Hide Forgot
Description of problem: When a new process is created through Guvnor, its package has already been determined. At this stage, the package name should arguably even be immutable. It is currently left to the user to type the package name Version-Release number of selected component (if applicable): ER6 How reproducible: Consistent Steps to Reproduce: 1. Create a new process 2. Observe the package property in the right-side panel Actual results: Package is left empty Expected results: Package would be set to correspond to the enclosing BRMS package Additional info:
https://issues.jboss.org/browse/JBPM-3471 This has been resolved and will be available in Designer 2.1
BRMS 5.3 ER2 still contains designer 2.0. So this fix probably is not included in ER2.