Bug 779418 (SOA-1806)

Summary: Defer creation of JMS connection in JmsMessageService and JmsSchedulerService until first use
Product: [JBoss] JBoss Enterprise SOA Platform 5 Reporter: Pavel Macik <pmacik>
Component: JBossESB, PerformanceAssignee: Kevin Conner <kevin.conner>
Status: CLOSED NEXTRELEASE QA Contact:
Severity: urgent Docs Contact:
Priority: urgent    
Version: 5.0.0 ER6   
Target Milestone: ---   
Target Release: 5.0.0 GA, 5.0.0 ER7   
Hardware: Unspecified   
OS: Unspecified   
URL: http://jira.jboss.org/jira/browse/SOA-1806
Whiteboard:
Fixed In Version: Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2010-01-28 11:01:33 UTC Type: Bug
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:

Description Pavel Macik 2010-01-08 16:59:43 UTC
Date of First Response: 2010-01-09 03:26:33
project_key: SOA

Comment 1 Kevin Conner 2010-01-08 17:00:10 UTC
Link: Added: This issue depends JBESB-3107


Comment 2 Kevin Conner 2010-01-09 08:26:33 UTC
The change has been made to the ESB codebase, will be in the next merge.

Comment 3 Kevin Conner 2010-01-12 20:59:37 UTC
The performance tests on the qe box do not show a great improvement after this fix, I'll need to do some further investigation in the morning.

I am still doing the ER7 tag tonight however, so that we can get a better view of the other changes.

Comment 4 Kevin Conner 2010-01-13 19:19:48 UTC
Profiling the qe test on ER7 shows a comparable result to the ER5 runs, so perhaps I have misunderstood the output of this test.

Comment 5 Pavel Macik 2010-01-28 11:01:33 UTC
Verified in ER7