 51:39 RBU 100.0% UBU 5.8% > 4609605632/24281239552 (19.0%) @1.5x, remaining 51:33 RBU 100.0% UBU 100.0% > 4632215552/24281239552 (19.1%) @1.5x, remaining 51:32 RBU 100.0% UBU 100.0% > 4654825472/24281239552 (19.2%) @1.5x, remaining 51:26 RBU 100.0% UBU 100.0% > 4676124672/24281239552 (19.3%) @1.4x, remaining 51:21 RBU 100.0% UBU 9.6% > 4697292800/24281239552 (19.3%) @1.4x, remaining 51:21 RBU 100.0% UBU 17.3% > 4718526464/24281239552 (19.4%) @1.4x, remaining 51:16 RBU 100.0% UBU 100.0% > 4741136384/24281239552 (19.5%) @1.5x, remaining 51:10 RBU 100.0% UBU 100.0% > 4763746304/24281239552 (19.6%) @1.5x, remaining 51:08 RBU 100.0% UBU 100.0% > 4786356224/24281239552 (19.7%) @1.5x, remaining 51:02 RBU 100.0% UBU 100.0% > 4808966144/24281239552 (19.8%) @1.5x, remaining 50:57 RBU 100.0% UBU 100.0% > 4831543296/24281239552 (19.9%) @1.5x, remaining 50:55 RBU 100.0% UBU 100.0% > 4852744192/24281239552 (20.0%) @1.4x, remaining 50:50 RBU 100.0% UBU 21.2% > 4875223040/24281239552 (20.1%) @1.5x, remaining 50:45 RBU 100.0% UBU 100.0% > 4897538048/24281239552 (20.2%) @1.5x, remaining 50:43 RBU 100.0% UBU 5.8% > 4919590912/24281239552 (20.3%) @1.5x, remaining 50:38 RBU 100.0% UBU 100.0% > 4941807616/24281239552 (20.4%) @1.5x, remaining 50:32 RBU 100.0% UBU 100.0% > 4964319232/24281239552 (20.4%) @1.5x, remaining 50:31 RBU 100.0% UBU 100.0% > 4985782272/24281239552 (20.5%) @1.4x, remaining 50:26 RBU 100.0% UBU 51.9% > 5007015936/24281239552 (20.6%) @1.4x, remaining 50:21 RBU 100.0% UBU 100.0% > 5029527552/24281239552 (20.7%) @1.5x, remaining 50:20 RBU 100.0% UBU 32.7% > 5050728448/24281239552 (20.8%) @1.4x, remaining 50:15 RBU 100.0% UBU 21.2% > 5073338368/24281239552 (20.9%) @1.5x, remaining 50:09 RBU 100.0% UBU 100.0% > 5094572032/24281239552 (21.0%) @1.4x, remaining 50:09 RBU 100.0% UBU 90.4% > 5117116416/24281239552 (21.1%) @1.5x, remaining 50:03 RBU 100.0% UBU 100.0% > 5139431424/24281239552 (21.2%) @1.5x, remaining 49:58 RBU 100.0% UBU 100.0% > 5160960000/24281239552 (21.3%) @1.4x, remaining 49:57 RBU 100.0% UBU 75.0% > 5183373312/24281239552 (21.3%) @1.5x, remaining 49:51 RBU 100.0% UBU 100.0% > 5205065728/24281239552 (21.4%) @1.4x, remaining 49:46 RBU 100.0% UBU 100.0% > 5225480192/24281239552 (21.5%) @1.4x, remaining 49:46 RBU 100.0% UBU 32.7% > 5246976000/24281239552 (21.6%) @1.4x, remaining 49:41 RBU 100.0% UBU 100.0% > 5269553152/24281239552 (21.7%) @1.5x, remaining 49:36 RBU 100.0% UBU 100.0% > 5292163072/24281239552 (21.8%) @1.5x, remaining 49:34 RBU 100.0% UBU 100.0% > 5313527808/24281239552 (21.9%) @1.4x, remaining 49:29 RBU 100.0% UBU 100.0% > 5335777280/24281239552 (22.0%) @1.5x, remaining 49:24 RBU 100.0% UBU 75.0% > 5357109248/24281239552 (22.1%) @1.4x, remaining 49:23 RBU 100.0% UBU 100.0% > 5378998272/24281239552 (22.2%) @1.5x, remaining 49:18 RBU 100.0% UBU 100.0% > 5400952832/24281239552 (22.2%) @1.5x, remaining 49:13 RBU 100.0% UBU 100.0% > 5423562752/24281239552 (22.3%) @1.5x, remaining 49:11 RBU 100.0% UBU 100.0% > 5444796416/24281239552 (22.4%) @1.4x, remaining 49:07 RBU 100.0% UBU 100.0% > 5467406336/24281239552 (22.5%) @1.5x, remaining 49:02 RBU 100.0% UBU 100.0% > 5489721344/24281239552 (22.6%) @1.5x, remaining 49:00 RBU 100.0% UBU 100.0% > 5511053312/24281239552 (22.7%) @1.4x, remaining 48:55 RBU 100.0% UBU 100.0% > 5532811264/24281239552 (22.8%) @1.5x, remaining 48:51 RBU 100.0% UBU 67.3% > 5554831360/24281239552 (22.9%) @1.5x, remaining 48:49 RBU 100.0% UBU 100.0% > 5577441280/24281239552 (23.0%) @1.5x, remaining 48:44 RBU 100.0% UBU 100.0% > 5598543872/24281239552 (23.1%) @1.4x, remaining 48:39 RBU 100.0% UBU 100.0% > 5621088256/24281239552 (23.1%) @1.5x, remaining 48:37 RBU 100.0% UBU 100.0% > 5642190848/24281239552 (23.2%) @1.4x, remaining 48:33 RBU 100.0% UBU 100.0% > 5664735232/24281239552 (23.3%) @1.5x, remaining 48:28 RBU 100.0% UBU 100.0% > 5686329344/24281239552 (23.4%) @1.4x, remaining 48:27 RBU 100.0% UBU 100.0% > 5707333632/24281239552 (23.5%) @1.4x, remaining 48:22 RBU 100.0% UBU 25.0% > 5729091584/24281239552 (23.6%) @1.5x, remaining 48:18 RBU 100.0% UBU 100.0% > 5750849536/24281239552 (23.7%) @1.5x, remaining 48:16 RBU 100.0% UBU 100.0% > 5770641408/24281239552 (23.8%) @1.3x, remaining 48:13 RBU 100.0% UBU 78.8% > 5792169984/24281239552 (23.9%) @1.4x, remaining 48:08 RBU 100.0% UBU 100.0% > 5814353920/24281239552 (23.9%) @1.5x, remaining 48:07 RBU 100.0% UBU 100.0% > 5835456512/24281239552 (24.0%) @1.4x, remaining 48:02 RBU 100.0% UBU 100.0% > 5857673216/24281239552 (24.1%) @1.5x, remaining 47:57 RBU 100.0% UBU 25.0% > 5880315904/24281239552 (24.2%) @1.5x, remaining 47:55 RBU 100.0% UBU 100.0% > 5903286272/24281239552 (24.3%) @1.5x, remaining 47:50 RBU 100.0% UBU 100.0% > 5925339136/24281239552 (24.4%) @1.5x, remaining 47:45 RBU 100.0% UBU 100.0% > 5947195392/24281239552 (24.5%) @1.5x, remaining 47:43 RBU 100.0% UBU 100.0% > 5969248256/24281239552 (24.6%) @1.5x, remaining 47:39 RBU 100.0% UBU 100.0% > 5992415232/24281239552 (24.7%) @1.5x, remaining 47:33 RBU 99.6% UBU 100.0% > 6015156224/24281239552 (24.8%) @1.5x, remaining 47:31 RBU 100.0% UBU 100.0% > 6036848640/24281239552 (24.9%) @1.4x, remaining 47:26 RBU 100.0% UBU 78.8% > 6059917312/24281239552 (25.0%) @1.5x, remaining 47:21 RBU 100.0% UBU 100.0% > 6081675264/24281239552 (25.0%) @1.5x, remaining 47:19 RBU 100.0% UBU 100.0% > 6104416256/24281239552 (25.1%) @1.5x, remaining 47:14 RBU 100.0% UBU 100.0% > 6126960640/24281239552 (25.2%) @1.5x, remaining 47:09 RBU 100.0% UBU 100.0% > 6149570560/24281239552 (25.3%) @1.5x, remaining 47:07 RBU 100.0% UBU 100.0% > 6171590656/24281239552 (25.4%) @1.5x, remaining 47:02 RBU 100.0% UBU 100.0% > 6194462720/24281239552 (25.5%) @1.5x, remaining 46:57 RBU 99.9% UBU 100.0% > 6216024064/24281239552 (25.6%) @1.4x, remaining 46:56 RBU 100.0% UBU 28.8% > 6238765056/24281239552 (25.7%) @1.5x, remaining 46:51 RBU 100.0% UBU 100.0% > 6260097024/24281239552 (25.8%) @1.4x, remaining 46:46 RBU 100.0% UBU 78.8% > 6282674176/24281239552 (25.9%) @1.5x, remaining 46:44 RBU 100.0% UBU 100.0% > 6302466048/24281239552 (26.0%) @1.3x, remaining 46:41 RBU 100.0% UBU 90.4% > 6325010432/24281239552 (26.0%) @1.5x, remaining 46:36 RBU 100.0% UBU 100.0% > 6347685888/24281239552 (26.1%) @1.5x, remaining 46:34 RBU 100.0% UBU 100.0% > 6368854016/24281239552 (26.2%) @1.4x, remaining 46:29 RBU 100.0% UBU 78.8% > 6391463936/24281239552 (26.3%) @1.5x, remaining 46:25 RBU 100.0% UBU 100.0% > 6414073856/24281239552 (26.4%) @1.5x, remaining 46:22 RBU 100.0% UBU 100.0% > 6436683776/24281239552 (26.5%) @1.5x, remaining 46:17 RBU 100.0% UBU 100.0% > 6459293696/24281239552 (26.6%) @1.5x, remaining 46:12 RBU 100.0% UBU 100.0% > 6481903616/24281239552 (26.7%) @1.5x, remaining 46:10 RBU 100.0% UBU 100.0% > 6503563264/24281239552 (26.8%) @1.4x, remaining 46:06 RBU 100.0% UBU 75.0% > 6525911040/24281239552 (26.9%) @1.5x, remaining 46:01 RBU 100.0% UBU 100.0% > 6548488192/24281239552 (27.0%) @1.5x, remaining 45:59 RBU 100.0% UBU 36.5% > 6571032576/24281239552 (27.1%) @1.5x, remaining 45:54 RBU 100.0% UBU 100.0% > 6593282048/24281239552 (27.2%) @1.5x, remaining 45:49 RBU 100.0% UBU 100.0% > 6615465984/24281239552 (27.2%) @1.5x, remaining 45:47 RBU 100.0% UBU 100.0% > 6637617152/24281239552 (27.3%) @1.5x, remaining 45:43 RBU 100.0% UBU 100.0% > 6659768320/24281239552 (27.4%) @1.5x, remaining 45:38 RBU 100.0% UBU 100.0% > 6682378240/24281239552 (27.5%) @1.5x, remaining 45:36 RBU 100.0% UBU 100.0% > 6704463872/24281239552 (27.6%) @1.5x, remaining 45:31 RBU 100.0% UBU 100.0% > 6726483968/24281239552 (27.7%) @1.5x, remaining 45:27 RBU 100.0% UBU 100.0% > 6748831744/24281239552 (27.8%) @1.5x, remaining 45:25 RBU 100.0% UBU 100.0% > 6771015680/24281239552 (27.9%) @1.5x, remaining 45:20 RBU 100.0% UBU 98.1% > 6792871936/24281239552 (28.0%) @1.5x, remaining 45:16 RBU 100.0% UBU 100.0% > 6815219712/24281239552 (28.1%) @1.5x, remaining 45:14 RBU 100.0% UBU 100.0% > 6837633024/24281239552 (28.2%) @1.5x, remaining 45:09 RBU 100.0% UBU 32.7% > 6857555968/24281239552 (28.2%) @1.3x, remaining 45:05 RBU 100.0% UBU 100.0% > 6880034816/24281239552 (28.3%) @1.5x, remaining 45:03 RBU 100.0% UBU 100.0% > 6902644736/24281239552 (28.4%) @1.5x, remaining 44:58 RBU 100.0% UBU 100.0% > 6925254656/24281239552 (28.5%) @1.5x, remaining 44:54 RBU 100.0% UBU 100.0% > 6946488320/24281239552 (28.6%) @1.4x, remaining 44:52 RBU 100.0% UBU 9.6% > 6969098240/24281239552 (28.7%) @1.5x, remaining 44:47 RBU 100.0% UBU 100.0% > 6990331904/24281239552 (28.8%) @1.4x, remaining 44:43 RBU 100.0% UBU 36.5% > 7012941824/24281239552 (28.9%) @1.5x, remaining 44:41 RBU 100.0% UBU 100.0% > 7034175488/24281239552 (29.0%) @1.4x, remaining 44:37 RBU 100.0% UBU 100.0% > 7056621568/24281239552 (29.1%) @1.5x, remaining 44:32 RBU 100.0% UBU 100.0% > 7078084608/24281239552 (29.2%) @1.4x, remaining 44:31 RBU 100.0% UBU 100.0% > 7100366848/24281239552 (29.2%) @1.5x, remaining 44:26 RBU 100.0% UBU 100.0% > 7120683008/24281239552 (29.3%) @1.4x, remaining 44:23 RBU 100.0% UBU 25.0% > 7142834176/24281239552 (29.4%) @1.5x, remaining 44:20 RBU 100.0% UBU 100.0% > 7165444096/24281239552 (29.5%) @1.5x, remaining 44:16 RBU 100.0% UBU 100.0% > 7186677760/24281239552 (29.6%) @1.4x, remaining 44:12 RBU 100.0% UBU 100.0% > 7209025536/24281239552 (29.7%) @1.5x, remaining 44:09 RBU 100.0% UBU 100.0% > 7230455808/24281239552 (29.8%) @1.4x, remaining 44:05 RBU 100.0% UBU 51.9% > 7252312064/24281239552 (29.9%) @1.5x, remaining 44:03 RBU 100.0% UBU 100.0% > 7274168320/24281239552 (30.0%) @1.5x, remaining 43:59 RBU 100.0% UBU 100.0% > 7296712704/24281239552 (30.1%) @1.5x, remaining 43:54 RBU 100.0% UBU 100.0% > 7318667264/24281239552 (30.1%) @1.5x, remaining 43:52 RBU 100.0% UBU 100.0% > 7340359680/24281239552 (30.2%) @1.4x, remaining 43:48 RBU 100.0% UBU 100.0% > 7362969600/24281239552 (30.3%) @1.5x, remaining 43:44 RBU 100.0% UBU 100.0% > 7382761472/24281239552 (30.4%) @1.3x, remaining 43:43 RBU 100.0% UBU 75.0% > 7404847104/24281239552 (30.5%) @1.5x, remaining 43:38 RBU 100.0% UBU 100.0% > 7426539520/24281239552 (30.6%) @1.4x, remaining 43:34 RBU 100.0% UBU 40.4% > 7447773184/24281239552 (30.7%) @1.4x, remaining 43:32 RBU 100.0% UBU 40.4% > 7469268992/24281239552 (30.8%) @1.4x, remaining 43:28 RBU 100.0% UBU 100.0% > 7491190784/24281239552 (30.9%) @1.5x, remaining 43:24 RBU 100.0% UBU 17.3% > 7512850432/24281239552 (30.9%) @1.4x, remaining 43:22 RBU 100.0% UBU 75.0% > 7533985792/24281239552 (31.0%) @1.4x, remaining 43:18 RBU 100.0% UBU 100.0% > 7555907584/24281239552 (31.1%) @1.5x, remaining 43:14 RBU 100.0% UBU 90.4% > 7577796608/24281239552 (31.2%) @1.5x, remaining 43:12 RBU 100.0% UBU 5.8% > 7598899200/24281239552 (31.3%) @1.4x, remaining 43:08 RBU 100.0% UBU 100.0% > 7621181440/24281239552 (31.4%) @1.5x, remaining 43:03 RBU 100.0% UBU 100.0% > 7642775552/24281239552 (31.5%) @1.4x, remaining 43:01 RBU 100.0% UBU 44.2% > 7664041984/24281239552 (31.6%) @1.4x, remaining 42:57 RBU 100.0% UBU 82.7% > 7686160384/24281239552 (31.7%) @1.5x, remaining 42:53 RBU 100.0% UBU 100.0% > 7707754496/24281239552 (31.7%) @1.4x, remaining 42:51 RBU 100.0% UBU 100.0% > 7730364416/24281239552 (31.8%) @1.5x, remaining 42:47 RBU 100.0% UBU 100.0% > 7752843264/24281239552 (31.9%) @1.5x, remaining 42:42 RBU 100.0% UBU 100.0% > 7774765056/24281239552 (32.0%) @1.5x, remaining 42:40 RBU 100.0% UBU 100.0% > 7796555776/24281239552 (32.1%) @1.5x, remaining 42:36 RBU 100.0% UBU 100.0% > 7818018816/24281239552 (32.2%) @1.4x, remaining 42:32 RBU 100.0% UBU 100.0% > 7840399360/24281239552 (32.3%) @1.5x, remaining 42:29 RBU 100.0% UBU 100.0% > 7862943744/24281239552 (32.4%) @1.5x, remaining 42:25 RBU 100.0% UBU 100.0% > 7885488128/24281239552 (32.5%) @1.5x, remaining 42:20 RBU 100.0% UBU 100.0% > 7908098048/24281239552 (32.6%) @1.5x, remaining 42:18 RBU 100.0% UBU 100.0% > 7928020992/24281239552 (32.7%) @1.3x, remaining 42:15 RBU 100.0% UBU 90.4% > 7950925824/24281239552 (32.7%) @1.5x, remaining 42:10 RBU 100.0% UBU 100.0% > 7973928960/24281239552 (32.8%) @1.5x, remaining 42:07 RBU 100.0% UBU 100.0% > 7997292544/24281239552 (32.9%) @1.6x, remaining 42:02 RBU 100.0% UBU 100.0% > 8019902464/24281239552 (33.0%) @1.5x, remaining 41:58 RBU 100.0% UBU 100.0% > 8042512384/24281239552 (33.1%) @1.5x, remaining 41:55 RBU 100.0% UBU 100.0% > 8064860160/24281239552 (33.2%) @1.5x, remaining 41:51 RBU 100.0% UBU 100.0% > 8087797760/24281239552 (33.3%) @1.5x, remaining 41:46 RBU 100.0% UBU 100.0% > 8109129728/24281239552 (33.4%) @1.4x, remaining 41:44 RBU 100.0% UBU 100.0% > 8132362240/24281239552 (33.5%) @1.5x, remaining 41:40 RBU 100.0% UBU 100.0% > 8155561984/24281239552 (33.6%) @1.5x, remaining 41:35 RBU 100.0% UBU 100.0% > 8178368512/24281239552 (33.7%) @1.5x, remaining 41:32 RBU 100.0% UBU 100.0% > 8200945664/24281239552 (33.8%) @1.5x, remaining 41:28 RBU 100.0% UBU 100.0% > 8222343168/24281239552 (33.9%) @1.4x, remaining 41:24 RBU 100.0% UBU 63.5% > 8244953088/24281239552 (34.0%) @1.5x, remaining 41:21 RBU 100.0% UBU 100.0% > 8267563008/24281239552 (34.0%) @1.5x, remaining 41:17 RBU 100.0% UBU 100.0% > 8290172928/24281239552 (34.1%) @1.5x, remaining 41:12 RBU 100.0% UBU 100.0% > 8313012224/24281239552 (34.2%) @1.5x, remaining 41:10 RBU 99.9% UBU 100.0% > 8335884288/24281239552 (34.3%) @1.5x, remaining 41:05 RBU 100.0% UBU 100.0% > 8358789120/24281239552 (34.4%) @1.5x, remaining 41:01 RBU 100.0% UBU 100.0% > 8380612608/24281239552 (34.5%) @1.5x, remaining 40:58 RBU 100.0% UBU 63.5% > 8403222528/24281239552 (34.6%) @1.5x, remaining 40:54 RBU 100.0% UBU 100.0% > 8425832448/24281239552 (34.7%) @1.5x, remaining 40:50 RBU 100.0% UBU 100.0% > 8448376832/24281239552 (34.8%) @1.5x, remaining 40:47 RBU 100.0% UBU 100.0% > 8468234240/24281239552 (34.9%) @1.3x, remaining 40:44 RBU 100.0% UBU 21.2% > 8490647552/24281239552 (35.0%) @1.5x, remaining 40:40 RBU 100.0% UBU 98.1% > 8513323008/24281239552 (35.1%) @1.5x, remaining 40:37 RBU 100.0% UBU 100.0% > 8535998464/24281239552 (35.2%) @1.5x, remaining 40:32 RBU 100.0% UBU 100.0% > 8558608384/24281239552 (35.2%) @1.5x, remaining 40:28 RBU 100.0% UBU 100.0% > 8579842048/24281239552 (35.3%) @1.4x, remaining 40:26 RBU 100.0% UBU 13.5% > 8602222592/24281239552 (35.4%) @1.5x, remaining 40:22 RBU 100.0% UBU 32.7% > 8623751168/24281239552 (35.5%) @1.4x, remaining 40:18 RBU 100.0% UBU 100.0% > 8645705728/24281239552 (35.6%) @1.5x, remaining 40:16 RBU 100.0% UBU 36.5% > 8668217344/24281239552 (35.7%) @1.5x, remaining 40:11 RBU 100.0% UBU 100.0% > 8690663424/24281239552 (35.8%) @1.5x, remaining 40:07 RBU 100.0% UBU 100.0% > 8713076736/24281239552 (35.9%) @1.5x, remaining 40:04 RBU 100.0% UBU 100.0% > 8735522816/24281239552 (36.0%) @1.5x, remaining 40:00 RBU 100.0% UBU 100.0% > 8756789248/24281239552 (36.1%) @1.4x, remaining 39:56 RBU 100.0% UBU 75.0% > 8779530240/24281239552 (36.2%) @1.5x, remaining 39:54 RBU 100.0% UBU 36.5% > 8801845248/24281239552 (36.2%) @1.5x, remaining 39:50 RBU 100.0% UBU 100.0% > 8824160256/24281239552 (36.3%) @1.5x, remaining 39:45 RBU 100.0% UBU 100.0% > 8846376960/24281239552 (36.4%) @1.5x, remaining 39:43 RBU 100.0% UBU 100.0% > 8868855808/24281239552 (36.5%) @1.5x, remaining 39:39 RBU 100.0% UBU 100.0% > 8891105280/24281239552 (36.6%) @1.5x, remaining 39:34 RBU 99.9% UBU 100.0% > 8913485824/24281239552 (36.7%) @1.5x, remaining 39:32 RBU 100.0% UBU 100.0% > 8936095744/24281239552 (36.8%) @1.5x, remaining 39:28 RBU 100.0% UBU 100.0% > 8958705664/24281239552 (36.9%) @1.5x, remaining 39:23 RBU 100.0% UBU 100.0% > 8981315584/24281239552 (37.0%) @1.5x, remaining 39:21 RBU 100.0% UBU 100.0% > 8999534592/24281239552 (37.1%) @1.2x, remaining 39:18 RBU 100.0% UBU 63.5% > 9014476800/24281239552 (37.1%) @1.0x, remaining 39:17 RBU 100.0% UBU 100.0% > 9037086720/24281239552 (37.2%) @1.5x, remaining 39:14 RBU 100.0% UBU 100.0% > 9059074048/24281239552 (37.3%) @1.5x, remaining 39:10 RBU 100.0% UBU 100.0% > 9081028608/24281239552 (37.4%) @1.5x, remaining 39:06 RBU 100.0% UBU 100.0% > 9103343616/24281239552 (37.5%) @1.5x, remaining 39:04 RBU 100.0% UBU 21.2% > 9125527552/24281239552 (37.6%) @1.5x, remaining 39:00 RBU 100.0% UBU 100.0% > 9147383808/24281239552 (37.7%) @1.5x, remaining 38:56 RBU 100.0% UBU 100.0% > 9169534976/24281239552 (37.8%) @1.5x, remaining 38:53 RBU 100.0% UBU 100.0% > 9192144896/24281239552 (37.9%) @1.5x, remaining 38:49 RBU 100.0% UBU 100.0% > 9214754816/24281239552 (38.0%) @1.5x, remaining 38:45 RBU 100.0% UBU 100.0% > 9237299200/24281239552 (38.0%) @1.5x, remaining 38:42 RBU 100.0% UBU 100.0% > 9259057152/24281239552 (38.1%) @1.5x, remaining 38:38 RBU 99.9% UBU 100.0% > 9281011712/24281239552 (38.2%) @1.5x, remaining 38:34 RBU 100.0% UBU 100.0% > 9303621632/24281239552 (38.3%) @1.5x, remaining 38:31 RBU 100.0% UBU 100.0% > 9326231552/24281239552 (38.4%) @1.5x, remaining 38:27 RBU 100.0% UBU 100.0% > 9348087808/24281239552 (38.5%) @1.5x, remaining 38:23 RBU 100.0% UBU 100.0% > 9369944064/24281239552 (38.6%) @1.5x, remaining 38:21 RBU 100.0% UBU 100.0% > 9392553984/24281239552 (38.7%) @1.5x, remaining 38:16 RBU 100.0% UBU 100.0% > 9415163904/24281239552 (38.8%) @1.5x, remaining 38:12 RBU 100.0% UBU 100.0% > 9436332032/24281239552 (38.9%) @1.4x, remaining 38:10 RBU 100.0% UBU 86.5% > 9458876416/24281239552 (39.0%) @1.5x, remaining 38:06 RBU 100.0% UBU 100.0% > 9480306688/24281239552 (39.0%) @1.4x, remaining 38:02 RBU 100.0% UBU 100.0% > 9502392320/24281239552 (39.1%) @1.5x, remaining 38:00 RBU 100.0% UBU 86.5% > 9523888128/24281239552 (39.2%) @1.4x, remaining 37:56 RBU 100.0% UBU 100.0% > 9543942144/24281239552 (39.3%) @1.3x, remaining 37:52 RBU 100.0% UBU 59.6% > 9566289920/24281239552 (39.4%) @1.5x, remaining 37:50 RBU 100.0% UBU 100.0% > 9587523584/24281239552 (39.5%) @1.4x, remaining 37:46 RBU 100.0% UBU 100.0% > 9609084928/24281239552 (39.6%) @1.4x, remaining 37:42 RBU 100.0% UBU 100.0% > 9631301632/24281239552 (39.7%) @1.5x, remaining 37:40 RBU 100.0% UBU 100.0% > 9653911552/24281239552 (39.8%) @1.5x, remaining 37:36 RBU 100.0% UBU 100.0% > 9675309056/24281239552 (39.8%) @1.4x, remaining 37:32 RBU 100.0% UBU 100.0% > 9697624064/24281239552 (39.9%) @1.5x, remaining 37:29 RBU 100.0% UBU 100.0% > 9718792192/24281239552 (40.0%) @1.4x, remaining 37:26 RBU 100.0% UBU 71.2% > 9741402112/24281239552 (40.1%) @1.5x, remaining 37:21 RBU 100.0% UBU 94.2% > 9762504704/24281239552 (40.2%) @1.4x, remaining 37:19 RBU 100.0% UBU 100.0% > 9783738368/24281239552 (40.3%) @1.4x, remaining 37:16 RBU 100.0% UBU 90.4% > 9806249984/24281239552 (40.4%) @1.5x, remaining 37:13 RBU 100.0% UBU 100.0% > 9827516416/24281239552 (40.5%) @1.4x, remaining 37:09 RBU 100.0% UBU 5.8% > 9849307136/24281239552 (40.6%) @1.5x, remaining 37:05 RBU 100.0% UBU 100.0% > 9870966784/24281239552 (40.7%) @1.4x, remaining 37:03 RBU 100.0% UBU 51.9% > 9892528128/24281239552 (40.7%) @1.4x, remaining 36:59 RBU 100.0% UBU 71.2% > 9913696256/24281239552 (40.8%) @1.4x, remaining 36:55 RBU 100.0% UBU 9.6% > 9935224832/24281239552 (40.9%) @1.4x, remaining 36:53 RBU 99.9% UBU 100.0% > 9957408768/24281239552 (41.0%) @1.5x, remaining 36:49 RBU 100.0% UBU 100.0% > 9979428864/24281239552 (41.1%) @1.5x, remaining 36:45 RBU 100.0% UBU 100.0% >10001055744/24281239552 (41.2%) @1.4x, remaining 36:43 RBU 100.0% UBU 100.0% >10023665664/24281239552 (41.3%) @1.5x, remaining 36:39 RBU 99.6% UBU 100.0% >10043785216/24281239552 (41.4%) @1.3x, remaining 36:35 RBU 100.0% UBU 51.9% >10065575936/24281239552 (41.5%) @1.5x, remaining 36:33 RBU 100.0% UBU 100.0% >10086055936/24281239552 (41.5%) @1.4x, remaining 36:29 RBU 100.0% UBU 71.2% >10107420672/24281239552 (41.6%) @1.4x, remaining 36:26 RBU 100.0% UBU 100.0% >10129702912/24281239552 (41.7%) @1.5x, remaining 36:23 RBU 100.0% UBU 100.0% >10151329792/24281239552 (41.8%) @1.4x, remaining 36:19 RBU 100.0% UBU 100.0% >10173415424/24281239552 (41.9%) @1.5x, remaining 36:15 RBU 100.0% UBU 100.0% >10195042304/24281239552 (42.0%) @1.4x, remaining 36:13 RBU 100.0% UBU 100.0% >10216472576/24281239552 (42.1%) @1.4x, remaining 36:09 RBU 100.0% UBU 55.8% >10238361600/24281239552 (42.2%) @1.5x, remaining 36:05 RBU 100.0% UBU 100.0% >10259595264/24281239552 (42.3%) @1.4x, remaining 36:03 RBU 100.0% UBU 36.5% >10281582592/24281239552 (42.3%) @1.5x, remaining 35:59 RBU 100.0% UBU 100.0% >10303307776/24281239552 (42.4%) @1.4x, remaining 35:55 RBU 100.0% UBU 100.0% >10324606976/24281239552 (42.5%) @1.4x, remaining 35:53 RBU 100.0% UBU 51.9% >10345840640/24281239552 (42.6%) @1.4x, remaining 35:49 RBU 100.0% UBU 71.2% >10366943232/24281239552 (42.7%) @1.4x, remaining 35:46 RBU 100.0% UBU 100.0% >10388176896/24281239552 (42.8%) @1.4x, remaining 35:43 RBU 100.0% UBU 100.0% >10410786816/24281239552 (42.9%) @1.5x, remaining 35:39 RBU 100.0% UBU 100.0% >10431954944/24281239552 (43.0%) @1.4x, remaining 35:36 RBU 100.0% UBU 100.0% >10453057536/24281239552 (43.0%) @1.4x, remaining 35:33 RBU 100.0% UBU 100.0% >10475667456/24281239552 (43.1%) @1.5x, remaining 35:29 RBU 100.0% UBU 100.0% >10496770048/24281239552 (43.2%) @1.4x, remaining 35:26 RBU 100.0% UBU 100.0% >10519117824/24281239552 (43.3%) @1.5x, remaining 35:23 RBU 100.0% UBU 100.0% >10540548096/24281239552 (43.4%) @1.4x, remaining 35:19 RBU 100.0% UBU 36.5% >10561814528/24281239552 (43.5%) @1.4x, remaining 35:16 RBU 100.0% UBU 100.0% >10584260608/24281239552 (43.6%) @1.5x, remaining 35:13 RBU 100.0% UBU 100.0% >10605363200/24281239552 (43.7%) @1.4x, remaining 35:09 RBU 100.0% UBU 100.0% >10625417216/24281239552 (43.8%) @1.3x, remaining 35:06 RBU 100.0% UBU 98.1% >10647142400/24281239552 (43.8%) @1.4x, remaining 35:03 RBU 100.0% UBU 32.7% >10669129728/24281239552 (43.9%) @1.5x, remaining 35:00 RBU 100.0% UBU 100.0% >10690363392/24281239552 (44.0%) @1.4x, remaining 34:56 RBU 100.0% UBU 17.3% >10711597056/24281239552 (44.1%) @1.4x, remaining 34:54 RBU 100.0% UBU 55.8% >10734141440/24281239552 (44.2%) @1.5x, remaining 34:49 RBU 100.0% UBU 100.0% >10755899392/24281239552 (44.3%) @1.5x, remaining 34:46 RBU 100.0% UBU 100.0% >10777853952/24281239552 (44.4%) @1.5x, remaining 34:43 RBU 100.0% UBU 100.0% >10799579136/24281239552 (44.5%) @1.4x, remaining 34:39 RBU 100.0% UBU 100.0% >10820255744/24281239552 (44.6%) @1.4x, remaining 34:36 RBU 100.0% UBU 44.2% >10841948160/24281239552 (44.7%) @1.4x, remaining 34:33 RBU 100.0% UBU 98.1% >10864164864/24281239552 (44.7%) @1.5x, remaining 34:29 RBU 100.0% UBU 13.5% >10886774784/24281239552 (44.8%) @1.5x, remaining 34:25 RBU 100.0% UBU 100.0% >10908172288/24281239552 (44.9%) @1.4x, remaining 34:23 RBU 100.0% UBU 100.0% >10931175424/24281239552 (45.0%) @1.5x, remaining 34:19 RBU 100.0% UBU 100.0% >10954211328/24281239552 (45.1%) @1.5x, remaining 34:14 RBU 100.0% UBU 100.0% >10977148928/24281239552 (45.2%) @1.5x, remaining 34:11 RBU 100.0% UBU 100.0% >10999758848/24281239552 (45.3%) @1.5x, remaining 34:07 RBU 100.0% UBU 100.0% >11022368768/24281239552 (45.4%) @1.5x, remaining 34:03 RBU 100.0% UBU 100.0% >11044192256/24281239552 (45.5%) @1.5x, remaining 34:01 RBU 100.0% UBU 90.4% >11066343424/24281239552 (45.6%) @1.5x, remaining 33:57 RBU 100.0% UBU 71.2% >11088887808/24281239552 (45.7%) @1.5x, remaining 33:53 RBU 100.0% UBU 100.0% >11111497728/24281239552 (45.8%) @1.5x, remaining 33:50 RBU 100.0% UBU 100.0% >11134271488/24281239552 (45.9%) @1.5x, remaining 33:46 RBU 100.0% UBU 100.0% >11155767296/24281239552 (45.9%) @1.4x, remaining 33:42 RBU 100.0% UBU 21.2% >11175591936/24281239552 (46.0%) @1.3x, remaining 33:40 RBU 100.0% UBU 94.2% >11198496768/24281239552 (46.1%) @1.5x, remaining 33:36 RBU 100.0% UBU 100.0% >11221434368/24281239552 (46.2%) @1.5x, remaining 33:32 RBU 100.0% UBU 100.0% >11243225088/24281239552 (46.3%) @1.5x, remaining 33:29 RBU 100.0% UBU 100.0% >11265507328/24281239552 (46.4%) @1.5x, remaining 33:25 RBU 100.0% UBU 51.9% >11287199744/24281239552 (46.5%) @1.4x, remaining 33:21 RBU 100.0% UBU 71.2% >11309744128/24281239552 (46.6%) @1.5x, remaining 33:19 RBU 99.7% UBU 100.0% >11331174400/24281239552 (46.7%) @1.4x, remaining 33:15 RBU 100.0% UBU 100.0% >11353620480/24281239552 (46.8%) @1.5x, remaining 33:11 RBU 100.0% UBU 75.0% >11375083520/24281239552 (46.8%) @1.4x, remaining 33:08 RBU 100.0% UBU 44.2% >11396448256/24281239552 (46.9%) @1.4x, remaining 33:05 RBU 100.0% UBU 100.0% >11417812992/24281239552 (47.0%) @1.4x, remaining 33:01 RBU 100.0% UBU 44.2% >11440422912/24281239552 (47.1%) @1.5x, remaining 32:58 RBU 100.0% UBU 100.0% >11462672384/24281239552 (47.2%) @1.5x, remaining 32:54 RBU 100.0% UBU 44.2% >11484397568/24281239552 (47.3%) @1.4x, remaining 32:51 RBU 100.0% UBU 100.0% >11506941952/24281239552 (47.4%) @1.5x, remaining 32:48 RBU 100.0% UBU 100.0% >11528306688/24281239552 (47.5%) @1.4x, remaining 32:44 RBU 100.0% UBU 82.7% >11550916608/24281239552 (47.6%) @1.5x, remaining 32:40 RBU 100.0% UBU 100.0% >11573526528/24281239552 (47.7%) @1.5x, remaining 32:37 RBU 100.0% UBU 100.0% >11594760192/24281239552 (47.8%) @1.4x, remaining 32:34 RBU 100.0% UBU 100.0% >11616190464/24281239552 (47.8%) @1.4x, remaining 32:30 RBU 100.0% UBU 94.2% >11638571008/24281239552 (47.9%) @1.5x, remaining 32:27 RBU 100.0% UBU 100.0% >11659902976/24281239552 (48.0%) @1.4x, remaining 32:24 RBU 100.0% UBU 59.6% >11681267712/24281239552 (48.1%) @1.4x, remaining 32:20 RBU 100.0% UBU 9.6% >11703484416/24281239552 (48.2%) @1.5x, remaining 32:17 RBU 100.0% UBU 100.0% >11722948608/24281239552 (48.3%) @1.3x, remaining 32:14 RBU 100.0% UBU 28.8% >11745329152/24281239552 (48.4%) @1.5x, remaining 32:10 RBU 100.0% UBU 100.0% >11767676928/24281239552 (48.5%) @1.5x, remaining 32:07 RBU 100.0% UBU 100.0% >11790057472/24281239552 (48.6%) @1.5x, remaining 32:03 RBU 100.0% UBU 100.0% >11812667392/24281239552 (48.6%) @1.5x, remaining 32:00 RBU 100.0% UBU 100.0% >11835015168/24281239552 (48.7%) @1.5x, remaining 31:57 RBU 100.0% UBU 90.4% >11857231872/24281239552 (48.8%) @1.5x, remaining 31:53 RBU 100.0% UBU 100.0% >11879448576/24281239552 (48.9%) @1.5x, remaining 31:49 RBU 100.0% UBU 100.0% >11901730816/24281239552 (49.0%) @1.5x, remaining 31:46 RBU 100.0% UBU 100.0% >11924340736/24281239552 (49.1%) @1.5x, remaining 31:42 RBU 100.0% UBU 100.0% >11946950656/24281239552 (49.2%) @1.5x, remaining 31:38 RBU 100.0% UBU 100.0% >11968479232/24281239552 (49.3%) @1.4x, remaining 31:36 RBU 100.0% UBU 90.4% >11990859776/24281239552 (49.4%) @1.5x, remaining 31:32 RBU 100.0% UBU 94.2% >12013142016/24281239552 (49.5%) @1.5x, remaining 31:28 RBU 100.0% UBU 100.0% >12034637824/24281239552 (49.6%) @1.4x, remaining 31:25 RBU 100.0% UBU 17.3% >12057247744/24281239552 (49.7%) @1.5x, remaining 31:21 RBU 100.0% UBU 100.0% >12079726592/24281239552 (49.7%) @1.5x, remaining 31:17 RBU 100.0% UBU 100.0% >12100632576/24281239552 (49.8%) @1.4x, remaining 31:15 RBU 100.0% UBU 75.0% >12122587136/24281239552 (49.9%) @1.5x, remaining 31:11 RBU 100.0% UBU 100.0% >12145033216/24281239552 (50.0%) @1.5x, remaining 31:07 RBU 100.0% UBU 25.0% >12166889472/24281239552 (50.1%) @1.5x, remaining 31:04 RBU 100.0% UBU 100.0% >12188778496/24281239552 (50.2%) @1.5x, remaining 31:01 RBU 100.0% UBU 100.0% >12211388416/24281239552 (50.3%) @1.5x, remaining 30:57 RBU 100.0% UBU 100.0% >12233998336/24281239552 (50.4%) @1.5x, remaining 30:54 RBU 100.0% UBU 100.0% >12253790208/24281239552 (50.5%) @1.3x, remaining 30:51 RBU 100.0% UBU 9.6% >12276400128/24281239552 (50.6%) @1.5x, remaining 30:47 RBU 100.0% UBU 100.0% >12297568256/24281239552 (50.6%) @1.4x, remaining 30:44 RBU 100.0% UBU 25.0% >12320112640/24281239552 (50.7%) @1.5x, remaining 30:40 RBU 100.0% UBU 100.0% >12342198272/24281239552 (50.8%) @1.5x, remaining 30:36 RBU 100.0% UBU 100.0% >12363923456/24281239552 (50.9%) @1.4x, remaining 30:34 RBU 100.0% UBU 100.0% >12386369536/24281239552 (51.0%) @1.5x, remaining 30:30 RBU 100.0% UBU 100.0% >12408979456/24281239552 (51.1%) @1.5x, remaining 30:26 RBU 100.0% UBU 100.0% >12431392768/24281239552 (51.2%) @1.5x, remaining 30:23 RBU 100.0% UBU 100.0% >12452986880/24281239552 (51.3%) @1.4x, remaining 30:19 RBU 100.0% UBU 100.0% >12475301888/24281239552 (51.4%) @1.5x, remaining 30:16 RBU 100.0% UBU 100.0% >12497911808/24281239552 (51.5%) @1.5x, remaining 30:13 RBU 100.0% UBU 100.0% >12519145472/24281239552 (51.6%) @1.4x, remaining 30:09 RBU 100.0% UBU 51.9% >12540510208/24281239552 (51.6%) @1.4x, remaining 30:06 RBU 100.0% UBU 100.0% >12562923520/24281239552 (51.7%) @1.5x, remaining 30:03 RBU 100.0% UBU 100.0% >12584222720/24281239552 (51.8%) @1.4x, remaining 29:59 RBU 100.0% UBU 100.0% >12605456384/24281239552 (51.9%) @1.4x, remaining 29:56 RBU 100.0% UBU 28.8% >12626755584/24281239552 (52.0%) @1.4x, remaining 29:53 RBU 100.0% UBU 100.0% >12649168896/24281239552 (52.1%) @1.5x, remaining 29:49 RBU 100.0% UBU 100.0% >12670337024/24281239552 (52.2%) @1.4x, remaining 29:46 RBU 100.0% UBU 21.2% >12692946944/24281239552 (52.3%) @1.5x, remaining 29:43 RBU 100.0% UBU 100.0% >12715393024/24281239552 (52.4%) @1.5x, remaining 29:39 RBU 100.0% UBU 100.0% >12736790528/24281239552 (52.5%) @1.4x, remaining 29:36 RBU 100.0% UBU 100.0% >12759465984/24281239552 (52.5%) @1.5x, remaining 29:32 RBU 100.0% UBU 78.8% >12780503040/24281239552 (52.6%) @1.4x, remaining 29:29 RBU 100.0% UBU 100.0% >12800294912/24281239552 (52.7%) @1.3x, remaining 29:26 RBU 100.0% UBU 44.2% >12822904832/24281239552 (52.8%) @1.5x, remaining 29:23 RBU 100.0% UBU 100.0% >12844204032/24281239552 (52.9%) @1.4x, remaining 29:19 RBU 100.0% UBU 100.0% >12866486272/24281239552 (53.0%) @1.5x, remaining 29:16 RBU 100.0% UBU 100.0% >12888932352/24281239552 (53.1%) @1.5x, remaining 29:12 RBU 100.0% UBU 100.0% >12910198784/24281239552 (53.2%) @1.4x, remaining 29:09 RBU 100.0% UBU 100.0% >12932743168/24281239552 (53.3%) @1.5x, remaining 29:06 RBU 100.0% UBU 100.0% >12954763264/24281239552 (53.4%) @1.5x, remaining 29:02 RBU 100.0% UBU 100.0% >12976390144/24281239552 (53.4%) @1.4x, remaining 28:58 RBU 100.0% UBU 100.0% >12999000064/24281239552 (53.5%) @1.5x, remaining 28:55 RBU 100.0% UBU 100.0% >13020364800/24281239552 (53.6%) @1.4x, remaining 28:52 RBU 100.0% UBU 100.0% >13042057216/24281239552 (53.7%) @1.4x, remaining 28:48 RBU 100.0% UBU 100.0% >13063880704/24281239552 (53.8%) @1.5x, remaining 28:45 RBU 100.0% UBU 100.0% >13085048832/24281239552 (53.9%) @1.4x, remaining 28:42 RBU 100.0% UBU 100.0% >13107658752/24281239552 (54.0%) @1.5x, remaining 28:38 RBU 100.0% UBU 100.0% >13128826880/24281239552 (54.1%) @1.4x, remaining 28:35 RBU 100.0% UBU 51.9% >13150912512/24281239552 (54.2%) @1.5x, remaining 28:32 RBU 100.0% UBU 100.0% >13172539392/24281239552 (54.2%) @1.4x, remaining 28:28 RBU 100.0% UBU 100.0% >13195149312/24281239552 (54.3%) @1.5x, remaining 28:25 RBU 100.0% UBU 100.0% >13216251904/24281239552 (54.4%) @1.4x, remaining 28:22 RBU 100.0% UBU 51.9% >13237420032/24281239552 (54.5%) @1.4x, remaining 28:18 RBU 100.0% UBU 94.2% >13258588160/24281239552 (54.6%) @1.4x, remaining 28:15 RBU 100.0% UBU 100.0% >13279690752/24281239552 (54.7%) @1.4x, remaining 28:12 RBU 100.0% UBU 36.5% >13302235136/24281239552 (54.8%) @1.5x, remaining 28:08 RBU 100.0% UBU 100.0% >13323534336/24281239552 (54.9%) @1.4x, remaining 28:05 RBU 100.0% UBU 82.7% >13343326208/24281239552 (55.0%) @1.3x, remaining 28:02 RBU 100.0% UBU 17.3% >13364428800/24281239552 (55.0%) @1.4x, remaining 27:59 RBU 100.0% UBU 100.0% >13386612736/24281239552 (55.1%) @1.5x, remaining 27:56 RBU 100.0% UBU 100.0% >13408141312/24281239552 (55.2%) @1.4x, remaining 27:52 RBU 100.0% UBU 100.0% >13429243904/24281239552 (55.3%) @1.4x, remaining 27:49 RBU 100.0% UBU 32.7% >13451657216/24281239552 (55.4%) @1.5x, remaining 27:46 RBU 100.0% UBU 100.0% >13473087488/24281239552 (55.5%) @1.4x, remaining 27:42 RBU 100.0% UBU 98.1% >13494255616/24281239552 (55.6%) @1.4x, remaining 27:39 RBU 100.0% UBU 71.2% >13515358208/24281239552 (55.7%) @1.4x, remaining 27:36 RBU 100.0% UBU 100.0% >13536591872/24281239552 (55.7%) @1.4x, remaining 27:33 RBU 100.0% UBU 100.0% >13558022144/24281239552 (55.8%) @1.4x, remaining 27:29 RBU 100.0% UBU 100.0% >13579386880/24281239552 (55.9%) @1.4x, remaining 27:27 RBU 100.0% UBU 100.0% >13600817152/24281239552 (56.0%) @1.4x, remaining 27:23 RBU 100.0% UBU 100.0% >13622837248/24281239552 (56.1%) @1.5x, remaining 27:19 RBU 100.0% UBU 100.0% >13644201984/24281239552 (56.2%) @1.4x, remaining 27:17 RBU 100.0% UBU 100.0% >13666549760/24281239552 (56.3%) @1.5x, remaining 27:13 RBU 100.0% UBU 100.0% >13687914496/24281239552 (56.4%) @1.4x, remaining 27:09 RBU 100.0% UBU 100.0% >13709246464/24281239552 (56.5%) @1.4x, remaining 27:07 RBU 99.9% UBU 17.3% >13731332096/24281239552 (56.6%) @1.5x, remaining 27:03 RBU 100.0% UBU 100.0% >13752598528/24281239552 (56.6%) @1.4x, remaining 26:59 RBU 100.0% UBU 51.9% >13773733888/24281239552 (56.7%) @1.4x, remaining 26:57 RBU 100.0% UBU 100.0% >13796311040/24281239552 (56.8%) @1.5x, remaining 26:53 RBU 100.0% UBU 100.0% >13817413632/24281239552 (56.9%) @1.4x, remaining 26:50 RBU 100.0% UBU 100.0% >13839892480/24281239552 (57.0%) @1.5x, remaining 26:46 RBU 100.0% UBU 100.0% >13861060608/24281239552 (57.1%) @1.4x, remaining 26:43 RBU 100.0% UBU 100.0% >13880852480/24281239552 (57.2%) @1.3x, remaining 26:40 RBU 100.0% UBU 48.1% >13902086144/24281239552 (57.3%) @1.4x, remaining 26:37 RBU 100.0% UBU 51.9% >13924696064/24281239552 (57.3%) @1.5x, remaining 26:33 RBU 100.0% UBU 100.0% >13945798656/24281239552 (57.4%) @1.4x, remaining 26:30 RBU 100.0% UBU 100.0% >13967360000/24281239552 (57.5%) @1.4x, remaining 26:27 RBU 100.0% UBU 100.0% >13989511168/24281239552 (57.6%) @1.5x, remaining 26:23 RBU 100.0% UBU 100.0% >14010679296/24281239552 (57.7%) @1.4x, remaining 26:20 RBU 100.0% UBU 100.0% >14031912960/24281239552 (57.8%) @1.4x, remaining 26:17 RBU 100.0% UBU 44.2% >14052950016/24281239552 (57.9%) @1.4x, remaining 26:14 RBU 100.0% UBU 100.0% >14075494400/24281239552 (58.0%) @1.5x, remaining 26:10 RBU 100.0% UBU 100.0% >14096596992/24281239552 (58.1%) @1.4x, remaining 26:07 RBU 100.0% UBU 100.0% >14117830656/24281239552 (58.1%) @1.4x, remaining 26:04 RBU 100.0% UBU 100.0% >14139064320/24281239552 (58.2%) @1.4x, remaining 26:00 RBU 100.0% UBU 100.0% >14160232448/24281239552 (58.3%) @1.4x, remaining 25:58 RBU 100.0% UBU 36.5% >14181466112/24281239552 (58.4%) @1.4x, remaining 25:54 RBU 100.0% UBU 100.0% >14202699776/24281239552 (58.5%) @1.4x, remaining 25:51 RBU 100.0% UBU 9.6% >14223507456/24281239552 (58.6%) @1.4x, remaining 25:48 RBU 100.0% UBU 100.0% >14244839424/24281239552 (58.7%) @1.4x, remaining 25:45 RBU 100.0% UBU 78.8% >14266335232/24281239552 (58.8%) @1.4x, remaining 25:41 RBU 100.0% UBU 100.0% >14288224256/24281239552 (58.8%) @1.5x, remaining 25:38 RBU 100.0% UBU 100.0% >14309982208/24281239552 (58.9%) @1.5x, remaining 25:35 RBU 100.0% UBU 100.0% >14332592128/24281239552 (59.0%) @1.5x, remaining 25:31 RBU 100.0% UBU 100.0% >14353694720/24281239552 (59.1%) @1.4x, remaining 25:28 RBU 100.0% UBU 100.0% >14376108032/24281239552 (59.2%) @1.5x, remaining 25:24 RBU 100.0% UBU 100.0% >14397407232/24281239552 (59.3%) @1.4x, remaining 25:21 RBU 100.0% UBU 78.8% >14417199104/24281239552 (59.4%) @1.3x, remaining 25:18 RBU 100.0% UBU 59.6% >14438367232/24281239552 (59.5%) @1.4x, remaining 25:15 RBU 100.0% UBU 100.0% >14460387328/24281239552 (59.6%) @1.5x, remaining 25:11 RBU 100.0% UBU 100.0% >14482079744/24281239552 (59.6%) @1.4x, remaining 25:08 RBU 100.0% UBU 100.0% >14504198144/24281239552 (59.7%) @1.5x, remaining 25:05 RBU 100.0% UBU 100.0% >14525792256/24281239552 (59.8%) @1.4x, remaining 25:01 RBU 100.0% UBU 100.0% >14547091456/24281239552 (59.9%) @1.4x, remaining 24:58 RBU 100.0% UBU 100.0% >14568587264/24281239552 (60.0%) @1.4x, remaining 24:55 RBU 100.0% UBU 100.0% >14590672896/24281239552 (60.1%) @1.5x, remaining 24:51 RBU 100.0% UBU 100.0% >14611709952/24281239552 (60.2%) @1.4x, remaining 24:48 RBU 100.0% UBU 100.0% >14633926656/24281239552 (60.3%) @1.5x, remaining 24:45 RBU 100.0% UBU 100.0% >14655094784/24281239552 (60.4%) @1.4x, remaining 24:41 RBU 100.0% UBU 17.3% >14676590592/24281239552 (60.4%) @1.4x, remaining 24:38 RBU 100.0% UBU 100.0% >14697824256/24281239552 (60.5%) @1.4x, remaining 24:35 RBU 100.0% UBU 9.6% >14718926848/24281239552 (60.6%) @1.4x, remaining 24:32 RBU 100.0% UBU 100.0% >14740979712/24281239552 (60.7%) @1.5x, remaining 24:29 RBU 100.0% UBU 100.0% >14762573824/24281239552 (60.8%) @1.4x, remaining 24:25 RBU 100.0% UBU 100.0% >14784069632/24281239552 (60.9%) @1.4x, remaining 24:22 RBU 100.0% UBU 100.0% >14806286336/24281239552 (61.0%) @1.5x, remaining 24:19 RBU 100.0% UBU 100.0% >14828404736/24281239552 (61.1%) @1.5x, remaining 24:15 RBU 100.0% UBU 100.0% >14849998848/24281239552 (61.2%) @1.4x, remaining 24:11 RBU 100.0% UBU 100.0% >14872739840/24281239552 (61.3%) @1.5x, remaining 24:08 RBU 100.0% UBU 100.0% >14893907968/24281239552 (61.3%) @1.4x, remaining 24:05 RBU 100.0% UBU 94.2% >14915534848/24281239552 (61.4%) @1.4x, remaining 24:01 RBU 100.0% UBU 100.0% >14937817088/24281239552 (61.5%) @1.5x, remaining 23:58 RBU 100.0% UBU 100.0% >14959050752/24281239552 (61.6%) @1.4x, remaining 23:55 RBU 100.0% UBU 100.0% >14981726208/24281239552 (61.7%) @1.5x, remaining 23:51 RBU 100.0% UBU 100.0% >15003025408/24281239552 (61.8%) @1.4x, remaining 23:48 RBU 100.0% UBU 100.0% >15025012736/24281239552 (61.9%) @1.5x, remaining 23:44 RBU 100.0% UBU 100.0% >15047753728/24281239552 (62.0%) @1.5x, remaining 23:41 RBU 100.0% UBU 100.0% >15070724096/24281239552 (62.1%) @1.5x, remaining 23:37 RBU 100.0% UBU 100.0% >15093596160/24281239552 (62.2%) @1.5x, remaining 23:34 RBU 100.0% UBU 100.0% >15116206080/24281239552 (62.3%) @1.5x, remaining 23:30 RBU 100.0% UBU 100.0% >15137439744/24281239552 (62.3%) @1.4x, remaining 23:27 RBU 100.0% UBU 5.8% >15160311808/24281239552 (62.4%) @1.5x, remaining 23:23 RBU 100.0% UBU 100.0% >15183151104/24281239552 (62.5%) @1.5x, remaining 23:20 RBU 100.0% UBU 100.0% >15205400576/24281239552 (62.6%) @1.5x, remaining 23:16 RBU 100.0% UBU 100.0% >15227944960/24281239552 (62.7%) @1.5x, remaining 23:12 RBU 100.0% UBU 100.0% >15250554880/24281239552 (62.8%) @1.5x, remaining 23:09 RBU 100.0% UBU 100.0% >15273066496/24281239552 (62.9%) @1.5x, remaining 23:06 RBU 100.0% UBU 100.0% >15294464000/24281239552 (63.0%) @1.4x, remaining 23:02 RBU 100.0% UBU 55.8% >15317073920/24281239552 (63.1%) @1.5x, remaining 22:59 RBU 100.0% UBU 100.0% >15339618304/24281239552 (63.2%) @1.5x, remaining 22:55 RBU 100.0% UBU 100.0% >15362228224/24281239552 (63.3%) @1.5x, remaining 22:51 RBU 100.0% UBU 100.0% >15384805376/24281239552 (63.4%) @1.5x, remaining 22:48 RBU 100.0% UBU 100.0% >15407513600/24281239552 (63.5%) @1.5x, remaining 22:44 RBU 100.0% UBU 100.0% >15430189056/24281239552 (63.5%) @1.5x, remaining 22:41 RBU 100.0% UBU 100.0% >15452831744/24281239552 (63.6%) @1.5x, remaining 22:38 RBU 100.0% UBU 100.0% >15475343360/24281239552 (63.7%) @1.5x, remaining 22:34 RBU 100.0% UBU 59.6% >15495266304/24281239552 (63.8%) @1.3x, remaining 22:31 RBU 100.0% UBU 5.8% >15517515776/24281239552 (63.9%) @1.5x, remaining 22:28 RBU 100.0% UBU 100.0% >15539175424/24281239552 (64.0%) @1.4x, remaining 22:24 RBU 100.0% UBU 100.0% >15561785344/24281239552 (64.1%) @1.5x, remaining 22:20 RBU 100.0% UBU 100.0% >15583805440/24281239552 (64.2%) @1.5x, remaining 22:17 RBU 99.8% UBU 100.0% >15605563392/24281239552 (64.3%) @1.5x, remaining 22:14 RBU 100.0% UBU 63.5% >15628107776/24281239552 (64.4%) @1.5x, remaining 22:10 RBU 100.0% UBU 100.0% >15649865728/24281239552 (64.5%) @1.5x, remaining 22:07 RBU 100.0% UBU 51.9% >15672311808/24281239552 (64.5%) @1.5x, remaining 22:03 RBU 100.0% UBU 100.0% >15694495744/24281239552 (64.6%) @1.5x, remaining 22:00 RBU 100.0% UBU 86.5% >15717040128/24281239552 (64.7%) @1.5x, remaining 21:57 RBU 100.0% UBU 100.0% >15739650048/24281239552 (64.8%) @1.5x, remaining 21:53 RBU 100.0% UBU 100.0% >15762259968/24281239552 (64.9%) @1.5x, remaining 21:49 RBU 100.0% UBU 100.0% >15784804352/24281239552 (65.0%) @1.5x, remaining 21:46 RBU 100.0% UBU 100.0% >15807119360/24281239552 (65.1%) @1.5x, remaining 21:42 RBU 100.0% UBU 100.0% >15829434368/24281239552 (65.2%) @1.5x, remaining 21:39 RBU 100.0% UBU 100.0% >15851126784/24281239552 (65.3%) @1.4x, remaining 21:36 RBU 100.0% UBU 100.0% >15872622592/24281239552 (65.4%) @1.4x, remaining 21:32 RBU 100.0% UBU 59.6% >15894904832/24281239552 (65.5%) @1.5x, remaining 21:28 RBU 100.0% UBU 100.0% >15917514752/24281239552 (65.6%) @1.5x, remaining 21:25 RBU 100.0% UBU 100.0% >15940124672/24281239552 (65.6%) @1.5x, remaining 21:22 RBU 100.0% UBU 100.0% >15962734592/24281239552 (65.7%) @1.5x, remaining 21:18 RBU 100.0% UBU 100.0% >15984230400/24281239552 (65.8%) @1.4x, remaining 21:15 RBU 100.0% UBU 13.5% >16006709248/24281239552 (65.9%) @1.5x, remaining 21:11 RBU 100.0% UBU 28.8% >16027942912/24281239552 (66.0%) @1.4x, remaining 21:08 RBU 100.0% UBU 86.5% >16047800320/24281239552 (66.1%) @1.3x, remaining 21:05 RBU 100.0% UBU 28.8% >16070410240/24281239552 (66.2%) @1.5x, remaining 21:01 RBU 100.0% UBU 100.0% >16092168192/24281239552 (66.3%) @1.5x, remaining 20:58 RBU 100.0% UBU 55.8% >16114319360/24281239552 (66.4%) @1.5x, remaining 20:55 RBU 100.0% UBU 63.5% >16136830976/24281239552 (66.5%) @1.5x, remaining 20:51 RBU 100.0% UBU 100.0% >16158097408/24281239552 (66.5%) @1.4x, remaining 20:48 RBU 100.0% UBU 98.1% >16180707328/24281239552 (66.6%) @1.5x, remaining 20:45 RBU 100.0% UBU 100.0% >16201809920/24281239552 (66.7%) @1.4x, remaining 20:41 RBU 100.0% UBU 100.0% >16224419840/24281239552 (66.8%) @1.5x, remaining 20:37 RBU 100.0% UBU 100.0% >16247029760/24281239552 (66.9%) @1.5x, remaining 20:34 RBU 100.0% UBU 100.0% >16269639680/24281239552 (67.0%) @1.5x, remaining 20:31 RBU 100.0% UBU 100.0% >16290840576/24281239552 (67.1%) @1.4x, remaining 20:27 RBU 100.0% UBU 59.6% >16312369152/24281239552 (67.2%) @1.4x, remaining 20:24 RBU 100.0% UBU 100.0% >16334716928/24281239552 (67.3%) @1.5x, remaining 20:21 RBU 100.0% UBU 100.0% >16357326848/24281239552 (67.4%) @1.5x, remaining 20:17 RBU 100.0% UBU 100.0% >16379936768/24281239552 (67.5%) @1.5x, remaining 20:14 RBU 100.0% UBU 100.0% >16402219008/24281239552 (67.6%) @1.5x, remaining 20:10 RBU 100.0% UBU 100.0% >16423976960/24281239552 (67.6%) @1.5x, remaining 20:07 RBU 100.0% UBU 100.0% >16446193664/24281239552 (67.7%) @1.5x, remaining 20:03 RBU 100.0% UBU 100.0% >16468738048/24281239552 (67.8%) @1.5x, remaining 20:00 RBU 100.0% UBU 100.0% >16491413504/24281239552 (67.9%) @1.5x, remaining 19:56 RBU 100.0% UBU 13.5% >16512516096/24281239552 (68.0%) @1.4x, remaining 19:53 RBU 100.0% UBU 100.0% >16534011904/24281239552 (68.1%) @1.4x, remaining 19:50 RBU 100.0% UBU 82.7% >16556294144/24281239552 (68.2%) @1.5x, remaining 19:46 RBU 100.0% UBU 100.0% >16577036288/24281239552 (68.3%) @1.4x, remaining 19:43 RBU 100.0% UBU 75.0% >16598728704/24281239552 (68.4%) @1.4x, remaining 19:40 RBU 100.0% UBU 100.0% >16620814336/24281239552 (68.5%) @1.5x, remaining 19:36 RBU 100.0% UBU 100.0% >16642539520/24281239552 (68.5%) @1.4x, remaining 19:33 RBU 100.0% UBU 100.0% >16664559616/24281239552 (68.6%) @1.5x, remaining 19:30 RBU 100.0% UBU 44.2% >16686514176/24281239552 (68.7%) @1.5x, remaining 19:26 RBU 100.0% UBU 48.1% >16708239360/24281239552 (68.8%) @1.4x, remaining 19:23 RBU 99.9% UBU 100.0% >16730292224/24281239552 (68.9%) @1.5x, remaining 19:19 RBU 100.0% UBU 94.2% >16751755264/24281239552 (69.0%) @1.4x, remaining 19:16 RBU 100.0% UBU 100.0% >16774332416/24281239552 (69.1%) @1.5x, remaining 19:13 RBU 100.0% UBU 25.0% >16795435008/24281239552 (69.2%) @1.4x, remaining 19:09 RBU 100.0% UBU 100.0% >16816668672/24281239552 (69.3%) @1.4x, remaining 19:06 RBU 100.0% UBU 40.4% >16839213056/24281239552 (69.4%) @1.5x, remaining 19:03 RBU 100.0% UBU 100.0% >16860381184/24281239552 (69.4%) @1.4x, remaining 18:59 RBU 100.0% UBU 44.2% >16881549312/24281239552 (69.5%) @1.4x, remaining 18:56 RBU 100.0% UBU 82.7% >16902782976/24281239552 (69.6%) @1.4x, remaining 18:53 RBU 100.0% UBU 100.0% >16925392896/24281239552 (69.7%) @1.5x, remaining 18:49 RBU 100.0% UBU 100.0% >16948002816/24281239552 (69.8%) @1.5x, remaining 18:46 RBU 100.0% UBU 100.0% >16969400320/24281239552 (69.9%) @1.4x, remaining 18:43 RBU 100.0% UBU 100.0% >16991715328/24281239552 (70.0%) @1.5x, remaining 18:39 RBU 100.0% UBU 100.0% >17014325248/24281239552 (70.1%) @1.5x, remaining 18:36 RBU 100.0% UBU 100.0% >17035493376/24281239552 (70.2%) @1.4x, remaining 18:33 RBU 100.0% UBU 71.2% >17057611776/24281239552 (70.3%) @1.5x, remaining 18:29 RBU 100.0% UBU 100.0% >17079140352/24281239552 (70.3%) @1.4x, remaining 18:26 RBU 100.0% UBU 100.0% >17101488128/24281239552 (70.4%) @1.5x, remaining 18:22 RBU 100.0% UBU 100.0% >17118920704/24281239552 (70.5%) @1.2x, remaining 18:20 RBU 100.0% UBU 36.5% >17137664000/24281239552 (70.6%) @1.2x, remaining 18:17 RBU 100.0% UBU 9.6% >17159192576/24281239552 (70.7%) @1.4x, remaining 18:14 RBU 100.0% UBU 75.0% >17181179904/24281239552 (70.8%) @1.5x, remaining 18:10 RBU 100.0% UBU 100.0% >17202413568/24281239552 (70.8%) @1.4x, remaining 18:07 RBU 100.0% UBU 100.0% >17224237056/24281239552 (70.9%) @1.5x, remaining 18:04 RBU 100.0% UBU 100.0% >17244815360/24281239552 (71.0%) @1.4x, remaining 18:01 RBU 100.0% UBU 100.0% >17267359744/24281239552 (71.1%) @1.5x, remaining 17:57 RBU 100.0% UBU 100.0% >17288527872/24281239552 (71.2%) @1.4x, remaining 17:54 RBU 100.0% UBU 21.2% >17311137792/24281239552 (71.3%) @1.5x, remaining 17:51 RBU 100.0% UBU 100.0% >17332305920/24281239552 (71.4%) @1.4x, remaining 17:47 RBU 100.0% UBU 100.0% >17354719232/24281239552 (71.5%) @1.5x, remaining 17:44 RBU 100.0% UBU 100.0% >17376083968/24281239552 (71.6%) @1.4x, remaining 17:41 RBU 100.0% UBU 75.0% >17398693888/24281239552 (71.7%) @1.5x, remaining 17:37 RBU 100.0% UBU 100.0% >17419862016/24281239552 (71.7%) @1.4x, remaining 17:34 RBU 100.0% UBU 32.7% >17441095680/24281239552 (71.8%) @1.4x, remaining 17:31 RBU 100.0% UBU 100.0% >17462788096/24281239552 (71.9%) @1.4x, remaining 17:27 RBU 100.0% UBU 5.8% >17485398016/24281239552 (72.0%) @1.5x, remaining 17:24 RBU 100.0% UBU 100.0% >17507418112/24281239552 (72.1%) @1.5x, remaining 17:20 RBU 100.0% UBU 100.0% >17529044992/24281239552 (72.2%) @1.4x, remaining 17:17 RBU 100.0% UBU 82.7% >17551032320/24281239552 (72.3%) @1.5x, remaining 17:14 RBU 100.0% UBU 32.7% >17573838848/24281239552 (72.4%) @1.5x, remaining 17:10 RBU 100.0% UBU 100.0% >17595170816/24281239552 (72.5%) @1.4x, remaining 17:07 RBU 100.0% UBU 13.5% >17616338944/24281239552 (72.6%) @1.4x, remaining 17:04 RBU 100.0% UBU 100.0% >17637507072/24281239552 (72.6%) @1.4x, remaining 17:00 RBU 100.0% UBU 63.5% >17660116992/24281239552 (72.7%) @1.5x, remaining 16:57 RBU 100.0% UBU 100.0% >17678073856/24281239552 (72.8%) @1.2x, remaining 16:54 RBU 100.0% UBU 51.9% >17699831808/24281239552 (72.9%) @1.5x, remaining 16:51 RBU 100.0% UBU 25.0% >17722441728/24281239552 (73.0%) @1.5x, remaining 16:48 RBU 100.0% UBU 100.0% >17744986112/24281239552 (73.1%) @1.5x, remaining 16:44 RBU 100.0% UBU 100.0% >17767596032/24281239552 (73.2%) @1.5x, remaining 16:40 RBU 100.0% UBU 100.0% >17788764160/24281239552 (73.3%) @1.4x, remaining 16:37 RBU 100.0% UBU 63.5% >17811374080/24281239552 (73.4%) @1.5x, remaining 16:34 RBU 100.0% UBU 100.0% >17834147840/24281239552 (73.4%) @1.5x, remaining 16:30 RBU 100.0% UBU 100.0% >17856593920/24281239552 (73.5%) @1.5x, remaining 16:27 RBU 100.0% UBU 100.0% >17879203840/24281239552 (73.6%) @1.5x, remaining 16:23 RBU 100.0% UBU 100.0% >17903026176/24281239552 (73.7%) @1.6x, remaining 16:19 RBU 100.0% UBU 100.0% >17924358144/24281239552 (73.8%) @1.4x, remaining 16:16 RBU 100.0% UBU 100.0% >17946968064/24281239552 (73.9%) @1.5x, remaining 16:13 RBU 100.0% UBU 100.0% >17968201728/24281239552 (74.0%) @1.4x, remaining 16:09 RBU 100.0% UBU 98.1% >17989566464/24281239552 (74.1%) @1.4x, remaining 16:06 RBU 100.0% UBU 100.0% >18010734592/24281239552 (74.2%) @1.4x, remaining 16:03 RBU 100.0% UBU 100.0% >18033082368/24281239552 (74.3%) @1.5x, remaining 15:59 RBU 100.0% UBU 100.0% >18054316032/24281239552 (74.4%) @1.4x, remaining 15:56 RBU 100.0% UBU 90.4% >18075713536/24281239552 (74.4%) @1.4x, remaining 15:53 RBU 100.0% UBU 100.0% >18096717824/24281239552 (74.5%) @1.4x, remaining 15:50 RBU 100.0% UBU 40.4% >18118737920/24281239552 (74.6%) @1.5x, remaining 15:46 RBU 100.0% UBU 100.0% >18140430336/24281239552 (74.7%) @1.4x, remaining 15:43 RBU 100.0% UBU 100.0% >18162548736/24281239552 (74.8%) @1.5x, remaining 15:39 RBU 100.0% UBU 100.0% >18184077312/24281239552 (74.9%) @1.4x, remaining 15:36 RBU 100.0% UBU 100.0% >18206031872/24281239552 (75.0%) @1.5x, remaining 15:33 RBU 100.0% UBU 100.0% >18226479104/24281239552 (75.1%) @1.4x, remaining 15:30 RBU 100.0% UBU 9.6% >18247516160/24281239552 (75.2%) @1.4x, remaining 15:27 RBU 100.0% UBU 100.0% >18269011968/24281239552 (75.2%) @1.4x, remaining 15:23 RBU 100.0% UBU 67.3% >18291294208/24281239552 (75.3%) @1.5x, remaining 15:20 RBU 100.0% UBU 100.0% >18312396800/24281239552 (75.4%) @1.4x, remaining 15:17 RBU 100.0% UBU 100.0% >18335006720/24281239552 (75.5%) @1.5x, remaining 15:13 RBU 100.0% UBU 100.0% >18356174848/24281239552 (75.6%) @1.4x, remaining 15:10 RBU 100.0% UBU 48.1% >18377408512/24281239552 (75.7%) @1.4x, remaining 15:07 RBU 100.0% UBU 100.0% >18399756288/24281239552 (75.8%) @1.5x, remaining 15:03 RBU 100.0% UBU 100.0% >18420858880/24281239552 (75.9%) @1.4x, remaining 15:00 RBU 100.0% UBU 100.0% >18443206656/24281239552 (76.0%) @1.5x, remaining 14:57 RBU 100.0% UBU 100.0% >18464571392/24281239552 (76.0%) @1.4x, remaining 14:53 RBU 100.0% UBU 100.0% >18486198272/24281239552 (76.1%) @1.4x, remaining 14:50 RBU 100.0% UBU 100.0% >18507694080/24281239552 (76.2%) @1.4x, remaining 14:47 RBU 100.0% UBU 44.2% >18528862208/24281239552 (76.3%) @1.4x, remaining 14:43 RBU 100.0% UBU 78.8% >18550751232/24281239552 (76.4%) @1.5x, remaining 14:40 RBU 100.0% UBU 100.0% >18571984896/24281239552 (76.5%) @1.4x, remaining 14:37 RBU 100.0% UBU 21.2% >18593153024/24281239552 (76.6%) @1.4x, remaining 14:34 RBU 100.0% UBU 28.8% >18614550528/24281239552 (76.7%) @1.4x, remaining 14:30 RBU 100.0% UBU 100.0% >18636668928/24281239552 (76.8%) @1.5x, remaining 14:27 RBU 100.0% UBU 100.0% >18656985088/24281239552 (76.8%) @1.4x, remaining 14:24 RBU 100.0% UBU 100.0% >18679136256/24281239552 (76.9%) @1.5x, remaining 14:20 RBU 100.0% UBU 100.0% >18700238848/24281239552 (77.0%) @1.4x, remaining 14:17 RBU 100.0% UBU 100.0% >18722455552/24281239552 (77.1%) @1.5x, remaining 14:14 RBU 100.0% UBU 100.0% >18743951360/24281239552 (77.2%) @1.4x, remaining 14:10 RBU 100.0% UBU 100.0% >18763677696/24281239552 (77.3%) @1.3x, remaining 14:08 RBU 100.0% UBU 55.8% >18786025472/24281239552 (77.4%) @1.5x, remaining 14:04 RBU 100.0% UBU 100.0% >18807259136/24281239552 (77.5%) @1.4x, remaining 14:01 RBU 100.0% UBU 100.0% >18829017088/24281239552 (77.5%) @1.5x, remaining 13:58 RBU 100.0% UBU 100.0% >18850840576/24281239552 (77.6%) @1.5x, remaining 13:54 RBU 100.0% UBU 100.0% >18872008704/24281239552 (77.7%) @1.4x, remaining 13:51 RBU 100.0% UBU 100.0% >18894356480/24281239552 (77.8%) @1.5x, remaining 13:47 RBU 100.0% UBU 100.0% >18915229696/24281239552 (77.9%) @1.4x, remaining 13:44 RBU 100.0% UBU 98.1% >18936496128/24281239552 (78.0%) @1.4x, remaining 13:41 RBU 100.0% UBU 100.0% >18957828096/24281239552 (78.1%) @1.4x, remaining 13:38 RBU 100.0% UBU 100.0% >18980110336/24281239552 (78.2%) @1.5x, remaining 13:34 RBU 100.0% UBU 100.0% >19001245696/24281239552 (78.3%) @1.4x, remaining 13:31 RBU 100.0% UBU 100.0% >19022479360/24281239552 (78.3%) @1.4x, remaining 13:28 RBU 100.0% UBU 100.0% >19044466688/24281239552 (78.4%) @1.5x, remaining 13:24 RBU 100.0% UBU 100.0% >19065208832/24281239552 (78.5%) @1.4x, remaining 13:21 RBU 100.0% UBU 28.8% >19087294464/24281239552 (78.6%) @1.5x, remaining 13:18 RBU 100.0% UBU 100.0% >19108331520/24281239552 (78.7%) @1.4x, remaining 13:15 RBU 100.0% UBU 100.0% >19129958400/24281239552 (78.8%) @1.4x, remaining 13:11 RBU 100.0% UBU 100.0% >19151978496/24281239552 (78.9%) @1.5x, remaining 13:08 RBU 100.0% UBU 100.0% >19172786176/24281239552 (79.0%) @1.4x, remaining 13:05 RBU 100.0% UBU 78.8% >19194314752/24281239552 (79.0%) @1.4x, remaining 13:01 RBU 100.0% UBU 100.0% >19215351808/24281239552 (79.1%) @1.4x, remaining 12:58 RBU 100.0% UBU 100.0% >19236585472/24281239552 (79.2%) @1.4x, remaining 12:55 RBU 100.0% UBU 100.0% >19257819136/24281239552 (79.3%) @1.4x, remaining 12:52 RBU 100.0% UBU 86.5% >19278921728/24281239552 (79.4%) @1.4x, remaining 12:49 RBU 100.0% UBU 100.0% >19298779136/24281239552 (79.5%) @1.3x, remaining 12:46 RBU 100.0% UBU 55.8% >19316178944/24281239552 (79.6%) @1.2x, remaining 12:43 RBU 100.0% UBU 9.6% >19338362880/24281239552 (79.6%) @1.5x, remaining 12:40 RBU 100.0% UBU 100.0% >19359465472/24281239552 (79.7%) @1.4x, remaining 12:36 RBU 100.0% UBU 100.0% >19380633600/24281239552 (79.8%) @1.4x, remaining 12:33 RBU 100.0% UBU 100.0% >19401736192/24281239552 (79.9%) @1.4x, remaining 12:30 RBU 100.0% UBU 100.0% >19422838784/24281239552 (80.0%) @1.4x, remaining 12:27 RBU 100.0% UBU 100.0% >19444760576/24281239552 (80.1%) @1.5x, remaining 12:23 RBU 100.0% UBU 100.0% >19466485760/24281239552 (80.2%) @1.4x, remaining 12:20 RBU 100.0% UBU 100.0% >19487588352/24281239552 (80.3%) @1.4x, remaining 12:17 RBU 100.0% UBU 100.0% >19508690944/24281239552 (80.3%) @1.4x, remaining 12:13 RBU 100.0% UBU 100.0% >19530252288/24281239552 (80.4%) @1.4x, remaining 12:10 RBU 100.0% UBU 100.0% >19552108544/24281239552 (80.5%) @1.5x, remaining 12:07 RBU 100.0% UBU 100.0% >19573506048/24281239552 (80.6%) @1.4x, remaining 12:03 RBU 100.0% UBU 100.0% >19594608640/24281239552 (80.7%) @1.4x, remaining 12:00 RBU 100.0% UBU 100.0% >19615711232/24281239552 (80.8%) @1.4x, remaining 11:57 RBU 100.0% UBU 100.0% >19637239808/24281239552 (80.9%) @1.4x, remaining 11:54 RBU 100.0% UBU 100.0% >19659358208/24281239552 (81.0%) @1.5x, remaining 11:50 RBU 100.0% UBU 100.0% >19680460800/24281239552 (81.1%) @1.4x, remaining 11:47 RBU 100.0% UBU 100.0% >19701596160/24281239552 (81.1%) @1.4x, remaining 11:44 RBU 100.0% UBU 100.0% >19723976704/24281239552 (81.2%) @1.5x, remaining 11:41 RBU 100.0% UBU 100.0% >19744751616/24281239552 (81.3%) @1.4x, remaining 11:37 RBU 100.0% UBU 90.4% >19766378496/24281239552 (81.4%) @1.4x, remaining 11:34 RBU 100.0% UBU 100.0% >19787153408/24281239552 (81.5%) @1.4x, remaining 11:31 RBU 100.0% UBU 86.5% >19807404032/24281239552 (81.6%) @1.4x, remaining 11:28 RBU 100.0% UBU 21.2% >19829555200/24281239552 (81.7%) @1.5x, remaining 11:24 RBU 100.0% UBU 100.0% >19851116544/24281239552 (81.8%) @1.4x, remaining 11:21 RBU 100.0% UBU 100.0% >19869073408/24281239552 (81.8%) @1.2x, remaining 11:18 RBU 100.0% UBU 32.7% >19890634752/24281239552 (81.9%) @1.4x, remaining 11:15 RBU 100.0% UBU 100.0% >19911671808/24281239552 (82.0%) @1.4x, remaining 11:12 RBU 100.0% UBU 100.0% >19932971008/24281239552 (82.1%) @1.4x, remaining 11:09 RBU 100.0% UBU 100.0% >19955089408/24281239552 (82.2%) @1.5x, remaining 11:05 RBU 100.0% UBU 100.0% >19976421376/24281239552 (82.3%) @1.4x, remaining 11:02 RBU 100.0% UBU 40.4% >19997523968/24281239552 (82.4%) @1.4x, remaining 10:59 RBU 100.0% UBU 100.0% >20018626560/24281239552 (82.4%) @1.4x, remaining 10:55 RBU 100.0% UBU 100.0% >20039663616/24281239552 (82.5%) @1.4x, remaining 10:52 RBU 100.0% UBU 100.0% >20061716480/24281239552 (82.6%) @1.5x, remaining 10:49 RBU 100.0% UBU 100.0% >20083310592/24281239552 (82.7%) @1.4x, remaining 10:45 RBU 100.0% UBU 100.0% >20104544256/24281239552 (82.8%) @1.4x, remaining 10:42 RBU 100.0% UBU 100.0% >20125679616/24281239552 (82.9%) @1.4x, remaining 10:39 RBU 100.0% UBU 100.0% >20147994624/24281239552 (83.0%) @1.5x, remaining 10:35 RBU 100.0% UBU 100.0% >20169293824/24281239552 (83.1%) @1.4x, remaining 10:32 RBU 100.0% UBU 100.0% >20192034816/24281239552 (83.2%) @1.5x, remaining 10:29 RBU 100.0% UBU 63.5% >20213039104/24281239552 (83.2%) @1.4x, remaining 10:25 RBU 100.0% UBU 100.0% >20234108928/24281239552 (83.3%) @1.4x, remaining 10:22 RBU 100.0% UBU 5.8% >20255735808/24281239552 (83.4%) @1.4x, remaining 10:19 RBU 100.0% UBU 100.0% >20278083584/24281239552 (83.5%) @1.5x, remaining 10:16 RBU 100.0% UBU 100.0% >20299841536/24281239552 (83.6%) @1.5x, remaining 10:12 RBU 100.0% UBU 100.0% >20321796096/24281239552 (83.7%) @1.5x, remaining 10:09 RBU 100.0% UBU 100.0% >20344209408/24281239552 (83.8%) @1.5x, remaining 10:05 RBU 100.0% UBU 100.0% >20365508608/24281239552 (83.9%) @1.4x, remaining 10:02 RBU 100.0% UBU 100.0% >20388052992/24281239552 (84.0%) @1.5x, remaining 9:59 RBU 100.0% UBU 100.0% >20407844864/24281239552 (84.0%) @1.3x, remaining 9:56 RBU 100.0% UBU 59.6% >20429340672/24281239552 (84.1%) @1.4x, remaining 9:52 RBU 100.0% UBU 100.0% >20451557376/24281239552 (84.2%) @1.5x, remaining 9:49 RBU 100.0% UBU 100.0% >20472725504/24281239552 (84.3%) @1.4x, remaining 9:46 RBU 100.0% UBU 82.7% >20495335424/24281239552 (84.4%) @1.5x, remaining 9:42 RBU 100.0% UBU 100.0% >20517683200/24281239552 (84.5%) @1.5x, remaining 9:39 RBU 100.0% UBU 100.0% >20539113472/24281239552 (84.6%) @1.4x, remaining 9:35 RBU 100.0% UBU 75.0% >20561690624/24281239552 (84.7%) @1.5x, remaining 9:32 RBU 100.0% UBU 100.0% >20583088128/24281239552 (84.8%) @1.4x, remaining 9:29 RBU 100.0% UBU 100.0% >20604780544/24281239552 (84.9%) @1.4x, remaining 9:25 RBU 100.0% UBU 100.0% >20626407424/24281239552 (84.9%) @1.4x, remaining 9:22 RBU 100.0% UBU 5.8% >20647772160/24281239552 (85.0%) @1.4x, remaining 9:19 RBU 100.0% UBU 100.0% >20669988864/24281239552 (85.1%) @1.5x, remaining 9:15 RBU 100.0% UBU 100.0% >20691419136/24281239552 (85.2%) @1.4x, remaining 9:12 RBU 100.0% UBU 100.0% >20714160128/24281239552 (85.3%) @1.5x, remaining 9:08 RBU 100.0% UBU 100.0% >20735295488/24281239552 (85.4%) @1.4x, remaining 9:05 RBU 100.0% UBU 78.8% >20756692992/24281239552 (85.5%) @1.4x, remaining 9:02 RBU 100.0% UBU 82.7% >20778221568/24281239552 (85.6%) @1.4x, remaining 8:58 RBU 100.0% UBU 55.8% >20800733184/24281239552 (85.7%) @1.5x, remaining 8:55 RBU 100.0% UBU 100.0% >20823146496/24281239552 (85.8%) @1.5x, remaining 8:52 RBU 100.0% UBU 100.0% >20845756416/24281239552 (85.9%) @1.5x, remaining 8:48 RBU 100.0% UBU 100.0% >20868300800/24281239552 (85.9%) @1.5x, remaining 8:45 RBU 100.0% UBU 100.0% >20890025984/24281239552 (86.0%) @1.4x, remaining 8:41 RBU 100.0% UBU 100.0% >20912209920/24281239552 (86.1%) @1.5x, remaining 8:38 RBU 100.0% UBU 100.0% >20934164480/24281239552 (86.2%) @1.5x, remaining 8:34 RBU 100.0% UBU 17.3% >20952154112/24281239552 (86.3%) @1.2x, remaining 8:32 RBU 100.0% UBU 71.2% >20974796800/24281239552 (86.4%) @1.5x, remaining 8:28 RBU 100.0% UBU 100.0% >20998225920/24281239552 (86.5%) @1.6x, remaining 8:25 RBU 100.0% UBU 100.0% >21019820032/24281239552 (86.6%) @1.4x, remaining 8:21 RBU 100.0% UBU 100.0% >21042298880/24281239552 (86.7%) @1.5x, remaining 8:18 RBU 100.0% UBU 100.0% >21063991296/24281239552 (86.8%) @1.4x, remaining 8:15 RBU 100.0% UBU 17.3% >21086142464/24281239552 (86.8%) @1.5x, remaining 8:11 RBU 100.0% UBU 100.0% >21108752384/24281239552 (86.9%) @1.5x, remaining 8:07 RBU 100.0% UBU 100.0% >21129986048/24281239552 (87.0%) @1.4x, remaining 8:04 RBU 100.0% UBU 55.8% >21152333824/24281239552 (87.1%) @1.5x, remaining 8:01 RBU 100.0% UBU 90.4% >21173895168/24281239552 (87.2%) @1.4x, remaining 7:57 RBU 100.0% UBU 28.8% >21196505088/24281239552 (87.3%) @1.5x, remaining 7:54 RBU 100.0% UBU 100.0% >21218295808/24281239552 (87.4%) @1.5x, remaining 7:51 RBU 100.0% UBU 71.2% >21240774656/24281239552 (87.5%) @1.5x, remaining 7:47 RBU 99.9% UBU 100.0% >21263024128/24281239552 (87.6%) @1.5x, remaining 7:44 RBU 100.0% UBU 21.2% >21285568512/24281239552 (87.7%) @1.5x, remaining 7:40 RBU 100.0% UBU 100.0% >21307031552/24281239552 (87.8%) @1.4x, remaining 7:37 RBU 100.0% UBU 100.0% >21329608704/24281239552 (87.8%) @1.5x, remaining 7:34 RBU 100.0% UBU 100.0% >21351956480/24281239552 (87.9%) @1.5x, remaining 7:30 RBU 100.0% UBU 100.0% >21374500864/24281239552 (88.0%) @1.5x, remaining 7:27 RBU 100.0% UBU 100.0% >21396127744/24281239552 (88.1%) @1.4x, remaining 7:23 RBU 100.0% UBU 44.2% >21418475520/24281239552 (88.2%) @1.5x, remaining 7:20 RBU 100.0% UBU 100.0% >21441150976/24281239552 (88.3%) @1.5x, remaining 7:16 RBU 100.0% UBU 63.5% >21462253568/24281239552 (88.4%) @1.4x, remaining 7:13 RBU 100.0% UBU 100.0% >21484929024/24281239552 (88.5%) @1.5x, remaining 7:10 RBU 100.0% UBU 59.6% >21504983040/24281239552 (88.6%) @1.3x, remaining 7:06 RBU 100.0% UBU 55.8% >21526151168/24281239552 (88.7%) @1.4x, remaining 7:03 RBU 100.0% UBU 100.0% >21548695552/24281239552 (88.7%) @1.5x, remaining 7:00 RBU 100.0% UBU 100.0% >21571436544/24281239552 (88.8%) @1.5x, remaining 6:56 RBU 100.0% UBU 25.0% >21592801280/24281239552 (88.9%) @1.4x, remaining 6:53 RBU 100.0% UBU 100.0% >21614985216/24281239552 (89.0%) @1.5x, remaining 6:50 RBU 100.0% UBU 100.0% >21636644864/24281239552 (89.1%) @1.4x, remaining 6:46 RBU 100.0% UBU 100.0% >21658730496/24281239552 (89.2%) @1.5x, remaining 6:43 RBU 100.0% UBU 90.4% >21680881664/24281239552 (89.3%) @1.5x, remaining 6:39 RBU 100.0% UBU 100.0% >21703163904/24281239552 (89.4%) @1.5x, remaining 6:36 RBU 100.0% UBU 100.0% >21725577216/24281239552 (89.5%) @1.5x, remaining 6:33 RBU 100.0% UBU 100.0% >21747924992/24281239552 (89.6%) @1.5x, remaining 6:29 RBU 99.9% UBU 71.2% >21769551872/24281239552 (89.7%) @1.4x, remaining 6:26 RBU 100.0% UBU 100.0% >21792161792/24281239552 (89.7%) @1.5x, remaining 6:22 RBU 100.0% UBU 100.0% >21808742400/24281239552 (89.8%) @1.1x, remaining 6:20 RBU 100.0% UBU 100.0% >21831352320/24281239552 (89.9%) @1.5x, remaining 6:16 RBU 100.0% UBU 100.0% >21852520448/24281239552 (90.0%) @1.4x, remaining 6:13 RBU 100.0% UBU 100.0% >21874999296/24281239552 (90.1%) @1.5x, remaining 6:10 RBU 100.0% UBU 100.0% >21897609216/24281239552 (90.2%) @1.5x, remaining 6:06 RBU 100.0% UBU 100.0% >21920219136/24281239552 (90.3%) @1.5x, remaining 6:03 RBU 100.0% UBU 100.0% >21942796288/24281239552 (90.4%) @1.5x, remaining 5:59 RBU 100.0% UBU 100.0% >21964062720/24281239552 (90.5%) @1.4x, remaining 5:56 RBU 100.0% UBU 100.0% >21986607104/24281239552 (90.5%) @1.5x, remaining 5:52 RBU 100.0% UBU 5.8% >22007906304/24281239552 (90.6%) @1.4x, remaining 5:49 RBU 100.0% UBU 100.0% >22029828096/24281239552 (90.7%) @1.5x, remaining 5:46 RBU 100.0% UBU 32.7% >22047784960/24281239552 (90.8%) @1.2x, remaining 5:43 RBU 100.0% UBU 36.5% >22070231040/24281239552 (90.9%) @1.5x, remaining 5:40 RBU 100.0% UBU 100.0% >22092840960/24281239552 (91.0%) @1.5x, remaining 5:36 RBU 100.0% UBU 100.0% >22114271232/24281239552 (91.1%) @1.4x, remaining 5:33 RBU 100.0% UBU 98.1% >22136619008/24281239552 (91.2%) @1.5x, remaining 5:29 RBU 100.0% UBU 100.0% >22159163392/24281239552 (91.3%) @1.5x, remaining 5:26 RBU 100.0% UBU 100.0% >22180593664/24281239552 (91.3%) @1.4x, remaining 5:23 RBU 100.0% UBU 100.0% >22203072512/24281239552 (91.4%) @1.5x, remaining 5:19 RBU 100.0% UBU 71.2% >22225158144/24281239552 (91.5%) @1.5x, remaining 5:16 RBU 100.0% UBU 100.0% >22246916096/24281239552 (91.6%) @1.5x, remaining 5:12 RBU 100.0% UBU 86.5% >22268149760/24281239552 (91.7%) @1.4x, remaining 5:09 RBU 100.0% UBU 32.7% >22290759680/24281239552 (91.8%) @1.5x, remaining 5:06 RBU 100.0% UBU 100.0% >22313369600/24281239552 (91.9%) @1.5x, remaining 5:02 RBU 100.0% UBU 100.0% >22334603264/24281239552 (92.0%) @1.4x, remaining 4:59 RBU 100.0% UBU 100.0% >22357213184/24281239552 (92.1%) @1.5x, remaining 4:55 RBU 100.0% UBU 100.0% >22379823104/24281239552 (92.2%) @1.5x, remaining 4:52 RBU 100.0% UBU 100.0% >22401712128/24281239552 (92.3%) @1.5x, remaining 4:48 RBU 99.9% UBU 100.0% >22423535616/24281239552 (92.3%) @1.5x, remaining 4:45 RBU 100.0% UBU 100.0% >22446047232/24281239552 (92.4%) @1.5x, remaining 4:42 RBU 100.0% UBU 100.0% >22467870720/24281239552 (92.5%) @1.5x, remaining 4:38 RBU 100.0% UBU 100.0% >22489792512/24281239552 (92.6%) @1.5x, remaining 4:35 RBU 100.0% UBU 100.0% >22512402432/24281239552 (92.7%) @1.5x, remaining 4:31 RBU 100.0% UBU 100.0% >22535012352/24281239552 (92.8%) @1.5x, remaining 4:28 RBU 100.0% UBU 100.0% >22556704768/24281239552 (92.9%) @1.4x, remaining 4:25 RBU 100.0% UBU 100.0% >22578659328/24281239552 (93.0%) @1.5x, remaining 4:21 RBU 100.0% UBU 100.0% >22597206016/24281239552 (93.1%) @1.2x, remaining 4:18 RBU 100.0% UBU 9.6% >22619029504/24281239552 (93.2%) @1.5x, remaining 4:15 RBU 100.0% UBU 100.0% >22641213440/24281239552 (93.2%) @1.5x, remaining 4:12 RBU 100.0% UBU 5.8% >22662938624/24281239552 (93.3%) @1.4x, remaining 4:08 RBU 100.0% UBU 100.0% >22684827648/24281239552 (93.4%) @1.5x, remaining 4:05 RBU 100.0% UBU 100.0% >22707109888/24281239552 (93.5%) @1.5x, remaining 4:02 RBU 100.0% UBU 100.0% >22728343552/24281239552 (93.6%) @1.4x, remaining 3:58 RBU 100.0% UBU 90.4% >22750265344/24281239552 (93.7%) @1.5x, remaining 3:55 RBU 100.0% UBU 100.0% >22772187136/24281239552 (93.8%) @1.5x, remaining 3:52 RBU 100.0% UBU 100.0% >22794797056/24281239552 (93.9%) @1.5x, remaining 3:48 RBU 100.0% UBU 100.0% >22817013760/24281239552 (94.0%) @1.5x, remaining 3:45 RBU 100.0% UBU 100.0% >22838575104/24281239552 (94.1%) @1.4x, remaining 3:41 RBU 100.0% UBU 67.3% >22859808768/24281239552 (94.1%) @1.4x, remaining 3:38 RBU 100.0% UBU 36.5% >22882287616/24281239552 (94.2%) @1.5x, remaining 3:35 RBU 100.0% UBU 100.0% >22903914496/24281239552 (94.3%) @1.4x, remaining 3:31 RBU 100.0% UBU 100.0% >22925836288/24281239552 (94.4%) @1.5x, remaining 3:28 RBU 100.0% UBU 100.0% >22947299328/24281239552 (94.5%) @1.4x, remaining 3:25 RBU 100.0% UBU 100.0% >22969057280/24281239552 (94.6%) @1.5x, remaining 3:21 RBU 100.0% UBU 67.3% >22990880768/24281239552 (94.7%) @1.5x, remaining 3:18 RBU 100.0% UBU 100.0% >23012376576/24281239552 (94.8%) @1.4x, remaining 3:15 RBU 100.0% UBU 100.0% >23034724352/24281239552 (94.9%) @1.5x, remaining 3:11 RBU 100.0% UBU 100.0% >23057203200/24281239552 (95.0%) @1.5x, remaining 3:08 RBU 100.0% UBU 100.0% >23078567936/24281239552 (95.0%) @1.4x, remaining 3:04 RBU 100.0% UBU 100.0% >23100981248/24281239552 (95.1%) @1.5x, remaining 3:01 RBU 100.0% UBU 100.0% >23123361792/24281239552 (95.2%) @1.5x, remaining 2:57 RBU 100.0% UBU 100.0% >23143383040/24281239552 (95.3%) @1.3x, remaining 2:54 RBU 100.0% UBU 48.1% >23165304832/24281239552 (95.4%) @1.5x, remaining 2:51 RBU 100.0% UBU 100.0% >23186964480/24281239552 (95.5%) @1.4x, remaining 2:48 RBU 100.0% UBU 100.0% >23208525824/24281239552 (95.6%) @1.4x, remaining 2:44 RBU 100.0% UBU 25.0% >23230808064/24281239552 (95.7%) @1.5x, remaining 2:41 RBU 100.0% UBU 100.0% >23253286912/24281239552 (95.8%) @1.5x, remaining 2:37 RBU 100.0% UBU 100.0% >23274586112/24281239552 (95.9%) @1.4x, remaining 2:34 RBU 100.0% UBU 9.6% >23296344064/24281239552 (95.9%) @1.5x, remaining 2:31 RBU 100.0% UBU 100.0% >23318102016/24281239552 (96.0%) @1.5x, remaining 2:28 RBU 100.0% UBU 100.0% >23340711936/24281239552 (96.1%) @1.5x, remaining 2:24 RBU 100.0% UBU 100.0% >23361880064/24281239552 (96.2%) @1.4x, remaining 2:21 RBU 100.0% UBU 100.0% >23384260608/24281239552 (96.3%) @1.5x, remaining 2:17 RBU 100.0% UBU 100.0% >23405527040/24281239552 (96.4%) @1.4x, remaining 2:14 RBU 100.0% UBU 25.0% >23426760704/24281239552 (96.5%) @1.4x, remaining 2:11 RBU 100.0% UBU 100.0% >23448748032/24281239552 (96.6%) @1.5x, remaining 2:07 RBU 100.0% UBU 100.0% >23470211072/24281239552 (96.7%) @1.4x, remaining 2:04 RBU 100.0% UBU 100.0% >23492788224/24281239552 (96.8%) @1.5x, remaining 2:01 RBU 100.0% UBU 100.0% >23514054656/24281239552 (96.8%) @1.4x, remaining 1:57 RBU 100.0% UBU 98.1% >23535976448/24281239552 (96.9%) @1.5x, remaining 1:54 RBU 100.0% UBU 100.0% >23557767168/24281239552 (97.0%) @1.5x, remaining 1:51 RBU 100.0% UBU 100.0% >23580442624/24281239552 (97.1%) @1.5x, remaining 1:47 RBU 100.0% UBU 98.1% >23600103424/24281239552 (97.2%) @1.3x, remaining 1:44 RBU 100.0% UBU 51.9% >23622647808/24281239552 (97.3%) @1.5x, remaining 1:41 RBU 100.0% UBU 100.0% >23643815936/24281239552 (97.4%) @1.4x, remaining 1:37 RBU 100.0% UBU 100.0% >23666163712/24281239552 (97.5%) @1.5x, remaining 1:34 RBU 100.0% UBU 100.0% >23684841472/24281239552 (97.5%) @1.2x, remaining 1:31 RBU 100.0% UBU 32.7% >23707385856/24281239552 (97.6%) @1.5x, remaining 1:28 RBU 100.0% UBU 100.0% >23729143808/24281239552 (97.7%) @1.5x, remaining 1:24 RBU 100.0% UBU 100.0% >23751098368/24281239552 (97.8%) @1.5x, remaining 1:21 RBU 100.0% UBU 100.0% >23773544448/24281239552 (97.9%) @1.5x, remaining 1:18 RBU 100.0% UBU 100.0% >23794876416/24281239552 (98.0%) @1.4x, remaining 1:14 RBU 100.0% UBU 32.7% >23815979008/24281239552 (98.1%) @1.4x, remaining 1:11 RBU 100.0% UBU 100.0% >23838588928/24281239552 (98.2%) @1.5x, remaining 1:08 RBU 100.0% UBU 100.0% >23859691520/24281239552 (98.3%) @1.4x, remaining 1:04 RBU 100.0% UBU 100.0% >23882301440/24281239552 (98.4%) @1.5x, remaining 1:01 RBU 100.0% UBU 100.0% >23903797248/24281239552 (98.4%) @1.4x, remaining 0:58 RBU 100.0% UBU 100.0% >23925882880/24281239552 (98.5%) @1.5x, remaining 0:54 RBU 100.0% UBU 100.0% >23947608064/24281239552 (98.6%) @1.4x, remaining 0:51 RBU 100.0% UBU 100.0% >23968841728/24281239552 (98.7%) @1.4x, remaining 0:48 RBU 100.0% UBU 9.6% >23990108160/24281239552 (98.8%) @1.4x, remaining 0:44 RBU 100.0% UBU 98.1% >24012062720/24281239552 (98.9%) @1.5x, remaining 0:41 RBU 100.0% UBU 100.0% >24022745088/24281239552 (98.9%) @0.7x, remaining 0:39 RBU 100.0% UBU 100.0% >24022745088/24281239552 (98.9%) @0.0x, remaining 0:39 RBU 100.0% UBU 100.0% >24034017280/24281239552 (99.0%) @0.8x, remaining 0:38 RBU 100.0% UBU 9.6% >24056365056/24281239552 (99.1%) @1.5x, remaining 0:34 RBU 100.0% UBU 100.0% >24077598720/24281239552 (99.2%) @1.4x, remaining 0:31 RBU 100.0% UBU 59.6% >24098963456/24281239552 (99.2%) @1.4x, remaining 0:28 RBU 100.0% UBU 100.0% >24120098816/24281239552 (99.3%) @1.4x, remaining 0:24 RBU 100.0% UBU 90.4% >24142544896/24281239552 (99.4%) @1.5x, remaining 0:21 RBU 100.0% UBU 100.0% >24163909632/24281239552 (99.5%) @1.4x, remaining 0:18 RBU 100.0% UBU 100.0% >24186257408/24281239552 (99.6%) @1.5x, remaining 0:14 RBU 100.0% UBU 100.0% >24208867328/24281239552 (99.7%) @1.5x, remaining 0:11 RBU 100.0% UBU 100.0% >24226627584/24281239552 (99.8%) @1.2x, remaining 0:08 RBU 100.0% UBU 40.4% > >growisofs command: >----------------------- >/usr/bin/growisofs -Z /dev/sr1=/dev/fd/0 -use-the-force-luke=notray -use-the-force-luke=tty -use-the-force-luke=4gms -use-the-force-luke=tracksize:11856074 -dvd-compat -speed=4 -use-the-force-luke=bufsize:32m > >mkisofs >----------------------- >11856074 >I: -input-charset not specified, using utf-8 (detected in locale settings) > 0.00% done, estimate finish Sat Mar 9 17:13:00 2013 > 0.01% done, estimate finish Sat Mar 9 14:03:39 2013 > 0.01% done, estimate finish Sat Mar 9 12:59:06 2013 > 0.02% done, estimate finish Sat Mar 9 12:26:34 2013 > 0.02% done, estimate finish Sat Mar 9 12:06:26 2013 > 0.03% done, estimate finish Sat Mar 9 11:53:29 2013 > 0.03% done, estimate finish Sat Mar 9 11:44:11 2013 > 0.03% done, estimate finish Sat Mar 9 11:37:12 2013 > 0.04% done, estimate finish Sat Mar 9 11:31:36 2013 > 0.04% done, estimate finish Sat Mar 9 11:27:15 2013 > 0.05% done, estimate finish Sat Mar 9 11:23:42 2013 > 0.05% done, estimate finish Sat Mar 9 11:20:44 2013 > 0.05% done, estimate finish Sat Mar 9 11:18:09 2013 > 0.06% done, estimate finish Sat Mar 9 11:16:00 2013 > 0.06% done, estimate finish Sat Mar 9 11:14:08 2013 > 0.07% done, estimate finish Sat Mar 9 11:12:30 2013 > 0.07% done, estimate finish Sat Mar 9 11:11:01 2013 > 0.08% done, estimate finish Sat Mar 9 11:09:45 2013 > 0.08% done, estimate finish Sat Mar 9 11:08:36 2013 > 0.08% done, estimate finish Sat Mar 9 11:07:34 2013 > 0.09% done, estimate finish Sat Mar 9 11:06:36 2013 > 0.09% done, estimate finish Sat Mar 9 11:05:45 2013 > 0.10% done, estimate finish Sat Mar 9 11:04:59 2013 > 0.10% done, estimate finish Sat Mar 9 11:04:16 2013 > 0.11% done, estimate finish Sat Mar 9 11:03:36 2013 > 0.11% done, estimate finish Sat Mar 9 11:03:00 2013 > 0.11% done, estimate finish Sat Mar 9 11:02:26 2013 > 0.12% done, estimate finish Sat Mar 9 11:01:55 2013 > 0.12% done, estimate finish Sat Mar 9 11:01:25 2013 > 0.13% done, estimate finish Sat Mar 9 11:00:58 2013 > 0.13% done, estimate finish Sat Mar 9 11:00:33 2013 > 0.13% done, estimate finish Sat Mar 9 11:00:09 2013 > 0.14% done, estimate finish Sat Mar 9 13:59:16 2013 > 0.14% done, estimate finish Sat Mar 9 13:53:41 2013 > 0.15% done, estimate finish Sat Mar 9 14:22:17 2013 > 0.15% done, estimate finish Sat Mar 9 14:16:23 2013 > 0.16% done, estimate finish Sat Mar 9 14:10:36 2013 > 0.16% done, estimate finish Sat Mar 9 14:05:19 2013 > 0.16% done, estimate finish Sat Mar 9 14:10:25 2013 > 0.17% done, estimate finish Sat Mar 9 14:05:24 2013 > 0.17% done, estimate finish Sat Mar 9 14:00:28 2013 > 0.18% done, estimate finish Sat Mar 9 13:55:55 2013 > 0.18% done, estimate finish Sat Mar 9 13:51:35 2013 > 0.19% done, estimate finish Sat Mar 9 13:56:25 2013 > 0.19% done, estimate finish Sat Mar 9 13:52:08 2013 > 0.19% done, estimate finish Sat Mar 9 13:48:09 2013 > 0.20% done, estimate finish Sat Mar 9 13:44:21 2013 > 0.20% done, estimate finish Sat Mar 9 13:40:42 2013 > 0.21% done, estimate finish Sat Mar 9 13:37:05 2013 > 0.21% done, estimate finish Sat Mar 9 13:41:38 2013 > 0.22% done, estimate finish Sat Mar 9 13:38:15 2013 > 0.22% done, estimate finish Sat Mar 9 13:35:00 2013 > 0.22% done, estimate finish Sat Mar 9 13:31:46 2013 > 0.23% done, estimate finish Sat Mar 9 13:28:46 2013 > 0.23% done, estimate finish Sat Mar 9 13:25:52 2013 > 0.24% done, estimate finish Sat Mar 9 13:23:04 2013 > 0.24% done, estimate finish Sat Mar 9 13:27:12 2013 > 0.24% done, estimate finish Sat Mar 9 13:24:29 2013 > 0.25% done, estimate finish Sat Mar 9 13:21:51 2013 > 0.25% done, estimate finish Sat Mar 9 13:19:18 2013 > 0.26% done, estimate finish Sat Mar 9 13:16:45 2013 > 0.26% done, estimate finish Sat Mar 9 13:14:22 2013 > 0.27% done, estimate finish Sat Mar 9 13:18:20 2013 > 0.27% done, estimate finish Sat Mar 9 13:16:00 2013 > 0.27% done, estimate finish Sat Mar 9 13:13:40 2013 > 0.28% done, estimate finish Sat Mar 9 13:11:29 2013 > 0.28% done, estimate finish Sat Mar 9 13:09:21 2013 > 0.29% done, estimate finish Sat Mar 9 13:07:17 2013 > 0.29% done, estimate finish Sat Mar 9 13:10:57 2013 > 0.30% done, estimate finish Sat Mar 9 13:08:55 2013 > 0.30% done, estimate finish Sat Mar 9 13:06:57 2013 > 0.30% done, estimate finish Sat Mar 9 13:05:02 2013 > 0.31% done, estimate finish Sat Mar 9 13:03:06 2013 > 0.31% done, estimate finish Sat Mar 9 13:01:17 2013 > 0.32% done, estimate finish Sat Mar 9 13:04:48 2013 > 0.32% done, estimate finish Sat Mar 9 13:03:00 2013 > 0.32% done, estimate finish Sat Mar 9 13:01:12 2013 > 0.33% done, estimate finish Sat Mar 9 12:59:31 2013 > 0.33% done, estimate finish Sat Mar 9 12:57:52 2013 > 0.34% done, estimate finish Sat Mar 9 12:56:15 2013 > 0.34% done, estimate finish Sat Mar 9 12:59:30 2013 > 0.35% done, estimate finish Sat Mar 9 12:57:54 2013 > 0.35% done, estimate finish Sat Mar 9 12:56:21 2013 > 0.35% done, estimate finish Sat Mar 9 12:54:50 2013 > 0.36% done, estimate finish Sat Mar 9 12:53:18 2013 > 0.36% done, estimate finish Sat Mar 9 12:51:51 2013 > 0.37% done, estimate finish Sat Mar 9 12:50:27 2013 > 0.37% done, estimate finish Sat Mar 9 12:53:33 2013 > 0.38% done, estimate finish Sat Mar 9 12:52:06 2013 > 0.38% done, estimate finish Sat Mar 9 12:50:44 2013 > 0.38% done, estimate finish Sat Mar 9 12:49:24 2013 > 0.39% done, estimate finish Sat Mar 9 12:48:05 2013 > 0.39% done, estimate finish Sat Mar 9 12:46:46 2013 > 0.40% done, estimate finish Sat Mar 9 12:49:43 2013 > 0.40% done, estimate finish Sat Mar 9 12:48:26 2013 > 0.40% done, estimate finish Sat Mar 9 12:47:11 2013 > 0.41% done, estimate finish Sat Mar 9 12:45:56 2013 > 0.41% done, estimate finish Sat Mar 9 12:44:44 2013 > 0.42% done, estimate finish Sat Mar 9 12:43:34 2013 > 0.42% done, estimate finish Sat Mar 9 12:42:25 2013 > 0.43% done, estimate finish Sat Mar 9 12:45:10 2013 > 0.43% done, estimate finish Sat Mar 9 12:44:01 2013 > 0.43% done, estimate finish Sat Mar 9 12:42:54 2013 > 0.44% done, estimate finish Sat Mar 9 12:41:48 2013 > 0.44% done, estimate finish Sat Mar 9 12:40:42 2013 > 0.45% done, estimate finish Sat Mar 9 12:39:38 2013 > 0.45% done, estimate finish Sat Mar 9 12:38:36 2013 > 0.46% done, estimate finish Sat Mar 9 12:41:15 2013 > 0.46% done, estimate finish Sat Mar 9 12:40:11 2013 > 0.46% done, estimate finish Sat Mar 9 12:39:10 2013 > 0.47% done, estimate finish Sat Mar 9 12:38:10 2013 > 0.47% done, estimate finish Sat Mar 9 12:37:12 2013 > 0.48% done, estimate finish Sat Mar 9 12:36:12 2013 > 0.48% done, estimate finish Sat Mar 9 12:38:43 2013 > 0.49% done, estimate finish Sat Mar 9 12:37:46 2013 > 0.49% done, estimate finish Sat Mar 9 12:36:50 2013 > 0.49% done, estimate finish Sat Mar 9 12:35:52 2013 > 0.50% done, estimate finish Sat Mar 9 12:34:58 2013 > 0.50% done, estimate finish Sat Mar 9 12:34:04 2013 > 0.51% done, estimate finish Sat Mar 9 12:33:12 2013 > 0.51% done, estimate finish Sat Mar 9 12:35:34 2013 > 0.51% done, estimate finish Sat Mar 9 12:34:41 2013 > 0.52% done, estimate finish Sat Mar 9 12:33:50 2013 > 0.52% done, estimate finish Sat Mar 9 12:32:59 2013 > 0.53% done, estimate finish Sat Mar 9 12:32:07 2013 > 0.53% done, estimate finish Sat Mar 9 12:31:18 2013 > 0.54% done, estimate finish Sat Mar 9 12:33:36 2013 > 0.54% done, estimate finish Sat Mar 9 12:32:47 2013 > 0.54% done, estimate finish Sat Mar 9 12:31:57 2013 > 0.55% done, estimate finish Sat Mar 9 12:31:09 2013 > 0.55% done, estimate finish Sat Mar 9 12:30:22 2013 > 0.56% done, estimate finish Sat Mar 9 12:29:36 2013 > 0.56% done, estimate finish Sat Mar 9 12:31:47 2013 > 0.57% done, estimate finish Sat Mar 9 12:31:01 2013 > 0.57% done, estimate finish Sat Mar 9 12:30:16 2013 > 0.57% done, estimate finish Sat Mar 9 12:29:31 2013 > 0.58% done, estimate finish Sat Mar 9 12:28:45 2013 > 0.58% done, estimate finish Sat Mar 9 12:28:02 2013 > 0.59% done, estimate finish Sat Mar 9 12:30:09 2013 > 0.59% done, estimate finish Sat Mar 9 12:29:26 2013 > 0.59% done, estimate finish Sat Mar 9 12:28:42 2013 > 0.60% done, estimate finish Sat Mar 9 12:27:59 2013 > 0.60% done, estimate finish Sat Mar 9 12:27:18 2013 > 0.61% done, estimate finish Sat Mar 9 12:26:36 2013 > 0.61% done, estimate finish Sat Mar 9 12:25:55 2013 > 0.62% done, estimate finish Sat Mar 9 12:27:57 2013 > 0.62% done, estimate finish Sat Mar 9 12:27:16 2013 > 0.62% done, estimate finish Sat Mar 9 12:26:36 2013 > 0.63% done, estimate finish Sat Mar 9 12:25:56 2013 > 0.63% done, estimate finish Sat Mar 9 12:25:17 2013 > 0.64% done, estimate finish Sat Mar 9 12:24:38 2013 > 0.64% done, estimate finish Sat Mar 9 12:26:36 2013 > 0.65% done, estimate finish Sat Mar 9 12:25:57 2013 > 0.65% done, estimate finish Sat Mar 9 12:25:19 2013 > 0.65% done, estimate finish Sat Mar 9 12:24:41 2013 > 0.66% done, estimate finish Sat Mar 9 12:24:04 2013 > 0.66% done, estimate finish Sat Mar 9 12:23:27 2013 > 0.67% done, estimate finish Sat Mar 9 12:22:51 2013 > 0.67% done, estimate finish Sat Mar 9 12:24:44 2013 > 0.67% done, estimate finish Sat Mar 9 12:24:08 2013 > 0.68% done, estimate finish Sat Mar 9 12:23:32 2013 > 0.68% done, estimate finish Sat Mar 9 12:22:56 2013 > 0.69% done, estimate finish Sat Mar 9 12:22:22 2013 > 0.69% done, estimate finish Sat Mar 9 12:21:47 2013 > 0.70% done, estimate finish Sat Mar 9 12:23:36 2013 > 0.70% done, estimate finish Sat Mar 9 12:23:02 2013 > 0.70% done, estimate finish Sat Mar 9 12:22:28 2013 > 0.71% done, estimate finish Sat Mar 9 12:21:54 2013 > 0.71% done, estimate finish Sat Mar 9 12:21:20 2013 > 0.72% done, estimate finish Sat Mar 9 12:20:47 2013 > 0.72% done, estimate finish Sat Mar 9 12:20:15 2013 > 0.73% done, estimate finish Sat Mar 9 12:22:01 2013 > 0.73% done, estimate finish Sat Mar 9 12:21:27 2013 > 0.73% done, estimate finish Sat Mar 9 12:20:55 2013 > 0.74% done, estimate finish Sat Mar 9 12:20:24 2013 > 0.74% done, estimate finish Sat Mar 9 12:19:52 2013 > 0.75% done, estimate finish Sat Mar 9 12:19:20 2013 > 0.75% done, estimate finish Sat Mar 9 12:21:03 2013 > 0.75% done, estimate finish Sat Mar 9 12:20:32 2013 > 0.76% done, estimate finish Sat Mar 9 12:20:01 2013 > 0.76% done, estimate finish Sat Mar 9 12:19:30 2013 > 0.77% done, estimate finish Sat Mar 9 12:19:00 2013 > 0.77% done, estimate finish Sat Mar 9 12:18:30 2013 > 0.78% done, estimate finish Sat Mar 9 12:20:10 2013 > 0.78% done, estimate finish Sat Mar 9 12:19:39 2013 > 0.78% done, estimate finish Sat Mar 9 12:19:10 2013 > 0.79% done, estimate finish Sat Mar 9 12:18:41 2013 > 0.79% done, estimate finish Sat Mar 9 12:18:12 2013 > 0.80% done, estimate finish Sat Mar 9 12:17:43 2013 > 0.80% done, estimate finish Sat Mar 9 12:19:19 2013 > 0.81% done, estimate finish Sat Mar 9 12:18:51 2013 > 0.81% done, estimate finish Sat Mar 9 12:18:22 2013 > 0.81% done, estimate finish Sat Mar 9 12:17:54 2013 > 0.82% done, estimate finish Sat Mar 9 12:17:26 2013 > 0.82% done, estimate finish Sat Mar 9 12:16:59 2013 > 0.83% done, estimate finish Sat Mar 9 12:16:32 2013 > 0.83% done, estimate finish Sat Mar 9 12:18:04 2013 > 0.84% done, estimate finish Sat Mar 9 12:17:37 2013 > 0.84% done, estimate finish Sat Mar 9 12:17:10 2013 > 0.84% done, estimate finish Sat Mar 9 12:16:44 2013 > 0.85% done, estimate finish Sat Mar 9 12:16:17 2013 > 0.85% done, estimate finish Sat Mar 9 12:15:50 2013 > 0.86% done, estimate finish Sat Mar 9 12:17:21 2013 > 0.86% done, estimate finish Sat Mar 9 12:16:55 2013 > 0.86% done, estimate finish Sat Mar 9 12:16:29 2013 > 0.87% done, estimate finish Sat Mar 9 12:16:03 2013 > 0.87% done, estimate finish Sat Mar 9 12:15:38 2013 > 0.88% done, estimate finish Sat Mar 9 12:15:12 2013 > 0.88% done, estimate finish Sat Mar 9 12:16:40 2013 > 0.89% done, estimate finish Sat Mar 9 12:16:15 2013 > 0.89% done, estimate finish Sat Mar 9 12:15:50 2013 > 0.89% done, estimate finish Sat Mar 9 12:15:25 2013 > 0.90% done, estimate finish Sat Mar 9 12:15:00 2013 > 0.90% done, estimate finish Sat Mar 9 12:14:36 2013 > 0.91% done, estimate finish Sat Mar 9 12:16:02 2013 > 0.91% done, estimate finish Sat Mar 9 12:15:38 2013 > 0.92% done, estimate finish Sat Mar 9 12:15:13 2013 > 0.92% done, estimate finish Sat Mar 9 12:14:49 2013 > 0.92% done, estimate finish Sat Mar 9 12:14:25 2013 > 0.93% done, estimate finish Sat Mar 9 12:14:02 2013 > 0.93% done, estimate finish Sat Mar 9 12:13:38 2013 > 0.94% done, estimate finish Sat Mar 9 12:13:15 2013 > 0.94% done, estimate finish Sat Mar 9 12:14:39 2013 > 0.94% done, estimate finish Sat Mar 9 12:14:15 2013 > 0.95% done, estimate finish Sat Mar 9 12:13:52 2013 > 0.95% done, estimate finish Sat Mar 9 12:13:29 2013 > 0.96% done, estimate finish Sat Mar 9 12:13:07 2013 > 0.96% done, estimate finish Sat Mar 9 12:14:28 2013 > 0.97% done, estimate finish Sat Mar 9 12:14:05 2013 > 0.97% done, estimate finish Sat Mar 9 12:13:43 2013 > 0.97% done, estimate finish Sat Mar 9 12:13:21 2013 > 0.98% done, estimate finish Sat Mar 9 12:12:59 2013 > 0.98% done, estimate finish Sat Mar 9 12:12:36 2013 > 0.99% done, estimate finish Sat Mar 9 12:12:15 2013 > 0.99% done, estimate finish Sat Mar 9 12:13:34 2013 > 1.00% done, estimate finish Sat Mar 9 12:13:13 2013 > 1.00% done, estimate finish Sat Mar 9 12:12:51 2013 > 1.00% done, estimate finish Sat Mar 9 12:12:29 2013 > 1.01% done, estimate finish Sat Mar 9 12:12:08 2013 > 1.01% done, estimate finish Sat Mar 9 12:11:47 2013 > 1.02% done, estimate finish Sat Mar 9 12:13:04 2013 > 1.02% done, estimate finish Sat Mar 9 12:12:43 2013 > 1.02% done, estimate finish Sat Mar 9 12:12:22 2013 > 1.03% done, estimate finish Sat Mar 9 12:12:02 2013 > 1.03% done, estimate finish Sat Mar 9 12:11:41 2013 > 1.04% done, estimate finish Sat Mar 9 12:12:57 2013 > 1.04% done, estimate finish Sat Mar 9 12:12:36 2013 > 1.05% done, estimate finish Sat Mar 9 12:12:16 2013 > 1.05% done, estimate finish Sat Mar 9 12:11:55 2013 > 1.05% done, estimate finish Sat Mar 9 12:11:35 2013 > 1.06% done, estimate finish Sat Mar 9 12:11:15 2013 > 1.06% done, estimate finish Sat Mar 9 12:10:56 2013 > 1.07% done, estimate finish Sat Mar 9 12:10:35 2013 > 1.07% done, estimate finish Sat Mar 9 12:11:49 2013 > 1.08% done, estimate finish Sat Mar 9 12:11:30 2013 > 1.08% done, estimate finish Sat Mar 9 12:11:10 2013 > 1.08% done, estimate finish Sat Mar 9 12:10:50 2013 > 1.09% done, estimate finish Sat Mar 9 12:10:31 2013 > 1.09% done, estimate finish Sat Mar 9 12:10:12 2013 > 1.10% done, estimate finish Sat Mar 9 12:11:24 2013 > 1.10% done, estimate finish Sat Mar 9 12:11:05 2013 > 1.10% done, estimate finish Sat Mar 9 12:10:46 2013 > 1.11% done, estimate finish Sat Mar 9 12:10:27 2013 > 1.11% done, estimate finish Sat Mar 9 12:10:08 2013 > 1.12% done, estimate finish Sat Mar 9 12:09:49 2013 > 1.12% done, estimate finish Sat Mar 9 12:11:00 2013 > 1.13% done, estimate finish Sat Mar 9 12:10:42 2013 > 1.13% done, estimate finish Sat Mar 9 12:10:23 2013 > 1.13% done, estimate finish Sat Mar 9 12:10:04 2013 > 1.14% done, estimate finish Sat Mar 9 12:09:46 2013 > 1.14% done, estimate finish Sat Mar 9 12:09:28 2013 > 1.15% done, estimate finish Sat Mar 9 12:09:10 2013 > 1.15% done, estimate finish Sat Mar 9 12:10:19 2013 > 1.16% done, estimate finish Sat Mar 9 12:10:01 2013 > 1.16% done, estimate finish Sat Mar 9 12:09:43 2013 > 1.16% done, estimate finish Sat Mar 9 12:09:26 2013 > 1.17% done, estimate finish Sat Mar 9 12:09:07 2013 > 1.17% done, estimate finish Sat Mar 9 12:08:50 2013 > 1.18% done, estimate finish Sat Mar 9 12:09:58 2013 > 1.18% done, estimate finish Sat Mar 9 12:09:40 2013 > 1.19% done, estimate finish Sat Mar 9 12:09:22 2013 > 1.19% done, estimate finish Sat Mar 9 12:09:05 2013 > 1.19% done, estimate finish Sat Mar 9 12:08:48 2013 > 1.20% done, estimate finish Sat Mar 9 12:08:31 2013 > 1.20% done, estimate finish Sat Mar 9 12:08:14 2013 > 1.21% done, estimate finish Sat Mar 9 12:09:20 2013 > 1.21% done, estimate finish Sat Mar 9 12:09:03 2013 > 1.21% done, estimate finish Sat Mar 9 12:08:46 2013 > 1.22% done, estimate finish Sat Mar 9 12:08:29 2013 > 1.22% done, estimate finish Sat Mar 9 12:08:12 2013 > 1.23% done, estimate finish Sat Mar 9 12:07:56 2013 > 1.23% done, estimate finish Sat Mar 9 12:09:01 2013 > 1.24% done, estimate finish Sat Mar 9 12:08:44 2013 > 1.24% done, estimate finish Sat Mar 9 12:08:27 2013 > 1.24% done, estimate finish Sat Mar 9 12:08:11 2013 > 1.25% done, estimate finish Sat Mar 9 12:07:55 2013 > 1.25% done, estimate finish Sat Mar 9 12:07:38 2013 > 1.26% done, estimate finish Sat Mar 9 12:08:42 2013 > 1.26% done, estimate finish Sat Mar 9 12:08:26 2013 > 1.27% done, estimate finish Sat Mar 9 12:08:10 2013 > 1.27% done, estimate finish Sat Mar 9 12:07:54 2013 > 1.27% done, estimate finish Sat Mar 9 12:07:38 2013 > 1.28% done, estimate finish Sat Mar 9 12:07:22 2013 > 1.28% done, estimate finish Sat Mar 9 12:07:06 2013 > 1.29% done, estimate finish Sat Mar 9 12:08:08 2013 > 1.29% done, estimate finish Sat Mar 9 12:07:53 2013 > 1.29% done, estimate finish Sat Mar 9 12:07:37 2013 > 1.30% done, estimate finish Sat Mar 9 12:07:22 2013 > 1.30% done, estimate finish Sat Mar 9 12:07:06 2013 > 1.31% done, estimate finish Sat Mar 9 12:06:51 2013 > 1.31% done, estimate finish Sat Mar 9 12:07:52 2013 > 1.32% done, estimate finish Sat Mar 9 12:07:36 2013 > 1.32% done, estimate finish Sat Mar 9 12:07:21 2013 > 1.32% done, estimate finish Sat Mar 9 12:07:06 2013 > 1.33% done, estimate finish Sat Mar 9 12:06:51 2013 > 1.33% done, estimate finish Sat Mar 9 12:06:36 2013 > 1.34% done, estimate finish Sat Mar 9 12:06:21 2013 > 1.34% done, estimate finish Sat Mar 9 12:07:20 2013 > 1.35% done, estimate finish Sat Mar 9 12:07:06 2013 > 1.35% done, estimate finish Sat Mar 9 12:06:51 2013 > 1.35% done, estimate finish Sat Mar 9 12:06:36 2013 > 1.36% done, estimate finish Sat Mar 9 12:06:21 2013 > 1.36% done, estimate finish Sat Mar 9 12:06:07 2013 > 1.37% done, estimate finish Sat Mar 9 12:07:06 2013 > 1.37% done, estimate finish Sat Mar 9 12:06:51 2013 > 1.37% done, estimate finish Sat Mar 9 12:06:36 2013 > 1.38% done, estimate finish Sat Mar 9 12:06:22 2013 > 1.38% done, estimate finish Sat Mar 9 12:06:08 2013 > 1.39% done, estimate finish Sat Mar 9 12:05:53 2013 > 1.39% done, estimate finish Sat Mar 9 12:06:51 2013 > 1.40% done, estimate finish Sat Mar 9 12:06:36 2013 > 1.40% done, estimate finish Sat Mar 9 12:06:22 2013 > 1.40% done, estimate finish Sat Mar 9 12:06:08 2013 > 1.41% done, estimate finish Sat Mar 9 12:05:54 2013 > 1.41% done, estimate finish Sat Mar 9 12:05:40 2013 > 1.42% done, estimate finish Sat Mar 9 12:06:37 2013 > 1.42% done, estimate finish Sat Mar 9 12:06:22 2013 > 1.43% done, estimate finish Sat Mar 9 12:06:09 2013 > 1.43% done, estimate finish Sat Mar 9 12:05:55 2013 > 1.43% done, estimate finish Sat Mar 9 12:05:41 2013 > 1.44% done, estimate finish Sat Mar 9 12:05:27 2013 > 1.44% done, estimate finish Sat Mar 9 12:06:23 2013 > 1.45% done, estimate finish Sat Mar 9 12:06:09 2013 > 1.45% done, estimate finish Sat Mar 9 12:05:56 2013 > 1.46% done, estimate finish Sat Mar 9 12:05:42 2013 > 1.46% done, estimate finish Sat Mar 9 12:05:28 2013 > 1.46% done, estimate finish Sat Mar 9 12:05:15 2013 > 1.47% done, estimate finish Sat Mar 9 12:06:10 2013 > 1.47% done, estimate finish Sat Mar 9 12:05:56 2013 > 1.48% done, estimate finish Sat Mar 9 12:05:43 2013 > 1.48% done, estimate finish Sat Mar 9 12:05:30 2013 > 1.48% done, estimate finish Sat Mar 9 12:05:17 2013 > 1.49% done, estimate finish Sat Mar 9 12:05:03 2013 > 1.49% done, estimate finish Sat Mar 9 12:04:50 2013 > 1.50% done, estimate finish Sat Mar 9 12:04:37 2013 > 1.50% done, estimate finish Sat Mar 9 12:05:31 2013 > 1.51% done, estimate finish Sat Mar 9 12:05:18 2013 > 1.51% done, estimate finish Sat Mar 9 12:05:05 2013 > 1.51% done, estimate finish Sat Mar 9 12:04:52 2013 > 1.52% done, estimate finish Sat Mar 9 12:04:39 2013 > 1.52% done, estimate finish Sat Mar 9 12:05:32 2013 > 1.53% done, estimate finish Sat Mar 9 12:05:19 2013 > 1.53% done, estimate finish Sat Mar 9 12:05:06 2013 > 1.54% done, estimate finish Sat Mar 9 12:04:54 2013 > 1.54% done, estimate finish Sat Mar 9 12:04:41 2013 > 1.54% done, estimate finish Sat Mar 9 12:04:28 2013 > 1.55% done, estimate finish Sat Mar 9 12:04:16 2013 > 1.55% done, estimate finish Sat Mar 9 12:05:08 2013 > 1.56% done, estimate finish Sat Mar 9 12:04:55 2013 > 1.56% done, estimate finish Sat Mar 9 12:04:43 2013 > 1.56% done, estimate finish Sat Mar 9 12:04:30 2013 > 1.57% done, estimate finish Sat Mar 9 12:04:18 2013 > 1.57% done, estimate finish Sat Mar 9 12:04:05 2013 > 1.58% done, estimate finish Sat Mar 9 12:03:53 2013 > 1.58% done, estimate finish Sat Mar 9 12:04:44 2013 > 1.59% done, estimate finish Sat Mar 9 12:04:32 2013 > 1.59% done, estimate finish Sat Mar 9 12:04:20 2013 > 1.59% done, estimate finish Sat Mar 9 12:04:08 2013 > 1.60% done, estimate finish Sat Mar 9 12:03:56 2013 > 1.60% done, estimate finish Sat Mar 9 12:03:44 2013 > 1.61% done, estimate finish Sat Mar 9 12:04:34 2013 > 1.61% done, estimate finish Sat Mar 9 12:04:22 2013 > 1.62% done, estimate finish Sat Mar 9 12:04:10 2013 > 1.62% done, estimate finish Sat Mar 9 12:03:58 2013 > 1.62% done, estimate finish Sat Mar 9 12:03:46 2013 > 1.63% done, estimate finish Sat Mar 9 12:03:34 2013 > 1.63% done, estimate finish Sat Mar 9 12:04:24 2013 > 1.64% done, estimate finish Sat Mar 9 12:04:12 2013 > 1.64% done, estimate finish Sat Mar 9 12:04:00 2013 > 1.64% done, estimate finish Sat Mar 9 12:03:48 2013 > 1.65% done, estimate finish Sat Mar 9 12:03:37 2013 > 1.65% done, estimate finish Sat Mar 9 12:03:25 2013 > 1.66% done, estimate finish Sat Mar 9 12:04:14 2013 > 1.66% done, estimate finish Sat Mar 9 12:04:02 2013 > 1.67% done, estimate finish Sat Mar 9 12:03:51 2013 > 1.67% done, estimate finish Sat Mar 9 12:03:39 2013 > 1.67% done, estimate finish Sat Mar 9 12:03:28 2013 > 1.68% done, estimate finish Sat Mar 9 12:03:16 2013 > 1.68% done, estimate finish Sat Mar 9 12:03:05 2013 > 1.69% done, estimate finish Sat Mar 9 12:03:53 2013 > 1.69% done, estimate finish Sat Mar 9 12:03:41 2013 > 1.70% done, estimate finish Sat Mar 9 12:03:30 2013 > 1.70% done, estimate finish Sat Mar 9 12:03:19 2013 > 1.70% done, estimate finish Sat Mar 9 12:03:08 2013 > 1.71% done, estimate finish Sat Mar 9 12:02:56 2013 > 1.71% done, estimate finish Sat Mar 9 12:03:44 2013 > 1.72% done, estimate finish Sat Mar 9 12:03:33 2013 > 1.72% done, estimate finish Sat Mar 9 12:03:22 2013 > 1.72% done, estimate finish Sat Mar 9 12:03:10 2013 > 1.73% done, estimate finish Sat Mar 9 12:02:59 2013 > 1.73% done, estimate finish Sat Mar 9 12:02:49 2013 > 1.74% done, estimate finish Sat Mar 9 12:03:35 2013 > 1.74% done, estimate finish Sat Mar 9 12:03:24 2013 > 1.75% done, estimate finish Sat Mar 9 12:03:13 2013 > 1.75% done, estimate finish Sat Mar 9 12:03:02 2013 > 1.75% done, estimate finish Sat Mar 9 12:02:52 2013 > 1.76% done, estimate finish Sat Mar 9 12:02:40 2013 > 1.76% done, estimate finish Sat Mar 9 12:02:30 2013 > 1.77% done, estimate finish Sat Mar 9 12:03:16 2013 > 1.77% done, estimate finish Sat Mar 9 12:03:05 2013 > 1.78% done, estimate finish Sat Mar 9 12:02:54 2013 > 1.78% done, estimate finish Sat Mar 9 12:02:44 2013 > 1.78% done, estimate finish Sat Mar 9 12:02:33 2013 > 1.79% done, estimate finish Sat Mar 9 12:02:22 2013 > 1.79% done, estimate finish Sat Mar 9 12:03:07 2013 > 1.80% done, estimate finish Sat Mar 9 12:02:57 2013 > 1.80% done, estimate finish Sat Mar 9 12:02:46 2013 > 1.80% done, estimate finish Sat Mar 9 12:02:36 2013 > 1.81% done, estimate finish Sat Mar 9 12:02:25 2013 > 1.81% done, estimate finish Sat Mar 9 12:02:15 2013 > 1.82% done, estimate finish Sat Mar 9 12:03:00 2013 > 1.82% done, estimate finish Sat Mar 9 12:02:49 2013 > 1.83% done, estimate finish Sat Mar 9 12:02:39 2013 > 1.83% done, estimate finish Sat Mar 9 12:02:28 2013 > 1.83% done, estimate finish Sat Mar 9 12:02:18 2013 > 1.84% done, estimate finish Sat Mar 9 12:02:08 2013 > 1.84% done, estimate finish Sat Mar 9 12:01:58 2013 > 1.85% done, estimate finish Sat Mar 9 12:02:42 2013 > 1.85% done, estimate finish Sat Mar 9 12:02:32 2013 > 1.86% done, estimate finish Sat Mar 9 12:02:21 2013 > 1.86% done, estimate finish Sat Mar 9 12:02:11 2013 > 1.86% done, estimate finish Sat Mar 9 12:02:01 2013 > 1.87% done, estimate finish Sat Mar 9 12:01:51 2013 > 1.87% done, estimate finish Sat Mar 9 12:02:35 2013 > 1.88% done, estimate finish Sat Mar 9 12:02:24 2013 > 1.88% done, estimate finish Sat Mar 9 12:02:14 2013 > 1.89% done, estimate finish Sat Mar 9 12:02:04 2013 > 1.89% done, estimate finish Sat Mar 9 12:01:55 2013 > 1.89% done, estimate finish Sat Mar 9 12:01:44 2013 > 1.90% done, estimate finish Sat Mar 9 12:01:35 2013 > 1.90% done, estimate finish Sat Mar 9 12:02:17 2013 > 1.91% done, estimate finish Sat Mar 9 12:02:08 2013 > 1.91% done, estimate finish Sat Mar 9 12:01:58 2013 > 1.91% done, estimate finish Sat Mar 9 12:01:48 2013 > 1.92% done, estimate finish Sat Mar 9 12:01:38 2013 > 1.92% done, estimate finish Sat Mar 9 12:01:29 2013 > 1.93% done, estimate finish Sat Mar 9 12:02:10 2013 > 1.93% done, estimate finish Sat Mar 9 12:02:01 2013 > 1.94% done, estimate finish Sat Mar 9 12:01:51 2013 > 1.94% done, estimate finish Sat Mar 9 12:01:42 2013 > 1.94% done, estimate finish Sat Mar 9 12:01:32 2013 > 1.95% done, estimate finish Sat Mar 9 12:01:22 2013 > 1.95% done, estimate finish Sat Mar 9 12:02:04 2013 > 1.96% done, estimate finish Sat Mar 9 12:01:55 2013 > 1.96% done, estimate finish Sat Mar 9 12:01:45 2013 > 1.97% done, estimate finish Sat Mar 9 12:01:35 2013 > 1.97% done, estimate finish Sat Mar 9 12:01:26 2013 > 1.97% done, estimate finish Sat Mar 9 12:01:17 2013 > 1.98% done, estimate finish Sat Mar 9 12:01:07 2013 > 1.98% done, estimate finish Sat Mar 9 12:01:48 2013 > 1.99% done, estimate finish Sat Mar 9 12:01:39 2013 > 1.99% done, estimate finish Sat Mar 9 12:01:29 2013 > 1.99% done, estimate finish Sat Mar 9 12:01:20 2013 > 2.00% done, estimate finish Sat Mar 9 12:01:11 2013 > 2.00% done, estimate finish Sat Mar 9 12:01:51 2013 > 2.01% done, estimate finish Sat Mar 9 12:01:42 2013 > 2.01% done, estimate finish Sat Mar 9 12:01:33 2013 > 2.02% done, estimate finish Sat Mar 9 12:01:23 2013 > 2.02% done, estimate finish Sat Mar 9 12:01:14 2013 > 2.02% done, estimate finish Sat Mar 9 12:01:05 2013 > 2.03% done, estimate finish Sat Mar 9 12:01:45 2013 > 2.03% done, estimate finish Sat Mar 9 12:01:36 2013 > 2.04% done, estimate finish Sat Mar 9 12:01:27 2013 > 2.04% done, estimate finish Sat Mar 9 12:01:18 2013 > 2.05% done, estimate finish Sat Mar 9 12:01:08 2013 > 2.05% done, estimate finish Sat Mar 9 12:00:59 2013 > 2.05% done, estimate finish Sat Mar 9 12:00:51 2013 > 2.06% done, estimate finish Sat Mar 9 12:01:30 2013 > 2.06% done, estimate finish Sat Mar 9 12:01:21 2013 > 2.07% done, estimate finish Sat Mar 9 12:01:12 2013 > 2.07% done, estimate finish Sat Mar 9 12:01:03 2013 > 2.07% done, estimate finish Sat Mar 9 12:00:54 2013 > 2.08% done, estimate finish Sat Mar 9 12:01:33 2013 > 2.08% done, estimate finish Sat Mar 9 12:01:24 2013 > 2.09% done, estimate finish Sat Mar 9 12:01:16 2013 > 2.09% done, estimate finish Sat Mar 9 12:01:07 2013 > 2.10% done, estimate finish Sat Mar 9 12:00:58 2013 > 2.10% done, estimate finish Sat Mar 9 12:00:49 2013 > 2.10% done, estimate finish Sat Mar 9 12:00:40 2013 > 2.11% done, estimate finish Sat Mar 9 12:01:19 2013 > 2.11% done, estimate finish Sat Mar 9 12:01:10 2013 > 2.12% done, estimate finish Sat Mar 9 12:01:01 2013 > 2.12% done, estimate finish Sat Mar 9 12:00:53 2013 > 2.13% done, estimate finish Sat Mar 9 12:00:44 2013 > 2.13% done, estimate finish Sat Mar 9 12:00:35 2013 > 2.13% done, estimate finish Sat Mar 9 12:01:13 2013 > 2.14% done, estimate finish Sat Mar 9 12:01:05 2013 > 2.14% done, estimate finish Sat Mar 9 12:00:56 2013 > 2.15% done, estimate finish Sat Mar 9 12:00:47 2013 > 2.15% done, estimate finish Sat Mar 9 12:00:39 2013 > 2.16% done, estimate finish Sat Mar 9 12:00:30 2013 > 2.16% done, estimate finish Sat Mar 9 12:01:08 2013 > 2.16% done, estimate finish Sat Mar 9 12:00:59 2013 > 2.17% done, estimate finish Sat Mar 9 12:00:51 2013 > 2.17% done, estimate finish Sat Mar 9 12:00:43 2013 > 2.18% done, estimate finish Sat Mar 9 12:00:34 2013 > 2.18% done, estimate finish Sat Mar 9 12:00:25 2013 > 2.18% done, estimate finish Sat Mar 9 12:00:17 2013 > 2.19% done, estimate finish Sat Mar 9 12:00:54 2013 > 2.19% done, estimate finish Sat Mar 9 12:00:46 2013 > 2.20% done, estimate finish Sat Mar 9 12:00:38 2013 > 2.20% done, estimate finish Sat Mar 9 12:00:29 2013 > 2.21% done, estimate finish Sat Mar 9 12:00:21 2013 > 2.21% done, estimate finish Sat Mar 9 12:00:13 2013 > 2.21% done, estimate finish Sat Mar 9 12:00:49 2013 > 2.22% done, estimate finish Sat Mar 9 12:00:41 2013 > 2.22% done, estimate finish Sat Mar 9 12:00:33 2013 > 2.23% done, estimate finish Sat Mar 9 12:00:25 2013 > 2.23% done, estimate finish Sat Mar 9 12:00:16 2013 > 2.24% done, estimate finish Sat Mar 9 12:00:08 2013 > 2.24% done, estimate finish Sat Mar 9 12:00:45 2013 > 2.24% done, estimate finish Sat Mar 9 12:00:37 2013 > 2.25% done, estimate finish Sat Mar 9 12:00:28 2013 > 2.25% done, estimate finish Sat Mar 9 12:00:20 2013 > 2.26% done, estimate finish Sat Mar 9 12:00:12 2013 > 2.26% done, estimate finish Sat Mar 9 12:00:04 2013 > 2.26% done, estimate finish Sat Mar 9 11:59:56 2013 > 2.27% done, estimate finish Sat Mar 9 12:00:32 2013 > 2.27% done, estimate finish Sat Mar 9 12:00:24 2013 > 2.28% done, estimate finish Sat Mar 9 12:00:16 2013 > 2.28% done, estimate finish Sat Mar 9 12:00:07 2013 > 2.29% done, estimate finish Sat Mar 9 12:00:00 2013 > 2.29% done, estimate finish Sat Mar 9 11:59:52 2013 > 2.29% done, estimate finish Sat Mar 9 12:00:27 2013 > 2.30% done, estimate finish Sat Mar 9 12:00:19 2013 > 2.30% done, estimate finish Sat Mar 9 12:00:11 2013 > 2.31% done, estimate finish Sat Mar 9 12:00:03 2013 > 2.31% done, estimate finish Sat Mar 9 11:59:56 2013 > 2.32% done, estimate finish Sat Mar 9 11:59:47 2013 > 2.32% done, estimate finish Sat Mar 9 12:00:23 2013 > 2.32% done, estimate finish Sat Mar 9 12:00:15 2013 > 2.33% done, estimate finish Sat Mar 9 12:00:07 2013 > 2.33% done, estimate finish Sat Mar 9 11:59:59 2013 > 2.34% done, estimate finish Sat Mar 9 11:59:51 2013 > 2.34% done, estimate finish Sat Mar 9 11:59:44 2013 > 2.34% done, estimate finish Sat Mar 9 11:59:36 2013 > 2.35% done, estimate finish Sat Mar 9 12:00:11 2013 > 2.35% done, estimate finish Sat Mar 9 12:00:03 2013 > 2.36% done, estimate finish Sat Mar 9 11:59:55 2013 > 2.36% done, estimate finish Sat Mar 9 11:59:47 2013 > 2.37% done, estimate finish Sat Mar 9 11:59:40 2013 > 2.37% done, estimate finish Sat Mar 9 11:59:32 2013 > 2.37% done, estimate finish Sat Mar 9 12:00:07 2013 > 2.38% done, estimate finish Sat Mar 9 11:59:59 2013 > 2.38% done, estimate finish Sat Mar 9 11:59:51 2013 > 2.39% done, estimate finish Sat Mar 9 11:59:43 2013 > 2.39% done, estimate finish Sat Mar 9 11:59:36 2013 > 2.40% done, estimate finish Sat Mar 9 11:59:28 2013 > 2.40% done, estimate finish Sat Mar 9 12:00:02 2013 > 2.40% done, estimate finish Sat Mar 9 11:59:55 2013 > 2.41% done, estimate finish Sat Mar 9 11:59:47 2013 > 2.41% done, estimate finish Sat Mar 9 11:59:40 2013 > 2.42% done, estimate finish Sat Mar 9 11:59:32 2013 > 2.42% done, estimate finish Sat Mar 9 12:00:06 2013 > 2.42% done, estimate finish Sat Mar 9 11:59:58 2013 > 2.43% done, estimate finish Sat Mar 9 11:59:51 2013 > 2.43% done, estimate finish Sat Mar 9 11:59:43 2013 > 2.44% done, estimate finish Sat Mar 9 11:59:36 2013 > 2.44% done, estimate finish Sat Mar 9 11:59:29 2013 > 2.45% done, estimate finish Sat Mar 9 12:00:02 2013 > 2.45% done, estimate finish Sat Mar 9 11:59:54 2013 > 2.45% done, estimate finish Sat Mar 9 11:59:47 2013 > 2.46% done, estimate finish Sat Mar 9 11:59:40 2013 > 2.46% done, estimate finish Sat Mar 9 11:59:32 2013 > 2.47% done, estimate finish Sat Mar 9 11:59:25 2013 > 2.47% done, estimate finish Sat Mar 9 11:59:58 2013 > 2.48% done, estimate finish Sat Mar 9 11:59:51 2013 > 2.48% done, estimate finish Sat Mar 9 11:59:43 2013 > 2.48% done, estimate finish Sat Mar 9 11:59:36 2013 > 2.49% done, estimate finish Sat Mar 9 11:59:29 2013 > 2.49% done, estimate finish Sat Mar 9 11:59:21 2013 > 2.50% done, estimate finish Sat Mar 9 11:59:54 2013 > 2.50% done, estimate finish Sat Mar 9 11:59:47 2013 > 2.51% done, estimate finish Sat Mar 9 11:59:40 2013 > 2.51% done, estimate finish Sat Mar 9 11:59:32 2013 > 2.51% done, estimate finish Sat Mar 9 11:59:25 2013 > 2.52% done, estimate finish Sat Mar 9 11:59:18 2013 > 2.52% done, estimate finish Sat Mar 9 11:59:11 2013 > 2.53% done, estimate finish Sat Mar 9 11:59:43 2013 > 2.53% done, estimate finish Sat Mar 9 11:59:36 2013 > 2.53% done, estimate finish Sat Mar 9 11:59:29 2013 > 2.54% done, estimate finish Sat Mar 9 11:59:22 2013 > 2.54% done, estimate finish Sat Mar 9 11:59:15 2013 > 2.55% done, estimate finish Sat Mar 9 11:59:08 2013 > 2.55% done, estimate finish Sat Mar 9 11:59:40 2013 > 2.56% done, estimate finish Sat Mar 9 11:59:33 2013 > 2.56% done, estimate finish Sat Mar 9 11:59:26 2013 > 2.56% done, estimate finish Sat Mar 9 11:59:19 2013 > 2.57% done, estimate finish Sat Mar 9 11:59:11 2013 > 2.57% done, estimate finish Sat Mar 9 11:59:04 2013 > 2.58% done, estimate finish Sat Mar 9 11:59:36 2013 > 2.58% done, estimate finish Sat Mar 9 11:59:29 2013 > 2.59% done, estimate finish Sat Mar 9 11:59:22 2013 > 2.59% done, estimate finish Sat Mar 9 11:59:15 2013 > 2.59% done, estimate finish Sat Mar 9 11:59:08 2013 > 2.60% done, estimate finish Sat Mar 9 11:59:01 2013 > 2.60% done, estimate finish Sat Mar 9 11:59:33 2013 > 2.61% done, estimate finish Sat Mar 9 11:59:26 2013 > 2.61% done, estimate finish Sat Mar 9 11:59:19 2013 > 2.61% done, estimate finish Sat Mar 9 11:59:12 2013 > 2.62% done, estimate finish Sat Mar 9 11:59:05 2013 > 2.62% done, estimate finish Sat Mar 9 11:58:58 2013 > 2.63% done, estimate finish Sat Mar 9 11:59:29 2013 > 2.63% done, estimate finish Sat Mar 9 11:59:23 2013 > 2.64% done, estimate finish Sat Mar 9 11:59:15 2013 > 2.64% done, estimate finish Sat Mar 9 11:59:09 2013 > 2.64% done, estimate finish Sat Mar 9 11:59:02 2013 > 2.65% done, estimate finish Sat Mar 9 11:58:55 2013 > 2.65% done, estimate finish Sat Mar 9 11:59:26 2013 > 2.66% done, estimate finish Sat Mar 9 11:59:19 2013 > 2.66% done, estimate finish Sat Mar 9 11:59:12 2013 > 2.67% done, estimate finish Sat Mar 9 11:59:06 2013 > 2.67% done, estimate finish Sat Mar 9 11:58:59 2013 > 2.67% done, estimate finish Sat Mar 9 11:58:52 2013 > 2.68% done, estimate finish Sat Mar 9 11:59:23 2013 > 2.68% done, estimate finish Sat Mar 9 11:59:16 2013 > 2.69% done, estimate finish Sat Mar 9 11:59:09 2013 > 2.69% done, estimate finish Sat Mar 9 11:59:03 2013 > 2.69% done, estimate finish Sat Mar 9 11:58:56 2013 > 2.70% done, estimate finish Sat Mar 9 11:58:49 2013 > 2.70% done, estimate finish Sat Mar 9 11:59:19 2013 > 2.71% done, estimate finish Sat Mar 9 11:59:13 2013 > 2.71% done, estimate finish Sat Mar 9 11:59:06 2013 > 2.72% done, estimate finish Sat Mar 9 11:59:00 2013 > 2.72% done, estimate finish Sat Mar 9 11:58:53 2013 > 2.72% done, estimate finish Sat Mar 9 11:58:46 2013 > 2.73% done, estimate finish Sat Mar 9 11:58:40 2013 > 2.73% done, estimate finish Sat Mar 9 11:59:10 2013 > 2.74% done, estimate finish Sat Mar 9 11:59:03 2013 > 2.74% done, estimate finish Sat Mar 9 11:58:57 2013 > 2.75% done, estimate finish Sat Mar 9 11:58:50 2013 > 2.75% done, estimate finish Sat Mar 9 11:58:44 2013 > 2.75% done, estimate finish Sat Mar 9 11:58:37 2013 > 2.76% done, estimate finish Sat Mar 9 11:59:07 2013 > 2.76% done, estimate finish Sat Mar 9 11:59:00 2013 > 2.77% done, estimate finish Sat Mar 9 11:58:54 2013 > 2.77% done, estimate finish Sat Mar 9 11:58:47 2013 > 2.78% done, estimate finish Sat Mar 9 11:58:41 2013 > 2.78% done, estimate finish Sat Mar 9 11:58:34 2013 > 2.78% done, estimate finish Sat Mar 9 11:59:04 2013 > 2.79% done, estimate finish Sat Mar 9 11:58:57 2013 > 2.79% done, estimate finish Sat Mar 9 11:58:51 2013 > 2.80% done, estimate finish Sat Mar 9 11:58:44 2013 > 2.80% done, estimate finish Sat Mar 9 11:58:38 2013 > 2.80% done, estimate finish Sat Mar 9 11:58:32 2013 > 2.81% done, estimate finish Sat Mar 9 11:59:01 2013 > 2.81% done, estimate finish Sat Mar 9 11:58:54 2013 > 2.82% done, estimate finish Sat Mar 9 11:58:48 2013 > 2.82% done, estimate finish Sat Mar 9 11:58:42 2013 > 2.83% done, estimate finish Sat Mar 9 11:58:35 2013 > 2.83% done, estimate finish Sat Mar 9 11:58:29 2013 > 2.83% done, estimate finish Sat Mar 9 11:58:58 2013 > 2.84% done, estimate finish Sat Mar 9 11:58:52 2013 > 2.84% done, estimate finish Sat Mar 9 11:58:45 2013 > 2.85% done, estimate finish Sat Mar 9 11:58:39 2013 > 2.85% done, estimate finish Sat Mar 9 11:58:33 2013 > 2.86% done, estimate finish Sat Mar 9 11:58:26 2013 > 2.86% done, estimate finish Sat Mar 9 11:58:20 2013 > 2.86% done, estimate finish Sat Mar 9 11:58:49 2013 > 2.87% done, estimate finish Sat Mar 9 11:58:43 2013 > 2.87% done, estimate finish Sat Mar 9 11:58:36 2013 > 2.88% done, estimate finish Sat Mar 9 11:58:30 2013 > 2.88% done, estimate finish Sat Mar 9 11:58:24 2013 > 2.88% done, estimate finish Sat Mar 9 11:58:18 2013 > 2.89% done, estimate finish Sat Mar 9 11:58:46 2013 > 2.89% done, estimate finish Sat Mar 9 11:58:40 2013 > 2.90% done, estimate finish Sat Mar 9 11:58:34 2013 > 2.90% done, estimate finish Sat Mar 9 11:58:28 2013 > 2.91% done, estimate finish Sat Mar 9 11:58:21 2013 > 2.91% done, estimate finish Sat Mar 9 11:58:15 2013 > 2.91% done, estimate finish Sat Mar 9 11:58:44 2013 > 2.92% done, estimate finish Sat Mar 9 11:58:37 2013 > 2.92% done, estimate finish Sat Mar 9 11:58:31 2013 > 2.93% done, estimate finish Sat Mar 9 11:58:25 2013 > 2.93% done, estimate finish Sat Mar 9 11:58:19 2013 > 2.94% done, estimate finish Sat Mar 9 11:58:47 2013 > 2.94% done, estimate finish Sat Mar 9 11:58:41 2013 > 2.94% done, estimate finish Sat Mar 9 11:58:35 2013 > 2.95% done, estimate finish Sat Mar 9 11:58:29 2013 > 2.95% done, estimate finish Sat Mar 9 11:58:23 2013 > 2.96% done, estimate finish Sat Mar 9 11:58:17 2013 > 2.96% done, estimate finish Sat Mar 9 11:58:11 2013 > 2.96% done, estimate finish Sat Mar 9 11:58:38 2013 > 2.97% done, estimate finish Sat Mar 9 11:58:32 2013 > 2.97% done, estimate finish Sat Mar 9 11:58:26 2013 > 2.98% done, estimate finish Sat Mar 9 11:58:20 2013 > 2.98% done, estimate finish Sat Mar 9 11:58:14 2013 > 2.99% done, estimate finish Sat Mar 9 11:58:08 2013 > 2.99% done, estimate finish Sat Mar 9 11:58:02 2013 > 2.99% done, estimate finish Sat Mar 9 11:58:30 2013 > 3.00% done, estimate finish Sat Mar 9 11:58:24 2013 > 3.00% done, estimate finish Sat Mar 9 11:58:18 2013 > 3.01% done, estimate finish Sat Mar 9 11:58:12 2013 > 3.01% done, estimate finish Sat Mar 9 11:58:06 2013 > 3.02% done, estimate finish Sat Mar 9 11:58:00 2013 > 3.02% done, estimate finish Sat Mar 9 11:58:28 2013 > 3.02% done, estimate finish Sat Mar 9 11:58:21 2013 > 3.03% done, estimate finish Sat Mar 9 11:58:16 2013 > 3.03% done, estimate finish Sat Mar 9 11:58:10 2013 > 3.04% done, estimate finish Sat Mar 9 11:58:04 2013 > 3.04% done, estimate finish Sat Mar 9 11:57:58 2013 > 3.04% done, estimate finish Sat Mar 9 11:57:52 2013 > 3.05% done, estimate finish Sat Mar 9 11:58:19 2013 > 3.05% done, estimate finish Sat Mar 9 11:58:13 2013 > 3.06% done, estimate finish Sat Mar 9 11:58:07 2013 > 3.06% done, estimate finish Sat Mar 9 11:58:02 2013 > 3.07% done, estimate finish Sat Mar 9 11:57:56 2013 > 3.07% done, estimate finish Sat Mar 9 11:57:50 2013 > 3.07% done, estimate finish Sat Mar 9 11:58:17 2013 > 3.08% done, estimate finish Sat Mar 9 11:58:11 2013 > 3.08% done, estimate finish Sat Mar 9 11:58:05 2013 > 3.09% done, estimate finish Sat Mar 9 11:58:00 2013 > 3.09% done, estimate finish Sat Mar 9 11:57:54 2013 > 3.10% done, estimate finish Sat Mar 9 11:57:48 2013 > 3.10% done, estimate finish Sat Mar 9 11:58:15 2013 > 3.10% done, estimate finish Sat Mar 9 11:58:09 2013 > 3.11% done, estimate finish Sat Mar 9 11:58:03 2013 > 3.11% done, estimate finish Sat Mar 9 11:57:57 2013 > 3.12% done, estimate finish Sat Mar 9 11:57:52 2013 > 3.12% done, estimate finish Sat Mar 9 11:57:46 2013 > 3.13% done, estimate finish Sat Mar 9 11:57:40 2013 > 3.13% done, estimate finish Sat Mar 9 11:58:07 2013 > 3.13% done, estimate finish Sat Mar 9 11:58:01 2013 > 3.14% done, estimate finish Sat Mar 9 11:57:55 2013 > 3.14% done, estimate finish Sat Mar 9 11:57:50 2013 > 3.15% done, estimate finish Sat Mar 9 11:57:44 2013 > 3.15% done, estimate finish Sat Mar 9 11:57:39 2013 > 3.15% done, estimate finish Sat Mar 9 11:58:05 2013 > 3.16% done, estimate finish Sat Mar 9 11:57:59 2013 > 3.16% done, estimate finish Sat Mar 9 11:57:53 2013 > 3.17% done, estimate finish Sat Mar 9 11:57:48 2013 > 3.17% done, estimate finish Sat Mar 9 11:57:42 2013 > 3.18% done, estimate finish Sat Mar 9 11:57:37 2013 > 3.18% done, estimate finish Sat Mar 9 11:58:02 2013 > 3.18% done, estimate finish Sat Mar 9 11:57:57 2013 > 3.19% done, estimate finish Sat Mar 9 11:57:51 2013 > 3.19% done, estimate finish Sat Mar 9 11:57:46 2013 > 3.20% done, estimate finish Sat Mar 9 11:57:40 2013 > 3.20% done, estimate finish Sat Mar 9 11:57:35 2013 > 3.21% done, estimate finish Sat Mar 9 11:57:29 2013 > 3.21% done, estimate finish Sat Mar 9 11:57:55 2013 > 3.21% done, estimate finish Sat Mar 9 11:57:49 2013 > 3.22% done, estimate finish Sat Mar 9 11:57:44 2013 > 3.22% done, estimate finish Sat Mar 9 11:57:38 2013 > 3.23% done, estimate finish Sat Mar 9 11:57:33 2013 > 3.23% done, estimate finish Sat Mar 9 11:57:27 2013 > 3.23% done, estimate finish Sat Mar 9 11:57:53 2013 > 3.24% done, estimate finish Sat Mar 9 11:57:47 2013 > 3.24% done, estimate finish Sat Mar 9 11:57:42 2013 > 3.25% done, estimate finish Sat Mar 9 11:57:36 2013 > 3.25% done, estimate finish Sat Mar 9 11:57:31 2013 > 3.26% done, estimate finish Sat Mar 9 11:57:26 2013 > 3.26% done, estimate finish Sat Mar 9 11:57:20 2013 > 3.26% done, estimate finish Sat Mar 9 11:57:45 2013 > 3.27% done, estimate finish Sat Mar 9 11:57:40 2013 > 3.27% done, estimate finish Sat Mar 9 11:57:35 2013 > 3.28% done, estimate finish Sat Mar 9 11:57:29 2013 > 3.28% done, estimate finish Sat Mar 9 11:57:24 2013 > 3.29% done, estimate finish Sat Mar 9 11:57:19 2013 > 3.29% done, estimate finish Sat Mar 9 11:57:44 2013 > 3.29% done, estimate finish Sat Mar 9 11:57:38 2013 > 3.30% done, estimate finish Sat Mar 9 11:57:33 2013 > 3.30% done, estimate finish Sat Mar 9 11:57:28 2013 > 3.31% done, estimate finish Sat Mar 9 11:57:22 2013 > 3.31% done, estimate finish Sat Mar 9 11:57:17 2013 > 3.31% done, estimate finish Sat Mar 9 11:57:42 2013 > 3.32% done, estimate finish Sat Mar 9 11:57:36 2013 > 3.32% done, estimate finish Sat Mar 9 11:57:31 2013 > 3.33% done, estimate finish Sat Mar 9 11:57:26 2013 > 3.33% done, estimate finish Sat Mar 9 11:57:21 2013 > 3.34% done, estimate finish Sat Mar 9 11:57:15 2013 > 3.34% done, estimate finish Sat Mar 9 11:57:40 2013 > 3.34% done, estimate finish Sat Mar 9 11:57:35 2013 > 3.35% done, estimate finish Sat Mar 9 11:57:29 2013 > 3.35% done, estimate finish Sat Mar 9 11:57:24 2013 > 3.36% done, estimate finish Sat Mar 9 11:57:19 2013 > 3.36% done, estimate finish Sat Mar 9 11:57:14 2013 > 3.37% done, estimate finish Sat Mar 9 11:57:08 2013 > 3.37% done, estimate finish Sat Mar 9 11:57:33 2013 > 3.37% done, estimate finish Sat Mar 9 11:57:28 2013 > 3.38% done, estimate finish Sat Mar 9 11:57:22 2013 > 3.38% done, estimate finish Sat Mar 9 11:57:17 2013 > 3.39% done, estimate finish Sat Mar 9 11:57:12 2013 > 3.39% done, estimate finish Sat Mar 9 11:57:07 2013 > 3.40% done, estimate finish Sat Mar 9 11:57:31 2013 > 3.40% done, estimate finish Sat Mar 9 11:57:26 2013 > 3.40% done, estimate finish Sat Mar 9 11:57:21 2013 > 3.41% done, estimate finish Sat Mar 9 11:57:16 2013 > 3.41% done, estimate finish Sat Mar 9 11:57:10 2013 > 3.42% done, estimate finish Sat Mar 9 11:57:05 2013 > 3.42% done, estimate finish Sat Mar 9 11:57:00 2013 > 3.42% done, estimate finish Sat Mar 9 11:57:24 2013 > 3.43% done, estimate finish Sat Mar 9 11:57:19 2013 > 3.43% done, estimate finish Sat Mar 9 11:57:14 2013 > 3.44% done, estimate finish Sat Mar 9 11:57:09 2013 > 3.44% done, estimate finish Sat Mar 9 11:57:04 2013 > 3.45% done, estimate finish Sat Mar 9 11:56:59 2013 > 3.45% done, estimate finish Sat Mar 9 11:56:54 2013 > 3.45% done, estimate finish Sat Mar 9 11:57:18 2013 > 3.46% done, estimate finish Sat Mar 9 11:57:13 2013 > 3.46% done, estimate finish Sat Mar 9 11:57:07 2013 > 3.47% done, estimate finish Sat Mar 9 11:57:02 2013 > 3.47% done, estimate finish Sat Mar 9 11:56:57 2013 > 3.48% done, estimate finish Sat Mar 9 11:57:21 2013 > 3.48% done, estimate finish Sat Mar 9 11:57:16 2013 > 3.48% done, estimate finish Sat Mar 9 11:57:11 2013 > 3.49% done, estimate finish Sat Mar 9 11:57:06 2013 > 3.49% done, estimate finish Sat Mar 9 11:57:01 2013 > 3.50% done, estimate finish Sat Mar 9 11:56:56 2013 > 3.50% done, estimate finish Sat Mar 9 11:56:51 2013 > 3.50% done, estimate finish Sat Mar 9 11:56:46 2013 > 3.51% done, estimate finish Sat Mar 9 11:57:09 2013 > 3.51% done, estimate finish Sat Mar 9 11:57:05 2013 > 3.52% done, estimate finish Sat Mar 9 11:56:59 2013 > 3.52% done, estimate finish Sat Mar 9 11:56:54 2013 > 3.53% done, estimate finish Sat Mar 9 11:56:50 2013 > 3.53% done, estimate finish Sat Mar 9 11:56:45 2013 > 3.53% done, estimate finish Sat Mar 9 11:57:08 2013 > 3.54% done, estimate finish Sat Mar 9 11:57:03 2013 > 3.54% done, estimate finish Sat Mar 9 11:56:58 2013 > 3.55% done, estimate finish Sat Mar 9 11:56:53 2013 > 3.55% done, estimate finish Sat Mar 9 11:56:48 2013 > 3.56% done, estimate finish Sat Mar 9 11:56:43 2013 > 3.56% done, estimate finish Sat Mar 9 11:57:07 2013 > 3.56% done, estimate finish Sat Mar 9 11:57:02 2013 > 3.57% done, estimate finish Sat Mar 9 11:56:57 2013 > 3.57% done, estimate finish Sat Mar 9 11:56:52 2013 > 3.58% done, estimate finish Sat Mar 9 11:56:47 2013 > 3.58% done, estimate finish Sat Mar 9 11:56:42 2013 > 3.58% done, estimate finish Sat Mar 9 11:56:37 2013 > 3.59% done, estimate finish Sat Mar 9 11:57:00 2013 > 3.59% done, estimate finish Sat Mar 9 11:56:55 2013 > 3.60% done, estimate finish Sat Mar 9 11:56:50 2013 > 3.60% done, estimate finish Sat Mar 9 11:56:46 2013 > 3.61% done, estimate finish Sat Mar 9 11:56:41 2013 > 3.61% done, estimate finish Sat Mar 9 11:56:36 2013 > 3.61% done, estimate finish Sat Mar 9 11:56:59 2013 > 3.62% done, estimate finish Sat Mar 9 11:56:54 2013 > 3.62% done, estimate finish Sat Mar 9 11:56:49 2013 > 3.63% done, estimate finish Sat Mar 9 11:56:44 2013 > 3.63% done, estimate finish Sat Mar 9 11:56:40 2013 > 3.64% done, estimate finish Sat Mar 9 11:56:35 2013 > 3.64% done, estimate finish Sat Mar 9 11:56:30 2013 > 3.64% done, estimate finish Sat Mar 9 11:56:53 2013 > 3.65% done, estimate finish Sat Mar 9 11:56:48 2013 > 3.65% done, estimate finish Sat Mar 9 11:56:43 2013 > 3.66% done, estimate finish Sat Mar 9 11:56:38 2013 > 3.66% done, estimate finish Sat Mar 9 11:56:33 2013 > 3.66% done, estimate finish Sat Mar 9 11:56:29 2013 > 3.67% done, estimate finish Sat Mar 9 11:56:51 2013 > 3.67% done, estimate finish Sat Mar 9 11:56:46 2013 > 3.68% done, estimate finish Sat Mar 9 11:56:42 2013 > 3.68% done, estimate finish Sat Mar 9 11:56:37 2013 > 3.69% done, estimate finish Sat Mar 9 11:56:32 2013 > 3.69% done, estimate finish Sat Mar 9 11:56:28 2013 > 3.69% done, estimate finish Sat Mar 9 11:56:23 2013 > 3.70% done, estimate finish Sat Mar 9 11:56:45 2013 > 3.70% done, estimate finish Sat Mar 9 11:56:40 2013 > 3.71% done, estimate finish Sat Mar 9 11:56:36 2013 > 3.71% done, estimate finish Sat Mar 9 11:56:31 2013 > 3.72% done, estimate finish Sat Mar 9 11:56:26 2013 > 3.72% done, estimate finish Sat Mar 9 11:56:22 2013 > 3.72% done, estimate finish Sat Mar 9 11:56:44 2013 > 3.73% done, estimate finish Sat Mar 9 11:56:39 2013 > 3.73% done, estimate finish Sat Mar 9 11:56:35 2013 > 3.74% done, estimate finish Sat Mar 9 11:56:30 2013 > 3.74% done, estimate finish Sat Mar 9 11:56:25 2013 > 3.74% done, estimate finish Sat Mar 9 11:56:21 2013 > 3.75% done, estimate finish Sat Mar 9 11:56:43 2013 > 3.75% done, estimate finish Sat Mar 9 11:56:38 2013 > 3.76% done, estimate finish Sat Mar 9 11:56:33 2013 > 3.76% done, estimate finish Sat Mar 9 11:56:29 2013 > 3.77% done, estimate finish Sat Mar 9 11:56:24 2013 > 3.77% done, estimate finish Sat Mar 9 11:56:20 2013 > 3.77% done, estimate finish Sat Mar 9 11:56:15 2013 > 3.78% done, estimate finish Sat Mar 9 11:56:37 2013 > 3.78% done, estimate finish Sat Mar 9 11:56:32 2013 > 3.79% done, estimate finish Sat Mar 9 11:56:28 2013 > 3.79% done, estimate finish Sat Mar 9 11:56:23 2013 > 3.80% done, estimate finish Sat Mar 9 11:56:19 2013 > 3.80% done, estimate finish Sat Mar 9 11:56:14 2013 > 3.80% done, estimate finish Sat Mar 9 11:56:36 2013 > 3.81% done, estimate finish Sat Mar 9 11:56:31 2013 > 3.81% done, estimate finish Sat Mar 9 11:56:27 2013 > 3.82% done, estimate finish Sat Mar 9 11:56:22 2013 > 3.82% done, estimate finish Sat Mar 9 11:56:17 2013 > 3.83% done, estimate finish Sat Mar 9 11:56:13 2013 > 3.83% done, estimate finish Sat Mar 9 11:56:08 2013 > 3.83% done, estimate finish Sat Mar 9 11:56:30 2013 > 3.84% done, estimate finish Sat Mar 9 11:56:25 2013 > 3.84% done, estimate finish Sat Mar 9 11:56:21 2013 > 3.85% done, estimate finish Sat Mar 9 11:56:16 2013 > 3.85% done, estimate finish Sat Mar 9 11:56:12 2013 > 3.85% done, estimate finish Sat Mar 9 11:56:07 2013 > 3.86% done, estimate finish Sat Mar 9 11:56:03 2013 > 3.86% done, estimate finish Sat Mar 9 11:56:24 2013 > 3.87% done, estimate finish Sat Mar 9 11:56:20 2013 > 3.87% done, estimate finish Sat Mar 9 11:56:15 2013 > 3.88% done, estimate finish Sat Mar 9 11:56:11 2013 > 3.88% done, estimate finish Sat Mar 9 11:56:07 2013 > 3.88% done, estimate finish Sat Mar 9 11:56:28 2013 > 3.89% done, estimate finish Sat Mar 9 11:56:23 2013 > 3.89% done, estimate finish Sat Mar 9 11:56:19 2013 > 3.90% done, estimate finish Sat Mar 9 11:56:14 2013 > 3.90% done, estimate finish Sat Mar 9 11:56:10 2013 > 3.91% done, estimate finish Sat Mar 9 11:56:06 2013 > 3.91% done, estimate finish Sat Mar 9 11:56:01 2013 > 3.91% done, estimate finish Sat Mar 9 11:55:57 2013 > 3.92% done, estimate finish Sat Mar 9 11:56:18 2013 > 3.92% done, estimate finish Sat Mar 9 11:56:13 2013 > 3.93% done, estimate finish Sat Mar 9 11:56:09 2013 > 3.93% done, estimate finish Sat Mar 9 11:56:05 2013 > 3.93% done, estimate finish Sat Mar 9 11:56:00 2013 > 3.94% done, estimate finish Sat Mar 9 11:55:56 2013 > 3.94% done, estimate finish Sat Mar 9 11:56:17 2013 > 3.95% done, estimate finish Sat Mar 9 11:56:13 2013 > 3.95% done, estimate finish Sat Mar 9 11:56:08 2013 > 3.96% done, estimate finish Sat Mar 9 11:56:04 2013 > 3.96% done, estimate finish Sat Mar 9 11:55:59 2013 > 3.96% done, estimate finish Sat Mar 9 11:55:55 2013 > 3.97% done, estimate finish Sat Mar 9 11:56:16 2013 > 3.97% done, estimate finish Sat Mar 9 11:56:11 2013 > 3.98% done, estimate finish Sat Mar 9 11:56:07 2013 > 3.98% done, estimate finish Sat Mar 9 11:56:03 2013 > 3.99% done, estimate finish Sat Mar 9 11:55:58 2013 > 3.99% done, estimate finish Sat Mar 9 11:55:54 2013 > 3.99% done, estimate finish Sat Mar 9 11:56:15 2013 > 4.00% done, estimate finish Sat Mar 9 11:56:11 2013 > 4.00% done, estimate finish Sat Mar 9 11:56:06 2013 > 4.01% done, estimate finish Sat Mar 9 11:56:02 2013 > 4.01% done, estimate finish Sat Mar 9 11:55:58 2013 > 4.01% done, estimate finish Sat Mar 9 11:55:53 2013 > 4.02% done, estimate finish Sat Mar 9 11:55:49 2013 > 4.02% done, estimate finish Sat Mar 9 11:56:10 2013 > 4.03% done, estimate finish Sat Mar 9 11:56:05 2013 > 4.03% done, estimate finish Sat Mar 9 11:56:01 2013 > 4.04% done, estimate finish Sat Mar 9 11:55:57 2013 > 4.04% done, estimate finish Sat Mar 9 11:55:52 2013 > 4.04% done, estimate finish Sat Mar 9 11:55:48 2013 > 4.05% done, estimate finish Sat Mar 9 11:56:09 2013 > 4.05% done, estimate finish Sat Mar 9 11:56:04 2013 > 4.06% done, estimate finish Sat Mar 9 11:56:00 2013 > 4.06% done, estimate finish Sat Mar 9 11:55:56 2013 > 4.07% done, estimate finish Sat Mar 9 11:55:52 2013 > 4.07% done, estimate finish Sat Mar 9 11:55:47 2013 > 4.07% done, estimate finish Sat Mar 9 11:56:08 2013 > 4.08% done, estimate finish Sat Mar 9 11:56:04 2013 > 4.08% done, estimate finish Sat Mar 9 11:55:59 2013 > 4.09% done, estimate finish Sat Mar 9 11:55:55 2013 > 4.09% done, estimate finish Sat Mar 9 11:55:51 2013 > 4.09% done, estimate finish Sat Mar 9 11:55:47 2013 > 4.10% done, estimate finish Sat Mar 9 11:55:43 2013 > 4.10% done, estimate finish Sat Mar 9 11:56:03 2013 > 4.11% done, estimate finish Sat Mar 9 11:55:58 2013 > 4.11% done, estimate finish Sat Mar 9 11:55:54 2013 > 4.12% done, estimate finish Sat Mar 9 11:55:50 2013 > 4.12% done, estimate finish Sat Mar 9 11:55:46 2013 > 4.12% done, estimate finish Sat Mar 9 11:55:42 2013 > 4.13% done, estimate finish Sat Mar 9 11:56:02 2013 > 4.13% done, estimate finish Sat Mar 9 11:55:58 2013 > 4.14% done, estimate finish Sat Mar 9 11:55:53 2013 > 4.14% done, estimate finish Sat Mar 9 11:55:49 2013 > 4.15% done, estimate finish Sat Mar 9 11:55:45 2013 > 4.15% done, estimate finish Sat Mar 9 11:55:41 2013 > 4.15% done, estimate finish Sat Mar 9 11:55:37 2013 > 4.16% done, estimate finish Sat Mar 9 11:55:57 2013 > 4.16% done, estimate finish Sat Mar 9 11:55:53 2013 > 4.17% done, estimate finish Sat Mar 9 11:55:49 2013 > 4.17% done, estimate finish Sat Mar 9 11:55:44 2013 > 4.18% done, estimate finish Sat Mar 9 11:55:40 2013 > 4.18% done, estimate finish Sat Mar 9 11:55:36 2013 > 4.18% done, estimate finish Sat Mar 9 11:55:56 2013 > 4.19% done, estimate finish Sat Mar 9 11:55:52 2013 > 4.19% done, estimate finish Sat Mar 9 11:55:48 2013 > 4.20% done, estimate finish Sat Mar 9 11:55:44 2013 > 4.20% done, estimate finish Sat Mar 9 11:55:40 2013 > 4.20% done, estimate finish Sat Mar 9 11:55:35 2013 > 4.21% done, estimate finish Sat Mar 9 11:55:55 2013 > 4.21% done, estimate finish Sat Mar 9 11:55:51 2013 > 4.22% done, estimate finish Sat Mar 9 11:55:47 2013 > 4.22% done, estimate finish Sat Mar 9 11:55:43 2013 > 4.23% done, estimate finish Sat Mar 9 11:55:39 2013 > 4.23% done, estimate finish Sat Mar 9 11:55:35 2013 > 4.23% done, estimate finish Sat Mar 9 11:55:31 2013 > 4.24% done, estimate finish Sat Mar 9 11:55:50 2013 > 4.24% done, estimate finish Sat Mar 9 11:55:46 2013 > 4.25% done, estimate finish Sat Mar 9 11:55:42 2013 > 4.25% done, estimate finish Sat Mar 9 11:55:38 2013 > 4.26% done, estimate finish Sat Mar 9 11:55:34 2013 > 4.26% done, estimate finish Sat Mar 9 11:55:30 2013 > 4.26% done, estimate finish Sat Mar 9 11:55:49 2013 > 4.27% done, estimate finish Sat Mar 9 11:55:45 2013 > 4.27% done, estimate finish Sat Mar 9 11:55:41 2013 > 4.28% done, estimate finish Sat Mar 9 11:55:37 2013 > 4.28% done, estimate finish Sat Mar 9 11:55:33 2013 > 4.28% done, estimate finish Sat Mar 9 11:55:29 2013 > 4.29% done, estimate finish Sat Mar 9 11:55:25 2013 > 4.29% done, estimate finish Sat Mar 9 11:55:45 2013 > 4.30% done, estimate finish Sat Mar 9 11:55:41 2013 > 4.30% done, estimate finish Sat Mar 9 11:55:37 2013 > 4.31% done, estimate finish Sat Mar 9 11:55:33 2013 > 4.31% done, estimate finish Sat Mar 9 11:55:29 2013 > 4.31% done, estimate finish Sat Mar 9 11:55:25 2013 > 4.32% done, estimate finish Sat Mar 9 11:55:21 2013 > 4.32% done, estimate finish Sat Mar 9 11:55:40 2013 > 4.33% done, estimate finish Sat Mar 9 11:55:36 2013 > 4.33% done, estimate finish Sat Mar 9 11:55:32 2013 > 4.34% done, estimate finish Sat Mar 9 11:55:28 2013 > 4.34% done, estimate finish Sat Mar 9 11:55:24 2013 > 4.34% done, estimate finish Sat Mar 9 11:55:43 2013 > 4.35% done, estimate finish Sat Mar 9 11:55:39 2013 > 4.35% done, estimate finish Sat Mar 9 11:55:35 2013 > 4.36% done, estimate finish Sat Mar 9 11:55:31 2013 > 4.36% done, estimate finish Sat Mar 9 11:55:28 2013 > 4.36% done, estimate finish Sat Mar 9 11:55:24 2013 > 4.37% done, estimate finish Sat Mar 9 11:55:43 2013 > 4.37% done, estimate finish Sat Mar 9 11:55:39 2013 > 4.38% done, estimate finish Sat Mar 9 11:55:35 2013 > 4.38% done, estimate finish Sat Mar 9 11:55:31 2013 > 4.39% done, estimate finish Sat Mar 9 11:55:27 2013 > 4.39% done, estimate finish Sat Mar 9 11:55:23 2013 > 4.39% done, estimate finish Sat Mar 9 11:55:19 2013 > 4.40% done, estimate finish Sat Mar 9 11:55:38 2013 > 4.40% done, estimate finish Sat Mar 9 11:55:34 2013 > 4.41% done, estimate finish Sat Mar 9 11:55:30 2013 > 4.41% done, estimate finish Sat Mar 9 11:55:26 2013 > 4.42% done, estimate finish Sat Mar 9 11:55:22 2013 > 4.42% done, estimate finish Sat Mar 9 11:55:41 2013 > 4.42% done, estimate finish Sat Mar 9 11:55:37 2013 > 4.43% done, estimate finish Sat Mar 9 11:55:33 2013 > 4.43% done, estimate finish Sat Mar 9 11:55:29 2013 > 4.44% done, estimate finish Sat Mar 9 11:55:26 2013 > 4.44% done, estimate finish Sat Mar 9 11:55:22 2013 > 4.44% done, estimate finish Sat Mar 9 11:55:18 2013 > 4.45% done, estimate finish Sat Mar 9 11:55:14 2013 > 4.45% done, estimate finish Sat Mar 9 11:55:33 2013 > 4.46% done, estimate finish Sat Mar 9 11:55:29 2013 > 4.46% done, estimate finish Sat Mar 9 11:55:25 2013 > 4.47% done, estimate finish Sat Mar 9 11:55:21 2013 > 4.47% done, estimate finish Sat Mar 9 11:55:17 2013 > 4.47% done, estimate finish Sat Mar 9 11:55:14 2013 > 4.48% done, estimate finish Sat Mar 9 11:55:32 2013 > 4.48% done, estimate finish Sat Mar 9 11:55:28 2013 > 4.49% done, estimate finish Sat Mar 9 11:55:24 2013 > 4.49% done, estimate finish Sat Mar 9 11:55:21 2013 > 4.50% done, estimate finish Sat Mar 9 11:55:17 2013 > 4.50% done, estimate finish Sat Mar 9 11:55:13 2013 > 4.50% done, estimate finish Sat Mar 9 11:55:31 2013 > 4.51% done, estimate finish Sat Mar 9 11:55:28 2013 > 4.51% done, estimate finish Sat Mar 9 11:55:24 2013 > 4.52% done, estimate finish Sat Mar 9 11:55:20 2013 > 4.52% done, estimate finish Sat Mar 9 11:55:16 2013 > 4.53% done, estimate finish Sat Mar 9 11:55:13 2013 > 4.53% done, estimate finish Sat Mar 9 11:55:09 2013 > 4.53% done, estimate finish Sat Mar 9 11:55:27 2013 > 4.54% done, estimate finish Sat Mar 9 11:55:23 2013 > 4.54% done, estimate finish Sat Mar 9 11:55:20 2013 > 4.55% done, estimate finish Sat Mar 9 11:55:16 2013 > 4.55% done, estimate finish Sat Mar 9 11:55:12 2013 > 4.55% done, estimate finish Sat Mar 9 11:55:08 2013 > 4.56% done, estimate finish Sat Mar 9 11:55:27 2013 > 4.56% done, estimate finish Sat Mar 9 11:55:23 2013 > 4.57% done, estimate finish Sat Mar 9 11:55:19 2013 > 4.57% done, estimate finish Sat Mar 9 11:55:15 2013 > 4.58% done, estimate finish Sat Mar 9 11:55:12 2013 > 4.58% done, estimate finish Sat Mar 9 11:55:08 2013 > 4.58% done, estimate finish Sat Mar 9 11:55:26 2013 > 4.59% done, estimate finish Sat Mar 9 11:55:22 2013 > 4.59% done, estimate finish Sat Mar 9 11:55:18 2013 > 4.60% done, estimate finish Sat Mar 9 11:55:15 2013 > 4.60% done, estimate finish Sat Mar 9 11:55:11 2013 > 4.61% done, estimate finish Sat Mar 9 11:55:07 2013 > 4.61% done, estimate finish Sat Mar 9 11:55:04 2013 > 4.61% done, estimate finish Sat Mar 9 11:55:22 2013 > 4.62% done, estimate finish Sat Mar 9 11:55:18 2013 > 4.62% done, estimate finish Sat Mar 9 11:55:14 2013 > 4.63% done, estimate finish Sat Mar 9 11:55:11 2013 > 4.63% done, estimate finish Sat Mar 9 11:55:07 2013 > 4.63% done, estimate finish Sat Mar 9 11:55:25 2013 > 4.64% done, estimate finish Sat Mar 9 11:55:21 2013 > 4.64% done, estimate finish Sat Mar 9 11:55:17 2013 > 4.65% done, estimate finish Sat Mar 9 11:55:14 2013 > 4.65% done, estimate finish Sat Mar 9 11:55:10 2013 > 4.66% done, estimate finish Sat Mar 9 11:55:28 2013 > 4.66% done, estimate finish Sat Mar 9 11:55:24 2013 > 4.66% done, estimate finish Sat Mar 9 11:55:20 2013 > 4.67% done, estimate finish Sat Mar 9 11:55:17 2013 > 4.67% done, estimate finish Sat Mar 9 11:55:13 2013 > 4.68% done, estimate finish Sat Mar 9 11:55:10 2013 > 4.68% done, estimate finish Sat Mar 9 11:55:06 2013 > 4.69% done, estimate finish Sat Mar 9 11:55:24 2013 > 4.69% done, estimate finish Sat Mar 9 11:55:20 2013 > 4.69% done, estimate finish Sat Mar 9 11:55:16 2013 > 4.70% done, estimate finish Sat Mar 9 11:55:13 2013 > 4.70% done, estimate finish Sat Mar 9 11:55:09 2013 > 4.71% done, estimate finish Sat Mar 9 11:55:27 2013 > 4.71% done, estimate finish Sat Mar 9 11:55:23 2013 > 4.72% done, estimate finish Sat Mar 9 11:55:19 2013 > 4.72% done, estimate finish Sat Mar 9 11:55:16 2013 > 4.72% done, estimate finish Sat Mar 9 11:55:12 2013 > 4.73% done, estimate finish Sat Mar 9 11:55:09 2013 > 4.73% done, estimate finish Sat Mar 9 11:55:05 2013 > 4.74% done, estimate finish Sat Mar 9 11:55:23 2013 > 4.74% done, estimate finish Sat Mar 9 11:55:19 2013 > 4.74% done, estimate finish Sat Mar 9 11:55:15 2013 > 4.75% done, estimate finish Sat Mar 9 11:55:12 2013 > 4.75% done, estimate finish Sat Mar 9 11:55:08 2013 > 4.76% done, estimate finish Sat Mar 9 11:55:26 2013 > 4.76% done, estimate finish Sat Mar 9 11:55:22 2013 > 4.77% done, estimate finish Sat Mar 9 11:55:18 2013 > 4.77% done, estimate finish Sat Mar 9 11:55:15 2013 > 4.77% done, estimate finish Sat Mar 9 11:55:11 2013 > 4.78% done, estimate finish Sat Mar 9 11:55:08 2013 > 4.78% done, estimate finish Sat Mar 9 11:55:04 2013 > 4.79% done, estimate finish Sat Mar 9 11:55:01 2013 > 4.79% done, estimate finish Sat Mar 9 11:55:18 2013 > 4.80% done, estimate finish Sat Mar 9 11:55:14 2013 > 4.80% done, estimate finish Sat Mar 9 11:55:11 2013 > 4.80% done, estimate finish Sat Mar 9 11:55:07 2013 > 4.81% done, estimate finish Sat Mar 9 11:55:04 2013 > 4.81% done, estimate finish Sat Mar 9 11:55:21 2013 > 4.82% done, estimate finish Sat Mar 9 11:55:17 2013 > 4.82% done, estimate finish Sat Mar 9 11:55:14 2013 > 4.82% done, estimate finish Sat Mar 9 11:55:10 2013 > 4.83% done, estimate finish Sat Mar 9 11:55:07 2013 > 4.83% done, estimate finish Sat Mar 9 11:55:03 2013 > 4.84% done, estimate finish Sat Mar 9 11:55:00 2013 > 4.84% done, estimate finish Sat Mar 9 11:55:17 2013 > 4.85% done, estimate finish Sat Mar 9 11:55:13 2013 > 4.85% done, estimate finish Sat Mar 9 11:55:10 2013 > 4.85% done, estimate finish Sat Mar 9 11:55:06 2013 > 4.86% done, estimate finish Sat Mar 9 11:55:03 2013 > 4.86% done, estimate finish Sat Mar 9 11:55:20 2013 > 4.87% done, estimate finish Sat Mar 9 11:55:16 2013 > 4.87% done, estimate finish Sat Mar 9 11:55:13 2013 > 4.88% done, estimate finish Sat Mar 9 11:55:09 2013 > 4.88% done, estimate finish Sat Mar 9 11:55:06 2013 > 4.88% done, estimate finish Sat Mar 9 11:55:02 2013 > 4.89% done, estimate finish Sat Mar 9 11:54:59 2013 > 4.89% done, estimate finish Sat Mar 9 11:55:16 2013 > 4.90% done, estimate finish Sat Mar 9 11:55:12 2013 > 4.90% done, estimate finish Sat Mar 9 11:55:09 2013 > 4.90% done, estimate finish Sat Mar 9 11:55:05 2013 > 4.91% done, estimate finish Sat Mar 9 11:55:02 2013 > 4.91% done, estimate finish Sat Mar 9 11:54:59 2013 > 4.92% done, estimate finish Sat Mar 9 11:54:55 2013 > 4.92% done, estimate finish Sat Mar 9 11:55:12 2013 > 4.93% done, estimate finish Sat Mar 9 11:55:08 2013 > 4.93% done, estimate finish Sat Mar 9 11:55:05 2013 > 4.93% done, estimate finish Sat Mar 9 11:55:01 2013 > 4.94% done, estimate finish Sat Mar 9 11:54:58 2013 > 4.94% done, estimate finish Sat Mar 9 11:54:55 2013 > 4.95% done, estimate finish Sat Mar 9 11:55:11 2013 > 4.95% done, estimate finish Sat Mar 9 11:55:08 2013 > 4.96% done, estimate finish Sat Mar 9 11:55:05 2013 > 4.96% done, estimate finish Sat Mar 9 11:55:01 2013 > 4.96% done, estimate finish Sat Mar 9 11:54:58 2013 > 4.97% done, estimate finish Sat Mar 9 11:54:54 2013 > 4.97% done, estimate finish Sat Mar 9 11:55:11 2013 > 4.98% done, estimate finish Sat Mar 9 11:55:08 2013 > 4.98% done, estimate finish Sat Mar 9 11:55:04 2013 > 4.98% done, estimate finish Sat Mar 9 11:55:01 2013 > 4.99% done, estimate finish Sat Mar 9 11:54:57 2013 > 4.99% done, estimate finish Sat Mar 9 11:54:54 2013 > 5.00% done, estimate finish Sat Mar 9 11:54:51 2013 > 5.00% done, estimate finish Sat Mar 9 11:55:07 2013 > 5.01% done, estimate finish