Bug 1019566

Summary: Once remove brick commit happens, it should reflect in bricks and volumes list simultaneously
Product: Red Hat Gluster Storage Reporter: Shubhendu Tripathi <shtripat>
Component: rhscAssignee: Kanagaraj <kmayilsa>
Status: CLOSED ERRATA QA Contact: Shruti Sampat <ssampat>
Severity: medium Docs Contact:
Priority: high    
Version: 2.1CC: dpati, rhs-bugs, sankarshan, ssampat
Target Milestone: ---Keywords: ZStream
Target Release: RHGS 2.1.2   
Hardware: Unspecified   
OS: Unspecified   
Whiteboard:
Fixed In Version: CB6 Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2014-02-25 07:52:02 UTC Type: Bug
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:

Description Shubhendu Tripathi 2013-10-16 05:53:37 UTC
Description of problem:
Once remove brick is completed and Commit is selected for the same brick, the brick gets deleted from the list. But the remove brick icon still remains the volumes list in Activities column. It does not get removed at all.
This way no other activities can be performed on the volume at all.

The remove brick icons should disappear simultaneously once the remove brick is commited both from bricks list and volumes list tables.

Version-Release number of selected component (if applicable):


How reproducible:
Always

Steps to Reproduce:
1. Go to Volumes tab and select a volume
2. In the Bricks sub-tab select a brick from the list
3. Start remove brick by clicking the "Remove" menu option
4. Once deletion is completed, select the Commit option from the drop down menu option.

Actual results:
The commit is completed and brick gets deleted from the list. But the remove brick icon retains the volumes list against the volume in Activities column

Expected results:
The remove brick icon should disappear simultaneously from the volumes list as well after completion of remove brick activity.

Additional info:

Comment 2 Shruti Sampat 2013-10-17 08:46:43 UTC
If I understand correctly, the expected results here would be that the icon reflects that the operation has completed, and the menu items are disabled.

Comment 3 Kanagaraj 2013-10-20 04:26:55 UTC
shruti,
 The icon will removed from the volumes table, once the brick removal is committed by the user.

There were some issues in clearing the task details from volumes, it is now fixed.

Comment 4 Shruti Sampat 2013-11-06 13:08:16 UTC
Verified as fixed in Red Hat Storage Console Version: 2.1.2-0.22.master.el6_4.
After remove-brick commit is done, the row for the removed brick and the icon from the volumes table disappears simultaneously.

Comment 6 errata-xmlrpc 2014-02-25 07:52:02 UTC
Since the problem described in this bug report should be
resolved in a recent advisory, it has been closed with a
resolution of ERRATA.

For information on the advisory, and where to find the updated
files, follow the link below.

If the solution does not work for you, open a new bug report.

http://rhn.redhat.com/errata/RHEA-2014-0208.html