Bug 1076472 - Simulation engine: Process, which contains boundary event which probability is equal to 100, returns incorrect results
Summary: Simulation engine: Process, which contains boundary event which probability i...
Keywords:
Status: CLOSED CURRENTRELEASE
Alias: None
Product: JBoss BPMS Platform 6
Classification: Retired
Component: jBPM Designer
Version: 6.0.1
Hardware: Unspecified
OS: Unspecified
high
medium
Target Milestone: ER1
: 6.0.2
Assignee: Maciej Swiderski
QA Contact: Sona Mala
URL:
Whiteboard:
Depends On:
Blocks:
TreeView+ depends on / blocked
 
Reported: 2014-03-14 12:21 UTC by Sona Mala
Modified: 2014-08-06 19:51 UTC (History)
1 user (show)

Fixed In Version:
Clone Of:
Environment:
Last Closed: 2014-08-06 19:51:00 UTC
Type: Bug
Embargoed:


Attachments (Terms of Use)
BPMN2 definition (15.95 KB, application/xml)
2014-03-14 12:21 UTC, Sona Mala
no flags Details

Description Sona Mala 2014-03-14 12:21:29 UTC
Created attachment 874398 [details]
BPMN2 definition

Version-Release number of selected component (if applicable):
6.0.1 ER2 BPMS


Steps to Reproduce:
1. import attached process
2. run simulation (process instances: 10, Interval: 10)

Actual results:

Task 'A' was executed 30 times.


Expected results:

Task 'A' should be executed 10 times (once for each instance)

Comment 2 Sona Mala 2014-05-05 14:41:56 UTC
Verified for 6.0.2 ER2 BPMS and probability in this set: {100, 30, 0}


Note You need to log in before you can comment on or make changes to this bug.