Bug 2275965

Summary: "Average" and "Estimated days to fill" are showing a value '0' always in consumption trend.
Product: [Red Hat Storage] Red Hat OpenShift Data Foundation Reporter: Nagendra Reddy <nagreddy>
Component: management-consoleAssignee: Divyansh Kamboj <dkamboj>
Status: CLOSED ERRATA QA Contact: Nagendra Reddy <nagreddy>
Severity: medium Docs Contact:
Priority: unspecified    
Version: 4.16CC: asriram, dkamboj, ebenahar, ebondare, hnallurv, muagarwa, nthomas, odf-bz-bot, sheggodu, skatiyar
Target Milestone: ---   
Target Release: ODF 4.17.0   
Hardware: Unspecified   
OS: Unspecified   
Whiteboard:
Fixed In Version: 4.17.0-89 Doc Type: No Doc Update
Doc Text:
Story Points: ---
Clone Of: Environment:
Last Closed: 2024-10-30 14:27:30 UTC Type: Bug
Regression: --- Mount Type: ---
Documentation: --- CRM:
Verified Versions: Category: ---
oVirt Team: --- RHEL 7.3 requirements from Atomic Host:
Cloudforms Team: --- Target Upstream Version:
Embargoed:
Bug Depends On:    
Bug Blocks: 2272928    

Description Nagendra Reddy 2024-04-18 18:26:55 UTC
Created attachment 2027746 [details]
consumption trend

Description of problem (please be detailed as possible and provide log
snippests):

Storage consumption per day graph is showing the data correctly. I observed "Average" and "Estimated days to fill" is showing a value '0' always.

Please refer attached snapshots for reference.
Version of all relevant components (if applicable):

ODF: 4.16.0-79.stable

OCP: 4.16.0-0.nightly-2024-04-16-195622

Does this issue impact your ability to continue to work with the product
(please explain in detail what is the user impact)?

Yes
Is there any workaround available to the best of your knowledge?


Rate from 1 - 5 the complexity of the scenario you performed that caused this
bug (1 - very simple, 5 - very complex)?


Can this issue reproducible?


Can this issue reproduce from the UI?


If this is a regression, please provide more details to justify this:


Steps to Reproduce:
1.
2.
3.


Actual results:


Expected results:


Additional info:

Comment 5 Divyansh Kamboj 2024-04-19 05:15:19 UTC
in the cluster, there are 3 instances of mgr metrics. which shouldn't happen, in a regular cluster, there are a couple bugs on the ceph sides tracking this
reducing the severity to medium, as in a healthy cluster i can see the values correctly

Comment 10 Nagendra Reddy 2024-04-25 14:05:54 UTC
As part of happy path testing, I never induced any failures for Mgr manually. It happened automatically in background.

Now, as part of this BZ verification I tried to reproduce this BZ by failovering active mgr from 'a' to 'b' and observed that 'average' values went 3 times higher than the total consumption of Raw capacity. Due to this "Estimated days till full" also shown wrong value. Please refer to the sceenshot attached.

Comment 12 Mudit Agarwal 2024-04-25 14:20:05 UTC
This can be a valid bug but IMHO this should not be a happy path blocker (or a test blocker for that matter) where we are failing over the managers.

Comment 19 Sunil Kumar Acharya 2024-08-30 15:19:19 UTC
Please evaluate and provide qa_ack.

Comment 25 errata-xmlrpc 2024-10-30 14:27:30 UTC
Since the problem described in this bug report should be
resolved in a recent advisory, it has been closed with a
resolution of ERRATA.

For information on the advisory (Important: Red Hat OpenShift Data Foundation 4.17.0 Security, Enhancement, & Bug Fix Update), and where to find the updated
files, follow the link below.

If the solution does not work for you, open a new bug report.

https://access.redhat.com/errata/RHSA-2024:8676

Comment 26 Red Hat Bugzilla 2025-02-28 04:25:11 UTC
The needinfo request[s] on this closed bug have been removed as they have been unresolved for 120 days