Sat Mar 9 11:55:04 2013 > 5.01% done, estimate finish Sat Mar 9 11:55:00 2013 > 5.01% done, estimate finish Sat Mar 9 11:54:57 2013 > 5.02% done, estimate finish Sat Mar 9 11:54:54 2013 > 5.02% done, estimate finish Sat Mar 9 11:54:50 2013 > 5.03% done, estimate finish Sat Mar 9 11:55:07 2013 > 5.03% done, estimate finish Sat Mar 9 11:55:03 2013 > 5.04% done, estimate finish Sat Mar 9 11:55:00 2013 > 5.04% done, estimate finish Sat Mar 9 11:54:57 2013 > 5.04% done, estimate finish Sat Mar 9 11:54:53 2013 > 5.05% done, estimate finish Sat Mar 9 11:54:50 2013 > 5.05% done, estimate finish Sat Mar 9 11:54:47 2013 > 5.06% done, estimate finish Sat Mar 9 11:55:03 2013 > 5.06% done, estimate finish Sat Mar 9 11:55:00 2013 > 5.06% done, estimate finish Sat Mar 9 11:54:56 2013 > 5.07% done, estimate finish Sat Mar 9 11:54:53 2013 > 5.07% done, estimate finish Sat Mar 9 11:54:49 2013 > 5.08% done, estimate finish Sat Mar 9 11:54:46 2013 > 5.08% done, estimate finish Sat Mar 9 11:55:02 2013 > 5.09% done, estimate finish Sat Mar 9 11:54:59 2013 > 5.09% done, estimate finish Sat Mar 9 11:54:56 2013 > 5.09% done, estimate finish Sat Mar 9 11:54:52 2013 > 5.10% done, estimate finish Sat Mar 9 11:54:49 2013 > 5.10% done, estimate finish Sat Mar 9 11:54:46 2013 > 5.11% done, estimate finish Sat Mar 9 11:55:02 2013 > 5.11% done, estimate finish Sat Mar 9 11:54:59 2013 > 5.12% done, estimate finish Sat Mar 9 11:54:55 2013 > 5.12% done, estimate finish Sat Mar 9 11:54:52 2013 > 5.12% done, estimate finish Sat Mar 9 11:54:49 2013 > 5.13% done, estimate finish Sat Mar 9 11:54:45 2013 > 5.13% done, estimate finish Sat Mar 9 11:54:42 2013 > 5.14% done, estimate finish Sat Mar 9 11:54:58 2013 > 5.14% done, estimate finish Sat Mar 9 11:54:55 2013 > 5.15% done, estimate finish Sat Mar 9 11:54:52 2013 > 5.15% done, estimate finish Sat Mar 9 11:54:48 2013 > 5.15% done, estimate finish Sat Mar 9 11:54:45 2013 > 5.16% done, estimate finish Sat Mar 9 11:54:42 2013 > 5.16% done, estimate finish Sat Mar 9 11:54:58 2013 > 5.17% done, estimate finish Sat Mar 9 11:54:55 2013 > 5.17% done, estimate finish Sat Mar 9 11:54:51 2013 > 5.17% done, estimate finish Sat Mar 9 11:54:48 2013 > 5.18% done, estimate finish Sat Mar 9 11:54:45 2013 > 5.18% done, estimate finish Sat Mar 9 11:54:42 2013 > 5.19% done, estimate finish Sat Mar 9 11:54:58 2013 > 5.19% done, estimate finish Sat Mar 9 11:54:54 2013 > 5.20% done, estimate finish Sat Mar 9 11:54:51 2013 > 5.20% done, estimate finish Sat Mar 9 11:54:48 2013 > 5.20% done, estimate finish Sat Mar 9 11:54:45 2013 > 5.21% done, estimate finish Sat Mar 9 11:54:41 2013 > 5.21% done, estimate finish Sat Mar 9 11:54:38 2013 > 5.22% done, estimate finish Sat Mar 9 11:54:54 2013 > 5.22% done, estimate finish Sat Mar 9 11:54:51 2013 > 5.23% done, estimate finish Sat Mar 9 11:54:47 2013 > 5.23% done, estimate finish Sat Mar 9 11:54:44 2013 > 5.23% done, estimate finish Sat Mar 9 11:54:41 2013 > 5.24% done, estimate finish Sat Mar 9 11:54:38 2013 > 5.24% done, estimate finish Sat Mar 9 11:54:54 2013 > 5.25% done, estimate finish Sat Mar 9 11:54:50 2013 > 5.25% done, estimate finish Sat Mar 9 11:54:47 2013 > 5.25% done, estimate finish Sat Mar 9 11:54:44 2013 > 5.26% done, estimate finish Sat Mar 9 11:54:41 2013 > 5.26% done, estimate finish Sat Mar 9 11:54:37 2013 > 5.27% done, estimate finish Sat Mar 9 11:54:53 2013 > 5.27% done, estimate finish Sat Mar 9 11:54:50 2013 > 5.28% done, estimate finish Sat Mar 9 11:54:47 2013 > 5.28% done, estimate finish Sat Mar 9 11:54:44 2013 > 5.28% done, estimate finish Sat Mar 9 11:54:40 2013 > 5.29% done, estimate finish Sat Mar 9 11:54:37 2013 > 5.29% done, estimate finish Sat Mar 9 11:54:53 2013 > 5.30% done, estimate finish Sat Mar 9 11:54:50 2013 > 5.30% done, estimate finish Sat Mar 9 11:54:47 2013 > 5.31% done, estimate finish Sat Mar 9 11:54:43 2013 > 5.31% done, estimate finish Sat Mar 9 11:54:40 2013 > 5.31% done, estimate finish Sat Mar 9 11:54:37 2013 > 5.32% done, estimate finish Sat Mar 9 11:54:34 2013 > 5.32% done, estimate finish Sat Mar 9 11:54:49 2013 > 5.33% done, estimate finish Sat Mar 9 11:54:46 2013 > 5.33% done, estimate finish Sat Mar 9 11:54:43 2013 > 5.33% done, estimate finish Sat Mar 9 11:54:40 2013 > 5.34% done, estimate finish Sat Mar 9 11:54:37 2013 > 5.34% done, estimate finish Sat Mar 9 11:54:33 2013 > 5.35% done, estimate finish Sat Mar 9 11:54:49 2013 > 5.35% done, estimate finish Sat Mar 9 11:54:46 2013 > 5.36% done, estimate finish Sat Mar 9 11:54:43 2013 > 5.36% done, estimate finish Sat Mar 9 11:54:40 2013 > 5.36% done, estimate finish Sat Mar 9 11:54:36 2013 > 5.37% done, estimate finish Sat Mar 9 11:54:33 2013 > 5.37% done, estimate finish Sat Mar 9 11:54:49 2013 > 5.38% done, estimate finish Sat Mar 9 11:54:46 2013 > 5.38% done, estimate finish Sat Mar 9 11:54:42 2013 > 5.39% done, estimate finish Sat Mar 9 11:54:39 2013 > 5.39% done, estimate finish Sat Mar 9 11:54:36 2013 > 5.39% done, estimate finish Sat Mar 9 11:54:33 2013 > 5.40% done, estimate finish Sat Mar 9 11:54:30 2013 > 5.40% done, estimate finish Sat Mar 9 11:54:45 2013 > 5.41% done, estimate finish Sat Mar 9 11:54:42 2013 > 5.41% done, estimate finish Sat Mar 9 11:54:39 2013 > 5.41% done, estimate finish Sat Mar 9 11:54:36 2013 > 5.42% done, estimate finish Sat Mar 9 11:54:33 2013 > 5.42% done, estimate finish Sat Mar 9 11:54:30 2013 > 5.43% done, estimate finish Sat Mar 9 11:54:45 2013 > 5.43% done, estimate finish Sat Mar 9 11:54:42 2013 > 5.44% done, estimate finish Sat Mar 9 11:54:39 2013 > 5.44% done, estimate finish Sat Mar 9 11:54:36 2013 > 5.44% done, estimate finish Sat Mar 9 11:54:33 2013 > 5.45% done, estimate finish Sat Mar 9 11:54:29 2013 > 5.45% done, estimate finish Sat Mar 9 11:54:45 2013 > 5.46% done, estimate finish Sat Mar 9 11:54:42 2013 > 5.46% done, estimate finish Sat Mar 9 11:54:38 2013 > 5.47% done, estimate finish Sat Mar 9 11:54:35 2013 > 5.47% done, estimate finish Sat Mar 9 11:54:32 2013 > 5.47% done, estimate finish Sat Mar 9 11:54:29 2013 > 5.48% done, estimate finish Sat Mar 9 11:54:26 2013 > 5.48% done, estimate finish Sat Mar 9 11:54:41 2013 > 5.49% done, estimate finish Sat Mar 9 11:54:38 2013 > 5.49% done, estimate finish Sat Mar 9 11:54:35 2013 > 5.50% done, estimate finish Sat Mar 9 11:54:32 2013 > 5.50% done, estimate finish Sat Mar 9 11:54:29 2013 > 5.50% done, estimate finish Sat Mar 9 11:54:26 2013 > 5.51% done, estimate finish Sat Mar 9 11:54:41 2013 > 5.51% done, estimate finish Sat Mar 9 11:54:38 2013 > 5.52% done, estimate finish Sat Mar 9 11:54:35 2013 > 5.52% done, estimate finish Sat Mar 9 11:54:32 2013 > 5.52% done, estimate finish Sat Mar 9 11:54:29 2013 > 5.53% done, estimate finish Sat Mar 9 11:54:26 2013 > 5.53% done, estimate finish Sat Mar 9 11:54:41 2013 > 5.54% done, estimate finish Sat Mar 9 11:54:38 2013 > 5.54% done, estimate finish Sat Mar 9 11:54:35 2013 > 5.55% done, estimate finish Sat Mar 9 11:54:32 2013 > 5.55% done, estimate finish Sat Mar 9 11:54:29 2013 > 5.55% done, estimate finish Sat Mar 9 11:54:26 2013 > 5.56% done, estimate finish Sat Mar 9 11:54:22 2013 > 5.56% done, estimate finish Sat Mar 9 11:54:19 2013 > 5.57% done, estimate finish Sat Mar 9 11:54:34 2013 > 5.57% done, estimate finish Sat Mar 9 11:54:31 2013 > 5.58% done, estimate finish Sat Mar 9 11:54:28 2013 > 5.58% done, estimate finish Sat Mar 9 11:54:25 2013 > 5.58% done, estimate finish Sat Mar 9 11:54:22 2013 > 5.59% done, estimate finish Sat Mar 9 11:54:37 2013 > 5.59% done, estimate finish Sat Mar 9 11:54:34 2013 > 5.60% done, estimate finish Sat Mar 9 11:54:31 2013 > 5.60% done, estimate finish Sat Mar 9 11:54:28 2013 > 5.60% done, estimate finish Sat Mar 9 11:54:25 2013 > 5.61% done, estimate finish Sat Mar 9 11:54:22 2013 > 5.61% done, estimate finish Sat Mar 9 11:54:37 2013 > 5.62% done, estimate finish Sat Mar 9 11:54:34 2013 > 5.62% done, estimate finish Sat Mar 9 11:54:31 2013 > 5.63% done, estimate finish Sat Mar 9 11:54:28 2013 > 5.63% done, estimate finish Sat Mar 9 11:54:25 2013 > 5.63% done, estimate finish Sat Mar 9 11:54:22 2013 > 5.64% done, estimate finish Sat Mar 9 11:54:37 2013 > 5.64% done, estimate finish Sat Mar 9 11:54:34 2013 > 5.65% done, estimate finish Sat Mar 9 11:54:31 2013 > 5.65% done, estimate finish Sat Mar 9 11:54:28 2013 > 5.66% done, estimate finish Sat Mar 9 11:54:25 2013 > 5.66% done, estimate finish Sat Mar 9 11:54:22 2013 > 5.66% done, estimate finish Sat Mar 9 11:54:36 2013 > 5.67% done, estimate finish Sat Mar 9 11:54:33 2013 > 5.67% done, estimate finish Sat Mar 9 11:54:30 2013 > 5.68% done, estimate finish Sat Mar 9 11:54:27 2013 > 5.68% done, estimate finish Sat Mar 9 11:54:24 2013 > 5.68% done, estimate finish Sat Mar 9 11:54:22 2013 > 5.69% done, estimate finish Sat Mar 9 11:54:36 2013 > 5.69% done, estimate finish Sat Mar 9 11:54:33 2013 > 5.70% done, estimate finish Sat Mar 9 11:54:30 2013 > 5.70% done, estimate finish Sat Mar 9 11:54:27 2013 > 5.71% done, estimate finish Sat Mar 9 11:54:24 2013 > 5.71% done, estimate finish Sat Mar 9 11:54:21 2013 > 5.71% done, estimate finish Sat Mar 9 11:54:36 2013 > 5.72% done, estimate finish Sat Mar 9 11:54:33 2013 > 5.72% done, estimate finish Sat Mar 9 11:54:30 2013 > 5.73% done, estimate finish Sat Mar 9 11:54:27 2013 > 5.73% done, estimate finish Sat Mar 9 11:54:24 2013 > 5.74% done, estimate finish Sat Mar 9 11:54:21 2013 > 5.74% done, estimate finish Sat Mar 9 11:54:36 2013 > 5.74% done, estimate finish Sat Mar 9 11:54:33 2013 > 5.75% done, estimate finish Sat Mar 9 11:54:30 2013 > 5.75% done, estimate finish Sat Mar 9 11:54:27 2013 > 5.76% done, estimate finish Sat Mar 9 11:54:24 2013 > 5.76% done, estimate finish Sat Mar 9 11:54:21 2013 > 5.77% done, estimate finish Sat Mar 9 11:54:18 2013 > 5.77% done, estimate finish Sat Mar 9 11:54:33 2013 > 5.77% done, estimate finish Sat Mar 9 11:54:30 2013 > 5.78% done, estimate finish Sat Mar 9 11:54:27 2013 > 5.78% done, estimate finish Sat Mar 9 11:54:24 2013 > 5.79% done, estimate finish Sat Mar 9 11:54:21 2013 > 5.79% done, estimate finish Sat Mar 9 11:54:18 2013 > 5.79% done, estimate finish Sat Mar 9 11:54:32 2013 > 5.80% done, estimate finish Sat Mar 9 11:54:29 2013 > 5.80% done, estimate finish Sat Mar 9 11:54:26 2013 > 5.81% done, estimate finish Sat Mar 9 11:54:23 2013 > 5.81% done, estimate finish Sat Mar 9 11:54:21 2013 > 5.82% done, estimate finish Sat Mar 9 11:54:18 2013 > 5.82% done, estimate finish Sat Mar 9 11:54:32 2013 > 5.82% done, estimate finish Sat Mar 9 11:54:29 2013 > 5.83% done, estimate finish Sat Mar 9 11:54:26 2013 > 5.83% done, estimate finish Sat Mar 9 11:54:23 2013 > 5.84% done, estimate finish Sat Mar 9 11:54:20 2013 > 5.84% done, estimate finish Sat Mar 9 11:54:18 2013 > 5.85% done, estimate finish Sat Mar 9 11:54:15 2013 > 5.85% done, estimate finish Sat Mar 9 11:54:29 2013 > 5.85% done, estimate finish Sat Mar 9 11:54:26 2013 > 5.86% done, estimate finish Sat Mar 9 11:54:23 2013 > 5.86% done, estimate finish Sat Mar 9 11:54:20 2013 > 5.87% done, estimate finish Sat Mar 9 11:54:17 2013 > 5.87% done, estimate finish Sat Mar 9 11:54:15 2013 > 5.87% done, estimate finish Sat Mar 9 11:54:12 2013 > 5.88% done, estimate finish Sat Mar 9 11:54:26 2013 > 5.88% done, estimate finish Sat Mar 9 11:54:23 2013 > 5.89% done, estimate finish Sat Mar 9 11:54:20 2013 > 5.89% done, estimate finish Sat Mar 9 11:54:17 2013 > 5.90% done, estimate finish Sat Mar 9 11:54:14 2013 > 5.90% done, estimate finish Sat Mar 9 11:54:29 2013 > 5.90% done, estimate finish Sat Mar 9 11:54:26 2013 > 5.91% done, estimate finish Sat Mar 9 11:54:23 2013 > 5.91% done, estimate finish Sat Mar 9 11:54:20 2013 > 5.92% done, estimate finish Sat Mar 9 11:54:17 2013 > 5.92% done, estimate finish Sat Mar 9 11:54:14 2013 > 5.93% done, estimate finish Sat Mar 9 11:54:28 2013 > 5.93% done, estimate finish Sat Mar 9 11:54:25 2013 > 5.93% done, estimate finish Sat Mar 9 11:54:23 2013 > 5.94% done, estimate finish Sat Mar 9 11:54:20 2013 > 5.94% done, estimate finish Sat Mar 9 11:54:17 2013 > 5.95% done, estimate finish Sat Mar 9 11:54:14 2013 > 5.95% done, estimate finish Sat Mar 9 11:54:28 2013 > 5.95% done, estimate finish Sat Mar 9 11:54:25 2013 > 5.96% done, estimate finish Sat Mar 9 11:54:22 2013 > 5.96% done, estimate finish Sat Mar 9 11:54:20 2013 > 5.97% done, estimate finish Sat Mar 9 11:54:17 2013 > 5.97% done, estimate finish Sat Mar 9 11:54:14 2013 > 5.98% done, estimate finish Sat Mar 9 11:54:11 2013 > 5.98% done, estimate finish Sat Mar 9 11:54:25 2013 > 5.98% done, estimate finish Sat Mar 9 11:54:22 2013 > 5.99% done, estimate finish Sat Mar 9 11:54:19 2013 > 5.99% done, estimate finish Sat Mar 9 11:54:17 2013 > 6.00% done, estimate finish Sat Mar 9 11:54:14 2013 > 6.00% done, estimate finish Sat Mar 9 11:54:11 2013 > 6.01% done, estimate finish Sat Mar 9 11:54:08 2013 > 6.01% done, estimate finish Sat Mar 9 11:54:22 2013 > 6.01% done, estimate finish Sat Mar 9 11:54:19 2013 > 6.02% done, estimate finish Sat Mar 9 11:54:16 2013 > 6.02% done, estimate finish Sat Mar 9 11:54:14 2013 > 6.03% done, estimate finish Sat Mar 9 11:54:11 2013 > 6.03% done, estimate finish Sat Mar 9 11:54:25 2013 > 6.03% done, estimate finish Sat Mar 9 11:54:22 2013 > 6.04% done, estimate finish Sat Mar 9 11:54:19 2013 > 6.04% done, estimate finish Sat Mar 9 11:54:16 2013 > 6.05% done, estimate finish Sat Mar 9 11:54:14 2013 > 6.05% done, estimate finish Sat Mar 9 11:54:11 2013 > 6.06% done, estimate finish Sat Mar 9 11:54:25 2013 > 6.06% done, estimate finish Sat Mar 9 11:54:22 2013 > 6.06% done, estimate finish Sat Mar 9 11:54:19 2013 > 6.07% done, estimate finish Sat Mar 9 11:54:16 2013 > 6.07% done, estimate finish Sat Mar 9 11:54:13 2013 > 6.08% done, estimate finish Sat Mar 9 11:54:11 2013 > 6.08% done, estimate finish Sat Mar 9 11:54:08 2013 > 6.09% done, estimate finish Sat Mar 9 11:54:22 2013 > 6.09% done, estimate finish Sat Mar 9 11:54:19 2013 > 6.09% done, estimate finish Sat Mar 9 11:54:16 2013 > 6.10% done, estimate finish Sat Mar 9 11:54:13 2013 > 6.10% done, estimate finish Sat Mar 9 11:54:11 2013 > 6.11% done, estimate finish Sat Mar 9 11:54:24 2013 > 6.11% done, estimate finish Sat Mar 9 11:54:21 2013 > 6.12% done, estimate finish Sat Mar 9 11:54:19 2013 > 6.12% done, estimate finish Sat Mar 9 11:54:16 2013 > 6.12% done, estimate finish Sat Mar 9 11:54:13 2013 > 6.13% done, estimate finish Sat Mar 9 11:54:10 2013 > 6.13% done, estimate finish Sat Mar 9 11:54:08 2013 > 6.14% done, estimate finish Sat Mar 9 11:54:05 2013 > 6.14% done, estimate finish Sat Mar 9 11:54:18 2013 > 6.14% done, estimate finish Sat Mar 9 11:54:16 2013 > 6.15% done, estimate finish Sat Mar 9 11:54:13 2013 > 6.15% done, estimate finish Sat Mar 9 11:54:10 2013 > 6.16% done, estimate finish Sat Mar 9 11:54:08 2013 > 6.16% done, estimate finish Sat Mar 9 11:54:21 2013 > 6.17% done, estimate finish Sat Mar 9 11:54:18 2013 > 6.17% done, estimate finish Sat Mar 9 11:54:16 2013 > 6.17% done, estimate finish Sat Mar 9 11:54:13 2013 > 6.18% done, estimate finish Sat Mar 9 11:54:10 2013 > 6.18% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.19% done, estimate finish Sat Mar 9 11:54:21 2013 > 6.19% done, estimate finish Sat Mar 9 11:54:18 2013 > 6.20% done, estimate finish Sat Mar 9 11:54:15 2013 > 6.20% done, estimate finish Sat Mar 9 11:54:13 2013 > 6.20% done, estimate finish Sat Mar 9 11:54:10 2013 > 6.21% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.21% done, estimate finish Sat Mar 9 11:54:05 2013 > 6.22% done, estimate finish Sat Mar 9 11:54:02 2013 > 6.22% done, estimate finish Sat Mar 9 11:54:15 2013 > 6.22% done, estimate finish Sat Mar 9 11:54:13 2013 > 6.23% done, estimate finish Sat Mar 9 11:54:10 2013 > 6.23% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.24% done, estimate finish Sat Mar 9 11:54:05 2013 > 6.24% done, estimate finish Sat Mar 9 11:54:18 2013 > 6.25% done, estimate finish Sat Mar 9 11:54:15 2013 > 6.25% done, estimate finish Sat Mar 9 11:54:13 2013 > 6.25% done, estimate finish Sat Mar 9 11:54:10 2013 > 6.26% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.26% done, estimate finish Sat Mar 9 11:54:04 2013 > 6.27% done, estimate finish Sat Mar 9 11:54:02 2013 > 6.27% done, estimate finish Sat Mar 9 11:54:15 2013 > 6.28% done, estimate finish Sat Mar 9 11:54:12 2013 > 6.28% done, estimate finish Sat Mar 9 11:54:10 2013 > 6.28% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.29% done, estimate finish Sat Mar 9 11:54:04 2013 > 6.29% done, estimate finish Sat Mar 9 11:54:18 2013 > 6.30% done, estimate finish Sat Mar 9 11:54:15 2013 > 6.30% done, estimate finish Sat Mar 9 11:54:12 2013 > 6.30% done, estimate finish Sat Mar 9 11:54:10 2013 > 6.31% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.31% done, estimate finish Sat Mar 9 11:54:04 2013 > 6.32% done, estimate finish Sat Mar 9 11:54:17 2013 > 6.32% done, estimate finish Sat Mar 9 11:54:15 2013 > 6.33% done, estimate finish Sat Mar 9 11:54:12 2013 > 6.33% done, estimate finish Sat Mar 9 11:54:09 2013 > 6.33% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.34% done, estimate finish Sat Mar 9 11:54:04 2013 > 6.34% done, estimate finish Sat Mar 9 11:54:02 2013 > 6.35% done, estimate finish Sat Mar 9 11:54:15 2013 > 6.35% done, estimate finish Sat Mar 9 11:54:12 2013 > 6.36% done, estimate finish Sat Mar 9 11:54:09 2013 > 6.36% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.36% done, estimate finish Sat Mar 9 11:54:04 2013 > 6.37% done, estimate finish Sat Mar 9 11:54:01 2013 > 6.37% done, estimate finish Sat Mar 9 11:54:14 2013 > 6.38% done, estimate finish Sat Mar 9 11:54:12 2013 > 6.38% done, estimate finish Sat Mar 9 11:54:09 2013 > 6.38% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.39% done, estimate finish Sat Mar 9 11:54:04 2013 > 6.39% done, estimate finish Sat Mar 9 11:54:01 2013 > 6.40% done, estimate finish Sat Mar 9 11:53:59 2013 > 6.40% done, estimate finish Sat Mar 9 11:54:12 2013 > 6.41% done, estimate finish Sat Mar 9 11:54:09 2013 > 6.41% done, estimate finish Sat Mar 9 11:54:06 2013 > 6.41% done, estimate finish Sat Mar 9 11:54:04 2013 > 6.42% done, estimate finish Sat Mar 9 11:54:01 2013 > 6.42% done, estimate finish Sat Mar 9 11:54:14 2013 > 6.43% done, estimate finish Sat Mar 9 11:54:12 2013 > 6.43% done, estimate finish Sat Mar 9 11:54:09 2013 > 6.44% done, estimate finish Sat Mar 9 11:54:06 2013 > 6.44% done, estimate finish Sat Mar 9 11:54:04 2013 > 6.44% done, estimate finish Sat Mar 9 11:54:01 2013 > 6.45% done, estimate finish Sat Mar 9 11:53:59 2013 > 6.45% done, estimate finish Sat Mar 9 11:54:11 2013 > 6.46% done, estimate finish Sat Mar 9 11:54:09 2013 > 6.46% done, estimate finish Sat Mar 9 11:54:06 2013 > 6.47% done, estimate finish Sat Mar 9 11:54:04 2013 > 6.47% done, estimate finish Sat Mar 9 11:54:01 2013 > 6.47% done, estimate finish Sat Mar 9 11:53:59 2013 > 6.48% done, estimate finish Sat Mar 9 11:54:11 2013 > 6.48% done, estimate finish Sat Mar 9 11:54:09 2013 > 6.49% done, estimate finish Sat Mar 9 11:54:06 2013 > 6.49% done, estimate finish Sat Mar 9 11:54:04 2013 > 6.49% done, estimate finish Sat Mar 9 11:54:01 2013 > 6.50% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.50% done, estimate finish Sat Mar 9 11:53:56 2013 > 6.51% done, estimate finish Sat Mar 9 11:54:09 2013 > 6.51% done, estimate finish Sat Mar 9 11:54:06 2013 > 6.52% done, estimate finish Sat Mar 9 11:54:03 2013 > 6.52% done, estimate finish Sat Mar 9 11:54:01 2013 > 6.52% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.53% done, estimate finish Sat Mar 9 11:54:11 2013 > 6.53% done, estimate finish Sat Mar 9 11:54:09 2013 > 6.54% done, estimate finish Sat Mar 9 11:54:06 2013 > 6.54% done, estimate finish Sat Mar 9 11:54:03 2013 > 6.55% done, estimate finish Sat Mar 9 11:54:01 2013 > 6.55% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.55% done, estimate finish Sat Mar 9 11:54:11 2013 > 6.56% done, estimate finish Sat Mar 9 11:54:08 2013 > 6.56% done, estimate finish Sat Mar 9 11:54:06 2013 > 6.57% done, estimate finish Sat Mar 9 11:54:03 2013 > 6.57% done, estimate finish Sat Mar 9 11:54:01 2013 > 6.57% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.58% done, estimate finish Sat Mar 9 11:54:11 2013 > 6.58% done, estimate finish Sat Mar 9 11:54:08 2013 > 6.59% done, estimate finish Sat Mar 9 11:54:06 2013 > 6.59% done, estimate finish Sat Mar 9 11:54:03 2013 > 6.60% done, estimate finish Sat Mar 9 11:54:01 2013 > 6.60% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.60% done, estimate finish Sat Mar 9 11:53:56 2013 > 6.61% done, estimate finish Sat Mar 9 11:54:08 2013 > 6.61% done, estimate finish Sat Mar 9 11:54:06 2013 > 6.62% done, estimate finish Sat Mar 9 11:54:03 2013 > 6.62% done, estimate finish Sat Mar 9 11:54:01 2013 > 6.63% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.63% done, estimate finish Sat Mar 9 11:53:56 2013 > 6.63% done, estimate finish Sat Mar 9 11:53:53 2013 > 6.64% done, estimate finish Sat Mar 9 11:54:06 2013 > 6.64% done, estimate finish Sat Mar 9 11:54:03 2013 > 6.65% done, estimate finish Sat Mar 9 11:54:01 2013 > 6.65% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.65% done, estimate finish Sat Mar 9 11:53:56 2013 > 6.66% done, estimate finish Sat Mar 9 11:53:53 2013 > 6.66% done, estimate finish Sat Mar 9 11:54:06 2013 > 6.67% done, estimate finish Sat Mar 9 11:54:03 2013 > 6.67% done, estimate finish Sat Mar 9 11:54:00 2013 > 6.68% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.68% done, estimate finish Sat Mar 9 11:53:55 2013 > 6.68% done, estimate finish Sat Mar 9 11:53:53 2013 > 6.69% done, estimate finish Sat Mar 9 11:54:05 2013 > 6.69% done, estimate finish Sat Mar 9 11:54:03 2013 > 6.70% done, estimate finish Sat Mar 9 11:54:00 2013 > 6.70% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.71% done, estimate finish Sat Mar 9 11:53:55 2013 > 6.71% done, estimate finish Sat Mar 9 11:53:53 2013 > 6.71% done, estimate finish Sat Mar 9 11:54:05 2013 > 6.72% done, estimate finish Sat Mar 9 11:54:03 2013 > 6.72% done, estimate finish Sat Mar 9 11:54:00 2013 > 6.73% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.73% done, estimate finish Sat Mar 9 11:53:55 2013 > 6.74% done, estimate finish Sat Mar 9 11:53:53 2013 > 6.74% done, estimate finish Sat Mar 9 11:53:50 2013 > 6.74% done, estimate finish Sat Mar 9 11:54:03 2013 > 6.75% done, estimate finish Sat Mar 9 11:54:00 2013 > 6.75% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.76% done, estimate finish Sat Mar 9 11:53:55 2013 > 6.76% done, estimate finish Sat Mar 9 11:53:53 2013 > 6.76% done, estimate finish Sat Mar 9 11:53:50 2013 > 6.77% done, estimate finish Sat Mar 9 11:54:03 2013 > 6.77% done, estimate finish Sat Mar 9 11:54:00 2013 > 6.78% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.78% done, estimate finish Sat Mar 9 11:53:55 2013 > 6.79% done, estimate finish Sat Mar 9 11:53:53 2013 > 6.79% done, estimate finish Sat Mar 9 11:53:50 2013 > 6.79% done, estimate finish Sat Mar 9 11:54:03 2013 > 6.80% done, estimate finish Sat Mar 9 11:54:00 2013 > 6.80% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.81% done, estimate finish Sat Mar 9 11:53:55 2013 > 6.81% done, estimate finish Sat Mar 9 11:53:53 2013 > 6.82% done, estimate finish Sat Mar 9 11:53:50 2013 > 6.82% done, estimate finish Sat Mar 9 11:53:48 2013 > 6.82% done, estimate finish Sat Mar 9 11:54:00 2013 > 6.83% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.83% done, estimate finish Sat Mar 9 11:53:55 2013 > 6.84% done, estimate finish Sat Mar 9 11:53:53 2013 > 6.84% done, estimate finish Sat Mar 9 11:53:50 2013 > 6.84% done, estimate finish Sat Mar 9 11:53:48 2013 > 6.85% done, estimate finish Sat Mar 9 11:54:00 2013 > 6.85% done, estimate finish Sat Mar 9 11:53:58 2013 > 6.86% done, estimate finish Sat Mar 9 11:53:55 2013 > 6.86% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.87% done, estimate finish Sat Mar 9 11:54:05 2013 > 6.87% done, estimate finish Sat Mar 9 11:54:02 2013 > 6.87% done, estimate finish Sat Mar 9 11:54:00 2013 > 6.88% done, estimate finish Sat Mar 9 11:53:57 2013 > 6.88% done, estimate finish Sat Mar 9 11:53:55 2013 > 6.89% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.89% done, estimate finish Sat Mar 9 11:54:05 2013 > 6.90% done, estimate finish Sat Mar 9 11:54:02 2013 > 6.90% done, estimate finish Sat Mar 9 11:54:00 2013 > 6.90% done, estimate finish Sat Mar 9 11:54:12 2013 > 6.91% done, estimate finish Sat Mar 9 11:54:09 2013 > 6.91% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.92% done, estimate finish Sat Mar 9 11:54:05 2013 > 6.92% done, estimate finish Sat Mar 9 11:54:02 2013 > 6.92% done, estimate finish Sat Mar 9 11:54:00 2013 > 6.93% done, estimate finish Sat Mar 9 11:53:57 2013 > 6.93% done, estimate finish Sat Mar 9 11:53:55 2013 > 6.94% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.94% done, estimate finish Sat Mar 9 11:54:04 2013 > 6.95% done, estimate finish Sat Mar 9 11:54:02 2013 > 6.95% done, estimate finish Sat Mar 9 11:54:00 2013 > 6.95% done, estimate finish Sat Mar 9 11:53:57 2013 > 6.96% done, estimate finish Sat Mar 9 11:53:55 2013 > 6.96% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.97% done, estimate finish Sat Mar 9 11:54:04 2013 > 6.97% done, estimate finish Sat Mar 9 11:54:02 2013 > 6.98% done, estimate finish Sat Mar 9 11:54:00 2013 > 6.98% done, estimate finish Sat Mar 9 11:53:57 2013 > 6.98% done, estimate finish Sat Mar 9 11:53:55 2013 > 6.99% done, estimate finish Sat Mar 9 11:54:07 2013 > 6.99% done, estimate finish Sat Mar 9 11:54:04 2013 > 7.00% done, estimate finish Sat Mar 9 11:54:02 2013 > 7.00% done, estimate finish Sat Mar 9 11:54:00 2013 > 7.00% done, estimate finish Sat Mar 9 11:53:57 2013 > 7.01% done, estimate finish Sat Mar 9 11:53:55 2013 > 7.01% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.02% done, estimate finish Sat Mar 9 11:54:04 2013 > 7.02% done, estimate finish Sat Mar 9 11:54:02 2013 > 7.03% done, estimate finish Sat Mar 9 11:53:59 2013 > 7.03% done, estimate finish Sat Mar 9 11:53:57 2013 > 7.03% done, estimate finish Sat Mar 9 11:53:55 2013 > 7.04% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.04% done, estimate finish Sat Mar 9 11:54:04 2013 > 7.05% done, estimate finish Sat Mar 9 11:54:02 2013 > 7.05% done, estimate finish Sat Mar 9 11:53:59 2013 > 7.06% done, estimate finish Sat Mar 9 11:53:57 2013 > 7.06% done, estimate finish Sat Mar 9 11:53:55 2013 > 7.06% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.07% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.07% done, estimate finish Sat Mar 9 11:54:02 2013 > 7.08% done, estimate finish Sat Mar 9 11:53:59 2013 > 7.08% done, estimate finish Sat Mar 9 11:53:57 2013 > 7.09% done, estimate finish Sat Mar 9 11:53:55 2013 > 7.09% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.09% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.10% done, estimate finish Sat Mar 9 11:54:02 2013 > 7.10% done, estimate finish Sat Mar 9 11:53:59 2013 > 7.11% done, estimate finish Sat Mar 9 11:53:57 2013 > 7.11% done, estimate finish Sat Mar 9 11:53:55 2013 > 7.11% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.12% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.12% done, estimate finish Sat Mar 9 11:54:02 2013 > 7.13% done, estimate finish Sat Mar 9 11:53:59 2013 > 7.13% done, estimate finish Sat Mar 9 11:53:57 2013 > 7.14% done, estimate finish Sat Mar 9 11:53:55 2013 > 7.14% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.14% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.15% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.15% done, estimate finish Sat Mar 9 11:53:59 2013 > 7.16% done, estimate finish Sat Mar 9 11:53:57 2013 > 7.16% done, estimate finish Sat Mar 9 11:53:54 2013 > 7.17% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.17% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.17% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.18% done, estimate finish Sat Mar 9 11:53:59 2013 > 7.18% done, estimate finish Sat Mar 9 11:53:57 2013 > 7.19% done, estimate finish Sat Mar 9 11:53:54 2013 > 7.19% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.19% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.20% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.20% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.21% done, estimate finish Sat Mar 9 11:53:57 2013 > 7.21% done, estimate finish Sat Mar 9 11:53:54 2013 > 7.22% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.22% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.22% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.23% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.23% done, estimate finish Sat Mar 9 11:53:57 2013 > 7.24% done, estimate finish Sat Mar 9 11:53:54 2013 > 7.24% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.25% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.25% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.25% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.26% done, estimate finish Sat Mar 9 11:53:57 2013 > 7.26% done, estimate finish Sat Mar 9 11:53:54 2013 > 7.27% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.27% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.27% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.28% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.28% done, estimate finish Sat Mar 9 11:53:57 2013 > 7.29% done, estimate finish Sat Mar 9 11:53:54 2013 > 7.29% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.30% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.30% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.30% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.31% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.31% done, estimate finish Sat Mar 9 11:53:54 2013 > 7.32% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.32% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.33% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.33% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.33% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.34% done, estimate finish Sat Mar 9 11:53:41 2013 > 7.34% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.35% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.35% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.35% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.36% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.36% done, estimate finish Sat Mar 9 11:53:40 2013 > 7.37% done, estimate finish Sat Mar 9 11:53:52 2013 > 7.37% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.38% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.38% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.38% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.39% done, estimate finish Sat Mar 9 11:53:41 2013 > 7.39% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.40% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.40% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.41% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.41% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.41% done, estimate finish Sat Mar 9 11:53:40 2013 > 7.42% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.42% done, estimate finish Sat Mar 9 11:53:50 2013 > 7.43% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.43% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.44% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.44% done, estimate finish Sat Mar 9 11:53:41 2013 > 7.44% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.45% done, estimate finish Sat Mar 9 11:53:49 2013 > 7.45% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.46% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.46% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.46% done, estimate finish Sat Mar 9 11:53:40 2013 > 7.47% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.47% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.48% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.48% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.49% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.49% done, estimate finish Sat Mar 9 11:53:41 2013 > 7.49% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.50% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.50% done, estimate finish Sat Mar 9 11:53:47 2013 > 7.51% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.51% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.52% done, estimate finish Sat Mar 9 11:53:40 2013 > 7.52% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.52% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.53% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.53% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.54% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.54% done, estimate finish Sat Mar 9 11:53:41 2013 > 7.54% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.55% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.55% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.56% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.56% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.57% done, estimate finish Sat Mar 9 11:53:41 2013 > 7.57% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.57% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.58% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.58% done, estimate finish Sat Mar 9 11:53:45 2013 > 7.59% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.59% done, estimate finish Sat Mar 9 11:53:40 2013 > 7.60% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.60% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.60% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.61% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.61% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.62% done, estimate finish Sat Mar 9 11:53:41 2013 > 7.62% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.62% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.63% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.63% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.64% done, estimate finish Sat Mar 9 11:53:43 2013 > 7.64% done, estimate finish Sat Mar 9 11:53:40 2013 > 7.65% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.65% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.65% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.66% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.66% done, estimate finish Sat Mar 9 11:53:30 2013 > 7.67% done, estimate finish Sat Mar 9 11:53:41 2013 > 7.67% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.68% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.68% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.68% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.69% done, estimate finish Sat Mar 9 11:53:30 2013 > 7.69% done, estimate finish Sat Mar 9 11:53:40 2013 > 7.70% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.70% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.71% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.71% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.71% done, estimate finish Sat Mar 9 11:53:30 2013 > 7.72% done, estimate finish Sat Mar 9 11:53:41 2013 > 7.72% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.73% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.73% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.73% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.74% done, estimate finish Sat Mar 9 11:53:30 2013 > 7.74% done, estimate finish Sat Mar 9 11:53:28 2013 > 7.75% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.75% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.76% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.76% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.76% done, estimate finish Sat Mar 9 11:53:30 2013 > 7.77% done, estimate finish Sat Mar 9 11:53:28 2013 > 7.77% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.78% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.78% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.79% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.79% done, estimate finish Sat Mar 9 11:53:30 2013 > 7.79% done, estimate finish Sat Mar 9 11:53:28 2013 > 7.80% done, estimate finish Sat Mar 9 11:53:26 2013 > 7.80% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.81% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.81% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.81% done, estimate finish Sat Mar 9 11:53:30 2013 > 7.82% done, estimate finish Sat Mar 9 11:53:28 2013 > 7.82% done, estimate finish Sat Mar 9 11:53:38 2013 > 7.83% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.83% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.84% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.84% done, estimate finish Sat Mar 9 11:53:30 2013 > 7.84% done, estimate finish Sat Mar 9 11:53:28 2013 > 7.85% done, estimate finish Sat Mar 9 11:53:26 2013 > 7.85% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.86% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.86% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.87% done, estimate finish Sat Mar 9 11:53:30 2013 > 7.87% done, estimate finish Sat Mar 9 11:53:28 2013 > 7.87% done, estimate finish Sat Mar 9 11:53:26 2013 > 7.88% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.88% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.89% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.89% done, estimate finish Sat Mar 9 11:53:30 2013 > 7.89% done, estimate finish Sat Mar 9 11:53:28 2013 > 7.90% done, estimate finish Sat Mar 9 11:53:26 2013 > 7.90% done, estimate finish Sat Mar 9 11:53:24 2013 > 7.91% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.91% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.92% done, estimate finish Sat Mar 9 11:53:30 2013 > 7.92% done, estimate finish Sat Mar 9 11:53:28 2013 > 7.92% done, estimate finish Sat Mar 9 11:53:26 2013 > 7.93% done, estimate finish Sat Mar 9 11:53:36 2013 > 7.93% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.94% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.94% done, estimate finish Sat Mar 9 11:53:30 2013 > 7.95% done, estimate finish Sat Mar 9 11:53:28 2013 > 7.95% done, estimate finish Sat Mar 9 11:53:26 2013 > 7.95% done, estimate finish Sat Mar 9 11:53:24 2013 > 7.96% done, estimate finish Sat Mar 9 11:53:34 2013 > 7.96% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.97% done, estimate finish Sat Mar 9 11:53:30 2013 > 7.97% done, estimate finish Sat Mar 9 11:53:28 2013 > 7.97% done, estimate finish Sat Mar 9 11:53:26 2013 > 7.98% done, estimate finish Sat Mar 9 11:53:24 2013 > 7.98% done, estimate finish Sat Mar 9 11:53:22 2013 > 7.99% done, estimate finish Sat Mar 9 11:53:32 2013 > 7.99% done, estimate finish Sat Mar 9 11:53:30 2013 > 8.00% done, estimate finish Sat Mar 9 11:53:28 2013 > 8.00% done, estimate finish Sat Mar 9 11:53:26 2013 > 8.00% done, estimate finish Sat Mar 9 11:53:24 2013 > 8.01% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.01% done, estimate finish Sat Mar 9 11:53:32 2013 > 8.02% done, estimate finish Sat Mar 9 11:53:30 2013 > 8.02% done, estimate finish Sat Mar 9 11:53:28 2013 > 8.03% done, estimate finish Sat Mar 9 11:53:26 2013 > 8.03% done, estimate finish Sat Mar 9 11:53:24 2013 > 8.03% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.04% done, estimate finish Sat Mar 9 11:53:32 2013 > 8.04% done, estimate finish Sat Mar 9 11:53:30 2013 > 8.05% done, estimate finish Sat Mar 9 11:53:28 2013 > 8.05% done, estimate finish Sat Mar 9 11:53:26 2013 > 8.06% done, estimate finish Sat Mar 9 11:53:24 2013 > 8.06% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.06% done, estimate finish Sat Mar 9 11:53:20 2013 > 8.07% done, estimate finish Sat Mar 9 11:53:30 2013 > 8.07% done, estimate finish Sat Mar 9 11:53:28 2013 > 8.08% done, estimate finish Sat Mar 9 11:53:26 2013 > 8.08% done, estimate finish Sat Mar 9 11:53:24 2013 > 8.08% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.09% done, estimate finish Sat Mar 9 11:53:20 2013 > 8.09% done, estimate finish Sat Mar 9 11:53:30 2013 > 8.10% done, estimate finish Sat Mar 9 11:53:28 2013 > 8.10% done, estimate finish Sat Mar 9 11:53:26 2013 > 8.11% done, estimate finish Sat Mar 9 11:53:24 2013 > 8.11% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.11% done, estimate finish Sat Mar 9 11:53:20 2013 > 8.12% done, estimate finish Sat Mar 9 11:53:30 2013 > 8.12% done, estimate finish Sat Mar 9 11:53:28 2013 > 8.13% done, estimate finish Sat Mar 9 11:53:26 2013 > 8.13% done, estimate finish Sat Mar 9 11:53:24 2013 > 8.14% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.14% done, estimate finish Sat Mar 9 11:53:20 2013 > 8.14% done, estimate finish Sat Mar 9 11:53:30 2013 > 8.15% done, estimate finish Sat Mar 9 11:53:28 2013 > 8.15% done, estimate finish Sat Mar 9 11:53:26 2013 > 8.16% done, estimate finish Sat Mar 9 11:53:24 2013 > 8.16% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.16% done, estimate finish Sat Mar 9 11:53:20 2013 > 8.17% done, estimate finish Sat Mar 9 11:53:18 2013 > 8.17% done, estimate finish Sat Mar 9 11:53:28 2013 > 8.18% done, estimate finish Sat Mar 9 11:53:26 2013 > 8.18% done, estimate finish Sat Mar 9 11:53:24 2013 > 8.19% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.19% done, estimate finish Sat Mar 9 11:53:20 2013 > 8.19% done, estimate finish Sat Mar 9 11:53:18 2013 > 8.20% done, estimate finish Sat Mar 9 11:53:28 2013 > 8.20% done, estimate finish Sat Mar 9 11:53:26 2013 > 8.21% done, estimate finish Sat Mar 9 11:53:24 2013 > 8.21% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.22% done, estimate finish Sat Mar 9 11:53:20 2013 > 8.22% done, estimate finish Sat Mar 9 11:53:18 2013 > 8.22% done, estimate finish Sat Mar 9 11:53:16 2013 > 8.23% done, estimate finish Sat Mar 9 11:53:26 2013 > 8.23% done, estimate finish Sat Mar 9 11:53:24 2013 > 8.24% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.24% done, estimate finish Sat Mar 9 11:53:20 2013 > 8.24% done, estimate finish Sat Mar 9 11:53:18 2013 > 8.25% done, estimate finish Sat Mar 9 11:53:16 2013 > 8.25% done, estimate finish Sat Mar 9 11:53:26 2013 > 8.26% done, estimate finish Sat Mar 9 11:53:24 2013 > 8.26% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.27% done, estimate finish Sat Mar 9 11:53:20 2013 > 8.27% done, estimate finish Sat Mar 9 11:53:18 2013 > 8.27% done, estimate finish Sat Mar 9 11:53:16 2013 > 8.28% done, estimate finish Sat Mar 9 11:53:26 2013 > 8.28% done, estimate finish Sat Mar 9 11:53:24 2013 > 8.29% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.29% done, estimate finish Sat Mar 9 11:53:20 2013 > 8.30% done, estimate finish Sat Mar 9 11:53:18 2013 > 8.30% done, estimate finish Sat Mar 9 11:53:16 2013 > 8.30% done, estimate finish Sat Mar 9 11:53:14 2013 > 8.31% done, estimate finish Sat Mar 9 11:53:24 2013 > 8.31% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.32% done, estimate finish Sat Mar 9 11:53:20 2013 > 8.32% done, estimate finish Sat Mar 9 11:53:18 2013 > 8.32% done, estimate finish Sat Mar 9 11:53:16 2013 > 8.33% done, estimate finish Sat Mar 9 11:53:14 2013 > 8.33% done, estimate finish Sat Mar 9 11:53:25 2013 > 8.34% done, estimate finish Sat Mar 9 11:53:22 2013 > 8.34% done, estimate finish Sat Mar 9 11:53:21 2013 > 8.35% done, estimate finish Sat Mar 9 11:53:19 2013 > 8.35% done, estimate finish Sat Mar 9 11:53:17 2013 > 8.35% done, estimate finish Sat Mar 9 11:53:15 2013 > 8.36% done, estimate finish Sat Mar 9 11:53:25 2013 > 8.36% done, estimate finish Sat Mar 9 11:53:23 2013 > 8.37% done, estimate finish Sat Mar 9 11:53:21 2013 > 8.37% done, estimate finish Sat Mar 9 11:53:19 2013 > 8.38% done, estimate finish Sat Mar 9 11:53:17 2013 > 8.38% done, estimate finish Sat Mar 9 11:53:15 2013 > 8.38% done, estimate finish Sat Mar 9 11:53:13 2013 > 8.39% done, estimate finish Sat Mar 9 11:53:23 2013 > 8.39% done, estimate finish Sat Mar 9 11:53:21 2013 > 8.40% done, estimate finish Sat Mar 9 11:53:19 2013 > 8.40% done, estimate finish Sat Mar 9 11:53:17 2013 > 8.41% done, estimate finish Sat Mar 9 11:53:15 2013 > 8.41% done, estimate finish Sat Mar 9 11:53:13 2013 > 8.41% done, estimate finish Sat Mar 9 11:53:23 2013 > 8.42% done, estimate finish Sat Mar 9 11:53:21 2013 > 8.42% done, estimate finish Sat Mar 9 11:53:19 2013 > 8.43% done, estimate finish Sat Mar 9 11:53:17 2013 > 8.43% done, estimate finish Sat Mar 9 11:53:15 2013 > 8.43% done, estimate finish Sat Mar 9 11:53:13 2013 > 8.44% done, estimate finish Sat Mar 9 11:53:23 2013 > 8.44% done, estimate finish Sat Mar 9 11:53:21 2013 > 8.45% done, estimate finish Sat Mar 9 11:53:19 2013 > 8.45% done, estimate finish Sat Mar 9 11:53:17 2013 > 8.46% done, estimate finish Sat Mar 9 11:53:15 2013 > 8.46% done, estimate finish Sat Mar 9 11:53:13 2013 > 8.46% done, estimate finish Sat Mar 9 11:53:11 2013 > 8.47% done, estimate finish Sat Mar 9 11:53:21 2013 > 8.47% done, estimate finish Sat Mar 9 11:53:19 2013 > 8.48% done, estimate finish Sat Mar 9 11:53:17 2013 > 8.48% done, estimate finish Sat Mar 9 11:53:15 2013 > 8.49% done, estimate finish Sat Mar 9 11:53:13 2013 > 8.49% done, estimate finish Sat Mar 9 11:53:11 2013 > 8.49% done, estimate finish Sat Mar 9 11:53:21 2013 > 8.50% done, estimate finish Sat Mar 9 11:53:19 2013 > 8.50% done, estimate finish Sat Mar 9 11:53:17 2013 > 8.51% done, estimate finish Sat Mar 9 11:53:15 2013 > 8.51% done, estimate finish Sat Mar 9 11:53:13 2013 > 8.51% done, estimate finish Sat Mar 9 11:53:11 2013 > 8.52% done, estimate finish Sat Mar 9 11:53:21 2013 > 8.52% done, estimate finish Sat Mar 9 11:53:19 2013 > 8.53% done, estimate finish Sat Mar 9 11:53:17 2013 > 8.53% done, estimate finish Sat Mar 9 11:53:15 2013 > 8.54% done, estimate finish Sat Mar 9 11:53:13 2013 > 8.54% done, estimate finish Sat Mar 9 11:53:11 2013 > 8.54% done, estimate finish Sat Mar 9 11:53:09 2013 > 8.55% done, estimate finish Sat Mar 9 11:53:19 2013 > 8.55% done, estimate finish Sat Mar 9 11:53:17 2013 > 8.56% done, estimate finish Sat Mar 9 11:53:15 2013 > 8.56% done, estimate finish Sat Mar 9 11:53:13 2013 > 8.57% done, estimate finish Sat Mar 9 11:53:11 2013 > 8.57% done, estimate finish Sat Mar 9 11:53:09 2013 > 8.57% done, estimate finish Sat Mar 9 11:53:19 2013 > 8.58% done, estimate finish Sat Mar 9 11:53:17 2013 > 8.58% done, estimate finish Sat Mar 9 11:53:15 2013 > 8.59% done, estimate finish Sat Mar 9 11:53:13 2013 > 8.59% done, estimate finish Sat Mar 9 11:53:11 2013 > 8.59% done, estimate finish Sat Mar 9 11:53:09 2013 > 8.60% done, estimate finish Sat Mar 9 11:53:19 2013 > 8.60% done, estimate finish Sat Mar 9 11:53:17 2013 > 8.61% done, estimate finish Sat Mar 9 11:53:15 2013 > 8.61% done, estimate finish Sat Mar 9 11:53:13 2013 > 8.62% done, estimate finish Sat Mar 9 11:53:11 2013 > 8.62% done, estimate finish Sat Mar 9 11:53:10 2013 > 8.62% done, estimate finish Sat Mar 9 11:53:08 2013 > 8.63% done, estimate finish Sat Mar 9 11:53:17 2013 > 8.63% done, estimate finish Sat Mar 9 11:53:15 2013 > 8.64% done, estimate finish Sat Mar 9 11:53:14 2013 > 8.64% done, estimate finish Sat Mar 9 11:53:12 2013 > 8.65% done, estimate finish Sat Mar 9 11:53:10 2013 > 8.65% done, estimate finish Sat Mar 9 11:53:08 2013 > 8.65% done, estimate finish Sat Mar 9 11:53:06 2013 > 8.66% done, estimate finish Sat Mar 9 11:53:15 2013 > 8.66% done, estimate finish Sat Mar 9 11:53:14 2013 > 8.67% done, estimate finish Sat Mar 9 11:53:12 2013 > 8.67% done, estimate finish Sat Mar 9 11:53:10 2013 > 8.67% done, estimate finish Sat Mar 9 11:53:08 2013 > 8.68% done, estimate finish Sat Mar 9 11:53:17 2013 > 8.68% done, estimate finish Sat Mar 9 11:53:16 2013 > 8.69% done, estimate finish Sat Mar 9 11:53:14 2013 > 8.69% done, estimate finish Sat Mar 9 11:53:12 2013 > 8.70% done, estimate finish Sat Mar 9 11:53:10 2013 > 8.70% done, estimate finish Sat Mar 9 11:53:08 2013 > 8.70% done, estimate finish Sat Mar 9 11:53:06 2013 > 8.71% done, estimate finish Sat Mar 9 11:53:16 2013 > 8.71% done, estimate finish Sat Mar 9 11:53:14 2013 > 8.72% done, estimate finish Sat Mar 9 11:53:12 2013 > 8.72% done, estimate finish Sat Mar 9 11:53:10 2013 > 8.73% done, estimate finish Sat Mar 9 11:53:08 2013 > 8.73% done, estimate finish Sat Mar 9 11:53:06 2013 > 8.73% done, estimate finish Sat Mar 9 11:53:16 2013 > 8.74% done, estimate finish Sat Mar 9 11:53:14 2013 > 8.74% done, estimate finish Sat Mar 9 11:53:12 2013 > 8.75% done, estimate finish Sat Mar 9 11:53:10 2013 > 8.75% done, estimate finish Sat Mar 9 11:53:08 2013 > 8.76% done, estimate finish Sat Mar 9 11:53:06 2013 > 8.76% done, estimate finish Sat Mar 9 11:53:04 2013 > 8.76% done, estimate finish Sat Mar 9 11:53:14 2013 > 8.77% done, estimate finish Sat Mar 9 11:53:12 2013 > 8.77% done, estimate finish Sat Mar 9 11:53:10 2013 > 8.78% done, estimate finish Sat Mar 9 11:53:08 2013 > 8.78% done, estimate finish Sat Mar 9 11:53:06 2013 > 8.78% done, estimate finish Sat Mar 9 11:53:16 2013 > 8.79% done, estimate finish Sat Mar 9 11:53:14 2013 > 8.79% done, estimate finish Sat Mar 9 11:53:12 2013 > 8.80% done, estimate finish Sat Mar 9 11:53:10 2013 > 8.80% done, estimate finish Sat Mar 9 11:53:08 2013 > 8.81% done, estimate finish Sat Mar 9 11:53:06 2013 > 8.81% done, estimate finish Sat Mar 9 11:53:05 2013 > 8.81% done, estimate finish Sat Mar 9 11:53:14 2013 > 8.82% done, estimate finish Sat Mar 9 11:53:12 2013 > 8.82% done, estimate finish Sat Mar 9 11:53:10 2013 > 8.83% done, estimate finish Sat Mar 9 11:53:08 2013 > 8.83% done, estimate finish Sat Mar 9 11:53:07 2013 > 8.84% done, estimate finish Sat Mar 9 11:53:16 2013 > 8.84% done, estimate finish Sat Mar 9 11:53:14 2013 > 8.84% done, estimate finish Sat Mar 9 11:53:12 2013 > 8.85% done, estimate finish Sat Mar 9 11:53:10 2013 > 8.85% done, estimate finish Sat Mar 9 11:53:08 2013 > 8.86% done, estimate finish Sat Mar 9 11:53:07 2013 > 8.86% done, estimate finish Sat Mar 9 11:53:05 2013 > 8.86% done, estimate finish Sat Mar 9 11:53:14 2013 > 8.87% done, estimate finish Sat Mar 9 11:53:12 2013 > 8.87% done, estimate finish Sat Mar 9 11:53:10 2013 > 8.88% done, estimate finish Sat Mar 9 11:53:09 2013 > 8.88% done, estimate finish Sat Mar 9 11:53:07 2013 > 8.89% done, estimate finish Sat Mar 9 11:53:05 2013 > 8.89% done, estimate finish Sat Mar 9 11:53:03 2013 > 8.89% done, estimate finish Sat Mar 9 11:53:12 2013 > 8.90% done, estimate finish Sat Mar 9 11:53:11 2013 > 8.90% done, estimate finish Sat Mar 9 11:53:09 2013 > 8.91% done, estimate finish Sat Mar 9 11:53:07 2013 > 8.91% done, estimate finish Sat Mar 9 11:53:05 2013 > 8.92% done, estimate finish Sat Mar 9 11:53:03 2013 > 8.92% done, estimate finish Sat Mar 9 11:53:12 2013 > 8.92% done, estimate finish Sat Mar 9 11:53:11 2013 > 8.93% done, estimate finish Sat Mar 9 11:53:09 2013 > 8.93% done, estimate finish Sat Mar 9 11:53:07 2013 > 8.94% done, estimate finish Sat Mar 9 11:53:05 2013 > 8.94% done, estimate finish Sat Mar 9 11:53:03 2013 > 8.94% done, estimate finish Sat Mar 9 11:53:13 2013 > 8.95% done, estimate finish Sat Mar 9 11:53:11 2013 > 8.95% done, estimate finish Sat Mar 9 11:53:09 2013 > 8.96% done, estimate finish Sat Mar 9 11:53:07 2013 > 8.96% done, estimate finish Sat Mar 9 11:53:05 2013 > 8.97% done, estimate finish Sat Mar 9 11:53:03 2013 > 8.97% done, estimate finish Sat Mar 9 11:53:13 2013 > 8.97% done, estimate finish Sat Mar 9 11:53:11 2013 > 8.98% done, estimate finish Sat Mar 9 11:53:09 2013 > 8.98% done, estimate finish Sat Mar 9 11:53:07 2013 > 8.99% done, estimate finish Sat Mar 9 11:53:05 2013 > 8.99% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.00% done, estimate finish Sat Mar 9 11:53:13 2013 > 9.00% done, estimate finish Sat Mar 9 11:53:11 2013 > 9.00% done, estimate finish Sat Mar 9 11:53:09 2013 > 9.01% done, estimate finish Sat Mar 9 11:53:07 2013 > 9.01% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.02% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.02% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.03% done, estimate finish Sat Mar 9 11:53:11 2013 > 9.03% done, estimate finish Sat Mar 9 11:53:09 2013 > 9.03% done, estimate finish Sat Mar 9 11:53:07 2013 > 9.04% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.04% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.05% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.05% done, estimate finish Sat Mar 9 11:53:11 2013 > 9.05% done, estimate finish Sat Mar 9 11:53:09 2013 > 9.06% done, estimate finish Sat Mar 9 11:53:07 2013 > 9.06% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.07% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.07% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.08% done, estimate finish Sat Mar 9 11:53:11 2013 > 9.08% done, estimate finish Sat Mar 9 11:53:09 2013 > 9.08% done, estimate finish Sat Mar 9 11:53:07 2013 > 9.09% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.09% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.10% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.10% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.11% done, estimate finish Sat Mar 9 11:53:09 2013 > 9.11% done, estimate finish Sat Mar 9 11:53:08 2013 > 9.11% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.12% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.12% done, estimate finish Sat Mar 9 11:53:13 2013 > 9.13% done, estimate finish Sat Mar 9 11:53:11 2013 > 9.13% done, estimate finish Sat Mar 9 11:53:09 2013 > 9.13% done, estimate finish Sat Mar 9 11:53:08 2013 > 9.14% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.14% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.15% done, estimate finish Sat Mar 9 11:53:13 2013 > 9.15% done, estimate finish Sat Mar 9 11:53:11 2013 > 9.16% done, estimate finish Sat Mar 9 11:53:10 2013 > 9.16% done, estimate finish Sat Mar 9 11:53:08 2013 > 9.16% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.17% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.17% done, estimate finish Sat Mar 9 11:53:13 2013 > 9.18% done, estimate finish Sat Mar 9 11:53:11 2013 > 9.18% done, estimate finish Sat Mar 9 11:53:10 2013 > 9.19% done, estimate finish Sat Mar 9 11:53:08 2013 > 9.19% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.19% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.20% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.20% done, estimate finish Sat Mar 9 11:53:12 2013 > 9.21% done, estimate finish Sat Mar 9 11:53:10 2013 > 9.21% done, estimate finish Sat Mar 9 11:53:08 2013 > 9.21% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.22% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.22% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.23% done, estimate finish Sat Mar 9 11:53:12 2013 > 9.23% done, estimate finish Sat Mar 9 11:53:10 2013 > 9.24% done, estimate finish Sat Mar 9 11:53:08 2013 > 9.24% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.24% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.25% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.25% done, estimate finish Sat Mar 9 11:53:12 2013 > 9.26% done, estimate finish Sat Mar 9 11:53:10 2013 > 9.26% done, estimate finish Sat Mar 9 11:53:08 2013 > 9.27% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.27% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.27% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.28% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.28% done, estimate finish Sat Mar 9 11:53:10 2013 > 9.29% done, estimate finish Sat Mar 9 11:53:08 2013 > 9.29% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.29% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.30% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.30% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.31% done, estimate finish Sat Mar 9 11:52:59 2013 > 9.31% done, estimate finish Sat Mar 9 11:53:08 2013 > 9.32% done, estimate finish Sat Mar 9 11:53:07 2013 > 9.32% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.32% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.33% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.33% done, estimate finish Sat Mar 9 11:53:10 2013 > 9.34% done, estimate finish Sat Mar 9 11:53:08 2013 > 9.34% done, estimate finish Sat Mar 9 11:53:07 2013 > 9.35% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.35% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.35% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.36% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.36% done, estimate finish Sat Mar 9 11:53:08 2013 > 9.37% done, estimate finish Sat Mar 9 11:53:07 2013 > 9.37% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.38% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.38% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.38% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.39% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.39% done, estimate finish Sat Mar 9 11:53:07 2013 > 9.40% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.40% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.40% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.41% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.41% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.42% done, estimate finish Sat Mar 9 11:53:07 2013 > 9.42% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.43% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.43% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.43% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.44% done, estimate finish Sat Mar 9 11:53:09 2013 > 9.44% done, estimate finish Sat Mar 9 11:53:07 2013 > 9.45% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.45% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.46% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.46% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.46% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.47% done, estimate finish Sat Mar 9 11:52:56 2013 > 9.47% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.48% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.48% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.48% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.49% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.49% done, estimate finish Sat Mar 9 11:53:07 2013 > 9.50% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.50% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.51% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.51% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.51% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.52% done, estimate finish Sat Mar 9 11:53:07 2013 > 9.52% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.53% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.53% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.54% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.54% done, estimate finish Sat Mar 9 11:52:59 2013 > 9.54% done, estimate finish Sat Mar 9 11:52:57 2013 > 9.55% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.55% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.56% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.56% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.56% done, estimate finish Sat Mar 9 11:52:59 2013 > 9.57% done, estimate finish Sat Mar 9 11:53:07 2013 > 9.57% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.58% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.58% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.59% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.59% done, estimate finish Sat Mar 9 11:52:59 2013 > 9.59% done, estimate finish Sat Mar 9 11:52:57 2013 > 9.60% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.60% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.61% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.61% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.62% done, estimate finish Sat Mar 9 11:52:59 2013 > 9.62% done, estimate finish Sat Mar 9 11:53:08 2013 > 9.62% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.63% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.63% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.64% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.64% done, estimate finish Sat Mar 9 11:52:59 2013 > 9.64% done, estimate finish Sat Mar 9 11:52:57 2013 > 9.65% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.65% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.66% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.66% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.67% done, estimate finish Sat Mar 9 11:52:59 2013 > 9.67% done, estimate finish Sat Mar 9 11:52:57 2013 > 9.67% done, estimate finish Sat Mar 9 11:52:56 2013 > 9.68% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.68% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.69% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.69% done, estimate finish Sat Mar 9 11:52:59 2013 > 9.70% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.70% done, estimate finish Sat Mar 9 11:53:06 2013 > 9.70% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.71% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.71% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.72% done, estimate finish Sat Mar 9 11:52:59 2013 > 9.72% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.73% done, estimate finish Sat Mar 9 11:52:56 2013 > 9.73% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.73% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.74% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.74% done, estimate finish Sat Mar 9 11:52:59 2013 > 9.75% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.75% done, estimate finish Sat Mar 9 11:52:56 2013 > 9.75% done, estimate finish Sat Mar 9 11:52:54 2013 > 9.76% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.76% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.77% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.77% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.78% done, estimate finish Sat Mar 9 11:52:56 2013 > 9.78% done, estimate finish Sat Mar 9 11:52:54 2013 > 9.78% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.79% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.79% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.80% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.80% done, estimate finish Sat Mar 9 11:52:56 2013 > 9.81% done, estimate finish Sat Mar 9 11:53:05 2013 > 9.81% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.81% done, estimate finish Sat Mar 9 11:53:01 2013 > 9.82% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.82% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.83% done, estimate finish Sat Mar 9 11:52:56 2013 > 9.83% done, estimate finish Sat Mar 9 11:52:55 2013 > 9.83% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.84% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.84% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.85% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.85% done, estimate finish Sat Mar 9 11:52:57 2013 > 9.86% done, estimate finish Sat Mar 9 11:52:55 2013 > 9.86% done, estimate finish Sat Mar 9 11:52:53 2013 > 9.86% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.87% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.87% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.88% done, estimate finish Sat Mar 9 11:52:57 2013 > 9.88% done, estimate finish Sat Mar 9 11:52:55 2013 > 9.89% done, estimate finish Sat Mar 9 11:53:03 2013 > 9.89% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.89% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.90% done, estimate finish Sat Mar 9 11:52:58 2013 > 9.90% done, estimate finish Sat Mar 9 11:52:57 2013 > 9.91% done, estimate finish Sat Mar 9 11:52:55 2013 > 9.91% done, estimate finish Sat Mar 9 11:52:53 2013 > 9.91% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.92% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.92% done, estimate finish Sat Mar 9 11:52:59 2013 > 9.93% done, estimate finish Sat Mar 9 11:52:57 2013 > 9.93% done, estimate finish Sat Mar 9 11:52:55 2013 > 9.94% done, estimate finish Sat Mar 9 11:52:54 2013 > 9.94% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.94% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.95% done, estimate finish Sat Mar 9 11:52:59 2013 > 9.95% done, estimate finish Sat Mar 9 11:52:57 2013 > 9.96% done, estimate finish Sat Mar 9 11:52:55 2013 > 9.96% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.97% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.97% done, estimate finish Sat Mar 9 11:53:00 2013 > 9.97% done, estimate finish Sat Mar 9 11:52:59 2013 > 9.98% done, estimate finish Sat Mar 9 11:52:57 2013 > 9.98% done, estimate finish Sat Mar 9 11:52:55 2013 > 9.99% done, estimate finish Sat Mar 9 11:53:04 2013 > 9.99% done, estimate finish Sat Mar 9 11:53:02 2013 > 9.99% done, estimate finish Sat Mar 9 11:53:00 2013 > 10.00% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.00% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.01% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.01% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.02% done, estimate finish Sat Mar 9 11:53:02 2013 > 10.02% done, estimate finish Sat Mar 9 11:53:01 2013 > 10.02% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.03% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.03% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.04% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.04% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.05% done, estimate finish Sat Mar 9 11:53:01 2013 > 10.05% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.05% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.06% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.06% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.07% done, estimate finish Sat Mar 9 11:53:02 2013 > 10.07% done, estimate finish Sat Mar 9 11:53:01 2013 > 10.08% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.08% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.08% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.09% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.09% done, estimate finish Sat Mar 9 11:53:03 2013 > 10.10% done, estimate finish Sat Mar 9 11:53:01 2013 > 10.10% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.10% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.11% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.11% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.12% done, estimate finish Sat Mar 9 11:53:03 2013 > 10.12% done, estimate finish Sat Mar 9 11:53:01 2013 > 10.13% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.13% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.13% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.14% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.14% done, estimate finish Sat Mar 9 11:53:03 2013 > 10.15% done, estimate finish Sat Mar 9 11:53:01 2013 > 10.15% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.16% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.16% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.16% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.17% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.17% done, estimate finish Sat Mar 9 11:53:01 2013 > 10.18% done, estimate finish Sat Mar 9 11:53:00 2013 > 10.18% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.18% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.19% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.19% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.20% done, estimate finish Sat Mar 9 11:53:01 2013 > 10.20% done, estimate finish Sat Mar 9 11:53:00 2013 > 10.21% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.21% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.21% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.22% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.22% done, estimate finish Sat Mar 9 11:53:01 2013 > 10.23% done, estimate finish Sat Mar 9 11:53:00 2013 > 10.23% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.24% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.24% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.24% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.25% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.25% done, estimate finish Sat Mar 9 11:53:00 2013 > 10.26% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.26% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.26% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.27% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.27% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.28% done, estimate finish Sat Mar 9 11:53:00 2013 > 10.28% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.29% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.29% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.29% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.30% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.30% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.31% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.31% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.32% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.32% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.32% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.33% done, estimate finish Sat Mar 9 11:53:00 2013 > 10.33% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.34% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.34% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.34% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.35% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.35% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.36% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.36% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.37% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.37% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.37% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.38% done, estimate finish Sat Mar 9 11:53:00 2013 > 10.38% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.39% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.39% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.40% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.40% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.40% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.41% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.41% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.42% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.42% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.43% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.43% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.43% done, estimate finish Sat Mar 9 11:52:49 2013 > 10.44% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.44% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.45% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.45% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.45% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.46% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.46% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.47% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.47% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.48% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.48% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.48% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.49% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.49% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.50% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.50% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.51% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.51% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.51% done, estimate finish Sat Mar 9 11:52:48 2013 > 10.52% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.52% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.53% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.53% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.53% done, estimate finish Sat Mar 9 11:52:59 2013 > 10.54% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.54% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.55% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.55% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.56% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.56% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.56% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.57% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.57% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.58% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.58% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.59% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.59% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.59% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.60% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.60% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.61% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.61% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.61% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.62% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.62% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.63% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.63% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.64% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.64% done, estimate finish Sat Mar 9 11:52:58 2013 > 10.64% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.65% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.65% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.66% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.66% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.67% done, estimate finish Sat Mar 9 11:52:49 2013 > 10.67% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.67% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.68% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.68% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.69% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.69% done, estimate finish Sat Mar 9 11:52:49 2013 > 10.70% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.70% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.70% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.71% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.71% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.72% done, estimate finish Sat Mar 9 11:52:49 2013 > 10.72% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.72% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.73% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.73% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.74% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.74% done, estimate finish Sat Mar 9 11:52:49 2013 > 10.75% done, estimate finish Sat Mar 9 11:52:57 2013 > 10.75% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.75% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.76% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.76% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.77% done, estimate finish Sat Mar 9 11:52:49 2013 > 10.77% done, estimate finish Sat Mar 9 11:52:48 2013 > 10.78% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.78% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.78% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.79% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.79% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.80% done, estimate finish Sat Mar 9 11:52:48 2013 > 10.80% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.80% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.81% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.81% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.82% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.82% done, estimate finish Sat Mar 9 11:52:48 2013 > 10.83% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.83% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.83% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.84% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.84% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.85% done, estimate finish Sat Mar 9 11:52:48 2013 > 10.85% done, estimate finish Sat Mar 9 11:52:56 2013 > 10.86% done, estimate finish Sat Mar 9 11:52:54 2013 > 10.86% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.86% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.87% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.87% done, estimate finish Sat Mar 9 11:52:48 2013 > 10.88% done, estimate finish Sat Mar 9 11:52:47 2013 > 10.88% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.88% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.89% done, estimate finish Sat Mar 9 11:52:51 2013 > 10.89% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.90% done, estimate finish Sat Mar 9 11:52:49 2013 > 10.90% done, estimate finish Sat Mar 9 11:52:47 2013 > 10.91% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.91% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.91% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.92% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.92% done, estimate finish Sat Mar 9 11:52:49 2013 > 10.93% done, estimate finish Sat Mar 9 11:52:47 2013 > 10.93% done, estimate finish Sat Mar 9 11:52:55 2013 > 10.94% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.94% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.94% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.95% done, estimate finish Sat Mar 9 11:52:49 2013 > 10.95% done, estimate finish Sat Mar 9 11:52:47 2013 > 10.96% done, estimate finish Sat Mar 9 11:52:46 2013 > 10.96% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.96% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.97% done, estimate finish Sat Mar 9 11:52:50 2013 > 10.97% done, estimate finish Sat Mar 9 11:52:49 2013 > 10.98% done, estimate finish Sat Mar 9 11:52:47 2013 > 10.98% done, estimate finish Sat Mar 9 11:52:46 2013 > 10.99% done, estimate finish Sat Mar 9 11:52:53 2013 > 10.99% done, estimate finish Sat Mar 9 11:52:52 2013 > 10.99% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.00% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.00% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.01% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.01% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.02% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.02% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.02% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.03% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.03% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.04% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.04% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.05% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.05% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.05% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.06% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.06% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.07% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.07% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.07% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.08% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.08% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.09% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.09% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.10% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.10% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.10% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.11% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.11% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.12% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.12% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.13% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.13% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.13% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.14% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.14% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.15% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.15% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.15% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.16% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.16% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.17% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.17% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.18% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.18% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.18% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.19% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.19% done, estimate finish Sat Mar 9 11:52:44 2013 > 11.20% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.20% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.21% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.21% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.21% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.22% done, estimate finish Sat Mar 9 11:52:44 2013 > 11.22% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.23% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.23% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.23% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.24% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.24% done, estimate finish Sat Mar 9 11:52:44 2013 > 11.25% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.25% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.26% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.26% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.26% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.27% done, estimate finish Sat Mar 9 11:52:44 2013 > 11.27% done, estimate finish Sat Mar 9 11:52:43 2013 > 11.28% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.28% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.29% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.29% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.29% done, estimate finish Sat Mar 9 11:52:44 2013 > 11.30% done, estimate finish Sat Mar 9 11:52:43 2013 > 11.30% done, estimate finish Sat Mar 9 11:52:42 2013 > 11.31% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.31% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.32% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.32% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.32% done, estimate finish Sat Mar 9 11:52:43 2013 > 11.33% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.33% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.34% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.34% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.34% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.35% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.35% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.36% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.36% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.37% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.37% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.37% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.38% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.38% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.39% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.39% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.40% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.40% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.40% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.41% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.41% done, estimate finish Sat Mar 9 11:52:57 2013 > 11.42% done, estimate finish Sat Mar 9 11:52:55 2013 > 11.42% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.42% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.43% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.43% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.44% done, estimate finish Sat Mar 9 11:52:57 2013 > 11.44% done, estimate finish Sat Mar 9 11:52:55 2013 > 11.45% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.45% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.45% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.46% done, estimate finish Sat Mar 9 11:52:58 2013 > 11.46% done, estimate finish Sat Mar 9 11:52:57 2013 > 11.47% done, estimate finish Sat Mar 9 11:52:55 2013 > 11.47% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.48% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.48% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.48% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.49% done, estimate finish Sat Mar 9 11:52:57 2013 > 11.49% done, estimate finish Sat Mar 9 11:52:56 2013 > 11.50% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.50% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.50% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.51% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.51% done, estimate finish Sat Mar 9 11:52:57 2013 > 11.52% done, estimate finish Sat Mar 9 11:52:56 2013 > 11.52% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.53% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.53% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.53% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.54% done, estimate finish Sat Mar 9 11:52:57 2013 > 11.54% done, estimate finish Sat Mar 9 11:52:56 2013 > 11.55% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.55% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.56% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.56% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.56% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.57% done, estimate finish Sat Mar 9 11:52:56 2013 > 11.57% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.58% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.58% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.58% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.59% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.59% done, estimate finish Sat Mar 9 11:52:56 2013 > 11.60% done, estimate finish Sat Mar 9 11:52:55 2013 > 11.60% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.61% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.61% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.61% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.62% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.62% done, estimate finish Sat Mar 9 11:52:55 2013 > 11.63% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.63% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.64% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.64% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.64% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.65% done, estimate finish Sat Mar 9 11:52:55 2013 > 11.65% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.66% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.66% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.66% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.67% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.67% done, estimate finish Sat Mar 9 11:52:55 2013 > 11.68% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.68% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.69% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.69% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.69% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.70% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.70% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.71% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.71% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.72% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.72% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.72% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.73% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.73% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.74% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.74% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.75% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.75% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.75% done, estimate finish Sat Mar 9 11:52:54 2013 > 11.76% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.76% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.77% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.77% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.77% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.78% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.78% done, estimate finish Sat Mar 9 11:52:44 2013 > 11.79% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.79% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.80% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.80% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.80% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.81% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.81% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.82% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.82% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.83% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.83% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.83% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.84% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.84% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.85% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.85% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.85% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.86% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.86% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.87% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.87% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.88% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.88% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.88% done, estimate finish Sat Mar 9 11:52:53 2013 > 11.89% done, estimate finish Sat Mar 9 11:52:51 2013 > 11.89% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.90% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.90% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.91% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.91% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.91% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.92% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.92% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.93% done, estimate finish Sat Mar 9 11:52:47 2013 > 11.93% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.93% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.94% done, estimate finish Sat Mar 9 11:52:43 2013 > 11.94% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.95% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.95% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.96% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.96% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.96% done, estimate finish Sat Mar 9 11:52:52 2013 > 11.97% done, estimate finish Sat Mar 9 11:52:50 2013 > 11.97% done, estimate finish Sat Mar 9 11:52:49 2013 > 11.98% done, estimate finish Sat Mar 9 11:52:48 2013 > 11.98% done, estimate finish Sat Mar 9 11:52:46 2013 > 11.99% done, estimate finish Sat Mar 9 11:52:45 2013 > 11.99% done, estimate finish Sat Mar 9 11:52:43 2013 > 11.99% done, estimate finish Sat Mar 9 11:52:50 2013 > 12.00% done, estimate finish Sat Mar 9 11:52:49 2013 > 12.00% done, estimate finish Sat Mar 9 11:52:48 2013 > 12.01% done, estimate finish Sat Mar 9 11:52:46 2013 > 12.01% done, estimate finish Sat Mar 9 11:52:45 2013 > 12.01% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.02% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.02% done, estimate finish Sat Mar 9 11:52:49 2013 > 12.03% done, estimate finish Sat Mar 9 11:52:48 2013 > 12.03% done, estimate finish Sat Mar 9 11:52:46 2013 > 12.04% done, estimate finish Sat Mar 9 11:52:45 2013 > 12.04% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.04% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.05% done, estimate finish Sat Mar 9 11:52:49 2013 > 12.05% done, estimate finish Sat Mar 9 11:52:48 2013 > 12.06% done, estimate finish Sat Mar 9 11:52:47 2013 > 12.06% done, estimate finish Sat Mar 9 11:52:45 2013 > 12.07% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.07% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.07% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.08% done, estimate finish Sat Mar 9 11:52:48 2013 > 12.08% done, estimate finish Sat Mar 9 11:52:47 2013 > 12.09% done, estimate finish Sat Mar 9 11:52:45 2013 > 12.09% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.10% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.10% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.10% done, estimate finish Sat Mar 9 11:52:48 2013 > 12.11% done, estimate finish Sat Mar 9 11:52:47 2013 > 12.11% done, estimate finish Sat Mar 9 11:52:45 2013 > 12.12% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.12% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.12% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.13% done, estimate finish Sat Mar 9 11:52:48 2013 > 12.13% done, estimate finish Sat Mar 9 11:52:47 2013 > 12.14% done, estimate finish Sat Mar 9 11:52:46 2013 > 12.14% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.15% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.15% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.15% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.16% done, estimate finish Sat Mar 9 11:52:47 2013 > 12.16% done, estimate finish Sat Mar 9 11:52:46 2013 > 12.17% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.17% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.18% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.18% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.18% done, estimate finish Sat Mar 9 11:52:47 2013 > 12.19% done, estimate finish Sat Mar 9 11:52:46 2013 > 12.19% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.20% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.20% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.20% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.21% done, estimate finish Sat Mar 9 11:52:47 2013 > 12.21% done, estimate finish Sat Mar 9 11:52:46 2013 > 12.22% done, estimate finish Sat Mar 9 11:52:45 2013 > 12.22% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.23% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.23% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.23% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.24% done, estimate finish Sat Mar 9 11:52:46 2013 > 12.24% done, estimate finish Sat Mar 9 11:52:45 2013 > 12.25% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.25% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.26% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.26% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.26% done, estimate finish Sat Mar 9 11:52:46 2013 > 12.27% done, estimate finish Sat Mar 9 11:52:45 2013 > 12.27% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.28% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.28% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.28% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.29% done, estimate finish Sat Mar 9 11:52:46 2013 > 12.29% done, estimate finish Sat Mar 9 11:52:45 2013 > 12.30% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.30% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.31% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.31% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.31% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.32% done, estimate finish Sat Mar 9 11:52:45 2013 > 12.32% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.33% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.33% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.34% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.34% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.34% done, estimate finish Sat Mar 9 11:52:45 2013 > 12.35% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.35% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.36% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.36% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.37% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.37% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.37% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.38% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.38% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.39% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.39% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.39% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.40% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.40% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.41% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.41% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.42% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.42% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.42% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.43% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.43% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.44% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.44% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.45% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.45% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.45% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.46% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.46% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.47% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.47% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.47% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.48% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.48% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.49% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.49% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.50% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.50% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.50% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.51% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.51% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.52% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.52% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.53% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.53% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.53% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.54% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.54% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.55% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.55% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.55% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.56% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.56% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.57% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.57% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.58% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.58% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.58% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.59% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.59% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.60% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.60% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.61% done, estimate finish Sat Mar 9 11:52:44 2013 > 12.61% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.61% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.62% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.62% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.63% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.63% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.63% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.64% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.64% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.65% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.65% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.66% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.66% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.66% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.67% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.67% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.68% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.68% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.69% done, estimate finish Sat Mar 9 11:52:43 2013 > 12.69% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.69% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.70% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.70% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.71% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.71% done, estimate finish Sat Mar 9 11:52:35 2013 > 12.72% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.72% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.72% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.73% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.73% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.74% done, estimate finish Sat Mar 9 11:52:35 2013 > 12.74% done, estimate finish Sat Mar 9 11:52:34 2013 > 12.74% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.75% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.75% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.76% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.76% done, estimate finish Sat Mar 9 11:52:35 2013 > 12.77% done, estimate finish Sat Mar 9 11:52:42 2013 > 12.77% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.77% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.78% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.78% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.79% done, estimate finish Sat Mar 9 11:52:35 2013 > 12.79% done, estimate finish Sat Mar 9 11:52:34 2013 > 12.80% done, estimate finish Sat Mar 9 11:52:41 2013 > 12.80% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.80% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.81% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.81% done, estimate finish Sat Mar 9 11:52:35 2013 > 12.82% done, estimate finish Sat Mar 9 11:52:34 2013 > 12.82% done, estimate finish Sat Mar 9 11:52:33 2013 > 12.82% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.83% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.83% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.84% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.84% done, estimate finish Sat Mar 9 11:52:34 2013 > 12.85% done, estimate finish Sat Mar 9 11:52:33 2013 > 12.85% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.85% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.86% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.86% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.87% done, estimate finish Sat Mar 9 11:52:34 2013 > 12.87% done, estimate finish Sat Mar 9 11:52:33 2013 > 12.88% done, estimate finish Sat Mar 9 11:52:40 2013 > 12.88% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.88% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.89% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.89% done, estimate finish Sat Mar 9 11:52:35 2013 > 12.90% done, estimate finish Sat Mar 9 11:52:33 2013 > 12.90% done, estimate finish Sat Mar 9 11:52:32 2013 > 12.90% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.91% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.91% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.92% done, estimate finish Sat Mar 9 11:52:35 2013 > 12.92% done, estimate finish Sat Mar 9 11:52:33 2013 > 12.93% done, estimate finish Sat Mar 9 11:52:32 2013 > 12.93% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.93% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.94% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.94% done, estimate finish Sat Mar 9 11:52:35 2013 > 12.95% done, estimate finish Sat Mar 9 11:52:34 2013 > 12.95% done, estimate finish Sat Mar 9 11:52:32 2013 > 12.96% done, estimate finish Sat Mar 9 11:52:39 2013 > 12.96% done, estimate finish Sat Mar 9 11:52:37 2013 > 12.96% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.97% done, estimate finish Sat Mar 9 11:52:35 2013 > 12.97% done, estimate finish Sat Mar 9 11:52:34 2013 > 12.98% done, estimate finish Sat Mar 9 11:52:32 2013 > 12.98% done, estimate finish Sat Mar 9 11:52:31 2013 > 12.98% done, estimate finish Sat Mar 9 11:52:38 2013 > 12.99% done, estimate finish Sat Mar 9 11:52:36 2013 > 12.99% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.00% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.00% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.01% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.01% done, estimate finish Sat Mar 9 11:52:38 2013 > 13.01% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.02% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.02% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.03% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.03% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.04% done, estimate finish Sat Mar 9 11:52:38 2013 > 13.04% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.04% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.05% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.05% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.06% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.06% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.07% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.07% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.07% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.08% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.08% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.09% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.09% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.09% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.10% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.10% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.11% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.11% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.12% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.12% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.12% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.13% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.13% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.14% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.14% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.15% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.15% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.15% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.16% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.16% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.17% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.17% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.17% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.18% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.18% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.19% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.19% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.20% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.20% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.20% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.21% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.21% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.22% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.22% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.23% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.23% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.23% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.24% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.24% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.25% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.25% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.25% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.26% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.26% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.27% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.27% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.28% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.28% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.28% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.29% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.29% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.30% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.30% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.31% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.31% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.31% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.32% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.32% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.33% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.33% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.33% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.34% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.34% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.35% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.35% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.36% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.36% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.36% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.37% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.37% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.38% done, estimate finish Sat Mar 9 11:52:28 2013 > 13.38% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.39% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.39% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.39% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.40% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.40% done, estimate finish Sat Mar 9 11:52:28 2013 > 13.41% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.41% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.42% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.42% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.42% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.43% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.43% done, estimate finish Sat Mar 9 11:52:27 2013 > 13.44% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.44% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.44% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.45% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.45% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.46% done, estimate finish Sat Mar 9 11:52:27 2013 > 13.46% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.47% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.47% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.47% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.48% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.48% done, estimate finish Sat Mar 9 11:52:28 2013 > 13.49% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.49% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.50% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.50% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.50% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.51% done, estimate finish Sat Mar 9 11:52:28 2013 > 13.51% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.52% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.52% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.52% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.53% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.53% done, estimate finish Sat Mar 9 11:52:28 2013 > 13.54% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.54% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.55% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.55% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.55% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.56% done, estimate finish Sat Mar 9 11:52:28 2013 > 13.56% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.57% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.57% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.58% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.58% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.58% done, estimate finish Sat Mar 9 11:52:28 2013 > 13.59% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.59% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.60% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.60% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.60% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.61% done, estimate finish Sat Mar 9 11:52:28 2013 > 13.61% done, estimate finish Sat Mar 9 11:52:27 2013 > 13.62% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.62% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.63% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.63% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.63% done, estimate finish Sat Mar 9 11:52:28 2013 > 13.64% done, estimate finish Sat Mar 9 11:52:27 2013 > 13.64% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.65% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.65% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.66% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.66% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.66% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.67% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.67% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.68% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.68% done, estimate finish Sat Mar 9 11:52:30 2013 > 13.69% done, estimate finish Sat Mar 9 11:52:29 2013 > 13.69% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.69% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.70% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.70% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.71% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.71% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.71% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.72% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.72% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.73% done, estimate finish Sat Mar 9 11:52:39 2013 > 13.73% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.74% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.74% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.74% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.75% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.75% done, estimate finish Sat Mar 9 11:52:39 2013 > 13.76% done, estimate finish Sat Mar 9 11:52:38 2013 > 13.76% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.77% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.77% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.77% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.78% done, estimate finish Sat Mar 9 11:52:39 2013 > 13.78% done, estimate finish Sat Mar 9 11:52:38 2013 > 13.79% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.79% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.79% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.80% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.80% done, estimate finish Sat Mar 9 11:52:39 2013 > 13.81% done, estimate finish Sat Mar 9 11:52:38 2013 > 13.81% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.82% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.82% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.82% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.83% done, estimate finish Sat Mar 9 11:52:39 2013 > 13.83% done, estimate finish Sat Mar 9 11:52:38 2013 > 13.84% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.84% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.85% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.85% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.85% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.86% done, estimate finish Sat Mar 9 11:52:38 2013 > 13.86% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.87% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.87% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.87% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.88% done, estimate finish Sat Mar 9 11:52:39 2013 > 13.88% done, estimate finish Sat Mar 9 11:52:38 2013 > 13.89% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.89% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.90% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.90% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.90% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.91% done, estimate finish Sat Mar 9 11:52:38 2013 > 13.91% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.92% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.92% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.93% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.93% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.93% done, estimate finish Sat Mar 9 11:52:38 2013 > 13.94% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.94% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.95% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.95% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.95% done, estimate finish Sat Mar 9 11:52:32 2013 > 13.96% done, estimate finish Sat Mar 9 11:52:38 2013 > 13.96% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.97% done, estimate finish Sat Mar 9 11:52:36 2013 > 13.97% done, estimate finish Sat Mar 9 11:52:35 2013 > 13.98% done, estimate finish Sat Mar 9 11:52:34 2013 > 13.98% done, estimate finish Sat Mar 9 11:52:33 2013 > 13.98% done, estimate finish Sat Mar 9 11:52:31 2013 > 13.99% done, estimate finish Sat Mar 9 11:52:37 2013 > 13.99% done, estimate finish Sat Mar 9 11:52:36 2013 > 14.00% done, estimate finish Sat Mar 9 11:52:35 2013 > 14.00% done, estimate finish Sat Mar 9 11:52:34 2013 > 14.01% done, estimate finish Sat Mar 9 11:52:33 2013 > 14.01% done, estimate finish Sat Mar 9 11:52:32 2013 > 14.01% done, estimate finish Sat Mar 9 11:52:37 2013 > 14.02% done, estimate finish Sat Mar 9 11:52:36 2013 > 14.02% done, estimate finish Sat Mar 9 11:52:35 2013 > 14.03% done, estimate finish Sat Mar 9 11:52:34 2013 > 14.03% done, estimate finish Sat Mar 9 11:52:33 2013 > 14.04% done, estimate finish Sat Mar 9 11:52:32 2013 > 14.04% done, estimate finish Sat Mar 9 11:52:38 2013 > 14.04% done, estimate finish Sat Mar 9 11:52:36 2013 > 14.05% done, estimate finish Sat Mar 9 11:52:35 2013 > 14.05% done, estimate finish Sat Mar 9 11:52:34 2013 > 14.06% done, estimate finish Sat Mar 9 11:52:33 2013 > 14.06% done, estimate finish Sat Mar 9 11:52:32 2013 > 14.06% done, estimate finish Sat Mar 9 11:52:38 2013 > 14.07% done, estimate finish Sat Mar 9 11:52:37 2013 > 14.07% done, estimate finish Sat Mar 9 11:52:35 2013 > 14.08% done, estimate finish Sat Mar 9 11:52:34 2013 > 14.08% done, estimate finish Sat Mar 9 11:52:33 2013 > 14.09% done, estimate finish Sat Mar 9 11:52:32 2013 > 14.09% done, estimate finish Sat Mar 9 11:52:38 2013 > 14.09% done, estimate finish Sat Mar 9 11:52:37 2013 > 14.10% done, estimate finish Sat Mar 9 11:52:35 2013 > 14.10% done, estimate finish Sat Mar 9 11:52:34 2013 > 14.11% done, estimate finish Sat Mar 9 11:52:33 2013 > 14.11% done, estimate finish Sat Mar 9 11:52:32 2013 > 14.12% done, estimate finish Sat Mar 9 11:52:38 2013 > 14.12% done, estimate finish Sat Mar 9 11:52:37 2013 > 14.12% done, estimate finish Sat Mar 9 11:52:36 2013 > 14.13% done, estimate finish Sat Mar 9 11:52:34 2013 > 14.13% done, estimate finish Sat Mar 9 11:52:33 2013 > 14.14% done, estimate finish Sat Mar 9 11:52:32 2013 > 14.14% done, estimate finish Sat Mar 9 11:52:31 2013 > 14.14% done, estimate finish Sat Mar 9 11:52:37 2013 > 14.15% done, estimate finish Sat Mar 9 11:52:36 2013 > 14.15% done, estimate finish Sat Mar 9 11:52:35 2013 > 14.16% done, estimate finish Sat Mar 9 11:52:33 2013 > 14.16% done, estimate finish Sat Mar 9 11:52:32 2013 > 14.17% done, estimate finish Sat Mar 9 11:52:31 2013 > 14.17% done, estimate finish Sat Mar 9 11:52:37 2013 > 14.17% done, estimate finish Sat Mar 9 11:52:36 2013 > 14.18% done, estimate finish Sat Mar 9 11:52:35 2013 > 14.18% done, estimate finish Sat Mar 9 11:52:34 2013 > 14.19% done, estimate finish Sat Mar 9 11:52:32 2013 > 14.19% done, estimate finish Sat Mar 9 11:52:31 2013 > 14.20% done, estimate finish Sat Mar 9 11:52:30 2013 > 14.20% done, estimate finish Sat Mar 9 11:52:36 2013 > 14.20% done, estimate finish Sat Mar 9 11:52:35 2013 > 14.21% done, estimate finish Sat Mar 9 11:52:34 2013 > 14.21% done, estimate finish Sat Mar 9 11:52:32 2013 > 14.22% done, estimate finish Sat Mar 9 11:52:31 2013 > 14.22% done, estimate finish Sat Mar 9 11:52:30 2013 > 14.22% done, estimate finish Sat Mar 9 11:52:36 2013 > 14.23% done, estimate finish Sat Mar 9 11:52:35 2013 > 14.23% done, estimate finish Sat Mar 9 11:52:34 2013 > 14.24% done, estimate finish Sat Mar 9 11:52:33 2013 > 14.24% done, estimate finish Sat Mar 9 11:52:31 2013 > 14.25% done, estimate finish Sat Mar 9 11:52:30 2013 > 14.25% done, estimate finish Sat Mar 9 11:52:36 2013 > 14.25% done, estimate finish Sat Mar 9 11:52:35 2013 > 14.26% done, estimate finish Sat Mar 9 11:52:34 2013 > 14.26% done, estimate finish Sat Mar 9 11:52:33 2013 > 14.27% done, estimate finish Sat Mar 9 11:52:32 2013 > 14.27% done, estimate finish Sat Mar 9 11:52:30 2013 > 14.28% done, estimate finish Sat Mar 9 11:52:50 2013 > 14.28% done, estimate finish Sat Mar 9 11:52:49 2013 > 14.28% done, estimate finish Sat Mar 9 11:52:48 2013 > 14.29% done, estimate finish Sat Mar 9 11:52:47 2013 > 14.29% done, estimate finish Sat Mar 9 11:52:53 2013 > 14.30% done, estimate finish Sat Mar 9 11:52:52 2013 > 14.30% done, estimate finish Sat Mar 9 11:52:50 2013 > 14.30% done, estimate finish Sat Mar 9 11:52:49 2013 > 14.31% done, estimate finish Sat Mar 9 11:52:48 2013 > 14.31% done, estimate finish Sat Mar 9 11:52:47 2013 > 14.32% done, estimate finish Sat Mar 9 11:52:53 2013 > 14.32% done, estimate finish Sat Mar 9 11:52:52 2013 > 14.33% done, estimate finish Sat Mar 9 11:52:50 2013 > 14.33% done, estimate finish Sat Mar 9 11:52:49 2013 > 14.33% done, estimate finish Sat Mar 9 11:52:48 2013 > 14.34% done, estimate finish Sat Mar 9 11:52:47 2013 > 14.34% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.35% done, estimate finish Sat Mar 9 11:52:52 2013 > 14.35% done, estimate finish Sat Mar 9 11:52:51 2013 > 14.36% done, estimate finish Sat Mar 9 11:52:49 2013 > 14.36% done, estimate finish Sat Mar 9 11:52:48 2013 > 14.36% done, estimate finish Sat Mar 9 11:52:47 2013 > 14.37% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.37% done, estimate finish Sat Mar 9 11:52:45 2013 > 14.38% done, estimate finish Sat Mar 9 11:52:51 2013 > 14.38% done, estimate finish Sat Mar 9 11:52:50 2013 > 14.39% done, estimate finish Sat Mar 9 11:52:48 2013 > 14.39% done, estimate finish Sat Mar 9 11:52:47 2013 > 14.39% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.40% done, estimate finish Sat Mar 9 11:52:52 2013 > 14.40% done, estimate finish Sat Mar 9 11:52:51 2013 > 14.41% done, estimate finish Sat Mar 9 11:52:50 2013 > 14.41% done, estimate finish Sat Mar 9 11:52:48 2013 > 14.41% done, estimate finish Sat Mar 9 11:52:47 2013 > 14.42% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.42% done, estimate finish Sat Mar 9 11:52:45 2013 > 14.43% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.43% done, estimate finish Sat Mar 9 11:52:50 2013 > 14.44% done, estimate finish Sat Mar 9 11:52:49 2013 > 14.44% done, estimate finish Sat Mar 9 11:52:47 2013 > 14.44% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.45% done, estimate finish Sat Mar 9 11:52:45 2013 > 14.45% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.46% done, estimate finish Sat Mar 9 11:52:50 2013 > 14.46% done, estimate finish Sat Mar 9 11:52:49 2013 > 14.47% done, estimate finish Sat Mar 9 11:52:48 2013 > 14.47% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.47% done, estimate finish Sat Mar 9 11:52:45 2013 > 14.48% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.48% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.49% done, estimate finish Sat Mar 9 11:52:49 2013 > 14.49% done, estimate finish Sat Mar 9 11:52:48 2013 > 14.49% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.50% done, estimate finish Sat Mar 9 11:52:45 2013 > 14.50% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.51% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.51% done, estimate finish Sat Mar 9 11:52:49 2013 > 14.52% done, estimate finish Sat Mar 9 11:52:48 2013 > 14.52% done, estimate finish Sat Mar 9 11:52:47 2013 > 14.52% done, estimate finish Sat Mar 9 11:52:45 2013 > 14.53% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.53% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.54% done, estimate finish Sat Mar 9 11:52:49 2013 > 14.54% done, estimate finish Sat Mar 9 11:52:48 2013 > 14.55% done, estimate finish Sat Mar 9 11:52:47 2013 > 14.55% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.55% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.56% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.56% done, estimate finish Sat Mar 9 11:52:42 2013 > 14.57% done, estimate finish Sat Mar 9 11:52:48 2013 > 14.57% done, estimate finish Sat Mar 9 11:52:47 2013 > 14.57% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.58% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.58% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.59% done, estimate finish Sat Mar 9 11:52:42 2013 > 14.59% done, estimate finish Sat Mar 9 11:52:48 2013 > 14.60% done, estimate finish Sat Mar 9 11:52:47 2013 > 14.60% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.60% done, estimate finish Sat Mar 9 11:52:45 2013 > 14.61% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.61% done, estimate finish Sat Mar 9 11:52:42 2013 > 14.62% done, estimate finish Sat Mar 9 11:52:41 2013 > 14.62% done, estimate finish Sat Mar 9 11:52:47 2013 > 14.63% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.63% done, estimate finish Sat Mar 9 11:52:45 2013 > 14.63% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.64% done, estimate finish Sat Mar 9 11:52:42 2013 > 14.64% done, estimate finish Sat Mar 9 11:52:41 2013 > 14.65% done, estimate finish Sat Mar 9 11:52:47 2013 > 14.65% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.66% done, estimate finish Sat Mar 9 11:52:45 2013 > 14.66% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.66% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.67% done, estimate finish Sat Mar 9 11:52:41 2013 > 14.67% done, estimate finish Sat Mar 9 11:52:40 2013 > 14.68% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.68% done, estimate finish Sat Mar 9 11:52:45 2013 > 14.68% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.69% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.69% done, estimate finish Sat Mar 9 11:52:42 2013 > 14.70% done, estimate finish Sat Mar 9 11:52:40 2013 > 14.70% done, estimate finish Sat Mar 9 11:52:39 2013 > 14.71% done, estimate finish Sat Mar 9 11:52:45 2013 > 14.71% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.71% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.72% done, estimate finish Sat Mar 9 11:52:42 2013 > 14.72% done, estimate finish Sat Mar 9 11:52:40 2013 > 14.73% done, estimate finish Sat Mar 9 11:52:46 2013 > 14.73% done, estimate finish Sat Mar 9 11:52:45 2013 > 14.74% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.74% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.74% done, estimate finish Sat Mar 9 11:52:42 2013 > 14.75% done, estimate finish Sat Mar 9 11:52:41 2013 > 14.75% done, estimate finish Sat Mar 9 11:52:40 2013 > 14.76% done, estimate finish Sat Mar 9 11:52:38 2013 > 14.76% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.76% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.77% done, estimate finish Sat Mar 9 11:52:42 2013 > 14.77% done, estimate finish Sat Mar 9 11:52:41 2013 > 14.78% done, estimate finish Sat Mar 9 11:52:40 2013 > 14.78% done, estimate finish Sat Mar 9 11:52:38 2013 > 14.79% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.79% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.79% done, estimate finish Sat Mar 9 11:52:42 2013 > 14.80% done, estimate finish Sat Mar 9 11:52:41 2013 > 14.80% done, estimate finish Sat Mar 9 11:52:40 2013 > 14.81% done, estimate finish Sat Mar 9 11:52:39 2013 > 14.81% done, estimate finish Sat Mar 9 11:52:44 2013 > 14.82% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.82% done, estimate finish Sat Mar 9 11:52:42 2013 > 14.82% done, estimate finish Sat Mar 9 11:52:41 2013 > 14.83% done, estimate finish Sat Mar 9 11:52:40 2013 > 14.83% done, estimate finish Sat Mar 9 11:52:39 2013 > 14.84% done, estimate finish Sat Mar 9 11:52:38 2013 > 14.84% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.84% done, estimate finish Sat Mar 9 11:52:42 2013 > 14.85% done, estimate finish Sat Mar 9 11:52:41 2013 > 14.85% done, estimate finish Sat Mar 9 11:52:40 2013 > 14.86% done, estimate finish Sat Mar 9 11:52:39 2013 > 14.86% done, estimate finish Sat Mar 9 11:52:38 2013 > 14.87% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.87% done, estimate finish Sat Mar 9 11:52:42 2013 > 14.87% done, estimate finish Sat Mar 9 11:52:41 2013 > 14.88% done, estimate finish Sat Mar 9 11:52:40 2013 > 14.88% done, estimate finish Sat Mar 9 11:52:39 2013 > 14.89% done, estimate finish Sat Mar 9 11:52:38 2013 > 14.89% done, estimate finish Sat Mar 9 11:52:43 2013 > 14.90% done, estimate finish Sat Mar 9 11:52:42 2013 > 14.90% done, estimate finish Sat Mar 9 11:52:41 2013 > 14.90% done, estimate finish Sat Mar 9 11:52:40 2013 > 14.91% done, estimate finish Sat Mar 9 11:52:39 2013 > 14.91% done, estimate finish Sat Mar 9 11:52:38 2013 > 14.92% done, estimate finish Sat Mar 9 11:53:17 2013 > 14.92% done, estimate finish Sat Mar 9 11:53:16 2013 > 14.92% done, estimate finish Sat Mar 9 11:53:15 2013 > 14.93% done, estimate finish Sat Mar 9 11:53:14 2013 > 14.93% done, estimate finish Sat Mar 9 11:53:13 2013 > 14.94% done, estimate finish Sat Mar 9 11:53:12 2013 > 14.94% done, estimate finish Sat Mar 9 11:53:17 2013 > 14.95% done, estimate finish Sat Mar 9 11:53:16 2013 > 14.95% done, estimate finish Sat Mar 9 11:53:15 2013 > 14.95% done, estimate finish Sat Mar 9 11:53:14 2013 > 14.96% done, estimate finish Sat Mar 9 11:53:13 2013 > 14.96% done, estimate finish Sat Mar 9 11:53:12 2013 > 14.97% done, estimate finish Sat Mar 9 11:53:17 2013 > 14.97% done, estimate finish Sat Mar 9 11:53:16 2013 > 14.98% done, estimate finish Sat Mar 9 11:53:15 2013 > 14.98% done, estimate finish Sat Mar 9 11:53:14 2013 > 14.98% done, estimate finish Sat Mar 9 11:53:13 2013 > 14.99% done, estimate finish Sat Mar 9 11:53:12 2013 > 14.99% done, estimate finish Sat Mar 9 11:53:17 2013 > 15.00% done, estimate finish Sat Mar 9 11:53:16 2013 > 15.00% done, estimate finish Sat Mar 9 11:53:15 2013 > 15.00% done, estimate finish Sat Mar 9 11:53:14 2013 > 15.01% done, estimate finish Sat Mar 9 11:53:13 2013 > 15.01% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.02% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.02% done, estimate finish Sat Mar 9 11:53:16 2013 > 15.03% done, estimate finish Sat Mar 9 11:53:15 2013 > 15.03% done, estimate finish Sat Mar 9 11:53:14 2013 > 15.03% done, estimate finish Sat Mar 9 11:53:13 2013 > 15.04% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.04% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.05% done, estimate finish Sat Mar 9 11:53:16 2013 > 15.05% done, estimate finish Sat Mar 9 11:53:15 2013 > 15.06% done, estimate finish Sat Mar 9 11:53:14 2013 > 15.06% done, estimate finish Sat Mar 9 11:53:13 2013 > 15.06% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.07% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.07% done, estimate finish Sat Mar 9 11:53:16 2013 > 15.08% done, estimate finish Sat Mar 9 11:53:15 2013 > 15.08% done, estimate finish Sat Mar 9 11:53:14 2013 > 15.09% done, estimate finish Sat Mar 9 11:53:13 2013 > 15.09% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.09% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.10% done, estimate finish Sat Mar 9 11:53:16 2013 > 15.10% done, estimate finish Sat Mar 9 11:53:15 2013 > 15.11% done, estimate finish Sat Mar 9 11:53:14 2013 > 15.11% done, estimate finish Sat Mar 9 11:53:13 2013 > 15.11% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.12% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.12% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.13% done, estimate finish Sat Mar 9 11:53:15 2013 > 15.13% done, estimate finish Sat Mar 9 11:53:14 2013 > 15.14% done, estimate finish Sat Mar 9 11:53:13 2013 > 15.14% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.14% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.15% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.15% done, estimate finish Sat Mar 9 11:53:15 2013 > 15.16% done, estimate finish Sat Mar 9 11:53:14 2013 > 15.16% done, estimate finish Sat Mar 9 11:53:13 2013 > 15.17% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.17% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.17% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.18% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.18% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.19% done, estimate finish Sat Mar 9 11:53:13 2013 > 15.19% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.19% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.20% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.20% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.21% done, estimate