Back to bug 1019598
| Who | When | What | Removed | Added |
|---|---|---|---|---|
| Shubhendu Tripathi | 2013-10-16 06:49:04 UTC | Keywords | ZStream | |
| Ramesh N | 2013-10-17 09:46:45 UTC | Status | NEW | ASSIGNED |
| CC | rnachimu | |||
| Assignee | dpati | rnachimu | ||
| Dusmant | 2013-10-17 17:53:24 UTC | Priority | unspecified | medium |
| CC | dpati | |||
| Severity | unspecified | medium | ||
| Ramesh N | 2013-10-25 07:29:41 UTC | Status | ASSIGNED | POST |
| Link ID | oVirt gerrit 20524 | |||
| RamaKasturi | 2013-10-29 13:20:14 UTC | CC | knarra | |
| Ramesh N | 2013-10-31 05:32:59 UTC | Status | POST | ON_QA |
| Fixed In Version | Cb6 | |||
| RamaKasturi | 2013-11-13 06:43:47 UTC | QA Contact | sdharane | knarra |
| Prasanth | 2013-11-13 07:01:44 UTC | CC | dtsang, mmahoney, pprakash, sdharane, ssampat | |
| Summary | Status of the volume in activities column after Stop rebalance should be in sync with gluster CLI output | [RHS-C] Status of the volume in activities column after Stop rebalance should be in sync with gluster CLI output | ||
| RamaKasturi | 2013-12-16 12:18:18 UTC | Status | ON_QA | VERIFIED |
| Jay Turner | 2014-01-15 11:27:22 UTC | Target Milestone | --- | RHS 2.1.2 |
| errata-xmlrpc | 2014-02-25 05:21:53 UTC | Status | VERIFIED | RELEASE_PENDING |
| errata-xmlrpc | 2014-02-25 07:52:18 UTC | Status | RELEASE_PENDING | CLOSED |
| Resolution | --- | ERRATA | ||
| Last Closed | 2014-02-25 02:52:18 UTC | |||
| Rejy M Cyriac | 2015-05-13 16:29:39 UTC | Target Release | --- | RHGS 2.1.2 |
| Target Milestone | RHS 2.1.2 | --- |
Back to bug 1019598