Bug 1409539
Summary: | Chargeback Report Total does not show correct Total cost per selected fields | ||||||
---|---|---|---|---|---|---|---|
Product: | Red Hat CloudForms Management Engine | Reporter: | Einat Pacifici <epacific> | ||||
Component: | Documentation | Assignee: | Chris Budzilowicz <cbudzilo> | ||||
Status: | CLOSED CURRENTRELEASE | QA Contact: | Dayle Parker <dayleparker> | ||||
Severity: | medium | Docs Contact: | |||||
Priority: | medium | ||||||
Version: | 5.7.0 | CC: | adahms, dayleparker, hhudgeon, jhardy, lavenel, obarenbo, slukasik, srevivo | ||||
Target Milestone: | GA | Keywords: | Documentation | ||||
Target Release: | cfme-future | ||||||
Hardware: | Unspecified | ||||||
OS: | Unspecified | ||||||
Whiteboard: | container | ||||||
Fixed In Version: | Doc Type: | If docs needed, set a value | |||||
Doc Text: | Story Points: | --- | |||||
Clone Of: | Environment: | ||||||
Last Closed: | 2017-02-27 09:40:10 UTC | Type: | Bug | ||||
Regression: | --- | Mount Type: | --- | ||||
Documentation: | --- | CRM: | |||||
Verified Versions: | Category: | --- | |||||
oVirt Team: | --- | RHEL 7.3 requirements from Atomic Host: | |||||
Cloudforms Team: | --- | Target Upstream Version: | |||||
Embargoed: | |||||||
Attachments: |
|
This works as designed. Total cost means - total cost of the given workload in the given time frame. What is the use-case for customer? -- What problem are they trying to solve by looking into subset of costs? What is their story? Assigning to Chris for review. Chris - looks like we may need to add a note to Chapter 5. of the Monitoring, Alerts, and Reporting guide to outline the above behaviour. This content is live on the Customer Portal. Closing. |
Created attachment 1236625 [details] Three Screenshots for Rates and Reports Description of problem: When generating a chargeback report for container projects, the Total Cost shown is the sum for all fields in Rate assigned and NOT Total Cost per fields selected in reports. Version-Release number of selected component (if applicable): 5.7.0.17 How reproducible: Always Steps to Reproduce: 1.Define a Chargeback Rate with Fixed Rate=1 for Fixed Rate1, Fixed Rate2, CPU Cores Fixed 2.Assign Rate to container Project for all Providers 3.Goto Reports and select fields to show: Fixed Rate1, Fixed Rate2 DO NOT SELECT Cores Fixed field 3.Generate Report Actual results: The Total Cost shown is not equal to the sum of Fixed Rate1 + Fixed Rate2 (The Total Cost actually calculated Fixed Rate1 + Fixed Rate2 + CPU Cores Fixed) Expected results: Total Cost shown should show actual sum of visible costs i.e. Fixed Rate1 + Fixed Rate2. Additional info: Screenshots attached.