Bug 1019159

Summary: Upgrade apache-mime4j to 0.6.redhat-3
Product: [JBoss] JBoss Enterprise Application Platform 6 Reporter: Lin Gao <lgao>
Component: BuildAssignee: Lin Gao <lgao>
Status: CLOSED CURRENTRELEASE QA Contact: Pavel Jelinek <pjelinek>
Severity: high Docs Contact: Russell Dickenson <rdickens>
Priority: unspecified    
Version: 6.2.0CC: pgier
Target Milestone: ER7Keywords: Rebase
Target Release: EAP 6.2.0   
Hardware: Unspecified   
OS: Unspecified   
Whiteboard:
Fixed In Version: Doc Type: Rebase: Bug Fixes and Enhancements
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2013-12-15 16:48:37 UTC Type: ---
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:

Description Lin Gao 2013-10-15 08:47:01 UTC
Required upgrade.

Comment 1 Lin Gao 2013-10-15 09:04:32 UTC
Source URL: git://git.app.eng.bos.redhat.com/apache/james-mime4j.git#446cc7656e1f1ba671eeb5f90028c6ac938385ed
Mead-Build: org.apache.james-apache-mime4j-0.6.redhat_3-1
Brew-Build: apache-mime4j-0.6-8.redhat_3.1.ep6.el6

Comment 2 Lin Gao 2013-10-15 09:07:13 UTC
Pull request: https://github.com/jbossas/jboss-eap/pull/551

Comment 3 Lin Gao 2013-10-17 01:28:57 UTC
Rebuild from internal SCM repository for Common Criteria requirements

Comment 4 Pavel Jelinek 2013-11-07 12:37:49 UTC
Upgraded in EAP 6.2.0 ER7

In jboss-eap-6.2.0.ER7-src.zip pom.xml there is 
version.org.apache.james.apache-mime4j 0.6.redhat-3

There is 
jboss-eap-6.2/modules/system/layers/base/org/apache/james/mime4j/main/apache-mime4j-0.6.redhat-3.jar
in jboss-eap-6.2.0.ER7.zip.