finish Sat Mar 9 11:53:14 2013 > 15.21% done, estimate finish Sat Mar 9 11:53:13 2013 > 15.22% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.22% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.22% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.23% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.23% done, estimate finish Sat Mar 9 11:53:14 2013 > 15.24% done, estimate finish Sat Mar 9 11:53:13 2013 > 15.24% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.25% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.25% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.25% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.26% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.26% done, estimate finish Sat Mar 9 11:53:13 2013 > 15.27% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.27% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.27% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.28% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.28% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.29% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.29% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.30% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.30% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.30% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.31% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.31% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.32% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.32% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.33% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.33% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.33% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.34% done, estimate finish Sat Mar 9 11:53:13 2013 > 15.34% done, estimate finish Sat Mar 9 11:53:12 2013 > 15.35% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.35% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.36% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.36% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.36% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.37% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.37% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.38% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.38% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.38% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.39% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.39% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.40% done, estimate finish Sat Mar 9 11:53:11 2013 > 15.40% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.41% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.41% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.41% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.42% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.42% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.43% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.43% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.44% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.44% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.44% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.45% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.45% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.46% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.46% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.46% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.47% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.47% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.48% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.48% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.49% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.49% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.49% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.50% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.50% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.51% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.51% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.52% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.52% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.52% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.53% done, estimate finish Sat Mar 9 11:53:10 2013 > 15.53% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.54% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.54% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.54% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.55% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.55% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.56% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.56% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.57% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.57% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.57% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.58% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.58% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.59% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.59% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.60% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.60% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.60% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.61% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.61% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.62% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.62% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.62% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.63% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.63% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.64% done, estimate finish Sat Mar 9 11:53:09 2013 > 15.64% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.65% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.65% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.65% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.66% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.66% done, estimate finish Sat Mar 9 11:53:02 2013 > 15.67% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.67% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.68% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.68% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.68% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.69% done, estimate finish Sat Mar 9 11:53:02 2013 > 15.69% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.70% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.70% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.71% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.71% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.71% done, estimate finish Sat Mar 9 11:53:02 2013 > 15.72% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.72% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.73% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.73% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.73% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.74% done, estimate finish Sat Mar 9 11:53:02 2013 > 15.74% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.75% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.75% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.76% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.76% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.76% done, estimate finish Sat Mar 9 11:53:02 2013 > 15.77% done, estimate finish Sat Mar 9 11:53:08 2013 > 15.77% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.78% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.78% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.79% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.79% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.79% done, estimate finish Sat Mar 9 11:53:01 2013 > 15.80% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.80% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.81% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.81% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.81% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.82% done, estimate finish Sat Mar 9 11:53:02 2013 > 15.82% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.83% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.83% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.84% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.84% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.84% done, estimate finish Sat Mar 9 11:53:02 2013 > 15.85% done, estimate finish Sat Mar 9 11:53:01 2013 > 15.85% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.86% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.86% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.87% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.87% done, estimate finish Sat Mar 9 11:53:02 2013 > 15.87% done, estimate finish Sat Mar 9 11:53:07 2013 > 15.88% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.88% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.89% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.89% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.89% done, estimate finish Sat Mar 9 11:53:02 2013 > 15.90% done, estimate finish Sat Mar 9 11:53:01 2013 > 15.90% done, estimate finish Sat Mar 9 11:53:06 2013 > 15.91% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.91% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.92% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.92% done, estimate finish Sat Mar 9 11:53:02 2013 > 15.92% done, estimate finish Sat Mar 9 11:53:01 2013 > 15.93% done, estimate finish Sat Mar 9 11:53:00 2013 > 15.93% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.94% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.94% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.95% done, estimate finish Sat Mar 9 11:53:02 2013 > 15.95% done, estimate finish Sat Mar 9 11:53:01 2013 > 15.95% done, estimate finish Sat Mar 9 11:53:00 2013 > 15.96% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.96% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.97% done, estimate finish Sat Mar 9 11:53:03 2013 > 15.97% done, estimate finish Sat Mar 9 11:53:02 2013 > 15.97% done, estimate finish Sat Mar 9 11:53:01 2013 > 15.98% done, estimate finish Sat Mar 9 11:53:00 2013 > 15.98% done, estimate finish Sat Mar 9 11:53:05 2013 > 15.99% done, estimate finish Sat Mar 9 11:53:04 2013 > 15.99% done, estimate finish Sat Mar 9 11:53:03 2013 > 16.00% done, estimate finish Sat Mar 9 11:53:02 2013 > 16.00% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.00% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.01% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.01% done, estimate finish Sat Mar 9 11:53:04 2013 > 16.02% done, estimate finish Sat Mar 9 11:53:03 2013 > 16.02% done, estimate finish Sat Mar 9 11:53:02 2013 > 16.03% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.03% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.03% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.04% done, estimate finish Sat Mar 9 11:53:04 2013 > 16.04% done, estimate finish Sat Mar 9 11:53:03 2013 > 16.05% done, estimate finish Sat Mar 9 11:53:02 2013 > 16.05% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.06% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.06% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.06% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.07% done, estimate finish Sat Mar 9 11:53:03 2013 > 16.07% done, estimate finish Sat Mar 9 11:53:02 2013 > 16.08% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.08% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.08% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.09% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.09% done, estimate finish Sat Mar 9 11:53:03 2013 > 16.10% done, estimate finish Sat Mar 9 11:53:02 2013 > 16.10% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.11% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.11% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.11% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.12% done, estimate finish Sat Mar 9 11:53:03 2013 > 16.12% done, estimate finish Sat Mar 9 11:53:02 2013 > 16.13% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.13% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.14% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.14% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.14% done, estimate finish Sat Mar 9 11:53:03 2013 > 16.15% done, estimate finish Sat Mar 9 11:53:02 2013 > 16.15% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.16% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.16% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.16% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.17% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.17% done, estimate finish Sat Mar 9 11:53:02 2013 > 16.18% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.18% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.19% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.19% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.19% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.20% done, estimate finish Sat Mar 9 11:53:02 2013 > 16.20% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.21% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.21% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.22% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.22% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.22% done, estimate finish Sat Mar 9 11:53:03 2013 > 16.23% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.23% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.24% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.24% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.24% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.25% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.25% done, estimate finish Sat Mar 9 11:53:02 2013 > 16.26% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.26% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.27% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.27% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.27% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.28% done, estimate finish Sat Mar 9 11:53:02 2013 > 16.28% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.29% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.29% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.30% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.30% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.30% done, estimate finish Sat Mar 9 11:53:02 2013 > 16.31% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.31% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.32% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.32% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.33% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.33% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.33% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.34% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.34% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.35% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.35% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.35% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.36% done, estimate finish Sat Mar 9 11:53:01 2013 > 16.36% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.37% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.37% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.38% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.38% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.38% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.39% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.39% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.40% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.40% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.41% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.41% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.41% done, estimate finish Sat Mar 9 11:53:00 2013 > 16.42% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.42% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.43% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.43% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.43% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.44% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.44% done, estimate finish Sat Mar 9 11:52:59 2013 > 16.45% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.45% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.46% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.46% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.46% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.47% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.47% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.48% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.48% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.49% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.49% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.49% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.50% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.50% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.51% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.51% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.51% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.52% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.52% done, estimate finish Sat Mar 9 11:52:58 2013 > 16.53% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.53% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.54% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.54% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.54% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.55% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.55% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.56% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.56% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.57% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.57% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.57% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.58% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.58% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.59% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.59% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.59% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.60% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.60% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.61% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.61% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.62% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.62% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.62% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.63% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.63% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.64% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.64% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.65% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.65% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.65% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.66% done, estimate finish Sat Mar 9 11:52:56 2013 >=== last message repeated 2 times. === > 16.67% done, estimate finish Sat Mar 9 11:52:54 2013 >=== last message repeated 2 times. === > 16.68% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.68% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.68% done, estimate finish Sat Mar 9 11:52:57 2013 > 16.69% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.69% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.70% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.70% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.70% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.71% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.71% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.72% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.72% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.73% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.73% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.73% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.74% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.74% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.75% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.75% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.76% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.76% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.76% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.77% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.77% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.78% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.78% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.78% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.79% done, estimate finish Sat Mar 9 11:52:56 2013 > 16.79% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.80% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.80% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.81% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.81% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.81% done, estimate finish Sat Mar 9 11:52:50 2013 > 16.82% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.82% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.83% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.83% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.84% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.84% done, estimate finish Sat Mar 9 11:52:50 2013 > 16.84% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.85% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.85% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.86% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.86% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.86% done, estimate finish Sat Mar 9 11:52:50 2013 > 16.87% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.87% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.88% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.88% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.89% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.89% done, estimate finish Sat Mar 9 11:52:50 2013 > 16.89% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.90% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.90% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.91% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.91% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.92% done, estimate finish Sat Mar 9 11:52:50 2013 > 16.92% done, estimate finish Sat Mar 9 11:52:55 2013 > 16.92% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.93% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.93% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.94% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.94% done, estimate finish Sat Mar 9 11:52:50 2013 > 16.94% done, estimate finish Sat Mar 9 11:52:49 2013 > 16.95% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.95% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.96% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.96% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.97% done, estimate finish Sat Mar 9 11:52:50 2013 > 16.97% done, estimate finish Sat Mar 9 11:52:49 2013 > 16.97% done, estimate finish Sat Mar 9 11:52:54 2013 > 16.98% done, estimate finish Sat Mar 9 11:52:53 2013 > 16.98% done, estimate finish Sat Mar 9 11:52:52 2013 > 16.99% done, estimate finish Sat Mar 9 11:52:51 2013 > 16.99% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.00% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.00% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.00% done, estimate finish Sat Mar 9 11:52:53 2013 > 17.01% done, estimate finish Sat Mar 9 11:52:53 2013 > 17.01% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.02% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.02% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.03% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.03% done, estimate finish Sat Mar 9 11:52:54 2013 > 17.03% done, estimate finish Sat Mar 9 11:52:53 2013 > 17.04% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.04% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.05% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.05% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.05% done, estimate finish Sat Mar 9 11:52:54 2013 > 17.06% done, estimate finish Sat Mar 9 11:52:53 2013 > 17.06% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.07% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.07% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.08% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.08% done, estimate finish Sat Mar 9 11:52:54 2013 > 17.08% done, estimate finish Sat Mar 9 11:52:53 2013 > 17.09% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.09% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.10% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.10% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.11% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.11% done, estimate finish Sat Mar 9 11:52:53 2013 > 17.11% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.12% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.12% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.13% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.13% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.13% done, estimate finish Sat Mar 9 11:52:53 2013 > 17.14% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.14% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.15% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.15% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.16% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.16% done, estimate finish Sat Mar 9 11:52:53 2013 > 17.16% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.17% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.17% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.18% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.18% done, estimate finish Sat Mar 9 11:52:54 2013 > 17.19% done, estimate finish Sat Mar 9 11:52:53 2013 > 17.19% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.19% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.20% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.20% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.21% done, estimate finish Sat Mar 9 11:52:54 2013 > 17.21% done, estimate finish Sat Mar 9 11:52:53 2013 > 17.21% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.22% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.22% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.23% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.23% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.24% done, estimate finish Sat Mar 9 11:52:53 2013 > 17.24% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.24% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.25% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.25% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.26% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.26% done, estimate finish Sat Mar 9 11:52:53 2013 > 17.27% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.27% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.27% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.28% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.28% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.29% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.29% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.29% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.30% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.30% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.31% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.31% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.32% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.32% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.32% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.33% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.33% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.34% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.34% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.35% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.35% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.35% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.36% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.36% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.37% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.37% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.38% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.38% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.38% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.39% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.39% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.40% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.40% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.40% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.41% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.41% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.42% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.42% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.43% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.43% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.43% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.44% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.44% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.45% done, estimate finish Sat Mar 9 11:52:52 2013 > 17.45% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.46% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.46% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.46% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.47% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.47% done, estimate finish Sat Mar 9 11:52:46 2013 > 17.48% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.48% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.48% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.49% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.49% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.50% done, estimate finish Sat Mar 9 11:52:46 2013 > 17.50% done, estimate finish Sat Mar 9 11:52:51 2013 > 17.51% done, estimate finish Sat Mar 9 11:52:50 2013 > 17.51% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.51% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.52% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.52% done, estimate finish Sat Mar 9 11:52:46 2013 > 17.53% done, estimate finish Sat Mar 9 11:52:45 2013 > 17.53% done, estimate finish Sat Mar 9 11:52:44 2013 > 17.54% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.54% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.54% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.55% done, estimate finish Sat Mar 9 11:52:46 2013 > 17.55% done, estimate finish Sat Mar 9 11:52:45 2013 > 17.56% done, estimate finish Sat Mar 9 11:52:44 2013 > 17.56% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.56% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.57% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.57% done, estimate finish Sat Mar 9 11:52:46 2013 > 17.58% done, estimate finish Sat Mar 9 11:52:46 2013 > 17.58% done, estimate finish Sat Mar 9 11:52:45 2013 > 17.59% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.59% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.59% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.60% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.60% done, estimate finish Sat Mar 9 11:52:46 2013 > 17.61% done, estimate finish Sat Mar 9 11:52:45 2013 > 17.61% done, estimate finish Sat Mar 9 11:52:44 2013 > 17.62% done, estimate finish Sat Mar 9 11:52:48 2013 >=== last message repeated 2 times. === > 17.62% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.63% done, estimate finish Sat Mar 9 11:52:46 2013 > 17.63% done, estimate finish Sat Mar 9 11:52:45 2013 > 17.64% done, estimate finish Sat Mar 9 11:52:44 2013 > 17.64% done, estimate finish Sat Mar 9 11:52:49 2013 > 17.65% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.65% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.65% done, estimate finish Sat Mar 9 11:52:46 2013 > 17.66% done, estimate finish Sat Mar 9 11:52:45 2013 > 17.66% done, estimate finish Sat Mar 9 11:52:44 2013 > 17.67% done, estimate finish Sat Mar 9 11:52:43 2013 > 17.67% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.67% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.68% done, estimate finish Sat Mar 9 11:52:46 2013 > 17.68% done, estimate finish Sat Mar 9 11:52:45 2013 > 17.69% done, estimate finish Sat Mar 9 11:52:44 2013 > 17.69% done, estimate finish Sat Mar 9 11:52:43 2013 > 17.70% done, estimate finish Sat Mar 9 11:52:48 2013 > 17.70% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.70% done, estimate finish Sat Mar 9 11:52:46 2013 > 17.71% done, estimate finish Sat Mar 9 11:52:45 2013 > 17.71% done, estimate finish Sat Mar 9 11:52:44 2013 > 17.72% done, estimate finish Sat Mar 9 11:52:43 2013 > 17.72% done, estimate finish Sat Mar 9 11:52:42 2013 > 17.73% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.73% done, estimate finish Sat Mar 9 11:52:46 2013 > 17.73% done, estimate finish Sat Mar 9 11:52:45 2013 > 17.74% done, estimate finish Sat Mar 9 11:52:44 2013 > 17.74% done, estimate finish Sat Mar 9 11:52:43 2013 > 17.75% done, estimate finish Sat Mar 9 11:52:42 2013 > 17.75% done, estimate finish Sat Mar 9 11:52:47 2013 > 17.75% done, estimate finish Sat Mar 9 11:52:46 2013 > 17.76% done, estimate finish Sat Mar 9 11:52:45 2013 > 17.76% done, estimate finish Sat Mar 9 11:52:44 2013 > 17.77% done, estimate finish Sat Mar 9 11:52:43 2013 > 17.77% done, estimate finish Sat Mar 9 11:52:42 2013 > 17.78% done, estimate finish Sat Mar 9 11:52:41 2013 >=== last message repeated 2 times. === > 17.78% done, estimate finish Sat Mar 9 11:52:45 2013 > 17.79% done, estimate finish Sat Mar 9 11:52:44 2013 > 17.79% done, estimate finish Sat Mar 9 11:52:43 2013 > 17.80% done, estimate finish Sat Mar 9 11:52:42 2013 >=== last message repeated 2 times. === > 17.81% done, estimate finish Sat Mar 9 11:52:41 2013 > 17.81% done, estimate finish Sat Mar 9 11:52:45 2013 > 17.81% done, estimate finish Sat Mar 9 11:52:44 2013 > 17.82% done, estimate finish Sat Mar 9 11:52:43 2013 >=== last message repeated 2 times. === > 17.83% done, estimate finish Sat Mar 9 11:52:42 2013 > 17.83% done, estimate finish Sat Mar 9 11:52:41 2013 > 17.83% done, estimate finish Sat Mar 9 11:52:40 2013 > 17.84% done, estimate finish Sat Mar 9 11:52:44 2013 >=== last message repeated 2 times. === > 17.85% done, estimate finish Sat Mar 9 11:52:43 2013 > 17.85% done, estimate finish Sat Mar 9 11:52:42 2013 > 17.86% done, estimate finish Sat Mar 9 11:52:41 2013 > 17.86% done, estimate finish Sat Mar 9 11:52:40 2013 > 17.86% done, estimate finish Sat Mar 9 11:52:45 2013 > 17.87% done, estimate finish Sat Mar 9 11:52:44 2013 > 17.87% done, estimate finish Sat Mar 9 11:52:43 2013 > 17.88% done, estimate finish Sat Mar 9 11:52:42 2013 > 17.88% done, estimate finish Sat Mar 9 11:52:41 2013 > 17.89% done, estimate finish Sat Mar 9 11:52:40 2013 > 17.89% done, estimate finish Sat Mar 9 11:52:39 2013 > 17.89% done, estimate finish Sat Mar 9 11:52:44 2013 > 17.90% done, estimate finish Sat Mar 9 11:52:43 2013 > 17.90% done, estimate finish Sat Mar 9 11:52:42 2013 > 17.91% done, estimate finish Sat Mar 9 11:52:41 2013 > 17.91% done, estimate finish Sat Mar 9 11:52:40 2013 > 17.91% done, estimate finish Sat Mar 9 11:52:39 2013 > 17.92% done, estimate finish Sat Mar 9 11:52:38 2013 > 17.92% done, estimate finish Sat Mar 9 11:52:43 2013 > 17.93% done, estimate finish Sat Mar 9 11:52:42 2013 > 17.93% done, estimate finish Sat Mar 9 11:52:41 2013 > 17.94% done, estimate finish Sat Mar 9 11:52:40 2013 > 17.94% done, estimate finish Sat Mar 9 11:52:39 2013 > 17.94% done, estimate finish Sat Mar 9 11:52:38 2013 > 17.95% done, estimate finish Sat Mar 9 11:52:43 2013 > 17.95% done, estimate finish Sat Mar 9 11:52:42 2013 > 17.96% done, estimate finish Sat Mar 9 11:52:41 2013 > 17.96% done, estimate finish Sat Mar 9 11:52:40 2013 > 17.97% done, estimate finish Sat Mar 9 11:52:39 2013 > 17.97% done, estimate finish Sat Mar 9 11:52:38 2013 > 17.97% done, estimate finish Sat Mar 9 11:52:37 2013 > 17.98% done, estimate finish Sat Mar 9 11:52:42 2013 > 17.98% done, estimate finish Sat Mar 9 11:52:41 2013 > 17.99% done, estimate finish Sat Mar 9 11:52:40 2013 > 17.99% done, estimate finish Sat Mar 9 11:52:39 2013 > 18.00% done, estimate finish Sat Mar 9 11:52:38 2013 >=== last message repeated 2 times. === > 18.00% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.01% done, estimate finish Sat Mar 9 11:52:41 2013 > 18.01% done, estimate finish Sat Mar 9 11:52:40 2013 > 18.02% done, estimate finish Sat Mar 9 11:52:39 2013 >=== last message repeated 2 times. === > 18.02% done, estimate finish Sat Mar 9 11:52:38 2013 > 18.03% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.03% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.04% done, estimate finish Sat Mar 9 11:52:40 2013 >=== last message repeated 2 times. === > 18.05% done, estimate finish Sat Mar 9 11:52:39 2013 > 18.05% done, estimate finish Sat Mar 9 11:52:38 2013 > 18.05% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.06% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.06% done, estimate finish Sat Mar 9 11:52:41 2013 > 18.07% done, estimate finish Sat Mar 9 11:52:40 2013 > 18.07% done, estimate finish Sat Mar 9 11:52:39 2013 > 18.08% done, estimate finish Sat Mar 9 11:52:38 2013 > 18.08% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.08% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.09% done, estimate finish Sat Mar 9 11:52:41 2013 > 18.09% done, estimate finish Sat Mar 9 11:52:40 2013 > 18.10% done, estimate finish Sat Mar 9 11:52:39 2013 > 18.10% done, estimate finish Sat Mar 9 11:52:38 2013 > 18.10% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.11% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.11% done, estimate finish Sat Mar 9 11:52:35 2013 > 18.12% done, estimate finish Sat Mar 9 11:52:40 2013 > 18.12% done, estimate finish Sat Mar 9 11:52:39 2013 > 18.13% done, estimate finish Sat Mar 9 11:52:38 2013 > 18.13% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.13% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.14% done, estimate finish Sat Mar 9 11:52:35 2013 > 18.14% done, estimate finish Sat Mar 9 11:52:40 2013 > 18.15% done, estimate finish Sat Mar 9 11:52:39 2013 > 18.15% done, estimate finish Sat Mar 9 11:52:38 2013 > 18.16% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.16% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.16% done, estimate finish Sat Mar 9 11:52:35 2013 > 18.17% done, estimate finish Sat Mar 9 11:52:40 2013 > 18.17% done, estimate finish Sat Mar 9 11:52:39 2013 > 18.18% done, estimate finish Sat Mar 9 11:52:38 2013 > 18.18% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.18% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.19% done, estimate finish Sat Mar 9 11:52:35 2013 >=== last message repeated 2 times. === > 18.20% done, estimate finish Sat Mar 9 11:52:39 2013 > 18.20% done, estimate finish Sat Mar 9 11:52:38 2013 > 18.21% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.21% done, estimate finish Sat Mar 9 11:52:36 2013 >=== last message repeated 2 times. === > 18.22% done, estimate finish Sat Mar 9 11:52:35 2013 > 18.22% done, estimate finish Sat Mar 9 11:52:39 2013 > 18.23% done, estimate finish Sat Mar 9 11:52:38 2013 > 18.23% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.24% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.24% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.24% done, estimate finish Sat Mar 9 11:52:35 2013 > 18.25% done, estimate finish Sat Mar 9 11:52:39 2013 > 18.25% done, estimate finish Sat Mar 9 11:52:38 2013 > 18.26% done, estimate finish Sat Mar 9 11:52:38 2013 > 18.26% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.27% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.27% done, estimate finish Sat Mar 9 11:52:35 2013 > 18.27% done, estimate finish Sat Mar 9 11:52:34 2013 > 18.28% done, estimate finish Sat Mar 9 11:52:33 2013 > 18.28% done, estimate finish Sat Mar 9 11:52:38 2013 > 18.29% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.29% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.29% done, estimate finish Sat Mar 9 11:52:35 2013 > 18.30% done, estimate finish Sat Mar 9 11:52:34 2013 > 18.30% done, estimate finish Sat Mar 9 11:52:33 2013 > 18.31% done, estimate finish Sat Mar 9 11:52:38 2013 > 18.31% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.32% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.32% done, estimate finish Sat Mar 9 11:52:35 2013 > 18.32% done, estimate finish Sat Mar 9 11:52:34 2013 > 18.33% done, estimate finish Sat Mar 9 11:52:33 2013 > 18.33% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.34% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.34% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.35% done, estimate finish Sat Mar 9 11:52:35 2013 > 18.35% done, estimate finish Sat Mar 9 11:52:34 2013 > 18.35% done, estimate finish Sat Mar 9 11:52:33 2013 > 18.36% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.36% done, estimate finish Sat Mar 9 11:52:37 2013 > 18.37% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.37% done, estimate finish Sat Mar 9 11:52:35 2013 > 18.37% done, estimate finish Sat Mar 9 11:52:34 2013 > 18.38% done, estimate finish Sat Mar 9 11:52:33 2013 >=== last message repeated 2 times. === > 18.39% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.39% done, estimate finish Sat Mar 9 11:52:36 2013 > 18.40% done, estimate finish Sat Mar 9 11:52:35 2013 > 18.40% done, estimate finish Sat Mar 9 11:52:34 2013 > 18.40% done, estimate finish Sat Mar 9 11:52:33 2013 > 18.41% done, estimate finish Sat Mar 9 11:52:33 2013 > 18.41% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.42% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.42% done, estimate finish Sat Mar 9 11:52:35 2013 > 18.43% done, estimate finish Sat Mar 9 11:52:34 2013 >=== last message repeated 2 times. === > 18.43% done, estimate finish Sat Mar 9 11:52:33 2013 > 18.44% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.44% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.45% done, estimate finish Sat Mar 9 11:52:35 2013 >=== last message repeated 2 times. === > 18.45% done, estimate finish Sat Mar 9 11:52:34 2013 > 18.46% done, estimate finish Sat Mar 9 11:52:33 2013 > 18.46% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.47% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.47% done, estimate finish Sat Mar 9 11:52:30 2013 > 18.48% done, estimate finish Sat Mar 9 11:52:35 2013 > 18.48% done, estimate finish Sat Mar 9 11:52:34 2013 > 18.48% done, estimate finish Sat Mar 9 11:52:33 2013 > 18.49% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.49% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.50% done, estimate finish Sat Mar 9 11:52:30 2013 > 18.50% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.51% done, estimate finish Sat Mar 9 11:52:34 2013 > 18.51% done, estimate finish Sat Mar 9 11:52:33 2013 > 18.51% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.52% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.52% done, estimate finish Sat Mar 9 11:52:30 2013 > 18.53% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.53% done, estimate finish Sat Mar 9 11:52:34 2013 > 18.53% done, estimate finish Sat Mar 9 11:52:33 2013 > 18.54% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.54% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.55% done, estimate finish Sat Mar 9 11:52:30 2013 >=== last message repeated 2 times. === > 18.56% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.56% done, estimate finish Sat Mar 9 11:52:33 2013 > 18.56% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.57% done, estimate finish Sat Mar 9 11:52:31 2013 >=== last message repeated 2 times. === > 18.58% done, estimate finish Sat Mar 9 11:52:30 2013 > 18.58% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.59% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.59% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.59% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.60% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.60% done, estimate finish Sat Mar 9 11:52:30 2013 > 18.61% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.61% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.61% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.62% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.62% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.63% done, estimate finish Sat Mar 9 11:52:30 2013 > 18.63% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.64% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.64% done, estimate finish Sat Mar 9 11:52:33 2013 > 18.64% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.65% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.65% done, estimate finish Sat Mar 9 11:52:30 2013 > 18.66% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.66% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.67% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.67% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.67% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.68% done, estimate finish Sat Mar 9 11:52:30 2013 > 18.68% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.69% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.69% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.70% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.70% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.70% done, estimate finish Sat Mar 9 11:52:30 2013 > 18.71% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.71% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.72% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.72% done, estimate finish Sat Mar 9 11:52:32 2013 > 18.72% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.73% done, estimate finish Sat Mar 9 11:52:30 2013 > 18.73% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.74% done, estimate finish Sat Mar 9 11:52:28 2013 >=== last message repeated 2 times. === > 18.75% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.75% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.75% done, estimate finish Sat Mar 9 11:52:30 2013 > 18.76% done, estimate finish Sat Mar 9 11:52:29 2013 >=== last message repeated 2 times. === > 18.77% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.77% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.78% done, estimate finish Sat Mar 9 11:52:31 2013 > 18.78% done, estimate finish Sat Mar 9 11:52:30 2013 >=== last message repeated 2 times. === > 18.79% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.79% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.80% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.80% done, estimate finish Sat Mar 9 11:52:26 2013 > 18.80% done, estimate finish Sat Mar 9 11:52:25 2013 > 18.81% done, estimate finish Sat Mar 9 11:52:30 2013 > 18.81% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.82% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.82% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.83% done, estimate finish Sat Mar 9 11:52:26 2013 > 18.83% done, estimate finish Sat Mar 9 11:52:25 2013 > 18.83% done, estimate finish Sat Mar 9 11:52:30 2013 > 18.84% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.84% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.85% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.85% done, estimate finish Sat Mar 9 11:52:26 2013 > 18.86% done, estimate finish Sat Mar 9 11:52:25 2013 >=== last message repeated 2 times. === > 18.86% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.87% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.87% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.88% done, estimate finish Sat Mar 9 11:52:26 2013 > 18.88% done, estimate finish Sat Mar 9 11:52:25 2013 >=== last message repeated 2 times. === > 18.89% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.89% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.90% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.90% done, estimate finish Sat Mar 9 11:52:26 2013 > 18.91% done, estimate finish Sat Mar 9 11:52:26 2013 > 18.91% done, estimate finish Sat Mar 9 11:52:25 2013 > 18.91% done, estimate finish Sat Mar 9 11:52:29 2013 > 18.92% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.92% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.93% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.93% done, estimate finish Sat Mar 9 11:52:26 2013 > 18.94% done, estimate finish Sat Mar 9 11:52:25 2013 > 18.94% done, estimate finish Sat Mar 9 11:52:24 2013 > 18.94% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.95% done, estimate finish Sat Mar 9 11:52:28 2013 > 18.95% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.96% done, estimate finish Sat Mar 9 11:52:26 2013 > 18.96% done, estimate finish Sat Mar 9 11:52:25 2013 > 18.97% done, estimate finish Sat Mar 9 11:52:24 2013 > 18.97% done, estimate finish Sat Mar 9 11:52:28 2013 >=== last message repeated 2 times. === > 18.98% done, estimate finish Sat Mar 9 11:52:27 2013 > 18.98% done, estimate finish Sat Mar 9 11:52:26 2013 > 18.99% done, estimate finish Sat Mar 9 11:52:25 2013 > 18.99% done, estimate finish Sat Mar 9 11:52:24 2013 > 18.99% done, estimate finish Sat Mar 9 11:52:29 2013 > 19.00% done, estimate finish Sat Mar 9 11:52:28 2013 > 19.00% done, estimate finish Sat Mar 9 11:52:27 2013 > 19.01% done, estimate finish Sat Mar 9 11:52:26 2013 > 19.01% done, estimate finish Sat Mar 9 11:52:25 2013 > 19.02% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.02% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.02% done, estimate finish Sat Mar 9 11:52:28 2013 > 19.03% done, estimate finish Sat Mar 9 11:52:27 2013 > 19.03% done, estimate finish Sat Mar 9 11:52:26 2013 > 19.04% done, estimate finish Sat Mar 9 11:52:25 2013 > 19.04% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.05% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.05% done, estimate finish Sat Mar 9 11:52:28 2013 > 19.05% done, estimate finish Sat Mar 9 11:52:27 2013 > 19.06% done, estimate finish Sat Mar 9 11:52:26 2013 > 19.06% done, estimate finish Sat Mar 9 11:52:25 2013 > 19.07% done, estimate finish Sat Mar 9 11:52:24 2013 >=== last message repeated 2 times. === > 19.07% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.08% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.08% done, estimate finish Sat Mar 9 11:52:26 2013 > 19.09% done, estimate finish Sat Mar 9 11:52:25 2013 >=== last message repeated 2 times. === > 19.10% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.10% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.10% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.11% done, estimate finish Sat Mar 9 11:52:26 2013 >=== last message repeated 2 times. === > 19.12% done, estimate finish Sat Mar 9 11:52:25 2013 > 19.12% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.13% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.13% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.13% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.14% done, estimate finish Sat Mar 9 11:52:26 2013 > 19.14% done, estimate finish Sat Mar 9 11:52:25 2013 > 19.15% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.15% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.15% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.16% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.16% done, estimate finish Sat Mar 9 11:52:26 2013 > 19.17% done, estimate finish Sat Mar 9 11:52:25 2013 > 19.17% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.18% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.18% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.18% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.19% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.19% done, estimate finish Sat Mar 9 11:52:25 2013 > 19.20% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.20% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.21% done, estimate finish Sat Mar 9 11:52:22 2013 >=== last message repeated 2 times. === > 19.21% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.22% done, estimate finish Sat Mar 9 11:52:25 2013 > 19.22% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.23% done, estimate finish Sat Mar 9 11:52:23 2013 >=== last message repeated 2 times. === > 19.23% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.24% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.24% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.25% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.25% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.26% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.26% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.26% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.27% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.27% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.28% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.28% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.29% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.29% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.29% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.30% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.30% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.31% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.31% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.32% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.32% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.32% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.33% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.33% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.34% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.34% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.34% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.35% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.35% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.36% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.36% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.37% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.37% done, estimate finish Sat Mar 9 11:52:20 2013 >=== last message repeated 2 times. === > 19.38% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.38% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.39% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.39% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.40% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.40% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.40% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.41% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.41% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.42% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.42% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.42% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.43% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.43% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.44% done, estimate finish Sat Mar 9 11:52:22 2013 >=== last message repeated 2 times. === > 19.45% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.45% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.45% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.46% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.46% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.47% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.47% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.48% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.48% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.48% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.49% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.49% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.50% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.50% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.50% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.51% done, estimate finish Sat Mar 9 11:52:24 2013 > 19.51% done, estimate finish Sat Mar 9 11:52:23 2013 > 19.52% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.52% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.53% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.53% done, estimate finish Sat Mar 9 11:52:19 2013 >=== last message repeated 2 times. === > 19.54% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.54% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.55% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.55% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.56% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.56% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.56% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.57% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.57% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.58% done, estimate finish Sat Mar 9 11:52:20 2013 >=== last message repeated 2 times. === > 19.58% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.59% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.59% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.60% done, estimate finish Sat Mar 9 11:52:21 2013 >=== last message repeated 2 times. === > 19.61% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.61% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.61% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.62% done, estimate finish Sat Mar 9 11:52:17 2013 > 19.62% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.63% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.63% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.64% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.64% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.64% done, estimate finish Sat Mar 9 11:52:17 2013 > 19.65% done, estimate finish Sat Mar 9 11:52:22 2013 > 19.65% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.66% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.66% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.67% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.67% done, estimate finish Sat Mar 9 11:52:17 2013 >=== last message repeated 2 times. === > 19.68% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.68% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.69% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.69% done, estimate finish Sat Mar 9 11:52:18 2013 >=== last message repeated 2 times. === > 19.70% done, estimate finish Sat Mar 9 11:52:17 2013 > 19.70% done, estimate finish Sat Mar 9 11:52:21 2013 > 19.71% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.71% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.72% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.72% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.72% done, estimate finish Sat Mar 9 11:52:17 2013 > 19.73% done, estimate finish Sat Mar 9 11:52:16 2013 > 19.73% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.74% done, estimate finish Sat Mar 9 11:52:19 2013 >=== last message repeated 2 times. === > 19.75% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.75% done, estimate finish Sat Mar 9 11:52:17 2013 > 19.75% done, estimate finish Sat Mar 9 11:52:16 2013 > 19.76% done, estimate finish Sat Mar 9 11:52:20 2013 >=== last message repeated 2 times. === > 19.77% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.77% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.77% done, estimate finish Sat Mar 9 11:52:17 2013 > 19.78% done, estimate finish Sat Mar 9 11:52:16 2013 > 19.78% done, estimate finish Sat Mar 9 11:52:15 2013 > 19.79% done, estimate finish Sat Mar 9 11:52:20 2013 > 19.79% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.80% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.80% done, estimate finish Sat Mar 9 11:52:17 2013 > 19.80% done, estimate finish Sat Mar 9 11:52:16 2013 > 19.81% done, estimate finish Sat Mar 9 11:52:16 2013 > 19.81% done, estimate finish Sat Mar 9 11:52:15 2013 > 19.82% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.82% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.83% done, estimate finish Sat Mar 9 11:52:17 2013 > 19.83% done, estimate finish Sat Mar 9 11:52:16 2013 >=== last message repeated 2 times. === > 19.84% done, estimate finish Sat Mar 9 11:52:15 2013 > 19.84% done, estimate finish Sat Mar 9 11:52:19 2013 > 19.85% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.85% done, estimate finish Sat Mar 9 11:52:17 2013 >=== last message repeated 2 times. === > 19.86% done, estimate finish Sat Mar 9 11:52:16 2013 > 19.86% done, estimate finish Sat Mar 9 11:52:15 2013 > 19.87% done, estimate finish Sat Mar 9 11:52:14 2013 > 19.87% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.88% done, estimate finish Sat Mar 9 11:52:17 2013 >=== last message repeated 2 times. === > 19.88% done, estimate finish Sat Mar 9 11:52:16 2013 > 19.89% done, estimate finish Sat Mar 9 11:52:15 2013 > 19.89% done, estimate finish Sat Mar 9 11:52:14 2013 > 19.90% done, estimate finish Sat Mar 9 11:52:18 2013 >=== last message repeated 2 times. === > 19.91% done, estimate finish Sat Mar 9 11:52:17 2013 > 19.91% done, estimate finish Sat Mar 9 11:52:16 2013 > 19.91% done, estimate finish Sat Mar 9 11:52:15 2013 > 19.92% done, estimate finish Sat Mar 9 11:52:14 2013 >=== last message repeated 2 times. === > 19.93% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.93% done, estimate finish Sat Mar 9 11:52:17 2013 > 19.93% done, estimate finish Sat Mar 9 11:52:16 2013 > 19.94% done, estimate finish Sat Mar 9 11:52:15 2013 > 19.94% done, estimate finish Sat Mar 9 11:52:14 2013 > 19.95% done, estimate finish Sat Mar 9 11:52:14 2013 > 19.95% done, estimate finish Sat Mar 9 11:52:18 2013 > 19.96% done, estimate finish Sat Mar 9 11:52:17 2013 > 19.96% done, estimate finish Sat Mar 9 11:52:16 2013 > 19.96% done, estimate finish Sat Mar 9 11:52:15 2013 > 19.97% done, estimate finish Sat Mar 9 11:52:15 2013 > 19.97% done, estimate finish Sat Mar 9 11:52:14 2013 > 19.98% done, estimate finish Sat Mar 9 11:52:13 2013 > 19.98% done, estimate finish Sat Mar 9 11:52:17 2013 > 19.99% done, estimate finish Sat Mar 9 11:52:16 2013 > 19.99% done, estimate finish Sat Mar 9 11:52:15 2013 >=== last message repeated 2 times. === > 20.00% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.00% done, estimate finish Sat Mar 9 11:52:13 2013 > 20.01% done, estimate finish Sat Mar 9 11:52:17 2013 > 20.01% done, estimate finish Sat Mar 9 11:52:16 2013 > 20.02% done, estimate finish Sat Mar 9 11:52:16 2013 > 20.02% done, estimate finish Sat Mar 9 11:52:15 2013 > 20.02% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.03% done, estimate finish Sat Mar 9 11:52:13 2013 > 20.03% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.04% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.04% done, estimate finish Sat Mar 9 11:52:16 2013 > 20.04% done, estimate finish Sat Mar 9 11:52:15 2013 > 20.05% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.05% done, estimate finish Sat Mar 9 11:52:13 2013 > 20.06% done, estimate finish Sat Mar 9 11:52:12 2013 >=== last message repeated 2 times. === > 20.07% done, estimate finish Sat Mar 9 11:52:16 2013 > 20.07% done, estimate finish Sat Mar 9 11:52:15 2013 > 20.07% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.08% done, estimate finish Sat Mar 9 11:52:13 2013 >=== last message repeated 2 times. === > 20.09% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.09% done, estimate finish Sat Mar 9 11:52:16 2013 > 20.10% done, estimate finish Sat Mar 9 11:52:15 2013 > 20.10% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.10% done, estimate finish Sat Mar 9 11:52:13 2013 > 20.11% done, estimate finish Sat Mar 9 11:52:13 2013 > 20.11% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.12% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.12% done, estimate finish Sat Mar 9 11:52:15 2013 > 20.12% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.13% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.13% done, estimate finish Sat Mar 9 11:52:13 2013 > 20.14% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.14% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.15% done, estimate finish Sat Mar 9 11:52:15 2013 > 20.15% done, estimate finish Sat Mar 9 11:52:14 2013 >=== last message repeated 2 times. === > 20.16% done, estimate finish Sat Mar 9 11:52:13 2013 > 20.16% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.17% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.17% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.18% done, estimate finish Sat Mar 9 11:52:15 2013 > 20.18% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.18% done, estimate finish Sat Mar 9 11:52:13 2013 > 20.19% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.19% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.20% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.20% done, estimate finish Sat Mar 9 11:52:15 2013 > 20.20% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.21% done, estimate finish Sat Mar 9 11:52:13 2013 > 20.21% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.22% done, estimate finish Sat Mar 9 11:52:11 2013 >=== last message repeated 2 times. === > 20.23% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.23% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.23% done, estimate finish Sat Mar 9 11:52:13 2013 > 20.24% done, estimate finish Sat Mar 9 11:52:12 2013 >=== last message repeated 2 times. === > 20.25% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.25% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.26% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.26% done, estimate finish Sat Mar 9 11:52:13 2013 >=== last message repeated 2 times. === > 20.27% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.27% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.28% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.28% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.29% done, estimate finish Sat Mar 9 11:52:13 2013 >=== last message repeated 2 times. === > 20.29% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.30% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.30% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.31% done, estimate finish Sat Mar 9 11:52:14 2013 >=== last message repeated 2 times. === > 20.31% done, estimate finish Sat Mar 9 11:52:13 2013 > 20.32% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.32% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.33% done, estimate finish Sat Mar 9 11:52:10 2013 >=== last message repeated 2 times. === > 20.34% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.34% done, estimate finish Sat Mar 9 11:52:13 2013 > 20.34% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.35% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.35% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.36% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.36% done, estimate finish Sat Mar 9 11:52:14 2013 > 20.37% done, estimate finish Sat Mar 9 11:52:13 2013 > 20.37% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.37% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.38% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.38% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.39% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.39% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.39% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.40% done, estimate finish Sat Mar 9 11:52:11 2013 >=== last message repeated 2 times. === > 20.41% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.41% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.42% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.42% done, estimate finish Sat Mar 9 11:52:12 2013 >=== last message repeated 2 times. === > 20.43% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.43% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.44% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.44% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.45% done, estimate finish Sat Mar 9 11:52:12 2013 >=== last message repeated 2 times. === > 20.45% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.46% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.46% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.47% done, estimate finish Sat Mar 9 11:52:08 2013 >=== last message repeated 2 times. === > 20.47% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.48% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.48% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.49% done, estimate finish Sat Mar 9 11:52:09 2013 >=== last message repeated 2 times. === > 20.50% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.50% done, estimate finish Sat Mar 9 11:52:12 2013 > 20.50% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.51% done, estimate finish Sat Mar 9 11:52:10 2013 >=== last message repeated 2 times. === > 20.52% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.52% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.53% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.53% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.53% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.54% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.54% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.55% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.55% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.55% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.56% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.56% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.57% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.57% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.58% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.58% done, estimate finish Sat Mar 9 11:52:11 2013 >=== last message repeated 2 times. === > 20.59% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.59% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.60% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.60% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.61% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.61% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.61% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.62% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.62% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.63% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.63% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.64% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.64% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.64% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.65% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.65% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.66% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.66% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.66% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.67% done, estimate finish Sat Mar 9 11:52:09 2013 >=== last message repeated 2 times. === > 20.68% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.68% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.69% done, estimate finish Sat Mar 9 11:52:11 2013 > 20.69% done, estimate finish Sat Mar 9 11:52:10 2013 >=== last message repeated 2 times. === > 20.70% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.70% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.71% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.71% done, estimate finish Sat Mar 9 11:52:06 2013 > 20.72% done, estimate finish Sat Mar 9 11:52:06 2013 > 20.72% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.72% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.73% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.73% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.74% done, estimate finish Sat Mar 9 11:52:06 2013 >=== last message repeated 2 times. === > 20.74% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.75% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.75% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.76% done, estimate finish Sat Mar 9 11:52:07 2013 >=== last message repeated 2 times. === > 20.77% done, estimate finish Sat Mar 9 11:52:06 2013 > 20.77% done, estimate finish Sat Mar 9 11:52:10 2013 > 20.77% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.78% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.78% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.79% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.79% done, estimate finish Sat Mar 9 11:52:06 2013 > 20.80% done, estimate finish Sat Mar 9 11:52:05 2013 > 20.80% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.80% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.81% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.81% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.82% done, estimate finish Sat Mar 9 11:52:06 2013 > 20.82% done, estimate finish Sat Mar 9 11:52:05 2013 > 20.82% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.83% done, estimate finish Sat Mar 9 11:52:08 2013 >=== last message repeated 2 times. === > 20.84% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.84% done, estimate finish Sat Mar 9 11:52:06 2013 > 20.85% done, estimate finish Sat Mar 9 11:52:05 2013 > 20.85% done, estimate finish Sat Mar 9 11:52:09 2013 >=== last message repeated 2 times. === > 20.86% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.86% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.87% done, estimate finish Sat Mar 9 11:52:06 2013 > 20.87% done, estimate finish Sat Mar 9 11:52:05 2013 > 20.88% done, estimate finish Sat Mar 9 11:52:05 2013 > 20.88% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.88% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.89% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.89% done, estimate finish Sat Mar 9 11:52:06 2013 > 20.90% done, estimate finish Sat Mar 9 11:52:06 2013 > 20.90% done, estimate finish Sat Mar 9 11:52:05 2013 > 20.91% done, estimate finish Sat Mar 9 11:52:09 2013 > 20.91% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.91% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.92% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.92% done, estimate finish Sat Mar 9 11:52:06 2013 > 20.93% done, estimate finish Sat Mar 9 11:52:05 2013 > 20.93% done, estimate finish Sat Mar 9 11:52:04 2013 > 20.93% done, estimate finish Sat Mar 9 11:52:08 2013 > 20.94% done, estimate finish Sat Mar 9 11:52:07 2013 >=== last message repeated 2 times. === > 20.95% done, estimate finish Sat Mar 9 11:52:06 2013 > 20.95% done, estimate finish Sat Mar 9 11:52:05 2013 > 20.96% done, estimate finish Sat Mar 9 11:52:04 2013 > 20.96% done, estimate finish Sat Mar 9 11:52:08 2013 >=== last message repeated 2 times. === > 20.97% done, estimate finish Sat Mar 9 11:52:07 2013 > 20.97% done, estimate finish Sat Mar 9 11:52:06 2013 > 20.98% done, estimate finish Sat Mar 9 11:52:05 2013 > 20.98% done, estimate finish Sat Mar 9 11:52:04 2013 > 20.99% done, estimate finish Sat Mar 9 11:52:08 2013 >=== last message repeated 2 times. === > 20.99% done, estimate finish Sat Mar 9 11:52:07 2013 > 21.00% done, estimate finish Sat Mar 9 11:52:06 2013 > 21.00% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.01% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.01% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.01% done, estimate finish Sat Mar 9 11:52:08 2013 > 21.02% done, estimate finish Sat Mar 9 11:52:07 2013 > 21.02% done, estimate finish Sat Mar 9 11:52:06 2013 > 21.03% done, estimate finish Sat Mar 9 11:52:05 2013 >=== last message repeated 2 times. === > 21.04% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.04% done, estimate finish Sat Mar 9 11:52:08 2013 > 21.04% done, estimate finish Sat Mar 9 11:52:07 2013 > 21.05% done, estimate finish Sat Mar 9 11:52:06 2013 >=== last message repeated 2 times. === > 21.06% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.06% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.07% done, estimate finish Sat Mar 9 11:52:08 2013 > 21.07% done, estimate finish Sat Mar 9 11:52:07 2013 > 21.07% done, estimate finish Sat Mar 9 11:52:06 2013 > 21.08% done, estimate finish Sat Mar 9 11:52:06 2013 > 21.08% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.09% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.09% done, estimate finish Sat Mar 9 11:52:08 2013 > 21.09% done, estimate finish Sat Mar 9 11:52:07 2013 > 21.10% done, estimate finish Sat Mar 9 11:52:07 2013 > 21.10% done, estimate finish Sat Mar 9 11:52:06 2013 > 21.11% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.11% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.12% done, estimate finish Sat Mar 9 11:52:03 2013 >=== last message repeated 2 times. === > 21.12% done, estimate finish Sat Mar 9 11:52:07 2013 > 21.13% done, estimate finish Sat Mar 9 11:52:06 2013 > 21.13% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.14% done, estimate finish Sat Mar 9 11:52:04 2013 >=== last message repeated 2 times. === > 21.15% done, estimate finish Sat Mar 9 11:52:08 2013 > 21.15% done, estimate finish Sat Mar 9 11:52:07 2013 > 21.15% done, estimate finish Sat Mar 9 11:52:06 2013 > 21.16% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.16% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.17% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.17% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.17% done, estimate finish Sat Mar 9 11:52:07 2013 > 21.18% done, estimate finish Sat Mar 9 11:52:06 2013 > 21.18% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.19% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.19% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.20% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.20% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.20% done, estimate finish Sat Mar 9 11:52:06 2013 > 21.21% done, estimate finish Sat Mar 9 11:52:05 2013 >=== last message repeated 2 times. === > 21.22% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.22% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.23% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.23% done, estimate finish Sat Mar 9 11:52:06 2013 >=== last message repeated 2 times. === > 21.24% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.24% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.25% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.25% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.26% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.26% done, estimate finish Sat Mar 9 11:52:06 2013 > 21.26% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.27% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.27% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.28% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.28% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.28% done, estimate finish Sat Mar 9 11:52:06 2013 > 21.29% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.29% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.30% done, estimate finish Sat Mar 9 11:52:03 2013 >=== last message repeated 2 times. === > 21.31% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.31% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.31% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.32% done, estimate finish Sat Mar 9 11:52:04 2013 >=== last message repeated 2 times. === > 21.33% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.33% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.34% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.34% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.34% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.35% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.35% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.36% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.36% done, estimate finish Sat Mar 9 11:52:01 2013 >=== last message repeated 2 times. === > 21.37% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.37% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.38% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.38% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.39% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.39% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.39% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.40% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.40% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.41% done, estimate finish Sat Mar 9 11:52:02 2013 >=== last message repeated 2 times. === > 21.42% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.42% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.42% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.43% done, estimate finish Sat Mar 9 11:52:03 2013 >=== last message repeated 2 times. === > 21.44% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.44% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.44% done, estimate finish Sat Mar 9 11:52:05 2013 > 21.45% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.45% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.46% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.46% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.47% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.47% done, estimate finish Sat Mar 9 11:52:00 2013 >=== last message repeated 2 times. === > 21.48% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.48% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.49% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.49% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.50% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.50% done, estimate finish Sat Mar 9 11:52:04 2013 >=== last message repeated 2 times. === > 21.51% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.51% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.52% done, estimate finish Sat Mar 9 11:52:01 2013 >=== last message repeated 2 times. === > 21.52% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.53% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.53% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.54% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.54% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.55% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.55% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.55% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.56% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.56% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.57% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.57% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.58% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.58% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.58% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.59% done, estimate finish Sat Mar 9 11:52:02 2013 >=== last message repeated 2 times. === > 21.60% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.60% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.61% done, estimate finish Sat Mar 9 11:51:59 2013 >=== last message repeated 2 times. === > 21.61% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.62% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.62% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.63% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.63% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.63% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.64% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.64% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.65% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.65% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.66% done, estimate finish Sat Mar 9 11:52:04 2013 >=== last message repeated 2 times. === > 21.66% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.67% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.67% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.68% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.68% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.69% done, estimate finish Sat Mar 9 11:52:04 2013 > 21.69% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.69% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.70% done, estimate finish Sat Mar 9 11:52:01 2013 >=== last message repeated 2 times. === > 21.71% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.71% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.71% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.72% done, estimate finish Sat Mar 9 11:52:02 2013 >=== last message repeated 2 times. === > 21.73% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.73% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.74% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.74% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.74% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.75% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.75% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.76% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.76% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.77% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.77% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.77% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.78% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.78% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.79% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.79% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.79% done, estimate finish Sat Mar 9 11:52:03 2013 > 21.80% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.80% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.81% done, estimate finish Sat Mar 9 11:52:00 2013 >=== last message repeated 2 times. === > 21.82% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.82% done, estimate finish Sat Mar 9 11:51:58 2013 > 21.82% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.83% done, estimate finish Sat Mar 9 11:52:01 2013 >=== last message repeated 2 times. === > 21.84% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.84% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.85% done, estimate finish Sat Mar 9 11:51:58 2013 > 21.85% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.85% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.86% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.86% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.87% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.87% done, estimate finish Sat Mar 9 11:51:58 2013 > 21.87% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.88% done, estimate finish Sat Mar 9 11:52:01 2013 >=== last message repeated 2 times. === > 21.89% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.89% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.90% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.90% done, estimate finish Sat Mar 9 11:51:58 2013 > 21.90% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.91% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.91% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.92% done, estimate finish Sat Mar 9 11:51:59 2013 >=== last message repeated 2 times. === > 21.93% done, estimate finish Sat Mar 9 11:51:58 2013 > 21.93% done, estimate finish Sat Mar 9 11:52:02 2013 > 21.93% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.94% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.94% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.95% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.95% done, estimate finish Sat Mar 9 11:51:58 2013 > 21.96% done, estimate finish Sat Mar 9 11:51:57 2013 > 21.96% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.96% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.97% done, estimate finish Sat Mar 9 11:52:00 2013 > 21.97% done, estimate finish Sat Mar 9 11:51:59 2013 > 21.98% done, estimate finish Sat Mar 9 11:51:58 2013 > 21.98% done, estimate finish Sat Mar 9 11:51:57 2013 > 21.98% done, estimate finish Sat Mar 9 11:52:01 2013 > 21.99% done, estimate finish Sat Mar 9 11:52:00 2013 >=== last message repeated 2 times. === > 22.00% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.00% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.01% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.01% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.01% done, estimate finish Sat Mar 9 11:52:01 2013 > 22.02% done, estimate finish Sat Mar 9 11:52:00 2013 > 22.02% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.03% done, estimate finish Sat Mar 9 11:51:58 2013 >=== last message repeated 2 times. === > 22.04% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.04% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.04% done, estimate finish Sat Mar 9 11:52:00 2013 > 22.05% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.05% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.06% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.06% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.06% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.07% done, estimate finish Sat Mar 9 11:52:00 2013 > 22.07% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.08% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.08% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.09% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.09% done, estimate finish Sat Mar 9 11:52:01 2013 > 22.09% done, estimate finish Sat Mar 9 11:52:00 2013 > 22.10% done, estimate finish Sat Mar 9 11:51:59 2013 >=== last message repeated 2 times. === > 22.11% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.11% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.12% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.12% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.12% done, estimate finish Sat Mar 9 11:52:00 2013 > 22.13% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.13% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.14% done, estimate finish Sat Mar 9 11:51:57 2013 >=== last message repeated 2 times. === > 22.14% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.15% done, estimate finish Sat Mar 9 11:52:00 2013 > 22.15% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.16% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.16% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.17% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.17% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.17% done, estimate finish Sat Mar 9 11:52:00 2013 > 22.18% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.18% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.19% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.19% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.20% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.20% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.20% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.21% done, estimate finish Sat Mar 9 11:51:58 2013 >=== last message repeated 2 times. === > 22.22% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.22% done, estimate finish Sat Mar 9 11:51:56 2013 >=== last message repeated 2 times. === > 22.23% done, estimate finish Sat Mar 9 11:51:59 2013 >=== last message repeated 2 times. === > 22.24% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.24% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.25% done, estimate finish Sat Mar 9 11:51:56 2013 >=== last message repeated 2 times. === > 22.25% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.26% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.26% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.27% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.27% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.28% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.28% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.28% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.29% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.29% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.30% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.30% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.31% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.31% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.31% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.32% done, estimate finish Sat Mar 9 11:51:57 2013 >=== last message repeated 2 times. === > 22.33% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.33% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.33% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.34% done, estimate finish Sat Mar 9 11:51:58 2013 >=== last message repeated 2 times. === > 22.35% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.35% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.36% done, estimate finish Sat Mar 9 11:51:55 2013 >=== last message repeated 2 times. === > 22.36% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.37% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.37% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.38% done, estimate finish Sat Mar 9 11:51:56 2013 >=== last message repeated 2 times. === > 22.39% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.39% done, estimate finish Sat Mar 9 11:51:59 2013 > 22.39% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.40% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.40% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.41% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.41% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.41% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.42% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.42% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.43% done, estimate finish Sat Mar 9 11:51:56 2013 >=== last message repeated 2 times. === > 22.44% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.44% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.44% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.45% done, estimate finish Sat Mar 9 11:51:57 2013 >=== last message repeated 2 times. === > 22.46% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.46% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.47% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.47% done, estimate finish Sat Mar 9 11:51:58 2013 > 22.47% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.48% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.48% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.49% done, estimate finish Sat Mar 9 11:51:55 2013 >=== last message repeated 2 times. === > 22.49% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.50% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.50% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.51% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.51% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.52% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.52% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.52% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.53% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.53% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.54% done, estimate finish Sat Mar 9 11:51:55 2013 >=== last message repeated 2 times. === > 22.55% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.55% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.55% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.56% done, estimate finish Sat Mar 9 11:51:56 2013 >=== last message repeated 2 times. === > 22.57% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.57% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.57% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.58% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.58% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.59% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.59% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.60% done, estimate finish Sat Mar 9 11:51:54 2013 >=== last message repeated 2 times. === > 22.60% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.61% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.61% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.62% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.62% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.63% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.63% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.63% done, estimate finish Sat Mar 9 11:51:57 2013 > 22.64% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.64% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.65% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.65% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.66% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.66% done, estimate finish Sat Mar 9 11:51:52 2013 > 22.66% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.67% done, estimate finish Sat Mar 9 11:51:55 2013 >=== last message repeated 2 times. === > 22.68% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.68% done, estimate finish Sat Mar 9 11:51:53 2013 >=== last message repeated 2 times. === > 22.69% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.69% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.70% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.70% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.71% done, estimate finish Sat Mar 9 11:51:53 2013 >=== last message repeated 2 times. === > 22.71% done, estimate finish Sat Mar 9 11:51:52 2013 > 22.72% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.72% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.73% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.73% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.74% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.74% done, estimate finish Sat Mar 9 11:51:52 2013 > 22.74% done, estimate finish Sat Mar 9 11:51:56 2013 > 22.75% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.75% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.76% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.76% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.76% done, estimate finish Sat Mar 9 11:51:52 2013 > 22.77% done, estimate finish Sat Mar 9 11:51:51 2013 > 22.77% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.78% done, estimate finish Sat Mar 9 11:51:54 2013 >=== last message repeated 2 times. === > 22.79% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.79% done, estimate finish Sat Mar 9 11:51:52 2013 >=== last message repeated 2 times. === > 22.80% done, estimate finish Sat Mar 9 11:51:55 2013 >=== last message repeated 2 times. === > 22.81% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.81% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.82% done, estimate finish Sat Mar 9 11:51:52 2013 >=== last message repeated 2 times. === > 22.82% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.83% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.83% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.84% done, estimate finish Sat Mar 9 11:51:53 2013 >=== last message repeated 2 times. === > 22.84% done, estimate finish Sat Mar 9 11:51:52 2013 > 22.85% done, estimate finish Sat Mar 9 11:51:51 2013 > 22.85% done, estimate finish Sat Mar 9 11:51:55 2013 > 22.86% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.86% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.87% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.87% done, estimate finish Sat Mar 9 11:51:52 2013 > 22.87% done, estimate finish Sat Mar 9 11:51:51 2013 > 22.88% done, estimate finish Sat Mar 9 11:51:51 2013 > 22.88% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.89% done, estimate finish Sat Mar 9 11:51:53 2013 >=== last message repeated 2 times. === > 22.90% done, estimate finish Sat Mar 9 11:51:52 2013 > 22.90% done, estimate finish Sat Mar 9 11:51:51 2013 >=== last message repeated 2 times. === > 22.91% done, estimate finish Sat Mar 9 11:51:54 2013 >=== last message repeated 2 times. === > 22.92% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.92% done, estimate finish Sat Mar 9 11:51:52 2013 > 22.93% done, estimate finish Sat Mar 9 11:51:51 2013 >=== last message repeated 2 times. === > 22.93% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.94% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.94% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.95% done, estimate finish Sat Mar 9 11:51:52 2013 >=== last message repeated 2 times. === > 22.95% done, estimate finish Sat Mar 9 11:51:51 2013 > 22.96% done, estimate finish Sat Mar 9 11:51:50 2013 > 22.96% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.97% done, estimate finish Sat Mar 9 11:51:53 2013 > 22.97% done, estimate finish Sat Mar 9 11:51:52 2013 > 22.98% done, estimate finish Sat Mar 9 11:51:52 2013 > 22.98% done, estimate finish Sat Mar 9 11:51:51 2013 > 22.98% done, estimate finish Sat Mar 9 11:51:50 2013 > 22.99% done, estimate finish Sat Mar 9 11:51:54 2013 > 22.99% done, estimate finish Sat Mar 9 11:51:53 2013 > 23.00% done, estimate finish Sat Mar 9 11:51:53 2013 > 23.00% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.01% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.01% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.01% done, estimate finish Sat Mar 9 11:51:54 2013 > 23.02% done, estimate finish Sat Mar 9 11:51:53 2013 >=== last message repeated 2 times. === > 23.03% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.03% done, estimate finish Sat Mar 9 11:51:51 2013 >=== last message repeated 2 times. === > 23.04% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.04% done, estimate finish Sat Mar 9 11:51:53 2013 > 23.05% done, estimate finish Sat Mar 9 11:51:53 2013 > 23.05% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.06% done, estimate finish Sat Mar 9 11:51:51 2013 >=== last message repeated 2 times. === > 23.06% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.07% done, estimate finish Sat Mar 9 11:51:54 2013 > 23.07% done, estimate finish Sat Mar 9 11:51:53 2013 > 23.08% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.08% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.09% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.09% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.09% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.10% done, estimate finish Sat Mar 9 11:51:53 2013 > 23.10% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.11% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.11% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.11% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.12% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.12% done, estimate finish Sat Mar 9 11:51:53 2013 > 23.13% done, estimate finish Sat Mar 9 11:51:52 2013 >=== last message repeated 2 times. === > 23.14% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.14% done, estimate finish Sat Mar 9 11:51:50 2013 >=== last message repeated 2 times. === > 23.15% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.15% done, estimate finish Sat Mar 9 11:51:53 2013 > 23.16% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.16% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.17% done, estimate finish Sat Mar 9 11:51:50 2013 >=== last message repeated 2 times. === > 23.17% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.18% done, estimate finish Sat Mar 9 11:51:53 2013 > 23.18% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.19% done, estimate finish Sat Mar 9 11:51:51 2013 >=== last message repeated 2 times. === > 23.19% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.20% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.20% done, estimate finish Sat Mar 9 11:51:53 2013 > 23.21% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.21% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.22% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.22% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.22% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.23% done, estimate finish Sat Mar 9 11:51:53 2013 > 23.23% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.24% done, estimate finish Sat Mar 9 11:51:51 2013 >=== last message repeated 2 times. === > 23.25% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.25% done, estimate finish Sat Mar 9 11:51:49 2013 >=== last message repeated 2 times. === > 23.26% done, estimate finish Sat Mar 9 11:51:52 2013 >=== last message repeated 2 times. === > 23.27% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.27% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.28% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.28% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.28% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.29% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.29% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.30% done, estimate finish Sat Mar 9 11:51:50 2013 >=== last message repeated 2 times. === > 23.30% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.31% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.31% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.32% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.32% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.33% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.33% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.33% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.34% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.34% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.35% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.35% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.36% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.36% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.36% done, estimate finish Sat Mar 9 11:51:52 2013 > 23.37% done, estimate finish Sat Mar 9 11:51:51 2013 >=== last message repeated 2 times. === > 23.38% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.38% done, estimate finish Sat Mar 9 11:51:49 2013 >=== last message repeated 2 times. === > 23.39% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.39% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.40% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.40% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.41% done, estimate finish Sat Mar 9 11:51:49 2013 >=== last message repeated 2 times. === > 23.41% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.42% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.42% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.43% done, estimate finish Sat Mar 9 11:51:50 2013 >=== last message repeated 2 times. === > 23.44% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.44% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.44% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.45% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.45% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.46% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.46% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.46% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.47% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.47% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.48% done, estimate finish Sat Mar 9 11:51:50 2013 >=== last message repeated 2 times. === > 23.49% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.49% done, estimate finish Sat Mar 9 11:51:48 2013 >=== last message repeated 2 times. === > 23.50% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.50% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.51% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.51% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.52% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.52% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.52% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.53% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.53% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.54% done, estimate finish Sat Mar 9 11:51:49 2013 >=== last message repeated 2 times. === > 23.54% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.55% done, estimate finish Sat Mar 9 11:51:47 2013 >=== last message repeated 2 times. === > 23.56% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.56% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.57% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.57% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.57% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.58% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.58% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.59% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.59% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.60% done, estimate finish Sat Mar 9 11:51:48 2013 >=== last message repeated 2 times. === > 23.60% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.61% done, estimate finish Sat Mar 9 11:51:50 2013 >=== last message repeated 2 times. === > 23.62% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.62% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.63% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.63% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.63% done, estimate finish Sat Mar 9 11:51:46 2013 > 23.64% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.64% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.65% done, estimate finish Sat Mar 9 11:51:48 2013 >=== last message repeated 2 times. === > 23.65% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.66% done, estimate finish Sat Mar 9 11:51:46 2013 > 23.66% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.67% done, estimate finish Sat Mar 9 11:51:49 2013 >=== last message repeated 2 times. === > 23.68% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.68% done, estimate finish Sat Mar 9 11:51:47 2013 >=== last message repeated 2 times. === > 23.69% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.69% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.70% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.70% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.71% done, estimate finish Sat Mar 9 11:51:47 2013 >=== last message repeated 2 times. === > 23.71% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.72% done, estimate finish Sat Mar 9 11:51:49 2013 >=== last message repeated 2 times. === > 23.73% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.73% done, estimate finish Sat Mar 9 11:51:47 2013 >=== last message repeated 2 times. === > 23.74% done, estimate finish Sat Mar 9 11:51:50 2013 >=== last message repeated 2 times. === > 23.75% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.75% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.76% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.76% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.76% done, estimate finish Sat Mar 9 11:51:46 2013 > 23.77% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.77% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.78% done, estimate finish Sat Mar 9 11:51:48 2013 >=== last message repeated 2 times. === > 23.79% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.79% done, estimate finish Sat Mar 9 11:51:46 2013 > 23.79% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.80% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.80% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.81% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.81% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.81% done, estimate finish Sat Mar 9 11:51:46 2013 > 23.82% done, estimate finish Sat Mar 9 11:51:46 2013 > 23.82% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.83% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.83% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.84% done, estimate finish Sat Mar 9 11:51:47 2013 >=== last message repeated 2 times. === > 23.84% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.85% done, estimate finish Sat Mar 9 11:51:49 2013 >=== last message repeated 2 times. === > 23.86% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.86% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.87% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.87% done, estimate finish Sat Mar 9 11:51:50 2013 >=== last message repeated 2 times. === > 23.88% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.88% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.89% done, estimate finish Sat Mar 9 11:51:47 2013 >=== last message repeated 2 times. === > 23.89% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.90% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.90% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.91% done, estimate finish Sat Mar 9 11:51:48 2013 >=== last message repeated 2 times. === > 23.92% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.92% done, estimate finish Sat Mar 9 11:51:50 2013 >=== last message repeated 2 times. === > 23.93% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.93% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.94% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.94% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.95% done, estimate finish Sat Mar 9 11:51:51 2013 > 23.95% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.95% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.96% done, estimate finish Sat Mar 9 11:51:49 2013 > 23.96% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.97% done, estimate finish Sat Mar 9 11:51:47 2013 > 23.97% done, estimate finish Sat Mar 9 11:51:46 2013 > 23.98% done, estimate finish Sat Mar 9 11:51:50 2013 > 23.98% done, estimate finish Sat Mar 9 11:51:49 2013 >=== last message repeated 2 times. === > 23.99% done, estimate finish Sat Mar 9 11:51:48 2013 > 23.99% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.00% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.00% done, estimate finish Sat Mar 9 11:51:50 2013 > 24.00% done, estimate finish Sat Mar 9 11:51:49 2013 > 24.01% done, estimate finish Sat Mar 9 11:51:49 2013 > 24.01% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.02% done, estimate finish Sat Mar 9 11:51:47 2013 >=== last message repeated 2 times. === > 24.03% done, estimate finish Sat Mar 9 11:51:50 2013 >=== last message repeated 2 times. === > 24.03% done, estimate finish Sat Mar 9 11:51:49 2013 > 24.04% done, estimate finish Sat Mar 9 11:51:48 2013 >=== last message repeated 2 times. === > 24.05% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.05% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.06% done, estimate finish Sat Mar 9 11:51:50 2013 > 24.06% done, estimate finish Sat Mar 9 11:51:49 2013 > 24.06% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.07% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.07% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.08% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.08% done, estimate finish Sat Mar 9 11:51:50 2013 > 24.08% done, estimate finish Sat Mar 9 11:51:49 2013 > 24.09% done, estimate finish Sat Mar 9 11:51:48 2013 >=== last message repeated 2 times. === > 24.10% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.10% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.11% done, estimate finish Sat Mar 9 11:51:50 2013 > 24.11% done, estimate finish Sat Mar 9 11:51:49 2013 >=== last message repeated 2 times. === > 24.12% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.12% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.13% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.13% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.14% done, estimate finish Sat Mar 9 11:51:49 2013 >=== last message repeated 2 times. === > 24.14% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.15% done, estimate finish Sat Mar 9 11:51:47 2013 >=== last message repeated 2 times. === > 24.16% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.16% done, estimate finish Sat Mar 9 11:51:49 2013 >=== last message repeated 2 times. === > 24.17% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.17% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.18% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.18% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.19% done, estimate finish Sat Mar 9 11:51:50 2013 > 24.19% done, estimate finish Sat Mar 9 11:51:49 2013 > 24.19% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.20% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.20% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.21% done, estimate finish Sat Mar 9 11:51:46 2013 >=== last message repeated 2 times. === > 24.22% done, estimate finish Sat Mar 9 11:51:49 2013 > 24.22% done, estimate finish Sat Mar 9 11:51:48 2013 >=== last message repeated 2 times. === > 24.23% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.23% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.24% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.24% done, estimate finish Sat Mar 9 11:51:49 2013 > 24.24% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.25% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.25% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.26% done, estimate finish Sat Mar 9 11:51:46 2013 >=== last message repeated 2 times. === > 24.27% done, estimate finish Sat Mar 9 11:51:49 2013 >=== last message repeated 2 times. === > 24.27% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.28% done, estimate finish Sat Mar 9 11:51:47 2013 >=== last message repeated 2 times. === > 24.29% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.29% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.30% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.30% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.30% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.31% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.31% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.32% done, estimate finish Sat Mar 9 11:51:45 2013 >=== last message repeated 2 times. === > 24.33% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.33% done, estimate finish Sat Mar 9 11:51:47 2013 >=== last message repeated 2 times. === > 24.34% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.34% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.35% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.35% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.35% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.36% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.36% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.37% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.37% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.38% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.38% done, estimate finish Sat Mar 9 11:51:48 2013 > 24.38% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.39% done, estimate finish Sat Mar 9 11:51:46 2013 >=== last message repeated 2 times. === > 24.40% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.40% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.41% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.41% done, estimate finish Sat Mar 9 11:51:47 2013 >=== last message repeated 2 times. === > 24.42% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.42% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.43% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.43% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.43% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.44% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.44% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.45% done, estimate finish Sat Mar 9 11:51:45 2013 >=== last message repeated 2 times. === > 24.46% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.46% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.46% done, estimate finish Sat Mar 9 11:51:47 2013 > 24.47% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.47% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.48% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.48% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.49% done, estimate finish Sat Mar 9 11:51:43 2013 >=== last message repeated 2 times. === > 24.49% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.50% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.50% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.51% done, estimate finish Sat Mar 9 11:51:44 2013 >=== last message repeated 2 times. === > 24.51% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.52% done, estimate finish Sat Mar 9 11:51:46 2013 >=== last message repeated 2 times. === > 24.53% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.53% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.54% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.54% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.54% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.55% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.55% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.56% done, estimate finish Sat Mar 9 11:51:44 2013 >=== last message repeated 2 times. === > 24.57% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.57% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.57% done, estimate finish Sat Mar 9 11:51:46 2013 > 24.58% done, estimate finish Sat Mar 9 11:51:45 2013 >=== last message repeated 2 times. === > 24.59% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.59% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.60% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.60% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.60% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.61% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.61% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.62% done, estimate finish Sat Mar 9 11:51:43 2013 >=== last message repeated 2 times. === > 24.62% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.63% done, estimate finish Sat Mar 9 11:51:45 2013 >=== last message repeated 2 times. === > 24.64% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.64% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.65% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.65% done, estimate finish Sat Mar 9 11:51:42 2013 >=== last message repeated 2 times. === > 24.66% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.66% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.67% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.67% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.68% done, estimate finish Sat Mar 9 11:51:42 2013 >=== last message repeated 2 times. === > 24.68% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.69% done, estimate finish Sat Mar 9 11:51:44 2013 >=== last message repeated 2 times. === > 24.70% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.70% done, estimate finish Sat Mar 9 11:51:42 2013 >=== last message repeated 2 times. === > 24.71% done, estimate finish Sat Mar 9 11:51:45 2013 >=== last message repeated 2 times. === > 24.72% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.72% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.73% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.73% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.73% done, estimate finish Sat Mar 9 11:51:41 2013 > 24.74% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.74% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.75% done, estimate finish Sat Mar 9 11:51:43 2013 >=== last message repeated 2 times. === > 24.76% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.76% done, estimate finish Sat Mar 9 11:51:41 2013 > 24.76% done, estimate finish Sat Mar 9 11:51:45 2013 > 24.77% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.77% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.78% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.78% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.78% done, estimate finish Sat Mar 9 11:51:41 2013 > 24.79% done, estimate finish Sat Mar 9 11:51:41 2013 > 24.79% done, estimate finish Sat Mar 9 11:51:40 2013 > 24.80% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.80% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.81% done, estimate finish Sat Mar 9 11:51:42 2013 >=== last message repeated 2 times. === > 24.81% done, estimate finish Sat Mar 9 11:51:41 2013 > 24.82% done, estimate finish Sat Mar 9 11:51:40 2013 > 24.82% done, estimate finish Sat Mar 9 11:51:44 2013 > 24.83% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.83% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.84% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.84% done, estimate finish Sat Mar 9 11:51:41 2013 > 24.84% done, estimate finish Sat Mar 9 11:51:40 2013 > 24.85% done, estimate finish Sat Mar 9 11:51:40 2013 > 24.85% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.86% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.86% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.86% done, estimate finish Sat Mar 9 11:51:41 2013 > 24.87% done, estimate finish Sat Mar 9 11:51:41 2013 > 24.87% done, estimate finish Sat Mar 9 11:51:40 2013 > 24.88% done, estimate finish Sat Mar 9 11:51:43 2013 >=== last message repeated 2 times. === > 24.89% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.89% done, estimate finish Sat Mar 9 11:51:41 2013 >=== last message repeated 2 times. === > 24.90% done, estimate finish Sat Mar 9 11:51:40 2013 > 24.90% done, estimate finish Sat Mar 9 11:51:39 2013 > 24.91% done, estimate finish Sat Mar 9 11:51:43 2013 > 24.91% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.92% done, estimate finish Sat Mar 9 11:51:41 2013 >=== last message repeated 2 times. === > 24.92% done, estimate finish Sat Mar 9 11:51:40 2013 > 24.93% done, estimate finish Sat Mar 9 11:51:39 2013 >=== last message repeated 2 times. === > 24.94% done, estimate finish Sat Mar 9 11:51:38 2013 > 24.94% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.95% done, estimate finish Sat Mar 9 11:51:41 2013 > 24.95% done, estimate finish Sat Mar 9 11:51:40 2013 >=== last message repeated 2 times. === > 24.96% done, estimate finish Sat Mar 9 11:51:39 2013 > 24.96% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.97% done, estimate finish Sat Mar 9 11:51:42 2013 > 24.97% done, estimate finish Sat Mar 9 11:51:41 2013 > 24.97% done, estimate finish Sat Mar 9 11:51:40 2013 > 24.98% done, estimate finish Sat Mar 9 11:51:40 2013 > 24.98% done, estimate finish Sat Mar 9 11:51:39 2013 > 24.99% done, estimate finish Sat Mar 9 11:51:42 2013 >=== last message repeated 2 times. === > 25.00% done, estimate finish Sat Mar 9 11:51:41 2013 >=== last message repeated 2 times. === > 25.00% done, estimate finish Sat Mar 9 11:51:40 2013 > 25.01% done, estimate finish Sat Mar 9 11:51:39 2013 >=== last message repeated 2 times. === > 25.02% done, estimate finish Sat Mar 9 11:51:42 2013 > 25.02% done, estimate finish Sat Mar 9 11:51:41 2013 > 25.03% done, estimate finish Sat Mar 9 11:51:41 2013 > 25.03% done, estimate finish Sat Mar 9 11:51:40 2013 > 25.03% done, estimate finish Sat Mar 9 11:51:39 2013 > 25.04% done, estimate finish Sat Mar 9 11:51:39 2013 > 25.04% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.05% done, estimate finish Sat Mar 9 11:51:41 2013 >=== last message repeated 2 times. === > 25.05% done, estimate finish Sat Mar 9 11:51:40 2013 > 25.06% done, estimate finish Sat Mar 9 11:51:39 2013 >=== last message repeated 2 times. === > 25.07% done, estimate finish Sat Mar 9 11:51:38 2013 >=== last message repeated 2 times. === > 25.08% done, estimate finish Sat Mar 9 11:51:41 2013 > 25.08% done, estimate finish Sat Mar 9 11:51:40 2013 >=== last message repeated 2 times. === > 25.09% done, estimate finish Sat Mar 9 11:51:39 2013 > 25.09% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.10% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.10% done, estimate finish Sat Mar 9 11:51:41 2013 > 25.11% done, estimate finish Sat Mar 9 11:51:40 2013 >=== last message repeated 2 times. === > 25.11% done, estimate finish Sat Mar 9 11:51:39 2013 > 25.12% done, estimate finish Sat Mar 9 11:51:38 2013 >=== last message repeated 2 times. === > 25.13% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.13% done, estimate finish Sat Mar 9 11:51:40 2013 >=== last message repeated 2 times. === > 25.14% done, estimate finish Sat Mar 9 11:51:39 2013 >=== last message repeated 2 times. === > 25.15% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.15% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.16% done, estimate finish Sat Mar 9 11:51:41 2013 > 25.16% done, estimate finish Sat Mar 9 11:51:40 2013 > 25.16% done, estimate finish Sat Mar 9 11:51:39 2013 > 25.17% done, estimate finish Sat Mar 9 11:51:39 2013 > 25.17% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.18% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.18% done, estimate finish Sat Mar 9 11:51:41 2013 > 25.19% done, estimate finish Sat Mar 9 11:51:40 2013 > 25.19% done, estimate finish Sat Mar 9 11:51:39 2013 >=== last message repeated 2 times. === > 25.20% done, estimate finish Sat Mar 9 11:51:38 2013 >=== last message repeated 2 times. === > 25.21% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.21% done, estimate finish Sat Mar 9 11:51:40 2013 >=== last message repeated 2 times. === > 25.22% done, estimate finish Sat Mar 9 11:51:39 2013 > 25.22% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.23% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.23% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.24% done, estimate finish Sat Mar 9 11:51:40 2013 >=== last message repeated 2 times. === > 25.24% done, estimate finish Sat Mar 9 11:51:39 2013 > 25.25% done, estimate finish Sat Mar 9 11:51:38 2013 >=== last message repeated 2 times. === > 25.26% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.26% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.27% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.27% done, estimate finish Sat Mar 9 11:51:39 2013 >=== last message repeated 2 times. === > 25.28% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.28% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.29% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.29% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.30% done, estimate finish Sat Mar 9 11:51:39 2013 >=== last message repeated 2 times. === > 25.30% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.31% done, estimate finish Sat Mar 9 11:51:37 2013 >=== last message repeated 2 times. === > 25.32% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.32% done, estimate finish Sat Mar 9 11:51:39 2013 >=== last message repeated 2 times. === > 25.33% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.33% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.34% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.34% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.35% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.35% done, estimate finish Sat Mar 9 11:51:39 2013 > 25.35% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.36% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.36% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.37% done, estimate finish Sat Mar 9 11:51:36 2013 >=== last message repeated 2 times. === > 25.38% done, estimate finish Sat Mar 9 11:51:39 2013 > 25.38% done, estimate finish Sat Mar 9 11:51:38 2013 >=== last message repeated 2 times. === > 25.39% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.39% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.40% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.40% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.40% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.41% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.41% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.42% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.42% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.43% done, estimate finish Sat Mar 9 11:51:35 2013 >=== last message repeated 2 times. === > 25.43% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.44% done, estimate finish Sat Mar 9 11:51:37 2013 >=== last message repeated 2 times. === > 25.45% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.45% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.46% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.46% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.46% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.47% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.47% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.48% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.48% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.48% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.49% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.49% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.50% done, estimate finish Sat Mar 9 11:51:36 2013 >=== last message repeated 2 times. === > 25.51% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.51% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.51% done, estimate finish Sat Mar 9 11:51:38 2013 > 25.52% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.52% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.53% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.53% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.54% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.54% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.54% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.55% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.55% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.56% done, estimate