Note: This bug is displayed in read-only format because the product is no longer active in Red Hat Bugzilla.

Bug 800331

Summary: Timer: Guvnor BPMN designer requires all timeDuration, timeCycle and timeDate to be filled in
Product: [JBoss] JBoss Enterprise BRMS Platform 5 Reporter: Radovan Synek <rsynek>
Component: BRM (Guvnor)Assignee: manstis
Status: CLOSED UPSTREAM QA Contact:
Severity: medium Docs Contact:
Priority: unspecified    
Version: BRMS 5.3.0.GA   
Target Milestone: ---   
Target Release: BRMS 5.3.0.GA   
Hardware: Unspecified   
OS: Unspecified   
Whiteboard:
Fixed In Version: Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2025-02-10 03:19:12 UTC Type: ---
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:
Attachments:
Description Flags
process definition none

Description Radovan Synek 2012-03-06 10:33:58 UTC
Created attachment 567907 [details]
process definition

Description of problem:

There are 3 options how to specify timer - duration, cycle and date. One of them should be filled in (see XSD - timerEventDefinition: http://www.omg.org/spec/BPMN/20100501/Semantic.xsd). But not all of them.

Steps to Reproduce:
1. Start the Guvnor, create new BPMN2 process.
2. Choose "Import from BPMN2" in BPMN designer and load attached definition.
3. Click on Validate Process button.
4. There is validation error over timer saying that timecycle and timedate are missing.

Comment 1 Tihomir Surdilovic 2012-03-07 14:26:52 UTC
Fixed and checked into master and the 2.1.x branch.

Comment 6 Red Hat Bugzilla 2025-02-10 03:19:12 UTC
This product has been discontinued or is no longer tracked in Red Hat Bugzilla.