Bug 229075

Summary: HTS: Memory test results show only 4 G to have been tested when 48G was in the system
Product: [Retired] Red Hat Hardware Certification Program Reporter: Archana K. Raghavan <raghavan>
Component: Test Suite (tests)Assignee: Greg Nichols <gnichols>
Status: CLOSED CURRENTRELEASE QA Contact:
Severity: medium Docs Contact:
Priority: medium    
Version: 5CC: wwlinuxengineering
Target Milestone: ---   
Target Release: ---   
Hardware: x86_64   
OS: Linux   
Whiteboard:
Fixed In Version: Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2007-10-04 20:45:36 UTC Type: ---
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:

Description Archana K. Raghavan 2007-02-16 20:06:48 UTC
From Bugzilla Helper:
User-Agent: Mozilla/5.0 (X11; U; Linux i686; en-US; rv:1.8.0.5) Gecko/20060726 Red Hat/1.5.0.5-0.el4.1 Firefox/1.5.0.5 pango-text

Description of problem:
This is in particular reference to:
https://hardware.redhat.com/hwcert/show.cgi?id=227038

The hardware results for the memory test show 4 G, where as results.xml show 48G of memory to have been used for the testing. Not sure what exactly is going on here.

Version-Release number of selected component (if applicable):
R24

How reproducible:
Didn't try


Steps to Reproduce:
1.
2.
3.

Actual Results:
Hardware results show only 4G of memory to be tested

Expected Results:
Show that 48G of memory has been tested.

Additional info:

Comment 2 Greg Nichols 2007-02-23 15:05:44 UTC
I suspect the threaded_memtest executable is being compiled as a 32-bit application.

Comment 3 Greg Nichols 2007-03-13 00:26:59 UTC
Fixed R31.

Comment 4 Greg Nichols 2007-04-09 17:15:47 UTC
Please verify this fix.

Thanks!

Comment 5 Archana K. Raghavan 2007-04-10 22:51:32 UTC
Greg,

I have sent a note to IBM requesting them to verify this. They were actually
facing this issue.

- Archana

Comment 6 Archana K. Raghavan 2007-04-11 21:30:25 UTC
Greg,
IBM has the machine tied up in other test cycles. They told me that it would be
a week before they can actually test it out.
Regards,
Archana

Comment 7 Jeremy West 2007-05-02 19:58:38 UTC
Per the IBM call this afternoon, this machine is still tied up in testing
cycles.  We should get results the end of this week/early next week.

Comment 8 Greg Nichols 2007-10-04 20:45:23 UTC
Changing to verified given lack of bad news