finish Sat Mar 9 11:51:35 2013 >=== last message repeated 2 times. === > 25.56% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.57% done, estimate finish Sat Mar 9 11:51:33 2013 > 25.57% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.58% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.58% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.59% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.59% done, estimate finish Sat Mar 9 11:51:34 2013 >=== last message repeated 2 times. === > 25.60% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.60% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.61% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.61% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.62% done, estimate finish Sat Mar 9 11:51:34 2013 >=== last message repeated 2 times. === > 25.62% done, estimate finish Sat Mar 9 11:51:33 2013 > 25.63% done, estimate finish Sat Mar 9 11:51:36 2013 >=== last message repeated 2 times. === > 25.64% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.64% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.65% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.65% done, estimate finish Sat Mar 9 11:51:33 2013 > 25.65% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.66% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.66% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.67% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.67% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.67% done, estimate finish Sat Mar 9 11:51:33 2013 > 25.68% done, estimate finish Sat Mar 9 11:51:33 2013 > 25.68% done, estimate finish Sat Mar 9 11:51:32 2013 > 25.69% done, estimate finish Sat Mar 9 11:51:35 2013 >=== last message repeated 2 times. === > 25.70% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.70% done, estimate finish Sat Mar 9 11:51:33 2013 > 25.70% done, estimate finish Sat Mar 9 11:51:37 2013 > 25.71% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.71% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.72% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.72% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.73% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.73% done, estimate finish Sat Mar 9 11:51:33 2013 > 25.73% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.74% done, estimate finish Sat Mar 9 11:51:36 2013 > 25.74% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.75% done, estimate finish Sat Mar 9 11:51:34 2013 >=== last message repeated 2 times. === > 25.75% done, estimate finish Sat Mar 9 11:51:33 2013 > 25.76% done, estimate finish Sat Mar 9 11:51:36 2013 >=== last message repeated 2 times. === > 25.77% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.77% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.78% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.78% done, estimate finish Sat Mar 9 11:51:33 2013 >=== last message repeated 2 times. === > 25.79% done, estimate finish Sat Mar 9 11:51:32 2013 > 25.79% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.80% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.80% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.81% done, estimate finish Sat Mar 9 11:51:33 2013 >=== last message repeated 2 times. === > 25.81% done, estimate finish Sat Mar 9 11:51:32 2013 > 25.82% done, estimate finish Sat Mar 9 11:51:35 2013 >=== last message repeated 2 times. === > 25.83% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.83% done, estimate finish Sat Mar 9 11:51:33 2013 >=== last message repeated 2 times. === > 25.84% done, estimate finish Sat Mar 9 11:51:32 2013 >=== last message repeated 2 times. === > 25.85% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.85% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.86% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.86% done, estimate finish Sat Mar 9 11:51:33 2013 > 25.86% done, estimate finish Sat Mar 9 11:51:32 2013 > 25.87% done, estimate finish Sat Mar 9 11:51:32 2013 > 25.87% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.88% done, estimate finish Sat Mar 9 11:51:34 2013 >=== last message repeated 2 times. === > 25.89% done, estimate finish Sat Mar 9 11:51:33 2013 > 25.89% done, estimate finish Sat Mar 9 11:51:32 2013 >=== last message repeated 2 times. === > 25.90% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.90% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.91% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.91% done, estimate finish Sat Mar 9 11:51:33 2013 >=== last message repeated 2 times. === > 25.92% done, estimate finish Sat Mar 9 11:51:32 2013 > 25.92% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.93% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.93% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.94% done, estimate finish Sat Mar 9 11:51:33 2013 >=== last message repeated 2 times. === > 25.94% done, estimate finish Sat Mar 9 11:51:32 2013 > 25.95% done, estimate finish Sat Mar 9 11:51:31 2013 > 25.95% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.96% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.96% done, estimate finish Sat Mar 9 11:51:33 2013 > 25.97% done, estimate finish Sat Mar 9 11:51:33 2013 > 25.97% done, estimate finish Sat Mar 9 11:51:32 2013 >=== last message repeated 2 times. === > 25.98% done, estimate finish Sat Mar 9 11:51:35 2013 > 25.98% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.99% done, estimate finish Sat Mar 9 11:51:34 2013 > 25.99% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.00% done, estimate finish Sat Mar 9 11:51:32 2013 >=== last message repeated 2 times. === > 26.00% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.01% done, estimate finish Sat Mar 9 11:51:34 2013 >=== last message repeated 2 times. === > 26.02% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.02% done, estimate finish Sat Mar 9 11:51:32 2013 >=== last message repeated 2 times. === > 26.03% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.03% done, estimate finish Sat Mar 9 11:51:34 2013 > 26.04% done, estimate finish Sat Mar 9 11:51:34 2013 > 26.04% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.05% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.05% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.05% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.06% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.06% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.07% done, estimate finish Sat Mar 9 11:51:33 2013 >=== last message repeated 2 times. === > 26.08% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.08% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.08% done, estimate finish Sat Mar 9 11:51:35 2013 > 26.09% done, estimate finish Sat Mar 9 11:51:34 2013 > 26.09% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.10% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.10% done, estimate finish Sat Mar 9 11:51:32 2013 >=== last message repeated 2 times. === > 26.11% done, estimate finish Sat Mar 9 11:51:35 2013 > 26.11% done, estimate finish Sat Mar 9 11:51:34 2013 > 26.12% done, estimate finish Sat Mar 9 11:51:34 2013 > 26.12% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.13% done, estimate finish Sat Mar 9 11:51:32 2013 >=== last message repeated 2 times. === > 26.13% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.14% done, estimate finish Sat Mar 9 11:51:34 2013 >=== last message repeated 2 times. === > 26.15% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.15% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.16% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.16% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.16% done, estimate finish Sat Mar 9 11:51:34 2013 > 26.17% done, estimate finish Sat Mar 9 11:51:34 2013 > 26.17% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.18% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.18% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.19% done, estimate finish Sat Mar 9 11:51:31 2013 >=== last message repeated 2 times. === > 26.19% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.20% done, estimate finish Sat Mar 9 11:51:33 2013 >=== last message repeated 2 times. === > 26.21% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.21% done, estimate finish Sat Mar 9 11:51:31 2013 >=== last message repeated 2 times. === > 26.22% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.22% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.23% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.23% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.24% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.24% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.24% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.25% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.25% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.26% done, estimate finish Sat Mar 9 11:51:32 2013 >=== last message repeated 2 times. === > 26.27% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.27% done, estimate finish Sat Mar 9 11:51:30 2013 >=== last message repeated 2 times. === > 26.28% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.28% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.29% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.29% done, estimate finish Sat Mar 9 11:51:31 2013 >=== last message repeated 2 times. === > 26.30% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.30% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.31% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.31% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.32% done, estimate finish Sat Mar 9 11:51:31 2013 >=== last message repeated 2 times. === > 26.32% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.33% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.33% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.34% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.34% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.35% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.35% done, estimate finish Sat Mar 9 11:51:30 2013 >=== last message repeated 2 times. === > 26.36% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.36% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.37% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.37% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.37% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.38% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.38% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.39% done, estimate finish Sat Mar 9 11:51:32 2013 >=== last message repeated 2 times. === > 26.40% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.40% done, estimate finish Sat Mar 9 11:51:30 2013 >=== last message repeated 2 times. === > 26.41% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.41% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.42% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.42% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.43% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.43% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.43% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.44% done, estimate finish Sat Mar 9 11:51:33 2013 > 26.44% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.45% done, estimate finish Sat Mar 9 11:51:31 2013 >=== last message repeated 2 times. === > 26.45% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.46% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.46% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.47% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.47% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.48% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.48% done, estimate finish Sat Mar 9 11:51:30 2013 >=== last message repeated 2 times. === > 26.49% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.49% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.50% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.50% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.51% done, estimate finish Sat Mar 9 11:51:30 2013 >=== last message repeated 2 times. === > 26.51% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.52% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.52% done, estimate finish Sat Mar 9 11:51:32 2013 > 26.53% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.53% done, estimate finish Sat Mar 9 11:51:30 2013 >=== last message repeated 2 times. === > 26.54% done, estimate finish Sat Mar 9 11:51:29 2013 >=== last message repeated 2 times. === > 26.55% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.55% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.56% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.56% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.56% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.57% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.57% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.58% done, estimate finish Sat Mar 9 11:51:31 2013 >=== last message repeated 2 times. === > 26.59% done, estimate finish Sat Mar 9 11:51:30 2013 >=== last message repeated 2 times. === > 26.59% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.60% done, estimate finish Sat Mar 9 11:51:28 2013 >=== last message repeated 2 times. === > 26.61% done, estimate finish Sat Mar 9 11:51:31 2013 > 26.61% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.62% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.62% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.62% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.63% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.63% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.64% done, estimate finish Sat Mar 9 11:51:30 2013 >=== last message repeated 2 times. === > 26.64% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.65% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.65% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.66% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.66% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.67% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.67% done, estimate finish Sat Mar 9 11:51:29 2013 >=== last message repeated 2 times. === > 26.68% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.68% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.69% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.69% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.70% done, estimate finish Sat Mar 9 11:51:29 2013 >=== last message repeated 2 times. === > 26.70% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.71% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.71% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.72% done, estimate finish Sat Mar 9 11:51:30 2013 >=== last message repeated 2 times. === > 26.72% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.73% done, estimate finish Sat Mar 9 11:51:28 2013 >=== last message repeated 2 times. === > 26.74% done, estimate finish Sat Mar 9 11:51:27 2013 >=== last message repeated 2 times. === > 26.75% done, estimate finish Sat Mar 9 11:51:30 2013 > 26.75% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.75% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.76% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.76% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.77% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.77% done, estimate finish Sat Mar 9 11:51:26 2013 > 26.78% done, estimate finish Sat Mar 9 11:51:29 2013 >=== last message repeated 2 times. === > 26.78% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.79% done, estimate finish Sat Mar 9 11:51:27 2013 >=== last message repeated 2 times. === > 26.80% done, estimate finish Sat Mar 9 11:51:26 2013 > 26.80% done, estimate finish Sat Mar 9 11:51:29 2013 >=== last message repeated 2 times. === > 26.81% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.81% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.82% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.82% done, estimate finish Sat Mar 9 11:51:26 2013 > 26.83% done, estimate finish Sat Mar 9 11:51:26 2013 > 26.83% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.83% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.84% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.84% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.85% done, estimate finish Sat Mar 9 11:51:26 2013 >=== last message repeated 2 times. === > 26.86% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.86% done, estimate finish Sat Mar 9 11:51:28 2013 >=== last message repeated 2 times. === > 26.87% done, estimate finish Sat Mar 9 11:51:27 2013 >=== last message repeated 2 times. === > 26.88% done, estimate finish Sat Mar 9 11:51:26 2013 > 26.88% done, estimate finish Sat Mar 9 11:51:25 2013 > 26.89% done, estimate finish Sat Mar 9 11:51:28 2013 >=== last message repeated 2 times. === > 26.89% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.90% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.90% done, estimate finish Sat Mar 9 11:51:26 2013 > 26.91% done, estimate finish Sat Mar 9 11:51:25 2013 >=== last message repeated 2 times. === > 26.91% done, estimate finish Sat Mar 9 11:51:28 2013 > 26.92% done, estimate finish Sat Mar 9 11:51:27 2013 >=== last message repeated 2 times. === > 26.93% done, estimate finish Sat Mar 9 11:51:26 2013 >=== last message repeated 2 times. === > 26.94% done, estimate finish Sat Mar 9 11:51:29 2013 > 26.94% done, estimate finish Sat Mar 9 11:51:28 2013 >=== last message repeated 2 times. === > 26.95% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.95% done, estimate finish Sat Mar 9 11:51:26 2013 > 26.96% done, estimate finish Sat Mar 9 11:51:26 2013 > 26.96% done, estimate finish Sat Mar 9 11:51:25 2013 > 26.97% done, estimate finish Sat Mar 9 11:51:28 2013 >=== last message repeated 2 times. === > 26.97% done, estimate finish Sat Mar 9 11:51:27 2013 > 26.98% done, estimate finish Sat Mar 9 11:51:26 2013 >=== last message repeated 2 times. === > 26.99% done, estimate finish Sat Mar 9 11:51:25 2013 > 26.99% done, estimate finish Sat Mar 9 11:51:28 2013 >=== last message repeated 2 times. === > 27.00% done, estimate finish Sat Mar 9 11:51:27 2013 >=== last message repeated 2 times. === > 27.01% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.01% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.02% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.02% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.02% done, estimate finish Sat Mar 9 11:51:27 2013 > 27.03% done, estimate finish Sat Mar 9 11:51:27 2013 > 27.03% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.04% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.04% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.05% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.05% done, estimate finish Sat Mar 9 11:51:27 2013 >=== last message repeated 2 times. === > 27.06% done, estimate finish Sat Mar 9 11:51:26 2013 >=== last message repeated 2 times. === > 27.07% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.07% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.07% done, estimate finish Sat Mar 9 11:51:28 2013 > 27.08% done, estimate finish Sat Mar 9 11:51:27 2013 > 27.08% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.09% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.09% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.10% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.10% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.10% done, estimate finish Sat Mar 9 11:51:27 2013 > 27.11% done, estimate finish Sat Mar 9 11:51:26 2013 >=== last message repeated 2 times. === > 27.12% done, estimate finish Sat Mar 9 11:51:25 2013 >=== last message repeated 2 times. === > 27.13% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.13% done, estimate finish Sat Mar 9 11:51:27 2013 >=== last message repeated 2 times. === > 27.14% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.14% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.15% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.15% done, estimate finish Sat Mar 9 11:51:24 2013 >=== last message repeated 2 times. === > 27.16% done, estimate finish Sat Mar 9 11:51:27 2013 > 27.16% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.17% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.17% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.18% done, estimate finish Sat Mar 9 11:51:24 2013 >=== last message repeated 2 times. === > 27.18% done, estimate finish Sat Mar 9 11:51:27 2013 > 27.19% done, estimate finish Sat Mar 9 11:51:26 2013 >=== last message repeated 2 times. === > 27.20% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.20% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.21% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.21% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.21% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.22% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.22% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.23% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.23% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.24% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.24% done, estimate finish Sat Mar 9 11:51:27 2013 > 27.24% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.25% done, estimate finish Sat Mar 9 11:51:25 2013 >=== last message repeated 2 times. === > 27.26% done, estimate finish Sat Mar 9 11:51:24 2013 >=== last message repeated 2 times. === > 27.26% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.27% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.27% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.28% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.28% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.29% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.29% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.29% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.30% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.30% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.31% done, estimate finish Sat Mar 9 11:51:24 2013 >=== last message repeated 2 times. === > 27.32% done, estimate finish Sat Mar 9 11:51:23 2013 >=== last message repeated 2 times. === > 27.32% done, estimate finish Sat Mar 9 11:51:26 2013 > 27.33% done, estimate finish Sat Mar 9 11:51:25 2013 >=== last message repeated 2 times. === > 27.34% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.34% done, estimate finish Sat Mar 9 11:51:23 2013 >=== last message repeated 2 times. === > 27.35% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.35% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.36% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.36% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.37% done, estimate finish Sat Mar 9 11:51:23 2013 >=== last message repeated 2 times. === > 27.37% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.38% done, estimate finish Sat Mar 9 11:51:25 2013 >=== last message repeated 2 times. === > 27.39% done, estimate finish Sat Mar 9 11:51:24 2013 >=== last message repeated 2 times. === > 27.40% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.40% done, estimate finish Sat Mar 9 11:51:22 2013 >=== last message repeated 2 times. === > 27.41% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.41% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.42% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.42% done, estimate finish Sat Mar 9 11:51:23 2013 >=== last message repeated 2 times. === > 27.43% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.43% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.44% done, estimate finish Sat Mar 9 11:51:24 2013 >=== last message repeated 2 times. === > 27.45% done, estimate finish Sat Mar 9 11:51:23 2013 >=== last message repeated 2 times. === > 27.45% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.46% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.46% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.47% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.47% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.48% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.48% done, estimate finish Sat Mar 9 11:51:22 2013 >=== last message repeated 2 times. === > 27.49% done, estimate finish Sat Mar 9 11:51:25 2013 > 27.49% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.50% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.50% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.50% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.51% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.51% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.52% done, estimate finish Sat Mar 9 11:51:24 2013 >=== last message repeated 2 times. === > 27.53% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.53% done, estimate finish Sat Mar 9 11:51:22 2013 >=== last message repeated 2 times. === > 27.54% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.54% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.55% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.55% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.56% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.56% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.56% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.57% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.57% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.58% done, estimate finish Sat Mar 9 11:51:23 2013 >=== last message repeated 2 times. === > 27.59% done, estimate finish Sat Mar 9 11:51:22 2013 >=== last message repeated 2 times. === > 27.59% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.60% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.60% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.61% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.61% done, estimate finish Sat Mar 9 11:51:22 2013 >=== last message repeated 2 times. === > 27.62% done, estimate finish Sat Mar 9 11:51:21 2013 >=== last message repeated 2 times. === > 27.63% done, estimate finish Sat Mar 9 11:51:24 2013 > 27.63% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.64% done, estimate finish Sat Mar 9 11:51:22 2013 >=== last message repeated 2 times. === > 27.64% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.65% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.65% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.66% done, estimate finish Sat Mar 9 11:51:23 2013 >=== last message repeated 2 times. === > 27.67% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.67% done, estimate finish Sat Mar 9 11:51:21 2013 >=== last message repeated 2 times. === > 27.68% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.68% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.69% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.69% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.69% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.70% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.70% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.71% done, estimate finish Sat Mar 9 11:51:23 2013 >=== last message repeated 2 times. === > 27.72% done, estimate finish Sat Mar 9 11:51:22 2013 >=== last message repeated 2 times. === > 27.72% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.73% done, estimate finish Sat Mar 9 11:51:20 2013 >=== last message repeated 2 times. === > 27.74% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.74% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.75% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.75% done, estimate finish Sat Mar 9 11:51:21 2013 >=== last message repeated 2 times. === > 27.76% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.76% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.77% done, estimate finish Sat Mar 9 11:51:22 2013 >=== last message repeated 2 times. === > 27.77% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.78% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.78% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.79% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.79% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.80% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.80% done, estimate finish Sat Mar 9 11:51:21 2013 >=== last message repeated 2 times. === > 27.81% done, estimate finish Sat Mar 9 11:51:20 2013 >=== last message repeated 2 times. === > 27.82% done, estimate finish Sat Mar 9 11:51:23 2013 > 27.82% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.83% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.83% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.83% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.84% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.84% done, estimate finish Sat Mar 9 11:51:19 2013 > 27.85% done, estimate finish Sat Mar 9 11:51:22 2013 >=== last message repeated 2 times. === > 27.86% done, estimate finish Sat Mar 9 11:51:21 2013 >=== last message repeated 2 times. === > 27.86% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.87% done, estimate finish Sat Mar 9 11:51:19 2013 > 27.87% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.88% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.88% done, estimate finish Sat Mar 9 11:51:21 2013 >=== last message repeated 2 times. === > 27.89% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.89% done, estimate finish Sat Mar 9 11:51:19 2013 > 27.90% done, estimate finish Sat Mar 9 11:51:19 2013 > 27.90% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.91% done, estimate finish Sat Mar 9 11:51:21 2013 >=== last message repeated 2 times. === > 27.91% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.92% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.92% done, estimate finish Sat Mar 9 11:51:19 2013 > 27.93% done, estimate finish Sat Mar 9 11:51:18 2013 > 27.93% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.94% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.94% done, estimate finish Sat Mar 9 11:51:20 2013 >=== last message repeated 2 times. === > 27.95% done, estimate finish Sat Mar 9 11:51:19 2013 >=== last message repeated 2 times. === > 27.96% done, estimate finish Sat Mar 9 11:51:22 2013 > 27.96% done, estimate finish Sat Mar 9 11:51:21 2013 > 27.96% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.97% done, estimate finish Sat Mar 9 11:51:20 2013 > 27.97% done, estimate finish Sat Mar 9 11:51:19 2013 > 27.98% done, estimate finish Sat Mar 9 11:51:19 2013 > 27.98% done, estimate finish Sat Mar 9 11:51:18 2013 > 27.99% done, estimate finish Sat Mar 9 11:51:21 2013 >=== last message repeated 2 times. === > 27.99% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.00% done, estimate finish Sat Mar 9 11:51:19 2013 >=== last message repeated 2 times. === > 28.01% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.01% done, estimate finish Sat Mar 9 11:51:21 2013 > 28.02% done, estimate finish Sat Mar 9 11:51:21 2013 > 28.02% done, estimate finish Sat Mar 9 11:51:20 2013 >=== last message repeated 2 times. === > 28.03% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.03% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.04% done, estimate finish Sat Mar 9 11:51:21 2013 >=== last message repeated 2 times. === > 28.04% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.05% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.05% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.06% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.06% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.07% done, estimate finish Sat Mar 9 11:51:21 2013 > 28.07% done, estimate finish Sat Mar 9 11:51:20 2013 >=== last message repeated 2 times. === > 28.08% done, estimate finish Sat Mar 9 11:51:19 2013 >=== last message repeated 2 times. === > 28.09% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.09% done, estimate finish Sat Mar 9 11:51:21 2013 > 28.10% done, estimate finish Sat Mar 9 11:51:21 2013 > 28.10% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.10% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.11% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.11% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.12% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.12% done, estimate finish Sat Mar 9 11:51:21 2013 > 28.12% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.13% done, estimate finish Sat Mar 9 11:51:19 2013 >=== last message repeated 2 times. === > 28.14% done, estimate finish Sat Mar 9 11:51:18 2013 >=== last message repeated 2 times. === > 28.15% done, estimate finish Sat Mar 9 11:51:21 2013 > 28.15% done, estimate finish Sat Mar 9 11:51:20 2013 >=== last message repeated 2 times. === > 28.16% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.16% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.17% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.17% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.18% done, estimate finish Sat Mar 9 11:51:20 2013 >=== last message repeated 2 times. === > 28.18% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.19% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.19% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.20% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.20% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.21% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.21% done, estimate finish Sat Mar 9 11:51:19 2013 >=== last message repeated 2 times. === > 28.22% done, estimate finish Sat Mar 9 11:51:18 2013 >=== last message repeated 2 times. === > 28.23% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.23% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.23% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.24% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.24% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.25% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.25% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.26% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.26% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.26% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.27% done, estimate finish Sat Mar 9 11:51:18 2013 >=== last message repeated 2 times. === > 28.28% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 28.29% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.29% done, estimate finish Sat Mar 9 11:51:19 2013 >=== last message repeated 2 times. === > 28.30% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.30% done, estimate finish Sat Mar 9 11:51:21 2013 > 28.31% done, estimate finish Sat Mar 9 11:51:20 2013 >=== last message repeated 2 times. === > 28.31% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.32% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.32% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.33% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.33% done, estimate finish Sat Mar 9 11:51:21 2013 > 28.34% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.34% done, estimate finish Sat Mar 9 11:51:19 2013 >=== last message repeated 2 times. === > 28.35% done, estimate finish Sat Mar 9 11:51:18 2013 >=== last message repeated 2 times. === > 28.36% done, estimate finish Sat Mar 9 11:51:21 2013 > 28.36% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.37% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.37% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.37% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.38% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.38% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.39% done, estimate finish Sat Mar 9 11:51:20 2013 >=== last message repeated 2 times. === > 28.39% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.40% done, estimate finish Sat Mar 9 11:51:18 2013 >=== last message repeated 2 times. === > 28.41% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.41% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.42% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.42% done, estimate finish Sat Mar 9 11:51:19 2013 >=== last message repeated 2 times. === > 28.43% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.43% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.44% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.44% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.45% done, estimate finish Sat Mar 9 11:51:19 2013 >=== last message repeated 2 times. === > 28.45% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.46% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.46% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.47% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.47% done, estimate finish Sat Mar 9 11:51:19 2013 >=== last message repeated 2 times. === > 28.48% done, estimate finish Sat Mar 9 11:51:18 2013 >=== last message repeated 2 times. === > 28.49% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 28.50% done, estimate finish Sat Mar 9 11:51:20 2013 > 28.50% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.50% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.51% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.51% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.52% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.52% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.53% done, estimate finish Sat Mar 9 11:51:19 2013 >=== last message repeated 2 times. === > 28.53% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.54% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 28.55% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.55% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.56% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.56% done, estimate finish Sat Mar 9 11:51:18 2013 >=== last message repeated 2 times. === > 28.57% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.57% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.58% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.58% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.58% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.59% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.59% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.60% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.60% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.61% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.61% done, estimate finish Sat Mar 9 11:51:18 2013 >=== last message repeated 2 times. === > 28.62% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 28.63% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.63% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.64% done, estimate finish Sat Mar 9 11:51:18 2013 >=== last message repeated 2 times. === > 28.64% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.65% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.65% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.66% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.66% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.66% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.67% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.67% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.68% done, estimate finish Sat Mar 9 11:51:16 2013 >=== last message repeated 2 times. === > 28.69% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.69% done, estimate finish Sat Mar 9 11:51:18 2013 >=== last message repeated 2 times. === > 28.70% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 28.71% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.71% done, estimate finish Sat Mar 9 11:51:15 2013 > 28.72% done, estimate finish Sat Mar 9 11:51:15 2013 > 28.72% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.72% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.73% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.73% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.74% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.74% done, estimate finish Sat Mar 9 11:51:18 2013 >=== last message repeated 2 times. === > 28.75% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 28.76% done, estimate finish Sat Mar 9 11:51:16 2013 >=== last message repeated 2 times. === > 28.77% done, estimate finish Sat Mar 9 11:51:19 2013 > 28.77% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.77% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.78% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.78% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.79% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.79% done, estimate finish Sat Mar 9 11:51:15 2013 > 28.80% done, estimate finish Sat Mar 9 11:51:18 2013 >=== last message repeated 2 times. === > 28.80% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.81% done, estimate finish Sat Mar 9 11:51:16 2013 >=== last message repeated 2 times. === > 28.82% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 28.82% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.83% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 28.84% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.84% done, estimate finish Sat Mar 9 11:51:15 2013 > 28.85% done, estimate finish Sat Mar 9 11:51:15 2013 > 28.85% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.85% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.86% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.86% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.87% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.87% done, estimate finish Sat Mar 9 11:51:15 2013 > 28.88% done, estimate finish Sat Mar 9 11:51:14 2013 > 28.88% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 28.89% done, estimate finish Sat Mar 9 11:51:16 2013 >=== last message repeated 2 times. === > 28.90% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 28.91% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.91% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.91% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.92% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.92% done, estimate finish Sat Mar 9 11:51:15 2013 > 28.93% done, estimate finish Sat Mar 9 11:51:15 2013 > 28.93% done, estimate finish Sat Mar 9 11:51:18 2013 > 28.93% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.94% done, estimate finish Sat Mar 9 11:51:17 2013 > 28.94% done, estimate finish Sat Mar 9 11:51:16 2013 > 28.95% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 28.96% done, estimate finish Sat Mar 9 11:51:14 2013 > 28.96% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 28.97% done, estimate finish Sat Mar 9 11:51:16 2013 >=== last message repeated 2 times. === > 28.98% done, estimate finish Sat Mar 9 11:51:15 2013 > 28.98% done, estimate finish Sat Mar 9 11:51:14 2013 > 28.99% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 28.99% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.00% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.00% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.01% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.01% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 29.02% done, estimate finish Sat Mar 9 11:51:16 2013 >=== last message repeated 2 times. === > 29.03% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.04% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.04% done, estimate finish Sat Mar 9 11:51:17 2013 > 29.04% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.05% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.05% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.06% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.06% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.07% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 29.07% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.08% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.09% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.09% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 29.10% done, estimate finish Sat Mar 9 11:51:16 2013 >=== last message repeated 2 times. === > 29.11% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.12% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.12% done, estimate finish Sat Mar 9 11:51:17 2013 > 29.12% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.13% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.13% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.14% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.14% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.15% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.15% done, estimate finish Sat Mar 9 11:51:16 2013 >=== last message repeated 2 times. === > 29.16% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.17% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.17% done, estimate finish Sat Mar 9 11:51:17 2013 >=== last message repeated 2 times. === > 29.18% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.18% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.19% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.19% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.20% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.20% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.20% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.21% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.21% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.22% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.23% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.23% done, estimate finish Sat Mar 9 11:51:16 2013 >=== last message repeated 2 times. === > 29.24% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.25% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.26% done, estimate finish Sat Mar 9 11:51:16 2013 >=== last message repeated 2 times. === > 29.26% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.27% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.27% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.28% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.28% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.28% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.29% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.30% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.31% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.31% done, estimate finish Sat Mar 9 11:51:16 2013 >=== last message repeated 2 times. === > 29.32% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.32% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.33% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.33% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.34% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.34% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.34% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.35% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.35% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.36% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 29.36% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.37% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.38% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.39% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 29.39% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.40% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.40% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.41% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.41% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.42% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.42% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.43% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.44% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 29.44% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.45% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.46% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.46% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.47% done, estimate finish Sat Mar 9 11:51:16 2013 >=== last message repeated 2 times. === > 29.47% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.48% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.48% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.49% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.49% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.50% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.50% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.51% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.52% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.52% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.53% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.53% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.54% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.54% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.55% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.55% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.55% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.56% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.57% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 29.58% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.58% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.59% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.60% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.60% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.61% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.61% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.62% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.62% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.63% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.63% done, estimate finish Sat Mar 9 11:51:15 2013 >=== last message repeated 2 times. === > 29.64% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.65% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 29.66% done, estimate finish Sat Mar 9 11:51:16 2013 > 29.66% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.66% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.67% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.67% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.68% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.68% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.69% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.69% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.69% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.70% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 29.71% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 29.71% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.72% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.73% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 29.74% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.74% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.74% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.75% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.75% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.76% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.76% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.77% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.77% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.78% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 29.79% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 29.79% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.80% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.80% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.81% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.81% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.82% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.82% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.82% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.83% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.83% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.84% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 29.85% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.85% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.86% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 29.87% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.87% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.87% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.88% done, estimate finish Sat Mar 9 11:51:14 2013 > 29.88% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.89% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.89% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.90% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.90% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.91% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 29.92% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 29.93% done, estimate finish Sat Mar 9 11:51:15 2013 > 29.93% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.94% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.94% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.95% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.95% done, estimate finish Sat Mar 9 11:51:11 2013 > 29.96% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.96% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.97% done, estimate finish Sat Mar 9 11:51:13 2013 > 29.97% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.98% done, estimate finish Sat Mar 9 11:51:12 2013 > 29.98% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 29.99% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 30.00% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.01% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.01% done, estimate finish Sat Mar 9 11:51:14 2013 > 30.01% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.02% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.02% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.03% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.03% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.04% done, estimate finish Sat Mar 9 11:51:14 2013 > 30.04% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 30.05% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.06% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.06% done, estimate finish Sat Mar 9 11:51:14 2013 >=== last message repeated 2 times. === > 30.07% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 30.08% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.08% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.09% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.09% done, estimate finish Sat Mar 9 11:51:14 2013 > 30.09% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.10% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.10% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.11% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.11% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.12% done, estimate finish Sat Mar 9 11:51:14 2013 > 30.12% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 30.13% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.14% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.14% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.15% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.15% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.16% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.16% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.17% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.17% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.17% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.18% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.18% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.19% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.20% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.20% done, estimate finish Sat Mar 9 11:51:13 2013 >=== last message repeated 2 times. === > 30.21% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.22% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.23% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.23% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.23% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.24% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.24% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.25% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.25% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.25% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.26% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.27% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.28% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.28% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.28% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.29% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.29% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.30% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.30% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.31% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.31% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.31% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.32% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.32% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.33% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 30.33% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.34% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.35% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.36% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 30.36% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.37% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.37% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.38% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.38% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.39% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.39% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.40% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.41% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 30.41% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.42% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.43% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.43% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.44% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.44% done, estimate finish Sat Mar 9 11:51:09 2013 > 30.44% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.45% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.45% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.46% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.46% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.47% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.47% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.48% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.49% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 30.49% done, estimate finish Sat Mar 9 11:51:09 2013 > 30.50% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.50% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.51% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.51% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.52% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.52% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.52% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.53% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.54% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 30.55% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.55% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.56% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.57% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.57% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.58% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.58% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.59% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.59% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.60% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.60% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.61% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.62% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 30.63% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.63% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.64% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.64% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.65% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.65% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.66% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.66% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.67% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.67% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.68% done, estimate finish Sat Mar 9 11:51:13 2013 > 30.68% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.69% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.70% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 30.71% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.71% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.72% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.72% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.73% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.73% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.74% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.74% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.75% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 30.76% done, estimate finish Sat Mar 9 11:51:09 2013 > 30.76% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.77% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.78% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.78% done, estimate finish Sat Mar 9 11:51:09 2013 > 30.79% done, estimate finish Sat Mar 9 11:51:09 2013 > 30.79% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.79% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.80% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.80% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.81% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.81% done, estimate finish Sat Mar 9 11:51:09 2013 > 30.82% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.82% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.83% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 30.84% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.85% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.85% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.86% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.86% done, estimate finish Sat Mar 9 11:51:09 2013 > 30.87% done, estimate finish Sat Mar 9 11:51:12 2013 >=== last message repeated 2 times. === > 30.87% done, estimate finish Sat Mar 9 11:51:11 2013 > 30.88% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 30.89% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 30.90% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.90% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.91% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 30.92% done, estimate finish Sat Mar 9 11:51:09 2013 > 30.92% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.93% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.93% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.94% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.94% done, estimate finish Sat Mar 9 11:51:09 2013 > 30.95% done, estimate finish Sat Mar 9 11:51:09 2013 > 30.95% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.96% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 30.97% done, estimate finish Sat Mar 9 11:51:09 2013 > 30.97% done, estimate finish Sat Mar 9 11:51:12 2013 > 30.98% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 30.98% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.99% done, estimate finish Sat Mar 9 11:51:10 2013 > 30.99% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.00% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.00% done, estimate finish Sat Mar 9 11:51:12 2013 > 31.01% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 31.01% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.02% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.02% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.03% done, estimate finish Sat Mar 9 11:51:12 2013 > 31.03% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 31.04% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.05% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.05% done, estimate finish Sat Mar 9 11:51:12 2013 > 31.06% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 31.06% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.07% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.07% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.08% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.08% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.09% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.09% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.10% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.11% done, estimate finish Sat Mar 9 11:51:12 2013 > 31.11% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 31.12% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.13% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.13% done, estimate finish Sat Mar 9 11:51:12 2013 > 31.14% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 31.14% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.15% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.15% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.16% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.16% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.17% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.17% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.18% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.19% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 31.20% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.20% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.21% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.21% done, estimate finish Sat Mar 9 11:51:12 2013 > 31.22% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 31.22% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.23% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.24% done, estimate finish Sat Mar 9 11:51:12 2013 > 31.24% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.25% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.25% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.26% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.27% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 31.28% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.28% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.29% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.29% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.30% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.30% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.31% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.32% done, estimate finish Sat Mar 9 11:51:12 2013 > 31.32% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.33% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.33% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.34% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.34% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.35% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 31.36% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.36% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.37% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.37% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.38% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.38% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.39% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.40% done, estimate finish Sat Mar 9 11:51:11 2013 >=== last message repeated 2 times. === > 31.41% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.41% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.42% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.42% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.43% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.43% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.44% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.44% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.45% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 31.46% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.46% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.47% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.47% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.48% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.48% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.49% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.49% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.50% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.50% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.51% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.51% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.52% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.52% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.53% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 31.54% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.55% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.55% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.56% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.56% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.57% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.57% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.58% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.58% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.59% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.59% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.60% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.60% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.61% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 31.62% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.63% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.63% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.64% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.64% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.65% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.65% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.66% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 31.67% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.67% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.68% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.68% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.68% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.69% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.69% done, estimate finish Sat Mar 9 11:51:11 2013 > 31.70% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.71% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.71% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.72% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.72% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.73% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.73% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.74% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 31.75% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.76% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.76% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.77% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.77% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.78% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.78% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.79% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.79% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 31.80% done, estimate finish Sat Mar 9 11:51:07 2013 > 31.80% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.81% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.81% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.82% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.82% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 31.83% done, estimate finish Sat Mar 9 11:51:10 2013 >=== last message repeated 2 times. === > 31.84% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.84% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.85% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.85% done, estimate finish Sat Mar 9 11:51:07 2013 > 31.86% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.86% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.87% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.87% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 31.88% done, estimate finish Sat Mar 9 11:51:07 2013 > 31.88% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.89% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.90% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 31.90% done, estimate finish Sat Mar 9 11:51:07 2013 > 31.91% done, estimate finish Sat Mar 9 11:51:07 2013 > 31.91% done, estimate finish Sat Mar 9 11:51:10 2013 > 31.92% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.92% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.93% done, estimate finish Sat Mar 9 11:51:08 2013 > 31.93% done, estimate finish Sat Mar 9 11:51:07 2013 > 31.94% done, estimate finish Sat Mar 9 11:51:07 2013 > 31.94% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.95% done, estimate finish Sat Mar 9 11:51:09 2013 > 31.95% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 31.96% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 2 times. === > 31.97% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 31.98% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 31.98% done, estimate finish Sat Mar 9 11:51:07 2013 > 31.99% done, estimate finish Sat Mar 9 11:51:07 2013 > 31.99% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.00% done, estimate finish Sat Mar 9 11:51:09 2013 > 32.00% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 32.01% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 2 times. === > 32.02% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.02% done, estimate finish Sat Mar 9 11:51:09 2013 > 32.03% done, estimate finish Sat Mar 9 11:51:09 2013 > 32.03% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 32.04% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 2 times. === > 32.05% done, estimate finish Sat Mar 9 11:51:09 2013 >=== last message repeated 2 times. === > 32.06% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 32.06% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.07% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.07% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.08% done, estimate finish Sat Mar 9 11:51:09 2013 > 32.08% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 32.09% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 2 times. === > 32.10% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.10% done, estimate finish Sat Mar 9 11:51:09 2013 > 32.11% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 32.11% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.12% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.12% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.13% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.13% done, estimate finish Sat Mar 9 11:51:09 2013 > 32.14% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 32.14% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.15% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.15% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.16% done, estimate finish Sat Mar 9 11:51:09 2013 > 32.16% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 32.17% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 2 times. === > 32.18% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.19% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 32.19% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.20% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.20% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.21% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.21% done, estimate finish Sat Mar 9 11:51:08 2013 > 32.22% done, estimate finish Sat Mar 9 11:51:08 2013 > 32.22% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 2 times. === > 32.23% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.24% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.24% done, estimate finish Sat Mar 9 11:51:08 2013 > 32.25% done, estimate finish Sat Mar 9 11:51:08 2013 > 32.25% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 2 times. === > 32.26% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.27% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.27% done, estimate finish Sat Mar 9 11:51:08 2013 > 32.27% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.28% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.28% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.29% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.29% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.30% done, estimate finish Sat Mar 9 11:51:08 2013 > 32.30% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 2 times. === > 32.31% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.32% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.32% done, estimate finish Sat Mar 9 11:51:08 2013 > 32.33% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 2 times. === > 32.33% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.34% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.34% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.35% done, estimate finish Sat Mar 9 11:51:08 2013 >=== last message repeated 2 times. === > 32.35% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.36% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.36% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.37% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.37% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.38% done, estimate finish Sat Mar 9 11:51:08 2013 > 32.38% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 2 times. === > 32.39% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.40% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.40% done, estimate finish Sat Mar 9 11:51:08 2013 > 32.41% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 2 times. === > 32.41% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.42% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.42% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.43% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.43% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 2 times. === > 32.44% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.45% done, estimate finish Sat Mar 9 11:51:05 2013 >=== last message repeated 2 times. === > 32.46% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 3 times. === > 32.47% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.48% done, estimate finish Sat Mar 9 11:51:05 2013 >=== last message repeated 2 times. === > 32.49% done, estimate finish Sat Mar 9 11:51:07 2013 >=== last message repeated 2 times. === > 32.49% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.50% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.50% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.51% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.51% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.52% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.52% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.53% done, estimate finish Sat Mar 9 11:51:05 2013 >=== last message repeated 2 times. === > 32.54% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.54% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.54% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.55% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.55% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.56% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.56% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.57% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.57% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.58% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.58% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.59% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.59% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.60% done, estimate finish Sat Mar 9 11:51:07 2013 > 32.60% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.61% done, estimate finish Sat Mar 9 11:51:05 2013 >=== last message repeated 2 times. === > 32.62% done, estimate finish Sat Mar 9 11:51:04 2013 >=== last message repeated 2 times. === > 32.62% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.63% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.63% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.64% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.64% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.65% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.65% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.66% done, estimate finish Sat Mar 9 11:51:05 2013 >=== last message repeated 2 times. === > 32.67% done, estimate finish Sat Mar 9 11:51:04 2013 >=== last message repeated 2 times. === > 32.68% done, estimate finish Sat Mar 9 11:51:03 2013 > 32.68% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.69% done, estimate finish Sat Mar 9 11:51:05 2013 >=== last message repeated 2 times. === > 32.70% done, estimate finish Sat Mar 9 11:51:04 2013 >=== last message repeated 2 times. === > 32.70% done, estimate finish Sat Mar 9 11:51:03 2013 > 32.71% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.71% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.72% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.72% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.73% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.73% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.74% done, estimate finish Sat Mar 9 11:51:05 2013 >=== last message repeated 2 times. === > 32.75% done, estimate finish Sat Mar 9 11:51:04 2013 >=== last message repeated 2 times. === > 32.76% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.76% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.77% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.77% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.78% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.78% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.79% done, estimate finish Sat Mar 9 11:51:05 2013 >=== last message repeated 2 times. === > 32.80% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.80% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.81% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.81% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.82% done, estimate finish Sat Mar 9 11:51:05 2013 >=== last message repeated 2 times. === > 32.83% done, estimate finish Sat Mar 9 11:51:04 2013 >=== last message repeated 2 times. === > 32.84% done, estimate finish Sat Mar 9 11:51:06 2013 >=== last message repeated 2 times. === > 32.84% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.85% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.85% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.86% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.86% done, estimate finish Sat Mar 9 11:51:03 2013 > 32.87% done, estimate finish Sat Mar 9 11:51:06 2013 > 32.87% done, estimate finish Sat Mar 9 11:51:05 2013 >=== last message repeated 2 times. === > 32.88% done, estimate finish Sat Mar 9 11:51:04 2013 >=== last message repeated 2 times. === > 32.89% done, estimate finish Sat Mar 9 11:51:03 2013 >=== last message repeated 2 times. === > 32.89% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.90% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.90% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.91% done, estimate finish Sat Mar 9 11:51:04 2013 >=== last message repeated 2 times. === > 32.92% done, estimate finish Sat Mar 9 11:51:03 2013 >=== last message repeated 2 times. === > 32.92% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.93% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.93% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.94% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.94% done, estimate finish Sat Mar 9 11:51:03 2013 > 32.95% done, estimate finish Sat Mar 9 11:51:03 2013 > 32.95% done, estimate finish Sat Mar 9 11:51:05 2013 >=== last message repeated 2 times. === > 32.96% done, estimate finish Sat Mar 9 11:51:04 2013 >=== last message repeated 2 times. === > 32.97% done, estimate finish Sat Mar 9 11:51:03 2013 >=== last message repeated 2 times. === > 32.97% done, estimate finish Sat Mar 9 11:51:02 2013 > 32.98% done, estimate finish Sat Mar 9 11:51:05 2013 > 32.98% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.99% done, estimate finish Sat Mar 9 11:51:04 2013 > 32.99% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.00% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.00% done, estimate finish Sat Mar 9 11:51:02 2013 >=== last message repeated 2 times. === > 33.01% done, estimate finish Sat Mar 9 11:51:04 2013 >=== last message repeated 2 times. === > 33.02% done, estimate finish Sat Mar 9 11:51:04 2013 > 33.02% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.03% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.03% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.03% done, estimate finish Sat Mar 9 11:51:05 2013 > 33.04% done, estimate finish Sat Mar 9 11:51:04 2013 >=== last message repeated 2 times. === > 33.05% done, estimate finish Sat Mar 9 11:51:03 2013 >=== last message repeated 2 times. === > 33.05% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.06% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.06% done, estimate finish Sat Mar 9 11:51:04 2013 > 33.07% done, estimate finish Sat Mar 9 11:51:04 2013 > 33.07% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.08% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.08% done, estimate finish Sat Mar 9 11:51:02 2013 >=== last message repeated 2 times. === > 33.09% done, estimate finish Sat Mar 9 11:51:04 2013 >=== last message repeated 2 times. === > 33.10% done, estimate finish Sat Mar 9 11:51:03 2013 >=== last message repeated 2 times. === > 33.11% done, estimate finish Sat Mar 9 11:51:02 2013 >=== last message repeated 2 times. === > 33.11% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.12% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.12% done, estimate finish Sat Mar 9 11:51:04 2013 > 33.13% done, estimate finish Sat Mar 9 11:51:03 2013 >=== last message repeated 2 times. === > 33.13% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.14% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.14% done, estimate finish Sat Mar 9 11:51:04 2013 > 33.15% done, estimate finish Sat Mar 9 11:51:04 2013 > 33.15% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.16% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.16% done, estimate finish Sat Mar 9 11:51:02 2013 >=== last message repeated 2 times. === > 33.17% done, estimate finish Sat Mar 9 11:51:01 2013 >=== last message repeated 2 times. === > 33.18% done, estimate finish Sat Mar 9 11:51:03 2013 >=== last message repeated 2 times. === > 33.19% done, estimate finish Sat Mar 9 11:51:02 2013 >=== last message repeated 2 times. === > 33.19% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.20% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.20% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.21% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.21% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.22% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.22% done, estimate finish Sat Mar 9 11:51:01 2013 >=== last message repeated 2 times. === > 33.23% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.23% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.24% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.24% done, estimate finish Sat Mar 9 11:51:02 2013 >=== last message repeated 2 times. === > 33.25% done, estimate finish Sat Mar 9 11:51:01 2013 >=== last message repeated 2 times. === > 33.26% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.26% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.27% done, estimate finish Sat Mar 9 11:51:02 2013 >=== last message repeated 2 times. === > 33.27% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.28% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.28% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.29% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.29% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.30% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.30% done, estimate finish Sat Mar 9 11:51:01 2013 >=== last message repeated 2 times. === > 33.31% done, estimate finish Sat Mar 9 11:51:00 2013 >=== last message repeated 2 times. === > 33.32% done, estimate finish Sat Mar 9 11:51:02 2013 >=== last message repeated 2 times. === > 33.32% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.33% done, estimate finish Sat Mar 9 11:51:01 2013 >=== last message repeated 2 times. === > 33.34% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.34% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.35% done, estimate finish Sat Mar 9 11:51:02 2013 >=== last message repeated 2 times. === > 33.35% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.36% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.36% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.37% done, estimate finish Sat Mar 9 11:51:03 2013 > 33.37% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.38% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.38% done, estimate finish Sat Mar 9 11:51:01 2013 >=== last message repeated 2 times. === > 33.39% done, estimate finish Sat Mar 9 11:51:00 2013 >=== last message repeated 2 times. === > 33.40% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.40% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.40% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.41% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.41% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.42% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.42% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.43% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.43% done, estimate finish Sat Mar 9 11:51:01 2013 >=== last message repeated 2 times. === > 33.44% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.44% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.45% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.45% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.46% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.46% done, estimate finish Sat Mar 9 11:51:01 2013 >=== last message repeated 2 times. === > 33.47% done, estimate finish Sat Mar 9 11:51:00 2013 >=== last message repeated 2 times. === > 33.48% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.48% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.49% done, estimate finish Sat Mar 9 11:51:01 2013 >=== last message repeated 2 times. === > 33.49% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.50% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.50% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.51% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.51% done, estimate finish Sat Mar 9 11:51:01 2013 >=== last message repeated 2 times. === > 33.52% done, estimate finish Sat Mar 9 11:51:00 2013 >=== last message repeated 2 times. === > 33.53% done, estimate finish Sat Mar 9 11:50:59 2013 >=== last message repeated 2 times. === > 33.54% done, estimate finish Sat Mar 9 11:51:01 2013 >=== last message repeated 3 times. === > 33.55% done, estimate finish Sat Mar 9 11:51:00 2013 >=== last message repeated 2 times. === > 33.56% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.56% done, estimate finish Sat Mar 9 11:51:02 2013 > 33.57% done, estimate finish Sat Mar 9 11:51:01 2013 >=== last message repeated 2 times. === > 33.57% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.58% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.58% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.59% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.59% done, estimate finish Sat Mar 9 11:50:58 2013 > 33.59% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.60% done, estimate finish Sat Mar 9 11:51:00 2013 >=== last message repeated 2 times. === > 33.61% done, estimate finish Sat Mar 9 11:50:59 2013 >=== last message repeated 2 times. === > 33.62% done, estimate finish Sat Mar 9 11:50:58 2013 > 33.62% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.62% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.63% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.63% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.64% done, estimate finish Sat Mar 9 11:50:59 2013 >=== last message repeated 2 times. === > 33.65% done, estimate finish Sat Mar 9 11:50:58 2013 > 33.65% done, estimate finish Sat Mar 9 11:51:01 2013 > 33.65% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.66% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.66% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.67% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.67% done, estimate finish Sat Mar 9 11:50:58 2013 >=== last message repeated 2 times. === > 33.68% done, estimate finish Sat Mar 9 11:51:00 2013 >=== last message repeated 2 times. === > 33.69% done, estimate finish Sat Mar 9 11:50:59 2013 >=== last message repeated 2 times. === > 33.70% done, estimate finish Sat Mar 9 11:50:58 2013 >=== last message repeated 2 times. === > 33.70% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.71% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.71% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.72% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.72% done, estimate finish Sat Mar 9 11:50:58 2013 > 33.73% done, estimate finish Sat Mar 9 11:50:58 2013 > 33.73% done, estimate finish Sat Mar 9 11:50:57 2013 > 33.73% done, estimate finish Sat Mar 9 11:51:00 2013 > 33.74% done, estimate finish Sat Mar 9 11:50:59 2013 >=== last message repeated 2 times. === > 33.75% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.75% done, estimate finish Sat Mar 9 11:50:58 2013 >=== last message repeated 2 times. === > 33.76% done, estimate finish Sat Mar 9 11:51:00 2013 >=== last message repeated 2 times. === > 33.77% done, estimate finish Sat Mar 9 11:50:59 2013 >=== last message repeated 2 times. === > 33.78% done, estimate finish Sat Mar 9 11:50:58 2013 >=== last message repeated 2 times. === > 33.78% done, estimate finish Sat Mar 9 11:50:57 2013 > 33.79% done, estimate finish Sat Mar 9 11:50:57 2013 > 33.79% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.80% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.80% done, estimate finish Sat Mar 9 11:50:58 2013 > 33.81% done, estimate finish Sat Mar 9 11:50:58 2013 > 33.81% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 33.82% done, estimate finish Sat Mar 9 11:50:59 2013 >=== last message repeated 2 times. === > 33.83% done, estimate finish Sat Mar 9 11:50:58 2013 >=== last message repeated 2 times. === > 33.83% done, estimate finish Sat Mar 9 11:50:57 2013 > 33.84% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 33.85% done, estimate finish Sat Mar 9 11:50:59 2013 >=== last message repeated 2 times. === > 33.86% done, estimate finish Sat Mar 9 11:50:58 2013 >=== last message repeated 2 times. === > 33.86% done, estimate finish Sat Mar 9 11:50:57 2013 > 33.87% done, estimate finish Sat Mar 9 11:50:57 2013 > 33.87% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.88% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.88% done, estimate finish Sat Mar 9 11:50:58 2013 > 33.89% done, estimate finish Sat Mar 9 11:50:58 2013 > 33.89% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 33.90% done, estimate finish Sat Mar 9 11:50:56 2013 > 33.90% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.91% done, estimate finish Sat Mar 9 11:50:58 2013 >=== last message repeated 2 times. === > 33.92% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 33.92% done, estimate finish Sat Mar 9 11:50:56 2013 > 33.93% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.93% done, estimate finish Sat Mar 9 11:50:58 2013 > 33.94% done, estimate finish Sat Mar 9 11:50:58 2013 > 33.94% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 33.95% done, estimate finish Sat Mar 9 11:50:57 2013 > 33.95% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.96% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.96% done, estimate finish Sat Mar 9 11:50:58 2013 > 33.97% done, estimate finish Sat Mar 9 11:50:58 2013 > 33.97% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 33.98% done, estimate finish Sat Mar 9 11:50:56 2013 > 33.98% done, estimate finish Sat Mar 9 11:50:59 2013 > 33.99% done, estimate finish Sat Mar 9 11:50:58 2013 >=== last message repeated 2 times. === > 34.00% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 34.00% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.01% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.01% done, estimate finish Sat Mar 9 11:50:58 2013 > 34.02% done, estimate finish Sat Mar 9 11:50:58 2013 > 34.02% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 34.03% done, estimate finish Sat Mar 9 11:50:56 2013 >=== last message repeated 2 times. === > 34.04% done, estimate finish Sat Mar 9 11:50:58 2013 >=== last message repeated 2 times. === > 34.05% done, estimate finish Sat Mar 9 11:50:58 2013 > 34.05% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 34.06% done, estimate finish Sat Mar 9 11:50:56 2013 >=== last message repeated 2 times. === > 34.07% done, estimate finish Sat Mar 9 11:50:58 2013 >=== last message repeated 2 times. === > 34.08% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 34.08% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.09% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.09% done, estimate finish Sat Mar 9 11:50:58 2013 > 34.10% done, estimate finish Sat Mar 9 11:50:58 2013 > 34.10% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 34.11% done, estimate finish Sat Mar 9 11:50:56 2013 >=== last message repeated 2 times. === > 34.12% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.12% done, estimate finish Sat Mar 9 11:50:58 2013 > 34.13% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 34.13% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.14% done, estimate finish Sat Mar 9 11:50:56 2013 >=== last message repeated 2 times. === > 34.15% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.15% done, estimate finish Sat Mar 9 11:50:58 2013 > 34.16% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 34.16% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.17% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.17% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.18% done, estimate finish Sat Mar 9 11:50:58 2013 > 34.18% done, estimate finish Sat Mar 9 11:50:57 2013 > 34.19% done, estimate finish Sat Mar 9 11:50:57 2013 > 34.19% done, estimate finish Sat Mar 9 11:50:56 2013 >=== last message repeated 2 times. === > 34.20% done, estimate finish Sat Mar 9 11:50:55 2013 >=== last message repeated 2 times. === > 34.21% done, estimate finish Sat Mar 9 11:50:57 2013 >=== last message repeated 2 times. === > 34.21% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.22% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.22% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.23% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.23% done, estimate finish Sat Mar 9 11:50:57 2013 > 34.24% done, estimate finish Sat Mar 9 11:50:57 2013 > 34.24% done, estimate finish Sat Mar 9 11:50:56 2013 >=== last message repeated 2 times. === > 34.25% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.25% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.26% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.26% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.27% done, estimate finish Sat Mar 9 11:50:57 2013 > 34.27% done, estimate finish Sat Mar 9 11:50:56 2013 >=== last message repeated 2 times. === > 34.28% done, estimate finish Sat Mar 9 11:50:55 2013 >=== last message repeated 2 times. === > 34.29% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.29% done, estimate finish Sat Mar 9 11:50:57 2013 > 34.29% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.30% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.30% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.31% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.31% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.32% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.32% done, estimate finish Sat Mar 9 11:50:56 2013 >=== last message repeated 2 times. === > 34.33% done, estimate finish Sat Mar 9 11:50:55 2013 >=== last message repeated 2 times. === > 34.34% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.34% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.35% done, estimate finish Sat Mar 9 11:50:56 2013 >=== last message repeated 3 times. === > 34.36% done, estimate finish Sat Mar 9 11:50:55 2013 >=== last message repeated 2 times. === > 34.37% done, estimate finish Sat Mar 9 11:50:54 2013 >=== last message repeated 2 times. === > 34.37% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.38% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.38% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.39% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.39% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.40% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.40% done, estimate finish Sat Mar 9 11:50:56 2013 >=== last message repeated 2 times. === > 34.41% done, estimate finish Sat Mar 9 11:50:55 2013 >=== last message repeated 2 times. === > 34.42% done, estimate finish Sat Mar 9 11:50:54 2013 >=== last message repeated 2 times. === > 34.43% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 34.43% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.44% done, estimate finish Sat Mar 9 11:50:55 2013 >=== last message repeated 2 times. === > 34.45% done, estimate finish Sat Mar 9 11:50:54 2013 >=== last message repeated 2 times. === > 34.45% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.46% done, estimate finish Sat Mar 9 11:50:56 2013 > 34.46% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.47% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.47% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.48% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.48% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 34.49% done, estimate finish Sat Mar 9 11:50:55 2013 >=== last message repeated 2 times. === > 34.50% done, estimate finish Sat Mar 9 11:50:54 2013 >=== last message repeated 2 times. === > 34.51% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 34.51% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.52% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.52% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.53% done, estimate finish Sat Mar 9 11:50:54 2013 >=== last message repeated 2 times. === > 34.54% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 34.54% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.55% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.55% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.56% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.56% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 34.57% done, estimate finish Sat Mar 9 11:50:55 2013 >=== last message repeated 2 times. === > 34.58% done, estimate finish Sat Mar 9 11:50:54 2013 >=== last message repeated 2 times. === > 34.59% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 34.59% done, estimate finish Sat Mar 9 11:50:52 2013 > 34.60% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.60% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.61% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.61% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.62% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 34.62% done, estimate finish Sat Mar 9 11:50:52 2013 > 34.63% done, estimate finish Sat Mar 9 11:50:54 2013 >=== last message repeated 2 times. === > 34.64% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.64% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 34.65% done, estimate finish Sat Mar 9 11:50:55 2013 >=== last message repeated 2 times. === > 34.66% done, estimate finish Sat Mar 9 11:50:54 2013 >=== last message repeated 2 times. === > 34.67% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 34.67% done, estimate finish Sat Mar 9 11:50:52 2013 > 34.68% done, estimate finish Sat Mar 9 11:50:55 2013 > 34.68% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.69% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.69% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.70% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.70% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 34.71% done, estimate finish Sat Mar 9 11:50:54 2013 >=== last message repeated 2 times. === > 34.72% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 3 times. === > 34.73% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 34.74% done, estimate finish Sat Mar 9 11:50:54 2013 >=== last message repeated 2 times. === > 34.75% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 34.75% done, estimate finish Sat Mar 9 11:50:52 2013 > 34.76% done, estimate finish Sat Mar 9 11:50:52 2013 > 34.76% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.77% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.77% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.78% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.78% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 34.79% done, estimate finish Sat Mar 9 11:50:51 2013 > 34.79% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.80% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 34.81% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 3 times. === > 34.82% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.82% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.83% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 34.83% done, estimate finish Sat Mar 9 11:50:52 2013 > 34.84% done, estimate finish Sat Mar 9 11:50:52 2013 > 34.84% done, estimate finish Sat Mar 9 11:50:51 2013 > 34.85% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.85% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.86% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.86% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 34.87% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 34.88% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 34.89% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 34.89% done, estimate finish Sat Mar 9 11:50:51 2013 > 34.90% done, estimate finish Sat Mar 9 11:50:51 2013 > 34.90% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.91% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.91% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 34.92% done, estimate finish Sat Mar 9 11:50:52 2013 > 34.92% done, estimate finish Sat Mar 9 11:50:51 2013 > 34.93% done, estimate finish Sat Mar 9 11:50:51 2013 > 34.93% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.94% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.94% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 34.95% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 34.96% done, estimate finish Sat Mar 9 11:50:50 2013 > 34.96% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.97% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 34.97% done, estimate finish Sat Mar 9 11:50:51 2013 > 34.98% done, estimate finish Sat Mar 9 11:50:54 2013 > 34.98% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.99% done, estimate finish Sat Mar 9 11:50:53 2013 > 34.99% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 35.00% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.00% done, estimate finish Sat Mar 9 11:50:54 2013 > 35.01% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 35.02% done, estimate finish Sat Mar 9 11:50:53 2013 > 35.02% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 35.03% done, estimate finish Sat Mar 9 11:50:54 2013 >=== last message repeated 2 times. === > 35.04% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 35.05% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 35.05% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.06% done, estimate finish Sat Mar 9 11:50:54 2013 > 35.06% done, estimate finish Sat Mar 9 11:50:53 2013 > 35.07% done, estimate finish Sat Mar 9 11:50:53 2013 > 35.07% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 35.08% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.09% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 35.10% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 35.10% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.11% done, estimate finish Sat Mar 9 11:50:54 2013 > 35.11% done, estimate finish Sat Mar 9 11:50:53 2013 > 35.12% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 35.13% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 35.13% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.14% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.14% done, estimate finish Sat Mar 9 11:50:53 2013 > 35.15% done, estimate finish Sat Mar 9 11:50:53 2013 > 35.15% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.16% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.16% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.17% done, estimate finish Sat Mar 9 11:50:53 2013 >=== last message repeated 2 times. === > 35.18% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 35.18% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.19% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.20% done, estimate finish Sat Mar 9 11:50:53 2013 > 35.20% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.21% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 35.21% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.22% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.22% done, estimate finish Sat Mar 9 11:50:53 2013 > 35.23% done, estimate finish Sat Mar 9 11:50:53 2013 > 35.23% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.24% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.24% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.25% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.25% done, estimate finish Sat Mar 9 11:50:53 2013 > 35.26% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 35.26% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.27% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.27% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.28% done, estimate finish Sat Mar 9 11:50:53 2013 > 35.28% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.29% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.29% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.30% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.30% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.31% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 35.32% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.32% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.33% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.34% done, estimate finish Sat Mar 9 11:50:52 2013 >=== last message repeated 2 times. === > 35.34% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.35% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.35% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.36% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.36% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.37% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.37% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.38% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.39% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.39% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.40% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 3 times. === > 35.41% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.42% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.42% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.42% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.43% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.43% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.44% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.44% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.45% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.45% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.46% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.47% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.47% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.48% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.48% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.49% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.50% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.50% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.51% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.51% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.52% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.52% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.53% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.53% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.54% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.55% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.55% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.56% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.56% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.57% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.58% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.58% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.59% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.59% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.60% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.60% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.61% done, estimate finish Sat Mar 9 11:50:52 2013 > 35.61% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 2 times. === > 35.62% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.63% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 35.64% done, estimate finish Sat Mar 9 11:50:48 2013 > 35.64% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.64% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.65% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.65% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.66% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 35.67% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.67% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.68% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.68% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.69% done, estimate finish Sat Mar 9 11:50:51 2013 >=== last message repeated 3 times. === > 35.70% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.71% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 35.72% done, estimate finish Sat Mar 9 11:50:48 2013 > 35.72% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.72% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.73% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.73% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.74% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.74% done, estimate finish Sat Mar 9 11:50:48 2013 > 35.75% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.75% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.76% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 35.77% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.77% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.78% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 3 times. === > 35.79% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 35.80% done, estimate finish Sat Mar 9 11:50:48 2013 > 35.80% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.80% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.81% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.81% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.82% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.82% done, estimate finish Sat Mar 9 11:50:48 2013 > 35.83% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.83% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.84% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 35.85% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 35.86% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.86% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.87% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 35.88% done, estimate finish Sat Mar 9 11:50:48 2013 > 35.88% done, estimate finish Sat Mar 9 11:50:51 2013 > 35.88% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.89% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.89% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.90% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.90% done, estimate finish Sat Mar 9 11:50:48 2013 > 35.91% done, estimate finish Sat Mar 9 11:50:48 2013 > 35.91% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.92% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 35.93% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 35.94% done, estimate finish Sat Mar 9 11:50:50 2013 >=== last message repeated 2 times. === > 35.94% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.95% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 35.96% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 35.96% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.97% done, estimate finish Sat Mar 9 11:50:50 2013 > 35.97% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.98% done, estimate finish Sat Mar 9 11:50:49 2013 > 35.98% done, estimate finish Sat Mar 9 11:50:48 2013 > 35.99% done, estimate finish Sat Mar 9 11:50:48 2013 > 35.99% done, estimate finish Sat Mar 9 11:50:47 2013 > 35.99% done, estimate finish Sat Mar 9 11:50:50 2013 > 36.00% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 36.01% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 36.02% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.02% done, estimate finish Sat Mar 9 11:50:50 2013 > 36.02% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.03% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.03% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.04% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 36.04% done, estimate finish Sat Mar 9 11:50:50 2013 > 36.05% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 36.06% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.06% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.07% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.07% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.07% done, estimate finish Sat Mar 9 11:50:50 2013 > 36.08% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 36.09% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 36.10% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.10% done, estimate finish Sat Mar 9 11:50:50 2013 > 36.10% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.11% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.11% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.12% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.12% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.13% done, estimate finish Sat Mar 9 11:50:50 2013 > 36.13% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 36.14% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 36.15% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.15% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.15% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.16% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 36.17% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 36.18% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.18% done, estimate finish Sat Mar 9 11:50:50 2013 > 36.18% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.19% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.19% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.20% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.20% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.21% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.21% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 36.22% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 36.23% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.23% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.23% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.24% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 36.25% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 36.26% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 36.26% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.27% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.27% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.28% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.28% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.29% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.29% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.29% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.30% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 36.31% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 3 times. === > 36.32% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.32% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.33% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 36.34% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 36.34% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.35% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.35% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.36% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.36% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.37% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.37% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.37% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.38% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 36.39% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 36.39% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.40% done, estimate finish Sat Mar 9 11:50:49 2013 > 36.40% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.41% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 36.42% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 36.42% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.43% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 36.44% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.44% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.45% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.45% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 36.46% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 36.47% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 36.48% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 36.48% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.49% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.49% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.50% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 36.50% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.51% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.51% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.52% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.52% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.53% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.53% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 36.54% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.54% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.55% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 36.56% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 36.56% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.57% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.57% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.58% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.58% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 36.59% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.59% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.60% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 36.61% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.61% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 36.62% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.62% done, estimate finish Sat Mar 9 11:50:48 2013 > 36.63% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 36.64% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 36.64% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.65% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.65% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.66% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.66% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 36.67% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.67% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.68% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 36.69% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.69% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 36.70% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 36.71% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 36.72% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 36.72% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.73% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.73% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.74% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.74% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.75% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.75% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 36.76% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.76% done, estimate finish Sat Mar 9 11:50:47 2013 > 36.77% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 3 times. === > 36.78% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 36.79% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 36.80% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 36.80% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.81% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.81% done, estimate finish Sat Mar 9 11:50:44 2013 > 36.82% done, estimate finish Sat Mar 9 11:50:44 2013 > 36.82% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.83% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.83% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 36.84% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.84% done, estimate finish Sat Mar 9 11:50:44 2013 > 36.85% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 3 times. === > 36.86% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 36.87% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 36.88% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 36.88% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.89% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.89% done, estimate finish Sat Mar 9 11:50:44 2013 > 36.90% done, estimate finish Sat Mar 9 11:50:44 2013 > 36.90% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.91% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.91% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 36.92% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 36.93% done, estimate finish Sat Mar 9 11:50:44 2013 > 36.93% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.93% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.94% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 36.95% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 36.96% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 36.96% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.97% done, estimate finish Sat Mar 9 11:50:45 2013 > 36.97% done, estimate finish Sat Mar 9 11:50:44 2013 > 36.98% done, estimate finish Sat Mar 9 11:50:44 2013 > 36.98% done, estimate finish Sat Mar 9 11:50:43 2013 > 36.99% done, estimate finish Sat Mar 9 11:50:46 2013 > 36.99% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 37.00% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 37.01% done, estimate finish Sat Mar 9 11:50:44 2013 > 37.01% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.01% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.02% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 37.03% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 37.04% done, estimate finish Sat Mar 9 11:50:43 2013 > 37.04% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 37.05% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.05% done, estimate finish Sat Mar 9 11:50:44 2013 > 37.06% done, estimate finish Sat Mar 9 11:50:44 2013 > 37.06% done, estimate finish Sat Mar 9 11:50:43 2013 > 37.07% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.07% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 37.08% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 37.09% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 37.10% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 37.10% done, estimate finish Sat Mar 9 11:50:44 2013 > 37.11% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 37.12% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 37.12% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.13% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.13% done, estimate finish Sat Mar 9 11:50:44 2013 > 37.14% done, estimate finish Sat Mar 9 11:50:44 2013 > 37.14% done, estimate finish Sat Mar 9 11:50:43 2013 > 37.15% done, estimate finish Sat Mar 9 11:50:43 2013 > 37.15% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 37.16% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 37.17% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 37.18% done, estimate finish Sat Mar 9 11:50:43 2013 > 37.18% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.18% done, estimate finish Sat Mar 9 11:50:44 2013 > 37.19% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 37.20% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 37.20% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.21% done, estimate finish Sat Mar 9 11:50:50 2013 > 37.21% done, estimate finish Sat Mar 9 11:50:49 2013 > 37.22% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 37.23% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 37.23% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.24% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.24% done, estimate finish Sat Mar 9 11:50:49 2013 > 37.25% done, estimate finish Sat Mar 9 11:50:49 2013 > 37.25% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.26% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.26% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.27% done, estimate finish Sat Mar 9 11:50:49 2013 >=== last message repeated 2 times. === > 37.28% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 3 times. === > 37.29% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.30% done, estimate finish Sat Mar 9 11:50:49 2013 > 37.30% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.31% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 37.31% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.32% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.32% done, estimate finish Sat Mar 9 11:50:49 2013 > 37.33% done, estimate finish Sat Mar 9 11:50:49 2013 > 37.33% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.34% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.34% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.35% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.35% done, estimate finish Sat Mar 9 11:50:49 2013 > 37.36% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 37.36% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.37% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.38% done, estimate finish Sat Mar 9 11:50:49 2013 > 37.38% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.39% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 37.39% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.40% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.40% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.41% done, estimate finish Sat Mar 9 11:50:49 2013 > 37.41% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.42% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.42% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.43% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.43% done, estimate finish Sat Mar 9 11:50:49 2013 > 37.44% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 37.45% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 3 times. === > 37.46% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.46% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.47% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.47% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.48% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.48% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.49% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.49% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.50% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.50% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.51% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.51% done, estimate finish Sat Mar 9 11:50:49 2013 > 37.52% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 37.53% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.53% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.54% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 