Bug 1000198

Summary: Regression bug - Time for overall document completed in a project is incorrect
Product: [Retired] Zanata Reporter: Isaac Rooskov <irooskov>
Component: Component-UIAssignee: Damian Jansen <djansen>
Status: CLOSED WORKSFORME QA Contact: Zanata-QA Mailling List <zanata-qa>
Severity: unspecified Docs Contact:
Priority: unspecified    
Version: 3.0CC: yshao, zanata-bugs
Target Milestone: ---   
Target Release: ---   
Hardware: Unspecified   
OS: Unspecified   
Whiteboard:
Fixed In Version: Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2014-03-10 01:29:28 UTC Type: Bug
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:

Description Isaac Rooskov 2013-08-22 22:34:06 UTC
Description of problem:

When on the page that displays all the documents in a project, the percentage of how much is left to translate of the project is correct, however the time (in hours) now shows up as incorrect. It was correct in the previous version.

Version-Release number of selected component (if applicable):

3.0

How reproducible:

100%

Steps to Reproduce:
1. Go into a project
2. Go to the document level (1 level before the editor)
3. Look at the top right and notice the hours are incorrect

Actual results:

Hours are incorrect, but the percentage is correct.

Expected results:

Correct time is shown.

Additional info:

Comment 1 Damian Jansen 2014-03-10 01:29:28 UTC
Tested, appears to have been fixed by recent changes to stats.