Description of problem: This bug tracks the progress of the 2.7.0 Release Notes. As I mentioned in the Engineering meeting on Monday, July 28th, these notes will need to be completed a week earlier than usual in the release cycle, as I'm going on vacation the week they would typically be finalized. In the Engineering meeting Monday, these Major Enhancements were identified as needing documentation: Easy ISOs page redesign (98685) Rollback (86858) Default System Group (91969) Delete User button - maybe (91972) In addition, Greg D. says we may need Satellite Release Notes this release, as well. I will need to know shortly. Version-Release number of selected component (if applicable): How reproducible: Steps to Reproduce: 1. 2. 3. Actual results: Expected results: Additional info:
I've completed the first draft of these notes, which can be seen here: http://intranet.corp.redhat.com/redhat/images/wiki/RHnRel270.html I have distributed them for input from Engineering. They will be finalized shortly.
These are now done and checked into CVS. See internal version here: http://intranet.corp.redhat.com/redhat/images/wiki/RHnRel270.html
Looks good.
Docs looks good in prod.