Bug 1478442

Summary: Run Jobs with Future Execution is creating two jobs
Product: Red Hat Satellite Reporter: Curtis Matthews <cmatthew>
Component: Remote ExecutionAssignee: satellite6-bugs <satellite6-bugs>
Status: CLOSED DUPLICATE QA Contact:
Severity: urgent Docs Contact:
Priority: unspecified    
Version: 6.2.10CC: aruzicka, bbuckingham, bkearney, cmatthew, inecas, jhutar
Target Milestone: Unspecified   
Target Release: Unused   
Hardware: Unspecified   
OS: Unspecified   
Whiteboard:
Fixed In Version: Doc Type: If docs needed, set a value
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2017-08-09 18:07:00 UTC Type: Bug
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:

Description Curtis Matthews 2017-08-04 14:41:50 UTC
Description of problem:  When scheduling a job with future execution, two sub-tasks are being created.  Depending on the type of job, this can cause failures.


Version-Release number of selected component (if applicable): 6.2.10


How reproducible:  Can reproduce everytime via the UI or the API.


Steps to Reproduce:
1.  Run job with future execution.
2.  Upon completion, 2 sub-tasks are listed for the same command.
3.

Actual results:  Job is being executed twice.


Expected results:  Job should only be executed once.


Additional info:  Tested this in an environment with 6.2.9 and the problem doesn't exist.

Comment 2 Curtis Matthews 2017-08-04 15:25:20 UTC
Still pulling the requested logs, etc. but this may be a duplicate of bug 1473341 depending on the minor revision.

Comment 4 Curtis Matthews 2017-08-09 18:07:00 UTC
hotfix-1478886 has corrected this issue.

Comment 6 Ivan Necas 2017-09-15 12:43:36 UTC
*** Bug 1491938 has been marked as a duplicate of this bug. ***