Bug 1002060 - Unable to add task (User, Script etc.) from Shape Repository if process contains this kind of task
Summary: Unable to add task (User, Script etc.) from Shape Repository if process conta...
Keywords:
Status: CLOSED CURRENTRELEASE
Alias: None
Product: JBoss BPMS Platform 6
Classification: Retired
Component: jBPM Designer
Version: 6.0.0
Hardware: Unspecified
OS: Unspecified
unspecified
high
Target Milestone: ER4
: 6.0.0
Assignee: Tihomir Surdilovic
QA Contact: Sona Mala
URL:
Whiteboard:
Depends On:
Blocks:
TreeView+ depends on / blocked
 
Reported: 2013-08-28 12:18 UTC by Sona Mala
Modified: 2015-04-28 14:44 UTC (History)
2 users (show)

Fixed In Version:
Clone Of:
Environment:
Last Closed: 2014-08-06 20:13:11 UTC
Type: Bug
Embargoed:


Attachments (Terms of Use)
Video file - step to reproduce (3.63 MB, video/webm)
2013-08-28 12:18 UTC, Sona Mala
no flags Details

Description Sona Mala 2013-08-28 12:18:28 UTC
Created attachment 791371 [details]
Video file - step to reproduce

Description of problem:
An user is able to add just one task (User, Script, Send etc.) from Shape Repository. If the user tries to add another task to canvas then Generic Task is added. 


Version-Release number of selected component (if applicable):
BPMS 6.0.0 ER 1

How reproducible:


Steps to Reproduce (see attached video):
1. add two User Tasks to the canvas

Actual results:
The first task has attributes for User Task.
The second one is Generic Task.


Expected results:
Both tasks are User Tasks.

Comment 1 Tihomir Surdilovic 2013-09-03 18:53:58 UTC
fixed on designer master and 6.0.x branches

Comment 5 Sona Mala 2013-10-15 14:29:32 UTC
Verified for ER4


Note You need to log in before you can comment on or make changes to this bug.