Bug 1227488
Summary: | stop button functionality incomplete | |||
---|---|---|---|---|
Product: | Red Hat Certification Program | Reporter: | Brian Brock <bbrock> | |
Component: | redhat-certification | Assignee: | Greg Nichols <gnichols> | |
Status: | CLOSED ERRATA | QA Contact: | Brian Brock <bbrock> | |
Severity: | unspecified | Docs Contact: | ||
Priority: | unspecified | |||
Version: | 1.0 | CC: | bbrock, brose | |
Target Milestone: | --- | |||
Target Release: | --- | |||
Hardware: | Unspecified | |||
OS: | Unspecified | |||
Whiteboard: | ||||
Fixed In Version: | redhat-certification-2.0-201509011 | Doc Type: | Bug Fix | |
Doc Text: | Story Points: | --- | ||
Clone Of: | ||||
: | 1262369 1277191 (view as bug list) | Environment: | ||
Last Closed: | 2015-11-19 16:35:08 UTC | Type: | Bug | |
Regression: | --- | Mount Type: | --- | |
Documentation: | --- | CRM: | ||
Verified Versions: | Category: | --- | ||
oVirt Team: | --- | RHEL 7.3 requirements from Atomic Host: | ||
Cloudforms Team: | --- | Target Upstream Version: | ||
Embargoed: |
Description
Brian Brock
2015-06-02 19:27:41 UTC
This bug blocks the ability to abort the current test run. closing the certification, from the certification screen listing all hosts, does not resolve the problem, and does not appear to close the certification. Relabelng the button to be "restart", since that's what it really does. The expected behavior is that the test run will restart, so an interactive test will return to the first prompt in the test. currently the "restart" button is skipping the test being run. When I ran a test on a laptop system that always requires the suspend / hibernate tests, clicking "restart" skipped ahead to the intended test. Does this need to be fixed? (In reply to Brian Brock from comment #6) > currently the "restart" button is skipping the test being run. > > When I ran a test on a laptop system that always requires the suspend / > hibernate tests, clicking "restart" skipped ahead to the intended test. > > Does this need to be fixed? What is the "intended test"? the test that was selected to be run, instead of the mandatory tests added to the list. Cloned suspend test issue to bug 1277191 verified in redhat-certification-2.0-20151030.el7 The original bug described has been fixed, the new issue seen is reflected in the new clone. Since the problem described in this bug report should be resolved in a recent advisory, it has been closed with a resolution of ERRATA. For information on the advisory, and where to find the updated files, follow the link below. If the solution does not work for you, open a new bug report. https://rhn.redhat.com/errata/RHBA-2015-2479.html |