Bug 1178965 - Fail fast when using two phase commit with ASYNC backup strategy
Summary: Fail fast when using two phase commit with ASYNC backup strategy
Keywords:
Status: CLOSED UPSTREAM
Alias: None
Product: JBoss Data Grid 6
Classification: JBoss
Component: Infinispan
Version: 6.4.0
Hardware: Unspecified
OS: Unspecified
unspecified
unspecified
Target Milestone: ---
: 6.4.1
Assignee: Tristan Tarrant
QA Contact: Martin Gencur
URL:
Whiteboard:
Depends On:
Blocks:
TreeView+ depends on / blocked
 
Reported: 2015-01-05 19:27 UTC by Matej Čimbora
Modified: 2025-02-10 03:43 UTC (History)
2 users (show)

Fixed In Version:
Clone Of:
Environment:
Last Closed: 2025-02-10 03:43:50 UTC
Type: Bug
Embargoed:


Attachments (Terms of Use)


Links
System ID Private Priority Status Summary Last Updated
Red Hat Issue Tracker ISPN-5119 0 Major Resolved Fail fast when using two phase commit with ASYNC backup strategy 2018-02-08 00:35:13 UTC

Description Matej Čimbora 2015-01-05 19:27:05 UTC
Example:
<backup site="LON" useTwoPhaseCommit="true" strategy="ASYNC"/>

From xsd (two-phase-commit):
Whether a backup will use a 2PC cycle for SYNC backups. Defaults to "false". NOTE: Not used for ASYNC backup strategies.

Comment 2 Martin Gencur 2015-01-08 09:29:53 UTC
Hi Matej, could you please rephrase the description? It is not very clear what the problem is and what you want to achieve. Thanks

Comment 3 Matej Čimbora 2015-01-08 09:35:39 UTC
Hi Martin, my idea was to throw an exception, whenever given example configuration combination is used (as the values do not get replicated to remote site in that case). Currently, user gets no feedback, so it might be pretty confusing.

Comment 6 Red Hat Bugzilla 2025-02-10 03:43:50 UTC
This product has been discontinued or is no longer tracked in Red Hat Bugzilla.


Note You need to log in before you can comment on or make changes to this bug.