Description of problem: Started field shows N/A, instead of showing a timestamp in the rebalance status pop up Version-Release number of selected component (if applicable): How reproducible: Always. Steps to Reproduce: 1.Create Distribute Volume with 2 bricks. 2.Start rebalance on this volume. 3.click on rebalance status action Actual results: N/A displayed in the start time section even if the rebalance is started and is in progress. Expected results: Show rebalance start time. Additional info:
Verified in RHS Console version rhsc-2.1.2-0.0.scratch.beta1.el6_4.noarch (cb4). Status At field displays the following : "2013-Oct-17, 19:50"
Since the problem described in this bug report should be resolved in a recent advisory, it has been closed with a resolution of ERRATA. For information on the advisory, and where to find the updated files, follow the link below. If the solution does not work for you, open a new bug report. http://rhn.redhat.com/errata/RHEA-2014-0208.html