Bug 690718 - [JBQA-4447] TCMS RFE: "Create Jira" for test case run, "Create tracking Jira" for test case.
Summary: [JBQA-4447] TCMS RFE: "Create Jira" for test case run, "Create tracking Jira...
Keywords:
Status: NEW
Alias: None
Product: TCMS
Classification: Other
Component: Application
Version: Devel
Hardware: Unspecified
OS: Unspecified
unspecified
unspecified
Target Milestone: ---
: 4.0
Assignee: Yang Ren
QA Contact: Nobody
URL:
Whiteboard:
: JBQA-4447 (view as bug list)
Depends On:
Blocks:
TreeView+ depends on / blocked
 
Reported: 2011-03-25 06:24 UTC by Ondřej Žižka
Modified: 2022-03-14 03:25 UTC (History)
3 users (show)

Fixed In Version:
Doc Type: Bug Fix
Doc Text:
Clone Of:
Environment:
Last Closed:


Attachments (Terms of Use)

Description Ondřej Žižka 2011-03-25 06:24:25 UTC
Copying information manually from TCMS to Jira or vice versa is quite cumbersome and tedious.
It would be nice if TCMS was integrated with Jira in the following ways:

1) Test run's case would have a button to create a jira with test's information pre-filled.

    * Title = Test run title + test case title
    * Type Bug
    * Project
    * Affected version
    * A link to TCMS case -> Description or URL
    * A link to TCMS plan -> Description
    * Note -> Description
    * Comments from TCMS case -> Description
    * Reporter = assigned tester
    * Watching = manager
    * Environment = Environment

2) Every Jira created this way would be stored with a test case run and displayed in it as a link.

3) When creating Jira, TCMS would search all the runs of the same case for existing Jiras, and list them to allow choosing one of them to link with the case instead of creating a new one.

4) At the end of the run, there would be a form to create a tracking jira for the run, which would have two options:
a) To create a prefilled jiras for each failing case,
b) To link all jiras already bound with the cases.
The "sub-jiras" would be linked with the tracking jira as "Incorporated by".

5) Tracking jira, similiar to 4), only for a test plan:
Each test run of the given plan is processed as in 4), but the sub-issues are linked with a single tracking jira.

Comment 1 Danqing Li 2011-08-31 06:02:44 UTC
*** Bug 703844 has been marked as a duplicate of this bug. ***

Comment 2 Chaobin Tang 2012-05-23 07:11:20 UTC
Also, the integration would then depend on the support from both side of the system.


Note You need to log in before you can comment on or make changes to this bug.