Bug 2576788 (CVE-2026-99444)

Summary: CVE-2026-99444 kernel: kernel: Denial of Service via use-after-free in sbs-battery driver
Product: [Other] Security Response Reporter: OSIDB Bzimport <bzimport>
Component: vulnerabilityAssignee: Product Security DevOps Team <prodsec-dev>
Status: NEW --- QA Contact:
Severity: medium Docs Contact:
Priority: medium    
Version: unspecifiedCC: akhatavk, aos-team-art-private, asdas, dpaolell, jdelft, jupierce, lgarciaa, mbiarnes, ppalepu, ppostler, prdhamdh, rhel-process-autobot, sghai, sidsharm, suppawar, vlaad, watson-tool-maintainers
Target Milestone: ---Keywords: Security
Target Release: ---   
Hardware: All   
OS: Linux   
Whiteboard:
Fixed In Version: Doc Type: ---
Doc Text:
A flaw was found in the Linux kernel's Smart Battery System (SBS) battery driver. An improper teardown sequence unregisters and frees the power supply resource before background polling operations are completely stopped. This allows an active polling task to access memory that has already been released, resulting in a use-after-free condition. A local user could exploit this flaw during device cleanup to trigger a system crash, leading to a Denial of Service (DoS) or potentially elevating privileges.
Story Points: ---
Clone Of: Environment:
Last Closed: Type: ---
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:

Description OSIDB Bzimport 2026-11-19 15:32:21 UTC
In the Linux kernel, the following vulnerability has been resolved:

power: supply: sbs-battery: disable polling before supply teardown

The managed poll-work cancellation is registered before the power
supply, so cleanup unregisters the supply before draining polling.
A pending or running poller can then call power_supply_changed() on
the released supply.

Commit 8d59cf3887fb ("power: supply: sbs-battery: Fix use-after-free in
power_supply_changed()") moved the IRQ request after supply registration,
but did not change the poll-work cancellation order.

Add a later managed action that disables and drains polling before
supply teardown. Its retained disabled state prevents external-power
callbacks from rearming the poll work after it has been drained.
Keep the original autocancel to initialize work before supply callbacks
can run and to cover failed supply registration.

The teardown ordering issue was found by static analysis.