Bug 1118661

Summary: Procedure 13.1. Configuring Hot Rod Connectors for Remote Client-Server Mode, worker-threads Parameter
Product: [JBoss] JBoss Data Grid 6 Reporter: Vitalii Chepeliuk <vchepeli>
Component: DocumentationAssignee: Misha H. Ali <mhusnain>
Status: CLOSED CURRENTRELEASE QA Contact:
Severity: unspecified Docs Contact:
Priority: unspecified    
Version: 6.3.0CC: jdg-bugs, mhusnain, vchepeli
Target Milestone: GA   
Target Release: 6.3.0   
Hardware: Unspecified   
OS: Unspecified   
Whiteboard:
Fixed In Version: Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of: Environment:
Build Name: 12532, Administration and Configuration Guide-6.3 Build Date: 07-07-2014 11:21:19 Topic ID: 8806-635853 [Latest]
Last Closed: 2014-07-21 02:15:06 UTC Type: Bug
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:

Description Vitalii Chepeliuk 2014-07-11 08:42:00 UTC
Title: Configure Hot Rod Connectors

Describe the issue:
The worker-threads parameter specifies the number of worker threads available for the Hot Rod connector. The default value for this parameter is the number of cores available multiplied by two. This is an optional parameter. 
<< "number of cores available multiplied by two" is wrong, should be 160

Suggestions for improvement:
The default value for this parameter is 160. 

Additional information:

Comment 3 Misha H. Ali 2014-07-21 02:15:06 UTC
Now available on access.redhat.com under the JBoss Data Grid 6.3 documentation label.