Note: This bug is displayed in read-only format because the product is no longer active in Red Hat Bugzilla.

Bug 1076472

Summary: Simulation engine: Process, which contains boundary event which probability is equal to 100, returns incorrect results
Product: [Retired] JBoss BPMS Platform 6 Reporter: Sona Mala <smala>
Component: jBPM DesignerAssignee: Maciej Swiderski <mswiders>
Status: CLOSED CURRENTRELEASE QA Contact: Sona Mala <smala>
Severity: medium Docs Contact:
Priority: high    
Version: 6.0.1CC: kverlaen
Target Milestone: ER1   
Target Release: 6.0.2   
Hardware: Unspecified   
OS: Unspecified   
Whiteboard:
Fixed In Version: Doc Type: Bug Fix
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2014-08-06 19:51:00 UTC Type: Bug
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:
Attachments:
Description Flags
BPMN2 definition none

Description Sona Mala 2014-03-14 12:21:29 UTC
Created attachment 874398 [details]
BPMN2 definition

Version-Release number of selected component (if applicable):
6.0.1 ER2 BPMS


Steps to Reproduce:
1. import attached process
2. run simulation (process instances: 10, Interval: 10)

Actual results:

Task 'A' was executed 30 times.


Expected results:

Task 'A' should be executed 10 times (once for each instance)

Comment 2 Sona Mala 2014-05-05 14:41:56 UTC
Verified for 6.0.2 ER2 BPMS and probability in this set: {100, 30, 0}