| Summary: | Undo operation is not considered to be a modification by the process designer. | ||||||
|---|---|---|---|---|---|---|---|
| Product: | [Retired] JBoss BPMS Platform 6 | Reporter: | Marek Baluch <mbaluch> | ||||
| Component: | jBPM Designer | Assignee: | Tihomir Surdilovic <tsurdilo> | ||||
| Status: | CLOSED CURRENTRELEASE | QA Contact: | Marek Baluch <mbaluch> | ||||
| Severity: | low | Docs Contact: | |||||
| Priority: | medium | ||||||
| Version: | 6.0.0 | CC: | kverlaen | ||||
| Target Milestone: | ER5 | ||||||
| Target Release: | 6.0.0 | ||||||
| Hardware: | Unspecified | ||||||
| OS: | Unspecified | ||||||
| Whiteboard: | |||||||
| Fixed In Version: | Doc Type: | Bug Fix | |||||
| Doc Text: | Story Points: | --- | |||||
| Clone Of: | Environment: | ||||||
| Last Closed: | 2014-08-06 20:10:06 UTC | Type: | Bug | ||||
| Regression: | --- | Mount Type: | --- | ||||
| Documentation: | --- | CRM: | |||||
| Verified Versions: | Category: | --- | |||||
| oVirt Team: | --- | RHEL 7.3 requirements from Atomic Host: | |||||
| Cloudforms Team: | --- | Target Upstream Version: | |||||
| Attachments: |
|
||||||
Not sure I understand the issue as described. Designer supports CTRL-Z as undo operation. I have a process in which I delete the 'start' node. I save the process. Then I return the deleted 'start' node using the 'undo' button in the toolbar. At this point the process has changed because the 'start' node is there again right? When I try to save the process I get the message 'Process contains no changes since last save'. Please see the attached video. It demonstrates the problem. I hope this helps. The undo and redo operations now set the unsaved flag in Designer. Verified on ER5. |
Created attachment 800011 [details] How to reproduce vid. Description of problem: Undo operation is not considered as modification by the process designer. It is possible to get around the problem by clicking the canvas. Steps to Reproduce: See attached video. Found on: BPMS 6.0.0.ER3.