Bug 1000198 - Regression bug - Time for overall document completed in a project is incorrect
Summary: Regression bug - Time for overall document completed in a project is incorrect
Keywords:
Status: CLOSED WORKSFORME
Alias: None
Product: Zanata
Classification: Retired
Component: Component-UI
Version: 3.0
Hardware: Unspecified
OS: Unspecified
unspecified
unspecified
Target Milestone: ---
: ---
Assignee: Damian Jansen
QA Contact: Zanata-QA Mailling List
URL:
Whiteboard:
Depends On:
Blocks:
TreeView+ depends on / blocked
 
Reported: 2013-08-22 22:34 UTC by Isaac Rooskov
Modified: 2015-08-06 05:55 UTC (History)
2 users (show)

Fixed In Version:
Story Points: ---
Clone Of:
Environment:
Last Closed: 2014-03-10 01:29:28 UTC
Embargoed:


Attachments (Terms of Use)

Description Isaac Rooskov 2013-08-22 22:34:06 UTC
Description of problem:

When on the page that displays all the documents in a project, the percentage of how much is left to translate of the project is correct, however the time (in hours) now shows up as incorrect. It was correct in the previous version.

Version-Release number of selected component (if applicable):

3.0

How reproducible:

100%

Steps to Reproduce:
1. Go into a project
2. Go to the document level (1 level before the editor)
3. Look at the top right and notice the hours are incorrect

Actual results:

Hours are incorrect, but the percentage is correct.

Expected results:

Correct time is shown.

Additional info:

Comment 1 Damian Jansen 2014-03-10 01:29:28 UTC
Tested, appears to have been fixed by recent changes to stats.


Note You need to log in before you can comment on or make changes to this bug.