Bug 1196561 - [RFE] status reference that sync plan is started in Tasks
Summary: [RFE] status reference that sync plan is started in Tasks
Keywords:
Status: CLOSED CURRENTRELEASE
Alias: None
Product: Red Hat Satellite
Classification: Red Hat
Component: Repositories
Version: 6.0.8
Hardware: Unspecified
OS: Unspecified
unspecified
medium
Target Milestone: Unspecified
Assignee: satellite6-bugs
QA Contact: Katello QA List
URL:
Whiteboard:
Depends On:
Blocks: 1122832
TreeView+ depends on / blocked
 
Reported: 2015-02-26 09:49 UTC by Peter Vreman
Modified: 2019-09-26 13:52 UTC (History)
3 users (show)

Fixed In Version:
Doc Type: Enhancement
Doc Text:
Clone Of:
Environment:
Last Closed: 2016-12-01 12:56:34 UTC
Target Upstream Version:
Embargoed:


Attachments (Terms of Use)


Links
System ID Private Priority Status Summary Last Updated
Red Hat Bugzilla 1197660 0 unspecified CLOSED [RFE] Overview of scheduled (sync) tasks 2021-02-22 00:41:40 UTC
Red Hat Bugzilla 1215484 0 medium CLOSED [RFE] Satellite 6 Synchronization is running but there is no indication of what is being processed | run 2021-02-22 00:41:40 UTC
Red Hat Bugzilla 1216142 0 medium CLOSED [RFE] Improve the API for task management 2021-02-22 00:41:40 UTC

Internal Links: 1197660 1215484 1216142

Description Peter Vreman 2015-02-26 09:49:51 UTC
Description of problem:
The tasks list provides a good overview what is being processed in the background. Also repo syncs are included. But it is unclear what triggered the repo sync. If it was e.g. started from a Sync plan or manual.
It would be good to have an entry in the tasks lists that a Sync plan is being started and finished.


Version-Release number of selected component (if applicable):


How reproducible:


Steps to Reproduce:
1. Create a hourly sync plan to sync a product
2.
3.

Actual results:
Only tasks that repos are sync, there is no reference included that it was started from a scheduled sync plan

Expected results:
Reference included that a sync plan is started&finsihed and which tasks below to the sync plan

Additional info:

Comment 1 RHEL Program Management 2015-02-26 20:17:49 UTC
Since this issue was entered in Red Hat Bugzilla, the release flag has been
set to ? to ensure that it is properly evaluated for this release.

Comment 4 Bryan Kearney 2016-07-08 20:32:11 UTC
Per 6.3 planning, moving out non acked bugs to the backlog

Comment 6 Peter Vreman 2016-12-01 12:56:34 UTC
This is available in 6.2 where there is a parent task and sub tasks.