Bug 1025751
Summary: | Upgrade EAP to 6.1.1 | ||
---|---|---|---|
Product: | [JBoss] JBoss Fuse Service Works 6 | Reporter: | Tomas Rohovsky <trohovsk> |
Component: | Build Process | Assignee: | Julian Coleman <jcoleman> |
Status: | VERIFIED --- | QA Contact: | Matej Melko <mmelko> |
Severity: | high | Docs Contact: | |
Priority: | unspecified | ||
Version: | 6.0.0 GA | CC: | ldimaggi, oskutka, soa-p-jira |
Target Milestone: | ER7 | ||
Target Release: | 6.0.0 | ||
Hardware: | Unspecified | ||
OS: | Unspecified | ||
Whiteboard: | |||
Fixed In Version: | Doc Type: | Bug Fix | |
Doc Text: | Story Points: | --- | |
Clone Of: | Environment: | ||
Last Closed: | Type: | Task | |
Regression: | --- | Mount Type: | --- |
Documentation: | --- | CRM: | |
Verified Versions: | Category: | --- | |
oVirt Team: | --- | RHEL 7.3 requirements from Atomic Host: | |
Cloudforms Team: | --- | Target Upstream Version: | |
Embargoed: |
Description
Tomas Rohovsky
2013-11-01 13:14:59 UTC
I don't control which version of EAP is pulled into FSW, so assigning this to Julian to let him redirect as necessary. All Integration Platform products have been altered to have EAP 6.1.1 as a base. |