Description of problem: Need to upgrade JBoss Negotiation for EAP 6.2 CP2 to include a fix for SECURITY-795
The fix for the following bug needs to be included in EAP 6.3 https://bugzilla.redhat.com/show_bug.cgi?id=1065515 https://issues.jboss.org/browse/SECURITY-795
The comment above should say EAP 6.2 cp2
Darran Lofthouse <darran.lofthouse> updated the status of jira SECURITY-795 to Resolved
Here is the tag: - https://github.com/wildfly/jboss-negotiation/tree/security-negotiation-2.2.7.Final
Verified on EAP 6.2.2.CR2.