37.55% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.55% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.56% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.56% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.57% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.57% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.58% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.58% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.59% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 37.60% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.60% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.61% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.61% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.62% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 37.63% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.63% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.64% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.64% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.65% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.65% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.66% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 3 times. === > 37.67% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 37.68% done, estimate finish Sat Mar 9 11:50:48 2013 >=== last message repeated 2 times. === > 37.69% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.69% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.70% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.70% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.71% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.71% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.72% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 37.73% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.73% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.74% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 3 times. === > 37.75% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 37.76% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.76% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.77% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.77% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.78% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.78% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.79% done, estimate finish Sat Mar 9 11:50:48 2013 > 37.79% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.80% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.80% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 37.81% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.81% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.82% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.82% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.82% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.83% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 37.84% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.84% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.85% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.85% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.86% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.86% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.87% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.87% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.88% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.88% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 37.89% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 37.90% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.90% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.90% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.91% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 37.92% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 37.93% done, estimate finish Sat Mar 9 11:50:47 2013 >=== last message repeated 2 times. === > 37.93% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.94% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.94% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.95% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.95% done, estimate finish Sat Mar 9 11:50:44 2013 > 37.96% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.96% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 37.97% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 37.98% done, estimate finish Sat Mar 9 11:50:45 2013 > 37.98% done, estimate finish Sat Mar 9 11:50:47 2013 > 37.98% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.99% done, estimate finish Sat Mar 9 11:50:46 2013 > 37.99% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.00% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 38.01% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.01% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 38.02% done, estimate finish Sat Mar 9 11:50:46 2013 > 38.02% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.03% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.03% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.04% done, estimate finish Sat Mar 9 11:50:47 2013 > 38.04% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 38.05% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 38.06% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.07% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 38.07% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.08% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 38.09% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.09% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 38.10% done, estimate finish Sat Mar 9 11:50:46 2013 > 38.10% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.11% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.11% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.12% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.12% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 38.13% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 38.14% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.15% done, estimate finish Sat Mar 9 11:50:46 2013 >=== last message repeated 2 times. === > 38.15% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.16% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 38.17% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.17% done, estimate finish Sat Mar 9 11:50:46 2013 > 38.18% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 38.19% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.19% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.20% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.20% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.20% done, estimate finish Sat Mar 9 11:50:46 2013 > 38.21% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 38.22% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.23% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.23% done, estimate finish Sat Mar 9 11:50:46 2013 > 38.23% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.24% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.24% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.25% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.25% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.26% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 38.27% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.27% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.28% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.28% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.28% done, estimate finish Sat Mar 9 11:50:46 2013 > 38.29% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 38.30% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.31% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.31% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.32% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.32% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.33% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.33% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.34% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 38.35% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.35% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.36% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.36% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.37% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 38.38% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.39% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.39% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.40% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.40% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.41% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.41% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.42% done, estimate finish Sat Mar 9 11:50:45 2013 >=== last message repeated 2 times. === > 38.43% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.44% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.44% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.45% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.45% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.46% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.47% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.47% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.48% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.48% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.49% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.49% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.50% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.50% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.51% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.52% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.52% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.53% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.53% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.54% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.55% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.55% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.56% done, estimate finish Sat Mar 9 11:50:45 2013 > 38.56% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.57% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.57% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.58% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.58% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.59% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.60% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 3 times. === > 38.61% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.61% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.62% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.63% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.63% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.64% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.64% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.65% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.65% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.66% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.66% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 38.67% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.68% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 3 times. === > 38.69% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 38.70% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.71% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.71% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.72% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.72% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.73% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.73% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.74% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.74% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 38.75% done, estimate finish Sat Mar 9 11:50:44 2013 >=== last message repeated 2 times. === > 38.76% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 3 times. === > 38.77% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 38.78% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.78% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.79% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.79% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.80% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.80% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.81% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.81% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.82% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.82% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 38.83% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.83% done, estimate finish Sat Mar 9 11:50:41 2013 > 38.84% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.85% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 3 times. === > 38.86% done, estimate finish Sat Mar 9 11:50:41 2013 > 38.86% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.87% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.87% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.88% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.88% done, estimate finish Sat Mar 9 11:50:41 2013 > 38.89% done, estimate finish Sat Mar 9 11:50:44 2013 > 38.89% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.90% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.90% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 38.91% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 38.92% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.93% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 3 times. === > 38.94% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 38.95% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.95% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.96% done, estimate finish Sat Mar 9 11:50:42 2013 > 38.96% done, estimate finish Sat Mar 9 11:50:41 2013 > 38.97% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 38.98% done, estimate finish Sat Mar 9 11:50:43 2013 > 38.98% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 38.99% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.00% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 39.01% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 3 times. === > 39.02% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.02% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.03% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.03% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.04% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.04% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.05% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.05% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.06% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.06% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.07% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.08% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 39.09% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.09% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.10% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.10% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.11% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.11% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.12% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.12% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.13% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.13% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.14% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.14% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.15% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.16% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 39.17% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.17% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.18% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.19% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.19% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.20% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.20% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.21% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.21% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.22% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 3 times. === > 39.23% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.24% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.24% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.25% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.25% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.26% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.27% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.27% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.28% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.28% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.29% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.29% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.30% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 3 times. === > 39.31% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.32% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.32% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.33% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.33% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.34% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.34% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.35% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.35% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.36% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.36% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.37% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.37% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.38% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 3 times. === > 39.39% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.40% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.40% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.41% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.41% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.42% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.42% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.43% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.43% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.44% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.44% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.45% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 39.46% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.47% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 3 times. === > 39.48% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.48% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.49% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.49% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.50% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.50% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.51% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.52% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.52% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.53% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.53% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.54% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.55% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 3 times. === > 39.56% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.56% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.57% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.57% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.58% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.58% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.59% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.60% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.60% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.61% done, estimate finish Sat Mar 9 11:50:43 2013 >=== last message repeated 2 times. === > 39.62% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.63% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 3 times. === > 39.64% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.64% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.65% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.65% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.66% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.66% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.67% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.68% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.68% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.69% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.69% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.70% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.71% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.71% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.72% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.72% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.73% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.73% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.74% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.74% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.75% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.76% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.76% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.77% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.77% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.78% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.79% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.79% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.80% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.80% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.81% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.81% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.82% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.82% done, estimate finish Sat Mar 9 11:50:43 2013 > 39.83% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.84% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 3 times. === > 39.85% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.85% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.86% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.87% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.87% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.88% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.88% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.89% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.89% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.90% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.90% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 39.91% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.92% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 3 times. === > 39.93% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 39.94% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 39.95% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 39.95% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.96% done, estimate finish Sat Mar 9 11:50:40 2013 > 39.96% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.97% done, estimate finish Sat Mar 9 11:50:42 2013 > 39.97% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.98% done, estimate finish Sat Mar 9 11:50:41 2013 > 39.98% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 39.99% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 40.00% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 3 times. === > 40.01% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.02% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.02% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.03% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.03% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.04% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.04% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.05% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.05% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.06% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.06% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.07% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.07% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.08% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.09% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 40.10% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.10% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.11% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.11% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.12% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.12% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.13% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.14% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.14% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.15% done, estimate finish Sat Mar 9 11:50:42 2013 >=== last message repeated 2 times. === > 40.16% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.17% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 40.18% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.18% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.19% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.19% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.20% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.20% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.21% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.22% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.22% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.23% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.23% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.24% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.25% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 40.26% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.26% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.27% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.27% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.28% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.28% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.29% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.30% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.30% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.31% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.31% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.32% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.33% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 40.34% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.34% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.35% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.35% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.36% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.36% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.37% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.38% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.38% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.39% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.39% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.40% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.41% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.41% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.42% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.42% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.43% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.43% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.44% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.44% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.45% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.46% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 40.47% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.47% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.48% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.49% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.49% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.50% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.51% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.51% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.52% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.52% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.53% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.54% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 40.55% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.55% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.56% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.57% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.57% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.58% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.59% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.59% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.60% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.60% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.60% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.61% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.62% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 40.63% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.63% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.64% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.64% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.65% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.65% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.66% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.67% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.67% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.68% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.68% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 40.69% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.70% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 40.71% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.71% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.72% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.72% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.73% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.73% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.74% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.75% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.75% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.76% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.76% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.76% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.77% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.78% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.79% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 40.79% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.80% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.80% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.81% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.81% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.82% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.83% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.84% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.84% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.84% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.85% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.86% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.87% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.87% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.88% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.88% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.89% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.89% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.90% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.91% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.92% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.92% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.92% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.93% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.94% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.95% done, estimate finish Sat Mar 9 11:50:39 2013 > 40.95% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.96% done, estimate finish Sat Mar 9 11:50:41 2013 > 40.96% done, estimate finish Sat Mar 9 11:50:40 2013 > 40.97% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 40.97% done, estimate finish Sat Mar 9 11:50:42 2013 > 40.98% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 40.99% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.00% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.00% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.00% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.01% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.01% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.02% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.03% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.03% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 41.04% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.04% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.05% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.05% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.05% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.06% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 41.07% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.08% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.08% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.09% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.09% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.10% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.11% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.11% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.12% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.12% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.13% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.13% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.14% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.14% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 41.15% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.16% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.16% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.17% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.17% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.18% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.19% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.19% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.20% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.21% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.21% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.22% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.22% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 41.23% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.24% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 41.25% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.25% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.26% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.27% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.27% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.28% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.29% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.29% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.30% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.30% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.31% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.32% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 41.33% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.33% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.34% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.35% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.35% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.36% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.37% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.37% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.38% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.38% done, estimate finish Sat Mar 9 11:50:38 2013 > 41.38% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.39% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.40% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.41% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.41% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.41% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.42% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.42% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.43% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.43% done, estimate finish Sat Mar 9 11:50:38 2013 > 41.44% done, estimate finish Sat Mar 9 11:50:38 2013 > 41.44% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.45% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.45% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.46% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.46% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.46% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.47% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.48% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.49% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.49% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.49% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.50% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.50% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.51% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.51% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.52% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.53% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.53% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.54% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.54% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.54% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.55% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.56% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.57% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.57% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.58% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.58% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.59% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.59% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.60% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.61% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.62% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.62% done, estimate finish Sat Mar 9 11:50:38 2013 > 41.62% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.63% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.64% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.65% done, estimate finish Sat Mar 9 11:50:38 2013 > 41.65% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.66% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.66% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.67% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 3 times. === > 41.68% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.69% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.70% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 41.70% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.71% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.72% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.72% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.73% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.73% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.74% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.74% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.75% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 41.76% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 41.77% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.78% done, estimate finish Sat Mar 9 11:50:41 2013 >=== last message repeated 2 times. === > 41.78% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.79% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.79% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.80% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.80% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.81% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.81% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.82% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.82% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.83% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.83% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.84% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 41.85% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.86% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.86% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.86% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.87% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.87% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.88% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.89% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.89% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.90% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.90% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.91% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.91% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.92% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 41.93% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.94% done, estimate finish Sat Mar 9 11:50:38 2013 > 41.94% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.94% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.95% done, estimate finish Sat Mar 9 11:50:40 2013 > 41.95% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.96% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.97% done, estimate finish Sat Mar 9 11:50:41 2013 > 41.97% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 41.98% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 41.99% done, estimate finish Sat Mar 9 11:50:39 2013 > 41.99% done, estimate finish Sat Mar 9 11:50:41 2013 > 42.00% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 42.01% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.02% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.02% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.03% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.03% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.04% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.05% done, estimate finish Sat Mar 9 11:50:41 2013 > 42.05% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.06% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.07% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.07% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.08% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 42.09% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.10% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.10% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.11% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.11% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.12% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.13% done, estimate finish Sat Mar 9 11:50:41 2013 > 42.13% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.14% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.15% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.15% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.16% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.16% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.17% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.18% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.18% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.19% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.19% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.20% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.20% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.21% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 42.22% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.23% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.23% done, estimate finish Sat Mar 9 11:50:41 2013 > 42.24% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.24% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.25% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.26% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.26% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.27% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.27% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.28% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.28% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.29% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 42.30% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.31% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.31% done, estimate finish Sat Mar 9 11:50:41 2013 > 42.32% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.32% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.33% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.34% done, estimate finish Sat Mar 9 11:50:41 2013 > 42.34% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.35% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.35% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.36% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.36% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.37% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 3 times. === > 42.38% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.39% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 42.40% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.40% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.41% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.42% done, estimate finish Sat Mar 9 11:50:41 2013 > 42.42% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.43% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.43% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.44% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.44% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.45% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.46% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.46% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.47% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 42.48% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.48% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.49% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.50% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.50% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.51% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.51% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.52% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.52% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.53% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.54% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 42.55% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 42.56% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.56% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.57% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.57% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.58% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.58% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.59% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.59% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.60% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.60% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.61% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.62% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 42.63% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.63% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.64% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.64% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.65% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.65% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.66% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.67% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.67% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.68% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.68% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.69% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.70% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 42.71% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.71% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.72% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.72% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.73% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.73% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.74% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.75% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.75% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.76% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.76% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.77% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.78% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 42.79% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.79% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.80% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.80% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.81% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.81% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.82% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.83% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.83% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.84% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.84% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.85% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.86% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 42.87% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.87% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.88% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.88% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.89% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.89% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.90% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.91% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.91% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.92% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.92% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.93% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.94% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 42.95% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.96% done, estimate finish Sat Mar 9 11:50:40 2013 > 42.96% done, estimate finish Sat Mar 9 11:50:39 2013 > 42.97% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 42.97% done, estimate finish Sat Mar 9 11:50:38 2013 > 42.98% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 42.99% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 43.00% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.00% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.01% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.02% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.02% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.03% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.04% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.04% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.05% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.05% done, estimate finish Sat Mar 9 11:50:41 2013 > 43.06% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.07% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.08% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.08% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.08% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.09% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.10% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.10% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.11% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.12% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.12% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.13% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.13% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.14% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.15% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.16% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.16% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.16% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.17% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.17% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.18% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.18% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.19% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.20% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.20% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.21% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.21% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.21% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.22% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.23% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.24% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.24% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.24% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.25% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.25% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.26% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.26% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.27% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.27% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.28% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.28% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.29% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.29% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.29% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.30% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.31% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.32% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.32% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.32% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.33% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.33% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.34% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.34% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.35% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.35% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.36% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.37% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.37% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.38% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.39% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.40% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.40% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.41% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.41% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.42% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.43% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.43% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.44% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.45% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.45% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.46% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.47% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.48% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.48% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.49% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.49% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.50% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.51% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.51% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.52% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.53% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.53% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.54% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.54% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.55% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.56% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.56% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.57% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.57% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.58% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.58% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.59% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.59% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.60% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.61% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.61% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.62% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.62% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.63% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.64% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.64% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.65% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.65% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.66% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.66% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.67% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.67% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.68% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.69% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.69% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.70% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.70% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.70% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.71% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.72% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.72% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.73% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.74% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.74% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.75% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.75% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.76% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.77% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.78% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.78% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.78% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.79% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.80% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.80% done, estimate finish Sat Mar 9 11:50:40 2013 > 43.81% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.82% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.82% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.83% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.83% done, estimate finish Sat Mar 9 11:50:37 2013 > 43.84% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.85% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.86% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.86% done, estimate finish Sat Mar 9 11:50:37 2013 > 43.86% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.87% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.88% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.88% done, estimate finish Sat Mar 9 11:50:37 2013 > 43.89% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.90% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.90% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.91% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.91% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.92% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.93% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 43.94% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.94% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.95% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.96% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.96% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.97% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 43.98% done, estimate finish Sat Mar 9 11:50:39 2013 > 43.98% done, estimate finish Sat Mar 9 11:50:38 2013 > 43.99% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 43.99% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.00% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.01% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.01% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.02% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 44.02% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.03% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.03% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.04% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.04% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 44.05% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.06% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.06% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.07% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.07% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.07% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.08% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.09% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.09% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.10% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.10% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.11% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.11% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.12% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.12% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.13% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.13% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.14% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.14% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.15% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 44.15% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.16% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.17% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.18% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.18% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.19% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.19% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.20% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.20% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.21% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.21% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.22% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.23% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 44.23% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.24% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.25% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.26% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.26% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.27% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.27% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.28% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.28% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.29% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 44.30% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.31% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 44.31% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.32% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.33% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.34% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.34% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.35% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.35% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.36% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.36% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.37% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 44.38% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.39% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.39% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.40% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.40% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.41% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.42% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.42% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.43% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.43% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.44% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.44% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.45% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 44.46% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.47% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.47% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.48% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.48% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.49% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.50% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.50% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.51% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.51% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.52% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.52% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.53% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 44.54% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.55% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.55% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.56% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.56% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.57% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.58% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.58% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.59% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.60% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.60% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.61% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 44.62% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.63% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.63% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.64% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.64% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.65% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.66% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.66% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.67% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.68% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.68% done, estimate finish Sat Mar 9 11:50:40 2013 > 44.69% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 3 times. === > 44.70% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.71% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.71% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.72% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.72% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.73% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.74% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.75% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.75% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.76% done, estimate finish Sat Mar 9 11:50:40 2013 >=== last message repeated 2 times. === > 44.77% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.77% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.78% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.79% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.79% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.80% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.80% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.81% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.82% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.83% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.83% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.84% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.84% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.85% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.85% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.86% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.87% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.87% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.88% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.88% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.89% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.89% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.90% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.91% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.91% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.92% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.92% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.93% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.93% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.94% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 44.95% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.95% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.96% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 44.96% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.97% done, estimate finish Sat Mar 9 11:50:38 2013 > 44.97% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.98% done, estimate finish Sat Mar 9 11:50:37 2013 > 44.98% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.99% done, estimate finish Sat Mar 9 11:50:39 2013 > 44.99% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 45.00% done, estimate finish Sat Mar 9 11:50:38 2013 > 45.00% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.01% done, estimate finish Sat Mar 9 11:50:39 2013 >=== last message repeated 2 times. === > 45.01% done, estimate finish Sat Mar 9 11:50:38 2013 > 45.02% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 45.03% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.03% done, estimate finish Sat Mar 9 11:50:39 2013 > 45.04% done, estimate finish Sat Mar 9 11:50:39 2013 > 45.04% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 45.05% done, estimate finish Sat Mar 9 11:50:38 2013 > 45.05% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.06% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.07% done, estimate finish Sat Mar 9 11:50:39 2013 > 45.07% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 45.08% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.09% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.09% done, estimate finish Sat Mar 9 11:50:39 2013 > 45.10% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 3 times. === > 45.11% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.12% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.12% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 45.13% done, estimate finish Sat Mar 9 11:50:38 2013 > 45.13% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.14% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.15% done, estimate finish Sat Mar 9 11:50:39 2013 > 45.15% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 45.16% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.17% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.17% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.18% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 3 times. === > 45.19% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.20% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.20% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 45.21% done, estimate finish Sat Mar 9 11:50:38 2013 > 45.21% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.22% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.23% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.23% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 45.24% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.25% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.25% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.26% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.26% done, estimate finish Sat Mar 9 11:50:38 2013 >=== last message repeated 2 times. === > 45.27% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.28% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 3 times. === > 45.29% done, estimate finish Sat Mar 9 11:50:38 2013 > 45.29% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.30% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.31% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.31% done, estimate finish Sat Mar 9 11:50:38 2013 > 45.32% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.33% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.33% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.34% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.34% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.35% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.36% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 3 times. === > 45.37% done, estimate finish Sat Mar 9 11:50:38 2013 > 45.37% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.38% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.39% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.39% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.40% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.41% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.41% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.42% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.42% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.43% done, estimate finish Sat Mar 9 11:50:37 2013 >=== last message repeated 2 times. === > 45.44% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.45% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.45% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.45% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.46% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.46% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.47% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.47% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.48% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.48% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.49% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.49% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.50% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.50% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.51% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.51% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.52% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.53% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.53% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 45.54% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.54% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.55% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.55% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.56% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 45.57% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.57% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.58% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.58% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 45.59% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.59% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.60% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.61% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.61% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 45.62% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.62% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.63% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.63% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.64% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 45.65% done, estimate finish Sat Mar 9 11:50:37 2013 > 45.65% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.66% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.66% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 45.67% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.67% done, estimate finish Sat Mar 9 11:50:34 2013 > 45.68% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.69% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.69% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 45.70% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.70% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.71% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.72% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 3 times. === > 45.73% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.74% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.74% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 45.75% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.75% done, estimate finish Sat Mar 9 11:50:34 2013 > 45.76% done, estimate finish Sat Mar 9 11:50:34 2013 > 45.76% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.77% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.77% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 45.78% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 45.79% done, estimate finish Sat Mar 9 11:50:36 2013 >=== last message repeated 2 times. === > 45.80% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 3 times. === > 45.81% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 45.82% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.82% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 45.83% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.83% done, estimate finish Sat Mar 9 11:50:34 2013 > 45.84% done, estimate finish Sat Mar 9 11:50:34 2013 > 45.84% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.85% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 3 times. === > 45.86% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 45.87% done, estimate finish Sat Mar 9 11:50:34 2013 > 45.87% done, estimate finish Sat Mar 9 11:50:36 2013 > 45.88% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 3 times. === > 45.89% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 45.90% done, estimate finish Sat Mar 9 11:50:33 2013 > 45.90% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 45.91% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.91% done, estimate finish Sat Mar 9 11:50:34 2013 > 45.92% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 45.93% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 3 times. === > 45.94% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 45.95% done, estimate finish Sat Mar 9 11:50:34 2013 > 45.95% done, estimate finish Sat Mar 9 11:50:33 2013 > 45.96% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 45.96% done, estimate finish Sat Mar 9 11:50:34 2013 > 45.97% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 45.98% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 45.98% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.99% done, estimate finish Sat Mar 9 11:50:35 2013 > 45.99% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.00% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.01% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.01% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 46.02% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.03% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.03% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.04% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 46.04% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.05% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.06% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.07% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 46.07% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.08% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.09% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.09% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 46.10% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.11% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.11% done, estimate finish Sat Mar 9 11:50:35 2013 > 46.12% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 46.12% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.13% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.13% done, estimate finish Sat Mar 9 11:50:36 2013 > 46.14% done, estimate finish Sat Mar 9 11:50:36 2013 > 46.14% done, estimate finish Sat Mar 9 11:50:35 2013 > 46.15% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 46.15% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.16% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.16% done, estimate finish Sat Mar 9 11:50:36 2013 > 46.17% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 3 times. === > 46.18% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.19% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.19% done, estimate finish Sat Mar 9 11:50:35 2013 > 46.20% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 46.20% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.21% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.22% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.22% done, estimate finish Sat Mar 9 11:50:35 2013 > 46.23% done, estimate finish Sat Mar 9 11:50:35 2013 > 46.23% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.24% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.24% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.25% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 3 times. === > 46.26% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.27% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.27% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.28% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 46.28% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.29% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.30% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.30% done, estimate finish Sat Mar 9 11:50:35 2013 > 46.31% done, estimate finish Sat Mar 9 11:50:35 2013 > 46.31% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.32% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.32% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.33% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.33% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 46.34% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.35% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.35% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.36% done, estimate finish Sat Mar 9 11:50:35 2013 >=== last message repeated 2 times. === > 46.36% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.37% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.38% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.39% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.39% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.40% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.40% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.41% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.42% done, estimate finish Sat Mar 9 11:50:35 2013 > 46.42% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.43% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.44% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.44% done, estimate finish Sat Mar 9 11:50:35 2013 > 46.44% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.45% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.46% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.47% done, estimate finish Sat Mar 9 11:50:35 2013 > 46.47% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.48% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.48% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.49% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.50% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 3 times. === > 46.51% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.52% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.52% done, estimate finish Sat Mar 9 11:50:35 2013 > 46.52% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.53% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.54% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.55% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.55% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.56% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.56% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.57% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.58% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 3 times. === > 46.59% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.60% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.60% done, estimate finish Sat Mar 9 11:50:35 2013 > 46.60% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.61% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.62% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.63% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.63% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.63% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.64% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.64% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.65% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.66% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 3 times. === > 46.67% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.68% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.68% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.69% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.69% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.69% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.70% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.71% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 46.71% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.72% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.72% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.73% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.74% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.74% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.75% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.76% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.76% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.77% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.77% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.77% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.78% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.79% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 46.79% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.80% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.80% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.81% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.82% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.82% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.83% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.84% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.84% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.85% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.85% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.85% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.86% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.87% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 46.87% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.88% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.88% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.89% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.89% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.90% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.90% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.91% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.92% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.92% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.93% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.93% done, estimate finish Sat Mar 9 11:50:34 2013 > 46.93% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.94% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.95% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 3 times. === > 46.96% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 46.97% done, estimate finish Sat Mar 9 11:50:33 2013 > 46.97% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.98% done, estimate finish Sat Mar 9 11:50:32 2013 > 46.98% done, estimate finish Sat Mar 9 11:50:34 2013 >=== last message repeated 2 times. === > 46.99% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.00% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.00% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.01% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.01% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.02% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.03% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.04% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.04% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.05% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.05% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.06% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.06% done, estimate finish Sat Mar 9 11:50:34 2013 > 47.07% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.08% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.08% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.09% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.09% done, estimate finish Sat Mar 9 11:50:34 2013 > 47.09% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.10% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.11% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.12% done, estimate finish Sat Mar 9 11:50:34 2013 > 47.12% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.13% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.13% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.14% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.14% done, estimate finish Sat Mar 9 11:50:34 2013 > 47.15% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.16% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.16% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.17% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.17% done, estimate finish Sat Mar 9 11:50:34 2013 > 47.17% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.18% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.19% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.20% done, estimate finish Sat Mar 9 11:50:34 2013 > 47.20% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.21% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.21% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.22% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.22% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.23% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.24% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.25% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.25% done, estimate finish Sat Mar 9 11:50:34 2013 > 47.25% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.26% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.27% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.28% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.28% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.29% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.29% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.30% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.30% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.31% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.32% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.33% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.33% done, estimate finish Sat Mar 9 11:50:34 2013 > 47.33% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.34% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.35% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.36% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.36% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.37% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.37% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.38% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.39% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 3 times. === > 47.40% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.41% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.41% done, estimate finish Sat Mar 9 11:50:31 2013 > 47.41% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.42% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.42% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.43% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.44% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.44% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.45% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.45% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.46% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.47% done, estimate finish Sat Mar 9 11:50:31 2013 > 47.47% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.48% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.49% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.49% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.50% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.50% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.51% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.52% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.52% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.53% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.53% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.54% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.55% done, estimate finish Sat Mar 9 11:50:31 2013 > 47.55% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.56% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.57% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.57% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.58% done, estimate finish Sat Mar 9 11:50:31 2013 > 47.58% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.59% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.60% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.60% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.61% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.61% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.62% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.63% done, estimate finish Sat Mar 9 11:50:31 2013 > 47.63% done, estimate finish Sat Mar 9 11:50:33 2013 >=== last message repeated 2 times. === > 47.64% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.65% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.65% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.66% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.66% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.67% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.68% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 3 times. === > 47.69% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.70% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.70% done, estimate finish Sat Mar 9 11:50:31 2013 > 47.71% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.71% done, estimate finish Sat Mar 9 11:50:33 2013 > 47.72% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.73% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.73% done, estimate finish Sat Mar 9 11:50:31 2013 > 47.74% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.74% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.75% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.76% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 3 times. === > 47.77% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.78% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.78% done, estimate finish Sat Mar 9 11:50:31 2013 > 47.79% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.79% done, estimate finish Sat Mar 9 11:50:30 2013 > 47.80% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.81% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.81% done, estimate finish Sat Mar 9 11:50:31 2013 > 47.82% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.82% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.83% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.84% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 3 times. === > 47.85% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.86% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.86% done, estimate finish Sat Mar 9 11:50:31 2013 > 47.87% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.87% done, estimate finish Sat Mar 9 11:50:30 2013 > 47.88% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.89% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.89% done, estimate finish Sat Mar 9 11:50:31 2013 > 47.90% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.90% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.91% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.92% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 3 times. === > 47.93% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.94% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.94% done, estimate finish Sat Mar 9 11:50:31 2013 > 47.95% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.95% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.96% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 47.97% done, estimate finish Sat Mar 9 11:50:32 2013 > 47.97% done, estimate finish Sat Mar 9 11:50:31 2013 > 47.98% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 47.98% done, estimate finish Sat Mar 9 11:50:30 2013 > 47.99% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 48.00% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.01% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.01% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 48.02% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.02% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.03% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.03% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.04% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.04% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.05% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.06% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.06% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.07% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 48.08% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.09% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.09% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.10% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.10% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.11% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.11% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.12% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.12% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.13% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.14% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.14% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.15% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 48.16% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.17% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.17% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.17% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.18% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.18% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.19% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.19% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.20% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 48.21% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.22% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.22% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.22% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.23% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 48.24% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.25% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.25% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.25% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.26% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.26% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.27% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.27% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.28% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 48.29% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.30% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.30% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.31% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.31% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.32% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.33% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 3 times. === > 48.34% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.34% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.35% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.36% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 3 times. === > 48.37% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.38% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.38% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 48.39% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.39% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.40% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.41% done, estimate finish Sat Mar 9 11:50:33 2013 > 48.41% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 48.42% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.42% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.43% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.43% done, estimate finish Sat Mar 9 11:50:33 2013 > 48.44% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 3 times. === > 48.45% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.46% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.46% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 48.47% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.47% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.48% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.49% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 3 times. === > 48.50% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.50% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.51% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.52% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 3 times. === > 48.53% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.54% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.54% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 48.55% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.55% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.56% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.57% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.57% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.58% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.59% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.59% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.60% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.60% done, estimate finish Sat Mar 9 11:50:32 2013 >=== last message repeated 2 times. === > 48.61% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.62% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.62% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.63% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.63% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.64% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.65% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.65% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.66% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.67% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.67% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.68% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.68% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.69% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.70% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.70% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.71% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.71% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.71% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.72% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.73% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 3 times. === > 48.74% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.75% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.75% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.76% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.76% done, estimate finish Sat Mar 9 11:50:32 2013 > 48.77% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.78% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.78% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.79% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.79% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.80% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.81% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 3 times. === > 48.82% done, estimate finish Sat Mar 9 11:50:29 2013 > 48.82% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.83% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.83% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.84% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.84% done, estimate finish Sat Mar 9 11:50:29 2013 > 48.85% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.86% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.86% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.87% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.87% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.88% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.89% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 3 times. === > 48.90% done, estimate finish Sat Mar 9 11:50:29 2013 > 48.90% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.91% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.91% done, estimate finish Sat Mar 9 11:50:30 2013 > 48.92% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.92% done, estimate finish Sat Mar 9 11:50:29 2013 > 48.93% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.94% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.95% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 48.95% done, estimate finish Sat Mar 9 11:50:29 2013 > 48.96% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 48.97% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 3 times. === > 48.98% done, estimate finish Sat Mar 9 11:50:29 2013 > 48.98% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.99% done, estimate finish Sat Mar 9 11:50:31 2013 > 48.99% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.00% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 49.00% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.01% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.01% done, estimate finish Sat Mar 9 11:50:31 2013 > 49.02% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 49.03% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.03% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.04% done, estimate finish Sat Mar 9 11:50:31 2013 >=== last message repeated 2 times. === > 49.05% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 49.06% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.06% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.07% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.07% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.08% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 49.08% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.09% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.09% done, estimate finish Sat Mar 9 11:50:31 2013 > 49.10% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 49.11% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.11% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.12% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.12% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.13% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 49.14% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.14% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.15% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.15% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.16% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 49.16% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.17% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.18% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.18% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.19% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.19% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.20% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.20% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.21% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 49.22% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.22% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.23% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.23% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.24% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 49.24% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.25% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.26% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.26% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.27% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.27% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.28% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.28% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.29% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 49.30% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 3 times. === > 49.31% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.31% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.32% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 49.33% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 3 times. === > 49.34% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.34% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.35% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.35% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.36% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.36% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.37% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.38% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 3 times. === > 49.39% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.39% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.40% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.40% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.41% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 3 times. === > 49.42% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.43% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.43% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.44% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.44% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.45% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.45% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.46% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 3 times. === > 49.47% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.48% done, estimate finish Sat Mar 9 11:50:30 2013 >=== last message repeated 2 times. === > 49.49% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 3 times. === > 49.50% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.51% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.51% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.52% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.52% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.53% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.53% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.54% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 3 times. === > 49.55% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.56% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.56% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.57% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 3 times. === > 49.58% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.59% done, estimate finish Sat Mar 9 11:50:30 2013 > 49.59% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.60% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.60% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.61% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.62% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 3 times. === > 49.63% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.64% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.64% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.65% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 3 times. === > 49.66% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.67% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.67% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.68% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.68% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.69% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.70% done, estimate finish Sat Mar 9 11:50:27 2013 > 49.70% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.71% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.72% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.72% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.73% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.73% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.74% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.75% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.75% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.76% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.76% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.77% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.78% done, estimate finish Sat Mar 9 11:50:27 2013 > 49.78% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.79% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.80% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.80% done, estimate finish Sat Mar 9 11:50:27 2013 > 49.81% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.81% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.82% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.83% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.83% done, estimate finish Sat Mar 9 11:50:27 2013 > 49.84% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.84% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.85% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.86% done, estimate finish Sat Mar 9 11:50:27 2013 > 49.86% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.87% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.88% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.88% done, estimate finish Sat Mar 9 11:50:27 2013 > 49.89% done, estimate finish Sat Mar 9 11:50:27 2013 > 49.89% done, estimate finish Sat Mar 9 11:50:29 2013 > 49.89% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.90% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.91% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 49.92% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.92% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.93% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.94% done, estimate finish Sat Mar 9 11:50:27 2013 > 49.94% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.95% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.96% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.96% done, estimate finish Sat Mar 9 11:50:27 2013 > 49.97% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 49.97% done, estimate finish Sat Mar 9 11:50:28 2013 > 49.98% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 49.99% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.00% done, estimate finish Sat Mar 9 11:50:29 2013 >=== last message repeated 2 times. === > 50.00% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.01% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.02% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.02% done, estimate finish Sat Mar 9 11:50:29 2013 > 50.03% done, estimate finish Sat Mar 9 11:50:29 2013 > 50.03% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.04% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.04% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.05% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.05% done, estimate finish Sat Mar 9 11:50:29 2013 > 50.05% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.06% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.07% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.08% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.08% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.09% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.10% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.11% done, estimate finish Sat Mar 9 11:50:29 2013 > 50.11% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.12% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.12% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.13% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.13% done, estimate finish Sat Mar 9 11:50:29 2013 > 50.13% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.14% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.15% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.16% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.16% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.17% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.18% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.19% done, estimate finish Sat Mar 9 11:50:29 2013 > 50.19% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.20% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.20% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.21% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.21% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.22% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.23% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.24% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.24% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.25% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.25% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.26% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.27% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.27% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.28% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.28% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.29% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.29% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.30% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.31% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.32% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.32% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.32% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.33% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.33% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.34% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.35% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.35% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.36% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.36% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.37% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.38% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.38% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.39% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.40% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.40% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 50.41% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.41% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.42% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.43% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.43% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.43% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.44% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.44% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.45% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.46% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 50.46% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.47% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.48% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.48% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 50.49% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.49% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.50% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.51% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 3 times. === > 50.52% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.52% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.53% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.54% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 50.54% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.55% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.56% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.56% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 50.57% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.57% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.58% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.59% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.59% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.60% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.61% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.62% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.62% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.63% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.64% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.64% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.65% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.65% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.66% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.67% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 50.67% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.68% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.69% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.70% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.70% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.71% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.72% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.72% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.73% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.73% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.74% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.75% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.75% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.76% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.77% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.78% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 3 times. === > 50.79% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.80% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.80% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.81% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.81% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.82% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.83% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 50.83% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.84% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.85% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.85% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.86% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.86% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.87% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.88% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.88% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.89% done, estimate finish Sat Mar 9 11:50:28 2013 >=== last message repeated 2 times. === > 50.89% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.90% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.91% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 3 times. === > 50.92% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.93% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.93% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.94% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.94% done, estimate finish Sat Mar 9 11:50:28 2013 > 50.94% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.95% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.96% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.96% done, estimate finish Sat Mar 9 11:50:26 2013 > 50.97% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 50.97% done, estimate finish Sat Mar 9 11:50:27 2013 > 50.98% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 50.99% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.00% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.00% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 51.01% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.01% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.02% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.02% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.03% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 51.04% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.04% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.05% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.05% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.06% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 51.07% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.08% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.08% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 51.09% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.09% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.10% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.10% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.11% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 51.12% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.12% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.13% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.13% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.14% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 51.15% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.16% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.16% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.16% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.17% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.17% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.18% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.18% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.19% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 51.20% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.20% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.21% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.21% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.22% done, estimate finish Sat Mar 9 11:50:27 2013 >=== last message repeated 2 times. === > 51.23% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.24% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.24% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.25% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.25% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.26% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.26% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.27% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.27% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.28% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.29% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.29% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.30% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.30% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.31% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.32% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.32% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.33% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.33% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.34% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.35% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 51.36% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.37% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.37% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.38% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.38% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.39% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.40% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.40% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.41% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.41% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.42% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.43% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 51.44% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.45% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.45% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.46% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.46% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.47% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.48% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.48% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.49% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.49% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.50% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.51% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 51.52% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.53% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.53% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.54% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.55% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.56% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.56% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.57% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.57% done, estimate finish Sat Mar 9 11:50:24 2013 > 51.58% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.59% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 51.60% done, estimate finish Sat Mar 9 11:50:24 2013 > 51.60% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.61% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.61% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.62% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.63% done, estimate finish Sat Mar 9 11:50:24 2013 > 51.63% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.64% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.64% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.65% done, estimate finish Sat Mar 9 11:50:27 2013 > 51.65% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.66% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.67% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 51.68% done, estimate finish Sat Mar 9 11:50:24 2013 > 51.68% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.69% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.69% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.70% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 51.71% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.72% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.72% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.73% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.73% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.74% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.75% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 51.76% done, estimate finish Sat Mar 9 11:50:24 2013 > 51.76% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.77% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.77% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.78% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 51.79% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.80% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.80% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.81% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.81% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.82% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.83% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 