Bug 1273685
Summary: | JBDS8.1.0: An error icon is shown for XOR Diverging/Converging gateway | ||||||||
---|---|---|---|---|---|---|---|---|---|
Product: | [Retired] JBoss BPMS Platform 6 | Reporter: | Hiroko Miura <hmiura> | ||||||
Component: | Eclipse Tooling | Assignee: | Kris Verlaenen <kverlaen> | ||||||
Status: | CLOSED EOL | QA Contact: | Jozef Marko <jomarko> | ||||||
Severity: | unspecified | Docs Contact: | |||||||
Priority: | high | ||||||||
Version: | 6.1.0 | CC: | ajuricic | ||||||
Target Milestone: | --- | ||||||||
Target Release: | --- | ||||||||
Hardware: | Unspecified | ||||||||
OS: | Unspecified | ||||||||
Whiteboard: | |||||||||
Fixed In Version: | Doc Type: | Bug Fix | |||||||
Doc Text: | Story Points: | --- | |||||||
Clone Of: | Environment: | ||||||||
Last Closed: | 2020-03-27 19:37:52 UTC | Type: | Bug | ||||||
Regression: | --- | Mount Type: | --- | ||||||
Documentation: | --- | CRM: | |||||||
Verified Versions: | Category: | --- | |||||||
oVirt Team: | --- | RHEL 7.3 requirements from Atomic Host: | |||||||
Cloudforms Team: | --- | Target Upstream Version: | |||||||
Embargoed: | |||||||||
Attachments: |
|
Created attachment 1084952 [details]
snapshot of problematic business process
It looks like this was fixed (possibly with https://bugzilla.redhat.com/show_bug.cgi?id=1200000 ?) Please retest with the latest version here: http://download.eclipse.org/bpmn2-modeler/updates/luna/1.1.4/ Verified on jbdsis-8.0.5, BPMN2 modeler 1.1.4.Final |
Created attachment 1084951 [details] problematic business process Description of problem: With the attached business process, red *error* icon is shown for XOR Conversing/Diversing gateway with the following warning. - 1st XOR Conversing Gateway ExclusiveGateway should have only one incoming Sequence Flow - 2nd XOR Diversing Gateway ExclusiveGateway should have only one outgoing Sequence Flow I attached screen shot which shows 2 business process ("sample" and "process_1") As you can confirm, sequence flows are configured correctly for each XOR gateway respectively, so this warning looks incorrect. In addition, red *error* icon is shown even though it's *warning*. Version-Release number of selected component (if applicable): JBDS8.1.0 with the latest integration pack(8.0.3) How reproducible: Problematic business process is attached to this bug. Steps to Reproduce: 1. import attached business process. 2. 3. Actual results: warning message is shown with showing error icon. Expected results: no warning/error is shown Additional info: more strange thing is, as you can see attached business process, if the set of process(like "sample" in screen shot) gets copied under it, error icon is not shown for copied process. Further more, after that, if the first set of process is deleted, error icon will be appear in copied business process.