Bug 1218874
| Summary: | [New] - Editing a snapshot schedule gives Operation Cancelled and the edit snapshot schedule hangs | ||
|---|---|---|---|
| Product: | [Retired] oVirt | Reporter: | RamaKasturi <knarra> |
| Component: | ovirt-engine-webadmin | Assignee: | Shubhendu Tripathi <shtripat> |
| Status: | CLOSED CURRENTRELEASE | QA Contact: | Arthy Loganathan <aloganat> |
| Severity: | high | Docs Contact: | |
| Priority: | medium | ||
| Version: | 3.6 | CC: | aloganat, bugs, ecohen, gklein, lsurette, mgoldboi, rbalakri, sabose, yeylon |
| Target Milestone: | --- | ||
| Target Release: | 3.6.0 | ||
| Hardware: | Unspecified | ||
| OS: | Unspecified | ||
| Whiteboard: | gluster | ||
| Fixed In Version: | ovirt-3.6.0-alpha1.2 | Doc Type: | Bug Fix |
| Doc Text: | Story Points: | --- | |
| Clone Of: | Environment: | ||
| Last Closed: | 2015-11-04 11:31:46 UTC | Type: | Bug |
| Regression: | --- | Mount Type: | --- |
| Documentation: | --- | CRM: | |
| Verified Versions: | Category: | --- | |
| oVirt Team: | Gluster | RHEL 7.3 requirements from Atomic Host: | |
| Cloudforms Team: | --- | Target Upstream Version: | |
| Embargoed: | |||
| Bug Depends On: | |||
| Bug Blocks: | 1187461 | ||
Should "start at" be validated at all? Removed the un-necessary start at validations Verified the fix in build, ovirt-engine-3.6.0-0.0.master.20150520172338.git652fdb6.el6.noarch It works fine. oVirt 3.6.0 has been released on November 4th, 2015 and should fix this issue. If problems still persist, please open a new BZ and reference this one. |
Description of problem: When user tries to edit a snapshot schedule, it says Operation cancelled with error while executing action: Cannot create ${type}. The value of start date is before current date and clicking on the close button results in the hang of edit snapshot scheduling dialog. Version-Release number of selected component (if applicable): ovirt-engine-3.6.0-0.0.master.20150429182702.git939c2e8.el6.noarch How reproducible: Always Steps to Reproduce: 1. Try creating a snap and schedule it. 2. while scheduling leave all the defaults 3. Now try to edit the schedule. Actual results: UI displays operation cancelled message with Error while executing action and the edit snapshot schedule hangs. Expected results: User should be able to edit the snapshot schedule . Additional info: