Bug 137981
Summary: | The time estimate tracking is totally useless | ||
---|---|---|---|
Product: | [Community] Bugzilla | Reporter: | William Cohen <wcohen> |
Component: | Bugzilla General | Assignee: | PnT DevOps Devs <hss-ied-bugs> |
Status: | CLOSED CURRENTRELEASE | QA Contact: | David Lawrence <dkl> |
Severity: | medium | Docs Contact: | |
Priority: | medium | ||
Version: | 3.2 | CC: | cward, kbaker |
Target Milestone: | --- | Keywords: | FutureFeature |
Target Release: | --- | ||
Hardware: | All | ||
OS: | Linux | ||
Whiteboard: | |||
Fixed In Version: | Doc Type: | Enhancement | |
Doc Text: | Story Points: | --- | |
Clone Of: | Environment: | ||
Last Closed: | 2009-04-02 14:07:02 UTC | Type: | --- |
Regression: | --- | Mount Type: | --- |
Documentation: | --- | CRM: | |
Verified Versions: | Category: | --- | |
oVirt Team: | --- | RHEL 7.3 requirements from Atomic Host: | |
Cloudforms Team: | --- | Target Upstream Version: | |
Embargoed: |
Description
William Cohen
2004-11-03 16:26:20 UTC
So you are saying that the estimated time field cannot be changed from 4 to 8 for example later once a better idea of time needed is decided? You should be able to and it will go in the bug activity like any other change so you can look back and see that it did in fact need more time than originally though. If this is broken or incomplete I will file a bug upstream since this is part of the main Bugzilla code base and has not been altered by myself. I made a dummy bug https://bugzilla.redhat.com/bugzilla/show_bug.cgi?id=138084 To show the problem. I initial set the estimate to 0.5 hours. Then attempted to put doen the "Hours Worked" as 1 hour. I got a message. The Hours Left field requires a positive number. How many estimate do you know that error on the high side? What I would like to see is where there can be multiple lines of estimates, a history of the estimates. Also allow the hours work to be an accurate reflection of the time spent regardless of what it does to the "Hours left" Est. Current Est. Hours Worked Hours Left %Complete Gain 0.5 0.5 0.0 + 1 0 0.0 -0.5 Basically have a new line each time a time field is change. Also have dates on when the times related things are changes. In general give better tracking on how much work required to fix bugs. Red Hat Bugzilla is now using version 3.2 of the Bugzilla codebase and therefore this bug will need to be re-verified against the new release. With the updated code this bug may no longer be relevant or may have been fixed in the new code. Updating bug version to 3.2. Is this RFE still valid? Yes, this appears to still be valid. The behavior seems to be improved. Is there some way to get a get history of estimate data? If there is someway to get the history of the estimate/work data, then this can be closed. Did you try the history tab? Upper right on the "Modified" label Looks like the information can be obtained from the history. |