Bug 1383702

Summary: Errata update date on CDN not valid and break filter results
Product: Red Hat Satellite Reporter: Franck Grosjean <franck.grosjean>
Component: Content ViewsAssignee: satellite6-bugs <satellite6-bugs>
Status: CLOSED NOTABUG QA Contact:
Severity: urgent Docs Contact:
Priority: high    
Version: 6.2.2CC: bbuckingham, fcami, fgrosjea, franck.grosjean, rnester, sgraf, tmlcoch, tstrachota, xdmoon
Target Milestone: Unspecified   
Target Release: Unused   
Hardware: Unspecified   
OS: Unspecified   
Whiteboard:
Fixed In Version: Doc Type: If docs needed, set a value
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2016-10-13 21:02:00 UTC Type: Bug
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:

Description Franck Grosjean 2016-10-11 13:40:06 UTC
Description of problem:

Updated date from an errata published on CDN is not valid facing Issued date

Version-Release number of selected component (if applicable):

Any component connected to CDN

How reproducible:

sync sat6 against Rhel6 rpms repos and check errata RHBA-2015:1426

----------------------------------------------------------
hammer erratum info --id RHBA-2015:1426 --repository-id 2
ID:          ff2f1623-0fe6-4c7b-b32d-9530b02237bd
Errata ID:   RHBA-2015:1426
Title:       grub bug fix update
Type:        bugfix
Severity:    
Issued:      2015-07-22  <---- match info from access.redhat.com
Updated:     2015-04-07  <---- Back to the futur ?

Description: The grub packages provide Grand Unified Boot Loader (GRUB), a boot loader
capable of booting a wide variety of operating systems.
----------------------------------------------------------

Steps to Reproduce:
1.install sat6
2.sync rhel 6server rpms repos
3.check issued/update date on errata RHBA-2015:1426

Actual results:

Update date have precedence on issued date and it's not possible to rely on filter feature

Expected results:

Update/issued date should match information found on access.redhat.com (7/22/2015)

Additional info:

Comment 1 Tomas Strachota 2016-10-12 13:29:30 UTC
I checked the erratum data on CDN and the date is wrong there. Satellite correctly interprets wrong data.

Comment 8 Tomas Mlcoch 2016-10-13 07:15:58 UTC
Metadata for that erratum was corrected.

Comment 9 rnester 2016-10-13 15:28:51 UTC
Currently, we do not perform the type of comparison that you're referencing. Please open an RFE for this test comparison at https://projects.engineering.redhat.com/browse/CONTENT and we'll add it to our backlog.

Comment 10 Brad Buckingham 2016-10-13 19:36:58 UTC
Based on the discussion, should this bugzilla be closed:notabug?

Comment 11 Franck Grosjean 2016-10-13 21:02:00 UTC
Thank you, I'll open a RFE. This bugzilla could be closed

Comment 12 Tomas Mlcoch 2016-10-17 06:50:28 UTC
The metadata was wrong and was corrected -> this was a bug.
I've also opened an RFE to content testing team to test sanity of dates before for every released erratum.