Bug 499896

Summary: [RFE] Move rejected work to the back of the queue in low-latency
Product: Red Hat Enterprise MRG Reporter: Robert Rati <rrati>
Component: condor-low-latencyAssignee: Matthew Farrellee <matt>
Status: CLOSED WONTFIX QA Contact: MRG Quality Engineering <mrgqe-bugs>
Severity: medium Docs Contact:
Priority: low    
Version: 1.0CC: matt
Target Milestone: 3.0   
Target Release: ---   
Hardware: All   
OS: Linux   
Whiteboard: FutureFeature
Fixed In Version: Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2013-01-08 18:43:50 UTC Type: ---
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:

Description Robert Rati 2009-05-08 18:55:28 UTC
Description of problem:
In low-latency, a job that is rejected will be released for another startd to grab however there is nothing preventing the node that just rejected the work from attempting to run it again.  Sometimes immediately after releasing the work if the timing lines up.  A means to address this is to have rejected work removed from the work queue, modified to add/modify an attribute denoting node names the job should not run on, and re-submit.


Version-Release number of selected component (if applicable):


How reproducible:


Steps to Reproduce:
1.
2.
3.
  
Actual results:


Expected results:


Additional info:

Comment 2 Matthew Farrellee 2013-01-08 18:43:50 UTC
Reopen when feature is required.