| Summary: | High Availability Documentation: Scenarios are provided but not the implementations/configuration details | ||
|---|---|---|---|
| Product: | [JBoss] JBoss Enterprise SOA Platform 4 | Reporter: | Burr Sutter <burr.sutter> |
| Component: | Documentation | Assignee: | Ken Johnson <kejohnso> |
| Status: | CLOSED WONTFIX | QA Contact: | |
| Severity: | high | Docs Contact: | |
| Priority: | high | ||
| Version: | 4.3 IR4 | CC: | minamoto |
| Target Milestone: | --- | ||
| Target Release: | FUTURE | ||
| Hardware: | Unspecified | ||
| OS: | Unspecified | ||
| URL: | http://jira.jboss.org/jira/browse/SOA-826 | ||
| Whiteboard: | |||
| Fixed In Version: | Doc Type: | Bug Fix | |
| Doc Text: | Story Points: | --- | |
| Clone Of: | Environment: | ||
| Last Closed: | 2011-12-06 22:01:27 UTC | Type: | Task |
| Regression: | --- | Mount Type: | --- |
| Documentation: | --- | CRM: | |
| Verified Versions: | Category: | --- | |
| oVirt Team: | --- | RHEL 7.3 requirements from Atomic Host: | |
| Cloudforms Team: | --- | Target Upstream Version: | |
|
Description
Burr Sutter
2008-09-24 00:43:07 UTC
This needs to be assigned to someone to produce the initial content for me to productize. Also what document should this information be in? Service Guide? needs to be assigned to someone to produce the initial content either need content now, or move this to a future release ;-) moving back to next release I need some idea of what is happening with this JIRA so I can schedule docs work for 5.0.1 What volume of material? e.g. how many pages, diagrams, etc When will draft material be ready ? |