Description of problem: When creating a new process in the Designer, the canvas should have a simple start node already present, since this is something every user will have to do.
added start node to the default bpmn2 for new processes. fix in designer master and 6.0.x branch
*** Bug 1014359 has been marked as a duplicate of this bug. ***
Verified with BPMS 6.0.0 ER4