Back to bug 1019598

Who When What Removed Added
Shubhendu Tripathi 2013-10-16 06:49:04 UTC Keywords ZStream
Ramesh N 2013-10-17 09:46:45 UTC Status NEW ASSIGNED
CC rnachimu
Assignee dpati rnachimu
Dusmant 2013-10-17 17:53:24 UTC Priority unspecified medium
CC dpati
Severity unspecified medium
Ramesh N 2013-10-25 07:29:41 UTC Status ASSIGNED POST
Link ID oVirt gerrit 20524
RamaKasturi 2013-10-29 13:20:14 UTC CC knarra
Ramesh N 2013-10-31 05:32:59 UTC Status POST ON_QA
Fixed In Version Cb6
RamaKasturi 2013-11-13 06:43:47 UTC QA Contact sdharane knarra
Prasanth 2013-11-13 07:01:44 UTC CC dtsang, mmahoney, pprakash, sdharane, ssampat
Summary Status of the volume in activities column after Stop rebalance should be in sync with gluster CLI output [RHS-C] Status of the volume in activities column after Stop rebalance should be in sync with gluster CLI output
RamaKasturi 2013-12-16 12:18:18 UTC Status ON_QA VERIFIED
Jay Turner 2014-01-15 11:27:22 UTC Target Milestone --- RHS 2.1.2
errata-xmlrpc 2014-02-25 05:21:53 UTC Status VERIFIED RELEASE_PENDING
errata-xmlrpc 2014-02-25 07:52:18 UTC Status RELEASE_PENDING CLOSED
Resolution --- ERRATA
Last Closed 2014-02-25 02:52:18 UTC
Rejy M Cyriac 2015-05-13 16:29:39 UTC Target Release --- RHGS 2.1.2
Target Milestone RHS 2.1.2 ---

Back to bug 1019598