Description of problem: In previous version of JBoss ON (3.1.2), server group resource methods: stop, start and restart, did not require any parameter. In the latest JBoss ON 3.2.x, all of them require "response timeout" parameter but this is not documented in the Complete Resource Reference document [1]. Changes like this, made in the rhq-plugin.xml file should be picked up and documented properly. [1] https://access.redhat.com/documentation/en-US/Red_Hat_JBoss_Operations_Network/3.2/html/Complete_Resource_Reference/JBossAS7-JBossAS7_Host_Controller.html#JBossAS7-JBossAS7_Host_Controller-ServerGroup Version-Release number of selected component (if applicable): How reproducible: Steps to Reproduce: 1. 2. 3. Actual results: Expected results: Additional info:
Will need to verify this in the Resource Reference Guide for 3.3 to ensure it has been corrected.
Taking ownership of JON docs bugs.
Can be checked and corrected once the Complete Resource Reference is building again, hence the depends on https://bugzilla.redhat.com/show_bug.cgi?id=1324786.
Issue still present in new version of the Complete Resource Reference. Not sure what would be required to fix this.
Created attachment 1341236 [details] experimental signature
Created attachment 1341237 [details] rhq git patch for experiment
Agreed, changing component to productization and assigning to Simeon
Triage: Larry, Simeon, Filip - JON is already in migration support phase, we are still far from proper solution -> closing as wont fix.