Bug 1013538
Summary: | Please update Errai version to 2.4.0.Final | ||
---|---|---|---|
Product: | [Retired] JBoss BRMS Platform 6 | Reporter: | Ryan Zhang <rzhang> |
Component: | BRE | Assignee: | Edson Tirelli <etirelli> |
Status: | CLOSED CURRENTRELEASE | QA Contact: | Lukáš Petrovický <lpetrovi> |
Severity: | unspecified | Docs Contact: | |
Priority: | unspecified | ||
Version: | 6.0.0 | ||
Target Milestone: | ER5 | ||
Target Release: | 6.0.0 | ||
Hardware: | Unspecified | ||
OS: | Unspecified | ||
Whiteboard: | |||
Fixed In Version: | Doc Type: | Bug Fix | |
Doc Text: | Story Points: | --- | |
Clone Of: | Environment: | ||
Last Closed: | 2014-08-06 20:17:56 UTC | Type: | Bug |
Regression: | --- | Mount Type: | --- |
Documentation: | --- | CRM: | |
Verified Versions: | Category: | --- | |
oVirt Team: | --- | RHEL 7.3 requirements from Atomic Host: | |
Cloudforms Team: | --- | Target Upstream Version: | |
Embargoed: | |||
Bug Depends On: | |||
Bug Blocks: | 1013544 |
Description
Ryan Zhang
2013-09-30 10:11:15 UTC
Ryan, Drools/jBPM 6.0.0.CR4 were overriding the version to use Final already, so as far as the community CR4, product ER4 builds, we are ok. I just updated the platform BOM to final as well, and will remove the local overrides from the drools/jbpm pom. https://github.com/jboss-integration/jboss-integration-platform-bom/commit/3bbb9df5742f42631ca7e62b969b3bc81c2b5f9a Ok,Thanks. We will make this in ER5 or later. ER5 contains Errai 2.4.1-redhat-1, which is close enough. VERIFIED. |