Bug 1422115

Summary: [Docs][RFE][Admin] New progress indicator to monitor the progress of Move Disk operations
Product: Red Hat Enterprise Virtualization Manager Reporter: Emma Heftman <eheftman>
Component: DocumentationAssignee: Emma Heftman <eheftman>
Status: CLOSED CURRENTRELEASE QA Contact: Tahlia Richardson <trichard>
Severity: unspecified Docs Contact:
Priority: high    
Version: 4.1.0CC: alitke, gklein, lbopf, lsurette, rbalakri, srevivo, trichard, ykaul, ylavi
Target Milestone: ovirt-4.1.1Keywords: FutureFeature
Target Release: ---   
Hardware: Unspecified   
OS: Unspecified   
Whiteboard:
Fixed In Version: Doc Type: If docs needed, set a value
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2017-02-27 07:15:54 UTC Type: Bug
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: Docs RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:
Bug Depends On: 1080379    
Bug Blocks:    

Description Emma Heftman 2017-02-14 13:50:57 UTC
Previously, almost all data path operations on the hosts could only be performed on the elected Storage Pool Manager. This could potentially cause bottlenecks. 
In this release, a new lightweight host jobs management infrastructure was introduced, which enables data path operations to run on any host. In addition, administrators can monitor the progress of Move Disk operations with the aid of a progress indicator.

Comment 1 Lucy Bopf 2017-02-16 04:28:43 UTC
Assigning to Emma for review.

Comment 2 Emma Heftman 2017-02-16 15:01:07 UTC
Adam, I'm trying to document the new progress indicator.
Can you please confirm that in 4.0, the Status column displayed the value Locked during the move procedure, and in 4.1 instead of Locked it will display a percentage of the progress.

I did not find anything documented about this in the feature page.

Comment 4 Adam Litke 2017-02-20 14:52:44 UTC
(In reply to emma heftman from comment #2)
> Adam, I'm trying to document the new progress indicator.
> Can you please confirm that in 4.0, the Status column displayed the value
> Locked during the move procedure, and in 4.1 instead of Locked it will
> display a percentage of the progress.
> 
> I did not find anything documented about this in the feature page.

Yes, this is correct.

Comment 5 Emma Heftman 2017-02-23 10:53:28 UTC
(In reply to Adam Litke from comment #4)
> (In reply to emma heftman from comment #2)
> > Adam, I'm trying to document the new progress indicator.
> > Can you please confirm that in 4.0, the Status column displayed the value
> > Locked during the move procedure, and in 4.1 instead of Locked it will
> > display a percentage of the progress.
> > 
> > I did not find anything documented about this in the feature page.
> 
> Yes, this is correct.

Adam, were you confirming that the documentation is correct?

It seems that you were answering the question, but I went ahead and created the documentation. Please review it and approve.

Comment 6 Adam Litke 2017-02-23 14:21:47 UTC
Sorry for the ambiguity.  I approve the documentation change.

Comment 10 Emma Heftman 2017-02-27 07:15:54 UTC
Link to updated the Administration Guide on the customer portal:

https://access.redhat.com/documentation/en-us/red_hat_virtualization/4.1-beta/html-single/administration_guide/