Bug 1422115 - [Docs][RFE][Admin] New progress indicator to monitor the progress of Move Disk operations
Summary: [Docs][RFE][Admin] New progress indicator to monitor the progress of Move Dis...
Keywords:
Status: CLOSED CURRENTRELEASE
Alias: None
Product: Red Hat Enterprise Virtualization Manager
Classification: Red Hat
Component: Documentation
Version: 4.1.0
Hardware: Unspecified
OS: Unspecified
high
unspecified
Target Milestone: ovirt-4.1.1
: ---
Assignee: Emma Heftman
QA Contact: Tahlia Richardson
URL:
Whiteboard:
Depends On: 1080379
Blocks:
TreeView+ depends on / blocked
 
Reported: 2017-02-14 13:50 UTC by Emma Heftman
Modified: 2019-05-07 13:15 UTC (History)
9 users (show)

Fixed In Version:
Doc Type: If docs needed, set a value
Doc Text:
Clone Of:
Environment:
Last Closed: 2017-02-27 07:15:54 UTC
oVirt Team: Docs
Target Upstream Version:
Embargoed:


Attachments (Terms of Use)

Description Emma Heftman 2017-02-14 13:50:57 UTC
Previously, almost all data path operations on the hosts could only be performed on the elected Storage Pool Manager. This could potentially cause bottlenecks. 
In this release, a new lightweight host jobs management infrastructure was introduced, which enables data path operations to run on any host. In addition, administrators can monitor the progress of Move Disk operations with the aid of a progress indicator.

Comment 1 Lucy Bopf 2017-02-16 04:28:43 UTC
Assigning to Emma for review.

Comment 2 Emma Heftman 2017-02-16 15:01:07 UTC
Adam, I'm trying to document the new progress indicator.
Can you please confirm that in 4.0, the Status column displayed the value Locked during the move procedure, and in 4.1 instead of Locked it will display a percentage of the progress.

I did not find anything documented about this in the feature page.

Comment 4 Adam Litke 2017-02-20 14:52:44 UTC
(In reply to emma heftman from comment #2)
> Adam, I'm trying to document the new progress indicator.
> Can you please confirm that in 4.0, the Status column displayed the value
> Locked during the move procedure, and in 4.1 instead of Locked it will
> display a percentage of the progress.
> 
> I did not find anything documented about this in the feature page.

Yes, this is correct.

Comment 5 Emma Heftman 2017-02-23 10:53:28 UTC
(In reply to Adam Litke from comment #4)
> (In reply to emma heftman from comment #2)
> > Adam, I'm trying to document the new progress indicator.
> > Can you please confirm that in 4.0, the Status column displayed the value
> > Locked during the move procedure, and in 4.1 instead of Locked it will
> > display a percentage of the progress.
> > 
> > I did not find anything documented about this in the feature page.
> 
> Yes, this is correct.

Adam, were you confirming that the documentation is correct?

It seems that you were answering the question, but I went ahead and created the documentation. Please review it and approve.

Comment 6 Adam Litke 2017-02-23 14:21:47 UTC
Sorry for the ambiguity.  I approve the documentation change.

Comment 10 Emma Heftman 2017-02-27 07:15:54 UTC
Link to updated the Administration Guide on the customer portal:

https://access.redhat.com/documentation/en-us/red_hat_virtualization/4.1-beta/html-single/administration_guide/


Note You need to log in before you can comment on or make changes to this bug.