Bug 1178965
| Summary: | Fail fast when using two phase commit with ASYNC backup strategy | ||
|---|---|---|---|
| Product: | [JBoss] JBoss Data Grid 6 | Reporter: | Matej Čimbora <mcimbora> |
| Component: | Infinispan | Assignee: | Tristan Tarrant <ttarrant> |
| Status: | CLOSED UPSTREAM | QA Contact: | Martin Gencur <mgencur> |
| Severity: | unspecified | Docs Contact: | |
| Priority: | unspecified | ||
| Version: | 6.4.0 | CC: | chuffman, jdg-bugs |
| Target Milestone: | --- | ||
| Target Release: | 6.4.1 | ||
| Hardware: | Unspecified | ||
| OS: | Unspecified | ||
| Whiteboard: | |||
| Fixed In Version: | Doc Type: | Known Issue | |
| Doc Text: |
In Red Hat JBoss Data Grid, using the two phase commit with the ASYNC backup strategy results in one phase commit unexpectedly being used instead.
This is a known issue in JBoss Data Grid 6.4 and no workaround is currently available for this issue.
|
Story Points: | --- |
| Clone Of: | Environment: | ||
| Last Closed: | 2025-02-10 03:43:50 UTC | Type: | Bug |
| Regression: | --- | Mount Type: | --- |
| Documentation: | --- | CRM: | |
| Verified Versions: | Category: | --- | |
| oVirt Team: | --- | RHEL 7.3 requirements from Atomic Host: | |
| Cloudforms Team: | --- | Target Upstream Version: | |
| Embargoed: | |||
|
Description
Matej Čimbora
2015-01-05 19:27:05 UTC
Hi Matej, could you please rephrase the description? It is not very clear what the problem is and what you want to achieve. Thanks Hi Martin, my idea was to throw an exception, whenever given example configuration combination is used (as the values do not get replicated to remote site in that case). Currently, user gets no feedback, so it might be pretty confusing. This product has been discontinued or is no longer tracked in Red Hat Bugzilla. |