Description of problem: Can we add a link to all changes needed to be done for Neutron either above or below the service upgrade in the service order section? (depending if we need to do them before or after the upgrade) Version-Release number of selected component (if applicable): https://documentation-devel.engineering.redhat.com/site/documentation/en-US/Red_Hat_Enterprise_Linux_OpenStack_Platform/5/html/Upgrade_Guide/sect-Method_-_Upgrade_Service-by-Service_with_Live_Compute_Upgrade.html How reproducible: Steps to Reproduce: 1. upgrade service by service with live compute 2. 3. Actual results: neutron has a lot of manual configuration but it's not clear when following the upgrade procedure. Expected results: can we add a link to network changes needed to the service by service order table: https://documentation-devel.engineering.redhat.com/site/documentation/en-US/Red_Hat_Enterprise_Linux_OpenStack_Platform/5/html/Upgrade_Guide/sect-Method_-_Upgrade_Service-by-Service.html#Service_Upgrade_Order_and_Instructions Additional info:
This bug is being assigned to Martin Lopes, who is the designated docs specialist for VMware integration.
Correction - Neutron; not VMware integration.