Description of problem: v7 should provide a way to continue a test run that is incomplete. A test run can be terminated via user intervention, system reboot, etc. A "continue" command could provide a means of continuing the test run. The reboot test needs this feature so that the test run can be continued after reboot. Version-Release number of selected component (if applicable): v7 1.2
Verified that continue command is included in v7-1.2-R23, and works normally after user intervention and system reboot. Move to 'VERIFIED'
An advisory has been issued which should help the problem described in this bug report. This report is therefore being closed with a resolution of ERRATA. For more information on therefore solution and/or where to find the updated files, please follow the link below. You may reopen this bug report if the solution does not work for you. http://rhn.redhat.com/errata/RHBA-2010-0702.html
Technical note added. If any revisions are required, please edit the "Technical Notes" field accordingly. All revisions will be proofread by the Engineering Content Services team. New Contents: The "continue" command has been added to allow a user to continue previously interrupted test.