Back to bug 999813

Who When What Removed Added
Osamu Nagano 2013-08-23 03:18:18 UTC Group redhat
mark yarborough 2013-09-05 22:29:26 UTC CC myarboro
Heiko Braun 2013-09-16 12:30:58 UTC Status NEW POST
Target Release --- EAP 6.2.0
Target Milestone --- ER2
Heiko Braun 2013-09-16 13:06:07 UTC Target Milestone ER2 ER3
Paul Gier 2013-09-25 00:00:23 UTC Blocks 1003533
Paul Gier 2013-09-25 00:02:08 UTC Status POST MODIFIED
Paul Gier 2013-09-25 00:39:45 UTC Status MODIFIED ON_QA
Brian Stansberry 2013-09-25 17:09:33 UTC CC brian.stansberry
Jakub Cechacek 2013-09-26 12:00:35 UTC Status ON_QA ASSIGNED
Severity unspecified high
Jakub Cechacek 2013-09-26 12:01:16 UTC Summary Cancel operation is ignored when flushing JMS destination metrics in the management console [Usability] Cancel operation is ignored when flushing JMS destination metrics in the management console
Jakub Cechacek 2013-09-26 12:10:46 UTC Status ASSIGNED VERIFIED
mark yarborough 2013-10-21 14:17:18 UTC CC brian.stansberry
Component Consoles Web Console
Harald Pehl 2013-11-21 20:50:26 UTC CC hpehl
Doc Text Cause: Before flushing a JMS destination under "Runtime > JMS Destinations", there's a confirmation dialog asking "Do you really..."

Consequence: Nevertheless pressing "Cancel" will flush the JMS destination.

Fix: Honor "Cancel" button

Result: JMS destination is only flushed if the confirmation dialog was closed with "Ok"
Russell Dickenson 2013-11-29 03:35:30 UTC Doc Text Cause: Before flushing a JMS destination under "Runtime > JMS Destinations", there's a confirmation dialog asking "Do you really..."

Consequence: Nevertheless pressing "Cancel" will flush the JMS destination.

Fix: Honor "Cancel" button

Result: JMS destination is only flushed if the confirmation dialog was closed with "Ok"
In JBoss EAP 6.1.0 and 6.1.1, before flushing a JMS destination via the web management console, a confirmation dialog was shown, requesting confirmation of the action. Regardless of the user's reply, the JMS destination *was* flushed. The root cause of this issue was that the result of the confirmation prompt was ignored. This issue has now been resolved and the JMS destination is only flushed if the confirmation dialog was closed with "OK".
Harald Pehl 2013-12-05 13:04:04 UTC Status VERIFIED POST
Target Release EAP 6.2.0 EAP 6.2.CP0a
Assignee hbraun hpehl
mark yarborough 2013-12-17 00:28:22 UTC Target Release EAP 6.2.CP0a EAP 6.3.0
Harald Pehl 2014-07-02 06:47:45 UTC Status POST ON_QA
Martin Velas 2014-07-08 15:10:35 UTC CC mvelas
Flags needinfo?
Brian Stansberry 2014-07-08 15:56:54 UTC CC brian.stansberry
Flags needinfo?
Martin Velas 2014-07-10 10:21:11 UTC Status ON_QA VERIFIED
Target Milestone ER3 ER9
Scott Mumford 2014-07-17 04:17:13 UTC Group redhat
CC smumford
Pavel Slavicek 2014-08-06 14:37:17 UTC Status VERIFIED CLOSED
Resolution --- CURRENTRELEASE
Last Closed 2014-08-06 10:37:17 UTC
John Skeoch 2015-02-01 23:00:11 UTC CC jkudrnac

Back to bug 999813