Bug 1007748

Summary: Installer: Add new line after options during console installation
Product: [JBoss] JBoss Enterprise Application Platform 6 Reporter: Petr Kremensky <pkremens>
Component: InstallerAssignee: Miles Tjandrawidjaja <mtjandra>
Status: CLOSED CURRENTRELEASE QA Contact: Petr Kremensky <pkremens>
Severity: medium Docs Contact: Russell Dickenson <rdickens>
Priority: unspecified    
Version: 6.2.0CC: thauser
Target Milestone: ER3   
Target Release: EAP 6.2.0   
Hardware: Unspecified   
OS: Unspecified   
Whiteboard:
Fixed In Version: Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2013-12-15 16:19:07 UTC Type: Bug
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:

Description Petr Kremensky 2013-09-13 09:12:44 UTC
This is more just a usability issue than a bug. 

In previous version of -console installer there was always a new line after "press 1 to continue, 2 to quit, 3 to redisplay.". So the user input looks like:
 
press 1 to continue, 2 to quit, 3 to redisplay.
1

But in 6.2 there is no new line after this string so the user input is appended to this message like:

press 1 to continue, 2 to quit, 3 to redisplay.1

There is always a new line before user input for all other options.

Comment 1 Miles Tjandrawidjaja 2013-09-13 18:24:49 UTC
Newline has been added whenever prompting the user for input during a console installation.

http://git.app.eng.bos.redhat.com/?p=izpack.git;a=commit;h=ceb1dade127e3d6db977648125fd2fac6d72384f

Comment 2 Petr Kremensky 2013-09-18 06:29:26 UTC
This is still same in ER2 as it was in ER1.

Comment 3 Petr Kremensky 2013-09-26 12:01:14 UTC
Please move all BZs ready for verification to ON_QA once the target milestone was released, thanks. 

Verified on EAP 6.2.0.ER3