Bug 1261139 - [GSS](6.4.z) Upgrade PicketLink from 2.5.4.SP7 to 2.5.4.SP8
Summary: [GSS](6.4.z) Upgrade PicketLink from 2.5.4.SP7 to 2.5.4.SP8
Keywords:
Status: CLOSED CURRENTRELEASE
Alias: None
Product: JBoss Enterprise Application Platform 6
Classification: JBoss
Component: PicketLink
Version: 6.4.3
Hardware: Unspecified
OS: Unspecified
unspecified
unspecified
Target Milestone: CR1
: EAP 6.4.8
Assignee: Vladimir Dosoudil
QA Contact: Ondrej Kotek
URL:
Whiteboard:
Depends On: 1282967 1296797 1323281
Blocks: eap648-payload
TreeView+ depends on / blocked
 
Reported: 2015-09-08 16:49 UTC by Brad Maxwell
Modified: 2017-01-17 12:31 UTC (History)
18 users (show)

Fixed In Version:
Doc Type: Bug Fix
Doc Text:
Clone Of: 1234273
Environment:
Last Closed: 2017-01-17 12:31:52 UTC
Type: Component Upgrade
Embargoed:


Attachments (Terms of Use)


Links
System ID Private Priority Status Summary Last Updated
Red Hat Issue Tracker JBEAP-3804 0 Major Closed Upgrade picketlink 2.5.5.SP1 to 2.5.5.SP2 2017-01-17 12:44:25 UTC

Comment 6 Jiří Bílek 2016-05-06 12:22:29 UTC
Verified with EAP 6.4.8.CP.CR2

Comment 7 JBoss JIRA Server 2016-05-25 21:33:03 UTC
Carlo de Wolf <cdewolf> updated the status of jira JBEAP-3804 to Resolved

Comment 8 JBoss JIRA Server 2016-08-23 11:38:33 UTC
Jiri Pallich <jpallich> updated the status of jira JBEAP-3804 to Closed

Comment 9 Petr Penicka 2017-01-17 12:31:52 UTC
Retroactively bulk-closing issues from released EAP 6.4 cumulative patches.


Note You need to log in before you can comment on or make changes to this bug.