Bug 71803

Summary: Modifying dates off by 1 month
Product: [Retired] Red Hat Linux Reporter: Mark Komarinski <mkomarinski>
Component: mrprojectAssignee: Jonathan Blandford <jrb>
Status: CLOSED RAWHIDE QA Contact:
Severity: high Docs Contact:
Priority: medium    
Version: 7.3CC: ddumas
Target Milestone: ---   
Target Release: ---   
Hardware: i386   
OS: Linux   
Whiteboard:
Fixed In Version: Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2002-08-19 14:51:08 UTC Type: ---
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:

Description Mark Komarinski 2002-08-19 14:51:04 UTC
From Bugzilla Helper:
User-Agent: Mozilla/5.0 Galeon/1.2.5 (X11; Linux i686; U;) Gecko/20020606

Description of problem:
Editing the date of a task moves the calendar back a month (so if it says
8/19/02, bringing up the calendar still says "August", but the date shows in the
field changes to 7/19/02.

Version-Release number of selected component (if applicable):


How reproducible:
Always

Steps to Reproduce:
1.start mrproject
2.click "insert"
3.double-click on date for new inserted item
4.on start or end fields, click drop-down arrow.
	

Actual Results:  month drops back one, but calendar remains the same.

Expected Results:  date should remain the same for the indicated month

Additional info:

increased severity as this has a pretty severe impact on how useful mrproject
is.  other note:  installed ximian.

Comment 1 Jonathan Blandford 2002-09-12 19:44:41 UTC
This is fixed in the version, and will be available in the next release.