51.84% done, estimate finish Sat Mar 9 11:50:24 2013 > 51.84% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.85% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.85% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.86% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.86% done, estimate finish Sat Mar 9 11:50:24 2013 > 51.87% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.88% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.88% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.89% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.89% done, estimate finish Sat Mar 9 11:50:24 2013 > 51.90% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.91% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 51.92% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.93% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.93% done, estimate finish Sat Mar 9 11:50:25 2013 > 51.94% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.94% done, estimate finish Sat Mar 9 11:50:24 2013 > 51.95% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.96% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.97% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 51.97% done, estimate finish Sat Mar 9 11:50:26 2013 > 51.98% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 51.99% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 52.00% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.00% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.01% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.01% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.02% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.02% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.03% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 52.04% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.05% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.05% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.06% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 52.07% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 52.08% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.08% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.09% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.09% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.10% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.10% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.11% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.11% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.12% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.13% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.13% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.14% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 52.15% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 52.16% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.16% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.17% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.17% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.18% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.18% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.19% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 52.20% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.21% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.21% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.22% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 52.23% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 52.24% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.24% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.25% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.25% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.26% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.26% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.27% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.27% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.28% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.29% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.29% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.30% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.30% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.31% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 52.32% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.32% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.33% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.33% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.34% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.34% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.35% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.35% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.36% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.37% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.37% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.38% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.38% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.39% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.40% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.40% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.40% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.41% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.41% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.42% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.42% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.43% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.43% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.44% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.45% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.45% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.46% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.46% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.47% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.48% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.48% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.49% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.49% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.50% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.50% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.51% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.51% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.52% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.53% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.53% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.54% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.54% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.55% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.56% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.56% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.57% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.57% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.58% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.58% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.59% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.59% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.60% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.61% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.61% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.62% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.62% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.63% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.64% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.64% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.65% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.65% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.66% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.67% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 52.68% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.69% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.69% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.70% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.70% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.71% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.72% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 52.73% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.74% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.75% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 52.76% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.77% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.77% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.78% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.78% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.79% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.80% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.80% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 52.81% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.82% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.83% done, estimate finish Sat Mar 9 11:50:24 2013 > 52.83% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 52.84% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.85% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.85% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.86% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.86% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.87% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.88% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.88% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.89% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.90% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.91% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.91% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.92% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.93% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.93% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.94% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.94% done, estimate finish Sat Mar 9 11:50:25 2013 > 52.95% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.96% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.96% done, estimate finish Sat Mar 9 11:50:26 2013 > 52.97% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.98% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 52.99% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 52.99% done, estimate finish Sat Mar 9 11:50:26 2013 > 53.00% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.01% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.01% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.02% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.02% done, estimate finish Sat Mar 9 11:50:26 2013 > 53.02% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.03% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.04% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 53.05% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.06% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.07% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.07% done, estimate finish Sat Mar 9 11:50:26 2013 > 53.08% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.09% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.09% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.10% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.10% done, estimate finish Sat Mar 9 11:50:26 2013 > 53.10% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.11% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.12% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 53.13% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.14% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.15% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.15% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.16% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.17% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.17% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.18% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.18% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.19% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.20% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 53.21% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.22% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.22% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.23% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.23% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.24% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.25% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.25% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.26% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.26% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.27% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.28% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 53.29% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.29% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.30% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.30% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.31% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 53.32% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.33% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.33% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.34% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.34% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.35% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.36% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.37% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.37% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.37% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.38% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.38% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.39% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 53.40% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.40% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.41% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.41% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.42% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.42% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.43% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.44% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.45% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.45% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.45% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.46% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.46% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.47% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 53.48% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.48% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.49% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.49% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.50% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.50% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.51% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.52% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.53% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.53% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 53.54% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.54% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.55% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 53.56% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.56% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.57% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.57% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.58% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.58% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.59% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 53.60% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.61% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.61% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 53.62% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.62% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.63% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 53.64% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.64% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.65% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.66% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.66% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.67% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.67% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.68% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.69% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.69% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 53.70% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.70% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.71% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.72% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 53.72% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.73% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.74% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.74% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.75% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.75% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.76% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.77% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.77% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 53.78% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.78% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.79% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.80% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 53.81% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.82% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.82% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.83% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.83% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.84% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.85% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.85% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 53.86% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.86% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.87% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.88% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 53.89% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.90% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.90% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.91% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.91% done, estimate finish Sat Mar 9 11:50:25 2013 > 53.92% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.93% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.93% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 53.94% done, estimate finish Sat Mar 9 11:50:23 2013 > 53.94% done, estimate finish Sat Mar 9 11:50:24 2013 > 53.95% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.96% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 53.97% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.98% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 53.99% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 53.99% done, estimate finish Sat Mar 9 11:50:25 2013 > 54.00% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.01% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.01% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.02% done, estimate finish Sat Mar 9 11:50:25 2013 > 54.02% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.03% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.04% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 54.05% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.06% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.07% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.07% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.08% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.09% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.09% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.10% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.10% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.11% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.12% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 54.13% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.14% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.15% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.15% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.16% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.17% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.17% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.18% done, estimate finish Sat Mar 9 11:50:25 2013 > 54.18% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.19% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.20% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 54.21% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.22% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.22% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.23% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.23% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.24% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.25% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.25% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.26% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.26% done, estimate finish Sat Mar 9 11:50:25 2013 > 54.26% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.27% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.28% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 54.29% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.29% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.30% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.30% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.31% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 54.32% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.33% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.33% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.34% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.34% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.35% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.36% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 54.37% done, estimate finish Sat Mar 9 11:50:22 2013 > 54.37% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.38% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.38% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.39% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 54.40% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.41% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.41% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.42% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.42% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.43% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.44% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 54.45% done, estimate finish Sat Mar 9 11:50:22 2013 > 54.45% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.46% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.46% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.47% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 54.48% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.49% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.49% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.50% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.50% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.51% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.52% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 54.53% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.54% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.54% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.55% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 54.56% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.57% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.57% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.58% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.58% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.59% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.60% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 3 times. === > 54.61% done, estimate finish Sat Mar 9 11:50:22 2013 > 54.61% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.62% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.62% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.63% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.63% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.64% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.65% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.66% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.66% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.67% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.68% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.69% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.69% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.70% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.70% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.71% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.71% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.72% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.73% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.74% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.74% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.75% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.76% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.77% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.77% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.78% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.78% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.79% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.79% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.80% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.81% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.82% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.82% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.83% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.84% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.85% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.85% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.86% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.86% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.87% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.87% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.88% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.89% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.90% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.90% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.91% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.92% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.93% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.93% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.94% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.94% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.95% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.95% done, estimate finish Sat Mar 9 11:50:24 2013 > 54.96% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.97% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 54.98% done, estimate finish Sat Mar 9 11:50:23 2013 > 54.98% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 54.99% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.00% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 55.01% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.01% done, estimate finish Sat Mar 9 11:50:22 2013 > 55.01% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.02% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.02% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.03% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 55.04% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.05% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 55.06% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.06% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.07% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.08% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.08% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.09% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.10% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.10% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.11% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 55.12% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.13% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.13% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.14% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.14% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.15% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.15% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.16% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.16% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.17% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.18% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.18% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.19% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 55.20% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.21% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.21% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.22% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.22% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.23% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.23% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.24% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.24% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.25% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.26% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.26% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.27% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 55.28% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.29% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.29% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.30% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.30% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.31% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.31% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.32% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.32% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.33% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.34% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.34% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.35% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 55.36% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.37% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 55.38% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.38% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.39% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.39% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.40% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 55.41% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.42% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.42% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.43% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.43% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.44% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.45% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.45% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.46% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.46% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.47% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.47% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.48% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 55.49% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.50% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.50% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.51% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.51% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.52% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.53% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.53% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.54% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.54% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.55% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.55% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.56% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.56% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.57% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.58% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 55.59% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.59% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.60% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.61% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 55.62% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.62% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.63% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.63% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.64% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.64% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.65% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.66% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.66% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 55.67% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.67% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.68% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.69% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.69% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.70% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.70% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.71% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.71% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.72% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.72% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.73% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.74% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.74% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 55.75% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.75% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.76% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.77% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.77% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.78% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.78% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.79% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.79% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.80% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.80% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.81% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.82% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.82% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 55.83% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.83% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.84% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 55.85% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.85% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.86% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.87% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.87% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.88% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 55.89% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.90% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.90% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 55.91% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.91% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.92% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.93% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.93% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.93% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.94% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.95% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.95% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.96% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 55.97% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 55.98% done, estimate finish Sat Mar 9 11:50:24 2013 > 55.98% done, estimate finish Sat Mar 9 11:50:23 2013 > 55.98% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.99% done, estimate finish Sat Mar 9 11:50:25 2013 > 55.99% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.00% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.01% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.01% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.02% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.03% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.03% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.04% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.05% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.06% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.06% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.06% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.07% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.07% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.08% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.09% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.09% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.10% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.11% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.11% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.12% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.13% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.14% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.14% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.15% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.15% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.16% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.17% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.17% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.18% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.19% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.19% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.20% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.21% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.22% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.22% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.23% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.23% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.24% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.25% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.25% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.26% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.27% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.27% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.28% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.28% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.29% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.30% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.30% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.31% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.31% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.32% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.33% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.33% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.34% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.35% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.36% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.36% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.37% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.38% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.38% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.38% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.39% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.39% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.40% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.41% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 56.41% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.42% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.43% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.44% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.44% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.44% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.45% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.46% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.46% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.46% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.47% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.47% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.48% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.49% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 56.49% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.50% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.51% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.52% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.52% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.52% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.53% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.54% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.54% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.54% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.55% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.55% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.56% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.57% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 56.57% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.58% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.59% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.59% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.60% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.60% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.60% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.61% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.62% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.62% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.63% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.63% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.64% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.65% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.65% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.66% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.67% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.67% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.68% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.68% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.68% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.69% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.70% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.70% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.71% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.71% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.72% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.73% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.73% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.74% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.75% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.75% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.76% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.76% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.77% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.78% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.78% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.79% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.79% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.80% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.81% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.81% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.82% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.83% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.83% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.84% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.84% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.85% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.86% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.86% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.87% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.87% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.88% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.89% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.89% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.90% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.91% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.91% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.92% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 56.92% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.93% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.94% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.94% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.95% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.95% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.96% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.97% done, estimate finish Sat Mar 9 11:50:23 2013 > 56.97% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.98% done, estimate finish Sat Mar 9 11:50:25 2013 > 56.98% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 56.99% done, estimate finish Sat Mar 9 11:50:24 2013 > 56.99% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.00% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.00% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.01% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.02% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.02% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.03% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.03% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.04% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.05% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.05% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.06% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.06% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.07% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.07% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.08% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.08% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.09% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.10% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 57.11% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.11% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.12% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.13% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 57.14% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.15% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.15% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.16% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.16% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.17% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.18% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 57.19% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.19% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.20% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.21% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 57.22% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.23% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.23% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.24% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.24% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.24% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.25% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.26% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.27% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.27% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.28% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.29% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.30% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.31% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.31% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.32% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.33% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.34% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.35% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.35% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.36% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.36% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.37% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.38% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.39% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.40% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.41% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.42% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.42% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.43% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.43% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.44% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.44% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.45% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.46% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.47% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.47% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.48% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.49% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.50% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.50% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.51% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.51% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.52% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.52% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.53% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.54% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.55% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.56% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.56% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.57% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.58% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.58% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.59% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.59% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.60% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.60% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.61% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.62% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.63% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.63% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.64% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.64% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.65% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.66% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.67% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.67% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.68% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.68% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.69% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.70% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.71% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.71% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.72% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.72% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.73% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.74% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.75% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.75% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.76% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.76% done, estimate finish Sat Mar 9 11:50:23 2013 > 57.77% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.78% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.79% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.79% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.80% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.80% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.81% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.82% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.83% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.83% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.84% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.84% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.85% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.86% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.87% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.87% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.88% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.88% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.89% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.90% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.91% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.91% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.92% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.92% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.93% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.94% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 57.95% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.95% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.96% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.96% done, estimate finish Sat Mar 9 11:50:24 2013 > 57.97% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 57.98% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 57.99% done, estimate finish Sat Mar 9 11:50:25 2013 > 57.99% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.00% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.00% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.01% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.02% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.03% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.03% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.04% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.04% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.05% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 58.06% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.07% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.08% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.08% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.09% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.10% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.11% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.11% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.12% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.12% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.13% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 58.14% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.15% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.16% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.16% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.17% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.18% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.19% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.19% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.20% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.20% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.21% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 58.22% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.23% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.24% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.24% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.25% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.26% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.27% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.27% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.28% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.28% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.29% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.30% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.31% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.32% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.32% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.33% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.34% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.35% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.35% done, estimate finish Sat Mar 9 11:50:23 2013 > 58.35% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.36% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.36% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.37% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.38% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.39% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.40% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.40% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.41% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.42% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.43% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.44% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.44% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.45% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.45% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.46% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.47% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.48% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.48% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.49% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.49% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.50% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.51% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.51% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.52% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.52% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.53% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.54% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.55% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.56% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.56% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.57% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.57% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.58% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.58% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.59% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.60% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.60% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.61% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.61% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.62% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.63% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.63% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.64% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.64% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.65% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.65% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.66% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.66% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.67% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.68% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.68% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.69% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.69% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.70% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.71% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.71% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.72% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.72% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.73% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.73% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.74% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 58.75% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.76% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.76% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.77% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.77% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.78% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.79% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 58.80% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.81% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.81% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.82% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 58.83% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.84% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.84% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.85% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.85% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.86% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.87% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 58.88% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.89% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.89% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.90% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 58.91% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.92% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.92% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 58.93% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.93% done, estimate finish Sat Mar 9 11:50:25 2013 > 58.94% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 58.95% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.95% done, estimate finish Sat Mar 9 11:50:26 2013 > 58.96% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.97% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 58.97% done, estimate finish Sat Mar 9 11:50:24 2013 > 58.98% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 58.99% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.00% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.00% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 59.01% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.01% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.02% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 59.03% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.03% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.04% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.05% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.05% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.06% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.06% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.07% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.08% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.08% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 59.09% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.09% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.10% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 59.11% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.11% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.12% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.13% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.13% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.14% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.14% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.15% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.16% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.16% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 59.17% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.17% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.18% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 59.19% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.19% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.20% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.21% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.21% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.22% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.22% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.23% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.24% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.24% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 59.25% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.25% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.26% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 59.27% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.27% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.28% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.29% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.29% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.30% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.30% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.31% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.32% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.32% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 59.33% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.33% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.34% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.35% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 59.36% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.37% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.37% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.38% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.38% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.39% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.40% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.40% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 59.41% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.41% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.42% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.43% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 59.43% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.44% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.45% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.45% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.46% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.46% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.47% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.48% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.48% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 59.49% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.49% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.50% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.51% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.51% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 59.52% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.53% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.53% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.54% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.54% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.55% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.56% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.56% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 59.57% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.57% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.58% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.59% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 3 times. === > 59.60% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.61% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.62% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 59.62% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.63% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.64% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.64% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 59.65% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.66% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.67% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.67% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 59.68% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.69% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.70% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 59.70% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.71% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.72% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.72% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 59.73% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.74% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.75% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.75% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 59.76% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.77% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.77% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.78% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.78% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.78% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.79% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.80% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.80% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 59.81% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.82% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.83% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.83% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 59.84% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.85% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.85% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.86% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.86% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.86% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.87% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.88% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.88% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.89% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.89% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.90% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.91% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 59.91% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.92% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.93% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.93% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.94% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.94% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.94% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.95% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.96% done, estimate finish Sat Mar 9 11:50:25 2013 > 59.96% done, estimate finish Sat Mar 9 11:50:24 2013 > 59.97% done, estimate finish Sat Mar 9 11:50:26 2013 > 59.97% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.98% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 59.99% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 59.99% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.00% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.01% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.01% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.02% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.02% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.02% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.03% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.04% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.04% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.05% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.05% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.06% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.07% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 60.07% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.08% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.09% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.09% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.10% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 60.10% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.11% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.12% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.12% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.13% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.13% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.14% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.15% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.15% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.15% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.16% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.17% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.17% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.18% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 60.18% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.19% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.20% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 60.21% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.21% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.22% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.23% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.23% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.24% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.25% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.25% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.26% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 60.26% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.27% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.28% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 60.29% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.29% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.30% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.31% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.31% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.32% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.33% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.33% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.34% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 60.34% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.35% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.36% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 60.37% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.37% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.38% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.39% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.39% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.40% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.41% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.41% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.42% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.42% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.43% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.44% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 60.45% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.45% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.46% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.47% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.47% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.48% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.49% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.49% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.50% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.50% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.51% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.52% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.52% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.53% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.53% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.54% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.55% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 60.56% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.57% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.57% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.58% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.58% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.59% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.60% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.60% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.61% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.61% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.62% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.62% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.63% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 60.64% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.65% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.65% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.66% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.66% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.67% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.68% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.68% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.69% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.69% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.70% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.70% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.71% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.71% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.72% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.73% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.73% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.74% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.74% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.75% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.76% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 60.77% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.77% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.78% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.78% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.79% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 60.80% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.81% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.81% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.82% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.82% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.83% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.84% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.84% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.85% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.86% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.86% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.87% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 60.88% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.89% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.89% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.90% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.90% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.91% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.92% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 60.93% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.94% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 60.94% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.95% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 60.96% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 60.97% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.97% done, estimate finish Sat Mar 9 11:50:24 2013 > 60.98% done, estimate finish Sat Mar 9 11:50:26 2013 > 60.98% done, estimate finish Sat Mar 9 11:50:25 2013 > 60.99% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 61.00% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.00% done, estimate finish Sat Mar 9 11:50:26 2013 > 61.01% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.02% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.02% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.03% done, estimate finish Sat Mar 9 11:50:26 2013 >=== last message repeated 2 times. === > 61.04% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 61.05% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.05% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.06% done, estimate finish Sat Mar 9 11:50:26 2013 > 61.06% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.07% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 61.08% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.08% done, estimate finish Sat Mar 9 11:50:26 2013 > 61.09% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.10% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.10% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.11% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.11% done, estimate finish Sat Mar 9 11:50:26 2013 > 61.12% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 61.13% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.14% done, estimate finish Sat Mar 9 11:50:26 2013 > 61.14% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.15% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 61.16% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.16% done, estimate finish Sat Mar 9 11:50:26 2013 > 61.17% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.18% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.18% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.19% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.19% done, estimate finish Sat Mar 9 11:50:26 2013 > 61.20% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.21% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.21% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.22% done, estimate finish Sat Mar 9 11:50:26 2013 > 61.22% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.23% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 61.24% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.25% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.26% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.26% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.27% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.27% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.28% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.29% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.29% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.30% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.30% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.31% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 61.32% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.33% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.33% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.34% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.34% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.35% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.36% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.37% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.37% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.38% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.39% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 61.40% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.41% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.41% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.42% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.42% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.43% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.44% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.45% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.45% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.46% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.46% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.47% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 3 times. === > 61.48% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.49% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.50% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.50% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.51% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.52% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.53% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.53% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.54% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.55% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.56% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 61.57% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.58% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.58% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.59% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.60% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.61% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.61% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.62% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.62% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.63% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.64% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 61.65% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.65% done, estimate finish Sat Mar 9 11:50:23 2013 > 61.66% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.66% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.67% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.68% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.68% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.69% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.69% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.70% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.71% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.72% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 61.73% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.74% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.74% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.75% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.76% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.77% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.77% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.78% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.79% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.80% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 61.81% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.81% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.82% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.82% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.83% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.84% done, estimate finish Sat Mar 9 11:50:23 2013 > 61.84% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.85% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.85% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.86% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.86% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.87% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.88% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 61.89% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.89% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.90% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.91% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 61.92% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.93% done, estimate finish Sat Mar 9 11:50:25 2013 > 61.93% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.94% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 61.95% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 61.96% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 61.97% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.97% done, estimate finish Sat Mar 9 11:50:23 2013 > 61.98% done, estimate finish Sat Mar 9 11:50:23 2013 > 61.98% done, estimate finish Sat Mar 9 11:50:24 2013 > 61.99% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 62.00% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.00% done, estimate finish Sat Mar 9 11:50:25 2013 > 62.01% done, estimate finish Sat Mar 9 11:50:25 2013 > 62.01% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 62.02% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 62.03% done, estimate finish Sat Mar 9 11:50:25 2013 >=== last message repeated 2 times. === > 62.04% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 62.05% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.05% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.06% done, estimate finish Sat Mar 9 11:50:25 2013 > 62.06% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.07% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 62.08% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.09% done, estimate finish Sat Mar 9 11:50:25 2013 > 62.09% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 62.10% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 62.11% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.11% done, estimate finish Sat Mar 9 11:50:25 2013 > 62.12% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 62.13% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.13% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.14% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.14% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.15% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 62.16% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.17% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.17% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 62.18% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 62.19% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.20% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 62.21% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.21% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.22% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.23% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 62.24% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.25% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.25% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.26% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 3 times. === > 62.27% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.28% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.28% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.28% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.29% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.29% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.30% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.31% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.31% done, estimate finish Sat Mar 9 11:50:24 2013 >=== last message repeated 2 times. === > 62.32% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.33% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.34% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.34% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.34% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.35% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.36% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.36% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.36% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.37% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.37% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.38% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.39% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.39% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.39% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.40% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.41% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.42% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.42% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.42% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.43% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.44% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.44% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.44% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.45% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.45% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.46% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.47% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.47% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 2 times. === > 62.48% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.49% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.50% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.50% done, estimate finish Sat Mar 9 11:50:24 2013 > 62.50% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.51% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.52% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.52% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 2 times. === > 62.53% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.53% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.54% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.55% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.55% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 2 times. === > 62.56% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.57% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.58% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 62.59% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.60% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.60% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.61% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 2 times. === > 62.61% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.62% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.63% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.63% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 2 times. === > 62.64% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.64% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.65% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.66% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 62.67% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.68% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.68% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.69% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 62.70% done, estimate finish Sat Mar 9 11:50:21 2013 > 62.70% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.71% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.71% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 2 times. === > 62.72% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.72% done, estimate finish Sat Mar 9 11:50:21 2013 > 62.73% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.74% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 62.75% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.75% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.76% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.76% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.77% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 62.78% done, estimate finish Sat Mar 9 11:50:21 2013 > 62.78% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.79% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 62.80% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.80% done, estimate finish Sat Mar 9 11:50:21 2013 > 62.81% done, estimate finish Sat Mar 9 11:50:23 2013 >=== last message repeated 2 times. === > 62.82% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 62.83% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.83% done, estimate finish Sat Mar 9 11:50:21 2013 > 62.84% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.84% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.85% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 62.86% done, estimate finish Sat Mar 9 11:50:21 2013 > 62.86% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.87% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 62.88% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.88% done, estimate finish Sat Mar 9 11:50:21 2013 > 62.89% done, estimate finish Sat Mar 9 11:50:21 2013 > 62.89% done, estimate finish Sat Mar 9 11:50:23 2013 > 62.90% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 62.91% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.91% done, estimate finish Sat Mar 9 11:50:21 2013 > 62.92% done, estimate finish Sat Mar 9 11:50:21 2013 > 62.92% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.93% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 62.94% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 62.95% done, estimate finish Sat Mar 9 11:50:21 2013 > 62.95% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.96% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 2 times. === > 62.96% done, estimate finish Sat Mar 9 11:50:21 2013 > 62.97% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 62.98% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 62.99% done, estimate finish Sat Mar 9 11:50:22 2013 > 62.99% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.00% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.00% done, estimate finish Sat Mar 9 11:50:22 2013 > 63.01% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 63.02% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.03% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.03% done, estimate finish Sat Mar 9 11:50:22 2013 > 63.04% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 2 times. === > 63.04% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.05% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.06% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 63.07% done, estimate finish Sat Mar 9 11:50:22 2013 > 63.07% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.08% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.09% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 63.10% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.11% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.11% done, estimate finish Sat Mar 9 11:50:22 2013 > 63.12% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 2 times. === > 63.12% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.13% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.14% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.14% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 2 times. === > 63.15% done, estimate finish Sat Mar 9 11:50:22 2013 > 63.15% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.16% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.17% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 3 times. === > 63.18% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.19% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.20% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 2 times. === > 63.20% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.21% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.22% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.22% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 2 times. === > 63.23% done, estimate finish Sat Mar 9 11:50:22 2013 > 63.23% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.24% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.25% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.25% done, estimate finish Sat Mar 9 11:50:22 2013 >=== last message repeated 2 times. === > 63.26% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.27% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.28% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.28% done, estimate finish Sat Mar 9 11:50:22 2013 > 63.28% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.29% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.30% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.30% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.31% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.31% done, estimate finish Sat Mar 9 11:50:22 2013 > 63.31% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.32% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.33% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.33% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.33% done, estimate finish Sat Mar 9 11:50:22 2013 > 63.34% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.35% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.36% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.36% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.37% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.38% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.38% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.39% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.39% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.40% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.41% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 63.42% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.43% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.44% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.44% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.45% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.46% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.46% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.47% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.47% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.48% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.49% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 63.50% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.50% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.51% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.52% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 63.53% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.53% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.54% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.54% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.55% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 63.56% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.57% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.58% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.58% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.59% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.60% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 63.61% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.61% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.62% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.62% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.63% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 63.64% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.64% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.65% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.66% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.66% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.67% done, estimate finish Sat Mar 9 11:50:21 2013 >=== last message repeated 2 times. === > 63.68% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 63.69% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.69% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.70% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.70% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.71% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 63.72% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 63.73% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.74% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.74% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.75% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 63.76% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 63.77% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.77% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.78% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.78% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.79% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 63.80% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 63.81% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.81% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.82% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.82% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.83% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 63.84% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.85% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.85% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.86% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.86% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.87% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 63.88% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 63.89% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.89% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.90% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.90% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.91% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 63.92% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.93% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.93% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.94% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.94% done, estimate finish Sat Mar 9 11:50:20 2013 > 63.95% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 63.96% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.96% done, estimate finish Sat Mar 9 11:50:21 2013 > 63.97% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.98% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 63.98% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.99% done, estimate finish Sat Mar 9 11:50:19 2013 > 63.99% done, estimate finish Sat Mar 9 11:50:21 2013 > 64.00% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.01% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.01% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.02% done, estimate finish Sat Mar 9 11:50:21 2013 > 64.02% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.03% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 64.04% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.04% done, estimate finish Sat Mar 9 11:50:21 2013 > 64.05% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.06% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.06% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.07% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.08% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.09% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.09% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.10% done, estimate finish Sat Mar 9 11:50:21 2013 > 64.10% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.11% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 64.12% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.12% done, estimate finish Sat Mar 9 11:50:21 2013 > 64.13% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.14% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.14% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.15% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.16% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.17% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.17% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.18% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.18% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.19% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 3 times. === > 64.20% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.21% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.21% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.22% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.22% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.23% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.24% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.25% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.25% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.26% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.27% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.28% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.28% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.29% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.29% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.30% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.30% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.31% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.32% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.33% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.33% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.34% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.35% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.36% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.36% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.37% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.37% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.38% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.38% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.39% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.40% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.40% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.41% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.41% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.42% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.43% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.44% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.44% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.45% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.46% done, estimate finish Sat Mar 9 11:50:20 2013 >=== last message repeated 2 times. === > 64.46% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.47% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.48% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.48% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.49% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.49% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.50% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.51% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.51% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.52% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.52% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.53% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.54% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.54% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.55% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 3 times. === > 64.56% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.56% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.57% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.57% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.58% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.59% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.59% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.60% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.60% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.61% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.62% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.62% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.63% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 3 times. === > 64.64% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.64% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.65% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.65% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.66% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.67% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 64.68% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.68% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.69% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.70% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.70% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.71% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 3 times. === > 64.72% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.72% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.73% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.73% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.74% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.75% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 64.76% done, estimate finish Sat Mar 9 11:50:20 2013 > 64.76% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.77% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.78% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 64.79% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 3 times. === > 64.80% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.80% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.81% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.81% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.82% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.83% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 64.84% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.84% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.85% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.86% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 64.87% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 3 times. === > 64.88% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.88% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.89% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 64.90% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 3 times. === > 64.91% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 64.92% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.92% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.93% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.94% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 64.95% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.95% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 64.96% done, estimate finish Sat Mar 9 11:50:19 2013 > 64.96% done, estimate finish Sat Mar 9 11:50:18 2013 > 64.97% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 64.98% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 3 times. === > 64.99% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.00% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.00% done, estimate finish Sat Mar 9 11:50:19 2013 > 65.01% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 65.02% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.03% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.03% done, estimate finish Sat Mar 9 11:50:19 2013 > 65.04% done, estimate finish Sat Mar 9 11:50:19 2013 > 65.04% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.05% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.06% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.06% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.06% done, estimate finish Sat Mar 9 11:50:19 2013 > 65.07% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.08% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.08% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.09% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 65.10% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.11% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.11% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.12% done, estimate finish Sat Mar 9 11:50:19 2013 > 65.12% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.13% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.14% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.14% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.14% done, estimate finish Sat Mar 9 11:50:19 2013 > 65.15% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.16% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.16% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.17% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.17% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.18% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.19% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.19% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.20% done, estimate finish Sat Mar 9 11:50:19 2013 > 65.20% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.21% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.22% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.22% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.23% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.24% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.25% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.25% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.26% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.27% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.27% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.28% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.28% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.29% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.30% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.30% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.31% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.32% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.33% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.34% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.35% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.35% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.36% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.37% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.38% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.38% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.39% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.39% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.40% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.41% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.42% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.43% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.43% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.44% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.45% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.46% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.46% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.47% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.47% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.48% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.49% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.50% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.51% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.52% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.53% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.54% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.54% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.55% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.55% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.56% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.57% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.58% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.58% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.59% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.59% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.60% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.61% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 65.62% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.62% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.63% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.64% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.64% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.65% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.66% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.66% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.67% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.67% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.68% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.69% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.69% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.70% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.70% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.71% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.72% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.72% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.73% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.74% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.74% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.75% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.75% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.76% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.77% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.77% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.78% done, estimate finish Sat Mar 9 11:50:18 2013 > 65.78% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.79% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.80% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 65.81% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.82% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.82% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.83% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.83% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.84% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.85% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.85% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.86% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.86% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.87% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.88% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 65.89% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.90% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.90% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.91% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 65.92% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.93% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.93% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.94% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.94% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.95% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 65.96% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 65.97% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.97% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 65.98% done, estimate finish Sat Mar 9 11:50:17 2013 > 65.98% done, estimate finish Sat Mar 9 11:50:16 2013 > 65.99% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.00% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.01% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.01% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.02% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.03% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.04% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.05% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.05% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.06% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.06% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.07% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.08% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.09% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.09% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.10% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.11% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.12% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.13% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.13% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.14% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.14% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.15% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.15% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.16% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.17% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.18% done, estimate finish Sat Mar 9 11:50:18 2013 > 66.18% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.19% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.20% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.20% done, estimate finish Sat Mar 9 11:50:18 2013 > 66.21% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.22% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.22% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.23% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.23% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.24% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.25% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.26% done, estimate finish Sat Mar 9 11:50:18 2013 > 66.26% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.27% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.28% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.29% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.30% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.30% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.31% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.31% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.32% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.33% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.34% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.34% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.35% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.36% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.37% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.38% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.38% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.39% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.40% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.41% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.42% done, estimate finish Sat Mar 9 11:50:18 2013 > 66.42% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.43% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.44% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.44% done, estimate finish Sat Mar 9 11:50:18 2013 > 66.45% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.46% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.46% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.47% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.48% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.49% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.50% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.50% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.51% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.52% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.53% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.53% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.54% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.54% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.55% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.56% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.57% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.57% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.58% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.59% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.60% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.61% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.61% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.62% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.62% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.63% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.64% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.65% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.65% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.66% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.67% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 66.68% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.69% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.69% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.70% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.70% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.71% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.72% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.73% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.73% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.74% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.75% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.75% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.76% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.77% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.77% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.78% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.78% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.79% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.80% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.80% done, estimate finish Sat Mar 9 11:50:15 2013 > 66.81% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.81% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.82% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.83% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.83% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.84% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.85% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.86% done, estimate finish Sat Mar 9 11:50:15 2013 > 66.86% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.86% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.87% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.88% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.88% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.89% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.89% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.90% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.91% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.91% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.92% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.92% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.93% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.94% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 66.94% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.95% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.96% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.96% done, estimate finish Sat Mar 9 11:50:15 2013 > 66.97% done, estimate finish Sat Mar 9 11:50:17 2013 > 66.97% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.98% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 66.99% done, estimate finish Sat Mar 9 11:50:16 2013 > 66.99% done, estimate finish Sat Mar 9 11:50:17 2013 > 67.00% done, estimate finish Sat Mar 9 11:50:17 2013 > 67.00% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.01% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.02% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.02% done, estimate finish Sat Mar 9 11:50:17 2013 > 67.02% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.03% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.04% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.04% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.05% done, estimate finish Sat Mar 9 11:50:17 2013 > 67.05% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.06% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.07% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.07% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.08% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.08% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.09% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.10% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.10% done, estimate finish Sat Mar 9 11:50:17 2013 > 