Bug 1019598
Summary: | [RHS-C] Status of the volume in activities column after Stop rebalance should be in sync with gluster CLI output | ||||||
---|---|---|---|---|---|---|---|
Product: | [Red Hat Storage] Red Hat Gluster Storage | Reporter: | Shubhendu Tripathi <shtripat> | ||||
Component: | rhsc | Assignee: | Ramesh N <rnachimu> | ||||
Status: | CLOSED ERRATA | QA Contact: | RamaKasturi <knarra> | ||||
Severity: | medium | Docs Contact: | |||||
Priority: | medium | ||||||
Version: | 2.1 | CC: | dpati, dtsang, knarra, mmahoney, pprakash, rhs-bugs, rnachimu, sdharane, ssampat | ||||
Target Milestone: | --- | Keywords: | ZStream | ||||
Target Release: | RHGS 2.1.2 | ||||||
Hardware: | Unspecified | ||||||
OS: | Unspecified | ||||||
Whiteboard: | |||||||
Fixed In Version: | Cb6 | Doc Type: | Bug Fix | ||||
Doc Text: | Story Points: | --- | |||||
Clone Of: | Environment: | ||||||
Last Closed: | 2014-02-25 07:52:18 UTC | Type: | Bug | ||||
Regression: | --- | Mount Type: | --- | ||||
Documentation: | --- | CRM: | |||||
Verified Versions: | Category: | --- | |||||
oVirt Team: | --- | RHEL 7.3 requirements from Atomic Host: | |||||
Cloudforms Team: | --- | Target Upstream Version: | |||||
Embargoed: | |||||||
Attachments: |
|
Description
Shubhendu Tripathi
2013-10-16 06:48:38 UTC
The above happens when glusterd is made down and rebalance is started, wait for some time and click on rebalance stop it actually stops rebalance and tasks pane shows that task is aborted. The above happens when glusterd is made down and rebalance is started, wait for some time and click on rebalance stop it actually stops rebalance and tasks pane shows that task is aborted. In the above scenario it gives the error attached in the "stoprebalance". This can be verified only when the following BZ : 1015045 is fixed. Created attachment 823945 [details]
Attaching stop rebalance error dialog.
verified and works fine in cb11 rhsc-2.1.2-0.27.beta.el6_5.noarch. When rebalance completes on all the nodes and clicked on stop button, it updates the icon as completed. when glusterd is made down and clicked on stop button, it updates the icon as failed. Doc Text is not required as its a new feature and we already have an RFE Since the problem described in this bug report should be resolved in a recent advisory, it has been closed with a resolution of ERRATA. For information on the advisory, and where to find the updated files, follow the link below. If the solution does not work for you, open a new bug report. http://rhn.redhat.com/errata/RHEA-2014-0208.html |