Bug 928072

Summary: joda-time invalid content of Implementation-Version
Product: [JBoss] JBoss Enterprise Application Platform 6 Reporter: Fernando Nasser <fnasser>
Component: BuildAssignee: Weinan Li <weli>
Status: CLOSED CURRENTRELEASE QA Contact:
Severity: unspecified Docs Contact:
Priority: unspecified    
Version: 6.1.0CC: rsvoboda
Target Milestone: ER6   
Target Release: EAP 6.1.0   
Hardware: Unspecified   
OS: Unspecified   
Whiteboard:
Fixed In Version: Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2013-07-23 18:35:56 UTC Type: Bug
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:
Bug Depends On:    
Bug Blocks: 927238    

Description Fernando Nasser 2013-03-26 20:14:16 UTC
Description of problem:

List of artifact with invalid content of Implementation-Version:

modules/system/layers/base/org/joda/time/main/joda-time-1.6.2-redhat-3.jar
- missing "-redhat-3" part

Additional info:

see https://bugzilla.redhat.com/show_bug.cgi?id=927238

Please check if it is possible to patch the version in the sources, if it is kept in a central location.  Name the patch %{name}-version.patch if this change is possible.  remember we'll need to change that patch too besides the vman patch to bump the suffix.

Comment 1 Weinan Li 2013-03-31 15:31:36 UTC
Currently we have two versions of builds:

joda-time-2.1-1.ep6.el5 - https://brewweb.devel.redhat.com/buildinfo?buildID=251733
joda-time-1.6.2-5.redhat_3.ep6.el6.4 - https://brewweb.devel.redhat.com/buildinfo?buildID=234655

I'm confirming with Fernando to see which version should be used.

Comment 2 Fernando Nasser 2013-04-16 19:09:13 UTC
joda-time-1.6.2-5.redhat_4.ep6.el6.5

Comment 3 Fernando Nasser 2013-04-19 13:18:59 UTC
Fix did not make it in time for the ER5 ZIP build, will be included in the ER6.

Comment 4 Rostislav Svoboda 2013-05-05 07:58:30 UTC
Verified on EAP 6.1.0 ER6