67.10% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.11% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.12% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.12% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.13% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.13% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.14% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.15% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.15% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.16% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.16% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.17% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.18% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.19% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 67.20% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.20% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.21% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.21% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.22% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.23% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.24% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.24% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.25% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.26% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.27% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 67.28% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.28% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.29% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.29% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.30% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.31% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.32% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.32% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.33% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.34% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.35% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 67.36% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.36% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.37% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.37% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.38% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.39% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.40% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.40% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.41% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.42% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.43% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.43% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.44% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.44% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.45% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 67.46% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.47% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.48% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.48% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.49% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.50% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.51% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.51% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.52% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.52% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.53% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.54% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.54% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.55% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.56% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 67.57% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.58% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.59% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.59% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.60% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.60% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.61% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.62% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.62% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.63% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.64% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 67.65% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.66% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.67% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.67% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.68% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.68% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.69% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.70% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.70% done, estimate finish Sat Mar 9 11:50:14 2013 > 67.70% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.71% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.72% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 67.73% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 67.74% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.75% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.75% done, estimate finish Sat Mar 9 11:50:14 2013 > 67.76% done, estimate finish Sat Mar 9 11:50:14 2013 > 67.76% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.77% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.78% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.78% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 67.79% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.80% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 67.81% done, estimate finish Sat Mar 9 11:50:14 2013 > 67.81% done, estimate finish Sat Mar 9 11:50:16 2013 > 67.82% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.83% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.83% done, estimate finish Sat Mar 9 11:50:14 2013 > 67.84% done, estimate finish Sat Mar 9 11:50:14 2013 > 67.84% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.85% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.86% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.86% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 67.87% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.88% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.89% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.89% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 67.90% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.91% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.91% done, estimate finish Sat Mar 9 11:50:14 2013 > 67.92% done, estimate finish Sat Mar 9 11:50:14 2013 > 67.92% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.93% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.94% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.94% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 67.95% done, estimate finish Sat Mar 9 11:50:14 2013 > 67.95% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.96% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.97% done, estimate finish Sat Mar 9 11:50:15 2013 > 67.97% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 67.98% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.99% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 67.99% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.00% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.01% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.02% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.02% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.03% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.03% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.04% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.05% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.05% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.06% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.07% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.07% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.08% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.08% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.09% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.10% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.10% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.11% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.12% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.13% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.13% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.14% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.15% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.15% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.16% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.17% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.17% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.18% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.18% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.19% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.20% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.21% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.21% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.22% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.23% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.24% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.25% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.26% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.26% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.27% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.28% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.29% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.29% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.30% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.30% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.31% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.32% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.33% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.33% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.34% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.34% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.35% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.36% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.37% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.37% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.38% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.38% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.39% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.40% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.41% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.42% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.42% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.43% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.43% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.44% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.45% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.45% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.46% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.46% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.47% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.48% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.49% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.50% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.50% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.51% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.51% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.52% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.53% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.53% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.54% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.55% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.56% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.57% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.58% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.58% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.59% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.59% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.60% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.61% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.61% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.62% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.62% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.63% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.64% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.65% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.65% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.66% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.66% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.67% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.68% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.69% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.69% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.70% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.71% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.72% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.73% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.73% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.74% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.74% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.75% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.76% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.77% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.77% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.78% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.78% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.79% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.80% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.81% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.81% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.82% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.82% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.83% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.84% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.85% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.85% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.86% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 68.86% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.87% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.88% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.89% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.89% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.90% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.90% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.91% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.92% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.93% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.93% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.94% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.95% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 68.96% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 68.97% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.97% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.98% done, estimate finish Sat Mar 9 11:50:15 2013 > 68.98% done, estimate finish Sat Mar 9 11:50:14 2013 > 68.99% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.00% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.01% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.01% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.02% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.02% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.03% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.04% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.05% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.05% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.06% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.06% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.07% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.08% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.09% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.10% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.11% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.12% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.13% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.13% done, estimate finish Sat Mar 9 11:50:13 2013 > 69.14% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.14% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.15% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.16% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.16% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.17% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.17% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.18% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.19% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.20% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.21% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.21% done, estimate finish Sat Mar 9 11:50:13 2013 > 69.22% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.22% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.23% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.24% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.25% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.26% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.27% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.28% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.29% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.29% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.30% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.30% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.31% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.32% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.32% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.33% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.34% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.35% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.36% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.37% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.37% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.38% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.38% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.39% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.40% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.41% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.42% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.43% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.44% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.45% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.45% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.46% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.46% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.47% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.48% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.48% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.49% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.50% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.51% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.52% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.53% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.53% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.54% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.54% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.55% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.56% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.56% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.57% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.58% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.59% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.60% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.61% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.61% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.62% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.62% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.63% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.64% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.64% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.65% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.66% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.67% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.68% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.69% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.69% done, estimate finish Sat Mar 9 11:50:13 2013 > 69.70% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.70% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.71% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.72% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.72% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.73% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.74% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.75% done, estimate finish Sat Mar 9 11:50:13 2013 > 69.75% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.76% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.77% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.77% done, estimate finish Sat Mar 9 11:50:13 2013 > 69.78% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.78% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.79% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.80% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.80% done, estimate finish Sat Mar 9 11:50:13 2013 > 69.80% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.81% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.82% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 69.83% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 69.84% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.85% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.85% done, estimate finish Sat Mar 9 11:50:13 2013 > 69.86% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.86% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.87% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.88% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.88% done, estimate finish Sat Mar 9 11:50:13 2013 > 69.88% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.89% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.90% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.91% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.91% done, estimate finish Sat Mar 9 11:50:13 2013 > 69.91% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.92% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.93% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.93% done, estimate finish Sat Mar 9 11:50:13 2013 > 69.94% done, estimate finish Sat Mar 9 11:50:15 2013 > 69.94% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.95% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.96% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.96% done, estimate finish Sat Mar 9 11:50:13 2013 > 69.97% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.98% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 69.99% done, estimate finish Sat Mar 9 11:50:14 2013 > 69.99% done, estimate finish Sat Mar 9 11:50:13 2013 > 69.99% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.00% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.01% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.01% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.02% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.02% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.03% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.04% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.04% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.05% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.05% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.06% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.07% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.07% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.08% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.09% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.09% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.10% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.10% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.11% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.12% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.12% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.13% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.13% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.14% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.15% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.15% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.16% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.17% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.18% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 70.19% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.20% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.20% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.21% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.21% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.22% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.23% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.23% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.24% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.25% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.26% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.26% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.27% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.28% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.28% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.29% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.29% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.30% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.31% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.31% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.32% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.33% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.34% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 70.35% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.36% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.36% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.37% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.37% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.38% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.39% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.39% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.40% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.41% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.42% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 70.43% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.43% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.44% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.44% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.45% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.45% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.46% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.47% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.47% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.48% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.48% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.49% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.50% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 70.51% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.52% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.52% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.53% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 70.54% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.55% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.55% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.56% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.56% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.57% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.58% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 70.59% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.60% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.60% done, estimate finish Sat Mar 9 11:50:13 2013 > 70.61% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 70.61% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.62% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.63% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.63% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.64% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.65% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.65% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.66% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.66% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.67% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.68% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.69% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.69% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.69% done, estimate finish Sat Mar 9 11:50:16 2013 > 70.70% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.71% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 70.72% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.72% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.73% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.74% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.74% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.75% done, estimate finish Sat Mar 9 11:50:16 2013 > 70.75% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.76% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.77% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.77% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.77% done, estimate finish Sat Mar 9 11:50:16 2013 > 70.78% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.79% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.80% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.80% done, estimate finish Sat Mar 9 11:50:16 2013 > 70.80% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.81% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.82% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.82% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.83% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.83% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.84% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.85% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.85% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.85% done, estimate finish Sat Mar 9 11:50:16 2013 > 70.86% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.87% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.88% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.88% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.88% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.89% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.90% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.90% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.91% done, estimate finish Sat Mar 9 11:50:16 2013 > 70.91% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.92% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.93% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.93% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 70.94% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.95% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.96% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.96% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.96% done, estimate finish Sat Mar 9 11:50:15 2013 > 70.97% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.98% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 70.98% done, estimate finish Sat Mar 9 11:50:14 2013 > 70.99% done, estimate finish Sat Mar 9 11:50:16 2013 > 70.99% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.00% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.01% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.01% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.01% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.02% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.03% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.04% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.04% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.04% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.05% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.06% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.06% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.07% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.07% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.08% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.09% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.09% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 71.10% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.11% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.12% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.12% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.12% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.13% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.14% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.15% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.15% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.15% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.16% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.17% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.17% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.17% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.18% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.19% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.20% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.20% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.20% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.21% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.22% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.23% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.23% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.23% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.24% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.25% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.25% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.25% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.26% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.27% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.28% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.28% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.28% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.29% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.30% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.31% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.31% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.31% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.32% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.33% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.33% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.33% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.34% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.35% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.36% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.36% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.36% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.37% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.38% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.39% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.39% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.39% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.40% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.41% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.41% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.41% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.42% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.43% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.44% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.44% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.44% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.45% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.46% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.47% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 71.47% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.48% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.49% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.49% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.50% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.50% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.51% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.52% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.52% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.52% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.53% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.54% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.55% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.55% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.55% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.56% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.57% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.57% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.58% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.58% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.59% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.60% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.60% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.60% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.61% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.62% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.63% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.63% done, estimate finish Sat Mar 9 11:50:16 2013 > 71.63% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.64% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.65% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.65% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.66% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.66% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.67% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.68% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 71.68% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.69% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.70% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.71% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 71.71% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.72% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.73% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.73% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.74% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.74% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.75% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.76% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.76% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.76% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.77% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.78% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.79% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 71.79% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.80% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.81% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.81% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.82% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.82% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.83% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.84% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 71.85% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.85% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.86% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.87% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 71.87% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.88% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.89% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.89% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.90% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.90% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.91% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.92% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 71.93% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.93% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.94% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.95% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 71.96% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 71.97% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.97% done, estimate finish Sat Mar 9 11:50:14 2013 > 71.98% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 71.98% done, estimate finish Sat Mar 9 11:50:15 2013 > 71.99% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.00% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.01% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.01% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.02% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.03% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.03% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.04% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.05% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.05% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.06% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.06% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.07% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.08% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.09% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.09% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.10% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.11% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.11% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.12% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.13% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.13% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.14% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.14% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.15% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.16% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.17% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.17% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.18% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.19% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.20% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.20% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.21% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.21% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.22% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.22% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.23% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.24% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.25% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.25% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.26% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.27% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.28% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.28% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.29% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.29% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.30% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 72.31% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.31% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.32% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.33% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.33% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.34% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.35% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.36% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.36% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.37% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.37% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.38% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 72.39% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.40% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.41% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.41% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.42% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.43% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.44% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.44% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.45% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.45% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.46% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.47% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.47% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.48% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.49% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 72.50% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.51% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.52% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.52% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.53% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.53% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.54% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.55% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.55% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.56% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.57% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.57% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.58% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.59% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.60% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.60% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.61% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.61% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.62% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.63% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.63% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.64% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.65% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.65% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.66% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.67% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.68% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.68% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.69% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.69% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.70% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.71% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.71% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.72% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.73% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.73% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.74% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.75% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.76% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.76% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.77% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.77% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.78% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.79% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 72.80% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.81% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.82% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 72.83% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.84% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.84% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.85% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.85% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.86% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.87% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.87% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.88% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.89% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.90% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 72.91% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 72.92% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 72.93% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.93% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.94% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.94% done, estimate finish Sat Mar 9 11:50:15 2013 > 72.95% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 72.96% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.96% done, estimate finish Sat Mar 9 11:50:16 2013 > 72.97% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 72.98% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 72.99% done, estimate finish Sat Mar 9 11:50:14 2013 > 72.99% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.00% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 73.01% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.01% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.02% done, estimate finish Sat Mar 9 11:50:16 2013 > 73.02% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.03% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 73.04% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.04% done, estimate finish Sat Mar 9 11:50:16 2013 > 73.05% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 73.06% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 73.07% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.07% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.08% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 73.09% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.09% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.10% done, estimate finish Sat Mar 9 11:50:16 2013 > 73.10% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.11% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 73.12% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.13% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 73.14% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 73.15% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.15% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.16% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 73.17% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 73.17% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.18% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.19% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 73.20% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.21% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.21% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.22% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 73.23% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.24% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.24% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.25% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 73.25% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.26% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.27% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 73.28% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.29% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.30% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 73.31% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.32% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.32% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.33% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 73.33% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.34% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.35% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.35% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 73.36% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.37% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.38% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 73.39% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.40% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.40% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.41% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 73.41% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.42% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.43% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.43% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 73.44% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.45% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.46% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 73.47% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.48% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.49% done, estimate finish Sat Mar 9 11:50:13 2013 > 73.49% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.49% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.50% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.51% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.52% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.52% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.53% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.54% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.54% done, estimate finish Sat Mar 9 11:50:13 2013 > 73.54% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.55% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.56% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.57% done, estimate finish Sat Mar 9 11:50:13 2013 > 73.57% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.57% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.58% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.59% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.60% done, estimate finish Sat Mar 9 11:50:13 2013 > 73.60% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.61% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.62% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.62% done, estimate finish Sat Mar 9 11:50:13 2013 > 73.62% done, estimate finish Sat Mar 9 11:50:15 2013 > 73.63% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.64% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.65% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 73.65% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.66% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.67% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.68% done, estimate finish Sat Mar 9 11:50:13 2013 > 73.68% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.69% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.70% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.70% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 73.71% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.72% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.73% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 73.74% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.75% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.76% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 73.76% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.77% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.78% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.78% done, estimate finish Sat Mar 9 11:50:13 2013 > 73.79% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 73.79% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.80% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.81% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 73.82% done, estimate finish Sat Mar 9 11:50:13 2013 > 73.82% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.83% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.84% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 73.85% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.86% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.86% done, estimate finish Sat Mar 9 11:50:13 2013 > 73.87% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 73.88% done, estimate finish Sat Mar 9 11:50:13 2013 > 73.88% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.89% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 73.90% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 73.91% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 73.92% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 73.93% done, estimate finish Sat Mar 9 11:50:13 2013 > 73.93% done, estimate finish Sat Mar 9 11:50:12 2013 > 73.94% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.94% done, estimate finish Sat Mar 9 11:50:13 2013 > 73.95% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 73.96% done, estimate finish Sat Mar 9 11:50:13 2013 > 73.96% done, estimate finish Sat Mar 9 11:50:14 2013 > 73.97% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 73.98% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 73.99% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.00% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.01% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.01% done, estimate finish Sat Mar 9 11:50:12 2013 > 74.02% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.02% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.03% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.04% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.04% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.05% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.06% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.07% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.08% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.09% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.09% done, estimate finish Sat Mar 9 11:50:12 2013 > 74.10% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.10% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.11% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.12% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.12% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.13% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.14% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.15% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.16% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.17% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.17% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.18% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.18% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.19% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.20% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.20% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.21% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.22% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.23% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.24% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.25% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.25% done, estimate finish Sat Mar 9 11:50:12 2013 > 74.26% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.26% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.27% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.28% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.28% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.29% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.30% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.31% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.32% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.33% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.33% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.34% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.34% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.35% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.36% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.37% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.38% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.39% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.40% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.41% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.41% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.42% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.42% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.43% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.44% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.44% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.45% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.46% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.47% done, estimate finish Sat Mar 9 11:50:12 2013 > 74.47% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.48% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.49% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.49% done, estimate finish Sat Mar 9 11:50:12 2013 > 74.50% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.50% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.51% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.52% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.53% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.54% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.55% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.56% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.57% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.57% done, estimate finish Sat Mar 9 11:50:12 2013 > 74.58% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.58% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.59% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.60% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.60% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.61% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.62% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.63% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.64% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.65% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.65% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.66% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.66% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.67% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.67% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.68% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.69% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.70% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.70% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.71% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.72% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.73% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.73% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.74% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.74% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.75% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.76% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.76% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.77% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.78% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.79% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.80% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.81% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.81% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.82% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.82% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.83% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.84% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.84% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.85% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.86% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.87% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.88% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.89% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.89% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.90% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.90% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.91% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.92% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.92% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.93% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.94% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 74.95% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 74.96% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.97% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 74.97% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.98% done, estimate finish Sat Mar 9 11:50:14 2013 > 74.98% done, estimate finish Sat Mar 9 11:50:13 2013 > 74.99% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.00% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.00% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.01% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.02% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 75.03% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.04% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.05% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.05% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.06% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.06% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.07% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.08% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.08% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.09% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.10% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 75.11% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.11% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.12% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.13% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.13% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.14% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.14% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.15% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.16% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.16% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.17% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.18% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.19% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.19% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.20% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.21% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.21% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.22% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.22% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.23% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.24% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 75.25% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.26% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.27% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.27% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.28% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.29% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.29% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.30% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.30% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.31% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.32% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 75.33% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.34% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.34% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.35% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 75.36% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.37% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.37% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.38% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.38% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.39% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.40% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 75.41% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.42% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.42% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.43% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.43% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.44% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.45% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.45% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.46% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.46% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.47% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.48% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 75.49% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.50% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.50% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.51% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.51% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.52% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.53% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.53% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.54% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.54% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.55% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.56% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.56% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.57% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.58% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.58% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.59% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.59% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.60% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.61% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.61% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.62% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.62% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.63% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.64% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.64% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.65% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.66% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.67% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.67% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.68% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.69% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.69% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.70% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.70% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.71% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.72% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 75.73% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.74% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.75% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.75% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.76% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.77% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.77% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.78% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.78% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.79% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.80% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.80% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.81% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.81% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.82% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.83% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.83% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.84% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.85% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.85% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.86% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.86% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.87% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.88% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.88% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.89% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.89% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.90% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.91% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.91% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.92% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.93% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.93% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.94% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.94% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.95% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.96% done, estimate finish Sat Mar 9 11:50:13 2013 > 75.96% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.97% done, estimate finish Sat Mar 9 11:50:14 2013 > 75.97% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.98% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 75.99% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 75.99% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.00% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.01% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.01% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.02% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.02% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.03% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.04% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.04% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.05% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.05% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.06% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.07% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.08% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.09% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.09% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.10% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.10% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.11% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.12% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.12% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.13% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.13% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.14% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.15% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.16% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.17% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.17% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.18% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.18% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.19% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.20% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.20% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.21% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.21% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.22% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.23% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.24% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.25% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.25% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.26% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.26% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.27% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.28% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.28% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.29% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.29% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.30% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.31% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.31% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.32% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.33% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.34% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.34% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.35% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.36% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.36% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.37% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.37% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.38% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.39% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.40% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.41% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.41% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.42% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.42% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.43% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.44% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.44% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.45% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.45% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.46% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.47% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.48% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.49% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.49% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.50% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.51% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.52% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.53% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.53% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.54% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.55% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.56% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.57% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.57% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.58% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.59% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.60% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.61% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.61% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.62% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.62% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.63% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.64% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.65% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.65% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.66% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.67% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.68% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.69% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.69% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.70% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.70% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.71% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.72% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.73% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.74% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.75% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.76% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.77% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.77% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.78% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.78% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.79% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.80% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.81% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.82% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.83% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.84% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.85% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.85% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.86% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.86% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.87% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.88% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 76.89% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.90% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.91% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.91% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.92% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.93% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.93% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.94% done, estimate finish Sat Mar 9 11:50:13 2013 > 76.94% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.95% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.96% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.96% done, estimate finish Sat Mar 9 11:50:14 2013 > 76.97% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.98% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 76.99% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 76.99% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.00% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.01% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.01% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.02% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.02% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.03% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.04% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 77.05% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.06% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.07% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 77.07% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.08% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.09% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.09% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.10% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.10% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.11% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.12% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 77.13% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.14% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.15% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 77.15% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.16% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.17% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.17% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.18% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.18% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.19% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.20% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 77.21% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.22% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.23% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 77.23% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.24% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.25% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.25% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.26% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.26% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.27% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.28% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 77.29% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.30% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.31% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 77.31% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.32% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.33% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.33% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.34% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.34% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.35% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.36% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 77.37% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.38% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.39% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.39% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.40% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.41% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.41% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.42% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.43% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.44% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.44% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.45% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.46% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.47% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.47% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.48% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.49% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.49% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.50% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.51% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.52% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.52% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.53% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.54% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.55% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.55% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.56% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.57% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.57% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.58% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.59% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.60% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.60% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.61% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.62% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.63% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.63% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.64% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.65% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.65% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.66% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.67% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.68% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.68% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.69% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.70% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.71% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.71% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.72% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.73% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.73% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.74% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.75% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.76% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.76% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.77% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.78% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.79% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.79% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.80% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.81% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.81% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.82% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.83% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.84% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.84% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.85% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.86% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.87% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.87% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.88% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.89% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.89% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.90% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.91% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.92% done, estimate finish Sat Mar 9 11:50:13 2013 > 77.92% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.93% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.94% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.95% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.95% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.96% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 77.97% done, estimate finish Sat Mar 9 11:50:14 2013 > 77.97% done, estimate finish Sat Mar 9 11:50:15 2013 > 77.98% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 77.99% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.00% done, estimate finish Sat Mar 9 11:50:13 2013 > 78.00% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.01% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.02% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.03% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.03% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.04% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.05% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.05% done, estimate finish Sat Mar 9 11:50:13 2013 > 78.06% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.07% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.08% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 78.09% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.10% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.11% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.11% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.12% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.13% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.13% done, estimate finish Sat Mar 9 11:50:13 2013 > 78.14% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.15% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.16% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 78.17% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.18% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.18% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.19% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.19% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.20% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.21% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.21% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.22% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.23% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.24% done, estimate finish Sat Mar 9 11:50:13 2013 > 78.24% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.25% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.26% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.26% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.27% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.27% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.28% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.29% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.29% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.30% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.31% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.32% done, estimate finish Sat Mar 9 11:50:13 2013 > 78.32% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.33% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.34% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.35% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.35% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.36% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.37% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.37% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.38% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.39% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.40% done, estimate finish Sat Mar 9 11:50:13 2013 > 78.40% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.41% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.42% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.43% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.43% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.44% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.45% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.45% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.46% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.47% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.48% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 78.49% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.50% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.51% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.51% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.52% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.53% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.53% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.54% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.55% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.56% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 78.57% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.58% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.59% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.59% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.60% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.61% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.61% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.62% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.63% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.64% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 78.65% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.66% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.66% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.67% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.67% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.68% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.69% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.69% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 78.70% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.71% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 78.72% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 78.73% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.74% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.74% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.75% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.75% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.76% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.77% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.77% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 78.78% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.79% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.80% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.80% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 78.81% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.82% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.82% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.83% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.83% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.84% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.85% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.85% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 78.86% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.87% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.88% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 78.89% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.90% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.90% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.91% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.91% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.92% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.93% done, estimate finish Sat Mar 9 11:50:14 2013 > 78.93% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 78.94% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.95% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.96% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 78.97% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.98% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 78.98% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.99% done, estimate finish Sat Mar 9 11:50:15 2013 > 78.99% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.00% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.01% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.01% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.02% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.03% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.04% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 79.05% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.06% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.06% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.07% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.07% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.08% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.09% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 79.10% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.11% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.12% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 79.13% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.14% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.14% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.15% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.15% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.16% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.17% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 79.18% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.19% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.19% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.20% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 79.21% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.22% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.22% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.23% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.23% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.24% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.25% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 79.26% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.27% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.27% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.28% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 79.29% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.30% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.31% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.31% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.32% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.33% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 79.34% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.35% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.35% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.36% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 79.37% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.38% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.39% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.39% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.40% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.40% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.41% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.42% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.42% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.43% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.43% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.44% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 79.45% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.45% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.46% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.47% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.47% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.48% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.48% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.49% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.50% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.50% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.51% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.52% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 79.53% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.53% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.54% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.55% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.55% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.56% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.56% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.57% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.58% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.58% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 79.59% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.60% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 79.61% done, estimate finish Sat Mar 9 11:50:14 2013 > 79.61% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.62% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.63% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.63% done, estimate finish Sat Mar 9 11:50:16 2013 > 79.64% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.65% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.65% done, estimate finish Sat Mar 9 11:50:16 2013 > 79.66% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.66% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.67% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 79.68% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 79.69% done, estimate finish Sat Mar 9 11:50:16 2013 > 79.69% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.70% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.71% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 79.72% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.72% done, estimate finish Sat Mar 9 11:50:16 2013 > 79.73% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.74% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.74% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.75% done, estimate finish Sat Mar 9 11:50:17 2013 > 79.75% done, estimate finish Sat Mar 9 11:50:16 2013 > 79.76% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.77% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.77% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.78% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.79% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 79.80% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.80% done, estimate finish Sat Mar 9 11:50:16 2013 > 79.81% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.82% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.82% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.83% done, estimate finish Sat Mar 9 11:50:17 2013 > 79.83% done, estimate finish Sat Mar 9 11:50:16 2013 > 79.84% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.85% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.85% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.86% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.87% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 79.88% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.88% done, estimate finish Sat Mar 9 11:50:16 2013 > 79.89% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.90% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.90% done, estimate finish Sat Mar 9 11:50:15 2013 > 79.91% done, estimate finish Sat Mar 9 11:50:17 2013 > 79.91% done, estimate finish Sat Mar 9 11:50:16 2013 > 79.92% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.93% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.93% done, estimate finish Sat Mar 9 11:50:17 2013 > 79.94% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.95% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 79.96% done, estimate finish Sat Mar 9 11:50:17 2013 > 79.96% done, estimate finish Sat Mar 9 11:50:16 2013 > 79.97% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.98% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 79.98% done, estimate finish Sat Mar 9 11:50:17 2013 > 79.99% done, estimate finish Sat Mar 9 11:50:17 2013 > 79.99% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.00% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.01% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.01% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.02% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.03% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.04% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.04% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.04% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.05% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.06% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.06% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.07% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.07% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.08% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.09% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.09% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.10% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.11% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.12% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.12% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.12% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.13% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.14% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.14% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.15% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.15% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.16% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.17% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.17% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.18% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.19% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.20% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.20% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.20% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.21% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.22% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.22% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.23% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.23% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.24% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.25% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.25% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.26% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.27% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.28% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.28% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.29% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.30% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.30% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.31% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.31% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.32% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.33% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.33% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.34% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.35% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.36% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.36% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.37% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.38% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.39% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.39% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.40% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.41% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.41% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.42% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.43% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.44% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.44% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.45% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.46% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.46% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.47% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.47% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.48% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.49% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.49% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.50% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.51% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.52% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.52% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.53% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.54% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.54% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.55% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.55% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.56% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.57% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 80.58% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.59% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.60% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.60% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.61% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.62% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.62% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.63% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.63% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.64% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.65% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 80.66% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.67% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.67% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.68% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.68% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.69% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.70% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.70% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.71% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.71% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.72% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.73% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 80.74% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.75% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.75% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.76% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.76% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.77% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.78% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.79% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.79% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.80% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.81% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.82% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.82% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.83% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.83% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.84% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.84% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.85% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.86% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.87% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.87% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.88% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.89% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.90% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.90% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.91% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.91% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.92% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.92% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.93% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.94% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.95% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.95% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.96% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.96% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.97% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 80.98% done, estimate finish Sat Mar 9 11:50:17 2013 > 80.98% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 80.99% done, estimate finish Sat Mar 9 11:50:16 2013 > 80.99% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.00% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.00% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.01% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.02% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.03% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.03% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.04% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.04% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.05% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.06% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.06% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.07% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.08% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.09% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 81.10% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.11% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.11% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.12% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.12% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.13% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.14% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.14% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.15% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.16% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.17% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.17% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.18% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.19% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.19% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.20% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.21% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.22% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.22% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.23% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.24% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.25% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.25% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.26% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.27% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.27% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.28% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.28% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.29% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.30% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.30% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.31% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.31% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.32% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.33% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.33% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.34% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.35% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.35% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.36% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.36% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.37% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.38% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.38% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.39% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.39% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.40% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.41% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 81.42% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.43% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.43% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.44% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.44% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.45% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.46% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.46% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.46% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.47% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.48% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.49% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.49% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.50% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.51% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.51% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.52% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.52% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.53% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.54% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.54% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.55% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.56% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.57% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.57% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.58% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.59% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.59% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.60% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 81.61% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.62% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.62% done, estimate finish Sat Mar 9 11:50:18 2013 > 81.62% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.63% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.64% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.65% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 81.65% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.66% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.67% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.67% done, estimate finish Sat Mar 9 11:50:18 2013 > 81.68% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 81.69% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.70% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.70% done, estimate finish Sat Mar 9 11:50:18 2013 > 81.71% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 81.72% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.73% done, estimate finish Sat Mar 9 11:50:18 2013 > 81.73% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.74% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.75% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.75% done, estimate finish Sat Mar 9 11:50:18 2013 > 81.76% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 81.77% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.78% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.78% done, estimate finish Sat Mar 9 11:50:18 2013 > 81.79% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 81.80% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.81% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.81% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.82% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.83% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.83% done, estimate finish Sat Mar 9 11:50:16 2013 > 81.84% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 81.85% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.86% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 81.87% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 81.88% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.89% done, estimate finish Sat Mar 9 11:50:18 2013 > 81.89% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.90% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.91% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 81.92% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 81.93% done, estimate finish Sat Mar 9 11:50:17 2013 > 81.93% done, estimate finish Sat Mar 9 11:50:18 2013 > 81.94% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 81.95% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.95% done, estimate finish Sat Mar 9 11:50:18 2013 > 81.96% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 81.97% done, estimate finish Sat Mar 9 11:50:18 2013 > 81.97% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 81.98% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 81.99% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.00% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 82.00% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.01% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.02% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.03% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 82.03% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.04% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.05% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.05% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.06% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.06% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.07% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.08% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 82.08% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.09% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.10% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.11% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 82.11% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.12% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.13% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.13% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.14% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.14% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.15% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.16% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 82.16% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.17% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.18% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.19% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.19% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.20% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.21% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.21% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.22% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.22% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.23% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.24% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 82.24% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.25% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.26% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.27% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.27% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.28% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.29% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.29% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.30% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.31% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.32% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 82.32% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.33% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.34% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.35% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.35% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.36% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.37% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.37% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.38% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.39% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.40% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 82.41% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.42% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.42% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.43% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.43% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.44% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.45% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.45% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.46% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.47% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.48% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.48% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.49% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.50% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.50% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.51% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.51% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.52% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.53% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.53% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.54% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.55% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.56% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.56% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.57% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.58% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.58% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.59% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.59% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.60% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.61% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.61% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.62% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.63% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.64% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.64% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.65% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.66% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.66% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.67% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.67% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.68% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.69% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.69% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.70% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.71% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.72% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.72% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.73% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.74% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.74% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.75% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.75% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.76% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.77% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.77% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.78% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.79% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.80% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.80% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.81% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.82% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.82% done, estimate finish Sat Mar 9 11:50:17 2013 > 82.83% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.84% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.85% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.85% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.86% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.87% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.88% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.88% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.89% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.90% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.90% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.91% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.92% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.93% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 82.94% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.95% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 82.96% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.96% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.97% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 82.98% done, estimate finish Sat Mar 9 11:50:18 2013 > 82.98% done, estimate finish Sat Mar 9 11:50:19 2013 > 82.99% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.00% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.01% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 83.02% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.03% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.04% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.04% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.05% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.06% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.06% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.07% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.08% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.09% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 