Bug 779418 (SOA-1806) - Defer creation of JMS connection in JmsMessageService and JmsSchedulerService until first use
Summary: Defer creation of JMS connection in JmsMessageService and JmsSchedulerService...
Keywords:
Status: CLOSED NEXTRELEASE
Alias: SOA-1806
Product: JBoss Enterprise SOA Platform 5
Classification: JBoss
Component: JBossESB, Performance
Version: 5.0.0 ER6
Hardware: Unspecified
OS: Unspecified
urgent
urgent
Target Milestone: ---
: 5.0.0 GA,5.0.0 ER7
Assignee: Kevin Conner
QA Contact:
URL: http://jira.jboss.org/jira/browse/SOA...
Whiteboard:
Depends On:
Blocks:
TreeView+ depends on / blocked
 
Reported: 2010-01-08 16:59 UTC by Pavel Macik
Modified: 2010-01-28 11:01 UTC (History)
0 users

Fixed In Version:
Doc Type: Bug Fix
Doc Text:
Clone Of:
Environment:
Last Closed: 2010-01-28 11:01:33 UTC
Type: Bug
Embargoed:


Attachments (Terms of Use)


Links
System ID Private Priority Status Summary Last Updated
Red Hat Issue Tracker SOA-1806 0 None None None Never

Description Pavel Macik 2010-01-08 16:59:43 UTC
Date of First Response: 2010-01-09 03:26:33
project_key: SOA

Comment 1 Kevin Conner 2010-01-08 17:00:10 UTC
Link: Added: This issue depends JBESB-3107


Comment 2 Kevin Conner 2010-01-09 08:26:33 UTC
The change has been made to the ESB codebase, will be in the next merge.

Comment 3 Kevin Conner 2010-01-12 20:59:37 UTC
The performance tests on the qe box do not show a great improvement after this fix, I'll need to do some further investigation in the morning.

I am still doing the ER7 tag tonight however, so that we can get a better view of the other changes.

Comment 4 Kevin Conner 2010-01-13 19:19:48 UTC
Profiling the qe test on ER7 shows a comparable result to the ER5 runs, so perhaps I have misunderstood the output of this test.

Comment 5 Pavel Macik 2010-01-28 11:01:33 UTC
Verified in ER7


Note You need to log in before you can comment on or make changes to this bug.