Bug 1005121 - Upgrade jbossts to 4.17.9.Final-redhat-1
Summary: Upgrade jbossts to 4.17.9.Final-redhat-1
Keywords:
Status: CLOSED CURRENTRELEASE
Alias: None
Product: JBoss Enterprise Application Platform 6
Classification: JBoss
Component: Build
Version: 6.2.0
Hardware: Unspecified
OS: Unspecified
unspecified
unspecified
Target Milestone: ER1
: EAP 6.2.0
Assignee: Vladimir Dosoudil
QA Contact: Pavel Jelinek
URL:
Whiteboard:
Depends On:
Blocks:
TreeView+ depends on / blocked
 
Reported: 2013-09-06 09:14 UTC by Vladimir Dosoudil
Modified: 2013-12-15 16:13 UTC (History)
0 users

Fixed In Version:
Doc Type: Bug Fix
Doc Text:
Clone Of:
Environment:
Last Closed: 2013-12-15 16:13:56 UTC
Type: Component Upgrade


Attachments (Terms of Use)

Description Vladimir Dosoudil 2013-09-06 09:14:18 UTC
Build jbossts 4.17.9.Final for EAP 6.2

Comment 2 Pavel Jelinek 2013-09-24 09:16:25 UTC
Upgraded in EAP 6.2.0 ER1.

There are
jts/main/jbossjts-jacorb-4.17.9.Final-redhat-1.jar,
jts/integration/main/jbossjts-integration-4.17.9.Final-redhat-1.jar,
xts/main/jbosstxbridge-4.17.9.Final-redhat-1.jar and 
xts/main/jbossxts-4.17.9.Final-redhat-1.jar
in jboss-eap-6.2.0 ER1.zip/jboss-eap-6.2/modules/system/layers/base/org/jboss/. 

Similarly in jboss-eap-6.2.0 ER1-src.zip pom.xml there is version.org.jboss.jbossts 4.17.9.Final-redhat-1.


Note You need to log in before you can comment on or make changes to this bug.