83.10% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.11% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.12% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.12% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.13% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.14% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.14% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.15% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.16% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.17% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.17% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.18% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.19% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.20% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.20% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.21% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.22% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.22% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.23% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.24% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.25% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.25% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.26% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.27% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.28% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.28% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.29% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.30% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.30% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.31% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.32% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.33% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.33% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.34% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.35% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.35% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.36% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.36% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.37% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.38% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.38% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.39% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.40% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.41% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.41% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.42% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.43% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.44% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.44% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.45% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.46% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.46% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.47% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.48% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.49% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.49% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.50% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.51% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.52% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.52% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.53% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.54% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.54% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.55% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.56% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.57% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.57% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.58% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.59% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.60% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.60% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.61% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.62% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.62% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.63% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.64% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.65% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.65% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.66% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.67% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.68% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.68% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.69% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.70% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.70% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.71% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.72% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.73% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.73% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.73% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.74% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.75% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.76% done, estimate finish Sat Mar 9 11:50:19 2013 > 83.76% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.77% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.78% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.78% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.79% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.79% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.80% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.81% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.81% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.81% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.82% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.83% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.84% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.84% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.85% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.86% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.86% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.87% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.87% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.88% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.89% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.89% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 83.90% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.91% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 83.92% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 83.93% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.94% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.94% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.95% done, estimate finish Sat Mar 9 11:50:17 2013 > 83.95% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.96% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.97% done, estimate finish Sat Mar 9 11:50:18 2013 > 83.97% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 83.98% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 83.99% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 84.00% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 84.01% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.02% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.02% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.03% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.03% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.04% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.05% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.05% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 84.06% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.06% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.07% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.08% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.08% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 84.09% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.10% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.10% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.11% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.11% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.12% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.13% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.13% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 84.14% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.14% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.15% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.16% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.16% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.16% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.17% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.18% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.18% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.19% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.20% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.21% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.21% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.21% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.22% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.23% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.24% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.24% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.24% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.25% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.26% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.26% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.27% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.28% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.29% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.29% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.29% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.30% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.31% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.32% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.32% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.32% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.33% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.34% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.34% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.35% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.36% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.37% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.37% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 84.38% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.39% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.40% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.40% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.40% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.41% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.42% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.43% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.43% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.44% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.45% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.45% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.45% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.46% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.47% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.48% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.48% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.48% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.49% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.50% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.51% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 84.51% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.52% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.53% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.53% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 84.54% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.55% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.56% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 84.57% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.58% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.59% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 84.59% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.60% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.61% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.61% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 84.62% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.63% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.64% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 84.65% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.66% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.67% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 84.67% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.68% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.69% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.69% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 84.70% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.71% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.72% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 84.73% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.74% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.75% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 84.75% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.76% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.77% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.77% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.78% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 84.78% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.79% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.80% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 84.81% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.82% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.83% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 84.84% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.85% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.85% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.86% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 84.87% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.88% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 84.89% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.90% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.91% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 84.92% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.92% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.93% done, estimate finish Sat Mar 9 11:50:18 2013 > 84.93% done, estimate finish Sat Mar 9 11:50:17 2013 > 84.94% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 84.95% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.96% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 84.97% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.98% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 84.99% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.00% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.01% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.01% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.02% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.03% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.04% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.05% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.05% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.06% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.07% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.08% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.08% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.09% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.09% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.10% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.10% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.11% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.12% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.13% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 85.14% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.15% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.16% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.17% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.17% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.18% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.18% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.19% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.20% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.21% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.21% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.22% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.23% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.24% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.25% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.25% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.26% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.26% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.27% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.28% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.29% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.29% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.30% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.31% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.32% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.33% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.33% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.34% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.35% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.36% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.37% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.37% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.38% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.39% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.40% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.40% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.41% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.41% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.42% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.43% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.44% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.45% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.46% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.47% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.48% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.48% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.49% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.49% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.50% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.51% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.52% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.53% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.54% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.55% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.56% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.56% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.57% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.57% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.58% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.59% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.60% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.61% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.62% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.62% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.63% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.64% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.64% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.65% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.65% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.66% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.67% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.68% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.69% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.69% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.70% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.70% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.71% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.72% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.72% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.73% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.73% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.74% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.75% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.75% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 85.76% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.77% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.78% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.78% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.79% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.80% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.80% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.81% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.81% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.82% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.83% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.83% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.84% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.85% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.86% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.87% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.88% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.89% done, estimate finish Sat Mar 9 11:50:18 2013 > 85.89% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.90% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.91% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.91% done, estimate finish Sat Mar 9 11:50:16 2013 > 85.92% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.93% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.94% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.95% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.96% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 85.97% done, estimate finish Sat Mar 9 11:50:16 2013 > 85.97% done, estimate finish Sat Mar 9 11:50:17 2013 > 85.98% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.99% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 85.99% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.00% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.01% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.02% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.02% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.03% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.04% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 86.05% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.05% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.06% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.07% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.07% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.08% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.08% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.09% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.10% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.10% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.11% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.11% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.12% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 86.13% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.14% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.15% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.15% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.16% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.17% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.18% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.18% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.19% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.19% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.20% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 86.21% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.22% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.22% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.23% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.23% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.24% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.25% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.26% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.26% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.27% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.27% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.28% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 3 times. === > 86.29% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.30% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.30% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.31% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.31% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.32% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.33% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.34% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.34% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.35% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.35% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.36% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.37% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.37% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.38% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.38% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.39% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.39% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.40% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.40% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.41% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.42% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.42% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.42% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.43% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.44% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.45% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.45% done, estimate finish Sat Mar 9 11:50:18 2013 > 86.45% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.46% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.47% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.47% done, estimate finish Sat Mar 9 11:50:18 2013 > 86.48% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.49% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.50% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.50% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.50% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.51% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.52% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.53% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.53% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.53% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.54% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.55% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.55% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.56% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.57% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.58% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.58% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.59% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.60% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.61% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.61% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.61% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.62% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.63% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.63% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.64% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.65% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.66% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.66% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.67% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.68% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.69% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.69% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.70% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.71% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.72% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.72% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.73% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.74% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.74% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.75% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.75% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.76% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.77% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.77% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.78% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.79% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.80% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 86.81% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.82% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.82% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.83% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.83% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.84% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.85% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.85% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.86% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.86% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.87% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.88% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 86.89% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.90% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.90% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.91% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.92% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.93% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.93% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.94% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.94% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.95% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 86.96% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 86.97% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 86.98% done, estimate finish Sat Mar 9 11:50:17 2013 > 86.98% done, estimate finish Sat Mar 9 11:50:16 2013 > 86.99% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.00% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 87.01% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.01% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.02% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.03% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 87.04% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.05% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.05% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.06% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.06% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.07% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.08% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.08% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.09% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.09% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.10% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.11% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 87.12% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.13% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.13% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.14% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.14% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.15% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.16% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.16% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.17% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.17% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.18% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.19% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 87.20% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.21% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.22% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.22% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.23% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.24% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.24% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.25% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.25% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.26% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.27% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 87.28% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.29% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.29% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.30% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.30% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.31% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.32% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.32% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.33% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.34% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.35% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.35% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.36% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.37% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.38% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.38% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.39% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.40% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.41% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.42% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.43% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.43% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.44% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.45% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.46% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.46% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.47% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.48% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.49% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.49% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.50% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.51% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.51% done, estimate finish Sat Mar 9 11:50:17 2013 > 87.52% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.53% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.54% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.54% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.55% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.56% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.57% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.58% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.59% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.59% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.60% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.60% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.61% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.62% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 87.63% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.64% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.65% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.65% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.66% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.67% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.67% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.68% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.68% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.69% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.70% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 87.71% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.72% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.73% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 87.74% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.75% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.75% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.76% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.76% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.77% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.78% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 87.79% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.79% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.80% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.81% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 87.82% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.83% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.83% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.84% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 87.85% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.86% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 87.87% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.87% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.88% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.89% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 87.90% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.91% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.91% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.92% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 87.93% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.93% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 87.94% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 87.95% done, estimate finish Sat Mar 9 11:50:15 2013 > 87.95% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.96% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 3 times. === > 87.97% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 87.98% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 87.98% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.99% done, estimate finish Sat Mar 9 11:50:16 2013 > 87.99% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.00% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.01% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.01% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 88.02% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.03% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.04% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.04% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 88.05% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.06% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.06% done, estimate finish Sat Mar 9 11:50:16 2013 > 88.07% done, estimate finish Sat Mar 9 11:50:16 2013 > 88.07% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.08% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.09% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.09% done, estimate finish Sat Mar 9 11:50:16 2013 > 88.10% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.11% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.12% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.12% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 88.13% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.14% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 88.15% done, estimate finish Sat Mar 9 11:50:16 2013 > 88.15% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.16% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.17% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.17% done, estimate finish Sat Mar 9 11:50:16 2013 > 88.18% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.19% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.20% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.20% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.21% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.22% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 88.23% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.23% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.24% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.25% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.25% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.26% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.27% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.28% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 88.29% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.30% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.31% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.31% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.31% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.32% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.33% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.33% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.34% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.35% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.36% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.36% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.37% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.38% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.39% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.39% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.39% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.40% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.41% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.41% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.42% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.43% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.44% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.44% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.45% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.46% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.47% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.47% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.47% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.48% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.49% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.49% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.50% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.50% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.51% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.52% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.52% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.53% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.54% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.55% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.55% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 88.56% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.57% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.57% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.58% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.59% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.60% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.60% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.61% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.61% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.62% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.63% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.63% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 88.64% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.65% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.66% done, estimate finish Sat Mar 9 11:50:16 2013 > 88.66% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.67% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.68% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.68% done, estimate finish Sat Mar 9 11:50:16 2013 > 88.68% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.69% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.70% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.71% done, estimate finish Sat Mar 9 11:50:16 2013 >=== last message repeated 2 times. === > 88.71% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.72% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.73% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.74% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.74% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.75% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.76% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 88.77% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.78% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.79% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.79% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.79% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.80% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.81% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.82% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.82% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.83% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.84% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.84% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.85% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.86% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.87% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.87% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.87% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.88% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.89% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.90% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 88.90% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.91% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.92% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.92% done, estimate finish Sat Mar 9 11:50:14 2013 > 88.93% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.94% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.95% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.95% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 88.96% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.97% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 88.98% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 88.98% done, estimate finish Sat Mar 9 11:50:15 2013 > 88.99% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.00% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.01% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.01% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.02% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.03% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.03% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.04% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.05% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.06% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.06% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.07% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.08% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.09% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.09% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.10% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.11% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.11% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.12% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.13% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.14% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.14% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.15% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.16% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.17% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.17% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.18% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.19% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.19% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.20% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.21% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.22% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.22% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.23% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.24% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.25% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.25% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.26% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.27% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.27% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.28% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.28% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.29% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.30% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.31% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.31% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.32% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.33% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.34% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.35% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.35% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.36% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.36% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.37% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.38% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.39% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.39% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.40% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.41% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.42% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.43% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.43% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.44% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.45% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.46% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.47% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.47% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.48% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.49% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.50% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.50% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.51% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.51% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.52% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.53% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.54% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.55% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.56% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.57% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.58% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.58% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.59% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.59% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.60% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.61% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.61% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.62% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.63% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.64% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.64% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.65% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.66% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.67% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.67% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.68% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.69% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.69% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.70% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.71% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.72% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.72% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.73% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.74% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.75% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.75% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.76% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.77% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.78% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.79% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.80% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.80% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.81% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.82% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.83% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.83% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.84% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.85% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.86% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.87% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.88% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.88% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.89% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.90% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.91% done, estimate finish Sat Mar 9 11:50:13 2013 > 89.91% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.92% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 89.93% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.94% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 89.95% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 89.96% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 89.97% done, estimate finish Sat Mar 9 11:50:14 2013 > 89.97% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.98% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 89.99% done, estimate finish Sat Mar 9 11:50:15 2013 > 89.99% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.00% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.00% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.01% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.02% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.03% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 90.04% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.05% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.06% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 90.07% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.07% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.08% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.08% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.09% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.10% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.11% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.11% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.12% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.13% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.14% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 90.15% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.15% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.16% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.16% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.17% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.18% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.19% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.19% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.20% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.21% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.22% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.22% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.23% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.23% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.24% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.24% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.25% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.26% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.27% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.27% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.28% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.29% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.30% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.30% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.31% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.31% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.32% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.33% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.33% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.34% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.35% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.35% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.36% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.37% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.38% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.38% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.39% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.39% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.40% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.41% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.41% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.42% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.43% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 90.44% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.44% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.45% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.46% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 90.47% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.47% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.48% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.49% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.49% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.50% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.51% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 90.52% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.52% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.53% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.54% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 90.55% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.55% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.56% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.57% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.57% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.58% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.59% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 90.60% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.61% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.62% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 90.63% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.63% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.64% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.65% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.65% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.66% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.67% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.68% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 90.69% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.70% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 90.71% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.71% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.72% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.73% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.73% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.74% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.75% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.76% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 90.77% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.78% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 90.79% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.79% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.80% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.81% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.81% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.82% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.83% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.84% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 90.85% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.86% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 90.87% done, estimate finish Sat Mar 9 11:50:13 2013 > 90.87% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.88% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.89% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.89% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.90% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.91% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.91% done, estimate finish Sat Mar 9 11:50:15 2013 > 90.92% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.92% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.93% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.94% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.95% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 90.95% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.96% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.97% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 90.98% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 90.99% done, estimate finish Sat Mar 9 11:50:14 2013 > 90.99% done, estimate finish Sat Mar 9 11:50:15 2013 > 91.00% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 91.00% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.01% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.02% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.02% done, estimate finish Sat Mar 9 11:50:15 2013 > 91.03% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 91.03% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.04% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.05% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 3 times. === > 91.06% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.07% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.08% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 91.08% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.09% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.10% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.11% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 91.11% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.12% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.13% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.13% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 91.14% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.15% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.16% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.16% done, estimate finish Sat Mar 9 11:50:15 2013 > 91.16% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.17% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.18% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.19% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 91.19% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.20% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.21% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.21% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 91.22% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.23% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.24% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.24% done, estimate finish Sat Mar 9 11:50:15 2013 > 91.24% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.25% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.26% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.27% done, estimate finish Sat Mar 9 11:50:15 2013 >=== last message repeated 2 times. === > 91.27% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.28% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.29% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.29% done, estimate finish Sat Mar 9 11:50:15 2013 > 91.30% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.31% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.32% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.32% done, estimate finish Sat Mar 9 11:50:15 2013 > 91.32% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.33% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.34% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.35% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.35% done, estimate finish Sat Mar 9 11:50:15 2013 > 91.35% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.36% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.37% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.38% done, estimate finish Sat Mar 9 11:50:15 2013 > 91.38% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.39% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.40% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.40% done, estimate finish Sat Mar 9 11:50:15 2013 > 91.40% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.41% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.42% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.43% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.43% done, estimate finish Sat Mar 9 11:50:13 2013 > 91.43% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.44% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.45% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.46% done, estimate finish Sat Mar 9 11:50:15 2013 > 91.46% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.47% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.48% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.48% done, estimate finish Sat Mar 9 11:50:15 2013 > 91.48% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.49% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.50% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.51% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.51% done, estimate finish Sat Mar 9 11:50:13 2013 > 91.51% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.52% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.53% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.54% done, estimate finish Sat Mar 9 11:50:13 2013 > 91.54% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.55% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.56% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.56% done, estimate finish Sat Mar 9 11:50:13 2013 > 91.57% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.58% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.59% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.59% done, estimate finish Sat Mar 9 11:50:13 2013 > 91.59% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.60% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.61% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.62% done, estimate finish Sat Mar 9 11:50:13 2013 > 91.62% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.63% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.64% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.65% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 91.66% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.67% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.67% done, estimate finish Sat Mar 9 11:50:13 2013 > 91.67% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.68% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.69% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.70% done, estimate finish Sat Mar 9 11:50:13 2013 > 91.70% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.71% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.72% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.73% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 3 times. === > 91.74% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.75% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.75% done, estimate finish Sat Mar 9 11:50:13 2013 > 91.75% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.76% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.77% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.78% done, estimate finish Sat Mar 9 11:50:13 2013 > 91.78% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.79% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.80% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.81% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 91.81% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.82% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.83% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.83% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 91.84% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.85% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.86% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 91.86% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.87% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.88% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.89% done, estimate finish Sat Mar 9 11:50:13 2013 > 91.89% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.90% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.91% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.91% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 91.92% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.93% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.94% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 91.94% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.95% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.96% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.97% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 91.97% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.98% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 91.99% done, estimate finish Sat Mar 9 11:50:14 2013 > 91.99% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.00% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.00% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.01% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.02% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.03% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.04% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.05% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.05% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.06% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.07% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.07% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.08% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.08% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.09% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.10% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.11% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.12% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.13% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.13% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.14% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.15% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.15% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.16% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.16% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.17% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.18% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.19% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.19% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.20% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.21% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.22% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.23% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.23% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.24% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.25% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.26% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.27% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.27% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.28% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.29% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.30% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.30% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.31% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.31% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.32% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.33% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.34% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.35% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.35% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.36% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.37% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.38% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.38% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.39% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.39% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.40% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.41% done, estimate finish Sat Mar 9 11:50:14 2013 >=== last message repeated 2 times. === > 92.42% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.43% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.44% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.44% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.45% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.46% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.46% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.47% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.47% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.48% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.49% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.49% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.50% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.51% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.52% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.52% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.53% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.54% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.55% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.55% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.56% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.57% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.58% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.59% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.60% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.60% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.61% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.62% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.63% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.63% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.64% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.65% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.66% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.67% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.68% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.68% done, estimate finish Sat Mar 9 11:50:14 2013 > 92.69% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.70% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.71% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.72% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.73% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.74% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.75% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.76% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.76% done, estimate finish Sat Mar 9 11:50:12 2013 > 92.77% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.78% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.79% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.80% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.81% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.82% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.83% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.84% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.84% done, estimate finish Sat Mar 9 11:50:12 2013 > 92.85% done, estimate finish Sat Mar 9 11:50:12 2013 > 92.85% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.86% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.87% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.87% done, estimate finish Sat Mar 9 11:50:12 2013 > 92.88% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.89% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.90% done, estimate finish Sat Mar 9 11:50:12 2013 > 92.90% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.91% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.92% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.92% done, estimate finish Sat Mar 9 11:50:12 2013 > 92.93% done, estimate finish Sat Mar 9 11:50:12 2013 > 92.93% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.94% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.95% done, estimate finish Sat Mar 9 11:50:13 2013 > 92.95% done, estimate finish Sat Mar 9 11:50:12 2013 > 92.96% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 92.97% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 92.98% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 92.99% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.00% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.00% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.01% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.01% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.02% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.03% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.03% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.04% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.04% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.05% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.06% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 93.07% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.08% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.08% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.09% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 93.10% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.11% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.11% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.12% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.12% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.13% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.14% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.14% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.15% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.16% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.16% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.17% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.18% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.19% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.20% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.21% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.21% done, estimate finish Sat Mar 9 11:50:14 2013 > 93.22% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.23% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.24% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.24% done, estimate finish Sat Mar 9 11:50:14 2013 > 93.25% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.26% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.27% done, estimate finish Sat Mar 9 11:50:14 2013 > 93.27% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.28% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.29% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.30% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.31% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.32% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.32% done, estimate finish Sat Mar 9 11:50:14 2013 > 93.33% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.34% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.35% done, estimate finish Sat Mar 9 11:50:14 2013 > 93.35% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.36% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.37% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.38% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.39% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.40% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.40% done, estimate finish Sat Mar 9 11:50:14 2013 > 93.41% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.42% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.43% done, estimate finish Sat Mar 9 11:50:14 2013 > 93.43% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.44% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.45% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.46% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.47% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.48% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.48% done, estimate finish Sat Mar 9 11:50:14 2013 > 93.49% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.50% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.51% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.52% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.53% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.54% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.55% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.56% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.56% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.57% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.58% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.59% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.59% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.60% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.61% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.62% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.62% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.63% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.64% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.64% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.65% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.65% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.66% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.67% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.67% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.68% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.69% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.70% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.70% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.71% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.72% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.72% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.73% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.74% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.75% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.75% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.76% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.77% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.78% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.78% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.79% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.80% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.80% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.81% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.81% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.82% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.83% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.83% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.84% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.85% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 3 times. === > 93.86% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.86% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.87% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.88% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.88% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.89% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.90% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.91% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.91% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.92% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.93% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.94% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.94% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.94% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.95% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.96% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.96% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.97% done, estimate finish Sat Mar 9 11:50:12 2013 > 93.97% done, estimate finish Sat Mar 9 11:50:13 2013 > 93.98% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.99% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 93.99% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.00% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.00% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.01% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.02% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.02% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.03% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.04% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.04% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.05% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.06% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.07% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.07% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.08% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.08% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.09% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.10% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.10% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.11% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.11% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.12% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.12% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.13% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.14% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.15% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.15% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.16% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.16% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.17% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.18% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.18% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.19% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.19% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.20% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.20% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.21% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.22% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.23% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.23% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.24% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.24% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.25% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.26% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.26% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.27% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.28% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.29% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.29% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.30% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.31% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.31% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.32% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.32% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.33% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.34% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.34% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.35% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.36% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.37% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.38% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.39% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.39% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.40% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.40% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.41% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.42% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.42% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.43% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.43% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.44% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.45% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.46% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.47% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.47% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.48% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.49% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.50% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.50% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.51% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.52% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.53% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.54% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.54% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.55% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.56% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.57% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.58% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.58% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.59% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.59% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.60% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.61% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.62% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.62% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.63% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.64% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.65% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.66% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.66% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.67% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.68% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.69% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.70% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.70% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.71% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.72% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.73% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.74% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.74% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.75% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.75% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.76% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.77% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.78% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.78% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.79% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.80% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.81% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.82% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.82% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.83% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.84% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.85% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.86% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.86% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.87% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.88% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.89% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.89% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.90% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.90% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.91% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 94.91% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.92% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.93% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.94% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.94% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.95% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.96% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 94.97% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 94.98% done, estimate finish Sat Mar 9 11:50:13 2013 > 94.98% done, estimate finish Sat Mar 9 11:50:12 2013 > 94.99% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.00% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 95.01% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.02% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.03% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 95.04% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.05% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.05% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.06% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.06% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.07% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.08% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.08% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.09% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.10% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.11% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 95.12% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.13% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.13% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.14% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.14% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.15% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.16% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.16% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.17% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.18% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.19% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 95.20% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.21% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.22% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.22% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.23% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.24% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.24% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.25% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.26% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.27% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 95.28% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.29% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.30% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.30% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.31% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.32% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.32% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.33% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.34% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.35% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.35% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.36% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.37% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.38% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.38% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.39% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.40% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 95.41% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.42% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.42% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.43% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 95.44% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.45% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.45% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.46% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.46% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.47% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.48% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 95.49% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.50% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.51% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 95.52% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.53% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.53% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.54% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.54% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.55% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.56% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 95.57% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.58% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.59% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.59% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.60% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.61% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.61% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.62% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.62% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.63% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.64% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.64% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.65% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.66% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.67% done, estimate finish Sat Mar 9 11:50:13 2013 >=== last message repeated 2 times. === > 95.68% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.69% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.70% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.70% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.71% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.72% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.72% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.73% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.74% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.75% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.75% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.76% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.77% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.78% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.78% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.79% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.80% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.80% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.81% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.82% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.83% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.83% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.84% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.85% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.86% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.86% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.87% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.88% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.89% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.90% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.91% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.91% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.92% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.93% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.94% done, estimate finish Sat Mar 9 11:50:13 2013 > 95.94% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.95% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.96% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.97% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 95.98% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 95.99% done, estimate finish Sat Mar 9 11:50:12 2013 > 95.99% done, estimate finish Sat Mar 9 11:50:13 2013 > 96.00% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.01% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.02% done, estimate finish Sat Mar 9 11:50:13 2013 > 96.02% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.03% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.04% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.05% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.06% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.07% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.07% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.08% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.09% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.10% done, estimate finish Sat Mar 9 11:50:13 2013 > 96.10% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.11% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.12% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.13% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.13% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.14% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.15% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.15% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.16% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.17% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.18% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.19% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.20% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.21% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.21% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.22% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.23% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.23% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.24% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.25% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.26% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.26% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.27% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.28% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.29% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.29% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.30% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.31% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.31% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.32% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.33% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.34% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.34% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.35% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.36% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.37% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.37% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.38% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.39% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.39% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.40% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.41% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.42% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.43% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.44% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.45% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.45% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.46% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.47% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.47% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.48% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.49% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.50% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.50% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.51% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.52% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.53% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.53% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.54% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.55% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.55% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.56% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.57% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.58% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.59% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.60% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.61% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.62% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.63% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.63% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.64% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.65% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.66% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.67% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.68% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.69% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.70% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.71% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.71% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.72% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.72% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.73% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.74% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.75% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.76% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 96.77% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.77% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.78% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.79% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.79% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.80% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.80% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.81% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.82% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.82% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.83% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.84% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.85% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.85% done, estimate finish Sat Mar 9 11:50:11 2013 >=== last message repeated 2 times. === > 96.86% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.87% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.87% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.88% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.88% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.89% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.90% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.90% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.91% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.92% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.93% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.93% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.93% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.94% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.95% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.95% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.96% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.96% done, estimate finish Sat Mar 9 11:50:12 2013 > 96.97% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.98% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 96.98% done, estimate finish Sat Mar 9 11:50:11 2013 > 96.99% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.00% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.01% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.01% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.01% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.02% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.03% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.03% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.04% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.04% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.05% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.06% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.06% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.07% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.08% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.09% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.09% done, estimate finish Sat Mar 9 11:50:11 2013 >=== last message repeated 2 times. === > 97.10% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.11% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.11% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.12% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.12% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.13% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.14% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.14% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.15% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.16% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.17% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.17% done, estimate finish Sat Mar 9 11:50:11 2013 >=== last message repeated 2 times. === > 97.18% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.19% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.19% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.20% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.20% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.21% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.22% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.22% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.23% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.24% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.25% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.25% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.25% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.26% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.27% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.28% done, estimate finish Sat Mar 9 11:50:11 2013 >=== last message repeated 2 times. === > 97.28% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.29% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.30% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.30% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.31% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.32% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.33% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.33% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.33% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.34% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.35% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.36% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.36% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.37% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.38% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.38% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.39% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.40% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.41% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.41% done, estimate finish Sat Mar 9 11:50:11 2013 >=== last message repeated 2 times. === > 97.42% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.43% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.44% done, estimate finish Sat Mar 9 11:50:11 2013 >=== last message repeated 2 times. === > 97.44% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.45% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.46% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.46% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.47% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.47% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.48% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.49% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.49% done, estimate finish Sat Mar 9 11:50:11 2013 >=== last message repeated 2 times. === > 97.50% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.51% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.52% done, estimate finish Sat Mar 9 11:50:11 2013 >=== last message repeated 2 times. === > 97.52% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.53% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.54% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.54% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.55% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.56% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.57% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.57% done, estimate finish Sat Mar 9 11:50:11 2013 >=== last message repeated 2 times. === > 97.58% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.59% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.60% done, estimate finish Sat Mar 9 11:50:11 2013 >=== last message repeated 2 times. === > 97.60% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.61% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.62% done, estimate finish Sat Mar 9 11:50:12 2013 > 97.62% done, estimate finish Sat Mar 9 11:50:13 2013 > 97.63% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 97.64% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.65% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 97.66% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.67% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.68% done, estimate finish Sat Mar 9 11:50:13 2013 > 97.68% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.69% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.70% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.71% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 97.72% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.73% done, estimate finish Sat Mar 9 11:50:13 2013 > 97.73% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.74% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.75% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.76% done, estimate finish Sat Mar 9 11:50:13 2013 > 97.76% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.77% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.78% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.79% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 97.80% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.81% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 97.82% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.83% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.84% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 97.85% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.86% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.87% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 97.88% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.89% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.90% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 97.91% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.92% done, estimate finish Sat Mar 9 11:50:11 2013 > 97.92% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.93% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.94% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.95% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 97.96% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.97% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 97.98% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 97.99% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.00% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.00% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.01% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.02% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.03% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.04% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.05% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.05% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.06% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.07% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.08% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.08% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.09% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.10% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.11% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.12% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.13% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.14% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.15% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.16% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.17% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.18% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.19% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.20% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.21% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.22% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.23% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.24% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.25% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.26% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.27% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.28% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.29% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.29% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.30% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.31% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.32% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.32% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.33% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.34% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.35% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.35% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.36% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.37% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.37% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.38% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.39% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.40% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.40% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.41% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.42% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.43% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.43% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.44% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.45% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.45% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.46% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.47% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.48% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.48% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.49% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.50% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.51% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.51% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.52% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.53% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.53% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.54% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.54% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.55% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.56% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.56% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.57% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.58% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.59% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.59% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.60% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.61% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.61% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.62% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.62% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.63% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.64% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.64% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.65% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.66% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.67% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.67% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.68% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.69% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.69% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.70% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.70% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.71% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.72% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.72% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.73% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.74% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.75% done, estimate finish Sat Mar 9 11:50:11 2013 >=== last message repeated 2 times. === > 98.76% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.77% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.77% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.78% done, estimate finish Sat Mar 9 11:50:11 2013 >=== last message repeated 2 times. === > 98.78% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.79% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.80% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.80% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.81% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.82% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.83% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.83% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.84% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.85% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.85% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.86% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.86% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.87% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.88% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.88% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.89% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.89% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.90% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.91% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.91% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.92% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.93% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.93% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.94% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.94% done, estimate finish Sat Mar 9 11:50:12 2013 > 98.95% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.96% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.97% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 98.98% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 98.99% done, estimate finish Sat Mar 9 11:50:11 2013 > 98.99% done, estimate finish Sat Mar 9 11:50:12 2013 > 99.00% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 99.01% done, estimate finish Sat Mar 9 11:50:12 2013 > 99.01% done, estimate finish Sat Mar 9 11:50:11 2013 > 99.02% done, estimate finish Sat Mar 9 11:50:11 2013 > 99.02% done, estimate finish Sat Mar 9 11:50:12 2013 > 99.03% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 99.04% done, estimate finish Sat Mar 9 11:50:12 2013 > 99.04% done, estimate finish Sat Mar 9 11:50:11 2013 > 99.05% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 3 times. === > 99.06% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 99.07% done, estimate finish Sat Mar 9 11:50:12 2013 >=== last message repeated 2 times. === > 99.08% done, estimate finish Sat Mar 9 11:50:17 2013 >=== last message repeated 2 times. === > 99.08% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.09% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.10% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.11% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.11% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.12% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.12% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.13% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 3 times. === > 99.14% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.15% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.16% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.16% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.17% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.18% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.19% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.19% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.20% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.20% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.21% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.22% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.22% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.23% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.24% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.24% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.25% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.26% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.27% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.27% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.28% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.28% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.29% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.30% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 3 times. === > 99.31% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.32% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.32% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.33% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.34% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.35% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.35% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.36% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.36% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.37% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.38% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 3 times. === > 99.39% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.40% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.40% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.41% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.42% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.43% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.43% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.44% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.44% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.45% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.46% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.46% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.47% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.48% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.48% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.49% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.49% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.50% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.51% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.51% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.52% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.52% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.53% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.54% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.54% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.55% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.56% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.57% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.57% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.58% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.59% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.59% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.60% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.60% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.61% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.62% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.62% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.63% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.64% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.65% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.65% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.66% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.67% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.67% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.68% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.68% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.69% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.70% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.70% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.71% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.72% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.73% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.73% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.74% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.75% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.75% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.76% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.76% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.77% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.78% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.78% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.79% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.80% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.81% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.81% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.81% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.82% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.83% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.83% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.84% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.84% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.85% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.86% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 3 times. === > 99.87% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.88% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.88% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.89% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.89% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.90% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.90% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.91% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.92% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.92% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.93% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.93% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.94% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 3 times. === > 99.95% done, estimate finish Sat Mar 9 11:50:18 2013 >=== last message repeated 2 times. === > 99.96% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.97% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === > 99.97% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.98% done, estimate finish Sat Mar 9 11:50:18 2013 > 99.98% done, estimate finish Sat Mar 9 11:50:19 2013 > 99.99% done, estimate finish Sat Mar 9 11:50:19 2013 >=== last message repeated 2 times. === >100.00% done, estimate finish Sat Mar 9 11:50:19 2013 >Total translation table size: 0 >Total rockridge attributes bytes: 60272 >Total directory bytes: 111456 >Path table size(bytes): 402 >Max brk space used 76000 >11856074 extents written (23156 MB) > >mkisofs calculate size command: >----------------------- >/usr/bin/genisoimage -gui -graft-points -print-size -quiet -volid F123456 -volset -appid K3B THE CD KREATOR (C) 1998-2010 SEBASTIAN TRUEG AND MICHAL MALEK -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/kde-arjan/k3baq6631.tmp -rational-rock -hide-list /tmp/kde-arjan/k3bEa6631.tmp -joliet -joliet-long -hide-joliet-list /tmp/kde-arjan/k3bqV6631.tmp -no-cache-inodes -full-iso9660-filenames -iso-level 3 -path-list /tmp/kde-arjan/k3bbZ6631.tmp > >mkisofs command: >----------------------- >/usr/bin/genisoimage -gui -graft-points -volid F123456 -volset -appid K3B THE CD KREATOR (C) 1998-2010 SEBASTIAN TRUEG AND MICHAL MALEK -publisher -preparer -sysid LINUX -volset-size 1 -volset-seqno 1 -sort /tmp/kde-arjan/k3bbh6631.tmp -rational-rock -hide-list /tmp/kde-arjan/k3bVs6631.tmp -joliet -joliet-long -hide-joliet-list /tmp/kde-arjan/k3bcF6631.tmp -no-cache-inodes -full-iso9660-filenames -iso-level 3 -path-list /tmp/kde-arjan/k3bcS6631.tmp
You cannot view the attachment while viewing its details because your browser does not support IFRAMEs.
View the attachment on a separate page
.
View Attachment As Raw
Actions:
View
Attachments on
bug 919675
: 707399 |
708207